TEST PLAN
Rev2.0
PAGE
1.0 Purpose
4.1
4.2
4.2.1
4.2.2
4.2.3
4.2.4
4.2.5
4.3
4.3.1
4.3.2
4.3.3
4.3.4
4.3.5
4.3.6
4.3.7
4.3.8
4.4
4.4.1
4.4.2
4.5
4.5.1
4.5.2
4.5.3
4.5.4
4.5.5
4.5.6
4.5.7
4.5.8
4.5.9
4.5.10
4.5.11
4.6
4.6.1
4.6.2
4.6.3
4.6.4
4.7
5
5
Test Set-Up
RF Tests
Test Set-Up
5
Transmit Power Test
6
Receiver Sensitivity and Overload Test
7
Transmit Frequency Accuracy
8
Automatic Transmit Power Control (ATPC) 8
SDH Tests
Synchronization 10
STM-1 Main Channel BER Test 11
E1 Wayside Channel BER Test
11
10BaseT Wayside Channel Test
12
RS232 User Channel Test 13
Engineering Order-Wire Test (EOW)
14
SDH Fault Management 15
Jitter Test
16
ATM Tests
STM-1 BER Test 17
Cell Loss Ratio Measurement (CLR)
18
Network Management Tests
General 19
Ethernet and Serial Connection
19
Inventory data 19
Frequency Control
20
Radio Parameters Control 20
Alarms Management
21
Performance Monitoring 21
Loopbacks Operation
22
External Alarm Operation 23
Software Reset 24
Software Download
24
2 x Fast Ethernet Tests
General 25
Fast Ethernet Traffic Test 25
Throughput Measurement 26
Dynamic Band-Width Allocation Tests
28
3 x E3 Tests
10
17
19
25
30
Page 2 of 38
4.8
32
34
5.1
5.2
5.3
5.4
5.5
34
34
35
36
37
General
Test Set-Up
STM-1 BER Test
Protection Switching Tests
1+1 Management Tests
Page 3 of 38
1.0 Purpose
The following document is Ceragon networks Validation and Acceptance Test
Plan for the evaluation tests of Ceragon Networks FibeAir1500/1528 SDH
Microwave link and its versatile network solutions.
This document describes the proposed test procedures for the
FibeAir1500/1528 product in 1+0 and 1+1 configurations with the different
interfaces configurations.
The document will include descriptions of the set-ups and procedures required
to verify the products functionality according to its specs and to verify
interoperability with other transmission equipment.
Page 4 of 38
4.1
Test Set-Up
4.2
RF Tests
Test Set-Up A:
General FibeAir1500/1528 V&A Test Plan
Page 5 of 38
Variable
Attenuator
Wave-Guide
ODU
Coupler
ODU
Coax Cable
1+0 Test-Set
STM-1
Ethernet
Cable
Fiber
Tx
Rx
SDH
Analyzer
Spectrum
Analyzer
Power
Meter
ETH
NMS
Tx Power
(Power Meter reading)
+20 dBm
+10 dBm
0 dBm
-10 dBm
Page 6 of 38
Test
Expected Results
Test Results
Page 7 of 38
Transmit Frequency
(Measured)
Accuracy
(ppm)
1
2
3
Page 8 of 38
IDU.
(d) Set the SDH Analyzer to transmission of STM-1, VC-4 bulk with 2^23
PRBS sequence (transmitter coupled to receiver).
(e) Verify that there are no alarms on the SDH Analyzer and on the Link
Manager management.
(f) Clear all alarm log files on the Link Manager management.
(g) Run BER test on the SDH Analyzer. Verify that there are no alarms or
errors of any kind.
(h) Activate ATPC and set the Reference Level to 45dBm.
(i) Verify that the Received RSL has changed to 45dBm and that the
Monitored Tx Level have reduced in 20dB (~0dBm).
(j) Add 15dB attenuation to the link using the Variable Attenuator and verify
that the RSL is maintained at 45dBm and the Monitored Tx Level has
increased in 15dB.
(k) Decrease 25dB attenuation from the link using the Variable Attenuator
and verify that the RSL is maintained at 45dBm and the Monitored Tx
Level has decreased in 25dB.
