Dotacion
Lt /Dia/m2
m2,unid,
Observ.
( Lt / Dia )
6.00
904.68
1 Administracion =
15.20 m2
6.00
91.20
5 Jardines =
63.00 m2
2.00
126.00
Sub-total1 =
1121.88
Segundo Piso:
11 Oficinas =
1 Sala star =
177.00 m2
6.00
1062.00
22.80 m2
3.00
68.40
Sub-total2 =
1130.40
172.90 m2
500.00
Tabla 1-5
5000.00
1 Admision =
13.72 m2
6.00
82.32
1 Sala star =
22.80 m2
3.00
68.40
Sub-total3 =
5150.72
500.00
Tabla 1-5
5500.00
65.40
Sub-total4 =
5565.40
Tabla 1-4
2400.00
Sub-total5 =
2400.00
188.90 m2
21.80 m2
3.00
Quinto Piso:
2
1200.00
Cada Dpto co 3
Dormitorios =
13116.12 ( Lt / Dia )
dotacion
Dotacin Total = Dotacion total sist. Directo + dotacion total sist. Indirecto =
15368.40 ( Lt / Dia )
cisterna
15368.40 Lt/dia
11526.3 Lt =
11.53 m3
5122.80 Lt =
5.12 m3
5400 Lts
2.2.- Dimensionamiento:
2.2.1.- Agua contra incendio en el T. E:
Capacidad del tanque elevado:
Agua de consumo diario =
5122.80 Lts
5400 Lts
Total =
10522.80 Lts
Capacidad Total:
Volumen de la cisterna =
11.53 m3
OK!
10.52 m3
OK!
2.2.2.-Esquema de Dimensionamiento:
3.3.1.- Tanque elevado:
3.50
0.4
N.A.
1.47mt
2.80
9.80 m2
ELEVACION
entonces h =
PLANTA
1.07 mts
CURSO:INSTALACIONES SANITARIAS
Area=9.8
cisterna
3.3.2.- Cisterna:
3.40
0.4
N.A.
1.6mt
2.50
9.62 m2
ELEVACION
entonces h =
PLANTA
1.20 mts
CURSO:INSTALACIONES SANITARIAS
Area=8.5
cisterna
CURSO:INSTALACIONES SANITARIAS
cisterna
CURSO:INSTALACIONES SANITARIAS
medidor-tub. entrada
PASO 3.- CALCULO DE LA CARGA DISPONIBLE Y SELECCIN DEL DIAMETRO DEL MED
3.1.- CALCULO DE LA CARGA DISPONIBLE:
H = Pr- Ps- Ht
donde:
H = carga disponible
Pr = presion en la red
Ps = presion de salida
Ht = altura de red a cisterna
datos:
Pr =
Ps =
Ht =
Resultado:
H=
H=
20.00
2.00
-1.30
Lb / Pulg2
mts
mts
13.30 mts
19.00 Lb / Pulg2
Q=
Hf (50%) =
11526.30 Lts
14400.00 seg
0.80 Lts/seg =
9.50 Lb / Pulg2
12.69
3/4"
INSTALACIONES SANITARIAS
GPM
medidor-tub. entrada
INSTALACIONES SANITARIAS
medidor-tub. entrada
INSTALACIONES SANITARIAS
medidor-tub. entrada
INSTALACIONES SANITARIAS
0.80
Lt/seg
gasto
Perd. Carga
Lt/seg
% / 1000
G.Busc
0.80
diam.
"
900.00
3/4
Luego:
Pr =
14.00 mts
L=
2 mts
S=
Hf (r-m) =
0.900
perdida carga
LxS =
pulg
1.80 mts
Lb/pulg2
mts
Dv (r-m) =
-1.30 mt
5/8"
14
9.8
Dv (m-c) =
0.00 mt
3/4"
3.8
2.66
1"
1.7
1.19
Hfm =
Ps =
De donde:
Hfmax =
8.84 mts
INSTALACIONES SANITARIAS
Tipo de Accesorios
Long. Equiv.
unidad
coefic.
parcial
03 codo de 90
03
1.42
4.26
02 valvula compuerta
02
0.216
0.432
01 valvula check
01
2.114
2.114
total=
6.806
Entoces:
Long. Equiv. Acces. =
6.81 mts
6.50 mts
13.31 mts
8.38278
<
8.84
8.38278 mts
..OK!
3/4"
tub. Alim=
1"
INSTALACIONES SANITARIAS
INSTALACIONES SANITARIAS
INSTALACIONES SANITARIAS
tub. impulsion
3.86 Lt/seg
Si el gasto de bombeo es de :
2 1/2"
Resumen:
Tuberia de impuldsion =
Tuberia de succion =
2"
2 1/2"