GOVERNMENT OF PAKISTAN
Ministry of Communication
BIDDII{G DOCUMENT
(Volume- I)
FOR
PACKAGE-4
CONSTRUCTIONOF RIVER
TRAINING & PROTECTIOI{ WORKS
(CONSISTINGOF GUIDE BANKS,
GUNDA BUNDSAND CUNETTE)
OF SHAHEED BEI{AZIRBHUTTO BRIDGE
OVER RIVER INDUS CONNECTING
CHACHRAN SHARIF WITH KOT MITHAN.
(SingleStageTwo EnvelopeBidding Procedure)
JAI{UARY.2OI4
IBiinn'vrri$r.,..Avs
Index
TABLE OF CONTENTS
Description
INSTRUCTIONS TO BIDDERS
A
GENERAL
Scope of Bid
Source of Funds
Eligible Bidders
One Bid per Bidder
Cost of Bidding
Site Visit
BIDDING DOCUMENTS
Contents of Bidding Documents
Clarification of Bidding Documents
Amendment of Bidding Documents
PREPARATION OF'BIDS
Language of Bid
Documents Comprising the Bid Submission
Bid Prices
Currencies of Bid and Pavment
Bid Validity
Bid Security
Alternative Proposals by Bidders
Pre-Bid Meeting
Format and Signing of Bid
STAGE
TWO
of GuideBanks,GundaBundsand
Works(Consisting
of RiverTraining& Protection
Package-4:
Construction
Sharifwith Kot Mithan.
Chachran
BenazirBhuttoBridgeoverRiverIndusCorrnecting
Cunette)
of Shaheed
Index
AWARD OF CONTRACT
Award
Employer's Right to Accept any Bid and to Reject any or all
Bids
Notification of Award
Performance Security (Bond)
Signing of Contract Agreement
General Performance of the Bidders
Integrity Pact
Instructions not Part of Contract
BIDDING DATA
1.1
1.1
2.r
3
7.t
8.1
10.1
11.1
13.1
14.T
15.1
15.2
t7.l
17.4
18.4
19.2 (a)
re.2(bl
20.1 (a)
23.1
32.r
k
F
Index
Appendix-G to Bid
Appendix-H to Bid
Appendix-I to Bid
Appendix-J to Bid
Appendix-K to Bid
Appendix-L to Bid
Appendix-M to Bid
Appendix-N to Bid
Appendix-O to Bid
Appendix-P to Bid
FORMS
BID SECURITY
PERFORMANCE SECURITY
CONTRACT AGREEMENT
CREDIT LINE FACILITY
MOBILIZATION ADVANCE GUARANTEE / BOND
\,/
t.'t.,.r)*
\:1,:l-t,:.
/':
:::
ofGuide Banks,GundaBundsand
Construction
ofRiver Training& ProtectionWorks(Consisting
Package-4:
BenazirBhuttoBridgeoverRiver IndusConnectingChachranSharifwith Kot Mithan.
Cunette)of Shaheed
i
I :r ij
Instructions To Bidders
nNSTRUCTtrQ.NS
TO
BNDDERS
Package-4:Construction of River Training & ProtectionWorks (Consisting of Guide Banks, Gunda Bunds and
Cunette)ofShaheed Benazir Bhutto Bridge over River Indus Connecting ChachranSharifwith Kot Mithan.
(1)
Instructions
To Bidders
INSTRUCTIONS TO BIDDERS
(Note:TheseInstructions to Bidders along with Bidding Data Sheet will
not be part of the Contract and will cease to have effect once the
contract is signed.)
A.
GENERAL
I B . 1 Scope of Bid
1.1
I.2
lf'.2
Source of Funds
2.I
IB.3
Eligible Bidders
3.1
a.
tf'}'
'
t::,il;..-.--'1
"tj.,'',*i,...,1,-,1,,
Package-4:Constructionof River Training & ProtectionWorks (Consistingof Guide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
Instructions To Bidders
The bidders shall bear all costs associated with the preparation
and submission of their respective bids and the Employer will in
]ro case be responsible or liable for those costs, regardless of the
conduct or outcome of the bidding process.
The bidders are advised to visit and examine the Site of Works and
its surroundings and obtain for themselves on their own
responsibility all information that may be necessary for preparing
the bid and entering into a contract for construction of the Works.
Al1 cost in this respect shall be at the bidder's own expense.
6.2
B.
BIDDING DOCUMENTS
Package-4:Construction of River Training & ProtectionWorks (Consisting of Guide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over fuver Indus ConnectingChachranSharif with Kot Mithan.
Instructions
7.2
To Bidders
9.2
9.3
C.
PREPARATION OF'BIDS
und..i';,,"-.,..
Package-4:Construction of River Training & Protection Works (Consisting of Guide Banks,.Gu,ndaB-unds
". .-:
t,'
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
,.,
.
Instructions To Bidders
(b)
(c)
venture;
Package-4:Construction of River Training & ProtectionWorks (Consistingof Guide Banks, Gunda Bunds ahd. .
Cunette)ofShaheed Benazir Bhutto Bridge over River Indus ConnectingChachranSharifwith Kot Mithan.
Instructions
To Bidders
(d)
(e)
11.3 The Bidder shall furnish, as part of the Technical Bid, a Technical
Proposal including a statement of work methods, equipment,
personnel, schedule and any other information as stipulated
Bidding Forms, in sufficient detail to demonstrate the adequacy of
the Bidders' proposal to meet the work requirements and the
completion time referred to in Sub-Clause 1.2 hereof.
TB.t2 Bid Prices
T 2 . T Unless stated otherwise in the Bidding Documents, the Contract
shall be for the whole of the Works as described in IB 1.1 hereof,
based on the unit rates ar:d / or prices submitted by the bidder.
12.2 The bidders shall fill in rates and prices for all items of the Works
described in the Bill of Quantities. Items against which no rate or
price is entered by a bidder will not be paid for by the Employer
when executed and shall be deemed covered by rates and prices for
other items in the Bill of Quantities.
I2.3 A11duties, taxes and other levies payable by the Contractor under
the Contract, or for any other cause, as on the date 28 days prior
to the deadline for submission of bids shall be included-'i{r,..dhe
-.
rates and prices and the total Bid Price submitted by
, a bid;.d-eil-,,-;':
..,.
t;i-,/t_
&
b
::-q-
-a,..-.,.+u',.,!
and ,:,
Works
Training
l f a l n m g d , l&
j f oProtection
rcCtlonwOrK
S ( L O n S(Consisting
l S L l n g o l L t u l qof
e DGuide
4 I l K s > uBanks,
u l l u 4 D uGunda
I l u s 4 l u ' Bunds
.:...:.
Package-4:
l'ackage-4: U
Construction
O n S t r U C n O n Oof
I KRiver
lvef
ttQof ShaheedBenazir Bhutto Bridge over fuver Indus ConnectingChachranSharif with Kot Mithan.
..i.4.,-1.,'
\..;3.';"f,;
i..:^..;-,j:(6)
Instructions
To Bidders
,ro Cu""ebe more than the original bid valtliti:Brid: The request
,!
i,.rl V
'"'''.
\=" j',:
..
"t,p
of GuideBariid;.Gr
Works(Consisting
F;;d;;-r, a;truction of niuer Training& Protection
Sharifwith
Chachran
BenazirBhuftoBridgeoverRiverIndusConnecting
Cunette)ofShaheed
.t',.,;'i
Instructions To Bidders
(b)
If the bidder does not accept the correction of his Bid Price
pursuant to IB 27.2 hereof; or
-In the case of successful bidder, if he fails within the
specified time limit to:
(c)
(i)
(ii)
(iii)
Package-4:Construction of River Training & ProtectionWorks (Consistingof Guide Banks, Gunda Bunds
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharifwith Kot Mithan
(8)
Instructions
To Bldders
L6.2
I7.2
17.3
17.4
will
not
for
Package-4:Construction ofRiver Training & ProtectionWorks (Consisting ofGuide Banks, Gunda Bunds
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan
(e)
Instructions To Bidders
I8.4
The Bidder shall prepare one original of the Technical Bid and one
original of the Price Bid comprising the Bid as described in
Bidding Data Sheet against IB 11 and clearly mark it .ORIGINAL TECHNICAL BID" and "ORIGINAL - PRICE BID". In addition, the
Bidder shall submit two (2) copies of the Bid and clearly mark
each of them "COPY." In the event of any discrepancy between the
original and the copies, the original shall prevail.
18.5
The original and all copies of the Bid shall be typed or written in
indelible ink and shall be signed by a person duly authorized lo
sign on behalf of the Bidder. This authorization shall consist of a
written confirmation as specified in the Bidding Data Sheet and
shall be attached to the bid. The name and position held by each
person signing the authorization must be typed or printed below
the signature. A11pages of the Bid, except for unamended printed
literature, shall be signed or initialed by the person signing the
bid.
Instructions To Bidders
D.
19.2
(b)
(c)
(b)
19.3
I9.4
20.r
(a)
rtltt^1
'$;t{
Package-4:Construction of River Training & ProtectionWorks (Consisting of Guide Banks, Gunda Bunds
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
Instructions
To Bidders
2O.2 The Employer ffiay, at his discretion, extend the deadline for
submission of Bids by issuing a-rlamendment in accordance with
Clause IB.9, in which case all rights and obligations of the
Employer and the bidders previously subject to the original
deadline will thereafter be subject to the deadline as extended.
lB.2t Late Bids
2I,
(a)
(b)
Any bidder may modify, substitute or withdraw his bid after bid
submission provided that the modification, substitution or written
notice of withdrawal is received by the Employer prior to the
deadline for submission of bids.
Package-4:Constructionof River Training & ProtectionWorks (Consistingof Guide Banks, Gunda Bunds and
Cunette)ofShaheed Benazir Bhutto Bridge over River Indus ConnectingChachranSharifwith Kot Mithan.
(r2)
Instructions To Bldders
Package-4:Construction of River Training & ProtectionWorks (Consistingof Guide Banks, Gunda Bunds
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan
(13)
Instructions To Bidders
23.6 a)
b)
23.7
of Technical Bids
qualification
and
shall
first
examine
The Employer
experience Data as per appendix M and N submitted by the
Bidder. The technical proposal examination of those bidders
only shall be taken in hand who meet the minimum
requirement as mentioned in appendix M and N. Only
substantially responsive qualification shall be considered for
further evaluation.
The Employer shall examine the Technical Bid to confirm
that all the documents have been provided, and to determine
the completeness of each document submitted.
and
that all the documents
shall confirm
The Employer
information have been provided for evaluation of Technical bid as
required under these bidding documents.
23.8 At the end of the evaluation of the Technical Bids, the Employer
will invite only those bidders who have submitted substantially
responsive Technical Bids and who have been determined as being
qualified for award to attend the opening of the Price Bids.
The date, time, and location of the opening of Price Bids will be
advised in writing by the Emptroyer. Bidders shall be given
reasonable notice for the opening of Price Bids.
23.9 The Employer will notify Bidders in writing who have been
on the grounds of their Technical Bids being subs
responsive to the requirements of the Bidding
\ \r'i.
! r:{
Package-4:Construction of River Training & ProtectionWorks (Consisting of Guide Banks, Gunda Bunds i
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharifwith Kot Mithan.
(r4)
Instructions To Bidders
return their Price Bids unopened before inviting others, who are
determined as being qualified, to attend the opening of Price Bids.
23.LO The Employer shall conduct the opening of Price Bids of all Bidders
who submitted substantially responsive Technical Bids, publically
in the presence of Bidders- representatives who choose to attend at
the address, date and time specified by the Employer. The Bidder's
representatives who are present shall be requested to sign a
register evidencing their attendance"
23.1IA11 envelopes containing Price Bids shall be opened one at a time
and the following read out and recorded:
(a)
(b)
(c)
The Bid
alternative
(d)
Prices, including
offers; and
as the
any
Employer
discounts
may
and
consider
Only Price Bids and discounts, read out and recorded during the
opening of Price Bids shall be considered for evaluation. No Bid
shall be rejected at the opening of Price Bids.
23.L2If this Bidding Document allows Bidders to quote separate prices
for different contracts, and the award to a single Bidder of multiple
contracts, the methodology to determine the lowest evaluated price
of the contract combinations is that which is most economicai to
the Employer.
18.24 Process to be Confidential
24.I
fiF
Package-4:Construction ofRiver Training & ProtectionWorks (Consisting ofGuide Banks, Gunda Bunds and
Cunette) of ShaheedBenazir Bhutto Bridge over fuver Indus ConnectingChachranSharif with Kot Mithan.
"
Instructions
To Bidders
later than fifteen (15) days after the announcement of the bid
evaluation report. However mere fact of lodging a complaint shal1
not warrant suspension of the procurement process.
18.25 Clarification of Bids
25.I
25.2 If a Bidder does not provide clarifications of its Bid by the date and
time set in the Employer's request for clarification, its bid may be
rejected.
18.26 Examination
of Responsiveness
Package-4:Constructionof River Training & Protection Works (Consisting of Guide Banks, Gunda Bunds and
Cunefte)ofShaheed Benazir Bhutto Bridge over River Indus ConnectingChachranSharifwith Kot Mithan.
(16)
Instructions
To Bidders
27.2
(b)
The amount stated in the Letter of Price Bid will be adjusted by the
Employer in accordance with the above procedure for the
correction of errors and with the concurrence of the bidder, shall
be considered as binding upon the bidder. If the bidder does not
accept the corrected Bid Price, his Bid will be rejected, and the Bid
Security shall be forfeited in accordance with I8.15.6 (b) hereof.
18.28 Evaluation
and Comparison
of Bids
28.I
The Employer will evaluate and compare only the Bids determined
to be substantially responsive in accordance with Clause 18.26.
28.2
In evaluating the Bids, the Employer will determine for each Bid
the evaluated Bid Price by adjusting the Bid Price as follows:
(a)
(b)
(c)
i.
(:. 1
. ,,].
\"$
Package-4:ConstructionofRiver Training & ProtectionWorks (ConsistingofGuide Banks,Gunda Bunds and
Cunette)ofShaheed Benazir Bhutto Bridge over River Indus ConnectingChachranSharifwith Kot Mithan.