(l) Verify that the SDH Analyzer did not detect any errors on the STM-1
signal during the ATPC tests.
(m)
ATPC Upper-Limit Test: Disabled ATPC using the Link Manager
management and set the Tx power to +5dBm at both ends of the link.
(n) Using the attenuators set the RSL to -30dBm.
(o) Activate ATPC and set the Reference Level to 45dBm.
(p) Verify that the Received RSL has changed to 45dBm and that the
Monitored Tx Level have reduced in 15dB (~-10dBm).
(q) Add 25dB attenuation to the link using the Variable Attenuator and verify
that the Monitored Tx Level does not exceed the pre-defined UpperLimit (+5dBm).
(r) Verify that the SDH Analyzer did not detect any errors on the STM-1
signal during the ATPC tests.
Results Summary
Step
ATPC
1
2
3
4
Expected Results
Test Results
Page 9 of 38
4.3
SDH Tests
Wave-Guide
ODU
Coupler
ODU
Coax Cable
1+0 Test-Set
Physical
Loop
STM-1
Ethernet
Cable
SDH
Analyzer
ETH
NMS
Required test-equipment
(a) SDH Analyzer (for BER measurement)
Test Procedure
(a) Set up a link using the Test-Set. Set the RSL to ~-40dBm.
(b) Change the frequency-offset synch according to the table and verify that
no errors are detected by the SDH Analyser on the STM-1 payload.
Results Summary
Step
Frequency
Offset
1
2
3
0
ppm
-20 ppm
+20 ppm
Expected
Results
Test Results
No errors
No errors
No errors
Page 10 of 38
Test
Expected Results
Test Results
SDH Alarms
No alarms
Errors Detected No errors
BER
No errors detected /
10E-13
Management
No alarms
Alarms
Page 11 of 38
Test Set-Up
Test Set-Up B will be used for this test.
Required test-equipment
(a) SDH Analyzer (for BER measurement)
Test Procedure
(a) Set up a link using the Test-Set. Set the RSL to ~-40dBm.
(b) Activate the Wayside Channel using the Link Manager management.
(c) Configure the IDUs with E1 interfaces as the Wayside Channels.
(d) Connect SDH analyzer to the E1 Wayside Channel of one IDU. Loop
the Wayside Channel in the second IDU.
(e) Set the SDH Analyzer to transmission of E1 2 Mbps signal (transmitter
coupled to receiver).
(f) Verify that there are no alarms on the SDH Analyzer.
(g) Clear all alarm log files on the Link Manager management.
(h) Run BER test on the SDH Analyzer. Verify that there are no alarms and
no errors of any kind.
(i) Allow this SDH test to run at least 60 minutes.
(j) Verify that no errors were detected by the SDH analyzer.
(k) Verify that there were no alarms on the management.
(l) Disable the Wayside Channel and verify that no traffic can run over the
link.
Results Summary
BER Test
Duration
Test
Expected Results
Test Results
SDH Alarms
No alarms
Errors Detected No errors
BER
No errors detected /
10E-13
Management
No alarms
Alarms
Page 12 of 38
Required test-equipment
(a) PC
Test Procedure
(a) Set up a link using the Test-Set. Set the RSL to ~-40dBm.
(b) Configure the IDUs with Ethernet Bridge 10BaseT interfaces as the
Wayside Channels.
(c) Activate the Wayside Channel using the Link Manager management.
(d) Connect the PC to one of the 10BaseT Wayside Channel on one end of
the link.
(e) Connect the second IDUs wayside channel to the Ethernet
management port using cross-cable.
(f) Send Ping command from one PC to the IDU on the other end of the
link and verify that reply is received.
(g) Launch Link Manager software and verify you can manage the IDU.
(h) Disable the Wayside Channel and verify that no traffic can run over the
link and no reply is received from the remote IDU.
Results Summary
Step Wayside Channel
Mode
1
2
Activated
Activated
Disabled
Expected Results
Test Results
Ping Received
Management of remote IDU
is possible
Ping is not received
Test Procedure
(a) Set up a link using the Test-Set. Set the RSL to ~-40dBm.
