DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

Contract ID:
Contract Name :

Location of the Contract :

14LA0259
REHAB/MAJOR REPAIR OF BANGOY ALONG MONTEVISTACOMPOSTELA-MATIBDRY. ROAD
COMPOSTELA VALLEY PROVINCE

CASH FLOW BY QUARTER AND PAYMENT SCHEDULE

PARTICULAR

15 C.D.

30 C.D.

45 C.D.

60 C.D.

FIRST QUARTER

SECOND QUARTER

THIRD QUARTER

FOURTH QUARTER

Accomplishment

15.880%

Cash Flow

277,792.02

Cumulative Accomplishment

15.880%

Cumulative Cash Flow

277,792.02

18.35%
321,000.22
34.23%
598,792.24

Submitted by :

ODILON MARLON L. GAVIOLA


Name & Signature of Bidder's Representative:
Position:
Prop./ Gen. Manager
Name of Bidder : LOTRIM CONSTRUCTION INC.

34.00%
594,768.81
68.23%
1,193,561.05

31.77%
555,758.97
100%
1,749,320.02

Contract ID
Contract Name

Department of Public Works and Highways (DPWH)


14LA0259
REHAB/MAJOR REPAIR OF BANGOY ALONG MONTEVISTACOMPOSTELA-MATIBDRY. ROAD

Location of the Contra COMPOSTELA VALLEY PROVINCE


P 8,499,255.98
ABC

SUMMARY OF BID PRICES


(All Parts of Bill of Quantities)
Instructions for completing the Summary of Bid Prices:
1. Part No. - Enter the " Part No. " for each section of the Bill of Quantities (BOQ) where unit prices are entered.
2. Part Description - Enter the "Part Description" Corresponding to the "Part No."
3. Total Amount - Enter the "Total Amount" in Pesos for all pages Having the same "Part description"

Contract ID:
Part No.

14LA0259
Part Description

Total Amount

Other general requirement

P 351,814.00

Earthworks

P 114,153.54

Bridge Construction

P 86,717.28

Drainage & Slope Protection Structure

P 1,196,635.20

T O T A L Amount Php

1,749,320.02

Total of All Amount in Words

#VALUE!

Name

ODILON MARLON L. GAVIOLA


PROP./MANAGER

Date _____'December 15, 2014

Signed

Duly authorized to sign the Bid for and on behalf of

LOTRIM CONSTRUCTION INC.


1/5

Page 2 of 14

Department of Public Works and Highways (DPWH)


14LA0259
REHAB/MAJOR REPAIR OF BANGOY ALONG MONTEVISTACOMPOSTELA-MATIBDRY. ROAD

Contract ID
Contract Name

Location of the Contra COMPOSTELA VALLEY PROVINCE

BILL OF QUANTITIES
PART

B.

OTHER GENERAL REQUIREMENT

Part Description:

(Columns (1),(2),(3), and (4) are to


filled up by the Procuring Entity)
Pay
Item
No.
(1)

Description
(2)

Columns (5) and (6) are to be


filled up by the Bidder )
Unit Quantity
(3)

(4)

Unit Price
(Pesos)
(5)
In Words

SPL-1

Construction Safety and Health

days

Amount
(Pesos)
(6)
In Words

103.00
#VALUE!

#VALUE!

In Figures

In Figures
157.00

In Words
SPL-2

Billboard

each

16,171.00
In Words

1.00
#VALUE!

In Figures

#VALUE!

In Figures
6,700.00

In Words
SPL-3

MOBILIZATION & DEMOBILIZATION

L.S.

6,700.00
In Words

1.00
#VALUE!

In Figures

#VALUE!

In Figures
284,723.00

In Words
SPL-4

TRAFFIC MANAGEMENT

L.S.

284,723.00
In Words

1.00
#VALUE!

In Figures

#VALUE!

In Figures
40,200.00

In Words
B.4(1)

COSTRUCTION SURVEY & STAKING

km.

40,200.00
In Words

0.10
#VALUE!

