Installation Guide

8 (Optional) Installing Batteries and Cables

(Optional) Installing Batteries and Cables

Smoking and sparks are prohibited near batteries.

Switch off battery circuit breakers before installing batteries.

Comply with regulations and warnings of the battery manufacturer.

Use tools with insulated handles, otherwise, batteries may be burnt out and personal injury
may occur.

During battery operations, wear goggles, rubber gloves, and protective clothes. Remove
conductive articles such as watches, bracelets, and rings.

If battery acid gets in the eyes, rinse with cold water for more than 15 minutes and seek
media advice immediately. If battery acid contacts skin or clothing, wash with soap and
water immediately.

Do not use metal to simultaneously contact two or more battery terminals. Do not use
metal to simultaneously touch battery terminals and grounded objects (for example,
battery compartment); otherwise, transient short circuit occurs, which produces sparks or
explosion.

During battery installation, never short-circuit or reversely connect positive and negative
battery terminals. Connect the negative battery cable before the positive battery cable.

Secure battery cables to a torque specified in battery documentation. Loose connections


will result in excessive voltage drop or cause batteries to burn out when the current is
large.

The following describes how to install the first layer of battery. All batteries are installed in
the same manner. Figure 8-1 shows battery installation completed.

Issue 01 (2014-07-09)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

68

TP48200A-HX09A5 & HX09A6 & HX09A7 &


DX09A2 & TBC300A-DCA6 & DCA7 & TCA3
Installation Guide

8 (Optional) Installing Batteries and Cables

Figure 8-1 Battery installation completed

8.1 (Optional) Installing Antitheft Baffle Plate Bases for


the Battery Cabinet
Procedure
Step 1 Remove screw caps from the position for installing antitheft baffle plate bases on the battery
cabinet.
Step 2 Install the antitheft baffle plate bases on the cabinet.

Issue 01 (2014-07-09)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

69

TP48200A-HX09A5 & HX09A6 & HX09A7 &


DX09A2 & TBC300A-DCA6 & DCA7 & TCA3
Installation Guide

8 (Optional) Installing Batteries and Cables

Figure 8-2 Installing antitheft baffle plate bases

----End

8.2 Installing Busbars


Prerequisites
Install busbars when there are two battery cabinets.

Procedure
Step 1 Take out positive and negative busbars from the fitting bag, and remove insulation covers.

Properly store the covers and reinstall them after installing battery cables.
Step 2 Remove screw caps from the position for installing battery cabinet busbars.
Step 3 Install two negative busbars on the left panels of two battery cabinets respectively.

Issue 01 (2014-07-09)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

70

TP48200A-HX09A5 & HX09A6 & HX09A7 &


DX09A2 & TBC300A-DCA6 & DCA7 & TCA3
Installation Guide

8 (Optional) Installing Batteries and Cables

Step 4 Install two positive busbars on the right panels of two battery cabinets respectively, as shown
in Figure 8-3.
Figure 8-3 Installing busbars

(1) Negative busbar

(2) Positive busbar

----End

Issue 01 (2014-07-09)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

71

TP48200A-HX09A5 & HX09A6 & HX09A7 &


DX09A2 & TBC300A-DCA6 & DCA7 & TCA3
Installation Guide

8 (Optional) Installing Batteries and Cables

8.3 Installing Battery Strings


Prerequisites
Ensure that batteries are from the same manufacturer and of the same model and have a close
voltage. New and old batteries cannot be used together.

Procedure
Step 1 Install batteries into the battery compartment in the sequence shown in Figure 8-4.
Figure 8-4 Installing battery strings

----End

8.4 Installing Copper Bars Between Batteries


Procedure
Step 1 Remove the insulation cover from the batteries.
Step 2 Install copper bars between batteries.
Step 3 Reinstall the insulation covers onto the two batteries in the middle.

Issue 01 (2014-07-09)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

72

TP48200A-HX09A5 & HX09A6 & HX09A7 &


DX09A2 & TBC300A-DCA6 & DCA7 & TCA3
Installation Guide

8 (Optional) Installing Batteries and Cables

Figure 8-5 Installing copper bars between batteries

----End

8.5 Installing Battery Cables (One Battery Cabinet)


Prerequisites

When installing battery cables, install the negative cable before the positive cable.

