Sunteți pe pagina 1din 6

PROJECT : CADANGAN MEMBINA SEBUAH DEPOH BAS

DAN KEMUDAHAN SOKONGAN BERKAITAN BAGI PROJEK MASS RAPID


TRANSIT LEMBAH KLANG ,JAJARAN SUNGAI BULOHKAJANG DIATAS LOT 81520
SELUAS 10.55 EKAR SEKSYEN U4,40150 SHAH ALAM SELANGOR DARUL EHSAN

DESCRIPTION OF JOB :
Water recticulation

PREPARED BY :
Mohd Firdaus Bin Kamaruddin

LEGAL AND OTHER REQUIREMENTS : OSHA 1994 SECTION 15(2)

APPROVED BY: Ching Soon Seng (PM)

JSA NO :
REV : 00

PAGE : 01
LOCATION :

(a) (b) (c) ,FMA section 10,26 shw reg 32 bowec Reg 8,9

Used approved type safety shoe.


Housekeeping & material arrangement.

Caught in between / hit by machinery

Experianced/licensed operator.
Stop all work near the excavation area

Briefing Methode statement to all


workers

conduct the mapping of underground


utilities before starting the drilling work

PROPOSED RISK CONTROL

LEVEL

CURRENT RISK CONTROL


Hazard/Effect

SCORE

Trip & falls

Job sequence /steps

1 Site survey, planning


& excavation

RISK RANKING

COSEQUENCE (B)

NO

RISK ASSESSMENT
PROBABILITY (A)

HAZARD INDENTICATION

RESPONSIBILITY

PE
Standing supervision.
Install rigid barrier to all excation area
above 1.5 meter.

Site safety supervisor


Site supervisor

Communication breakdown/ wrong methode apply

Provide Banksman to controll


machnery movement

Standing supervision

Provide training & infromation


Possible damage to underground utilities

Land slip / collapse

Using sheetpile or do benching / sloping at


excavation area
Place stockpile atlease 2 meter from excavation
area

Standing Supervision.
Apply PTW for excavation more than
3 meter.
Standing Supervision.

PROJECT : CADANGAN MEMBINA SEBUAH DEPOH BAS


DAN KEMUDAHAN SOKONGAN BERKAITAN BAGI PROJEK MASS RAPID
TRANSIT LEMBAH KLANG ,JAJARAN SUNGAI BULOHKAJANG DIATAS LOT 81520
SELUAS 10.55 EKAR SEKSYEN U4,40150 SHAH ALAM SELANGOR DARUL EHSAN

DESCRIPTION OF JOB :
Water recticulation

REV : 00

RISK ASSESSMENT

PROPOSED RISK CONTROL

LEVEL

Hazard/Effect

RISK RANKING
SCORE

CURRENT RISK CONTROL

COSEQUENCE (B)

Job sequence /steps

PAGE : 02

PROBABILITY (A)

HAZARD INDENTICATION

NO

APPROVED BY: Ching Soon Seng (PM)

LEGAL AND OTHER REQUIREMENTS : OSHA 1994 SECTION 15(2)


(a) (b) (c) ,FMA section 10,26 shw reg 32 bowec Reg 8,9

LOCATION :

JSA NO :

PREPARED BY :
Mohd Firdaus Bin Kamaruddin

2 Laying pipes and fitting

RESPONSIBILITY

PE
Crane topple

Hand / finger injuries

caught in between

Heat stress

Back injury

Experianced / licensed operator.


Attach steel plate at crane outrigger

wear hand glooves for


protection

Experianced / licensed operator.

Provide water dispenser & rest area

use proper body posture

Provide signalman.
Standing supervision.
Ground condition inspection.

Safety Supervisor

Site supervisor

Used tag line to control load


Signalman to control movement

Used tag line to control load


Signalman to control movement

Drink a lot of water


Used loose reflective clothing

Buddy system
Used proper manual handling
technique

PROJECT : CADANGAN MEMBINA SEBUAH DEPOH BAS


DAN KEMUDAHAN SOKONGAN BERKAITAN BAGI PROJEK MASS RAPID
TRANSIT LEMBAH KLANG ,JAJARAN SUNGAI BULOHKAJANG DIATAS LOT 81520
SELUAS 10.55 EKAR SEKSYEN U4,40150 SHAH ALAM SELANGOR DARUL EHSAN

DESCRIPTION OF JOB :
Water recticulation

PREPARED BY :
Mohd Firdaus Bin Kamaruddin

LEGAL AND OTHER REQUIREMENTS : OSHA 1994 SECTION 15(2)

APPROVED BY: Ching Soon Seng (PM)

JSA NO :
REV : 00

PAGE : 03
(a) (b) (c) ,FMA section 10,26 shw reg 32 bowec Reg 8,9

CURRENT RISK CONTROL


Hazard/Effect

Inspection & make sure rotating cover


not removed.

