RECONSTRUCTION
OLYMPIC COMPLEX
LUZHNIKI BY ARCH
GROUP
JUNE 12, 2014 MARCO RINALDI
EXPLORE

Tweet
http://aasarchitecture.com/2014/06/reconstruction-olympic-complex-luzhniki-arch-group.html[25.3.2016. 03.45.27]

ADMINISTRATIVE CENTER

Reconstruction Olympic Complex Luzhniki by Arch group

AIRPORT

BRIDGE
CAMPUS
CITY HALL
CONGRESS CENTER
CULTURAL CENTER
EDUCATION CENTER
EXHIBITION HALL
EXPO
HEADQUARTERS
HOTEL
HOUSE
HOUSING
LIBRARY
MASTER PLAN
MEDIA CENTER
MEDICAL CENTER
MIXED-USE
MUSIC CENTER

Olympic Complex Luzhniki is unique place for Russia and Europe that
represents a single architectural ensemble of buildings. Pool building
one of the two buildings that make up a single composition with a Grand
Sports Arena (Luzhniki Stadium). Therefore it is necessary to keep three
facades of the existing building so as not to disrupt this ensemble. This
pool building is actually the main object at the entrance to the territory of
the Luzhniki Olympic Complex from the Vorobyovy Gory metro station.

OPERA HOUSE
PARK
PARKING
PAVILION
PORT CRUISE
RESEARCH CENTER
RESORT
SALES CENTER
SCHOOL
SCIENCE CENTER
SPORTS CENTER
STADIUM
STATION
SUSTAINABILITY
TERMINAL
THEATRE
VISITOR CENTER

http://aasarchitecture.com/2014/06/reconstruction-olympic-complex-luzhniki-arch-group.html[25.3.2016. 03.45.27]

Reconstruction Olympic Complex Luzhniki by Arch group

WINERY

The proposed external solution design of the building consists of three


major elements: Older existing facades, New glass volume and Curved
shell roof. Existing north- west facade we keep completely because it has
a very expressive and recognizable silhouette that connects the other two
colonnaded facades. The new glass volume as a whole has a simple
rectangular structure, built in a square of historic facades, and playing
background and subordinate role, to create no visual conflict of old and
new. It performs the function of a binder between the old architecture
and contemporary. Roofing is the most expressive element of modern
building. It is a single plane as if lowered down on the entire complex
and take it smoothed contours.

http://aasarchitecture.com/2014/06/reconstruction-olympic-complex-luzhniki-arch-group.html[25.3.2016. 03.45.27]

Reconstruction Olympic Complex Luzhniki by Arch group

Its still a small separation from the old facades and new interior
volumes. From the ground the roof itself is almost not visible, it only
forms a silhouette of the building but its clearly visible from the metro
bridge and automobile overpass. There are several major factors
influencing the formation of the building volume:

1. Three historic facade of the Grand Sports Arena.

2. Location of the entrance area from the metro station side.

3. Necessity in a large, open space entertainment area.

4. The building orientation relative to the sun.

5. View of the building from metro bridge and from pass along the
Grand Sports Arena.

http://aasarchitecture.com/2014/06/reconstruction-olympic-complex-luzhniki-arch-group.html[25.3.2016. 03.45.27]

Reconstruction Olympic Complex Luzhniki by Arch group

In general for the volume formation of the building it is very important


the fact that the main points of view from the city are the metro bridge
and overpass. The complex also can be seen from the opposite bank of
the Moscow River. All other species are located in the territory of the
Luzhniki Stadium and if you want to see the buildings you need to
purposefully come in Luzhniki. The entire complex is covered with a
single coating. It gently wraps around the internal structure, forming a
soft silhouette of the building. In general roof falls from north to south,
from the far corner of Grand Sports Arena to the opposite corner, which
houses the recreation area entrance.

http://aasarchitecture.com/2014/06/reconstruction-olympic-complex-luzhniki-arch-group.html[25.3.2016. 03.45.27]

Reconstruction Olympic Complex Luzhniki by Arch group

This allows to solve three problems: target plane of the roof strait to the
Metro Bridge, minimally close Grand Sports Arena, made the maximum
turn of windows in the roof to the sun. In three places of the roof over
the main areas there are large openings closed by glass to ensure their
good insolation. Glazing apertures can be open to allow visitors to
sunbathe in the summer. Water park zone is located along the well-lit
south-west side of the building. This is due to the need of maximum
insolation. On both sides zone is framed by historic colonnades. In this
case we get a beautiful view of the water park on Grand Sports Arena
and panoramic views of Luzhniki parkland across the colonnade.