Instructions
To Bidders
AWARD OF CONTRACT
18.29 Award
29.1 Subject to Clauses IB.30 and 18.34, the Employer will award the
Contract to the bidder whose bid has been determined to be
substantially responsive to the Bidding Documents and who has
offered the lowest evaluated Bid Price, provided that such bidder
has been determined to be eligible in accordance with the
provisions of Clause IB.3 and qualify pursuant to IB 29.2.
29.2 The Employer, at any stage of the bid evaluation, having credible
reasons for or prima facie evidence of any defect in bidder's
bidders to provide information
capacities, mdy require the
concerning their professional, technical, financial, legal or
managerial competence whether already pre-qualified or not:
Provided that such qualification shall only be laid down after
recording reasons in writing. They shall form part of the records of
that bid evaluation report.
IB.3O Employer's Right to Accept any Bid and to Reject any or all
Bids
30.1 Notwithstanding Clause 18.29, the Employer reserves the right to
accept or reject any Bid, and to annul the bidding process and
reject all bids, at any time prior to award of Contract, without
thereby incurring any liability to the affected bidders or any
obligation except that the grounds for rejection of all bids shall
upon request be communicated to any bidder who sltb5nitted a
bid, without justification of grounds. Rejection of all.h'idS.shall'be
notified to all bidders promptly.
'
t'i"v
,!i.:.:
,,ili,j.' \.
, ,li,
Package-4:Constructionof River Training & ProtectionWorks (Consistingof Guide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
(18)
Instructions To Bidders
3I.2
31.3 The notification of award and its acceptance by the bidder will
constitute the formation of the Contract, binding the Employer
and the bidder till signing of the formal Contract Agreement.
3L4
Package-4:ConstructionofRiver Training & ProtectionWorks (Consistingof Guide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
(le)
Instructions To Bidders
Package-4:Construction of River Training & ProtectionWorks (Consisting of Guide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
(20)
Bidding
BIDDINGDATA
,a\
x-)
Package-4:Construction of River Training & ProtectionWorks (Consisting of Guide Banks, Gunda Bunds and
Cunette)ofshaheed Benazir Bhutto Bridge over River Indus ConnectingChachranSharifwith Kot Mithan
'
Data
Biddiug
Data
Bidding Data
The following specific data for the Works to be bided shall complement,
amend or supplement the provisions in the Instructions to Bidders.
Wherever there is a conflict, the provisions herein shall prevail over those
in the Instructions to Bidders.
Instructions to Bidders
Clause Reference
1.1
1.1
2.L
of Financing/Funding
Agency:
the
Eligible Bidders
Sub-clause 3.1a is deleted in its entirety
following;
3.1a. Firms who fulfill all the requirements stated below shall be eligible
for bidding;
Package-4:Construction ofRiver Training & ProtectionWorks (ConsistingofGuide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
(22)
Bidding
Data
ii)
iii)
iv)
v)
In case of joint venture, the Lead Partner must fulfill at least 70 V"
of the above conditions mentioned in Clause-3.1a (ii), (iii) and (iv)
and must have 50o/o or more share in the Joint Venture (JV)
agreement, while the other members of the JV must fulfill the
aforementioned criteria with respect to its share in the JV
Agreement. However, if any one partner alone fulfills the condition
in IB-3.1a (ii) above, then the other partner(s) are not required to
fulfill the condition of IB-3.1a (ii).
7.L
Volume - I
o
Instructions to Bidders:
.
Bidding Data Sheet;
o
Forms of Bid;
.
Appendicesto Bid (A, C, D, E, ...P to Bid);
.
Form of Bid Security;
o
Forms of Performance Security;
Package-4:Construction ofRiver Training & ProtectionWorks (Consisting ofGuide Banks, Gunda Bunds and
Cunette)ofShaheed Benazir Bhutto Bridge over River Indus Connecting ChachranSharifwith Kot Mithan.
Bidding
o
.
.
8.1
Data
b.
Volume - II
o
NHA General Specifications (December 1998) and
Addenda /Credenda to Specifications 1998.
c.
Volume - III
.
Tender Drawings
20rrl;
(h) Joint Venture/ Operation Agreement (if applicable);
(i) Pending litigation information;
(')
Special Stipulations (as filled by.the Employer) (appendix-A);
(appendix-p.)-;,-.
(k) Proposed Construction Schedule
(U
Package-4:Construction of River Training & ProtectionWorks (Consisting of Guide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus Connecting ChachranSharif with Kot Mithan.
fL:"f!"i
(24)
Bidding
(m)
(n)
(o)
(p)
(q)
(r)
(appendix-G);
(appendix-H);
(appendix-I);
(appendix-K);
(appendix-L);
(appendix-M);
(appendix-N);
(appendix-O);
(appendix-P)
Data
B) the
(appendix -C);
(appendix -D);
(appendix -J)
1 1 . 1( c l
Technical Bid (Envelop - Af details
o Written confirmation (Power of Attorney) authorizing
to submit the bid:
a person
authorizins
the
Package-4:Construction of River Training & ProtectionWorks (Consisting of Guide Banks, Gunda Bunds and
Cunette) ofShaheed Benazir Bhutto Bridee over River Indus Connectins ChachranSharifwith Kot Mithan.
Bidding
Data
b)
c)
d)
i;,1:./v
Package-4:Construction of River Training & Protection Works (Consisting ofGuide Banks, Gunda Bunds and
Cunette)ofShaheed Benazir Bhutto Bridge over River Indus ConnectingChachranSharifwith Kot Mithan.
'\,
Bidding
Data
ii.
111.
Foreign JV representation
confirmation of JV.
shall
be
ensured
for
Cash Flow
Capacity to have cash flow reasonably enough to meet
the cash flow requirements of the said work which is:
Rs. 3OO Million.
Min
Cash
Flow
I' :
Package-4:Constructionof River Training & ProtectionWorks (Consistingof Guide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
':
(27)
Bidding Data
b)
o Joint Venture/Operation
Agreement:
a)
b)
regarding
iajs',-
Package-4:Construction ofRiver Training & ProtectionWorks (ConsistingofGuide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
Bidding Data
(a)
(b)
(c)
(d)
(e)
Package-4:Construction ofRiver Training & ProtectionWorks (ConsistingofGuide Banks, Gunda Bunds and
Cunette)ofShaheed Benazir Bhutto Bridge over River Indus ConnectingChachranSharifwith Kot Mithan.
Biddtng
Financial Competence
(Appendix-Mtobid):
and
Access
to financial
Data
Resources
Oualification
(App
;;+ j:i i
Package-4:Construction of River Training & ProtectionWorks (ConsistingofGuide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharifwith Kot Mithan.
*/ir:
r'tl':,:','
.t<"86
Bidding Data
Bid).
The Key Staff and their minimum qualification are as follows:
a)
c)
d)
e)
05 years
projects.
of
:i::
t:.. .
'i::,''1,
.. '-
Package-4:Construction ofRiver Training & ProtectionWorks (Consisting ofGuide Banks, Gunda Bunds and
Cunette)ofShaheed Benazir Bhutto Bridge over River Indus Connecting ChachranSharifwith Kot Mithan.
(31)
Biddtng Data
s)
h)
Surve.'rors(3 Nos)
B. Sc. (Civil Engg.) having minimum O5 years working
experience in road project.
OR
i)
08
years working
Package-4:Construction of River Training & ProtectionWorks (Consistingof Guide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharifwith Kot Mithan.
(32)
Bidding Data
Package-4:Constructionof River Training & ProtectionWorks (Consistingof Guide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
(33)
Bidding Data
'''
Package-4:Constructionof River Training & ProtectionWorks (Consistingof Guide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
\F'1
Bidding
L9.2lal
Data
Package-4:Construction ofRiver Training & ProtectionWorks (Consisting ofGuide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharifwith Kot Mithan.
(3s)
FORMOF BID
AND APPENDIGES
Package-4:Constructionof River Training & ProtectionWorks (Consisting of Guide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
Letters of TechnicalBid.l
Package-4:Construction ofRiver Training & ProtectionWorks (Consistingof Guide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
(?1\
Letters
of Technlcal
to Bid
LTB-I,
Letter of Technical
Bid
Bid ReferenceNo:
Package-4: Construction of River Training & Protection Works
(Consisting of Guide Banks, Gunda Bunds and Cunette) of Shaheed
Benazir Bhutto Bridge over River Indus Connecting Chachran Sharif
with Kot Mithan.
To:
We, the undersigned, declare that:
(a)
(38)
LTB-2
We agree to permit Employer or its representative to inspect
our accounts and records and other documents relating to the
bid submission and to have them audited by auditors. This
permission is extended for verification of any information
provided in our Technical Bid which comprises all documents
enclosed herewith in accordance with 18.11.1 of the Bidding
Data Sheet.
Name
In the capacity of
Signed
Package-4:Construction of River Training & ProtectionWorks (Consistingof Guide Banks, Gunda Bunds and
Culette) of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
(3e)
LPB- 1
Letter of Price Bid
Date:
Bid ReferenceNo:
Package-4: Construction of River Training & Protection Works
(Consisting of Guide Banks, Gunda Bunds and Cunette) of Shaheed
Benazir Bhutto Bridge over River Indus Connecting Chachran Sharif
with Kot Mithan.
(b) The total price of our Bid, excluding any discounts offered in
item (c) below is:
Rs.
(c)
The discounts
application are:
offered
and
the
methodology
for
their
Rs....
(d) Our Bid shall be valid for a period of 12O days from the date
fixed for the bid submission deadline in accordance with the
Bidding Documents, and it shall remain binding upon us and
may be accepted at any time before the expiration of that
period;
(e)
to obtain a performance
(0
Package-4:Construction ofRiver Training & ProtectionWorks (Consisting ofGuide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over fuver Indus Connecting ChachranSharif with Kot Mithan.
(40)
LPB-2
constitute a binding contract between us, until a formal
contract is prepared and executed and we do hereby declare
that the Bid is made without any collusion, comparison of
figures or arrangement with any other bidder for the Works.
(g) We understand that you are not bound to accept the lowest
evaluated bid or any other bid that you may receive.
(h) We agree to permit Employer or its representative to inspect
our accounts and records and other documents relating to the
bid submission and to have them audited by auditors. This
permission is extended for verification of afry information
provided in our Technical Bid which comprises all documents
enclosed herewith in accordance with 18.11.1 of the Bidding
Data Sheet.
(i)
Name
In the capacity of
Signed
Duly authorized to sign the Bid for and on behalf of ....
Date
Address.
:
i ,.-:
^,f
Package-4:Construction of River Training & ProtectionWorks (Consisting of Guide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharifwith Kot Mithan.
(41)
,,',tir'
Appendix-A to Bid
SPECIAL STIPULATIONS
Clause
Conditions of Contract
1.
2.1
2.
10.1
ro.2
3.
4.
5.
6.
23.2
41.1
43.1
48.2
7"
a) Amount of Liquidated
Damages
47.7
b) Amount of Bonus
47.3
8.
48.1
9.
48.2
10.
49.r
60.2
r2
60.2
Limit of Retention
Money
Package-4:Construction ofRiver Training & ProtectionWorks (Consisting ofGuide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
(42)
13.
14.
15.
t6.
60.2
6 0 . 1 0 42 days
lOo/o of Contract Price stated in the
of Acceptance
excluding
orovisional sums.
from
The
Effective
2nd IPC.
Advance
shall
be
Mobilization
recovered in installments in such a
way that the whole amount should
60.13
be recovered upto last Interim
Payment Certificate or one month
before the stipulated Completion
Time whichever comes earlier.
60.12 Letter
Package-4:Construction ofRiver Training & ProtectionWorks (Consisting ofGuide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus Connecting ChachranSharif with Kot Mithan.
(43)
Appendix-B to Bid
FOREIGN CURRENCY REQUIREMENTS
1.
2.
excluding Provisional Sums
3.
nt in Pak. Ruoees
Australian
Euro
Jap
U.K.
U.S.
Package-4:Construction ofRiver Training & ProtectionWorks (ConsistingofGuide Banks, Gunda Bunds and
Cunette)ofShaheed Benazir Bhutto Bridge over River Indus ConnectingChachranSharifwith Kot Mithan.
(44)
3
CCINSTR.UTTI&?{*F SAEX&&fr E&NA,ZTR8$TJr?Ag]q.IrGtr
*yfi&, x{tlER gJyt$s
OAf&C?JJIft
CGrVf.*dCT.4 .ftWE&
"R"4#*'ia#
Airu? Ftr#f$C?t#?f
MXrKT* N
s.r#iaK$
-4f;f;9,Y8{&s-*qFIe
STT{&frULE $F ,SPECIF-IEDTfiATEE./I'T-S
FOR
It*rn
No.
t
Eescrtptian af
speei$^ed *I**eria.l
fiaarez *{ Index
1.
Unit
.7Ct,
I{I*n AQjustable
2.
3.
Vctue *f
Fg,ci-;sr
6
0.650
Pakistan
Labor
Unskilled / Skilted
State OiI
Liter
Per Dag
Tota?
0.2aa
0.150
1.0**
4q
Na,*,es;
*F\
r.
2.
ir__a*f tsf tuark drna P;r EscfilfiiJolr j-]rrrj:i;sel si'{.tll lte *u\tae af
tr:eftt1.dtr*2"ttt-t:llrt;s
{tx*tu ri i ng I}f ii yt r **t ts r-tz{ if e rri s & Fr o i.'i.s;*rtc j Si,irns;.
A !l n r:t,..;
i ttit it ; ilti jt' i3i;*e:e.l$riri ii.l
.".
\-
i:;
t
1.,
(4s)
Appendix-D to Bid
BILL OF QUANTITIES
A.
Preamble
1.
2.
3.
The rates and prices entered in the priced Bill of Quantities shall,
except insofar as it is otherwise provided under the Contract,
include all constructional plant, labour, supervision, materials
testing, erection, maintenance, insurance, profit, taxes and duties,
together with all general risks, liabilities and obligations set out or
implied in the Contract.
4.
5.
6.
7.
.-*x
Package-4:Constructionof River Training & ProtectionWorks (Consistingof Guide Banks, Gunda BundS and
Cunettl) of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
(46)
8.
9.
10.
1 1.
Where there is a discrepancy between the unit rate and the total
amount derived from the multiplication of the unit rate and the
quantity, the unit rate as quoted will govern, unless in the opinion
of the Employer, there is an obviously gross misplacement of the
decimal point in the unit rate, in which event the total amount as
quoted will govern and the unit rate will be corrected.