Procedure
Step 1 Lay out battery cables. Secure one end of a negative battery cable to the battery circuit
breaker on the power cabinet, and the other end to the negative battery terminal.

After you install all negative battery cables, install positive battery cables.

Issue 01 (2014-07-09)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

73

TP48200A-HX09A5 & HX09A6 & HX09A7 &


DX09A2 & TBC300A-DCA6 & DCA7 & TCA3
Installation Guide

8 (Optional) Installing Batteries and Cables

Step 2 Secure one end of a positive battery cable to the RTN+busbar on the power cabinet, and the
other end to the positive battery terminal.
Step 3 Reinstall insulation covers for batteries on the left and right.
Figure 8-6 Installing battery cables (using the TP48200A-HX09A5 as an example)

----End

8.6 Installing Battery Cables (Two Battery Cabinets)


Prerequisites

When installing battery cables, install the negative cable before the positive cable.

Issue 01 (2014-07-09)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

74

TP48200A-HX09A5 & HX09A6 & HX09A7 &


DX09A2 & TBC300A-DCA6 & DCA7 & TCA3
Installation Guide

8 (Optional) Installing Batteries and Cables

Procedure
Step 1 Take out two negative battery cables. Connect one end of the cables to the negative busbars
for two battery cabinets and the other end to battery circuit breakers on the battery cabinet.
Step 2 Take out four negative battery cables. Connect one end of the cables to negative busbars on
two battery cabinets and the other end to negative battery terminals.
Figure 8-7 Installing negative battery cables

After you install all negative battery cables, install positive battery cables.

Issue 01 (2014-07-09)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

75

TP48200A-HX09A5 & HX09A6 & HX09A7 &


DX09A2 & TBC300A-DCA6 & DCA7 & TCA3
Installation Guide

8 (Optional) Installing Batteries and Cables

Step 3 Take out two positive battery cables. Connect one end of the cables to positive busbars on two
battery cabinets and the other end to the RTN+ busbar on the power cabinet.
Step 4 Take out four positive battery cables. Connect one end of the cables to positive busbars on
two battery cabinets and the other end to positive battery terminals.
Figure 8-8 Installing positive battery cables

Step 5 Reinstall insulation covers for batteries on the left and right.
Step 6 Reinstall the insulation covers for the busbars on the left and right of the battery cabinet, as
shown in Figure 8-9.

Issue 01 (2014-07-09)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

76

TP48200A-HX09A5 & HX09A6 & HX09A7 &


DX09A2 & TBC300A-DCA6 & DCA7 & TCA3
Installation Guide

8 (Optional) Installing Batteries and Cables

Figure 8-9 Installing insulation covers for busbars

----End

8.7 (Optional) Installing Antitheft Baffle Plates for the


Battery Cabinet
Procedure
Step 1 Install antitheft baffle plates on the antitheft baffle plate bases for the battery cabinet, as
shown in Figure 8-10.

Issue 01 (2014-07-09)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

77

TP48200A-HX09A5 & HX09A6 & HX09A7 &


DX09A2 & TBC300A-DCA6 & DCA7 & TCA3
Installation Guide

8 (Optional) Installing Batteries and Cables

Figure 8-10 Installing an antitheft baffle plate

----End

Issue 01 (2014-07-09)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

78

TP48200A-HX09A5 & HX09A6 & HX09A7 &


DX09A2 & TBC300A-DCA6 & DCA7 & TCA3
Installation Guide

9 Verifying the Installation

Verifying the Installation

9.1 Checking Hardware Installation


l

Check that all screws, especially those used for electrical connections, are secured.
Check that flat washers and spring washers are installed properly.

Check that rectifiers are completely inserted into their respective slots and properly
locked.

9.2 Checking Electrical Connections


l

Check that all circuit breakers are switched off.

Check that flat washers and spring washers are securely installed for all the OT terminals
and that all the OT terminals are intact and properly connected.

Check that batteries are correctly installed and that battery cables are correctly connected
without being short circuited.

Check that input and output power cables and ground cables are correctly connected
without being short circuited.

9.3 Checking Cable Installation


l

Check that all cables are securely connected.