http://aasarchitecture.com/2014/06/reconstruction-olympic-complex-luzhniki-arch-group.html[25.3.2016. 03.45.27]

Reconstruction Olympic Complex Luzhniki by Arch group

All other functions of the complex form a single five-story volume which
stretches along the opposite north- east side so as not to obscure the
entertainment zone and the entrance. The entrance area is also situated in
the most illuminated part and appears to be a large, spacious space. From
the entrance area you can immediately see the entire internal structure of
the building: a swimming pool in a glass cube, the main entertainment
area with water attractions, five-story multi-block, historic colonnade,
wavelike cover. Water park zone is located on the second and partly on
the ground floor of the building. It is divided into three parts:

1. Slides and attractions area.

2. Recreation area, food and childrens area.

3. Nature recreation area (1st floor).

http://aasarchitecture.com/2014/06/reconstruction-olympic-complex-luzhniki-arch-group.html[25.3.2016. 03.45.27]

Reconstruction Olympic Complex Luzhniki by Arch group

The main part of the water park slides and attractions area. It consists of
the following elements:

1. Wave pool with beach.

2. Different kinds of slides.

3. Two FlowRider machines (children and professional) simulating an


ocean wave for surfing. Professional attitude allows you to simulate the
falling part of the wave and perform complex tricks.

4. Deep pool with climbing wall above the water, low platforms for
diving, bungee, etc. Climbing wall is composed of three parts of
different height. It is not usual curve wall but ultramodern design of
glass elements attached to it. It suites perfectly to overall design concept.

5. Slow (lazy) river.

6. Hydro and aero-massage pools. Mainly located in the central area and
along the opening wall.

7. Recreation area along the sliding facade.

http://aasarchitecture.com/2014/06/reconstruction-olympic-complex-luzhniki-arch-group.html[25.3.2016. 03.45.27]

Reconstruction Olympic Complex Luzhniki by Arch group

The complex has several swimming pools, one fifty-meter pool, two
twenty-meter and one small pool for relaxation. All pools are all-welded
and have a stainless steel bowl. Relaxation pool overlooks the facade of
the building and has one wall made entirely of glass. The complex has
several gym zones for various sports at different floors including the
fitness center. There is a large spa area on the fourth floor. There are
several cafes scattered throughout the complex. There is a restaurant
with a large terrace on the top floor. In the area of water park you can
find the aquabar where visitors can relax, being right in the water.

http://aasarchitecture.com/2014/06/reconstruction-olympic-complex-luzhniki-arch-group.html[25.3.2016. 03.45.27]

Reconstruction Olympic Complex Luzhniki by Arch group

On the ground floor there is a shopping arcade leading to the entrance to


the water park. There are illuminators in the ceiling of the corridor
gallery built into the bottom of the pools. The ground floor also has
shops with entrances directly from the street. They are located along the
north side of the building. The underground level has a large sports
hypermarket. You can go down from main lobby using the escalators.
The area in front of the main facade.

The whole right side of the square is active and dedicated to water. There
you can find the area with fountains gushing out of the ground, spray
park area with designer stainless steel elements of which squirt water
streams. Close to the glass cube with media facade located small pond
depth of 10 cm. This pond looks like a continuation of the pool inside the
cube. Left-hand side is a recreation zone. It is designed for relaxing and
socializing. Therefore it is saturated with low lawns and landscaping.
The closer to the facade the greater the area of gardening. Behind the
facade of this part is also a zone of recreation and cafes, so the outside
landscaping is a continuation of what is inside (as in the case of the
right-hand side).

http://aasarchitecture.com/2014/06/reconstruction-olympic-complex-luzhniki-arch-group.html[25.3.2016. 03.45.27]

Reconstruction Olympic Complex Luzhniki by Arch group

Along the long south-western faade there is pedestrian and recreation


area as this side is well lit by the sun. It consists of three parts:

1. Buffer landscaping along the facade.

2. Recreation area with playgrounds, benches and landscaping. You can


for example put table tennis, play chess, dance, conduct any activities or
just relax and socialize.

3. Broad sidewalk. It is designed for transit passage of people to other


objects of Luzhniki Olympic Complex.