12.
'i
r
nf
. :,.
Package-4:Construction of River Training & Protection Works (Consisting of Guide Banks, Gunda Bunds and
Cunette) of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharifwith Kot Mithan.
(41)
Appendix-D to Bid
BILL OF QUANTITIES
B.
Work Items
1.
2.
Package-4:Construction of River Training & ProtectionWorks (Consisting of Guide Banks, Gunda Bunds 6161;n;r
Cunette)of ShaheedBenazir Bhutto Bridge over fuver Indus ConnectingChachran Sharif with Kot Mithan
(48)
ffi"i".i1,,,
t
i;.'
,""
Package-4:Construction of River Training & Protection Works (Consisting of Guide Banks, Gunda Bunds and Cunette)
of ShaheedBenazir Bhutto Bridge over River Indus Connecting Chachran Sharif with Kot Mithan.
Bill of Quantity
PayIten
No.
Item Description
Unit Quantities
101
Clearingandgrubbing
SM
94,000
104
SM
94,000
l06c
CM
794,000
456,000
201
Granular Subbase
CM
6,460
509b
RiprapClassB
CM
8,300
6 1 3 a Sprigging
SM
38,000
6 l 3 b Sodding
SM
39,000
6l3c
SM
38,000
CM
22,500
89,000
Top Soil
sP-2.1Filter Layer(Medium)
TotatAmountin FigureRupees:
Name of Contractor and Stamp
CM
350,000
Rate
in fisures
Amount
in words
(Rs.)
Appendix-E to Bid
b)
MS
CD containing
the
soft copy of schedule in
Project/Primavera format must be provided, in which the
linkage between manpower, equipment and activities must be
provided.
(Attach sheets as required for the specified form of Construction
Schedule):
c)
Description
Whole Works
24 Months
Fftkage-4: Construction of River Training & ProtectionWorks (Consisting of Guide Banks, Gunda Bunds and
Cuhette)of ShaheedBenazir Bhutto Bridge over River Indus Connecting ChachranSharif with Kot Mithan.
(50)
Appendix-F to Bid
METHOD OF PERFORMING THE II/ORK
The Bidder is required to submit a narrative outlining the me
performing the Work. The narrative should indicate in detail
but not be limited to:
1.
2.
pment
ing personnel
for maintenance
other services to be
office accomm
used. Methodology
equipment and ma
ion of equipment
and
materials to the si
3.
The method
4.
Meth
5.
of environment.
w/c
alr
t system
of GuideBanks,GundaBundsand
Works(Consisting
Flokadd.+:Construction
of RiverTraining& Protection
ChachranSharifwith Kot Mithan.
BenazirBhuttoBridgeoverRiverIndusConnecting
Cuiiette)of Shaheed
(51)
[The Bidder will provide on Sheet 2 of this Appendix a list of all major
equipment and related items, under separate heading for items owned, to
be purchased or to be arranged on lease by him to carry out the Works.
The information shall include make, type, capacity, and anticipated
period of utilization for all equipment which shall be in sufficient detail to
demonstrate fully that the equipment will meet all requirements of the
Specifications.l
Package-4:Construction ofRiver Training & ProtectionWorks (ConsistingofGuide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
.'5_.,
(s2)
Owned
Purchased
or Leased
I
Description
of Unit
(Make,
Model, Yearl
2
Capacity
HP
Rating
Condition
Present
Location
or
Source
5
Date of
Delivery
at Site
Period of
Work on
Project
a. Owned
b. To be
Purchased
c. To be
arranged
on Lease
Package-4:Construction ofRiver Training & ProtectionWorks (Consisting ofGuide Banks, Gunda Bunds and
Cunette)ofShaheed Benazir Bhutto Bridge over River Indus ConnectingChachranSharifwith Kot Mithan.
Equipment / Plants
Nos.
Dump Truck
40
06
10
o2
Loader
o2
06
06
Vibrator Roller
o2
o2
10
o2
11
Jack Hammer
01
L2
o5
13
o4
T4
o2
15
Water Pump
05
T6
Tractor Trolley
50
: V
,Fi
Package-4:Construction ofRiver Training & ProtectionWorks (Consisting ofGuide Banks, Gunda Bunds and
Cunette) of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
(s4)
Appendix-H to Bid
CONSTRUCTION CAMP AND HOUSING FACILITIES
The Contractor in accordance with Clause 34 of the Conditions of
Contract shall provide description of his construction camp's facilities
and staff housing requirements.
The Contractor shall be responsible for pumps, electrical power, water
and electrical distribution systems, and sewerage system including all
fittings, pipes and other items necessary for servicing the Contractor's
construction camp
The Bidder shall list or explain his plans for providing these facilities for
the service of the Contract as follows:
i.
2.
Provision of Services.
a)
b)
c)
3.
Construction of Facilities
a)
b)
c)
4.
5.
Package-4:Construction ofRiver Training & ProtectionWorks (ConsistingofGuide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharifwith Kot Mithan.
(55)
Appendix-I to Bid
LIST OF SUBCONTRACTORS
I/We intend to subcontract the following parts of the Work to
subcontractors. In my/our
opinion, the subcontractors named
hereunder are reliable and competent to perform that part of the work for
which each is listed.
Enclosed are documentation outlining experience of subcontractors, the
curriculum vitae and experience of their key personnel who will be
assigned to the Contract, equipment to be supplied by them, size,
location and type of contracts carried out in the past.
Part of Works
lGive Detailsl
1
Subcontractor
lwith Complete Addressl
Package-4:Constructionof River Training & ProtectionWorks (Consistingof Guide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
(56)
Appendix-J to Bid
ESTIMATED PROGRESS PAYMENTS
Bidder's estimate of the value of work which would be executed by him
during each of the periods stated below, based on his Programme of the
rI vuantlftes.
Works and the Rates in the Bill of
Ouantities.
Period in Months
Amounts tRs.)
2
1
l"t Month
2'd Month
3.d Month
4th Month
Sth Month
6th Month
7th Month
Sth Month
9th Month
1OthMonth
11th Month
12th Month
13th Month
14th Month
1Sth Month
16th Month
17t1'Month
1Sth Month
19th Month
20th Month
21"t Month
22'd Month
23'd Month
24th Month
Bid Price
Package-4:Construction of River Training & ProtectionWorks (Consisting of Guide Banks, Gunda Bunds and
Cunette) ofShaheed Benazir Bhutto Bridge over River Indus Connecting ChachranSharifwith Kot Mithan.
(s7)
Appendix-K to Bid
ORGANIZATION CHART
FOR THE
SUPERVISORY STAFF AND LABOUR
Package-4:Construction ofRiver Training & ProtectionWorks (Consisting ofGuide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharifwith Kot Mithan.
(58)
Appendix-L to Bid
(INTEGRITY PACTI
DECLARATION OF FEES, COMMISSION AND BROKERAGE ETC.
PAYABLE BY THE SUPPLIERS OF GOODS, SERVICES & WORKS IN
CONTRACTS WORTH RS. 1O.OOMILLION OR MORE
Dated:
Contract No.
Contract Value:
Contract Title: Package-4: Construction of River Training & Protection
Works (Consisting of Guide Banks, Gunda Bunds and
Cunette) of Shaheed Benazir Bhutto Bridge over River
Indus Connecting Chachran Sharif with Kot Mithan.
;;;;
ithas
;;;privilege
-'^'h1:
;; i;il;,r:T:":d:#::i'l'T;'l"i::1ff
(se)
Name of Buyer:
Name of Seller/Supplier:
Si g n a t ure :......
Signature:
ISeal]
ISeal]
Note: The term "Buyer" means "Employer" and the term "Seller I
Supplier" means "Bidder f Contractor".
F
Package-4:Construction ofRiver Training & ProtectionWorks (Consisting of Guide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus Connecting ChachranSharif with Kot Mithan.
(60)
Appendix-M to Bid
FINANCIAL COMPETENCE AND ACCESS TO FINANCIAL
RESOURCES
The financial position of the bidder shall be checked as per following
details:
1.
2.
Criteria
Package-4:Constructionof River Training & Protection Works (Consistingof Guide Banks, Gunda Bunds and
Cunette) of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
(61)
Appendix-N to Bid
PAST PERFORMANCE, QUALIFICATION AND EXPERIENCE
lf General Construction Experience
Requirement
Bidder to
Provide
details
Role
under
construction
Experience
contracts in the role of contractor,
management
or
subcontractor,
for
least
the last 5
at
contractor
years prior to the bid submission
deadline.
Certificate of
registration of
firm/PEC
registration
. along with
experience
record
Contractor,
Subcontractor,
or Management
Contractor
as
or
Participation
contractor
management contractor, in at least 1
Contract within the last 5 years,
with a value of at least Rs. 1r3OO
Million that has been successfully or
is substantially completed and that
are similar to the proposed works.
The similarity shall be based on the
physical size, complexity, methods,
technology or other characteristics as
Bidding
in
these
indicated
Documents.
Bidder to
provide
specific
details
Letter of
acceptance
Completion
certificate
Role*
Prime
Contractor or
Management
Contractor
*) The bidders having equivalent experience in the role of only subcontractor are not eligible against this criterion.
**) Sometimes the contracts are enhanced, in such case the bidder
should submit the documents for enhancement of project which rnaY
help them qualify against similar experience criterion.
.,
the
JV
agreement.,,l
Venture,
in
Joint
project
has
been
completed
If the
showing the share of each partner must be submitted.
:,
Package-4:Construction ofRiver Training & ProtectionWorks (Consisting ofGuide Banks, Gunda Bunds and
Cunette) of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
(62)
\r1
.4
\,j
r'
Appendix-O to Bid
Sr.
No
1.
2.
3.
Name
of
Key
Staff
Designation
Project
Manager
Structural
Ensineer
Material
Ensineer
Nos.
Experience
01
Site
Supervisor
Assistant Site
Ensineer
o4
7.
Lab
Technician
o2
8.
Quantity
Survevor
01
9.
Surveyor
03
10.
Computer
Operator
o2
6.
Qualification
01
o2
5.
PEC
Registration
No.
01
Site Engineer
4.
CNIC
No.
OB
Note:
The Bidder must provide verified CVs of Key Staf duly signed by the
individuals alongwith their confirmation of availability for the subject
project.
The above mentioned staffs are the minimum required key staff for
this project that must be available at construction site all the time
during the currency of the contract. In case any of these staffs
abandons the project site for any reason whatsoever the contractor
must immediately arrange his equivalent replacement with prior
approval of the employer.
The staff other than above mentioned key staff e.g. supervisors,
assistants, operators and laborers etc. must also be available in
accordance to the contractors work program.
,,11-,,''1'""-"-,-,
,:
:'\
i. xf
'j.
Package-4:Construction of River Training & ProtectionWorks (Consistingof Guide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
(63)
Appendix-P to Bid
PROFORMA FOR LIST OF
CURRENT COMMITMENTS/PROJECTS IN HAND
Sr.
No.
Name of
Project
Client
Total Value
of Work
(Rs in
Million)
Date
of
Start
Date
of
Comp
letion
Total value
of Project
Completed
(as per
IPCI
Package-4:Construction ofRiver Training & ProtectionWorks (ConsistingofGuide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
Average
monthly
invoice
Forms
FQRTVI$
BIDSECURITY
PERFORh/trANCE
SECURITY
CONTRACTAGREEN/I.ENT
CREDITLINEF.ACILITY
MOBILIZAT]ON
ADVANJCE
GUARANTEEIBOND
\,
\-/
i;
i.,
Package-4:Construction ofRiver Training & ProtectionWorks (Consisting ofGuide Banks, Gunda Bunds and
Cunette)ofShaheed Benazir Bhutto Bridse over River Indus Connecting ChachranSharifwith Kot Mithan,
(65)
Forms
BS- 1
BID SECURITY
(Bank Guaranteef
Security Executed on
(Date)
Name of Surety (Bank) with Address:
(Scheduled Bank in Pakistan)
Name of Principal (Bidder) with Address
Penal Sum of Security Rupees
KNOW ALL MEN BY THESE PRESENTS,that in pursuance of the terms of the
Bid and at the request of the said Principal (Bidder) we, the Suretv above
bound
unto
held
firmly
and
named,
are
(hereinafter called the 'Employer') in the sum stated above for the payment of
which sum well and truly to be made, we bind ourselves, our heirs, executors,
administrators and successors,jointly and severally, firm1y by these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that whereas the Bidder has
for
Bid
No.
Bid
dated
the
accompanying
submitted
for-(Particulars
of Bid) to the said
Employer; and
WHEREAS, the Employer has required as a condition for considering said Bid
that the Bidder furnishes a Bid Security in the above said sum from a
Scheduled Bank in Pakistan or from a foreign bank duly counter-guaranteed by
a Scheduled Bank in Pakistan, to the Employer, conditioned as under:
(1)
that the Bid Security shall remain in force up to and including the date
28 days after the deadline for validity of bids as stated in the Instructions
to Bidders or as it may be extended by the Employer, notice of which
extension(s) to the Surety is hereby waived;
(2)
(3)
,
Package-4:Construction ofRiver Training & ProtectionWorks (Consisting ofGuide Banks, Gunda Bunds and
Cunette) of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
(66)
Forms
BS-2
NOW THEREFORE, if the successful Bidder shall, within the period specified
there for, on the prescribed form presented to him for signature enter into a
formal Contract with tl'e said Employer in accordance with his Bid as accepted
and furnish within twenty eight (28) days of his being requested to do so, a
Performance Security with good and sufficient surety, as may be required, upon
the form prescribed by the said Employer for the faithful performance and
proper fulfilment of the said Contract or in the event of non-withdrawal of the
said Bid within the time specified for its validity then this obligation shall be
void and of no effect. but otherwise to remain in full force and effect.
PROVIDED THAT the Surety shall forthwith pay the Employer the said sum
upon first written demand of the Employer (without cavil or argument) and
without requiring the Employer to prove or to show grounds or reasons for such
demand, notice of which shall be sent by the Employer by registered post duly
addressed to the Surety at its address given above.
PROVIDED ALSO THAT the Employer shall be the sole and final judge for
deciding whether the Principal (Bidder) has duly performed his obligations to
sign the Contract Agreement and to furnish the requisite Performance Security
within the time stated above, or has defaulted in fulfilling said requirements
and the Surety shall pay without objection the said sum upon demand from the
Employer forthwith and without any reference to the Principal (Bidder) or any
other person.
