Documente Academic
Documente Profesional
Documente Cultură
Contract ID:
Contract Name :
14LA0259
REHAB/MAJOR REPAIR OF BANGOY ALONG MONTEVISTACOMPOSTELA-MATIBDRY. ROAD
COMPOSTELA VALLEY PROVINCE
PARTICULAR
15 C.D.
30 C.D.
45 C.D.
60 C.D.
FIRST QUARTER
SECOND QUARTER
THIRD QUARTER
FOURTH QUARTER
Accomplishment
15.880%
Cash Flow
277,792.02
Cumulative Accomplishment
15.880%
277,792.02
18.35%
321,000.22
34.23%
598,792.24
Submitted by :
34.00%
594,768.81
68.23%
1,193,561.05
31.77%
555,758.97
100%
1,749,320.02
Contract ID
Contract Name
Contract ID:
Part No.
14LA0259
Part Description
Total Amount
P 351,814.00
Earthworks
P 114,153.54
Bridge Construction
P 86,717.28
P 1,196,635.20
T O T A L Amount Php
1,749,320.02
#VALUE!
Name
Signed
Page 2 of 14
Contract ID
Contract Name
BILL OF QUANTITIES
PART
B.
Part Description:
Description
(2)
(4)
Unit Price
(Pesos)
(5)
In Words
SPL-1
days
Amount
(Pesos)
(6)
In Words
103.00
#VALUE!
#VALUE!
In Figures
In Figures
157.00
In Words
SPL-2
Billboard
each
16,171.00
In Words
1.00
#VALUE!
In Figures
#VALUE!
In Figures
6,700.00
In Words
SPL-3
L.S.
6,700.00
In Words
1.00
#VALUE!
In Figures
#VALUE!
In Figures
284,723.00
In Words
SPL-4
TRAFFIC MANAGEMENT
L.S.
284,723.00
In Words
1.00
#VALUE!
In Figures
#VALUE!
In Figures
40,200.00
In Words
B.4(1)
km.
40,200.00
In Words
0.10
#VALUE!
#VALUE!
40,200.00
Total for this Page:
Total for this Part:
Submitted by:
4,020.00
351,814.00
351,814.00
Page 3 of 5
PROP./MANAGER
(Position)
BILL OF QUANTITIES
PART
C.
EARTHWORKS
Description
(2)
(3)
(4)
Unit Price
(Pesos)
(5)
In Words
103(1)
Structure Excavation
Cu.m.
Amount
(Pesos)
(6)
In Words
192.00
#VALUE!
#VALUE!
In Figures
In Figures
232.00
In Words
104(1)a
Embankment (Borrow)
Cu.m.
44,544.00
In Words
166.53
#VALUE!
#VALUE!
In Figures
In Figures
418.00
114,153.54
114,153.54
Page 4 of 5
PROP./MANAGER
(Position)
69,609.54
14LA0259
REHAB/MAJOR REPAIR OF BANGOY ALONG MONTEVISTACOMPOSTELA-MATIBDRY. ROAD
BILL OF QUANTITIES
PART
BRIDGE CONSTRUCTION
Part Description:
Description
(2)
(4)
Unit Price
(Pesos)
(5)
In Words
SPL-1
cu.m
Amount
(Pesos)
(6)
In Words
0.14
#VALUE!
#VALUE!
In Figures
In Figures
208.00
In Words
SPL-2
Epoxy Injection
m.
29.12
In Words
32.55
#VALUE!
#VALUE!
In Figures
In Figures
208.00
In Words
SPL-3
m.
6,770.40
In Words
261.70
#VALUE!
#VALUE!
In Figures
In Figures
208.00
In Words
SPL-4
ln.m
54,433.60
In Words
80.52
#VALUE!
#VALUE!
In Figures
In Figures
208.00
In Words
SPL-5
sq.m
16,748.16
In Words
42.00
#VALUE!
#VALUE!
In Figures
In Figures
208.00
8,736.00
86,717.28
86,717.28
Page 4 of 5
#REF!
(Name & Signature of Bidder's Representative)
PROP./MANAGER
(Position)
#REF!
(Date)
Contract ID
Contract Name
BILL OF QUANTITIES
PART
Pay
Item
No.
(1)
Description
(2)
(4)
Unit Price
(Pesos)
(5)
In Words
505(5)
cu.m
Amount
(Pesos)
(6)
In Words
31.47
#VALUE!
#VALUE!
In Figures
In Figures
208.00
In Words
507
Rubble Concrete
cu.m
6,545.76
In Words
76.55
#VALUE!
#VALUE!
In Figures
In Figures
208.00
In Words
508
cu.m
15,922.40
In Words
81.73
#VALUE!
#VALUE!