(b) Activate the User Channel using the Link Manager management.
(c) Connect the RS232 Analyzer to the user-channel port on one end the
link.
(d) Loop the remote IDU using physical loop.
General FibeAir1500/1528 V&A Test Plan
Page 13 of 38
(e) Run BER test and verify full throughput and no errors are detected.
(f) Disable the User Channel and verify that no traffic can run over the link.
Results Summary
Step
User Channel
Mode
1
Activated
Disabled
Expected Results
No errors detected,
100% throughput
No traffic
Test Results
Activated
Disabled
Expected Results
Test Results
Page 14 of 38
Disconnect Tx fiber
Expected Results
Test Results
Page 15 of 38
Insert B1 errors
Expected Results
Test Results
Intrinsic Jitter
Page 16 of 38
4.4
ATM Tests
Test
Expected Results
Test Results
ATM Alarms
No alarms
Errors Detected No errors
BER
No errors detected /
10E-13
Management
No alarms
Alarms
Page 17 of 38
CLR
(ATM Disabled)
CLR
(ATM Enabled)
10E-7
10E-6
10E-5
10E-4
10E-3
Page 18 of 38
4.5
4.5.1 General
The purpose of the tests in this section is to test the functionality of the Link
Manager management application.
The Link manager management grants the user full configuration, monitoring
and maintenance control on both Local and Remote terminals while connected
only to one end of the link.
Test Set-Up
Test Set-Up B will be used for all tests in this section.
(a) Set up a link using the Test-Set. Set the RSL to ~-40dBm.
(b) Connect SDH analyzer to one IDU. Loop the Line module in the second
IDU.
(c) Set the SDH Analyzer to transmission of STM-1, VC-4 bulk with 2^23
PRBS sequence (transmitter coupled to receiver).
Required test-equipment
(a) SDH Analyzer (for STM-1 signal generation)
(b) PC to install the Link Manager on.
Page 19 of 38
Test Procedure
(a) Launch the Link Manager management of one of the IDUs.
(b) Verify that all the inventory data in the System Information screen is
correct:
Radio Name
Link Manager version
IDU software version
IDU serial number
ODU serial number
Page 20 of 38
Page 21 of 38
second IDU.
(c) Verify that there are no alarms on the SDH Analyzer and on the Link
Manager management.
(d) Clear all alarm log files on the Link Manager management.
(e) Run BER test for 60 minutes.
(f) Verify that during the test no alarms were reported by the SDH
Analyzer or the Link Manager.
(g) Check the RSL Performance Monitoring screen to verify that no
changes of the RSL were recorded. Verify the data on the graph and
the history table corresponds the measured RSL.
(h) Check the SDH Performance Monitoring screen to verify that no
errors or un-availability were recorded on the graph or the history
tables.
(i) Reduce the RSL of the ODUs using the Variable Attenuator until
errors (BER=10E-5) are reported by the SDH Analyzer.
(j) Run the BER test for 60 minutes.
(k) Verify that during the test the SDH Analyzer reported the errors.
(l) Check the SDH Performance Monitoring screen for the errors or unavailability on the radio transmission caused by the low RSL. Verify
the errors recorded on the graph or the history tables.
(m)
Increase the RSL until no errors are reported by the SDH
Analyzer.
(n) Run BER test for 60 minutes.
(o) During the test, change the attenuation of the link using the Variable
Attenuator several times.
(p) Check the RSL Performance Monitoring screen to verify that the
changes in the RSL were recorded. Verify the data on the graph and
the history table corresponds the measured RSL.
Page 22 of 38
(i) Activate Local To IDU And Back loopback. Verify the Loopback Alarm
is reported by the LED panel and the management.
(j) Verify the MS-AIS is cleared.
(k) Run BER test and verify no errors are detected. Clear the loopback
and verify MS-AIS is reported.
(l) Activate Local To Remote And Back loopback. Verify the Loopback
Alarm is reported by the LED panel and the management.
(m)
Verify the MS-AIS is cleared.
(n) Run BER test and verify no errors are detected. Clear the loopback
and verify MS-AIS is reported.