#VALUE!

40,200.00
Total for this Page:
Total for this Part:
Submitted by:

ODILON MARLON L. GAVIOLA


(Name & Signature of Bidder's Representative)

4,020.00
351,814.00
351,814.00
Page 3 of 5

December 22, 2014


(Date)

PROP./MANAGER
(Position)

Department of Public Works and Highways (DPWH)


14LA0259
REHAB/MAJOR REPAIR OF BANGOY ALONG MONTEVISTACOMPOSTELA-MATIBDRY. ROAD
Location of the Contra COMPOSTELA VALLEY PROVINCE
Contract ID
Contract Name

BILL OF QUANTITIES
PART

C.

EARTHWORKS

(Columns (1),(2),(3), and (4) are to


filled up by the Procuring Entity)
Pay
Item
No.
(1)

Description

Columns (5) and (6) are to be


filled up by the Bidder )
Unit Quantity

(2)

(3)

(4)

Unit Price
(Pesos)
(5)
In Words

103(1)

Structure Excavation

Cu.m.

Amount
(Pesos)
(6)
In Words

192.00
#VALUE!

#VALUE!

In Figures

In Figures
232.00

In Words
104(1)a

Embankment (Borrow)

Cu.m.

44,544.00
In Words

166.53
#VALUE!

#VALUE!

In Figures

In Figures
418.00

Total for this Page:


Total for this Part:
Submitted by:

114,153.54
114,153.54
Page 4 of 5

ODILON MARLON L. GAVIOLA

December 22, 2014


(Date)

(Name & Signature of Bidder's Representative)

PROP./MANAGER
(Position)

Department of Public Works and Highways (DPWH)


Contract ID
Contract Name

69,609.54

14LA0259
REHAB/MAJOR REPAIR OF BANGOY ALONG MONTEVISTACOMPOSTELA-MATIBDRY. ROAD

Location of the Contra COMPOSTELA VALLEY PROVINCE

BILL OF QUANTITIES

PART

BRIDGE CONSTRUCTION

Part Description:

(Columns (1),(2),(3), and (4) are to


filled up by the Procuring Entity)
Pay
Item
No.
(1)

Description
(2)

Columns (5) and (6) are to be


filled up by the Bidder )
Unit Quantity
(3)

(4)

Unit Price
(Pesos)
(5)
In Words

SPL-1

Patching Concrete Members Type "A"

cu.m

Amount
(Pesos)
(6)
In Words

0.14
#VALUE!

#VALUE!

In Figures

In Figures
208.00

In Words
SPL-2

Epoxy Injection

m.

29.12
In Words

32.55
#VALUE!

#VALUE!

In Figures

In Figures
208.00

In Words
SPL-3

Epoxy Coating on Cracks

m.

6,770.40
In Words

261.70
#VALUE!

#VALUE!

In Figures

In Figures
208.00

In Words
SPL-4

Asphaltic Plug Joint

ln.m

54,433.60
In Words

80.52
#VALUE!

#VALUE!

In Figures

In Figures
208.00

In Words
SPL-5

Repainting of Steel Bearing

sq.m

16,748.16
In Words

42.00
#VALUE!

#VALUE!

In Figures

In Figures
208.00

Total for this Page:


Total for this Part:
Submitted by:

8,736.00
86,717.28
86,717.28
Page 4 of 5

#REF!
(Name & Signature of Bidder's Representative)

PROP./MANAGER
(Position)

#REF!
(Date)

Department of Public Works and Highways (DPWH)


14LA0259
REHAB/MAJOR REPAIR OF BANGOY ALONG MONTEVISTACOMPOSTELA-MATIBDRY. ROAD

Contract ID
Contract Name

Location of the Contra COMPOSTELA VALLEY PROVINCE

BILL OF QUANTITIES
PART

Drainage & Slope Protection Structure Part Description:


(Columns (1),(2),(3), and (4) are to
filled up by the Procuring Entity)

Pay
Item
No.
(1)

Description
(2)

Columns (5) and (6) are to be


filled up by the Bidder )
Unit Quantity
(3)

(4)

Unit Price
(Pesos)
(5)
In Words

505(5)

Grouted Riprap, Class "A"

cu.m

Amount
(Pesos)
(6)
In Words

31.47
#VALUE!

