UPGRADE OF HSM FINISHING MILL WIDTH AND FLATNESS GAUGES (HD)

(AF-1421074)
DAILY PROGRESS REPORT
Dated : April 2, 2016

EHSS AS OF: Apr 1 2016

D - 34

23-Apr-16

Target Date

TOTAL

OVERALL PROGRESS

Observation

Near Miss

Project

Weight

Incident Report

TOTAL PROGRESS

100.00%

Safety Officer

DOCUMENTATION

3.00%

3.00%

3.00%

0.00%

12.00%

12.00%

11.86%

-0.14%

OFFLINE ACTIVITIES

11.00%

10.03%

10.29%

0.26%

PRESHUTDOWN ACTIVITIES

15.00%

3.60%

5.06%

1.45%

SHUTDOWN

20.00%

ACTIVITIES BY IMS

30.01%

6
2

SAFETY WALKTHROUGH

2.00%

Documents Reject:

PROJECT CLOSEOUT

4.00%

Waiting for Mgr Signature

0.00%

3.00%

Docs to submit to E&PM:

Docs Submitted to PRO/ISD:

1.58%

3.00%

Admin & Support

Vehicle Status
Sticker Received:

Variance%

33.21%

3.00%

PROGRESS IN REPORTING DAY: Apr 1 2016

Docs Submitted to PRO/ISD:

CU. ACT %

31.64%

COMMON ACTIVITIES

PROCUREMENT

ID STATUS
Total ID's Received : 101

CU. PLN %

4
1
Manpower Status

Engineering & Construction


-Sand Blasting and application of Primer for Fabricated Materials

Total

In-Direct

Direct

28

was done. See attached photo.

Project S-Curve
6.00%

120.00%

Daily Plan
Daily Actual

5.00%

EXECUTIVE SUMMARY
-Termination works for FO Cable will be done by EEC and P.O was raised.
2 15m FO cable will be provided by EEC.

100.00%

Cumulative Plan
Cumulative Actual
4.00%

80.00%

3.00%

60.00%

2.00%

40.00%

1.00%

20.00%

0.00%

0.00%

-Safety Sign board P.O placed and will be delivered on 4th April.

PROCUREMENT
-90% of Tubing Material was delivered at SISCO.
-All Bolts were delivered at Store completely.

QUALITY REPORTS

22-Apr-16

20-Apr-16

18-Apr-16

16-Apr-16

14-Apr-16

12-Apr-16

10-Apr-16

8-Apr-16

6-Apr-16

4-Apr-16

2-Apr-16

31-Mar-16

29-Mar-16

27-Mar-16

25-Mar-16

23-Mar-16

21-Mar-16

19-Mar-16

17-Mar-16

15-Mar-16

13-Mar-16

9-Mar-16

11-Mar-16

7-Mar-16

5-Mar-16

3-Mar-16

1-Mar-16

PROGRESS FOR TOMORROW: Apr 2 2016

28-Feb-16

-Quality Surveilance during Painting activities witnessed by QC.

-Installation & alignment of TopPlan Central Station (430BO2)


-Installation & alignment of TopPlan Central Station (430BO1)
-Start Survey and Layout at Room 1
Manpower Histogram

-Start Pre assembly of Cobble Guard


-Inspection of Tubing Material

100

-Mobilization of Tubing Material at Site

Planned Indirect Manpower

90

-Preparation for tubing installation

Planned Direct Manpower


88

Actual Indirect Manpower

87

86

87

87

86

Actual Direct Manpower

86

80

-Blasting & Painting at Fabrication Area.


70
60
50

46

47

49

46

48

48

45

50

50

51

41
40
30

REASONS FOR VARIANCE

24

20
10

26

30

30

30

26
20

18

15
9

30

27

12

9 8 9

25

25

25

26

25

25

25

20

12

12

11

4
1

11

13

13

14

11

22

11

19 19 19
17
15 15 15 15
11
11 11
11 11
11

15
13
99

D - 54

D - 53

D - 52

D - 51

D - 50

D - 49

D - 48

D - 47

D - 46

D - 45

D - 44

D - 43

D - 42

D - 41

D - 40

D - 39

D - 38

D - 37

D - 36

D - 35

D - 34

D - 33

D - 32

D - 31

D - 30

D - 29

D - 28

D - 27

D - 26

D - 25

D - 24

D - 23

D - 22

CONCERNS & MITIGATION


Sr.
No.

CONCERNS

MITIGATION ACTIONS

ACTION BY

TARGET DATE

REMARKS

1
2
PREPARED BY:

4/2/2016

PLANNING DEPARTMENT

PAUL JAMES RAMOS

UPGRADE OF HSM FINISHING MILL WIDTH AND FLATNESS GAUGES (HD)


(AF-1421074)
ATTACHMENT
Dated : April 2, 2016

Figure 1 . Tube for Camera

Figure 2. Tube for Projector

Figure 3. Water Monitoring Plate

Figure 4 Tube for Camera

Figure 5. Heat Protection Plate

PREPARED BY:

4/2/2016

PLANNING DEPARTMENT

PAUL JAMES RAMOS

UPGRADE OF HSM FINISHING MILL WIDTH AND FLATNESS GAUGES (HD)


(AF-1421074)
SPECIALIZED INDUSTRIAL SERVICES CO. LTD
Report # 9
Activity ID

WEEKLY PROGRESS REPORT


Activity Name

Original
Duration

AF-1421074 UPGRADE OF HSM FINISHING MILL WIDTH AND FLATNESS MEASUREMENT GAUGES
COMMON ACTIVITIES
MOBILIZATION
A1440
Mobilization of Manpower, Equipment & Materials
SAFETY ORIENTATION & ID
A1020
Safety Program , Orientation and ID Preparation
MATERIAL RECEIVING
A3930
Material Receiving Inspection for Free Issued Items
A3910
Material Receiving Inspection for Structural Materials
A3920
Material Receiving Inspection for Electrical Materials
GENERAL ACTIVITIES
A1000
Award of P.O
A3840
Kick-off Meeting
A1010
Site Visit
DOCUMENTATION
A1030
Safety Plan
A1050
Project Quality Plan
A1060
Work Method Statement
A1070
All documents and Material Approvals
PROCUREMENT
STRUCTURAL
A2350
Beams
A2360
Plates
A2390
Channels
A2400
Bolts
PIPING
A4250
Tube
A4260
Fittings
A4270
Pipe Bend
A4280
Hose Nozzle
ELECTRICAL
A2410
GI Conduits
A2430
Electrical Consumables
FREE ISSUED ITEMS
A2370
Withdrawal of Free Issued Items from IMS
A2380
QC Inspection
CONSTRUCTION
OFFLINE ACTIVITIES
FABRICATION WORKS
PROJECTOR FRAME
A3230
Cutting of Beams
A3240
Fit-Up
A3250
QC Inspection
A3260
Full Weld
A3270
Qc Inspection
A3280
Sand Blasting and Painting Activities
HEAT PROTECTION PLATES
A3350
Cutting & Grinding of Plates
A3390
Qc Inspection
A3400
Sand Blasting and Painting Activities
TUBE FOR PROJECTOR
A3410
Cutting of Plates
A3420
Fit-Up
A3430
QC Inspection
A3440
Full Weld
A3450
Qc Inspection
A3460
Sand Blasting and Painting Activities
CAMERA FRAME
A3290
Cutting of Beams
A3300
Fit-Up
A3310
QC Inspection
A3320
Full Weld
A3330
Qc Inspection
A3340
Sand Blasting and Painting Activities
TUBE FOR CAMERA
A3940
Cutting of Plates
A3950
Fit-Up
A3960
QC Inspection
A3970
Full Weld
A3980
Qc Inspection
A3990
Sand Blasting and Painting Activities
SITE ACTIVITIES
MOBILIZATION
A3570
Mobilization of Partial Manpower & Equipment at Site
SCAFFOLDING
A3580
Installation of Scaffolding
CIVIL & STRUCTURAL WORKS
A3550
Marking , Survey and Layout at Site
ELECTRICAL WORKS
A3530
Rellocation of Patch Panel Box
A3540
Installation of Conduit Support
A3600
Cable Laying of Melvnet Cable(1X 120m)
A4350
Shifting of Patch Panel FO to new Box at Room 3
A3590
Installation of Conduit
A4360
Cable Laying of F0 Cable to PC Pulpit(1x250m)
A3610
Cable Laying of PLC Control Cable(1x100m)
PRESHUTDOWN ACTIVITIES
SITE ACTIVITIES
A4300
Shifting all the Material at Job Site for TopPlan Projector
A4290
Shifting all the Material at Job Site for Width Gauge
FIRST FLOOR
ROOM 1
DISSASSEMBLY
FLATNESS GAUGE
A2440
Disassemble of Flatness Gauge Measuring System
A2570
Disassemble of Steel Beam and Column