In Figures
In Figures
208.00
In Words
511-1
Gabions
cu.m.
16,999.84
In Words
340.00
#VALUE!
#VALUE!
In Figures
In Figures
2,837.00
In Words
511-3
Filter Cloth
sq.m.
964,580.00
In Words
925.90
#VALUE!
#VALUE!
In Figures
In Figures
208.00
192,587.20
Submitted by:
1,196,635.20
1,196,635.20
1,749,320.02
Page 5 of 5
PROP./MANAGER
(Position)
Contract ID : 14LA0259
Name of Contract :
Detailed Estimates
PART
B.
SPL-1
Qty.
103.00
days
Materials
Construction Safety and Health
103.00
days @
100.00
10,300.00
10,300.00
Labor
1
Safety officer
day
First aider
day
600.00
300.00
600.00
1,200.00
1,800.00
Direct Cost
1,452.00
Profit
1,452.00
Ocm
1,210.00
4,114.00
Total Cost
16,214.00
Unit Cost
157.00
Adjusted Cost
SPL-2
12,100.00
VAT/witholding tax
16,171.00
5,000.00
5,000.00
5,000.00
Billboard
Qty.
1.00
each
Materials
Billboard
1.00
each @
5,000.00
Direct Cost
VAT/witholding tax
600.00
Profit
600.00
Ocm
500.00
1,700.00
Total Cost
6,700.00
Unit Cost
6,700.00
Adjusted Cost
SPL-3
Qty.
6,700.00
212,480.00
212,480.00
212,480.00
L.S.
Materials
MOBILIZATION & DEMOBILIZATION
1.00 L.S.
Direct Cost
212,480.00
VAT/witholding tax
25,497.60
Profit
25,497.60
Ocm
21,248.00
72,243.20
Total Cost
284,723.20
Unit Cost
284,723.00
Adjusted Cost
Page 8 of 14
284,723.00
SPL-4
TRAFFIC MANAGEMENT
Qty.
1.00
L.S.
Materials
TRAFFIC MANAGEMENT
1.00 L.S.
30,000.00
Direct Cost
30,000.00
30,000.00
30,000.00
VAT/witholding tax
3,600.00
Profit
3,600.00
Ocm
3,000.00
10,200.00
Total Cost
40,200.00
Unit Cost
40,200.00
Adjusted Cost
40,200.00
3,000.00
3,000.00
3,000.00
0.10
km.
Materials
COSTRUCTION SURVEY & STAKING
0.10
km. @
30,000.00
Direct Cost
VAT/witholding tax
360.00
Profit
360.00
Ocm
300.00
1,020.00
Total Cost
4,020.00
Unit Cost
40,200.00
Adjusted Cost
PART
C.
4,020.00
12,000.00
EARTHWORKS
192.00
Cu.m.
Equipment
1
Backhoe
day
Dumptruck
day
12,000.00
10,000.00
20,000.00
32,000.00
Labor
1
Foreman
day
Laborer
day
600.00
300.00
600.00
600.00
1,200.00
Direct Cost
33,200.00
VAT/witholding tax
3,984.00
Profit
3,984.00
Ocm
3,320.00
11,288.00
Total Cost
44,488.00
Unit Cost
232.00
Adjusted Cost
44,544.00
52,000.00
166.53
Cu.m.
Materials
Earthfill
208.00 cu.m. @
Page 9 of 14
250.00
52,000.00
Equipment
1
Backhoe
day
12,000.00
Road Grader
day
12,000.00
Road roller
day
12,000.00
Labor
1
Foreman
day
Laborer
day
600.00
300.00
Direct Cost
VAT/witholding tax
6,240.00
Profit
6,240.00
Ocm
5,200.00
17,680.00
Total Cost
69,680.00
Unit Cost
418.00
Adjusted Cost
PART
SPL-1
52,000.00
69,609.54
155.00 P
21.70
21.70
21.70
BRIDGE CONSTRUCTION
Qty.
0.14
cu.m
Materials
0.14 cu.m @
2.60
Profit
2.60
Ocm
2.17
7.38
Total Cost
29.08
Unit Cost
208.00
Adjusted Cost
SPL-2
29.12
155.00 P
5,045.25
5,045.25
5,045.25
Epoxy Injection
Qty.
32.55
m.
Materials
32.55 m.
Epoxy Injection
Direct Cost
VAT/witholding tax
605.43
Profit
605.43
Ocm
504.53
1,715.39
Total Cost
6,760.64
Unit Cost
208.00
Adjusted Cost
SPL-3
6,770.40
155.00 P
40,563.50
40,563.50
40,563.50
Qty.
261.70
m.
Materials
261.70 m.