#VALUE!

In Figures

In Figures
208.00

In Words
507

Rubble Concrete

cu.m

6,545.76
In Words

76.55
#VALUE!

#VALUE!

In Figures

In Figures
208.00

In Words
508

Hand Laid Rock Embankment

cu.m

15,922.40
In Words

81.73
#VALUE!

#VALUE!

In Figures

In Figures
208.00

In Words
511-1

Gabions

cu.m.

16,999.84
In Words

340.00
#VALUE!

#VALUE!

In Figures

In Figures
2,837.00

In Words
511-3

Filter Cloth

sq.m.

964,580.00
In Words

925.90
#VALUE!

#VALUE!

In Figures

In Figures
208.00

192,587.20

Total for this Page:


Total for this Part:
Grand Total:

Submitted by:

1,196,635.20
1,196,635.20
1,749,320.02

Page 5 of 5

ODILON MARLON L. GAVIOLA


(Name & Signature of Bidder's Representative)

PROP./MANAGER
(Position)

December 22, 2014


(Date)

Contract ID : 14LA0259
Name of Contract :

REHAB/MAJOR REPAIR OF BANGOY ALONG MONTEVISTACOMPOSTELA-MATIBDRY. ROAD

COMPOSTELA VALLEY PROVINCE


Php 8,499,255.98

Location of the Contract:


ABC:

Detailed Estimates
PART

B.

SPL-1

OTHER GENERAL REQUIREMENT

Construction Safety and Health

Qty.

103.00

days

Materials
Construction Safety and Health

103.00

days @

100.00

10,300.00
10,300.00

Labor
1

Safety officer

day

First aider

day

600.00

300.00

600.00
1,200.00
1,800.00

Direct Cost

1,452.00

Profit

1,452.00

Ocm

1,210.00

Total indirect cost

4,114.00

Total Cost

16,214.00

Unit Cost

157.00

Adjusted Cost
SPL-2

12,100.00

VAT/witholding tax

16,171.00

5,000.00

5,000.00

5,000.00

Billboard

Qty.

1.00

each

Materials
Billboard

1.00

each @

5,000.00

Direct Cost
VAT/witholding tax

600.00

Profit

600.00

Ocm

500.00

Total indirect cost

1,700.00

Total Cost

6,700.00

Unit Cost

6,700.00

Adjusted Cost

SPL-3
Qty.

6,700.00

212,480.00

212,480.00

212,480.00

MOBILIZATION & DEMOBILIZATION


1.00

L.S.

Materials
MOBILIZATION & DEMOBILIZATION

1.00 L.S.

Direct Cost

212,480.00

VAT/witholding tax

25,497.60

Profit

25,497.60

Ocm

21,248.00

Total indirect cost

72,243.20

Total Cost

284,723.20

Unit Cost

284,723.00

Adjusted Cost

Page 8 of 14

284,723.00

SPL-4

TRAFFIC MANAGEMENT

Qty.

1.00

L.S.

Materials
TRAFFIC MANAGEMENT

1.00 L.S.

30,000.00

Direct Cost

30,000.00

30,000.00

30,000.00

VAT/witholding tax

3,600.00

Profit

3,600.00

Ocm

3,000.00

Total indirect cost

10,200.00

Total Cost

40,200.00

Unit Cost

40,200.00

Adjusted Cost

40,200.00

3,000.00

3,000.00

3,000.00

B.4(1) COSTRUCTION SURVEY & STAKING


Qty.

0.10

km.

Materials
COSTRUCTION SURVEY & STAKING

0.10

km. @

30,000.00

Direct Cost
VAT/witholding tax

360.00

Profit

360.00

Ocm

300.00

Total indirect cost

1,020.00

Total Cost

4,020.00

Unit Cost

40,200.00

Adjusted Cost
PART

C.