4/2/2016

655h
244h
40h
40h
144h
144h
26h
10h
10h
10h
112h
10h
8h
24h
150h
96h
150h
120h
70h
192h
192h
108h
120h
120h
192h
144h
144h
144h
144h
144h
132h
130h
132h
40h
30h
10h
381h
242h
119h
79h
10h
10h
10h
11h
11h
48h
99h
27h
14h
58h
72h
14h
14h
14h
14h
14h
44h
109h
10h
10h
11h
12h
10h
56h
72h
12h
14h
14h
14h
14h
44h
242h
34h
34h
156h
156h
6h
6h
154h
10h
72h
24h
12h
60h
36h
24h
123h
76h
18h
24h
89h
89h
40h
39h
9h
12h

Date:

Planned Start

Planned Finish

Budgeted
Labor
Units

2/28/16 7:00 AM
2/28/16 7:00 AM
3/20/16 4:00 PM
3/20/16 4:00 PM
3/6/16 7:00 AM
3/6/16 7:00 AM
3/20/16 12:00 PM
3/20/16 12:00 PM
3/20/16 4:00 PM
3/21/16 4:00 PM
2/28/16 7:00 AM
2/28/16 7:00 AM
3/6/16 7:00 AM
3/8/16 3:00 PM
2/29/16 7:00 AM
2/29/16 7:00 AM
2/29/16 7:00 AM
2/29/16 7:00 AM
3/9/16 7:00 AM
3/8/16 11:00 AM
3/8/16 11:00 AM
3/8/16 11:00 AM
3/8/16 11:00 AM
3/8/16 11:00 AM
3/8/16 11:00 AM
3/13/16 4:00 PM
3/13/16 4:00 PM
3/13/16 4:00 PM
3/13/16 4:00 PM
3/13/16 4:00 PM
3/8/16 11:00 AM
3/8/16 11:00 AM
3/8/16 11:00 AM
3/16/16 8:00 AM
3/16/16 8:00 AM
3/19/16 2:00 PM
3/15/16 8:00 AM
3/15/16 8:00 AM
3/24/16 4:00 PM
3/24/16 4:00 PM
3/24/16 4:00 PM
3/24/16 4:00 PM
3/26/16 2:00 PM
3/27/16 12:00 PM
3/27/16 12:00 PM
3/28/16 11:00 AM
3/27/16 12:00 PM
3/27/16 12:00 PM
3/29/16 3:00 PM
3/30/16 5:00 PM
3/29/16 11:00 AM
3/29/16 11:00 AM
3/29/16 11:00 AM
3/30/16 1:00 PM
3/31/16 3:00 PM
3/31/16 3:00 PM
3/31/16 3:00 PM
3/24/16 4:00 PM
3/24/16 4:00 PM
3/26/16 2:00 PM
3/27/16 12:00 PM
3/28/16 11:00 AM
3/29/16 11:00 AM
3/30/16 9:00 AM
3/29/16 11:00 AM
3/29/16 11:00 AM
3/29/16 11:00 AM
3/30/16 1:00 PM
3/31/16 3:00 PM
3/31/16 3:00 PM
3/31/16 3:00 PM
3/15/16 8:00 AM
3/20/16 4:00 PM
3/20/16 4:00 PM
3/20/16 4:00 PM
3/20/16 4:00 PM
4/6/16 1:00 AM
4/6/16 1:00 AM
3/15/16 8:00 AM
3/15/16 8:00 AM
3/22/16 6:00 AM
3/22/16 6:00 AM
3/22/16 6:00 AM
3/24/16 6:00 AM
3/24/16 6:00 AM
3/28/16 6:00 AM
3/29/16 7:00 AM
4/2/16 8:00 AM
4/2/16 8:00 AM
4/6/16 7:00 AM
3/29/16 7:00 AM
3/29/16 7:00 AM
3/29/16 7:00 AM
3/29/16 8:00 AM
3/29/16 8:00 AM
3/30/16 6:00 AM

4/23/16 5:00 PM
3/24/16 8:00 AM
3/24/16 8:00 AM
3/24/16 8:00 AM
3/20/16 4:00 PM
3/20/16 4:00 PM
3/22/16 2:00 PM
3/21/16 10:00 AM
3/21/16 2:00 PM
3/22/16 2:00 PM
3/12/16 8:00 AM
2/28/16 5:00 PM
3/6/16 3:00 PM
3/12/16 8:00 AM
3/16/16 8:00 AM
3/10/16 1:00 PM
3/16/16 8:00 AM
3/13/16 2:00 PM
3/16/16 8:00 AM
3/27/16 4:00 PM
3/27/16 4:00 PM
3/19/16 4:00 PM
3/20/16 4:00 PM
3/20/16 4:00 PM
3/27/16 4:00 PM
3/27/16 4:00 PM
3/27/16 4:00 PM
3/27/16 4:00 PM
3/27/16 4:00 PM
3/27/16 4:00 PM
3/21/16 4:00 PM
3/21/16 2:00 PM
3/21/16 4:00 PM
3/20/16 12:00 PM
3/19/16 2:00 PM
3/20/16 12:00 PM
4/12/16 3:00 PM
4/6/16 7:00 AM
4/4/16 5:00 PM
4/1/16 12:00 PM
3/26/16 2:00 PM
3/26/16 2:00 PM
3/27/16 12:00 PM
3/28/16 11:00 AM
3/28/16 11:00 AM
4/1/16 12:00 PM
4/4/16 5:00 PM
3/29/16 3:00 PM
3/30/16 5:00 PM
4/4/16 5:00 PM
4/4/16 1:00 PM
3/30/16 1:00 PM
3/30/16 1:00 PM
3/31/16 3:00 PM
4/2/16 7:00 AM
4/2/16 7:00 AM
4/4/16 1:00 PM
4/4/16 7:00 AM
3/26/16 2:00 PM
3/27/16 12:00 PM
3/28/16 11:00 AM
3/29/16 11:00 AM
3/30/16 9:00 AM
4/4/16 7:00 AM
4/4/16 1:00 PM
3/30/16 11:00 AM
3/30/16 1:00 PM
3/31/16 3:00 PM
4/2/16 7:00 AM
4/2/16 7:00 AM
4/4/16 1:00 PM
4/6/16 7:00 AM
3/23/16 2:00 PM
3/23/16 2:00 PM
4/3/16 6:00 PM
4/3/16 6:00 PM
4/6/16 7:00 AM
4/6/16 7:00 AM
3/29/16 6:00 PM
3/15/16 6:00 PM
3/28/16 6:00 PM
3/23/16 6:00 PM
3/22/16 6:00 PM
3/29/16 6:00 PM
3/27/16 6:00 PM
3/29/16 6:00 PM
4/7/16 9:00 AM
4/7/16 9:00 AM
4/3/16 2:00 PM
4/7/16 9:00 AM
4/5/16 2:00 PM
4/5/16 2:00 PM
4/1/16 12:00 PM
4/1/16 12:00 PM
3/29/16 5:00 PM
3/30/16 6:00 PM

24090
723
200
200
100
100
223
60
83
80
200
60
60
80
723
120
200
120
283
2891
1020
300
320
200
200
671
120
151
200
200
600
300
300
600
300
300
11081
2650
1370
276
50
60
20
55
11
80
202
108
14
80
374
98
98
14
70
14
80
208
50
60
11
36
10
41
310
62
84
14
56
14
80
1280
120
120
160
160
18
18
982
70
200
120
72
120
200
200
3613
520
120
400
2293
2293
708
480
90
80

PLANNING DEPARTMENT

Weight

Earned

100.00%
3.00%
0.83%
0.83%
0.42%
0.42%
0.93%
0.25%
0.34%
0.33%
0.83%
0.25%
0.25%
0.33%
3.00%
0.50%
0.83%
0.50%
1.17%
12.00%
4.23%
1.25%
1.33%
0.83%
0.83%
2.79%
0.50%
0.63%
0.83%
0.83%
2.49%
1.25%
1.25%
2.49%
1.25%
1.25%
46.00%
11.00%
5.69%
1.15%
0.21%
0.25%
0.08%
0.23%
0.05%
0.33%
0.84%
0.45%
0.06%
0.33%
1.55%
0.41%
0.41%
0.06%
0.29%
0.06%
0.33%
0.86%
0.21%
0.25%
0.05%
0.15%
0.04%
0.17%
1.29%
0.26%
0.35%
0.06%
0.23%
0.06%
0.33%
5.31%
0.50%
0.50%
0.66%
0.66%
0.07%
0.07%
4.08%
0.29%
0.83%
0.50%
0.30%
0.50%
0.83%
0.83%
15.00%
2.16%
0.50%
1.66%
9.52%
2.94%
2.94%
1.99%
0.37%
0.33%