Direct Cost
VAT/witholding tax
Page 10 of 14
4,867.62
Profit
4,867.62
Ocm
4,056.35
13,791.59
Total Cost
54,355.09
Unit Cost
208.00
Adjusted Cost
SPL-4
54,433.60
155.00 P
12,480.60
12,480.60
12,480.60
Qty.
80.52
ln.m
Materials
80.52 ln.m @
Direct Cost
VAT/witholding tax
1,497.67
Profit
1,497.67
Ocm
1,248.06
4,243.40
Total Cost
16,724.00
Unit Cost
208.00
Adjusted Cost
SPL-5
16,748.16
155.00 P
6,510.00
6,510.00
6,510.00
Qty.
42.00
sq.m
Materials
42.00 sq.m @
Direct Cost
VAT/witholding tax
781.20
Profit
781.20
Ocm
651.00
2,213.40
Total Cost
8,723.40
Unit Cost
208.00
Adjusted Cost
PART
8,736.00
155.00 P
4,877.85
4,877.85
4,877.85
31.47
cu.m
Materials
31.47 cu.m @
Direct Cost
VAT/witholding tax
585.34
Profit
585.34
Ocm
487.79
1,658.47
Total Cost
6,536.32
Unit Cost
208.00
Adjusted Cost
507
6,545.76
155.00 P
11,865.25
11,865.25
Rubble Concrete
Qty.
76.55
cu.m
Materials
Rubble Concrete
76.55 cu.m @
Page 11 of 14
Direct Cost
1,423.83
Profit
1,423.83
Ocm
1,186.53
4,034.19
Total Cost
15,899.44
Unit Cost
208.00
Adjusted Cost
508
15,922.40
155.00 P
12,668.15
12,668.15
12,668.15
Qty.
81.73
cu.m
Materials
81.73 cu.m @
Direct Cost
VAT/witholding tax
1,520.18
Profit
1,520.18
Ocm
1,266.82
4,307.17
Total Cost
16,975.32
Unit Cost
208.00
Adjusted Cost
511-1
11,865.25
VAT/witholding tax
16,999.84
321,300.00
Gabions
Qty.
340.00
cu.m.
Materials
Boulders
357.00 cu.m. @
Gabions
170.00 pcs.
900.00
2,000.00
340,000.00
P
661,300.00
24,000.00
Equipment
1
Backhoe
2.00 day
12,000.00
24,000.00
Labor
1
Foreman
7.50 days @
Skilled
7.50 days
600.00
400.00
12,000.00
4,500.00
Laborer
7.50 days
300.00
18,000.00
34,500.00
Direct Cost
86,376.00
Profit
86,376.00
Ocm
71,980.00
244,732.00
Total Cost
964,532.00
Unit Cost
2,837.00
Adjusted Cost
511-3
719,800.00
VAT/witholding tax
964,580.00
155.00 P
143,514.50
143,514.50
143,514.50
Filter Cloth
Qty.
925.90
sq.m.
Materials
Filter Cloth
925.90 sq.m. @
Direct Cost
VAT/witholding tax
Page 12 of 14
17,221.74
Profit
17,221.74
Ocm
14,351.45
48,794.93
Total Cost
192,309.43
Unit Cost
208.00
Adjusted Cost
GRAND TOTAL
Prepared by:
Page 13 of 14
192,587.20
1,749,320.02
14LA0259
Contract ID
Contract Name REHAB/MAJOR REPAIR OF BANGOY ALONG MONTEVISTACOMPOSTELA-MATIBDRY. ROAD
Materials
Unit Cost
##
Construction Safety and Health
Billboard
COSTRUCTION SURVEY & STAKING
Earthfill
##
##
##
Boulders
Gabions
Filter Cloth
##
P
P
P
P
P
P
P
P
P
P
P
P
#REF!
100.00
5,000.00
30,000.00
250.00
#REF!
#REF!
#REF!
900.00
2,000.00
155.00
#REF!
/sq.m.
/day
/ech
/km
/cu.m.
/Bags
/cu.m.
/L.m.
/cu.m.
/cu.m.
/sq.m
/pc.
Backhoe
Road Grader
Road Roller
Dumptruck
P
P
P
P
12,000.00
12,000.00
12,000.00
10,000.00
/DAY
/DAY
/DAY
/DAY
P
P
P
P
P
1,000.00
1,000.00
1,000.00
1,000.00
500.00
/DAY
/DAY
/DAY
/DAY
/DAY
Equipment
Labor
Foreman
Skilled
Laborer
P
P
P
Prepared by:
LOTRIM CONSTRUCTION
ODILON MARLON L. GAVIOLA
(Name & Signature of Bidder's Representative)
GENERAL MANAGER
(Position)
600.00 /DAY
400.00 /DAY
300.00 /DAY