4,020.00

12,000.00

EARTHWORKS

103(1) Structure Excavation


Qty.

192.00

Cu.m.

Equipment
1

Backhoe

day

Dumptruck

day

12,000.00
10,000.00

20,000.00
32,000.00

Labor
1

Foreman

day

Laborer

day

600.00

300.00

600.00
600.00
1,200.00

Direct Cost

33,200.00

VAT/witholding tax

3,984.00

Profit

3,984.00

Ocm

3,320.00

Total indirect cost

11,288.00

Total Cost

44,488.00

Unit Cost

232.00

Adjusted Cost

44,544.00

52,000.00

104(1)a Embankment (Borrow)


Qty.

166.53

Cu.m.

Materials
Earthfill

208.00 cu.m. @

Page 9 of 14

250.00

52,000.00

Equipment
1

Backhoe

day

12,000.00

Road Grader

day

12,000.00

Road roller

day

12,000.00

Labor
1

Foreman

day

Laborer

day

600.00

300.00

Direct Cost

VAT/witholding tax

6,240.00

Profit

6,240.00

Ocm

5,200.00

Total indirect cost

17,680.00

Total Cost

69,680.00

Unit Cost

418.00

Adjusted Cost
PART
SPL-1

52,000.00

69,609.54

155.00 P

21.70

21.70

21.70

BRIDGE CONSTRUCTION

Patching Concrete Members Type "A"

Qty.

0.14

cu.m
Materials
0.14 cu.m @

Patching Concrete Members Type "A"


Direct Cost
VAT/witholding tax

2.60

Profit

2.60

Ocm

2.17

Total indirect cost

7.38

Total Cost

29.08

Unit Cost

208.00

Adjusted Cost
SPL-2

29.12

155.00 P

5,045.25

5,045.25

5,045.25

Epoxy Injection

Qty.

32.55

m.
Materials
32.55 m.

Epoxy Injection

Direct Cost
VAT/witholding tax

605.43

Profit

605.43

Ocm

504.53

Total indirect cost

1,715.39

Total Cost

6,760.64

Unit Cost

208.00

Adjusted Cost
SPL-3

6,770.40

155.00 P

40,563.50

40,563.50

40,563.50

Epoxy Coating on Cracks

Qty.

261.70

m.
Materials

Epoxy Coating on Cracks

261.70 m.

Direct Cost
VAT/witholding tax

Page 10 of 14

4,867.62

Profit

4,867.62

Ocm

4,056.35

Total indirect cost

13,791.59

Total Cost

54,355.09

Unit Cost

208.00

Adjusted Cost
SPL-4

54,433.60

155.00 P

12,480.60

12,480.60

12,480.60

Asphaltic Plug Joint

Qty.

80.52

ln.m
Materials

Asphaltic Plug Joint

80.52 ln.m @

Direct Cost
VAT/witholding tax

1,497.67

Profit

1,497.67

Ocm

1,248.06

Total indirect cost

4,243.40

Total Cost

16,724.00

Unit Cost

208.00

Adjusted Cost
SPL-5

16,748.16

155.00 P

6,510.00

6,510.00

6,510.00

Repainting of Steel Bearing

Qty.

42.00

sq.m
Materials
42.00 sq.m @

Repainting of Steel Bearing

Direct Cost
VAT/witholding tax

781.20

Profit

781.20

Ocm

651.00

Total indirect cost

2,213.40

Total Cost

8,723.40

Unit Cost

208.00

Adjusted Cost
PART

8,736.00

155.00 P

4,877.85

4,877.85

4,877.85

Drainage & Slope Protection Structure

505(5) Grouted Riprap, Class "A"


Qty.

31.47

cu.m
Materials
31.47 cu.m @

Grouted Riprap, Class "A"

Direct Cost
VAT/witholding tax

585.34

Profit

585.34

Ocm

487.79

Total indirect cost

1,658.47

Total Cost

6,536.32

Unit Cost

208.00

Adjusted Cost
507

6,545.76

155.00 P

11,865.25

11,865.25

Rubble Concrete

Qty.