33.21%
3.00%
0.83%
0.83%
0.42%
0.42%
0.93%
0.25%
0.34%
0.33%
0.83%
0.25%
0.25%
0.33%
3.00%
0.50%
0.83%
0.50%
1.17%
11.86%
4.23%
1.25%
1.33%
0.83%
0.83%
2.65%
0.47%
0.60%
0.79%
0.79%
2.49%
1.25%
1.25%
2.49%
1.25%
1.25%
15.35%
10.29%
5.09%
1.01%
0.21%
0.25%
0.08%
0.23%
0.05%
0.20%
0.71%
0.45%
0.06%
0.20%
1.42%
0.41%
0.41%
0.06%
0.29%
0.06%
0.20%
0.80%
0.21%
0.25%
0.05%
0.15%
0.04%
0.10%
1.15%
0.26%
0.35%
0.06%
0.23%
0.06%
0.20%
5.21%
0.50%
0.50%
0.63%
0.63%
0.00%
0.00%
4.08%
0.29%
0.83%
0.50%
0.30%
0.50%
0.83%
0.83%
5.06%
0.10%
0.10%
0.00%
4.96%
2.94%
2.94%
1.99%
0.37%
0.33%

Activity
Status

Todays
Activity %

April 2, 2016
Cum.
Activitys
%

Prev.
Activity
%

Finished

100.00% 100.00%

Finished

100.00% 100.00%

Finished
Finished
Finished

100.00% 100.00%
100.00% 100.00%
100.00% 100.00%

Finished
Finished
Finished

100.00% 100.00%
100.00% 100.00%
100.00% 100.00%

Finished
Finished
Finished
Finished

100.00%
100.00%
100.00%
100.00%

Finished
Finished
Finished
Finished

15.00%

100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
100.00% 85.00%

On-going
On-going
On-going
On-going

15.00%
15.00%
15.00%
15.00%

95.00%
95.00%
95.00%
95.00%

100.00%
100.00%
100.00%
100.00%

80.00%
80.00%
80.00%
80.00%

Finished
Finished

100.00% 100.00%
100.00% 100.00%

Finished
Finished

100.00% 100.00%
100.00% 100.00%

Finished
Finished
Finished
Finished
Finished
On-going

60.00%

100.00%
100.00%
100.00%
100.00%
100.00%
60.00%

60.00%

100.00% 100.00%
100.00% 100.00%
60.00%
0.00%

60.00%

100.00%
100.00%
100.00%
100.00%
100.00%
60.00%

100.00%
100.00%
100.00%
100.00%
100.00%
0.00%

60.00%

100.00%
100.00%
100.00%
100.00%
100.00%
60.00%

100.00%
100.00%
100.00%
100.00%
100.00%
0.00%

60.00%

100.00%
100.00%
100.00%
100.00%
100.00%
60.00%

100.00%
100.00%
100.00%
100.00%
100.00%
0.00%

Finished
Finished
On-going
Finished
Finished
Finished
Finished
Finished
On-going
Finished
Finished
Finished
Finished
Finished
On-going
Finished
Finished
Finished
Finished
Finished
On-going

Finished
On-going

100.00% 100.00%
3.00%

95.00%

Not Started

0.00%

Finished
Finished
Finished
Finished
Finished
Finished
Finished

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

On-going
Not Started

Finished
Finished

100.00%
100.00%
100.00%
100.00%
100.00%
0.00%

20.00%

92.00%

100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%

20.00%
0.00%

100.00% 100.00%
100.00% 100.00%

PREPARED BY :
PAUL JAMES RAMOS

UPGRADE OF HSM FINISHING MILL WIDTH AND FLATNESS GAUGES (HD)


(AF-1421074)
SPECIALIZED INDUSTRIAL SERVICES CO. LTD
Report # 9
Activity ID

WEEKLY PROGRESS REPORT


Activity Name

Original
Duration

AF-1421074 UPGRADE OF HSM FINISHING MILL WIDTH AND FLATNESS MEASUREMENT GAUGES
A2580
Disassemble of Existing cable and blowers
A2590
Removal of Old Frame for the Flatness Gauge
A4410
Removal of Dust Protection
ELECTRICAL
A4380
Disconnection of Existing Cables
A4390
Disconnection of Existing Cables from Flatness Gauge Cable from Rm3-1
A4400
Disconnection & Isolation of Cable to be used
ROOM 2
ASSEMBLY
A3210
Installation of Holder for Water Chiller
A3220
Lifting and Installation of Water Chiller
ROOM 3
DISASSEMBLY
A3640
Dismantling of Existing cable connected to Flatness Gauge
A3620
Disassemble of Existing Central Stations (41JE15.H102)
A3630
Disassemble of Existing Central Stations (41JE15.H03)
A4420
Removal of 1 Warning Light for Flatness Gauge
ASSEMBLY
A3650
Lifting & Installation of TopPlan Central Station (430BO2)
A3670
Cable Laying Activities for TopPlan Central Station
A3680
Wiring and Termination Works for TopPlan Central Station
PIPING WORKS
A3850
Cutting & Bending of Pipes
A3860
Fit-Up
A3880
QC Inspection
A3870
Full Weld
A3890
Qc Inspection
A3900
Service Test
SHUTDOWN
GROUND FLOOR
SCAFFOLDING
A4430
Installation of Scaffolding around roller
A4440
Installation of Dummy Beam Support for Removal of Cobble Guard
DISASSEMBLY
ELECTRICAL
A2460
Removal of Existing Control Panel
A2470
Removal of Existing Housing for Water Monitoring
MECHANICAL
A2450
Disassemble of Existing Cobble Guard (Part 1 & Part 2)
A2480
Disassemble of Existing Heat Shield 1
A2490
Disassemble of Existing Heat Shield 2
A2500
Disassemble of Existing Tube for Width Gauge
A2510
Disassemble of Existing Tube for Flatness Gauge
A2520
Disassemble of Existing Backlight
A2530
Disassemble of Existing Drive Tracks
A2540
Disassemble Existing Protection
A2550
Disassemble Existing Hoses
A2560
Disassemble Existing Cables
ASSEMBLY
HEAT SHIELD
A2770
Drilling of Holes in the Heat Shield
A2780
Installation of Heat Shield
A2790
Bolting Activities
A2800
Application of Glue
A2810
Welding of Durasteel Plate
A2820
Insulation Works for Platform
A2830
Insulation Works for Heat Shield
HOUSING , TERMINAL BOX & LOCK VALVES
A2710
Installation of Supports for Terminal Box Installation
A2720
Mounting of Terminal Box
A2730
Installation of Housing for Water Monitoring
A2740
Installation of Lock Valves
TUBE FOR CAMERA HOUSING
A2750
Fit up & Alignment of Tube
A2760
QC Inspection
A3180
Welding Activities
A3190
QC Inspection
TUBE FOR PROJECTOR
A3690
Fit up of Tube
A3700
QC Inspection
A3710
Welding Activities
A3720
QC Inspection
COBBLE GUARD
A2840
Installation of Assembled Cobble Guard
A2850
Alligment of Cobble Guard
A2860
Bolt Torquing
DRIVE TRACKS AND BACKLIGHTS
A2870
Installation of Drive Tracks
A2880
Installation of Backlight
A2890
Installation & Allignment of Grease Protection
FIRST FLOOR
ACCESS WALL
A4870
Cutting of Existing wall for Shifting of Materials
ROOM 1
DISASSEMBLY
WIDTH GAUGE
A2600
Removal of Old Frame for width Gauge and dust protection
A2610
Disassembly of Width Gauge
A2620
Disassembly of Existing Cable and Blowers
ASSEMBLY
PROJECTOR HOUSING
A4320
Survey & Marking of Centerline for Projector Housing Installation
A2900
Welding of Mounting Plates
A2910
Fit up of Frame
A2920
Bolt Torquing

4/2/2016

655h
12h
12h
5h
23h
4h
12h
12h
20h
20h
8h
12h
66h
36h
12h
6h
6h
6h
36h
8h
24h
10h
58h
12h
22h
5h
12h
7h
12h
140h
140h
10h
4h
6h
48h
9h
3h
6h
48h
12h
5h
5h
4h
4h
4h
3h
4h
3h
4h
79h
25h
3h
2h
3h
3h
4h
5h
5h
54h
34h
8h
7h
5h
11h
5h
2h
2h
2h
15h
5h
2h
6h
2h
16h
10h
3h
3h
30h
5h
10h
15h
106h
5h
5h
96h
16h
16h
8h
3h
5h
80h
26h
3h
3h
2h
4h