(o) Connect the Link Manager management to the Remote IDU.
(p) From the Remote IDU, activate Remote Main Channel loopback.
Verify the Loopback Alarm is reported by the LED panel and the
management.
(q) Verify the MS-AIS is cleared.
(r) Run BER test and verify no errors are detected. Clear the loopback
and verify MS-AIS is reported.
(s) From the Remote IDU, activate Remote To Local And Back loopback.
Verify the Loopback Alarm is reported by the LED panel and the
management.
(t) Verify the MS-AIS is cleared.
(u) Run BER test and verify no errors are detected. Clear the loopback
and verify MS-AIS is reported.
(v) The test may be repeated for the E1 Wayside Channel.
Page 23 of 38
Page 24 of 38
4.6
4.6.1 General
To test and demonstrate the Fast Ethernet configuration of the
FibeAir1500/1528 radio link.
For Ethernet applications, the FibeAir provides a full IP solution, creating virtual
networks for LAN users (VLANs). The FibeAir provides two Fast Ethernet
connections over 155 Mbps.
Fast Ethernet tests include:
1. Fast Ethernet traffic test
2. Throughput measurement
3. Dynamic bandwidth allocation functionality
Test Set-Up
For the test the two IDUs has to be configured with 2 x Fast Ethernet
interfaces.
Test Set-up C will be used for the Fast Ethernet Tests.
Test Set-Up C:
Left Port
Left Port
Port 1
Port 2
Packet
Analyzer
FibeAir IDU
FibeAir ODU
Test-Kit
FibeAir ODU
Right Port
FibeAir IDU
Right Port
Port 3
Port 4
Test Equipment
(a) Packet Analyzer (for Fast Ethernet measurements)
Page 25 of 38
Results Summary
Step
BER Test
Duration
Left Ports
Left Ports
Test
Expected
Results
Test Results
Lost Packets
No lost packets
(Bytes Sent =
Bytes Received)
Collisions
No collisions
Management Alarms No alarms
Lost Packets
No lost packets
(Bytes Sent =
Bytes Received)
Collisions
No collisions
Management Alarms No alarms
Page 26 of 38
(g) Stop the transmit/receive on the Packet Analyzer. Record the received
packets rate (per second) and calculate the achieved throughput*.
Verify that the throughput is 100Mbps.
(h) Repeat steps (d) to (g) also for 64 bytes/packet (the minimum allowed)
and 512 bytes/packet.
(i) Repeat steps (c) to (h) for the right ports of the IDUs.
Results Summary
Step
BER
Transmitted Expected
Measured
Test
Packet Size Received Received Packet
Duration
(bytes)
Bit rate
Rate
(bits/sec)
(per sec)
Left
Ports
1518
512
64
1518
512
64
Left
Ports
Calculated
Received Bit
Rate (Bits/sec)
100Mbps
100Mbps
100Mbps
100Mbps
100Mbps
100Mbps
Packet
Size
(Bits)
512
4,096
12,144
Preamble +
Inner Packet Gap
(Bits)
160
160
160
Overall
Packet Size
(Bits)
672
4,256
12,304
Received
Packet Rate
(per sec)
148,810
23,497
8,127
Received
Bits Rate
(Bits/sec)
100 M
100 M
100 M
Agenda:
1. Packet Size (Bytes) Set. Configurable by the packet Analyzer.
2. Packet Size (Bits) calculated. Packet Size (Bytes) x 8 (Bits/Byte).
3. Preamble + Inner packet Gap (bits)
Preamble fixed by the IXIA to 64 Bits (8 Bytes)
Inner Packet Gapthe minimum available by the IXIA is 960 nsec (960E-9 sec),
equivalent to 96 Bits at rate of 100Mbits/sec:
1 Bit = 1 / 100Mbits/sec = 10 nsec
960 nsec / 10 nsec/Bit = 96 Bits.
4. Overall Packet Size (Bits) Packet Size (Bits) + Preamble + Inner Packet Gap (Bits)
5. Received Packets Rate measured result from the IXIA.
6. Received Bits Rate Overall Packet Size x Received Packet Rate.
Page 27 of 38
Page 28 of 38
(t) Verify that the throughput of the left interface is 80Mbps and the right
interface is 70Mbps.