All sharp egde or rotating part must have


cover

PROPOSED RISK CONTROL

LEVEL

Job sequence /steps

RISK RANKING

COSEQUENCE (B)

NO

RISK ASSESSMENT
PROBABILITY (A)

HAZARD INDENTICATION

SCORE

LOCATION :

3 Cutting & grinding


Radiation / skin burn

Used coverall / jacket


Used welding hand glove

RESPONSIBILITY

Certified welder.
Utilise welding apron

PE

Do not carry out this activity to long


Without stop.

Site Engineer
Site supervisor

Flying particle

Cut by rotating part

Used safety goggles & face sheild

Used safety helmet, shoe and hand glove

Site safety supervisor

PROJECT : CADANGAN MEMBINA SEBUAH DEPOH BAS


DAN KEMUDAHAN SOKONGAN BERKAITAN BAGI PROJEK MASS RAPID
TRANSIT LEMBAH KLANG ,JAJARAN SUNGAI BULOHKAJANG DIATAS LOT 81520
SELUAS 10.55 EKAR SEKSYEN U4,40150 SHAH ALAM SELANGOR DARUL EHSAN

DESCRIPTION OF JOB :
Water recticulation

REV : 00
LEGAL AND OTHER REQUIREMENTS : OSHA 1994 SECTION 15(2)
(a) (b) (c) ,FMA section 10,26 shw reg 32 bowec Reg 8,9

CURRENT RISK CONTROL


Hazard/Effect

4 General housekeeping
issues

RISK RANKING
PROPOSED RISK CONTROL

LEVEL

Job sequence /steps

COSEQUENCE (B)

NO

PAGE : 04

RISK ASSESSMENT
PROBABILITY (A)

HAZARD INDENTICATION

APPROVED BY: Ching Soon Seng (PM)

SCORE

LOCATION :

JSA NO :

PREPARED BY :
Mohd Firdaus Bin Kamaruddin

RESPONSIBILITY

PE
slip ,trip & fall

Keep Floor clean and debris free

conduct daily tool box talk


Site Suoervisor
Safety Supervisor

Cuts/ punctures

Back injury

Do not put hand in trash cans pick up plastics bags from the
edges

use hand gloves for the


protection

use proper body posture

Buddy system
Used proper manual handling
technique

Experianced/licensed operator.
Stop all work near the excavation area

Provide Banksman to controll


machnery movement

Briefing before start work


Wear suitable PPE.

Used buddy system

5 Backfiling & Compaction


Caught in between / hit by machinery

Hand arm / Whole body vibration

PROJECT : CADANGAN MEMBINA SEBUAH DEPOH BAS


DAN KEMUDAHAN SOKONGAN BERKAITAN BAGI PROJEK MASS RAPID
TRANSIT LEMBAH KLANG ,JAJARAN SUNGAI BULOHKAJANG DIATAS LOT 81520
SELUAS 10.55 EKAR SEKSYEN U4,40150 SHAH ALAM SELANGOR DARUL EHSAN

DESCRIPTION OF JOB :
Water recticulation

REV : 00

RISK ASSESSMENT

PROPOSED RISK CONTROL

LEVEL

Hazard/Effect

RISK RANKING
SCORE

CURRENT RISK CONTROL

COSEQUENCE (B)

Job sequence /steps

PAGE : 05

PROBABILITY (A)

HAZARD INDENTICATION

NO

APPROVED BY: Ching Soon Seng (PM)

LEGAL AND OTHER REQUIREMENTS : OSHA 1994 SECTION 15(2)


(a) (b) (c) ,FMA section 10,26 shw reg 32 bowec Reg 8,9

LOCATION :

JSA NO :

PREPARED BY :
Mohd Firdaus Bin Kamaruddin

6 Testing of pipe line

RESPONSIBILITY

PE
high prssure water contact eye

Check all fitting before start testing


Only authorized person at work area.

Used safety goggles


Warning sign.
Safety Supervisor

Hand / finger injuries

Electrocution

all tool equipment must have


proper guarding

wear hand glooves for


protection

all electrical cable have proper


insulator

Used industrial socket


Hang cable from ground.

Site supervisor

Risk Rating

IMPACT SEVERITY
1
Minimal

2
Minor

3
Moderate

4
Major

5
Severe

Financial

Less than Rm 50 k

RM 50 K to RM 250 K

RM 250 K- RM 1.0m

RM 1.0m to RM 10m

Greater than Rm 10 m

Safety

None

First aid required

Medical treatment
required

serious injury

a fatality case

Programme

Less than one week

1-4 Weeks

1-3 months

3-6 months

greater than 6 months

Third party impact

Negligible damage

Minor damage
some repairs
required

Moderate to high
damage requires
specialist to repair

Almost certain -happen frequenly (more than 10 times


within the project

very likely -could happen frequenly (more than 3


times within the project

Likely-could happen occasionly (less than 3 times


within the project

Unlikely- could happen rarely (1 times within the


project

Very unlikely- probablilty will not happen (has never


occurred)

LIKEHOOD

IMPACT CATEGORY

RISK AREA

Significant/permanent
widespread subtantial
damage
/permanent damage