Planned Start

Date:
Planned Finish

2/28/16 7:00 AM 4/23/16 5:00 PM


3/30/16 6:00 AM 3/30/16 6:00 PM
3/31/16 6:00 AM 3/31/16 6:00 PM
4/1/16 7:00 AM
4/1/16 12:00 PM
3/29/16 7:00 AM 3/30/16 6:00 PM
3/29/16 7:00 AM 3/29/16 11:00 AM
3/30/16 6:00 AM 3/30/16 6:00 PM
3/30/16 6:00 AM 3/30/16 6:00 PM
4/3/16 6:00 AM
4/4/16 2:00 PM
4/3/16 6:00 AM
4/4/16 2:00 PM
4/3/16 6:00 AM
4/3/16 2:00 PM
4/3/16 2:00 PM
4/4/16 2:00 PM
3/31/16 6:00 AM
4/5/16 2:00 PM
3/31/16 6:00 AM
4/3/16 8:00 AM
3/31/16 6:00 AM 3/31/16 6:00 PM
4/2/16 8:00 AM
4/2/16 2:00 PM
4/2/16 8:00 AM
4/2/16 2:00 PM
4/2/16 2:00 PM
4/3/16 8:00 AM
4/2/16 2:00 PM
4/5/16 2:00 PM
4/2/16 2:00 PM
4/3/16 10:00 AM
4/3/16 10:00 AM 4/5/16 10:00 AM
4/4/16 4:00 PM
4/5/16 2:00 PM
4/2/16 6:00 AM
4/6/16 11:00 AM
4/2/16 6:00 AM
4/2/16 6:00 PM
4/2/16 6:00 AM
4/3/16 4:00 PM
4/3/16 4:00 PM
4/4/16 9:00 AM
4/4/16 9:00 AM
4/5/16 9:00 AM
4/5/16 9:00 AM
4/5/16 4:00 PM
4/5/16 4:00 PM
4/6/16 11:00 AM
4/6/16 6:00 AM
4/12/16 3:00 PM
4/6/16 6:00 AM
4/12/16 3:00 PM
4/6/16 6:00 AM
4/6/16 5:00 PM
4/6/16 6:00 AM
4/6/16 10:00 AM
4/6/16 10:00 AM
4/6/16 5:00 PM
4/6/16 5:00 PM
4/8/16 9:00 PM
4/7/16 5:00 PM
4/8/16 3:00 AM
4/7/16 5:00 PM
4/7/16 8:00 PM
4/7/16 8:00 PM
4/8/16 3:00 AM
4/6/16 5:00 PM
4/8/16 9:00 PM
4/6/16 5:00 PM
4/7/16 6:00 AM
4/7/16 6:00 AM
4/7/16 11:00 AM
4/7/16 11:00 AM
4/7/16 5:00 PM
4/7/16 5:00 PM
4/7/16 9:00 PM
4/7/16 9:00 PM
4/8/16 2:00 AM
4/8/16 2:00 AM
4/8/16 6:00 AM
4/8/16 6:00 AM
4/8/16 9:00 AM
4/8/16 9:00 AM
4/8/16 2:00 PM
4/8/16 2:00 PM
4/8/16 5:00 PM
4/8/16 5:00 PM
4/8/16 9:00 PM
4/9/16 1:00 AM
4/12/16 3:00 PM
4/9/16 1:00 AM
4/10/16 4:00 AM
4/9/16 1:00 AM
4/9/16 4:00 AM
4/9/16 4:00 AM
4/9/16 6:00 AM
4/9/16 6:00 AM
4/9/16 9:00 AM
4/9/16 9:00 AM
4/9/16 12:00 PM
4/9/16 1:00 PM
4/9/16 5:00 PM
4/9/16 5:00 PM
4/9/16 10:00 PM
4/9/16 10:00 PM 4/10/16 4:00 AM
4/10/16 4:00 AM 4/12/16 3:00 PM
4/10/16 4:00 AM 4/11/16 5:00 PM
4/11/16 5:00 PM 4/12/16 2:00 AM
4/12/16 2:00 AM 4/12/16 9:00 AM
4/12/16 9:00 AM 4/12/16 3:00 PM
4/10/16 4:00 AM 4/10/16 4:00 PM
4/10/16 4:00 AM 4/10/16 9:00 AM
4/10/16 9:00 AM 4/10/16 11:00 AM
4/10/16 11:00 AM 4/10/16 2:00 PM
4/10/16 2:00 PM 4/10/16 4:00 PM
4/10/16 2:00 PM 4/11/16 6:00 AM
4/10/16 2:00 PM 4/10/16 7:00 PM
4/10/16 7:00 PM 4/10/16 9:00 PM
4/10/16 9:00 PM 4/11/16 4:00 AM
4/11/16 4:00 AM 4/11/16 6:00 AM
4/10/16 4:00 AM 4/10/16 9:00 PM
4/10/16 4:00 AM 4/10/16 3:00 PM
4/10/16 3:00 PM 4/10/16 6:00 PM
4/10/16 6:00 PM 4/10/16 9:00 PM
4/10/16 9:00 PM 4/12/16 6:00 AM
4/10/16 9:00 PM 4/11/16 3:00 AM
4/11/16 3:00 AM 4/11/16 2:00 PM
4/11/16 2:00 PM 4/12/16 6:00 AM
4/6/16 6:00 AM
4/11/16 2:00 AM
4/6/16 6:00 AM
4/6/16 11:00 AM
4/6/16 6:00 AM
4/6/16 11:00 AM
4/6/16 5:00 PM
4/11/16 2:00 AM
4/6/16 5:00 PM
4/7/16 10:00 AM
4/6/16 5:00 PM
4/7/16 10:00 AM
4/6/16 5:00 PM
4/7/16 2:00 AM
4/7/16 2:00 AM
4/7/16 5:00 AM
4/7/16 5:00 AM
4/7/16 10:00 AM
4/7/16 10:00 AM 4/11/16 2:00 AM
4/7/16 10:00 AM
4/8/16 3:00 PM
4/7/16 10:00 AM
4/7/16 2:00 PM
4/7/16 2:00 PM
4/7/16 5:00 PM
4/7/16 5:00 PM
4/7/16 7:00 PM
4/7/16 7:00 PM
4/7/16 11:00 PM

PLANNING DEPARTMENT

Budgeted
Labor
Units

Weight

Earned

24090
90
100
120
228
60
84
84
420
420
220
200
1165
560
160
100
100
200
605
120
245
240
800
120
150
10
100
200
220
4818
2587
130
100
30
1106
100
60
40
1006
216
120
120
70
100
60
120
120
40
40
1351
321
60
60
60
24
36
50
31
220
10
100
80
30
110
20
30
30
30
220
20
80
60
60
300
80
100
120
180
80
60
40
1538
30
30
778
177
177
80
27
70
601
239
21
21
26
28

100.00%
0.37%
0.42%
0.50%
0.95%
0.25%
0.35%
0.35%
1.74%
1.74%
0.91%
0.83%
4.84%
2.32%
0.66%
0.42%
0.42%
0.83%
2.51%
0.50%
1.02%
1.00%
3.32%
0.50%
0.62%
0.04%
0.42%
0.83%
0.91%
20.00%
10.74%
0.54%
0.42%
0.12%
4.59%
0.42%
0.25%
0.17%
4.18%
0.90%
0.50%
0.50%
0.29%
0.42%
0.25%
0.50%
0.50%
0.17%
0.17%
5.61%
1.33%
0.25%
0.25%
0.25%
0.10%
0.15%
0.21%
0.13%
0.91%
0.04%
0.42%
0.33%
0.12%
0.46%
0.08%
0.12%
0.12%
0.12%
0.91%
0.08%
0.33%
0.25%
0.25%
1.25%
0.33%
0.42%
0.50%
0.75%
0.33%
0.25%
0.17%
6.38%
0.12%
0.12%
3.23%
0.73%
0.73%
0.33%
0.11%
0.29%
2.49%
0.99%
0.09%
0.09%
0.11%
0.12%

33.21%
0.37%
0.42%
0.50%
0.95%
0.25%
0.35%
0.35%
0.52%
0.52%
0.27%
0.25%
1.49%
1.49%
0.66%
0.42%
0.42%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Activity
Status

Todays
Activity %

April 2, 2016
Cum.
Activitys
%

Prev.
Activity
%

Finished
Finished
Finished

100.00% 100.00%
100.00% 100.00%
100.00% 100.00%

Finished
Finished
Finished

100.00% 100.00%
100.00% 100.00%
100.00% 0.00%

100.00%

On-going
On-going

Finished
Finished
Finished
Not Started

90.00%
90.00%
90.00%

30.00%
30.00%

30.00%
30.00%

100.00%
100.00%
100.00%
0.00%

10.00%
10.00%
10.00%
0.00%

Not Started
Not Started
Not Started

0.00%
0.00%
0.00%

Not Started
Not Started
Not Started
Not Started
Not Started
Not Started

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Not Started
Not Started

0.00%
0.00%

Not Started
Not Started

0.00%
0.00%

Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Not Started
Not Started
Not Started
Not Started

0.00%
0.00%
0.00%
0.00%

Not Started
Not Started
Not Started
Not Started

0.00%
0.00%
0.00%
0.00%

Not Started
Not Started
Not Started
Not Started

0.00%
0.00%
0.00%
0.00%

Not Started
Not Started
Not Started

0.00%
0.00%
0.00%

Not Started
Not Started
Not Started

0.00%
0.00%
0.00%

Not Started

0.00%

Not Started
Not Started
Not Started

0.00%
0.00%
0.00%

Not Started
Not Started
Not Started
Not Started

0.00%
0.00%
0.00%
0.00%

PREPARED BY :
PAUL JAMES RAMOS

UPGRADE OF HSM FINISHING MILL WIDTH AND FLATNESS GAUGES (HD)