(u) Set the IDUs to Auto-Negotiation Enabled and Dynamic Bandwidth
Allocation Enabled.
(v) Set the Packet Analyzer to transmit in 100% utility and with the maximal
packet size packet size (1518 bytes/packet).
(w) Clear all logs of the Packet Analyzer and of the management.
(x) Start transmit/receive packets on both ports of the IDUs. Allow this test
to run for at least 10 minutes. Longer (or shorter) test period can be
used.
(y) Stop the transmit/receive on the Packet Analyzer. Record the received
packets rate (per second) and calculate the achieved throughput of
each port.
(z) Verify that the throughput of each interface is 75Mbps.
Results Summary
Step Dynamic BW
Left Interface
Allocation
Calculated Expected
Mode
Received
Received
Bit Rate
Bit Rate
(Bits/sec)
(Bits/sec)
1
2
3
4
5
Not Active
100% utility
Not Active
80% utility
Left Preferred
100% utility
Left Preferred
80% utility
Enabled
Right Interface
Calculated
Received
Bit Rate
(Bits/sec)
Expected
Received
Bit Rate
(Bits/sec)
100Mbps
50Mbps
80Mbps
50Mbps
100Mbps
50Mbps
80Mbps
70Mbps
75Mbps
75Mbps
Page 29 of 38
4.7
3 x E3 Tests
Test Purpose
To test and demonstrate the 3 x E3 configuration of the FibeAir1500/1528
radio link.
The FibeAir radio link provides three channels of E3 (or DS3) over 155 Mbps.
Test Set-Up
For the test the two IDUs has to be configured with 3 x E3 interfaces.
Test Set-up D will be used for the E3 Tests.
Test Set-Up D:
FibeAir IDU
E3#1
E3#2
E3#3
FibeAir IDU
FibeAir ODU
Test-Kit
FibeAir ODU
E3#1
E3#2
E3#3
SDH
Analyzer
Test Equipment
(a) SDH Analyzer (for E3 BER measurement)
Test Procedure
(a) Set up a link using the Test-Set. Set the RSL to ~-40dBm.
(b) Connect SDH analyzer to E3 Port #1 of one IDU. Loop E3 Port #1
module in the second IDU.
(c) Set the SDH Analyzer to transmission of E3 34Mbps signal (transmitter
coupled to receiver).
(d) Verify that there are no alarms on the SDH Analyzer and on the Link
Manager management.
(e) Clear all alarm log files on the Link Manager management.
(f) Run BER test on the SDH Analyzer. Verify that there are no alarms and
no errors of any kind.
(g) Allow this SDH test to run at least 15 minutes.
(h) Verify that no errors were detected by the SDH analyzer.
(i) Verify that there were no alarms on the management.
(j) Repeat steps (c) to (i) for E3 Port #2 and E3 Port #3.
Page 30 of 38
Results Summary
E3 Port
BER
Test
Duration
Port #1
Port #2
Port #3
Test
Expected Results
Test
Results
SDH Alarms
Errors Detected
BER
No alarms
No errors
No errors detected /
10E-13
Management Alarms No alarms
SDH Alarms
No alarms
Errors Detected
No errors
BER
No errors detected /
10E-13
Management Alarms No alarms
SDH Alarms
No alarms
Errors Detected
No errors
BER
No errors detected /
10E-13
Management Alarms No alarms
Page 31 of 38
4.8
Test Purpose
To test and demonstrate the Fast Ethernet and E3 configuration of the
FibeAir1500/1528 radio link.
The FibeAir radio link provides a unique solution supporting IP and TDM
applications.
Test Set-Up
For the test the two IDUs have to be configured with Fast Ethernet + E3
interfaces.
Test Set-up E will be used for the Fast Ethernet and E3 Tests.
Test Set-Up E:
FibeAir IDU
FE
E3#3
FibeAir IDU
FibeAir ODU
Test-Kit
FibeAir ODU
FE
E3#3
Port 1
Port 2
Packet
Analyzer
SDH
Analyzer
Test Equipment
(a) SDH Analyzer (for E3 BER measurement)
Test Procedure
(a) Set up a link using the Test-Set. Set the RSL to ~-40dBm.