76.55

cu.m
Materials

Rubble Concrete

76.55 cu.m @

Page 11 of 14

Direct Cost

1,423.83

Profit

1,423.83

Ocm

1,186.53

Total indirect cost

4,034.19

Total Cost

15,899.44

Unit Cost

208.00

Adjusted Cost
508

15,922.40

155.00 P

12,668.15

12,668.15

12,668.15

Hand Laid Rock Embankment

Qty.

81.73

cu.m
Materials
81.73 cu.m @

Hand Laid Rock Embankment

Direct Cost
VAT/witholding tax

1,520.18

Profit

1,520.18

Ocm

1,266.82

Total indirect cost

4,307.17

Total Cost

16,975.32

Unit Cost

208.00

Adjusted Cost
511-1

11,865.25

VAT/witholding tax

16,999.84

321,300.00

Gabions

Qty.

340.00

cu.m.

Materials
Boulders

357.00 cu.m. @

Gabions

170.00 pcs.

900.00
2,000.00

340,000.00
P

661,300.00

24,000.00

Equipment
1

Backhoe

2.00 day

12,000.00

24,000.00
Labor
1

Foreman

7.50 days @

Skilled

7.50 days

600.00
400.00

12,000.00

4,500.00

Laborer

7.50 days

300.00

18,000.00
34,500.00

Direct Cost

86,376.00

Profit

86,376.00

Ocm

71,980.00

Total indirect cost

244,732.00

Total Cost

964,532.00

Unit Cost

2,837.00

Adjusted Cost

511-3

719,800.00

VAT/witholding tax

964,580.00

155.00 P

143,514.50

143,514.50

143,514.50

Filter Cloth

Qty.

925.90

sq.m.
Materials

Filter Cloth

925.90 sq.m. @

Direct Cost
VAT/witholding tax

Page 12 of 14

17,221.74

Profit

17,221.74

Ocm

14,351.45

Total indirect cost

48,794.93

Total Cost

192,309.43

Unit Cost

208.00

Adjusted Cost

GRAND TOTAL
Prepared by:

LOTRIM CONSTRUCTION INC.

Page 13 of 14

192,587.20

1,749,320.02

14LA0259
Contract ID
Contract Name REHAB/MAJOR REPAIR OF BANGOY ALONG MONTEVISTACOMPOSTELA-MATIBDRY. ROAD

COMPOSTELA VALLEY PROVINCE

Summary of Unit Cost

Materials

Unit Cost

##
Construction Safety and Health
Billboard
COSTRUCTION SURVEY & STAKING
Earthfill
##
##
##
Boulders
Gabions
Filter Cloth
##

P
P
P
P
P
P
P
P
P
P
P
P

#REF!
100.00
5,000.00
30,000.00
250.00
#REF!
#REF!
#REF!
900.00
2,000.00
155.00
#REF!

/sq.m.
/day
/ech
/km
/cu.m.
/Bags
/cu.m.
/L.m.
/cu.m.
/cu.m.
/sq.m
/pc.

Backhoe
Road Grader
Road Roller
Dumptruck

P
P
P
P

12,000.00
12,000.00
12,000.00
10,000.00

/DAY
/DAY
/DAY
/DAY

Concrete bagger mixer


Plate Compactor
Conc. Vibrator
Conc. Saw
Bar cutter/Bar Bender

P
P
P
P
P

1,000.00
1,000.00
1,000.00
1,000.00
500.00

/DAY
/DAY
/DAY
/DAY
/DAY

Equipment

Labor
Foreman
Skilled
Laborer

P
P
P

Prepared by:

LOTRIM CONSTRUCTION
ODILON MARLON L. GAVIOLA
(Name & Signature of Bidder's Representative)

GENERAL MANAGER
(Position)

600.00 /DAY
400.00 /DAY
300.00 /DAY