(AF-1421074)
SPECIALIZED INDUSTRIAL SERVICES CO. LTD
Report # 9
Activity ID

WEEKLY PROGRESS REPORT


Activity Name

Original
Duration

AF-1421074 UPGRADE OF HSM FINISHING MILL WIDTH AND FLATNESS MEASUREMENT GAUGES
A2930
Weding of Frame to Plates
A2940
Lifting and Allignment of Projector Housing
A3000
Bolt Torquing
TOP PLAN PROJECTOR
A4340
Survey & Marking of Centerline for TopPlan Projector Installation
A4000
Welding of Mounting Plates
A2960
Instalaltion of Holder for Projector
A2970
Lifting and Alignment of Top plan Projector
A2950
Installation of Top plan Projector
A2980
Bolt Torquing
WIDTH GAUGE
A4330
Survey & Marking of Centerline for Width Gauge Installation
A3030
Installation and Alignment of IMS Width Gauge
A3040
Bolt Torquing
TOP PLAN CAMERA
A3120
Installation of Console for Camera
A3130
Fit up of Frame
A3140
Alignment of Frame
A3150
Bolting of Frame to Plates
A3160
Lifting and Allignment of Camera Housing & Console
A3170
Bolting Activities
ON-SITE CABINET
A3200
Installation of on-site Cabinet
ROOM 3
DISASSEMBLY
ELECTRICAL
A2670
Dissassemble of Existing Central Station(41JE15.H101)
A2680
Dismantling of Existing Cable for Width Gauge
PIPING
A2690
Disconnection of Piping , Tube and Hoses
A2700
Removal of Existing (Water Service Box) Panels
ASSEMBLY
ELECTRICAL
A3560
Modification of Existing Cable Tray Cover
A3730
Cabling works for Central Station (430B01)
A3740
Wiring & Termination Works for Width Gauge
ELECTRICAL AND AUTOMATION WORKS
TOPPLAN
A4010
Cable Laying & Termination for Main Power Supply Sation
A4020
Cable Laying & Termination for 100v Power Supply (40m)
A4030
Cable Laying & Termination for Camera , Service & EtherCAT
A4040
Cable Laying & Termination for Equipotential Bonding Measuring Point
A4050
Cable Laying & Termination for Power Supply Fan Camera Housing
A4060
Cable Laying & Termination for Power Supply LED Backlight
A4070
Cable Laying & Termination for Flow Sensor
A4080
Cable Laying & Termination for Solenoid Valve
A4090
Cable Laying & Termination for Analog Output
A4100
Continuity Testing
WIDTH GAUGE
A1200
Cable Laying & Termination for Main Power Supply Sation
A3750
Cable Laying & Termination for 100v Power Supply (40m)
A3760
Cable Laying & Termination for Camera , Service & EtherCAT
A3770
Cable Laying & Termination for Equipotential Bonding Measuring Point
A3780
Cable Laying & Termination for Power Supply Fan Camera Housing
A3790
Cable Laying & Termination for Power Supply LED Backlight
A3810
Cable Laying & Termination for Flow Sensor
A3820
Cable Laying & Termination for Solenoid Valve
A3830
Cable Laying & Termination for Analog Output
A3800
Continuity Testing
SURVEILLANCE , HOT & COLD COMMISSIONING BY IMS
TOP PLAN
A4690
Installation Supervision of Central station
A5030
Cable Laying & Testing Verification
A5040
Installation Supervision of water chiller
A4570
Switch on Power & Computer of Central Station
A4880
Cable termination Supervision
A4890
Piping for water chillier (only supervision & Inspection)
A4900
Centerline marking for projector Housing
A4910
Installation Supervision and allignment of the projector housing
A4920
Installation of Projector
A4930
Installation supervision of camera housing
A4980
Continuity test
A4940
Allignment of Camera Housing
A5000
Fixing supervision of Tubes
A4950
Camera & projector air piping checking
A4970
Installation Supervision of onsite control panel
A4960
Cobble Guard Inspection
A4590
Switch on power of Complete System
A4600
Communication Check of All internal Components(Camera & Projector)
A4990
Connecting media (Air, Water)
A4610
I/O Signal Testing(Internal)
A4620
Data interface Checking (IMS to Customer
A4630
Checking of All interlock in System
A4640
Hardware interface Check with Customer
A4660
System Calibration
A5010
Data inetrface checking(IMS to PCFC)
A5020
Data inetrface checking(IMS to MAC)
A4670
Software & Accuracy Check
A4680
System Observation
WIDTH GAUGE
A5050
Supervision for Width gauge shifting to Measuring house
A5060
Installaltion supervision and allignment of Camera Assembly
A5070
Centerline marking for width Gauge
A5080
Cable Termination
A5130
Drive Track inspection

4/2/2016

655h
4h
5h
5h
19h
3h
3h
6h
2h
5h
5h
22h
3h
16h
3h
18h
2h
5h
2h
5h
2h
2h
5h
5h
67h
25h
15h
10h
5h
10h
4h
6h
42h
42h
15h
12h
15h
45h
45h
5h
4h
3h
4h
3h
4h
4h
3h
5h
10h
33h
5h
2h
2h
4h
4h
4h
2h
3h
3h
4h
243h
243h
3h
24h
3h
2h
10h
4h
3h
5h
5h
4h
20h
3h
3h
3h
5h
3h
2h
3h
3h
4h
8h
2h
4h
10h
4h
20h
4h
18h
199h
20h
20h
3h
5h
4h

Date:

Planned Start

Planned Finish

Budgeted
Labor
Units

2/28/16 7:00 AM
4/7/16 11:00 PM
4/8/16 4:00 AM
4/8/16 9:00 AM
4/8/16 3:00 PM
4/8/16 3:00 PM
4/8/16 6:00 PM
4/8/16 9:00 PM
4/9/16 4:00 AM
4/9/16 6:00 AM
4/9/16 6:00 AM
4/9/16 4:00 AM
4/9/16 4:00 AM
4/9/16 7:00 AM
4/10/16 1:00 AM
4/10/16 1:00 AM
4/10/16 1:00 AM
4/10/16 3:00 AM
4/10/16 8:00 AM
4/10/16 10:00 AM
4/10/16 4:00 PM
4/10/16 6:00 PM
4/10/16 8:00 PM
4/10/16 8:00 PM
4/7/16 10:00 PM
4/7/16 10:00 PM
4/7/16 10:00 PM
4/7/16 10:00 PM
4/8/16 9:00 AM
4/8/16 3:00 PM
4/8/16 3:00 PM
4/8/16 7:00 PM
4/9/16 2:00 AM
4/9/16 2:00 AM
4/9/16 2:00 AM
4/9/16 6:00 PM
4/10/16 7:00 AM
4/9/16 6:00 PM
4/9/16 6:00 PM
4/9/16 6:00 PM
4/9/16 11:00 PM
4/10/16 4:00 AM
4/10/16 7:00 AM
4/10/16 11:00 AM
4/10/16 3:00 PM
4/10/16 7:00 PM
4/10/16 11:00 PM
4/11/16 3:00 AM
4/11/16 8:00 AM
4/9/16 6:00 PM
4/9/16 6:00 PM
4/9/16 11:00 PM
4/10/16 2:00 AM
4/10/16 4:00 AM
4/10/16 8:00 AM
4/10/16 1:00 PM
4/10/16 5:00 PM
4/10/16 7:00 PM
4/10/16 10:00 PM
4/11/16 2:00 AM
4/3/16 10:00 AM
4/3/16 10:00 AM
4/3/16 10:00 AM
4/3/16 10:00 AM
4/4/16 2:00 PM
4/5/16 2:00 PM
4/5/16 2:00 PM
4/6/16 11:00 AM
4/7/16 10:00 AM
4/8/16 4:00 AM
4/9/16 4:00 AM
4/10/16 1:00 AM
4/10/16 3:00 PM
4/10/16 4:00 PM
4/10/16 4:00 PM
4/11/16 2:00 AM
4/11/16 7:00 AM
4/11/16 5:00 PM
4/12/16 8:00 AM
4/12/16 10:00 AM
4/12/16 10:00 AM
4/13/16 8:00 AM
4/13/16 12:00 PM
4/14/16 8:00 AM
4/14/16 10:00 AM
4/14/16 5:00 PM
4/15/16 4:00 PM
4/15/16 4:00 PM
4/16/16 7:00 AM
4/16/16 11:00 AM
4/6/16 7:00 AM
4/6/16 7:00 AM
4/6/16 7:00 AM
4/9/16 9:00 AM
4/10/16 5:00 PM
4/10/16 9:00 PM