(b) Set the IDUs to Auto-Negotiation Enabled.
(c) Connect the Packet Analyzer to the 100 BaseT left ports of the IDUs.
Verify that the Link LED of the 100 BaseT interface is green.
(d) Set the Packet Analyzer to transmit and receive full duplex 100 Mb/s,
Auto-Negotiation enabled. Set the Packet Analyzer to transmit in 100%
utility and with 1518 bytes/packet packet size.
(e) Clear all logs of the Packet Analyzer and of the management.
(f) Start transmit/receive packets. Allow this test to run for at least 15
minutes. Longer (or shorter) test period can be used.
(g) Stop the transmit/receive on the Packet Analyzer. Verify that the number
of packets sent matches the number of packets received and that there
are no collisions or packet-loss.
(j) Record the received packets rate (per second) and calculate the
achieved throughput. Verify that the throughput is 100Mbps.
(h) Connect SDH analyzer to E3 Port #3 of one IDU. Loop E3 Port #3
General FibeAir1500/1528 V&A Test Plan
Page 32 of 38
E3
Test
Expected Results
Test Results
Lost Packets
No lost packets
(Bytes Sent = Bytes
Received)
Collisions
No collisions
Management Alarms No alarms
Throughput
100Mbps
SDH Alarms
No alarms
Errors Detected
No errors
BER
No errors detected /
10E-13
Management Alarms No alarms
Page 33 of 38
General
5.2
Test Set-Up
FibeAir1500/1528 1+1 link is composed from two 1+0 links, including 4 IDUs
and 4 ODUs.
The two links are connected using a Test-Set that will be used during the V&A
functionality tests.
The tests will be performed using Test Set-Up E.
Lab test set-up requires:
(a) Two FibeAir1500/1528 radio link.
(b) 48 VDc@3Amp power supply for each terminal (IDU+ODU).
(f) Coax cables between IDUs and ODUs.
(g) Test-Set for the tested frequency (38GHz).
(h) Protection cable to connect the two IDUs.
(i) Protection Kits for splitting the traffic interfaces.
(j) PC to install the Link Manager for the links management.
Test equipment to be used:
(a) SDH Analyzer (for BER measurement)
Page 34 of 38
Test Set-Up E:
High-Frequency
Coax Cable
Splitter
ODU
ODU
ODU
ODU
1+1 Test-Set
Ethernet
Cable
Protection
Cable
Fibers
Optical
Splitters
STM-1
Coax
cables
Electrical
Splitters
Physical Loop
ETH
Rx Tx
SDH
Analyzer
5.3
HUB
NMS
Test Purpose
To test and verify proper and error-free operation of the 155 Mbps channel of a
1+1 link in all four operation options.
Required test-equipment
(a) SDH Analyzer (for BER measurement)
Test Procedure
(a) Set up a links using the Test-Set. Set the RSL to ~-40dBm.
(b) Verify that the link is in 1+1 mode: on each side, one of the ODUs is
muted.
(c) Connect SDH analyzer to the optical splitters on one end o the link.
Loop the electrical splitters on the other end of the links.
(d) Set the SDH Analyzer to transmission of STM-1, VC-4 bulk with 2^23
PRBS sequence (transmitter coupled to receiver).
(e) Verify that there are no alarms on the SDH Analyzer and on the Link
Manager management.
(f) Clear all alarm log files on the Link Manager management.
(g) Run BER test on the SDH Analyzer. Verify that there are no alarms and
no errors of any kind.
(h) Force switch on each IDU (by disconnecting the Line input of the Master
IDU) on each end of the link.
(i) Verify that after the SDH Analyzer is restarted (after each switch), the
SDH Analyzer does not report any errors or alarms.
(j) Activate ATPC and change the attenuation of the link. Verify that the
General FibeAir1500/1528 V&A Test Plan
Page 35 of 38
5.4
Expected Results
Test Results
No alarms/errors
No alarms/errors
No alarms/errors
No alarms/errors
RSL = Reference
Level
No alarms/errors
Test Purpose
To test and verify proper functionality of the protection triggers of the 1+1 link:
Automatic switch, Manual switch, BER switch, External Input switch.