IN WITNESS WHEREOF, the above bounden Surety has executed the
instrument under its seal on the date indicated above, the narne and seal of the
Surety being hereto affixed and these presents duly signed by its undersigned
representative pursuant to authority of its governing body.
SURETY (Bank)
WITNESS:
Signature
1.
Narne
Title
2.
Name. Title & Address
'F i:
Package-4:Construction ofRiver Training & ProtectionWorks (Consisting ofGuide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over fuver Indus ConnectingChachranSharif with Kot Mithan.
(67)
Forms
PS-1
Dated
(Name
of
(Name of Project).
Package-4:Construction ofRiver Training & ProtectionWorks (Consisting ofGuide Banks, Gunda Bunds and
Cunefte)of ShaheedBenazir Bhutto Bridge over River Indus Connecting ChachranSharifwith Kot Mithan.
(68)
Forms
PS-2
Our total liability under this Guarantee is limited to the sum stated
above and it is a condition of any liability attaching to us under this
Guarantee that the claim for payment in writing shall be received by us
within the validity period of this Guarantee, failing which we shall be
discharged of our liability, if any, under this Guarantee.
(the Guarantor),
waiving all
We,
irrevocably
do
hereby
and
objections and defences under the Contract,
independently guarantee to pay to the Employer without delay upon the
Employer's first written demand without cavil or arguments and without
requiring the Employer to prove or to show grounds or reasons for such
demand any sum or sums up to the amount stated above, against the
Employer's written declaration that the Principal has refused or failed to
perform the obligations under the Contract which payment will be
effected by the Guarantor to Employer's designated Bank & Account
Number.
PROVIDED ALSO THAT the Employer shall be the sole and final judge for
deciding whether the Principal (Contractor) has duly performed his
obligations under the Contract or has defaulted in fulfilling said
obligations and the Guarantor shall pay without objection any sum or
sums up to the amount stated above upon first written demand from the
Employer forthwith and without any reference to the Principal or any
other person.
IN WITNESS WHEREOF, the above-bounden Guarantor has executed
this Instrument under its seal on the date indicated above, the name and
corporate seal of the Guarantor being hereto affixed and these presents
duly signed by its undersigned representative, pursuant to authority of
its governing body.
Guarantor (Bank)
Witness:
1.
Signature
Name
,9
.l:
Package-4:Construction of River Training & ProtectionWorks (Consisting of Guide Banks, Gunda Bunds dnd
Cunette) ofShaheed Benazir Bhutto Bridge over River Indus ConnectingChachranSharifwith Kot Mithan.
(6e)
Forms
cA-1
FORM OF CONTRACT AGREEMENT
THIS CONTRACTAGREEMENT (hereinafter called the "Agreement") made
on
the
day
o[_(month)
20
between
(hereafter called the "Employer") of the one part and (hereafter called the
"Contractor") of the other part.
WHEREAS the Employer is desirous that certain Works, viz
should be executed by the Contractor and has accepted a
Bid by the Contractor for the execution and completion of such Works
and the remedying of any defects therein.
NOW this Agreement witnesseth as follows:
1.
2.
3.
,s
Package4:Constructionof River Training & ProtectionWorks (Consistingof Guide Banks,Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
Forms
cA-2
4.
Signature of Employer
(Seal)
(Seal)
Witness:
Witness:
Package-4:Construction of River Training & ProtectionWorks (Consisting of Guide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
(71)
cL-1
CREDIT LINE FACILITY
To,
General Manager (P&CA)
National Highway Authority
28-Mauve, Area, G-9/l
ISLAMABAD
(Name & address of the client)
from
We also certifv that our bank (Bank name & address) has committed a
to M/s (Name of the bidder) for
credit line facility upto Rs.
on this basis of
to
the project (Project Name) from
their financial strength, market reputation and securities with us.
1.
Name
1.
Name
2.
Designation
2.
Designation
3.
Official Seal
3.
Official Seal
of Authorized Signatory
of Authorized Signatory
Package-4:Construction ofRiver Training & ProtectionWorks (ConsistingofGuide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
(72)
Forms
MG.1
Date
Package-4:Construction of River Training & ProtectionWorks (Consisting of Guide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachran Sharif with Kot Mithan.
(73)
F'orms
MG.2
The Guarantor's liabilitv under this Guarantee shall not in any case
(Rs
exceed the sum of Rupees
).
This Guarantee shall remain valid up to the aforesaid date and shall be
null and void after the aforesaid date or earlier if the advance made to
the Contractor is fully adjusted against payments from Interim Payment
Certificates of the Contractor provided that the
Signature
Name
Title
WITNESS
1.
Corporate Secretary (Seal)
2.
(Name Title & Address)
Corporate Guarantor(Seal)
.s
Package-4:Constructionof River Training & ProtectionWorks (Consistingof Guide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
(74)
FART-,1
GENiHMLCQNDITXON:S
OF CONTiRACT
lv
' , . ' i fSd
Package-4:Construction ofRiver Training & ProtectionWorks (Consisting ofGuide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
FOURTHEDITION 1987
Reprinted1988with editorialamendments
Package-4:Construction ofRiver Training & Protection Works (Consisting ofGuide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharifwith Kot Mithan.
(76)
ParticularConditionsof GontractPart-]1
PART,"II
ULAR COND'ITIONS
PARTNC
OF CONTRACT-
Package-4:Consfiuction of River Training & ProtectionWorks (Consistingof Guide Banks, Gunda Bunds and
Cunette)ofShaheed Benazir Bhutto Bridge over River Indus ConnectingChachran Sharifwith Kot Mithan.
(77)
ParticularConditionsof ContractPart-ll
TABLE OF CONTENTS
PART II . PARTICULAR CONDITIONS OF' CONTRACT
Clause
Title
1.1
2.1
2.2
2.7
2.8
5.1
5.2
6.6
6.7
10.1
10.4
Definitions
Engineer'sDuties andAuthority
Engineer's Representative
EngineerNot Liable
Replacement
of the Engineer
Language(s)and Law
Priority of ContractDocuments
ShopDrawings
As-Built Drawings
PerformanceSecurity
PerformanceSecurityBinding on Variationsand Changes
t 4 . r Programmeto be Submitted
t4.3
CashFlow Estimateto be Submitted
14.5 Detailed Programmeand Monthly ProgressReport
15.2 LanguageAbility of Contractor'sRepresentative
1 5 . 3 Contractor's Representative
16.3 LanguageAbility of SuperintendingStaff of Contractor
16.4 Employmentof Local Personnel
1 9 . 3 SafetyPrecautions
19.4 Lighting Works at Night
20.4
Employer'sRisks
21.4
Exclusions
2 5 . 5 InsuranceCompany
3 1 . 3 Co-operationwith Other Contractors
34.2 Ratesof Wagesand Conditionsof Labour
aA a
J+.J
Employmentof Personsin the Serviceof Others
34.4 Housingfor Labour
34.5 Health and Safety
34.6 Epidemics
34.7
Supplyof Water
34.8
Alcoholic Liquor or Drugs
34.9
Arms andAmmunition
3 4 . 1 0 Festivalsand ReligiousCustoms
3 4 . t \ DisorderlyConduct
3 4 . r 2 Complianceby Subcontractors
35.2 Recordsof Safetyand Health
3 5 . 3 Reportingof Accidents
3 6 . 6 Use of PakistaniMaterialsand Services
4 1 . 1 Commencement
of Works
Completion
of Works
+t.J
Bonusfor Early
48.2
Taking Over of Sectionsor Parts
Package-4:Constructionof River Training & Protection Works (Consisting of Guide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
ParticularGonditionsof ContractPart-ll
51.2
52.1
52.2
53.4
54.5
59.4
59.5
60,1
60.2
60.10
60.1I
63.1
65.2
67.3
68.1
68.2
70.I
72.2
72.3
73.1
73.2
74.1
75.1
76.1
77.1
78.1
Instructionsfor Variations
Valuationof Variations
Powerof Engineerto Fix Rates
Failureto Comply
Conditionsof Hire of Contractor'sEquipment
Paymentsto Nominated Sub-contractors
Evidenceof Payments
MonthlyStatements
Monthly Payments
Time for Payment
FinancialAssistanceto Contractor
Default of Contractor
SpecialRisks
Arbitration
Notice to Contractor
Notice to Employer and Engineer
Increaseor Decreaseof Cost
Currency Proportions
Currenciesof Paymentfor ProvisionalSums
Paymentof IncomeTax
CustomsDuty & Taxes
Integrity Pact
Terminationof Contractfor Employer'sConvenience
Liability of Contractor
Joint and SeveralLiability
Detailsto be Confidential
\":
- r i
.'').
\3
.':
J'.
E:l
',.,
.1_
':1."'..''.;:ii-'.
.-'i-i::a.ltjr'!.i;. : .'.
"-"4-
Package-4:Construction of River Training & ProtectionWorks (Consistingof Guide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
(7e)
1.1
Definitions
(a) (i) The Employer is Chairman NHA, Its successorLegal Representatives,28Mauve Area, G-911,National Highway Authority, Islamabad.
(a) (iv) To be Notified by the Employer
The following paragraphis added:
(a)(vi) "Bidder or Tenderer"meansany personor persons,company,corporation,firm or
joint venturesubmittinga Bid or Tender.
(bXv) The following is addedat the end of the paragraph:
The word "Tender" is synonymouswith ooBid"and the word "TenderDocuments"
with "Biddins Documents".
The following paragraphis added:
(bXix) "Programme" means the programme to be submitted by the Contractor in
with Sub-Clause14.1and any approvedrevisionsthereto.
accordance
(e)(i) The text is deletedand substitutedwith the following:
"Contract Price" meansthe sum statedin the Letter of Acceptanceas payableto
the Contractor for the execution and completion of the Works subject to such
additionstheretoor deductionstherefrom as may be madeand remedyingof any
with the provisionsof the Contract.
defectsthereinin accordance
2.1
Engineer'sDutiesand Authority
With referenceto Sub-Clause2.1(b),the following provisionsshall also apply;
The Engineershall obtainthe specificapprovalof the Employer before carrying
with the following Clauses:
out his dutiesin accordance
(i)
(ii)
(iii)
i,.,-'..
'i
//
l.
Package-4:Construction of River Training & ProtectionWorks (Consisting of Guide Banks, Gunda Bunds and
Cunette) of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
(80)
ParticularConditions of ContractPart-ll
(iv)
(v)
(vi)
(vii)
(viii)
in an emergency*situation,as statedherebelow, or
b)
(ix)
(x)
(xi)
(xii)
(xiii)
62.1.
Issuanceof "DefectLiabilityCertificate"underSub-Clause
(xiv)
(xv)
(xvi)
IssuinginstructionsunderClause58.
* (If in the opinion of the Engineeran emergencyoccurs affecting the safety of
life or of the Works or of adjoiningproperty,the Engineermay, without relieving
the Contractorof any of his dutiesandresponsibilitiesunderthe Contract,instruct
the Contractorto executeall suchwork or to do all such things as may, in the
to abateor reducethe risk. The Contractor
opinion of the Engineer,be necessary
instructionof the Engineer. The Engineer
any
such
comply
with
shall forthwith
shall determinean additionto the ContractPrice,in respectof suchinstruction,in
accordancewith Clause52 and shall notify the Contractoraccordingly,with a
copyto the Employer.)
1t
Engineer's Representative
The following paragraphis added:
Package-4:Constructionof River Training & ProtectionWorks (Consistingof GuideBanks, Gunda Bunds and
Cuneue)ofShaheed Benazir Bhutto Bridge over River Indus ConnectingChachranSharifwith Kot Mithan.
(81)
EngineerNot Liable
Approval, reviews and inspectionby the Engineerof any part of the Works does
not relieve the Contractorfrom his sole responsibilityand liability for the supply
of materials,plant and equipmentfor constructionof the Works and their parts in
accordancewith the Contractand neitherthe Engineer'sauthorityto act nor any
decisionmadeby him in goodfaith as providedfor underthe Contractwhetherto
exercise or not to exercise such authority shall give rise to any duty or
responsibilityof the Engineerto the Contractor,any Subcontractor,any of their
representativesor employeesor any other person performing any portion of the
Works.
2.8
5.1
Language(s)and Law
(a)
(b)
<',
(r)
(iD
(iii)
(iv)
(v)
(vi)
(vii)
(viii)
(ix)
(x)
The ContractAgteement;
The Letter of Acceptance;
The completedForm of Bid;
Addendum/ Corrigendum,if any;
SpecialStipulations(Appendix-Ato Bid);
The ParticularConditionsof Contract- Part-II;
The GeneralConditions- Part I:
The PricedBill of Quantities(Appendix-Dto
The completedAppendicesto Bid (C, E to P);
SpecialProvisions;
Package-4:Construction of River Training & ProtectionWorks (Consisting ofGuide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus Connecting ChachranSharif with Kot Mithan.
ParticularConditionsof GontractPart-ll
(xi)
(xii)
(xiii)
(xiv)
SupplementarySpecifications;
ParticularSpecifications;
The Drawings;
NHA GeneralSpecificationsand its Addendum.
ShopDrawings
The Contractorshall submit to the Engineerfor review 3 copies of all shop and
erectiondrawings applicableto this Contractas per provision of relevant SubClauseof the Contract.
Review and approval by the Engineershall not be construedas a completecheck
but will indicate only that the generalmethod of constructionand detailing is
satisfactory and that the Engineer's review or approval shall not relieve the
underthe Contract.
Contractorof any of his responsibilities
6.7
As-Built Drawings
At the completionof the Works underthe Contract,the Contractorshall furnishto
the Engineer6 copiesand one reproducibleof all drawingsamendedto conform
with the Works as built. The price of such Drawings shall be deemedto be
includedin the ContractPrice.
8.1
GeneralObligations
Following sentenceis addedat the end of Clause8.I
"However the contractor is requiredto bear the cost of StampedPapersrequired
to executethe ContractAgreement.