Check that all cables are arranged neatly and bound properly to their nearest cable ties
without being distorted or excessively bent.

Check that cable labels are properly and securely attached in the same direction.

Issue 01 (2014-07-09)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

79

TP48200A-HX09A5 & HX09A6 & HX09A7 &


DX09A2 & TBC300A-DCA6 & DCA7 & TCA3
Installation Guide

10 Commissioning

10

Commissioning

The following commissioning procedure may result in power failure or alarm generation.
Inform the alarm center before and after the procedure.

The commissioning involves various technologies. Only trained personnel are allowed to
perform commissioning. Perform operations strictly in compliance with commissioning
instructions.

The commissioning is performed with power on. During commissioning, stand on dry
insulating objects, and remove conductive articles such as watches and rings. Use
insulated tools.

During operations, do not contact two electric bodies that have different currents.

During commissioning, check that the status of the related unit or component meets
requirements before turning on any switch.

When you are performing operations and do not want others to operate, attach the label
"Do not turn on the switch because operations are in process." to the power distribution
device.

During commissioning, shut down the device immediately if any fault is detected. Rectify
the fault and proceed with the commissioning.

10.1 Connecting the AC Power Supply


Procedure
Step 1 Measure the input voltage on the AC input circuit breaker. The value should range from 85 V
AC to 300 V AC.
Step 2 Switch on the AC input circuit breaker and measure the output voltage of the AC input circuit
breaker. The value should range from 85 V AC to 300 V AC.
Step 3 Check that the indicators on the rectifiers are steady on.
Step 4 Measure the voltage between the -48 V busbar and the RTN+ busbar. The value should range
from -42 V DC to -58 V DC.
Issue 01 (2014-07-09)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

80

TP48200A-HX09A5 & HX09A6 & HX09A7 &


DX09A2 & TBC300A-DCA6 & DCA7 & TCA3
Installation Guide

10 Commissioning

----End

10.2 Setting the Display Language


After po
powering on the SMU, select English by pressing
to enter the standby screen.
press

or

on the LCD, and then

If you select an undesired language, remove and then insert the SMU. Select a language again after the
SMU restarts.

10.3 Setting the AC Input System


If the AC input system is dual-live wire, set the AC input system to single-phase on the LCD,
as shown in Table 10-1.
If the AC input system is single-/three-phase, set the AC input system as required, as shown in
Table 10-2.
Table 10-1 Setting a dual-live wire AC input system
Main
Menu

Second-

Third-

Fourth-

Level
Menu

Level
Menu

Level
Menu

Parameters
Settings

Power
System

Basic
Parameters

AC Type

Default

Setting

Single-Phase

Single-Phase

Default

Setting

Three
Phases

Both the
single-phase
and
three-phase
input
systems are
available.

Table 10-2 Setting a single- or three-phase AC input system


Main
Menu

Second-

Third-

Fourth-

Level
Menu

Level
Menu

Level
Menu

Parameters
Settings

Power
System

Basic
Parameters

AC Type

Set to the
local input
system.

Issue 01 (2014-07-09)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

81

TP48200A-HX09A5 & HX09A6 & HX09A7 &


DX09A2 & TBC300A-DCA6 & DCA7 & TCA3
Installation Guide

10 Commissioning

10.4 Setting the Date and Time


l

The LCD screen becomes dark if no button is pressed within 30 seconds.

You need to log in again if no button is pressed within 1 minute.

The preset user name is admin and the preset password is 000001.

Set the date and time as required.


Table 10-3 Setting the date and time
Main Menu

Second-Level
Menu

Third-Level
Menu

Default Value

Setting

Setting Wizard

Date and Time

Date and Time

Set to the local


date and time.

Time Zone

UTC +08:00
Beijing

Set to the local


time zone.

NTP Enable

No

Yes/No

NOTE
The date and
time vary
according to
time zones. Set
the time zone,
date, and time
based on the
local situation.

NOTE
Set the
parameter to
Yes if you need
to synchronize
the SMU time
and the site
network server
time.