Required test-equipment
(a) SDH Analyzer (for BER measurement)
Test Procedure
(a) Set up a links using the Test-Set. Set the RSL to ~-40dBm.
(b) Verify that the link is in 1+1 mode: on each side, one of the ODUs is
muted.
(c) Connect SDH analyzer to the optical splitters on one end o the link.
Loop the electrical splitters on the other end of the links.
(d) Set the SDH Analyzer to transmission of STM-1, VC-4 bulk with 2^23
PRBS sequence (transmitter coupled to receiver).
(e) Verify that there are no alarms on the SDH Analyzer and on the Link
Manager management.
(f) Clear all alarm log files on the Link Manager management.
(g) Run BER test on the SDH Analyzer. Verify that there are no alarms and
no errors of any kind.
(h) Force Automatic Switch on the Master IDU: disconnect the Line input,
disconnect the radio link, disconnect the IDU-ODU coax cable, reset the
IDU and power off the IDU.
(i) Verify that after the SDH Analyzer is restarted (after each switch), the
SDH Analyzer does not report any errors or alarms.
(j) Force Manual switch using the Link Manager management.
(k) Verify that after the SDH Analyzer is restarted (after each switch), the
SDH Analyzer does not report any errors or alarms.
General FibeAir1500/1528 V&A Test Plan
Page 36 of 38
(l) Set the Radio Excessive Errors Threshold to 10E-5 using the Link
Manager and enable BER switching.
(m)
Reduce the RSL of the Master ODU until radio BER reaches
10E-5 and verify that the link switched to the Standby unit.
(n) Verify that after the SDH Analyzer is restarted (after each switch), the
SDH Analyzer does not report any errors or alarms.
(o) Enable External Switch on the link. Insert external input alarm and verify
that the link switches.
(p) Verify that after the SDH Analyzer is restarted (after each switch), the
SDH Analyzer does not report any errors or alarms.
Results Summary
Step
Switching Triggers
1
2
3
4
5
6
7
8
5.5
Expected Results
Test Results
Link Switched, No
alarms/errors on link
Disconnect radio link
Link Switched, No
alarms/errors on link
Disconnect IDU-ODU cable Link Switched, No
alarms/errors on link
IDU reset
Link Switched, No
alarms/errors on link
IDU power-off
Link Switched, No
alarms/errors on link
Manual Switch
Link Switched, No
alarms/errors on link
BER Switch
Link Switched, No
alarms/errors on link
External Input Switch
Link Switched, No
alarms/errors on link
Test Purpose
To test and verify the management of 1+1 link via the In-Band Management
and the receipt of SNMP Traps on the Network Management Station.
Required test-equipment
(a) SDH Analyzer (for BER measurement)
(b) SNMPc Network Node Manager
Test Procedure
(a) Set up a links using the Test-Set. Set the RSL to ~-40dBm.
(b) Verify that the link is in 1+1 mode: on each side, one of the ODUs is
muted.
General FibeAir1500/1528 V&A Test Plan
Page 37 of 38
(c) Connect SDH analyzer to the optical splitters on one end of the link.
Loop the electrical splitters on the other end of the links.
(d) Configure the SNMPc to monitor all four IDUs.
(e) Ping the IP Address of each IDU and verify you get a reply from the
IDU.
(f) Launch Link Manager management session for each IDU and verify you
can manage each IDU.
(g) Generate a SNMP Trap on each one of the IDUs (disconnect the Line
input) and verify that the trap is received and reported by the SNMPc
NMS.
(h) Force a switch to one of the Master IDUs using the Link Manager and
verify the trap is received and reported by the SNMPc NMS.
(i) Power off one of the Master IDUs and verify that you can still manage
the three remaining IDUs.
Results Summary
Step
Test
1
2
Expected Results
Test Results
Ping reply
IDU can be
managed
Trap received and
reported
Traps received and
reported
Remaining IDUs
can be managed
Page 38 of 38