A more accurate estimate can be prepared after reviewing the structural and elevation drawings of the building and

by using
various cost involved in a construction project.
Total Area:
1242 sft

Bill of Quantity (This is an Estimate only. Exaxt qua


Get prices from multiple vendors and put in this sheet. Compare the cost of your project. Note that actual quantity may vary
Item
Quantity Unit
Bazri
Binding Wire
Bitumen
Brick Blast
Brick Tiles
Bricks
Cement
Cement for Base Coarse
Cement Paint
CI Pipe
Coarse Sand
Commercial Hardwood
Earth
Fine Sand
Glaze Tile
Hard Wood Shutter

27.324 CUM
24.84
Kg
42.228
Kg
11.178 CUM
4968
NOS
24094.8
NOS
433.576 Bags
21.114 Bags
186.3 SqM
18.63 Meter
14.904 CUM
558.9
RFT
11.178 CUM
17.388 CUM
183.816 SqM
18.63
NOS

Hardwood and Commercial Plyboard

4.968

NOS

Hardwood Window Shutter


Iron Grills
Labour for Brick Sup. Str
Labour for Brick Tiles

37.26
310.5

NOS
Kg

Labour for Brick Work Foundation


Labour for Ceiling Plaster
Labour for Cement Concrete
Labour for Ceramic Glaze Tile
Labour for DPC

Labour for Earth Excavation & Earth Filling


Labour for pipe including cost of Joints
Labour for Pointing
Labour for RCC
Labour for Steel RCC
Labour for Wall Plaster
MS Steel
Oil Bound Distemper with Labour
Paint Work with Labour
Sand
Shuttering
Stone Blast
White Cement
Item

2484

Kg

521.64
248.4
38.502
1863
24.84
1.242

SqM
SqM
CUM
SFT
CUM
Bags

Quantity
Foundation

Cement Concrete 1:6:12


Cement
Stone Blast
Sand
Labour for Cement Concrete
Total for Cement Concrete 1:6:12
Brick Work in Foundation with Cement Mortar 1:6
Labour for Brick Work Foundation
Sand
Cement
Bricks
Total for Brick Work in Foundation with Cement Mortar 1:6
Horizontal DPC with Cement Concrete 1:2:4( 40MM)
Labour for DPC
Bitumen
Cement
Coarse Sand
Bazri
Total for Horizontal DPC with Cement Concrete 1:2:4( 40MM)
Earth Work in Excavation in Foundation and Filling under Floors
Labour for Earth Excavation & Earth Filling

Unit

58.374
24.84
12.42

Bags
CUM
CUM

3.726
17.388
6210

CUM
Bags
NOS

21.114
3.105
2.484
4.968

Kg
Bags
CUM
CUM

Total for Earth Work in Excavation in Foundation and Filling


under Floors
Super Structure
RCC without Steel Cement Concrete 1:1.5:3
Labour for RCC
Shuttering
Bazri
Coarse Sand
Cement
Total for RCC without Steel Cement Concrete 1:1.5:3

1863
22.356
11.178
199.962

SFT
CUM
CUM
Bags

2484
24.84

Kg
Kg

44.712
9.936
17884.8

Bags
CUM
NOS

11.178
1.242
11.178

CUM
CUM
Bags

4968
21.114

NOS
Kg

MS Steel For RCC


Labour for Steel RCC
MS Steel
Binding Wire
Total for MS Steel For RCC
Brick Work in Super Structure Cement Mortar 1:6
Labour for Brick Sup. Str
Cement
Sand
Bricks
Total for Brick Work in Super Structure Cement Mortar 1:6
Brick Tile Tracing on Roof
Earth
Sand
Cement
Labour for Brick Tiles
Brick Tiles
Bitumen
Total for Brick Tile Tracing on Roof
Rain Water Pipe
CI Pipe
Labour for pipe including cost of Joints
Total for Rain Water Pipe

18.63 Meter

Flooring

Ceramic Glaze Tiles Flooring 300X300 MM First Quality with course


Glaze Tile
121.716
Cement
23.095
White Cement
1.242
Cement for Base Coarse
21.114