10.1 PerformanceSecurity
The text is deletedand substitutedwith the following:
The Contractor shall provide Performance Security to the Employer in the
prescribedform. The said Securityshallbe furnishedor causedto be furnishedby
the Contractorwithin 28 days after the receipt of the Letter of Acceptance.The
Pqige
PerformanceSecurityshall be of an amountequalto l}Yo of the Contr4at'.
statedin the Letter of Acceptance.SuchSecurityshall,at the option of the bidder"'
'
be in the form of either (a) bank guaranteefrom any ScheduledBank jn'Pakistan
or (b) bank guarantee from a bank located outside Pakistan dulyi cgunter1-';,
Package- : ConstructionofRiver Training & ProtectionWorks (ConsistingofGuide Banks, Gunda Bunds and
Cunette) of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
(83)
Programme to be Submitted
The programmeshall be submittedwithin 42 days from the date of receipt of
Letter of Acceptance,which shallbe in the form ofi
D
iD
14.3
(b)
:r
i1
Package-4:Construction ofRiver Training & ProtectionWorks (Consisting ofGuide Banks, Gunda Bunds and
Cunette)ofShaheed Benazir Bhutto Bridge over River Indus ConnectingChachranSharifwith Kot Mithan.
(84)
ParticularGondltionsof GontractPart-ll
(4)
(5)
(6)
(c)
During the period of the Contract,the Contractorshall keep a daily record of the
work progress,which shall be made availableto the Engineer as and when
requesied.The daily record shall include particulars of weather conditions,
number of men working, deliveries of materials, quantity, location and
assignmentof Contractor'sequipment.
15.2and 15.3areadded:
The followingSub-Clauses
15.2
15.3
Contractor'sRepresentative
The Contractor'sauthorisedrepresentativeand his other professionalengineers
working at Site shallregisterthemselveswith the PakistanEngineeringCouncil.
at Site shall be authorisedto exercise
The Contractor'sauthorisedrepresentative
adequateadministrativeand financial powers on behalf of the Contractor so as to
achievecompletion of the Works as per the Contract.
16.3 andl6.4areadded:
The followingSub-Clauses
Package-4:Constructionof River Training & ProtectionWorks (Consisting of Guide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
(85)
ParticularConditionsof ContractPart-ll
19.3 SafetyPrecautions
In order to provide for the safety, health and welfare of persons, and for
prevention of damage of any kind, all operationsfor the purposesof or in
connectionwith the Contractshall be carriedout in compliancewith the Safety
Requirementsof the Governmentof Pakistanwith such modifications thereto as
the Engineer may authoriseor direct and the Contractor shall take or causeto be
taken such further measuresand comply with such further requirementsas the
Engineermay determineto be reasonablynecessaryfor suchpurpose.
The Contractor shall make, maintain and submit reports to the Engineer
concerningsafety, health and welfare of personsand damageto property, as the
Engineermay from time to time prescribe.
19.4 Lighting Work at Night
In the event of work being carriedout at night, the Contractorshall at his own
cost, provide and maintain such good and sufficient light as will enablethe work
to proceed satisfactorily and without danger.The approachesto the Site and the
Works where the night-work is being carriedout shall be sufficiently lighted.All
arrangement adopted for such lighting shall be to the satisfaction of the
Engineer's Representative.
20.4
Employer's Risks
TheEmployer'srisksare:
Deletethe text and substitutewith the following:
(a)
(ii)
(iii)
(iv)
(v)
Works;
Package-4:Construction of River Training & ProtectionWorks (Consistingof Guide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over fuver Indus ConnectingChachranSharif with Kot Mithan.
(86)
ParticularConditionsof ContractPart-ll
(b)
(c)
loss or damageto the extent that it is due to the design of the Works, other than
any part of the designprovided by the Contractor or for which the Contractor is
responsible;and
(d)
any operation of the forces of nature (insofar as it occurs on the Site) which an
experiencedcontractor:
(D
(ii)
(b)
insureagainst.
21.4 Exclusions
The text is deletedand substitutedwith the following:
Thereshall be no obligationfor the insurancesin Sub-Clause21.1 to include loss
or damagecausedby the risks listedunderSub-Clause20.4 paras(a) (i) to (iv).
25.5 is added:
The following Sub-Clause
25.5 InsuranceCompany
The Contractorshall be obliged to place all insurancesrelating to the Contract
(including,but not limited to, the insurancesreferredto in Clauses2l,23 and24)
with either National InsuranceCompany of Pakistan or any other insurance
to the Employer.
companyoperatingin Pakistanand acceptable
Costsof suchinsurancesshallbe borneby the Contractor.
31.3is added:
The following Sub-Clause
31.3
Package-4:Construction ofRiver Training & ProtectionWorks (Consisting ofGuide Banks, Gunda Bunds and
Cunette) of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
(87)
ParticularConditionsof GontractPart-ll
34.2
34.3
34.4
Housingfor Labour
Saveinsofar as the Contract otherwiseprovides,the Contractor shall provide and
maintain such housing accommodationand amenities as he may consider
necessaryfor all his supervisorystaff and labour,employedfor the purposesof or
in connection with the Contract including all fencing, electricity supply,
sanitation, cookhouses,fire prevention, water supply and other requirementsin
or amenities.On completionof the
connectionwith suchhousingaccommodation
Contract,thesefacilities shall be handedover to the Employer or if the Employer
so desires,the temporarycampsor housingprovidedby the Contractorshall be
removedandthe Site reinstatedtoits original condition,all to the approvalof the
Engineer.
34.5
34.6
Epidemics
In the event of any outbreakof illness of an epidemicnature,the Contractorshall
comply with and carry out such regulations,orders and requirementsas may be
madeby the Government,or the local medicalor sanitaryauthorities,for purpose
of dealingwith and overcomingthe same.
34.7
Supply of Water
The Contractorshall, so far as is reasonablypracticable,having regardto local-r:
conditions, provide on the Site, to the satisfactionof the Engineer or his::'
representative,adequatesupply of drinking and other water for the use of his staff
(88)
and labour.
Reporting of Accidents
The Contractorshall report to the Engineerdetails of any accidentas soon as
possibleafter its occurrence.In the caseof any fatahty or seriousaccident,the
Contractorshall, in addition, notify the Engineer immediately by the quickest
availablemeans.
,:,
The following Sub-Clause36.6is added:
Package-4:Construction of River Training & ProtectionWorks (Consistingof Guide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachran Sharif with Kot Mithan.
(8e)
36.6
4l.l
Commencementof Works
The text is deletedand substitutedwith the following:
The Contractorshall commencethe Works on Site within the period named in
Appendix-A to Bid from the dateof receiptby him from the Engineerof a written
Notice to Commence.Thereafter, the Contractor shall proceed with the Works
with due expeditionand without delay.
The following Sub-Clause47.3 is added:
47.3
(e0)
ParticularConditionsof GontractPart-ll
an amount more than 2 percentof the Contract Price, and the actual quantity of
work executedunder the item exceedsor falls short of the quantity set out in Bill
of Quantitiesby more than 30o/oand applicableto the varied quantity only i.e.
starting from 130 percent to onward (In case the quantity of an item exceeds)
providedthe conditionsset aboveare fulfilled and if the quantity of a BOQ item
is reducedmore than 30 (thirty) percentthe changein rate will be applicableto all
the leftover /remaining quantity.
53.4
Failure to Comply
This Sub-Clauseis deletedin its entirety.
b)
i)
ii)
(el)
ParticularGonditionsof ContractPart-ll
Subcontractorand for which the Contractorhas failed to submit the
evidence described in sub-paragraphs(a) or (b) above. The
Contractorshall then repay,to the Employer, the amountwhich the
nominatedSubcontractorwas directly paid by the Employer.
60.1 MonthlyStatements
In the first line afterthe word "shall", the following is added:
of work doneunderClause56.1,"
"on the basisof thejoint measurement
In Para (c) the words "the Appendix to Tender" are deleted and substitutedwith
60.11(a)(6)hereof'.
the words" Sub-Cause
(in caseClause60.11is applicable)
60.2 Monthly Payments
o'I4".
In the first line, "28" is substitutedby
Add following at the end of secondparagraphof sub para(b)
The amountof final bill shallnot be lessthan 10%of the contractvalue.
60.8 Final Payment Certificate
The following paragraphis added:
The amountof final bill shallnot be lessthan 10% of the contractvalue.
60.10 Time for Payment
The text is deletedand substitutedwith the following:
The amount due to the Contractorunder any Interim Payment Certificate issued
by the Engineer pursuant to this Clause,or to any other terms of the Contract,
shall , subject to Clause47,be paid by the Employer to the Contractorwithin 30
daysafter suchInterim PaymentCertificatehas beenjointly verified by Employer
and Contractor, or, in the caseof the Final Certificate referred to in Sub Clause
60.8,within 60 daysafter suchFinal PaymentCertificatehasbeenjointly verified
by Employer and Contractor;Provided that the Interim Paymentshall be caused
in 42 daysand Final Paymentin 60 days in caseof foreign funded project. In the
event of the failure of the Employer to make payment within the times stated,the
Employer shall pay to the Contractor compensation at the 28 days rate of
KIBOR+2% per annumfor local currencyand LIBOR+l%o for foreign currency,
upon all sums unpaid from the date by which the sameshould have been paid.
The provisions of this Sub-Clauseare without prejudice to the Contractor's
entitlementunderClause69.
--,..
....;.'_::1-..1;:
, ..''-'l;'. -
iv
:i
bj
Employer
by
the
Contractor
to
the
made
available
.i
be
assistance
shall
Financial
I=
\'l l
,j
Package-4:Construction of River Training & ProtectionWorks (Consisting of Guide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
l'.''.i.'""ii
ii''.: -r:'.r .
;:;:::r:_iii:r:,.
(e2)
ParticularGonditionsof ContractPart-ll
adoptingfollowing MobilizationAdvanceClause:
MobilizationAdvance
(a)
An interest-freeMobilization Advance up to 10%oof the Contract Price
stated in the Letter of Acceptanceshall be paid by the Employer to the
Contractor in two equal parts upon submission by the Contractor of a
MobilizationAdvanceGuaranteefor the full amountof the Advancein the
specified form from a ScheduledBank in Pakistan,acceptableto the
Employer:
(b)
63.1
(1)
(2)
Default of Contractor
The following parais addedat the endof the Sub-Clause:
Providedfurther that in addition to the actiontaken by the Employer againstthe
Contractorunderthis Clause,the Employer may also refer the caseof default of
the Contractorto PakistanEngineeringCouncil for punitive action under the
Constructionand Operationof EngineeringWorks Bye-Laws 1987,as amended
from time to time.
65.2
SpecialRisks
The text is deletedand substitutedwith the following:
The SpecialRisks arethe risks definedunderSub-Clause20.4 sub paragraphs(a)
(i) to (a) (v).
67.3 Arbitration
In the sixth to eight lines, the words "shall be finally settled
undersuchRules" are deletedand substitutedwith the following:
appointed
shall be finally settled under the provisions of the Arbitration Act, 1940 as
thereoffor the time being
amendedor any statutorymodificationor re-enactment
in force.
-1;;.','';
':'.,1
,
Package-4:Construction ofRiver Training & ProtectionWorks (Consisting ofGuide Banks, Gunda Bunds and
Cunette) of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
. :
(e3)
I :::_,....
Noticeto Contractor
The following paragraphis added:
For the purposesof this Sub-Clause,the Contractor shall, immediately after
receipt of Letter of Acceptance,intimate in writing to the Employer and the
Engineerby registeredpost, the addressof his principal place of businessor any
changein such addressduring the period of the Contract.
The Employer :
Chairman,
National Highway Authority
28-Mauve Area,G-911,Islamabad
b)
The Engineer:
to be notified
(b)
Adjustment Formula
The contractprice shall only be adjustedfor changesin the basicpricesof the
':'r, .'r:,,!;t,':._
specifiedmaterialslisted in Appendix- C to bid as officially publishedby the
.
The
list
of
specified
specifiedsuppliersor manufacturersfrom time to time.
- . . . . . . ' ' , q . \. ' .1 r.. .'' .. , '.
\\'
suppliersis solely for the calculationof increasesor decreasein prices 0f
\
\/
i
specifiedmaterialspursuantto clause70 of the Conditions of Contractand
\
>
!
Th.e
the
specifications.
dbes not imply that such materials comply with
^' ., \, ! .
- - . . ' /" : ,
Package-4:Constructionof River Training & ProtectionWorks (Consistingof Guide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
ParticularConditionsof ContractPart-ll
Contractor has no obligation to purchasematerials from these "specified
suppliers".Shouldany specifiedsupplier ceaseto trade during the period of
the contract,the Engineer'sshall usethe price publishedby the Governmentof
Pakistan, Federal or Provincial, through its concerned agencies. While
computingthe amountof the adjustment,no transportation,haulage,loading,
unloadingor other incidentalor contingentchangeswill be considered.Only
the actual increaseor decreasein the price(s) of these specified inputs exfactory shall be consideredand adjusted.
Computationof the amountof increaseor decreaseof the specifiedmaterials
listed in Appendix - C to bid will be done for the work carriedout during the
currency of the Contract. Such increaseor decreasewill be adjustedat actual
along with Contractor'smonthly progressive bills. Adjustment shall be
allowedonly for the quantitiesof specifiedmaterialswhich haveactuallybeen
incorporatedin the PermanentWorks during the correspondingperiod of the
increaseor decrease.
The amountto be addedto or deductedfrom the interim paymentcertificate in
respectof changesin cost of materialsas specifiedin "Appendix - C to bid"
shall be determined;
(i) From the following formula in local currencyonly:
A
Where:
A : Adjustmentin ContractPricefor the period of Price change;
C: Proportionof costelementof specifiedmaterialin works net
provisionalsums(weightage);
VOW: Value of PermanentWorks executedduringthe period of change
in price excludingthe amountfor GeneralItemsin Bill No. 7.
The abovementionedformula is applicablefor High SpeedDiesel, Labor
(skilled)and Labor (unskilled)only:
(ii) From the following formula in local currencyonly:
A
Where:
A: Adjustmentin ContractPricefor the periodof Price change;
The above mentioned formula is applicable for Cement, Steel and
B itumen/AsphaltCementonly.
Package-4:Construction ofRiver Training & ProtectionWorks (Consisting ofGuide Banks, Gunda Bunds and
Cunette)ofShaheed Benazir Bhutto Bridge over River Indus Connecting ChachranSharifwith Kot Mithan.