10.5 Setting Battery Parameters


Set the Battery N Connected , Rated Capacity and Installation Timeas required.
Table 10-4 Setting battery parameters
Main
Menu

Second-

Third-

Fourth-

Level
Menu

Level
Menu

Level
Menu

Parameters
Settings

Battery

Basic
Parameters

Issue 01 (2014-07-09)

Default Value

Setting Value

Battery 1
Connected

Yes

Battery 2
Connected

Yes

If N battery
strings are
connected, set
Battery 1
Connected to
Battery N
Connected to
Yes, and set the
other
parameters to

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

82

TP48200A-HX09A5 & HX09A6 & HX09A7 &


DX09A2 & TBC300A-DCA6 & DCA7 & TCA3
Installation Guide

Main
Menu

10 Commissioning

Second-

Third-

Fourth-

Level
Menu

Level
Menu

Level
Menu

Default Value

Setting Value

No.
Rated
Capacity

150 Ah

Rated capacity
of the batteries
in a battery
string.
NOTE
The batteries
controlled by
one circuit
breaker or fuse
are called a
battery string.

Other
Parameters

Installation
Time

Set to the
current date

If battery routes 1 and 2 are respectively connected to a battery string (each battery string consists of
four 12 V, 150 Ah batteries in series), set Battery1 Connected and Battery2 Connected to Yes and
others to No, and set Rated Capacity to 150 Ah.

If battery route 1 is connected to two battery strings in parallel (each battery string consists of four
12 V, 150 Ah batteries in series), set Battery1 Connected to Yes and others to No, and set Rated
Capacity to 300 Ah.

10.6 (Optional) Setting the Hibernation Parameter


Set Hibernation Enable to Yes if you need to use the intelligent hibernation function of the
rectifiers.
Table 10-5 Setting the hibernation parameter
Main Menu

Second-Level
Menu

Third-Level
Menu

Default

Setting

Parameters
Settings

Energy Saving

Hibernation
Enable

No

Yes

10.7 (Optional) Setting Sensor Parameters


Set sensor parameters based on site requirements.

Issue 01 (2014-07-09)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

83

TP48200A-HX09A5 & HX09A6 & HX09A7 &


DX09A2 & TBC300A-DCA6 & DCA7 & TCA3
Installation Guide

10 Commissioning

Table 10-6 Sensor parameter settings


Main
Menu

Second-

Third-

Fourth-

Setting

Level Menu

Default
Value

Level Menu

Level Menu

Parameters
Settings

Power System

Sensor
Config. Para.

Water Sensor

None

Smoke Sensor

None

Set to Yes
or No as
required.

Ambient Temp.
Sensor

None

Ambient Humi.
Sensor

None

10.8 Setting Communications Parameters


10.8.1 Setting Parameters Before Using WebUI Management
Procedure
Step 1 Apply to the site or equipment room network administrator for a fixed IP address.
Step 2 Set the IP address, subnet mask, and gateway on the LCD, as shown in Table 10-7.
Table 10-7 IP parameters
Main
Menu

Second-

Third-

Level
Menu

Level Menu

Setting
Wizard

Network
Parameters

Default Value

Setting

IP Address

192.168.0.10

Set this parameter


according to the IP address
assigned by the network
administrator.

Subnet Mask

255.255.255.0

Set this parameter


according to the subnet
mask provided by the
network administrator.

Default
Gateway

192.168.0.1

Set this parameter


according to the gateway
address provided by the
network administrator.

----End

Issue 01 (2014-07-09)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

84

TP48200A-HX09A5 & HX09A6 & HX09A7 &


DX09A2 & TBC300A-DCA6 & DCA7 & TCA3
Installation Guide

10 Commissioning

10.8.2 (Optional) Setting Parameters Before Using the NetEco


Management
Networking Mode 1: over FE Port
Step 1 Apply to the site or equipment room network administrator for a fixed IP address.
Step 2 Set the IP address, subnet mask, and gateway on the LCD, as shown in Table 10-8.
Table 10-8 IP parameters
Main
Menu

Second-

Third-

Level
Menu

Level Menu

Setting
Wizard

Network
Parameters

Default Value

Setting

IP Address

192.168.0.10

Set this parameter


according to the IP address
assigned by the network
administrator.

Subnet Mask

255.255.255.0

Set this parameter


according to the subnet
mask provided by the
network administrator.

Default
Gateway

192.168.0.1

Set this parameter


according to the gateway
address provided by the
network administrator.