Area on the part of a Grand Sports Arena remains an open space for
events. Directly along the facade there is a recreation area with
playgrounds, benches and landscaping. Part of this area is formed of
terraces with ladders. Source: arch group.

http://aasarchitecture.com/2014/06/reconstruction-olympic-complex-luzhniki-arch-group.html[25.3.2016. 03.45.27]

Reconstruction Olympic Complex Luzhniki by Arch group

Location: Moscow, Russia


Architects: arch group
Project Team: Mikhail Krymov, Alexey Goryainov, Kochuk Irina,
Elena Utkina, Schelokova Ekatherina, Konstantin Kuhranov, Vitaly
Verbitsky, Andrey Zubkov, Maria Stepanova, Ilya Vasilyev
Gross building area: 47,652 m2
Land plot area: 32627 m2
Built-up area: 12373 m2
The total area of water surface: 5081 m2
Year: 2014
Employer: Luzhniki Olympic Complex

http://aasarchitecture.com/2014/06/reconstruction-olympic-complex-luzhniki-arch-group.html[25.3.2016. 03.45.27]

Reconstruction Olympic Complex Luzhniki by Arch group

http://aasarchitecture.com/2014/06/reconstruction-olympic-complex-luzhniki-arch-group.html[25.3.2016. 03.45.27]

Reconstruction Olympic Complex Luzhniki by Arch group

http://aasarchitecture.com/2014/06/reconstruction-olympic-complex-luzhniki-arch-group.html[25.3.2016. 03.45.27]

Reconstruction Olympic Complex Luzhniki by Arch group

http://aasarchitecture.com/2014/06/reconstruction-olympic-complex-luzhniki-arch-group.html[25.3.2016. 03.45.27]

Reconstruction Olympic Complex Luzhniki by Arch group

Article by Marco Rinaldi

with permalink:
http://aasarchitecture.com/2014/06/reconstruction-olympic-complexluzhniki-arch-group.html

Related Posts

PROSTOR

DIGITAL CLOUD BY

ROSATOM PAVILION BY

CONFECTIONERY BY

ARCH GROUP

ARCH GROUP

ARCH-GROUP

http://aasarchitecture.com/2014/06/reconstruction-olympic-complex-luzhniki-arch-group.html[25.3.2016. 03.45.27]

Reconstruction Olympic Complex Luzhniki by Arch group

APPLE STORE BY

MOTO-CENTER

WINNERS FOR MOSCOW

FOSTER + PARTNERS

COMPLEX IN CRIMEA

METRO STATIONS

OPENS IN TURKEY

BY 8D ARCHITECTS

COMPETITION

PREVIOUS POST

David Adjayes Sugar Hill nearly complete

NEXT POST

Open Issam Fares Institute by Zaha Hadid

LEAVE A REPLY
Your email address will not be published. Required fields are marked *

Comment

Name *
http://aasarchitecture.com/2014/06/reconstruction-olympic-complex-luzhniki-arch-group.html[25.3.2016. 03.45.27]

Reconstruction Olympic Complex Luzhniki by Arch group

Email *

Website

Prove that you are a human!

STAY WITH US

RECENT POSTS

NEWS

ARCHITECTURE

PUBLISH ON AASA

AZPML + SHARE ARCHITECTS


PRESENT RIVERSIDE COPA
CAGRANA MASTERPLAN FOR
VIENNA

AZPML + SHARE ARCHITECTS


PRESENT RIVERSIDE COPA
CAGRANA MASTERPLAN FOR
VIENNA

HOUSE ON SOLITUDE CREEK


BY ROBERT GURNEY
ARCHITECT

HOUSE ON SOLITUDE CREEK


BY ROBERT GURNEY
ARCHITECT

GRIMSHAWS HOUSING
DEVELOPMENT ABOVE NINE
ELMS STATION GO-AHEAD

GRIMSHAWS HOUSING
DEVELOPMENT ABOVE NINE

HOUSE OF THE QUARRY BY


RAMON ESTEVE ESTUDIO

PRIVACY
COPYRIGHT
CONTACT US

http://aasarchitecture.com/2014/06/reconstruction-olympic-complex-luzhniki-arch-group.html[25.3.2016. 03.45.27]

CABALLERIZAS LA ROSILLA
BY TALL ARQUITECTOS
THE CARMO TERRACE BY
LVARO SIZA VIEIRA
FLINDERS UNIVERSITY PLAZA
AND STUDENT HUB BY

Reconstruction Olympic Complex Luzhniki by Arch group

ELMS STATION GO-AHEAD


HOUSE OF THE QUARRY BY
RAMON ESTEVE ESTUDIO
CABALLERIZAS LA ROSILLA
BY TALL ARQUITECTOS

http://aasarchitecture.com/2014/06/reconstruction-olympic-complex-luzhniki-arch-group.html[25.3.2016. 03.45.27]

OFFICE BUILDING FOR GMP IN


LAS TABLAS BY RAFAEL DE
LA-HOZ
EIFFEL TOWER CRUISE
TERMINAL BY CLEMENT
BLANCHET ARCHITECTURE

WOODS BAGOT
WALL HOUSE BY AGI
ARCHITECTS

S-ar putea să vă placă și