FLAME ARRESTOR
PROJECT NO.
PROJECT TITLE
TAG:
DOC NO
CLIENT
DATE
LOCATION
SHEET NO.
Item
Rev
Title
Notes Units
Design Data
Description/Type
text
102
Inlet Nozzle N1
mm
150 NB
103
Oulet Nozzle N2
mm
150 NB
104
Drain
mm
3/4"
105
Instrument Nozzle
mm
106
Quantity
No
107
Location
text
108
Design Code
text
109
ASME Rating
text
CL150
110
111
Dimension (face-to-face)
112
Installation
Installation Distance from
Potential Ignition Source
113
text
mm
Vendor to Specify
Text
MTR
Piping to provide
MATERIALS
201
Body (Housing)
text
202
Internal Elements
text
SS316
203
Lifting Lugs
text
Required
204
Bolting
text
PROCESS CONDITIONS
301
Gas / Vapor
Text
Gas
302
Composition
Text
303
Bar(g) 0
304
Bar(g) 0
305
Operating Pressure
(Normal)
Bar(g) 0.012
306
Bar(g) 14.8
307
Bar(g) 0
308
309
Operating Temperature
(Max)
20
35
311
Operating Temperature
(Normal)
Design Temperature(Upper)
312
313
314
Flowrate (Max)
M3/Hr 1200
315
Flowrate (Operating)
M3/Hr 450
316
Text
IIA
310
20
70
Design Temperature(Lower)
-15
Bar
OPTIONS
401
Pressure Tap
Text
402
Text
403
Drain Plug
Text
404
Coating
Text
405
Other
Text
1 of 2
Supplier Data
(Note B)
1 OF 1
Operation Data
Item
Rev
Title
Notes Units
Design Data
Supplier Data
(Note B)
Operation Data
TESTING
501
Testing
text
502
NDE
text
as per Manufacturing
503
text
504
Listing Requirement
text
UL Listed / FM Approved
505
Material Certification
text
text
MSS SP-25
SPECIAL REQUIREMENTS
601
Marking
602
Painting
603
Intrument Connection
604
Insulation
605
Electrical Tracing
606
Supplementary
Requirements
text
text
MANUFACTURER DELIVERABLES
701
Certified Drawings
702
text
Required
703
Weight
704
Calculations
Required
705
Catalogue
Required
706
Required
Required
kg
Required
REFERENCE
601
Fluid Service
text
602
Manufacturer(s)
text
603
text
604
P&ID
text
NOTES
A
"Supplier Data" fields to be completed by the Supplier. The Supplier shall note any non compliance in the "Supplier Data" column.
Flame Arrestor to have a non-corrosive metal tag wired, indicating size & Tag number
Flame arrester housing shall be gas tight to prevent the escape of vapors.
The net free area through flame arrester elements shall be at least 1.5 times the cross-sectional area of the arrester inlet.
DETONATION FLAME ARRESTER MAY BE EXPOSED TO INSTANTANEOUS PRESSURE SPIKES IN EXCESS OF 1000 PSIG. ANY INSTRUMENTATION
ATTACHED TO THE ARRESTER MUST BE CAPABLE OF CONTINUED OPERATION IN THIS ENVIRONMENT
2 of 2