(e5)
ParticularGonditionsof GontractPart-ll
(c) Sourcesof Indices and Weightages
The sources of indices shall be those listed in Appendix - C to Bid, as
approved by the Engineer. As the proposed basis for price adjustment,the
Contractorshall have submittedwith his bid the tabulationof Weightagesand
Sourceof Indices if differentthan thosegiven in Appendix - C to Bid, which
shallbe subjectto approvalby the Engineer.
(d) Base,Currentoand ProvisionalIndices
The basecost indices or prices shall be those prevailing on the day 28 days
prior to the latestdate for submissionof bids. Current indicesor prices shall
be those prevailing on the day 28 days prior to the last day of the period to
which a particular monthly statementis related. If at any time the current
indices are not available,provisionalindices as determinedby the Engineer
will be used, subject to subsequentcorrection of the amounts paid to the
Contractorwhen the currentindicesbecomeavailable.
(e) Adjustment after Completion
If the Contractorfails to completethe.Works within the Time for Completion
prescribedunder Clause 43, adjustmentof prices thereafter until the date of
completion of the Works shall be made using either the indices or prices
relatingto the prescribedtime for completion,or the currentindicesor prices,
whicheveris more favorableto the Employer,provided that if an extensionof
time is grantedpursuantto Clause44, the aboveprovision shall apply only to
adjustmentsmade after the expiry of suchextensionof time.
(f) Weightages
The weightagesfor eachof the factorsof cost given in Appendix - C to Bid
shall be adjustedif, in the opinion of the Engineer,they have beenrendered
unbalanced,or inapplicableas a result of varied or additional
unreasonable,
work executedor instructedunderClause51. Such adjustment(s)shall haveto
be agreedin the variationorder.
..,,,,.,.ii.].,r,,,,.
'"-""1,,..',:-,,,
72.2 Currency Proportiont
, ,t:"'
,:.
,
r
All paymentsshall be in local cunencyonly.
i
,:t -. - i1, VI
72.3 Currencies of Payment for Provisional Sums
All paymentsshallbe in localcurrencyonly.
"l'),.1*9 -1:',,.
:'':];' ;: ' i
e3
s . 1 , 7 3 . 2 , 7 4 . 1 , 7 5 . 1 , 7 6 . I , 7 a7 n. Td 7 8 . la r ea d d e d :
T h ef o l l o w i n gS u b - C l a u s 7
73.1 Paymentof Income Tax
The Contractor, Subcontractorsand their employeesshall be responsiblefor
paymentof all their incometax, supertax andothertaxeson incomearisingout of
Package-4:ConstructionofRiver Training & ProtectionWorks (ConsistingofGuide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
(e6)
ParticularGonditionsof ContractPart-ll
the Contract and the rates and prices stated in the Contract shall be deemedto
coverall suchtaxes.
73.2
74.1
Integrity Pact
Ifthe Contractoror any ofhis Subcontractors,agentsor servantsis found to have
violated or involved in violation of the Integrity Pactsignedby the Contractoras
Appendix-Lto his Bid, thenthe Employershall be entitledto:
(a)
(b)
(c)
recover from the Contractoran amount equivalentto ten times the sum of
any commission,gratification,bribe, finder's fee or kickback given by the
Contractoror any ofhis Subcontractors,agentsor servants;
terminatethe Contract;and
recover from the Contractorany loss or damageto the Employer as a
resultof suchterminationor of any othercorruptbusinesspracticesof the
agentsor servants.
Contractoror any ofhis Subcontractors,
76.1
shallproceedasprovidedin Sub-Clause65.7hereof;and
shallbe paid by the Employerasprovidedin Sub-Clause65.8 hereof.
Liability of Contractor
or assignsshall follow strictly, all relevant
The Contractoror his Subcontractors
labour laws includingthe Workmen'sCompensationAct and the Employer shall
be fully indemnified for all claims, damagesetc. arising out of any dispute
betweenthe Contractor,his Subcontractorsor assignsand the Iabour employdty
them.
Package-4:Construction of River Training & ProtectionWorks (Consisting of Guide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
(e7)
ParticularConditionsof GontractPart-ll
77.1
,,':.;-'l'i;'''
i> ',
'1
,\
':'.
,""t:
Package-4:Construction of River Training & ProtectionWorks (Consistingof Guide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
(e8)
Clause
34.8
67.3
34.9
6.7
47.3
t4.3
59.5
4Ll
34.12
54.5
15.3
31.3
72.3
72.2
73.2
63.1
f.i
14.5
78.1
34.11
20.4
16.4
aA
J+.J
2.1
2.1
2.2
34.6
2t.4
53.4
34.10
60.1
J4.)
34.4
70.r
51.2
25.5 '' .,, ' . ,,
74,1:
'77.1',
t:
::'
l5',2
16,3..
5.1..,
76.r
t9.4
Package-4:Construction of River Training & ProtectionWorks (Consistingof Guide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over fuver Indus ConnectingChachranSharif with Kot Mithan.
(ee)
ParticularConditions of ContractPart-ll
Index
Monthly Payments
Monthly Statements
Notice to Contractor
Noticeto Employerand Engineer
Paymentof IncomeTax
Paymentsto Nominated Subcontractors
PerformanceSecurity
Powerof Engineerto Fix Rates
PerformanceSecurity Binding on Variation and Changes
Priority of ContractDocuments
Programmeto be Submitted
Ratesof Wagesand Conditionsof Labour
Recordsof Safetyand Health
of the Engineer
Replacement
Reportingof Accidents
SafetyPrecautions
ShopDrawings
SpecialRisks
Supplyof Water
TakingOver of Sectionsor Parts
Terminationof Contractfor Employer'sConvenience
Time for Payment
Use of PakistaniMaterialsand Services
Valuationof Variations
Clause
60.2
60.1
68.1
68,2
73.1
59.4
10.1
52.2
10.4
5.2
14.l
34.2
35.2
2.8
35.3
19.3
6.6
65.2
34.7
48.2
75.r
6 0 .0
1
36.6
52.r
Package-4:Constructionof River Training & ProtectionWorks (Consistingof Guide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
(100)
Construction
ofShaheedBenazir Bhutto Bridge over River indus
ConnectineChachranSharifrvith Kot Mithan
Contract4: Rivel Training & ProtectionWorks
SPECIALPROVISIONS
TABLE OF CONTENTS
SPECIALPROVISIONS
SP-I:
Description
andScopeof Works
SP-2:
RiverTraining& Protection
Works
(102)
SPECIAL PROVISIONS
SP-l
1.1
Descriptionof Work
olthe River
The work underthis contract(Contract4) comprisesof the constrLrction
Trainirrgand protectionWorks.
The proposedtrainingand protectionworks include;
a. Constructionof GuideBanks,
b. Constructionof Cunette
c. Constructionof GundaBr"rnd
for obtainingor leasing(as appropriate)land
The Contractorwill be responsible
which is requiredoutsidethe Right-of-Wayfor the abovefacilities, and for storage,
workirrgareas,borrow pits and quarries,sitesfor dumpingsurplusnraterialsandthe
reinstatement
of the land afteruse.
like and for all necessary
Information,on which the designof the projecthasbeenbased,will be availableto
contractorsfol their inspection.Every one of thernshouldrnakehis own interpretation
of the basic data and infonnation, such as materials availability, geo-technical
investigation,hydrology,traffic volumeand locationof utilities.
r.2
Materials Sources
and rock for usein the workswherenot availablef,rom
Filling materials,aggregates
excavationswithin the Site shall be providedby the Contractor,frorn sourcesto be
for all surveying
who will be responsible
by the Contractor,
identifiedand established
and testing to prove the extent and suitability of materials, l'or land and
royalty/maikana costs, for access roads, site facilities, stripping overburden,
insurance
separationof material,processingandtransportof materials,reinstatement,
within
the
rates
for the
as
included
costs
shali
be
considered
ar-rdall other costs.All
itemsinserledin the Bill of QLrantities.
'lest
1.3
Scopcof Works
'fhe
Bid subrnittedby the Tenderershall cover cost, time etc. lbr cxecutiou,
a)
construction,completionand maintenanceof the Project arrd iuclr-rdingall
This shall irrcludethe
materials,labortoolsandplantsetc.completein all respect.
constructior-r
of the following:
.
95
(103)
Submissior-r
of methodologyfor entirework includirrgl'raffic Diversion
Plan (if reqr,rired).
ii)
i i i ) S a fety devicesshor-rld
be usedto ensuresafediversionof traffic.
iv)
utilities,etc.
Site clearanceand dismantlingand shiftingof obstructions,
of work, as directed.
beforecommencement
v)
vi)
x)
c)
,m
w
(104)
Description
of guide banks,guide
River trainingand protectionwork shall includeconstruction
walls, gunda bund, cllnette, bard<protection,flooring and approachembankment
protectionas requiredfor ensuringsafetyof the bridge strllctlrrear-rdits approaches
agair-istdamageby flood/flowing water. Constructionof various componentsshall
or as directedby the Engineer.
conform to drawingsandthesespecifications
"r)
Guide Bank
bankand provisionof
2.2.1 This work shall consistof constructionof embankmentof gr,ride
in accordance
the
drawing
etc.
on
pitching/revetlnenton slopes,apron
as indicated
with thesespecificationsor as approvedby the Engineer.
2.2.2 The alignmentand layout of guide banksshall be as indicatedon the drawing or as
approvedby the Engineer. The constructionof embankmentfor guide bank shall
& 108 of NIIA Ceneral
conform to provisionsof items 100,105,106,107
pitchingand apronetc.,slrallbe as
filter underneath
Riprap/Pitching,
Specifications.
per tl-rese
Whereever,clearing& grubbingandcompactionof natural
specifications.
groundis reqr-rired
the sameshouldconformto provisionsoflitems100, 101and 104
providedas shownin drawingsshor-rld
For Sr-rb-base
of NHA GeneralSpecifications.
corrformto provisionsof items200 and201 of NHA GeneralSpecifications.
2.2.3 Gr-ridebanksshall generallybe madeof locally availablematerialsfrom the river bed
preferably cohesiotl iess materials.Trial pits shall be taken in borrow holes to
examinesllitabilityof soil for constructionand also to decidethe types of earlh
away from
be sufficier-rtly
to be arranged.The borrow pits shor-rld
moving n-rachinery
river
pits
di"rg
the
sideol
be
on
should
apron.
No
borrow
of
the
launching
location
the
guide
bar-rks.
the
of the
Constructionof guidebarrksshallbe takenin handalongwith the constructiori
gr;ide
in
barrk
one
the
work
of
the
to
complete
bridge.Every effort shall be made
guide
banl<
of
the
whole
completion
working season.Wherethereis any doubtabout
within one working season,suitablerreasllresslrall be plannedand executedfor
protectiortof completedwork. The constructionof gr-rideban[<shall be stafledl'rom
towardsuPstream.
abutt.tretrt
2.2.4 Constructiorlof apron and pitching of the guide banks shail generallyconfon-nto
lengthof pit along the gr-ride
clause2.3 and 2.4 of theseSpecifications.SrLfficient
of work so thatthe
bank shallbe readywithin oneto two monthsof comtnencement
As a
placingof stonesin the apronand in the slopepitchingcan be comnrenced.
guricleline,
earthwork shouldbe completedwithin 80 per centol'workingseasonand
70 per centworkingseasonshallbe availablefor layingapronand pitching.No
abor-rt
portion ol'the guidebank shouldbe left below HFL beforethe onseto{' monsoon.
water/lowestwaterlevel
Boltom of,apronpit shall be as low as permittedby sr-rb-soil
as shown on the drawingsor as directedby the Engineer.Sufficientlabourand
appropriate eafth moving machinery and trained staff shall be dcployed ir-r
coustlutctiotr
(r0s)
2.2.5 The Contractor shall fr,rrnishhis planning and rnethodologyfor appfoval of the
Engineerregardingtransporlof stonesfrom the quarriesto the site of work taking into
accoLrntthe quantities of stone required to be transported every day, truck, etc.,
and
deployed,availableferry or boatsand labouravailablefor loading and r-urloading
of
guide
reserve
bank.
Adequate
for laying within the time frame for constructionof
Reserve
stonesshor-rldbe maintainedfor major works as decidedby the Errgineer.
stonesshall be stackedfar awayfrom the main channelof the river.
2.2.6 Where the alignmer-rtof gr"ridebank or the approachembankmentcrossesbranch
channelofthe river, the branchchannelmay be eitherdivertedto the nrainchannelof
the river with the help of spllrs,etc.or closedby a properlydesignedclosingdyke or
(gundabund)beforetaking up constructionof guidebank.
closurebr-rnd
2.3
APRON
2.3.1 General
This work shall consistof furnishingand placinga protectivecoveringof erosion
pieces
resistantmaterialas riprap.This work shall consistof laying boulders/rock
directlyon the bed of riversfor protectionagainstscour.The work shall be carriedout
strictly in accordancewith the specificationsand in conforn,ity with lines, grades,
thichnessetc shownon drawings.
2.3.2 Laying Iloulder Apron
of stoneirr the
To ensnreregularand orderly dispositionof the fr-rllintendedqr"rantity
preparedfor
leveled
and
apron,the surfaceon which the apron is to be laid shall be
which
apronis
the ler,gthand width as shownon the drawings.In casethe surfaceon
low
water
to be laid is below the low water level,the groundlevei n-raybe raisedupto
level by durnpingeafth and the apron laid thereon.The qurantityof stonerequiredin
by takingthetoe of pitchingat higlrerlevel.
the apronshallbe reworkedor"rt
The rock/stonefor apronsl-rallbe placedby equipmenton the surfaceand to the depth
indicatedon drawings.l'lie rock/stoneshall be placedto the fr-rllcolrrsethicknessin
of underlyingrnaterial.
manneras to avoid displacement
one operationand in sr-rch
Tlie rock/stoneshall be placed in a mannerthat will ensllrethat the locl</stoneis
reasonablyhomogenouswith the large piecesuniformly distributedand finnly
with the smallerpiecesand spallsfilling the voids betweenlargepieces.
interlocked
Somehandplacingrlay be requiredto provideneatand unifonn surf,ace.