4/23/16 5:00 PM
4/8/16 4:00 AM
4/8/16 9:00 AM
4/8/16 3:00 PM
4/9/16 11:00 AM
4/8/16 6:00 PM
4/8/16 9:00 PM
4/9/16 4:00 AM
4/9/16 6:00 AM
4/9/16 11:00 AM
4/9/16 11:00 AM
4/10/16 4:00 AM
4/9/16 7:00 AM
4/10/16 12:00 AM
4/10/16 4:00 AM
4/10/16 8:00 PM
4/10/16 3:00 AM
4/10/16 8:00 AM
4/10/16 10:00 AM
4/10/16 4:00 PM
4/10/16 6:00 PM
4/10/16 8:00 PM
4/11/16 2:00 AM
4/11/16 2:00 AM
4/10/16 11:00 PM
4/9/16 2:00 AM
4/8/16 3:00 PM
4/8/16 9:00 AM
4/8/16 3:00 PM
4/9/16 2:00 AM
4/8/16 7:00 PM
4/9/16 2:00 AM
4/10/16 11:00 PM
4/10/16 11:00 PM
4/9/16 6:00 PM
4/10/16 7:00 AM
4/10/16 11:00 PM
4/11/16 7:00 PM
4/11/16 7:00 PM
4/9/16 11:00 PM
4/10/16 4:00 AM
4/10/16 7:00 AM
4/10/16 11:00 AM
4/10/16 3:00 PM
4/10/16 7:00 PM
4/10/16 11:00 PM
4/11/16 3:00 AM
4/11/16 8:00 AM
4/11/16 7:00 PM
4/11/16 6:00 AM
4/9/16 11:00 PM
4/10/16 2:00 AM
4/10/16 4:00 AM
4/10/16 8:00 AM
4/10/16 12:00 PM
4/10/16 5:00 PM
4/10/16 7:00 PM
4/10/16 10:00 PM
4/11/16 2:00 AM
4/11/16 6:00 AM
4/17/16 5:00 PM
4/17/16 5:00 PM
4/3/16 1:00 PM
4/5/16 10:00 AM
4/4/16 5:00 PM
4/5/16 4:00 PM
4/6/16 7:00 AM
4/6/16 4:00 PM
4/7/16 2:00 PM
4/8/16 9:00 AM
4/9/16 9:00 AM
4/10/16 5:00 AM
4/11/16 12:00 PM
4/10/16 7:00 PM
4/10/16 7:00 PM
4/11/16 5:00 AM
4/11/16 12:00 PM
4/11/16 8:00 PM
4/12/16 10:00 AM
4/12/16 2:00 PM
4/12/16 2:00 PM
4/13/16 12:00 PM
4/14/16 8:00 AM
4/14/16 10:00 AM
4/14/16 2:00 PM
4/15/16 4:00 PM
4/16/16 9:00 AM
4/17/16 1:00 PM
4/16/16 11:00 AM
4/17/16 5:00 PM
4/17/16 11:00 AM
4/7/16 5:00 AM
4/7/16 5:00 AM
4/9/16 12:00 PM
4/10/16 10:00 PM
4/11/16 2:00 AM

24090
28
80
35
158
18
18
36
16
35
35
90
30
50
10
104
16
20
14
20
20
14
10
10
730
360
180
140
40
180
80
100
370
370
150
120
100
693
542
120
80
30
20
12
30
10
10
90
140
151
30
16
16
20
5
5
5
5
21
28
7227
3897
20
100
120
160
80
100
100
100
100
10
5
5
5
5
10
10
98
100
100
400
100
150
160
100
350
500
600
309
3330
100
100
80
5
5

PLANNING DEPARTMENT

Weight

Earned

100.00%
0.12%
0.33%
0.15%
0.66%
0.07%
0.07%
0.15%
0.07%
0.15%
0.15%
0.37%
0.12%
0.21%
0.04%
0.43%
0.07%
0.08%
0.06%
0.08%
0.08%
0.06%
0.04%
0.04%
3.03%
1.49%
0.75%
0.58%
0.17%
0.75%
0.33%
0.42%
1.54%
1.54%
0.62%
0.50%
0.42%
2.88%
2.25%
0.50%
0.33%
0.12%
0.08%
0.05%
0.12%
0.04%
0.04%
0.37%
0.58%
0.63%
0.12%
0.07%
0.07%
0.08%
0.02%
0.02%
0.02%
0.02%
0.09%
0.12%
30.00%
16.18%
0.08%
0.42%
0.50%
0.66%
0.33%
0.42%
0.42%
0.42%
0.42%
0.04%
0.02%
0.02%
0.02%
0.02%
0.04%
0.04%
0.41%
0.42%
0.42%
1.66%
0.42%
0.62%
0.66%
0.42%
1.45%
2.08%
2.49%
1.28%
13.82%
0.42%
0.42%
0.33%
0.02%
0.02%

33.21%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Activity
Status

Todays
Activity %

April 2, 2016
Cum.
Activitys
%

Not Started
Not Started
Not Started

0.00%
0.00%
0.00%

Not Started
Not Started
Not Started
Not Started
Not Started
Not Started

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Not Started
Not Started
Not Started

0.00%
0.00%
0.00%

Not Started
Not Started
Not Started
Not Started
Not Started
Not Started

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Not Started

0.00%

Not Started
Not Started

0.00%
0.00%

Not Started
Not Started

0.00%
0.00%

Not Started
Not Started
Not Started

0.00%
0.00%
0.00%

Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Not Started
Not Started
Not Started
Not Started
Not Started

0.00%
0.00%
0.00%
0.00%
0.00%

Prev.
Activity
%

PREPARED BY :
PAUL JAMES RAMOS

UPGRADE OF HSM FINISHING MILL WIDTH AND FLATNESS GAUGES (HD)


(AF-1421074)
SPECIALIZED INDUSTRIAL SERVICES CO. LTD
Report # 9
Activity ID

WEEKLY PROGRESS REPORT


Activity Name

Original
Duration

AF-1421074 UPGRADE OF HSM FINISHING MILL WIDTH AND FLATNESS MEASUREMENT GAUGES 655h
A4750
Switch on Power & Computer of Central Station
2h
A5170
Checking of cable termination/connections
20h
A5120
Installation supervision of Cobble guard
2h
A5140
Back light installation inspection
4h
A5180
Switch on power of cameras & width gauge housing
2h
A4780
Communication Check of All internal Components(Camera)
3h
A5150
Inspection of Grease Protection
3h
A5110
Piping supervision for blow off Spray Backlight
2h
A4790
I/O Signal Testing(Internal)
4h
A4800
Data interface Checking (IMS to Customer
8h
A4810
Checking of All interlock in System
2h
A4820
Hardware interface Check with Customer
4h
A4830
Camera & Backlight Allignment
5h
A4840
System Calibration
10h
A5100
Lock valve installation supervision for Air & Water connections
3h
A5160
Connecting Media to Equipments
3h
A4850
Software & Accuracy Check
20h
A4860
System Observation
20h
SAFETY WALKTHROUGH
66h
A5190
Safety Walkthrough
3h
A5200
PSSR and Puchlisting
15h
A5210
Punchlist Rectification
48h
PROJECT CLOSEOUT
126h
A4110
Lifting and Disposal of Removed Equipment
36h
A1430
Demobilization of Manpower & Equipments
60h
A2320
Removal of Scaffolding
20h

4/2/2016

Date:

Planned Start

Planned Finish

Budgeted
Labor
Units

2/28/16 7:00 AM
4/11/16 8:00 AM
4/11/16 8:00 AM
4/11/16 5:00 PM
4/11/16 6:00 PM
4/12/16 8:00 AM
4/12/16 10:00 AM
4/12/16 10:00 AM
4/12/16 7:00 PM
4/13/16 6:00 AM
4/13/16 10:00 AM
4/14/16 6:00 AM
4/14/16 8:00 AM
4/14/16 8:00 AM
4/14/16 8:00 AM
4/14/16 10:00 AM
4/14/16 1:00 PM
4/15/16 9:00 AM
4/15/16 2:00 PM
4/17/16 11:00 AM
4/17/16 11:00 AM
4/17/16 2:00 PM
4/18/16 5:00 PM
4/12/16 8:00 AM
4/12/16 8:00 AM
4/17/16 11:00 AM
4/18/16 5:00 PM

4/23/16 5:00 PM
4/11/16 10:00 AM
4/12/16 6:00 AM
4/11/16 7:00 PM
4/11/16 10:00 PM
4/12/16 10:00 AM
4/12/16 2:00 PM
4/12/16 2:00 PM
4/12/16 9:00 PM
4/13/16 10:00 AM
4/13/16 6:00 PM
4/14/16 8:00 AM
4/14/16 12:00 PM
4/14/16 1:00 PM
4/14/16 6:00 PM
4/14/16 1:00 PM
4/14/16 4:00 PM
4/16/16 6:00 PM
4/17/16 11:00 AM
4/23/16 5:00 PM
4/17/16 2:00 PM
4/18/16 5:00 PM
4/23/16 5:00 PM
4/23/16 11:00 AM
4/14/16 3:00 PM
4/23/16 11:00 AM
4/20/16 1:00 PM

24090
200
220
100
100
100
120
130
150
200
300
200
200
100
40
40
40
500
300
482
200
120
162
963
200
363
400

PLANNING DEPARTMENT

Weight

Earned

100.00%
0.83%
0.91%
0.42%
0.42%
0.42%
0.50%
0.54%
0.62%
0.83%
1.25%
0.83%
0.83%
0.42%
0.17%
0.17%
0.17%
2.08%
1.25%
2.00%
0.83%
0.50%
0.67%
4.00%
0.83%
1.51%
1.66%

33.21%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Activity
Status

Todays
Activity %

April 2, 2016
Cum.
Activitys
%

Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started
Not Started

0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%

Not Started
Not Started
Not Started

0.00%
0.00%
0.00%

Not Started
Not Started
Not Started

0.00%
0.00%
0.00%

Prev.
Activity
%

PREPARED BY :
PAUL JAMES RAMOS

SPECIALIZED INDUSTRIAL SERVICES CO. LTD.


