Sunteți pe pagina 1din 3

TITLE

WORK INSTRUCTION FOR PERFORMING TEST AT


SWITCH GEAR
DOCUMENT NUMBER

REV

DATE

SHEET

F.SQ-WI.013.2

21 May 2012

1 of 3

PROCEDURE AUTHORIZATION
This work instruction have been generated and Department Authorization
implemented to identify the control that shall be applied
by members of staff in the department when carrying out
their duties
Signed:
This confirms that this work instruction has been Corporate Authorization
approved for official issue and that members of staff shall (Company Director)
complete the tasks assigned in accordance with the
mechanisms defined herein
The work instruction forms part of a formal system within
the company which ensures that this document is
handled in a controlled manner in accordance with
documented procedures.
This work instruction will be subject to audit as part of the
company policy towards quality

Rev.

Date

21 May 2012

Date:

Date:

Signed:
Quality Authorization
(Quality Management Rep' s)

Date:

Signed:

PROCEDURE REVISION
Section
Outline of Changed

Authorization

First Issue

1
2
3
4

STATEMENT OF CONFIDENTIALITY
This working instruction is for controlled circulation unless stamped "Uncontrolled Copy. The
documents or extracts from documents must nor be passed or copied to other companies, agents or
persons without the permission of the relevant Company Directors .

TITLE

WORK INSTRUCTION FOR PERFORMING TEST AT


SWITCH GEAR
DOCUMENT NUMBER

REV

DATE

SHEET

F.SQ-WI.013.2

21 May 2012

2 of 3

TABLE OF CONTENT
Page
1.0

SCOPE

2.0

WORKING INSTRUCTION

1.0 SCOPE

TITLE

WORK INSTRUCTION FOR PERFORMING TEST AT


SWITCH GEAR
DOCUMENT NUMBER

REV

DATE

SHEET

F.SQ-WI.013.2

21 May 2012

3 of 3

These work instruction describe the detail procedure for performing testing of
Switch Gear certification.
2.0

WORKING INSTRUCTION

No.
DESCRIPTION
1.0 PERFORMING TEST
1.1 Preparation
1.2 Measuring

1.3

Record

Action to be taken
1. Prepare the item specification
1. Work carefully when measuring
2. Wear apropriate PPE, glove with electrical
insulation, shoes with safety insulation.
3. Always calibrate or check calibration expiry of
each testing tools.
1. Make sure that all identification has been
recorded.
2. Record all measurement result
3. Kinds of test :
a. Earth continuity
b. High voltage isolation
c. Insulation resistance
d. Tripping/closing supply circuits from external
sources have continuity & integrity
e. Push button operation - Location and color.
f. Pick up & drop off voltage of contactors and
relays.
g. Accessibility of emergency opr. device.
h. Current and voltage transformer ratio.
i. Short circuit test.
j. Panel wiring termination and identification.
k. Warning labels.
l. Control operation test.

S-ar putea să vă placă și