Step 3 Set the IP Addresses and Ports for the active and standby servers of the NetEco on the LCD,
as described in Table 10-9.
Table 10-9 NetEco parameters
Main
Menu

Second-

Third-

Fourth-

Level
Menu

Level
Menu

Level
Menu

Parameters
Settings

Comm.
Parameters

Network
Parameters

Issue 01 (2014-07-09)

Default
Value

Setting

NetEco
Primary IP

192.168.0.10

Set an IP
address for
the active
NetEco
server.

NetEco
Backup IP

192.168.0.10

Set an IP
address for
the standby
NetEco
server.

NetEco Port
Number

31220

Set a port for


the NetEco.

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

85

TP48200A-HX09A5 & HX09A6 & HX09A7 &


DX09A2 & TBC300A-DCA6 & DCA7 & TCA3
Installation Guide

10 Commissioning

----End

Networking Mode 2: over RS485 Port


Step 1 Check that the following parameters are set properly: Port Mode to Manual, Protocol Type
to M/S Protocol, Baud Rate to 9600, and Comm. Address to 3.
Table 10-10 Communications parameters
Main
Menu

Second-

Third-

Fourth-

Fifth-

Level
Menu

Level
Menu

Level
Menu

Level
Menu

Parameters
Settings

Comm.
Parameters

Serial
Port

Northbound

M/S
Protocol

Northbound

Default
Value

Setting

Port
Mode

Manual

Manual

Protocol
Type

M/S
Protocol

M/S
Protocol

Baud
Rate

9600

9600

Comm.
Address

----End

10.8.3 (Optional) Setting Parameters Before Using the SNMP


Management
Prerequisites
Before setting SNMP parameters, obtain the information listed in Table 10-11 from the NMS.
Table 10-11 Information obtained from the NMS
Information

Description

SNMP version

SNMP version and port number used by the SMU and NMS.
The SNMP versions include SNMPv1, SNMPv2c, and
SNMPv3.

SNMP Port Number


Read Community Name
Write Community Name
User Name
MD5 Password

If you use SNMPv1 or SNMPv2c, enter the read community


name and write community name that comply with the NMS.
Otherwise, the SMU will not connect to the NMS.
To enhance the security, you need a user name and password
for authentication if you use SNMPv3. After the authentication
succeeds, the SMU can communicate with the NMS.

DES Password

Issue 01 (2014-07-09)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

86

TP48200A-HX09A5 & HX09A6 & HX09A7 &


DX09A2 & TBC300A-DCA6 & DCA7 & TCA3
Installation Guide

10 Commissioning

Information

Description

Trap Target Address

IP address and port number reported in the alarm trap.

Trap Port

Procedure
Step 1 Apply to the site or equipment room network administrator for a fixed IP address.
Step 2 Set the IP address, subnet mask, and gateway on the LCD, as shown in Table 10-12.
Table 10-12 IP parameters
Main
Menu

Setting
Wizard

Second-

Third-

Default Value

Setting

Level
Menu

Level

Network
Parameters

IP Address

192.168.0.10

Set this parameter


according to the IP
address assigned by the
network administrator.

Subnet Mask

255.255.255.0

Set this parameter


according to the subnet
mask provided by the
network administrator.

Default
Gateway

192.168.0.1

Set this parameter


according to the gateway
address provided by the
network administrator.

Menu

Step 3 Enter the IP address for the SMU in the address box of Internet Explorer. Log in to the
WebUI on the login page shown in Figure 10-1.

Issue 01 (2014-07-09)

The preset user name is admin and the preset password is Changeme.

You can set SNMP parameters on the WebUI locally or remotely.

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

87

TP48200A-HX09A5 & HX09A6 & HX09A7 &


DX09A2 & TBC300A-DCA6 & DCA7 & TCA3
Installation Guide

10 Commissioning

Figure 10-1 Login page

Step 4 On the System Settings tab page, select SNMP.


l

If the SNMP version is SNMPv1 or SNMPv2c, set SNMP Version to


SNMPv1&SNMPv2c under SNMP, and then set SNMP Port Number, Read
Community Name, and Write Community Name, as shown in Figure 10-2.
Figure 10-2 Setting SNMPv1 and SNMPv2c parameters

Issue 01 (2014-07-09)

If the SNMP version is SNMPv3, set SNMP Version to SNMPv3 under SNMP, click
Add under SNMPv3, and then set User Name, MD5 Password, and DES Password, as
shown in Figure 10-3.