2.4
2.4.I Description
This worl<shall consistof coveringof the slopesof guidebanks,trainingworks and
with erosionresistantmaterial;stone,boulders,over a layer of
road embankrnents
granularmaterialcalledfilter asshownon the drawings. While river sideslopesare
giverrthis plotectionagainstriver action,the rearslopes,not subjectedto directattack
of the river,rnay be protectedagainstordinarywavesplashingby 0.3-0.6metrethick
cover of riprap, clayey or silty earth and turfed. The materialsshall bc tested in
andshallmeetthe prescribedcriteria.
with theseSpecifications
accorciance
(106)
99
(107)
agglorrerates
or Alluvial cobbleswill not be permitted.Roundbouldersshall not be
allowed. Samplesof the stone/rockpieces to be used shall be sr"rbrnitted
to and
work.
approvedby the Engineerbeforeany pieceis usedin the pernranent
The size of stoneshall be as large as possible.In no caseany fragmentshall weigh
lessthan 60 kg. The specificgravity of stonesshallbe ashigh as possibleand it shall
not be lessthan 2.60.The sizesof spallsshall be a minimr"rm
of 25 rnrnand shall be
to fill the voidsin the pitching
sr-ritable
witlr ASTM
Abrasionafter 1,000revolutions
in a Los Angelesmachinein accordance
shall be measured
in
C 535 shallnot exceeda lossin weightof 40%o.
The soundr-ress
sodium sulphatesolutionin accordancewith ASTM CBB,ar-rdthe weight (ossafter 5
in accordance
with ASTM C
cyclesshall not exceed5Yr.The absorptionmeasured
97 shallnotexceed2Y,
as would
Rock piecesshall not containimpuritiesor foreign mattersin such qr-rantity
be darnagingto the environmentor the integrityof the Works.
The averageclensityof the stones/rockpiecesshall rrot be less than 2,600 l<g/cum,
pieceshaving
piecesby weightcomprisirrg
with not rnorethan 10%of the stones/rock
a der-rsitylessthan 2,550 kg/cu m. Not more than 5% of the stones/rockpiecesby
weight shall comprisepieceswhosemaximumdimensionis greaterthan threetimes
their minimurndimelisiorl,
wherethe minimumdimensionis definedas the minimum
distancebetweentwo parallelstraightlinesthroughwhichthe piececanjust pass.
The "Wx" of the stones/rockpieces is defined as the weight, which exceedsthe
'l'he
medianstoneweight (W50)of the
r.veightof xYoby weightol'the rock pieces.
piecesshall not be lessthan the valuedefinedou the Drawingsfor the
stones/rock
parlicr"rlar
type of pitchinglripraplapron.
The ratio of Ws5to W15shall not be lessthan
threerrorgfeaterthanten,and no pieceof rock shallweighmore than five timesthe
'fhe
valueof W3sshallnot be Iessthanhalf of,Ininimunrvalue
requiredvalueof W56.
W.n.
of
piecesshallcornprise
piecesweighinglessthan
Not morethan2Yoof the stones/rock
valueof W5s.
onethirliethof r"equrired
2.4.2.3Filter layer (m edia)
The nraterialfor the filter shall consist of sand, gravel,stone or coarsesand.To
preventescapeof the eurbarrkment
materialthror-rgh
the voids of the stone/rockpieces
as well as to allow fi'eemovementof water without creatingany Lrplifthcad on the
commonlyknown as a filter
pitching/riprap,
one or morelayersof gradedmaterials,
the pitching/riprap.
shall be providedunderneath
layer (medir"rm),
nts:
The gradationof tl-iefilter materialshall satisfythe following requireme
Provisionof a sr,ritablydesignedfilter is necessaryunderthe slope pitching/riprapto
prevent the escape of underlyir-rgembankrnentmaterial through the voids of
to the attackof flowing water and wave action,etc.
stone/rockpieceswhen sr"rbjected
the filter may be providedin onc or morelayers
In orderto achievethis requirernent,
satisiyingthe followingcriteria:
100
(108)
D 15(Filter)
<5
D 85 (Base)
D 15(Filter)
<20
4<
D 15(Base)
D s0 (Filte0
<25
D 50 (Base)
consistsof CH soilswitlr liquid limit
Filterdesignmay not be requiredif embankment
greaterlhan 50 resistantto surfaceerosion.In this case,if a layer of rrraterialis used
as beddingfor pitching,it shallbe well gradedandits D 85 sizeshallbe at leasttwice
the maximumvoid sizein pitching
In theforegoing,D i5 meansthe sizeofthat sievewhich allows 15 per centby weight
it andsimilaris the meaningof D 30 and D 85.
of the filter materialto passthrourgh
If more than one filter layer is required,the same requirementas above shall be
followed for each layer. The finer filter shall be consideredas base nraterialfor
selectionof coarserfi lter.
to a firm condition.The thicknessof filter is generally
The filter shallbe compacted
200
mrn. Wherefilter is providedin two layers,thickness
of
mm
to
300
of the order
150
mm.
of eachlayershallbe
2.4.3 Construction0perations
the side of banksshall be trimmed to the required
Beforelaying the pitching/r'iprap,
slopeand profilespr,rtr,rpby meansof line and pegsat intervalsof 3 metresto ensure
shall be filled arid
regularstraightwork and a r"rniformslopethroughout.Depressions
thoroughlycompacted.
The filter granular material shall be laid over the preparedbase and suitably
compactedto the thicknessspecifiedon the drawings.
The lowest collrseof pitching/riprapshall be starledfrom the top of apron and
lupin courscsupwards.
The stonepitching/riprapshall commencein a trenchbelow the toe o[ the slope.
Stoneshall be placedby derrickor by handto the requiredlength,thicknessand depth
conformingto the drawings.Stones/rockpiecesshall be set normal to the slope,and
to the face of the slope,Llrtless
placedso that the largestdimensionis perpendicular
of pitching.
thickness
suchdimensionis greaterthanthe specified
Tlre largeststonesshall be placedin the bottomcoursesand for Lrseas hcadersfor
cout'ses.
sr-rbscquetrt
(10e)
2.5.1 Measurement
The differentitems of work involvedshall be measuredasprovidedbelow:
a. Clearing& Grubbingreferitem 101.3of NHA GeneralSpecifications
b. Compactionof NaturalGroundreferitem 104.3of NHA GeneralSpecifications
c. Roadwayand Borrow Excavationrefer item 105.4of NHA CerreralSpecifications
106.3of NI-IA General
of NI"IA General
b'
1,02
( r10)
Pay Item
No.
Description
101
Clear"ing
& Grubbing
SM
104
Compactionof NaturalGrour-rd
SM
106c
ExcavateSurpiusCommonMaterialin drylwetarea
CM
1OBa
Fonnationof Embankmentfrom
RoadwayExcavationin commonmaterial
(in dry/wetarea)for Apron, GurideBanks,
Cunettectc
CM
201
GranularSubbase
CM
s09b
RipRapClassB
CM
613a
Sprigging
SM
6 13 b
Sodding
SM
613c
Top Soil
SM
sP-2.1
FilterLayer(Medium)
CM
sP,2.2
on Slopes,
ClassDi (Wso:80-100kg)
StonePitching
CM
sP-2.3
kg)
Riprapin Apron,ClassD2 (Wso: 100-150
CM
(111)
ADDENDA/CORRTGENDA
TO
NHAGENERAL
SPECIFICATIONS
1998
ADDENDA/CORRIGENDA
INTRODUCTION
Specificationshall be read in coniunctionwith NFIA General
This Addenda/Corrigendato NHA Ger.reral
In caseany GeneralSpeciticationsare at variancewith any
Specification1998 and other contractdocunrents.
shall prevail.
rrigenda.the Addenda/Corrigenda
plovisionof theseAddenda,/Co
P a g e1 0 0 - 3 .I t e m 1 0 0 . 7 .
Line I wlite "Pipe Culverts" insteadof Culverlsand
P a g e1 0 0 - 3 ,I t e u r 1 0 0 . 9 .
Lir-re2 Renrove"Clar,rsel7 of General"and rewordthe senteuceasl
"The Corrtractorshall be responsiblefol setting out of the wolk in accoldancewith thc Conditions of
revisions".
Contract,ContlactDrawings and any subsequent
3.
P a g el 0 l - 1 . I t e m 1 0 1 . 21. , C l e a r i n g / G l u b b i n g ,
In flfth line ol'first para replace"natural surface"with "natural surfaceot' sub-grade"
tl.
P a g el 0 l - 2 , I t e m 1 0 1 . 3 . 2 .
Line 4 Delete after "restolation of area" and add "to its original degreeo1'compactionand to oligir.ral
leve1".
P a g e1 0 2 - 1 i,t e r n 1 0 2 . 3 .
Line 5 Add "The tree, stumpsand rootsremainthe propertyof Employer,which shall bc
designatedplace as dilected by the Engineer".
Requirements
Page 104-1,Item 104.2. Construction
ReplaceTable as follor,vs:
Percent of Maximum l)ry l)ensity
-l'-180
as determined by AASI{TO
'B' or 'l)'
95%
93%
95%
F o r I l c i g h t o f E m b a nk m e n t
Level
l3clow sr-rb-grade
0-30cm
Over 30 cLn
Below the for"tndationof Structures
10.
Excavation.
Page 105-2,Item 105.2.3,Stfr.rctu|al
Insert"." in betweenthe rvords"description"and "methodof tneasurement".
as ttnder:
Page 105-2,Item 105.3,Rewritesecondparagraph
"The pratelialshall be consiclsred
unsuitableif soakedCBR is lessthan Five (5) percerrtol if it falls
l n c l e r - r \ - 6 o r A - T o f A A S H T O s o i l c l a s s i i i c a t i o nF.o r m a t e r i a l s w i t h C B R v a l r " r e o f F i (v5e) p e r c e n t o r
mor-ebut less than Ten (10) percentthe Contractorshall blend sttch tnaterialrvith other sr-ritable
rnaterialso that it becomessuitablefor embankmentwith reqtriredCBR as shown ot.tthe drawings.
fbrnr
to be includedin Item l08a Forrratiouof lln.rbarrkment
Paymentot'blendingshall be considelecl
RoadwayExcavation".
Page 105-3,PageItem 105.3.
Pala 5 l-ine I De tete"Rock. shaleand othef'.
Line 4 Lastword delete"Earth" andwrite "glanular"
ai
,a
'
A&c-| 04
,
( 1l 3 )
I3.
t4
l5
P a g e1 0 7 -I . l t e m 1 0 7 . 2 . 2 . ( c ) .
[,ine I Replace"size" witl.r"six"
16.
Page 107-4,Iteur 107.3.2secondpara first line delete"20 crns"and write " l5 cms".
11
ll
Page 107-5.Item 107.3.3(b) flfth line clelete"20 cms" anciwrite " t5 cms".
l8
Page107-6,Itern 107.3.3.Backfill,
Replacetlresub Item h) with lbllowing wording:
No backllll shall be replacedagainstany concreteor masonrystl'uctureuntil penlission sliall
have been given by the Engineer. Backfilling shall not be carlied out ur.rtilthe coucreteor
lutasonrystnlcture has been in place for foufteen (.l4) days. and sub.iectto concl'etecylinder'
compressivestrengthachieving twice the stressto which the structurewill be sub.lected.l'he
conct'etecylinders shall be cured undel identical site conditions to concfete / masonry
to tlre
stmcture and in a manner approved by the Engineer. The Contractol shall .sr-rbnrit
in question".
EngineertLrllcalcirlationdetailsofthe stresses
"h"
l9
l equirements,
P a g e1 0 8 - 1 I, t e m 1 0 8 . 2 .M a t e r i aR
Replacesub-itemb) with following wording:
shown on the dlawing, determinedirr
CBR of the fill materialshall not be lessthan the vah"re
to
with AASI-ITOT-193. CBR valueshall be obtainedat adensitycorresponding
accordance
the degreeofcompaction ofthat layer.
"b)
20.
0-30cm
Over'30cm
2t.
'B'
RelativeDensityin caseo1'sandl'ill
Method
or'D' whichevelis applicable,or correspor.rdirig
Page 108-3,Itern 108.3.2.Fortlationof Embankmentwith Rock Material,
o1'thethird paragraphof this sub-itemwith the tbllowing r,volding:
Replacethe secondsentence
"Rock f ill shallnot be placedwithin the following depthsfi'omtop of subgrade:
oJ
22
950/o
93Yo
60 cnr.
I 0 0c m
A&C- | 05
( 11 4 )
ZJ
2.1.
, d d I t e m l 0 8 . 3 . 7a s u n d e r :
P a g e1 0 8 - 5 A
"108.3.7' Trial Sections
"Before starting the formation of the embankmentthe Contractor shall constructa nrinimuut of tlrree
tlial sectionsoi200 meters each fbr each soil type proposedto be used for conrpactionas directed by
the llngineer. The soils used in the trials shall be the same as those intendedto be used fbr the
fbrmationof embankmentand the compactingequipmentshall be sanreequipmerltthat the Contractor
will r:seduringcompactionof ernbankmentandthat hasbeenacceptedby the Engineer.
The ob-iectof tl.resetrials will be to determinethe suitablemoisture content arrd the relationship
equipmentand densityobtainedfbl particulartype of soil.
betweenthe nurnberof passes o1'compacting
for
this
work,
which will be requiredas a strbsidiaryobligationof
payment
will
be
made
No separate
the Contractunder Pay Item Nos. 108a, 108c, 108d.as the case may be". If the trial sectionsare
carricdout in the permanentworks and approvedby the Engineef,the lengihsol'the trails shouldbe
deductedfronr the costofthe respectiveperlranentworks."
25.
26
P a g c1 0 8 - 6 I. t e r nl 0 8 . z lL.
StltrctutalExcavation.
Add wold "suitable"beforeRoadwayExcavationar.rd
27.
28.
29
"Soils having a minimum CBR value as shown on the drawing and deternrinedat 95'% cor-npaction
with swell value of not more than 0.3 percent,and snlchargeweights representingthc over burden.
shallbe used".
30.
3l
)L.
f)escription
SubgradePleparationin Existing Roadwith AggregateBase
Unil of
iVlcasurc m ent
SM
A&C-r06
/l l {\
Constrr"rction
of ShaheedBenazir Bhutto Bt'idgeover Rivet'Indus
ConnectineChachranShalif with l(ot Mithan
Contract4: River Tlaining & PlotectionWorks
74
ERRATA
Page No.
Para No.
Line No.
G -r 0
loth
3rd
2nd
I Oth
lst
2nd
lst
lst
lst
lst
5th
Col. S&T
Frequency
Col. S&T
Frequency
Col. S&T
Frequency
Col.Desig.