MATERIAL APPROVAL TRACKING SHEET
Project Title:

UPGRADE OF HSM FINISHING MILL WIDTH AND FLATNESS GAUGES

Project No:

AF-1421074

Sr No.

Item Description

Discipline

Material / Service No

MAR STATUS

Shutdown Materials
001

FLEXIBLE METAL CONDUIT

Electrical

002

FLEXIBLE METAL CONDUI COUPLING

Electrical

003

RIGID CONDUIT

Electrical

004

RIGID BUSH END

005

ONE SIDE HOLE CLAMP

006

UNISTRAT

007

UNISTRAT CLAMP

008

PIPE(316 L)

009

TEE -PIECE

010
011

FLEXIBLE METAL
CONDUIT
FLEXIBLE METAL
CONDUI COUPLING

APPROVED
APPROVED

RIGID CONDUIT

APPROVED

Electrical

RIGID BUSH END

APPROVED

Electrical

ONE SIDE HOLE CLAMP

APPROVED

Electrical

UNISTRAT

APPROVED

Electrical

UNISTRAT CLAMP

APPROVED

MECHANICAL

EN ISO 1127- 1.4301

APPROVED

MECHANICAL

DIN 2987 - 1.4301

APPROVED

PIPE BEND 90 DEGREE

MECHANICAL

ISO 3419 - 1.4301

APPROVED

VIEGA, 1845,

MECHANICAL

R1/2 X R1/2

APPROVED

012

CHANNEL

MECHANICAL

DIN1026-S235JR

APPROVED

013

PLATE

MECHANICAL

EN10029-S235JR

APPROVED

014

hexagon head screw

MECHANICAL

ISO 4017

APPROVED

015

hex nut

MECHANICAL

ISO 4032

APPROVED

016

WASHER

MECHANICAL

ISO 7089

APPROVED

017

PLATE

MECHANICAL

EN10029-S235JR

APPROVED

018

PLATE

MECHANICAL

EN10029-S235JR

APPROVED

019

FLAT BAR

MECHANICAL

EN10029-S235JR

APPROVED

020

BULP PLATE

MECHANICAL

DIN 59220 -S235JR

APPROVED

021

washer

MECHANICAL

ISO 7089-8

APPROVED

022

hexagon head screw

MECHANICAL

ISO 4017

APPROVED

023

washer

MECHANICAL

ISO 7089

APPROVED

024

hex nut

MECHANICAL

ISO 4032

APPROVED

025

eye bolt

MECHANICAL

RUD

APPROVED

026

bolt

MECHANICAL

027

CHANNEL

MECHANICAL

S 235 JR

APPROVED

028

FLAT BAR

MECHANICAL

S 235 JR

APPROVED

029

Paints

MECHANICAL

4/2/2016

APPROVED

APPROVED

REMARKS

SPECIALIZED INDUSTRIAL SERVICES CO. LTD.


MATERIAL TRACKING RECORD
Project Title:

UPGRADE OF HSM FINISHING MILL WIDTH AND FLATNESS GAUGES

Project No:

AF-1421074

Sr No.

Item Description

Discipline

Material / Service No

2-Apr-16

Status as of :
HADEED

Affiliate:

Progress of total Delivey:

0.00%

Rev:
Delay or
Remaining
Days

Actual
Delivery
date

Present Status

Delivery As
Per PO

Al-Basela Trading Est.

RECEIVED

17/03/2016

600

0.00%

PCS

Al-Basela Trading Est.

RECEIVED

17/03/2016

50

100.00%

PR No.

PR . Date

PO No.

P.O Date

Size

Quantity Ordered

Unit

35720

9-Mar-16

4027

16/03/2016

1''

600

MTRS

35720

9-Mar-16

4027

16/03/2016

1''

50

Vendor

Quantity
Arrived

Balance
Delivery %
To Arrive

Shutdown Materials
FLEXIBLE METAL
CONDUIT
FLEXIBLE METAL
CONDUI COUPLING

001

FLEXIBLE METAL CONDUIT

Electrical

002

FLEXIBLE METAL CONDUI COUPLING

Electrical

003

RIGID CONDUIT

Electrical

RIGID CONDUIT

35720

9-Mar-16

4027

16/03/2016

1''

25

MTRS

Al-Basela Trading Est.

RECEIVED

17/03/2016

25

100.00%

004

RIGID BUSH END

Electrical

35720

9-Mar-16

4027

16/03/2016

1''

30

PCS

Al-Basela Trading Est.

RECEIVED

17/03/2016

30

100.00%

005

ONE SIDE HOLE CLAMP

Electrical

35720

9-Mar-16

4027

16/03/2016

1''

100

PCS

Al-Basela Trading Est.

RECEIVED

17/03/2016

100

100.00%

006

UNISTRAT

Electrical

RIGID BUSH END


ONE SIDE HOLE
CLAMP
UNISTRAT

35720

9-Mar-16

4027

16/03/2016

50X50

20

MTRS

Al-Basela Trading Est.

RECEIVED

17/03/2016

20

100.00%

007

UNISTRAT CLAMP

Electrical

UNISTRAT CLAMP

35720

9-Mar-16

4027

16/03/2016

1''

50

SET

Al-Basela Trading Est.

RECEIVED

17/03/2016

50

100.00%

008

BOLT AND NUT (SS)

Electrical

BOLT AND NUT (SS)

35720

9-Mar-16

4027

16/03/2016

11/2''X10MM

20

E/A

Al-Basela Trading Est.

RECEIVED

17/03/2016

20

100.00%

009

BOLT AND NUT (SS)

Electrical

BOLT AND NUT (SS)

35720

9-Mar-16

4027

16/03/2016

11/2'X8MM

50

E/A

Al-Basela Trading Est.

RECEIVED

17/03/2016

50

100.00%

010

BOLT AND NUT (SS)

Electrical

BOLT AND NUT (SS)

35720

9-Mar-16

4027

16/03/2016

1''X10MM

20

E/A

Al-Basela Trading Est.

RECEIVED

17/03/2016

20

100.00%

011

BOLT AND NUT (SS)

Electrical

BOLT AND NUT (SS)

35720

9-Mar-16

4027

16/03/2016

1''X8MM

50

E/A

Al-Basela Trading Est.

RECEIVED

17/03/2016

50

100.00%

012

FLAT WASHER

Electrical

FLAT WASHER

35720

9-Mar-16

4027

16/03/2016

10MM

100

E/A

Al-Basela Trading Est.

RECEIVED

17/03/2016

100

100.00%

013

FLAT WASHER

Electrical

FLAT WASHER

35720

9-Mar-16

4027

16/03/2016

8MM

200

E/A

Al-Basela Trading Est.

RECEIVED

17/03/2016

200

100.00%

014

SPRING WASHER

Electrical

SPRING WASHER

35720

9-Mar-16

4027

16/03/2016

10MM

100

E/A

Al-Basela Trading Est.

RECEIVED

17/03/2016

100

100.00%

015

SPRING WASHER

Electrical

SPRING WASHER

35720

9-Mar-16

4027

16/03/2016

8MM

100

E/A

Al-Basela Trading Est.

RECEIVED

17/03/2016

100

100.00%

016

THREADAD ROD(SS)

Electrical

THREADAD ROD(SS)

35720

9-Mar-16

4027

16/03/2016

20MM DIA

12

MTRS

Al-Basela Trading Est.

RECEIVED

17/03/2016

12

100.00%

017

NUT (SS)

Electrical

NUT (SS)

35720

9-Mar-16

4027

16/03/2016

20MM DIA

50

E/A

Al-Basela Trading Est.

RECEIVED

17/03/2016

50

100.00%

018

FLAT WASHER

Electrical

FLAT WASHER

35720

9-Mar-16

4027

16/03/2016

20MM DIA

100

E/A

Al-Basela Trading Est.