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

88

TP48200A-HX09A5 & HX09A6 & HX09A7 &


DX09A2 & TBC300A-DCA6 & DCA7 & TCA3
Installation Guide

10 Commissioning

Figure 10-3 Setting SNMPv3 parameters

Step 5 Under SNMP Trap, set Trap Target Address and Trap Port.
Step 6 Under Mib files, click Export to export the Mib file and import it to the NMS.
If there is only one NMS, perform Step 6 once.

----End

Follow-up Procedure
You can query the power system operating status, active alarms, and the names of
user-defined dry contact inputs, and configure dry contact outputs on the NMS that is
connected over the SNMP.

10.9 Connecting the Battery Supply


Prerequisites

To avoid damage to batteries, switch on the battery circuit breaker only after you correctly set
battery parameters.

Procedure
Step 1 Switch off AC input circuit breakers.

Issue 01 (2014-07-09)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

89

TP48200A-HX09A5 & HX09A6 & HX09A7 &


DX09A2 & TBC300A-DCA6 & DCA7 & TCA3
Installation Guide

10 Commissioning

Step 2 Switch on the battery circuit breaker.


Step 3 Switch on AC input circuit breakers.
Step 4 Switch all the circuit breakers to the appropriate status based on site requirements.
Step 5 Observe the power system for 15 minutes. If no alarm (excluding door alarms) is generated on
the LCD during this period, the voltage and current for batteries and loads are normal.

Before delivery, the battery switch is set to AUTO and the system is under automatic
control.

Open the cover and flip the battery switch to MANUAL only when you need to forcibly
connect the battery supply. Flip the battery switch back to AUTO after commissioning.

Figure 10-4 Battery switch

(1) Battery switch (behind the cover)

----End

10.10 Subsequent Operations


Procedure
Step 1 Reinstall the removed cover or panel (if there is).
Step 2 Fasten package entry module.
Step 3 The paint on the surface of the cabinet should be kept intact. Therefore, any damaged paint
must be repaired.
Step 4 Lock the cabinet door and hand over the key to the administrator. Clean the site and leave.
----End

Issue 01 (2014-07-09)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

90

TP48200A-HX09A5 & HX09A6 & HX09A7 &


DX09A2 & TBC300A-DCA6 & DCA7 & TCA3
Installation Guide

A Associations Between Alarms and Dry Contacts on the


UIM

Associations Between Alarms and Dry


Contacts on the UIM
Table A-1 Associations between dry contacts and alarms
Dry Contact
Type

Silkscreen

Associated Alarm

Dry contact inputs

DIN1

Dry contact input 1

DIN2

Dry contact input 2

DIN3

Dry contact input 3

DIN4

Dry contact input 4

DIN5

Dry contact input 5

DIN6

Dry contact input 6

ALM1

Mains failure

ALM2

DC over/undervoltage

ALM3

Rectifier faults

ALM4

AC or DC SPD faults

ALM5

Load fuse blown, battery fuse blown, or loop


disconnection

ALM6

Battery over/undertemperature

ALM7

Door status alarm

ALM8

Heater/Air conditioner/Fan fault


alarm/Temperature control high temperature
alarm

Dry contact
outputs
The default setting
(closed: alarm;
open: normal) can
be modified.

Issue 01 (2014-07-09)

Huawei Proprietary and Confidential


Copyright Huawei Technologies Co., Ltd.

91

TP48200A-HX09A5 & HX09A6 & HX09A7 &


DX09A2 & TBC300A-DCA6 & DCA7 & TCA3
Installation Guide

B Acronyms and Abbreviations

Acronyms and Abbreviations

B
BBU

Building base band unit

F
FE

Fast Ethernet

H
HAU

Heater Assembly Unit

HTTPS

Hypertext Transfer Protocol Secure

L
LCD

Liquid crystal display

S
SMU

Site monitor unit

SNMP

Simple Network Management Protocol

T
TCUC