Col. Mat.
Col Desig.
Col Desig.
Col. S&T
Frequer-rcy
Col. S&T
Frequency
3rd
3rd
G-il
G-12
G-r6
G-t7
\J-
I /
G-20
G-20
G-21
u-zz
G-26
G-28
G-28
G-28
G-28
G-36
104-l
I 05-3
107-l
4tl.r
'lth
7th
Read
lsI
Read'M'as'CM'
I 6th
4th
8rh
l4rh
41"l'r
'AASHTO T-30'
Read'T-30' as
'Mixture'
'Premix
Replace
Asphalt'by
Replace'M-6' by'T-27'
Replace'M-6' by'T-21'
R e a d' l l 5 0 0 ' a s ' l l 1 0 0 0 '
9th
8th
3rd
lst
lst
2nd
202-l
2 0 3 - lI
204-l
204-1
205-3
214-4
2t5-I
215-3
301-l
3 0 1r-
Last
2nd
lst
5th
6th
lth
Ist
2nd
3rd
1Oth
Table
Table
302-l
305-6
310-8
310-8
3 l 0 -l 2
3ll-8
3ll-8
40r-30
405-l
5th
Table-l
4th
6th
2nd
3rd
3rd
5rh
4rh
2nd
4th
8th
I 3th
lst
3rd
5th
I6th
8th
407-t2
4tt-l
6 0 1I605-2
607-l
607-5
601-7
608-2
608-8
608-9
608-9
G-19
3r'd
Heading
6tlr
Last
2nd
5th
5th
lst
lst
5th
Ttlr
C o l .S & T
6rh
lst
lst
Last
lst
4th
3rd
lst
2nd
Ist
2nd
2nd
r09-r
Change
ISI
2nd
2nd
2nd
3rd
5th
lst
lst
lst
6rh
' 'CM:.
:n as
Rpacl
A&GIC'
(l l6)
ParaNo.
Line No.
G -r 9
G -r 9
G-r9
c-25
G-25
609-r
Col.S&T
Col.S&T
Col.S&T
Heading
Col.Mal
4th
5th
6th
ztla
6tii
lst
Change
R e a d' M ' a s ' C M ' .
Read'M'as'CM'.
Read l/200 M as l/200 M/Layer
Read'CRACK-RELIFE' as'CRACI(-RIILIIIF'.
'gfaded'.
Read 'gracleed'as
'of '
'or'.
Replace
by
A&c-| 08
(l 17)
Supplementary
Specifications
SUP.,PLEMENTARY
SPECIFICATIQN]S
Package-4:Construction of River Training & ProtectionWorks (Consistingof Guide Banks, Gunda Bunds and
Cuneue)ofShaheed Benazir Bhutto Bridge over River Indus ConnectingChachranSharifwith Kot Mithan.
(r18)
Supplementary Specifications
TABLE OF CONTENTS
SUPPLEMENTARY SPECIFICATIONS
SS-1
SS-2
SS_3
SS_4
SS-5
SS_6
SS-7
SS-8
SS_9
SS-10
SS- 11
SS-12
SS-13
SS_14
SS-15
SS_16
SS_17
SS_18
SS- 19
SS-20
SS-21
SS-22
SS-23
SS_24
SS_25
SS-26
SS-27
SS-28
SS_29
Progress Reports
Attendance of Meetings
Supply of Bitumen and Cement etc.
Electric Supply Rates and Prices Inclusive
Rates and Prices Inclusive
Provision of Plant
Rates inclusive of Lead and Lift
Borrow Areas
Time for Completion of Works
Document Not to be Altered or Mutilated
Personal Liability of Public Officials
Accessand Canal Roads
Railway Traffic
Irrigation Flow
Utility Lines
First Aid Facilities
Location of Contractor's Camp
Final Hand-Over
Making Good Damage to Services, Earthwork, etc.
Return of Plant, Materials, etc.
Method of Measurement
Record of Measurements
Dangerous Materials
Progress photographs
As Built Drawings/Shop Drawings
Safety Precautions
Income Tax
Satellite Imageries
Trainee
Package-4:Construction of River Training & ProtectionWorks (Consisting of Guide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus Connecting ChachranSharif with Kot Mithan.
( 11 e )
SUPPLEMENTARY SPECIFICATIONS
ss-1
Progress Report
The Contractor shall submit to the Employer fortnightly
progress reports in two copies detailing the progress in the
execution of work during the reporting period. The submission
of the progress reports shall be condition precedent to the
payment of Contractors Bills by the Employer. One week in
advance the Contractor shall submit for the Employer's
approval, particulars of the work he proposes to execute
within the following two weeks.
ss-2
ss-3
Attendances of Meetings
(a)
The Contractor shall attend and shall cause his SubContractors to attend any or all meetings when called
by the Employer or the Engineer to discuss progress of
the Work and other matters related to the Work and
the Contract, without any compensation from the
Employer.
(b)
SS-4
Electric Supply
The Contractor shall make arrangement for the electric power
supply and distribution of the same at the site of Works for
,,,.
the completion of the Works at his own exp_,elpe,,
,,
Package-4:Constructionof River Training & ProtectionWorks (Consistingof Guide Banks, Gunda Bufrds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachranSharif with Kot Mithan.
(120)
Supplementary
ss-5
Specificatlons
(b)
(c)
(d)
(e)
(0
(e)
(h)
(il
maintenance
of Contractor's
Furnishing
and
works,
fuel
for
Equipment,
temporary
Equipment,
tests, samples and labour necessary for execution of
the works, Equipment for transport, machines, test
laboratories, Site Office and sheds including all
expenses for the furnishing and maintenance of the
Workshops and storage areas used by the Contractor.
Required power, water and other services.
Illumination and safety at Site.
All additional costs due to any kind of difficult
working, conditions and interruptions which may
possibly be caused by adverse physical conditions.
Staff allowances, ambulances, expenses for medical
treatment, traveling expenses, holiday wages and
salaries and all other Costs for all employees, the
required means of communications such as telephone
and the like, the required means for protection
against accidents.
A11 expenses for royalties, licenses, liabilities
insurances, rent, hire and the like in connection with
the Works.
Other special work arrangements and provisions not
mentioned here but necessary for the proper and
complete execution of the Works.
All Government and/or Municipal taxes, customs
duties, excise duties, stamp duties or any other dues,
taxes or charges.
Cost of all insurances to be kept in foree dgring the
period of construction and the period' o,f.'maint"endnce
of the works under the Contract.
Package-4:Construction of River Training & ProtectionWorks (Consisting of Guide Banks, Gunda Bunds dnil
Cunette)ofShaheed Benazir Bhutto Bridge over River Indus ConnectingChachranSharifwith Kot Mithan.
(r2t)
U)
(k)
(1)
ss-6
Provision of Plant
In respect of any contractor's Equipment in general, except as
provided for in these Documents, which the contractor shall
be required to have available at Site for execution of Works in
accordance with the Drawings, Specifications or as directed by
the Employer, he shall make his own arrangements for foreign
exchange, import formalities, customs transport to the Site of
Works and all other formalities whatsoever at his own cost
and responsibility.
The Contractor shall be deemed to have taken into
consideration all Government or Local Bodies regulations, for
the time being in force, regarding the re-export of any plant
and equipment which he may have to import in connection
with the works. Any amendments to the existing rules andlor
further regulations imposed in this respect by the Government
of Pakistan shall be strictly followed by the Contractor.
ss-7
ss-8
|.i
'r
Borrow Areas
,::'l
,""s
",,v
Package-4:Construction of River Training & ProtectionWorks (Consisting of Guide Banks, Gunda Bunds and
Cunette) ofshaheed Benazir Bhutto Bridge over River Indus Connecting ChachranSharifwith Kot Mithan.
(r22)
Supplenentary
Specifi cations
ss-9
SS - 10
ss - 11
(123)
Supplementary Specifications
ss-12
ss-13
!r
iGe
\,-
1-'r
,'-.;,
'r
/)
}.-
:.;i>
Railway Traffic
Where construction work or operations of the Contractor are
performed within the limits of the right-of-way of the Pakistan
Railways, the Contractor shall cooperate with the railway
administration in order to expedite the work and to avoid
interference with the operation of the railway. Before
performing any work on his sidings yards or on other
transportation facilities adjacent to existing railways, the
Contractor shall enter into an agreement with and shall meet
all requirements of the railway administration within the area
of the Contractor's operation for the protection of its lines
against damage, interference with traffic or service thereon by
the operations of the Contractor under this Contract. The
Contractor shall not store or place any materials or equipment
on the right-of-way of the existing railway in such a manner
as to interfere with the operations of trains or the
maintenance of the rail bed and track. In advance of any
operation which may unavoidably interfere with the operation
of the railway, the Contractor shall notify the superintendent
of the corresponding Railway division in order that proper
flagging or other protection may be provided. The cost of
providing and maintaining all necessary safety meastlres,
watchman guards, signals and temporary structures or
.]j?;.-_:l-:.
Package-4:Construction ofRiver Training & ProtectionWorks (ConsistingofGuide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over fuver Indus ConnectingChachranSharif with Kot Mithan.
(r24)
Supplementary Specifications
ss- 14
Irrigation Flow
The Contractor shall conduct his operations so as to offer
the least possible obstruction for maintaining flow in
irrigation canals, channels and water courses. The
Contractor shall observe all rules and regulations of
appropriate authorities regarding the interruption and
maintenance of flow in irrigation canals, channels and water
sources and the Contractor shall save harmless and
indemnify the Employer in respect of all claims, demands,
proceedings, damages, costs and expenses whatsoever
arising out of or in relation to any such construction,
operations or interference with irrigation flow.
The Contractor shall maintain alternate channels wherever
temporary relocation of irrigation channels is required or
where his operations disrupt the irrigation flow, without any
compensation from the Employer.
ss-15
Utility Lines
The Contractor shall conduct his operations, make
necessary arrangements, take suitable precautions and
perform all required work incident to the protection of and
power transmission,
avoidance of interference with
telegraph, telephone and natural gas lines, oil lines water
and sewerage mains and other utilities within the areas of
his operations in connection with this Contact and the cost
thereof shall be borne by the Contractor and the Contractor
shall save harmless and indemnify the Employer in respect
of all claims, demands, proceedings, costs, charges and
expenses whatsoever arising out of or in relation to any such
interference.
i.
".'
i\
-.\'".::r.,
-:.
-,'
Package-4:Construction of River Training & ProtectionWorks (Consisting of Guide Banks, Gunda Bunds and
Cunette)ofShaheed Benazir Bhutto Bridge over River Indus Connecting ChachranSharifwith Kot Mithan.
(r2s)
ss-16
ss- 17
ss-18
ss-19
ss-20
etc
(126)
ss-21
Method of Measurement
The measurement of the Work shall be performed on the
basis of the Specifications. If these measurements exceed the
measurements indicated in the Specifications and Drawings,
excepting those directed by the Employer, such excess shali
be on the account of the Contractor and he shall not be
entitled to any compensation therefore. But if they are less
than the measurements indicated in the Specifications and
Drawings then the Works actually executed shall be
measured, provided they are technically acceptable and
there is no provision to the contrary in any other part of the
Contract Documents. A11work completed under the Contract
shall be measured according to the metric system for all
items, unless otherwise provided herein or in the special
Provisions. A11longitudinal measurement for area or volume
will be made horizontally along the road centre line, and no
deduction will be made for individual fixtures in the
pavement having an area of 1 sp. Meter or less. All
transverse measurements for area or volume of pavement
courses will be made horizontally in accordance with the
dimensions indicated on the plans, or the dimensions
ordered by the Employer. In computing volume of
excavation, embankment and borrow, the average end-area
method will be used.
Quantities of materials wasted or disposed off in a manner
not called for under the Contract or rejected loads of
materials, including material rejected after it has been
placed by reason of the failure of the contractor to conform
to the provisions of the Contract, or material not unloaded
from the transporting vehicle, or material placed outside of
the lines indicated on the drawings or established by the
Employer, or material remaining on hand after completion of
the work wiil not be paid for and such material should be
disposed off by the Contractor at his own expense. No
compensation will be allowed for hauling rejected materials.
The Works shall be measured net notwithstanding any
general or local custom except where otherwise specifically
described or prescribed in the Contract.
(127)
ss-22
Record of Measurements
The Contractor will supply to the Employer's Representative
six (6) copies of the abstract of Contractor's certificate of
payment every month along with two copies of detailed
measurements, quality control tests and cross sections with
calculations, and any other document or information which
form the basis of payment.
ss-23
Dangerous Materials
The Contractor and his sub Contractor shall convey, store
and make use of all explosives, dangerous petroleum,
acetylene, carbide of calcium and other similar material
provided by them for use in or on the works in strict
accordance with the provision of all laws, orders and
regulations that are in force at the Site or may be issued
from time to time by the Government.
ss-24
Progress Photographs
The Contractor shall furnish to the Employer every two
weeks at least four photographs to clearly show the progress
of construction. The photographs shall be submitted in three
glossy prints 2Ocm x 2Ocm, together with the negative. Each
print shall be marked on the back with the date and serial
number. There shall be no writing, lettering or marking on
the face of the photograph.
ss-25
Packagd-4:Construction of River Training & ProtectionWorks (Consistingof Guide Banks, Gunda Bunds and
Cunette)of ShaheedBenazir Bhutto Bridge over River Indus ConnectingChachran Sharif with Kot Mithan
(128)
Supplementary Specifications
ss-26
Safety Precautions
The Contractor shall adequately provide for the safety,
health and welfare of persons and for the prevention of
damage to works, material, equipment for the purpose of or
in connection with the Contract.
ss-27
ss-28
Satellite Imageries
Contractor shall provide satellite imagery of the project site
before execution of Work. Updated satellite imagery shall be
provided with each monthly progress report. Provision of
updated imagery shall be recorded in the measurement
book. The cost of providing satellite imageries is deemed to
be included in other items of BOQ.
ss-29
Trainee
V-vt(. '',I
>4
,,'
Package-4:Construction ofRiver Training & ProtectionWorks (Consisting ofGuide Banks, Gunda Bunds and
Cunette) ofShaheed Benazir Bhutto Bridge over River Indus ConnectingChachranSharifwith Kot Mithan.
(12e)