RECEIVED

17/03/2016

100

100.00%

019

CABLE TIE (SS)

Electrical

CABLE TIE (SS)

35720

9-Mar-16

4027

16/03/2016

300 MM L

PKT

Al-Basela Trading Est.

RECEIVED

17/03/2016

100.00%

020

CABLE TIE (SS)

Electrical

CABLE TIE (SS)

35720

9-Mar-16

4027

16/03/2016

200 MM L

PKT

Al-Basela Trading Est.

RECEIVED

17/03/2016

100.00%

021

CABLE TIE (SS)

Electrical

CABLE TIE (SS)

35720

9-Mar-16

4027

16/03/2016

100 MM L

PKT

Al-Basela Trading Est.

RECEIVED

17/03/2016

100.00%

022

INSULATION TAPE

Electrical

INSULATION TAPE

35720

9-Mar-16

4027

16/03/2016

RED

10

ROLL

Al-Basela Trading Est.

RECEIVED

17/03/2016

10

100.00%

023

INSULATION TAPE

Electrical

INSULATION TAPE

35720

9-Mar-16

4027

16/03/2016

YELLOW

10

ROLL

Al-Basela Trading Est.

RECEIVED

17/03/2016

10

100.00%

024

INSULATION TAPE

Electrical

INSULATION TAPE

35720

9-Mar-16

4027

16/03/2016

BLUE

10

ROLL

Al-Basela Trading Est.

RECEIVED

17/03/2016

10

100.00%

025

INSULATION TAPE

Electrical

INSULATION TAPE

35720

9-Mar-16

4027

16/03/2016

BLACK

10

ROLL

Al-Basela Trading Est.

RECEIVED

17/03/2016

10

100.00%

026

INSULATION TAPE

Electrical

INSULATION TAPE

35720

9-Mar-16

4027

16/03/2016

GREEN

10

ROLL

Al-Basela Trading Est.

RECEIVED

17/03/2016

10

100.00%

027

NYLON CABLE TIE

Electrical

NYLON CABLE TIE

35720

9-Mar-16

4027

16/03/2016

300 MM L

PKT

Al-Basela Trading Est.

RECEIVED

17/03/2016

100.00%

028

NYLON CABLE TIE

Electrical

NYLON CABLE TIE

35720

9-Mar-16

4027

16/03/2016

200MM L

PKT

Al-Basela Trading Est.

RECEIVED

17/03/2016

100.00%

029

NYLON CABLE TIE

Electrical

NYLON CABLE TIE

35720

9-Mar-16

4027

16/03/2016

100 MM L

PKT

Al-Basela Trading Est.

RECEIVED

17/03/2016

100.00%

030

SCREW

Electrical

SCREW

35720

9-Mar-16

4027

16/03/2016

11/2'' X4 MM DIA

100

E\A

Al-Basela Trading Est.

RECEIVED

17/03/2016

100

100.00%

031

SCREW

Electrical

SCREW

35720

9-Mar-16

4027

16/03/2016

1''X4 MM DIA

100

E\A

Al-Basela Trading Est.

RECEIVED

17/03/2016

100

100.00%

032

FISHER

Electrical

FISHER

35720

9-Mar-16

4027

16/03/2016

8 MM

PKT

Al-Basela Trading Est.

RECEIVED

17/03/2016

100.00%

033

FISHER

Electrical

FISHER

35720

9-Mar-16

4027

16/03/2016

PKT

Al-Basela Trading Est.

RECEIVED

17/03/2016

100.00%

034

Tubing

MECHANICAL

EN ISO 1127- 1.4301

35716

8-Mar-16

80

MTRS

RECEIVED

0.00%

035

Valves

MECHANICAL

DIN 2987 - 1.4301

35716

8-Mar-16

E/A

RECEIVED

0.00%

036

PIPE BEND 90 DEGREE

MECHANICAL

ISO 3419 - 1.4301

35716

8-Mar-16

RECEIVED

0.00%

VIEGA, 1845,

MECHANICAL

R1/2 X R1/2

35716

8-Mar-16

038

CHANNEL

MECHANICAL

DIN1026-S235JR

35716

8-Mar-16

4051

039

PLATE

MECHANICAL

EN10029-S235JR

35716

8-Mar-16

4051

040

hexagon head screw

MECHANICAL

ISO 4017

35716

8-Mar-16

M 20 X70-A2-70

041

hex nut

MECHANICAL

ISO 4032

35716

8-Mar-16

M2O-A2-70

042

WASHER

MECHANICAL

ISO 7089

35716

8-Mar-16

21-140 HV-A2

043

PLATE

MECHANICAL

EN10029-S235JR

35716

8-Mar-16

4085

10MM THICK

044

PLATE

MECHANICAL

EN10029-S235JR

35716

8-Mar-16

4051

5MM THICK

045

FLAT BAR

MECHANICAL

EN10029-S235JR

35716

8-Mar-16

4085

30X10

046

BULP PLATE

MECHANICAL

DIN 59220 -S235JR

35716

8-Mar-16

4085

5X1000X2000

047

washer

MECHANICAL

ISO 7089-8

35716

8-Mar-16

4-140 HV-A2

048

hexagon head screw

MECHANICAL

ISO 4017

35716

8-Mar-16

M8x30-A2-70

049

hexagon head screw

MECHANICAL

ISO 4017

35716

8-Mar-16

M20x60-A2-70

050

hexagon head screw

MECHANICAL

ISO 4017

35716

8-Mar-16

M24x100-A2-70

051

hexagon head screw

MECHANICAL

ISO 4017

35716

8-Mar-16

M24x120-A2-70

052

washer

MECHANICAL

ISO 7089

35716

8-Mar-16

053

washer

MECHANICAL

ISO 7089

35716

8-Mar-16

21-140 HV-A2

054

washer

MECHANICAL

ISO 7089

35716

8-Mar-16

25-140 HV

055

hex nut

MECHANICAL

ISO 4032

35716

8-Mar-16

056

hex nut

MECHANICAL

ISO 4032

35716

8-Mar-16

17
9
24
12
32
40
70
24
12
24
12
140
140
16
24
6
32
32
60
16
30

E/A

037

6MM
17,2MM X 2,3MM
1/2''
17,2MM X 2,3MM
1/2''
17,2MM X 2,3MM
1/2''
VIEGA, 1845,

057

eye bolt

MECHANICAL

RUD

35716

8-Mar-16

058

eye bolt

MECHANICAL

RUD

35716

8-Mar-16

4/2/2016

160
20MM THICK

21-140 HV-A2

M20-A2-70
M24-A2-70
STARPOINT VRS-F
M24
STARPOINT VRS-F
M20

PLANNING DEPARTMENT

E/A

0.00%

MTRS

RECEIVED

24

100.00%

MTRS

RECEIVED

12

100.00%

E/A

RECEIVED

0.00%

E/A

RECEIVED

0.00%

E/A

RECEIVED

MTRS

RECEIVED

24

100.00%

MTRS

RECEIVED

12

100.00%

MTRS

RECEIVED

24

100.00%

MTRS

RECEIVED

12

100.00%

E/A

RECEIVED

E/A

RECEIVED

E/A

RECEIVED

E/A

RECEIVED

0.00%

E/A

RECEIVED

0.00%

E/A

RECEIVED

0.00%

E/A

RECEIVED

0.00%

E/A

RECEIVED

0.00%

E/A

RECEIVED

0.00%

E/A

RECEIVED

0.00%

E/A

RECEIVED

0.00%

E/A

RECEIVED

0.00%

0.00%

0.00%

Remarks

SPECIALIZED INDUSTRIAL SERVICES CO. LTD.


MATERIAL TRACKING RECORD
Project Title:

UPGRADE OF HSM FINISHING MILL WIDTH AND FLATNESS GAUGES

Project No:

AF-1421074

Sr No.

Item Description

Discipline

Material / Service No

PR No.

PR . Date

PO No.

P.O Date

0.00%

Delay or
Remaining
Days

Actual
Delivery
date

Quantity
Arrived

Balance
Delivery %
To Arrive

Unit

100
10
48
24

E/A

RECEIVED

E/A

RECEIVED

MTRS

RECEIVED

48

100.00%

MTRS

RECEIVED

24

100.00%

bolt

MECHANICAL

35716

8-Mar-16

sample

hilti bolt

MECHANICAL

35716

8-Mar-16

M 16 X150

061

CHANNEL

MECHANICAL

S 235 JR

35716

8-Mar-16

4051

75X50X8MM

062

FLAT BAR

MECHANICAL

S 235 JR

35716

8-Mar-16

4085

75X4

063

Paints

Present Status

Delivery As
Per PO

Quantity Ordered

060

Vendor

Progress of total Delivey:

Rev:

Size

059

4/2/2016

2-Apr-16

Status as of :
HADEED

Affiliate:

RECEIVED

PLANNING DEPARTMENT

0.00%
0.00%

Remarks