SqM
Bags
Bags
Bags

Fine Sand
17.388
Brick Blast
11.178
Coarse Sand
1.242
Labour for Ceramic Glaze Tile
Total for Ceramic Glaze Tiles Flooring 300X300 MM First Quality
with course
Plastering/Wall tiles
Plaster on Ceiling (Roof) Cement Mortar 1:4
Sand
Cement
Labour for Ceiling Plaster
Total for Plaster on Ceiling (Roof) Cement Mortar 1:4
Plaster on Walls Cement Mortar 1:4
Labour for Wall Plaster
Cement
Sand
Total for Plaster on Walls Cement Mortar 1:4
Cement Pointing Cement Mortar 1:2
Sand
Labour for Pointing
Cement
Total for Cement Pointing Cement Mortar 1:2
Glazed Tiles in Dado or Skirting in Bathroom snd Kitchen Walls
Glaze Tile
Total for Glazed Tiles in Dado or Skirting in Bathroom snd
Kitchen Walls

CUM
CUM
CUM

2.484
13.662

CUM
Bags

49.68
7.452

Bags
CUM

1.242

CUM

12.42

Bags

62.1

SqM

Door,Window,Cupboard shutter,Iron Grills


Hardwood Door
Hard Wood Shutter
Total for Hardwood Door

18.63

NOS

Hardwood Frame Including Labour


Commercial Hardwood
Total for Hardwood Frame Including Labour

558.9

RFT

Hardwood Window
Hardwood Window Shutter
Total for Hardwood Window

37.26

NOS

Hard Wood Frame and Commercial Plyboard Shutter

Hardwood and Commercial Plyboard

4.968

NOS

310.5

Kg

248.4

SqM

521.64

SqM

186.3

SqM

Total for Hard Wood Frame and Commercial Plyboard Shutter


Iron Grilling with Labour
Iron Grills
Total for Iron Grilling with Labour
Paint
Paint on Wooden Doors and Windows
Paint Work with Labour
Total for Paint on Wooden Doors and Windows
Oil Bound Distemper with Filling on Walls
Oil Bound Distemper with Labour
Total for Oil Bound Distemper with Filling on Walls
Exterior Finish Cement Paint Snowcem
Cement Paint
Total for Exterior Finish Cement Paint Snowcem

Add 10% for Electric fitting wiring & Labor:


Add 10% for Water Supply fitting & Sanitary:
Add 5% for Sewerage:
Grand Total:

Ask question from Experts


See Elevation/Interior Designs
Construction Cost Estimate. A high level rough estimate.
evation drawings of the building and by using the exact dimensions of each wall. This high level estimate is based on the square feet of co

Project Cost in Rs.:


Project Labor Cost in Rs.:
1598446.238
190957.5
Project Cost Rs. Per SFT:
Project
Labor
Rs.
Cost
Per
SFT:
1287
154
tity (This is an Estimate only. Exaxt quantity can be arrived after reviewing the plans. Write to support@gharexpert.com
ur project. Note that actual quantity may vary depending upon the design.
Rate
Total Amount
Knowledgebase Links
Vendor 1
1400
70
60
600
7
6
320
320
35
500
1300
201
220
975
800
4380
4590
1030
70

38253.6
1738.8
2533.68
6706.8
34776
144568.8
138743.82
6756.48
6520.5
9315
19375.2
112338.9
2459.16
16953.3
147052.8
81599.4

Guidelines for Bazri


Guidelines for Binding Wire
Guidelines for Bitumen
Guidelines for Brick Blast
Guidelines for Brick Tiles
Guidelines for Bricks
Guidelines for Cement
Guidelines for Cement for Base Coarse
Guidelines for Cement Paint
Guidelines for CI Pipe
Guidelines for Coarse Sand
Guidelines for Commercial Hardwood
Guidelines for Earth
Guidelines for Fine Sand
Guidelines for Glaze Tile
Guidelines for Hard Wood Shutter
Guidelines for Hardwood and Commercial
22803.12 Plyboard
38377.8
21735
18630
13662

Guidelines for Hardwood Window Shutter


Guidelines for Iron Grills
Guidelines for Labour for Brick Sup. Str
Guidelines for Labour for Brick Tiles
Guidelines for Labour for Brick Work
6210 Foundation
4968 Guidelines for Labour for Ceiling Plaster
8694 Guidelines for Labour for Cement Concrete

16146 Guidelines for Labour for Ceramic Glaze Tile


621 Guidelines for Labour for DPC

24840

50
62
60
975
20
1050
850
Sub Total:
Rate

3105
14904
13662
7452
19872
124200
32341.68
14904
37539.45
37260
26082
1055.7
1278756.99
Total Amount

Guidelines for Labour for Earth Excavation &


Earth Filling
Guidelines for Labour for pipe including cost
of Joints
Guidelines for Labour for Pointing
Guidelines for Labour for RCC
Guidelines for Labour for Steel RCC
Guidelines for Labour for Wall Plaster
Guidelines for MS Steel
Guidelines for Oil Bound Distemper with
Labour
Guidelines for Paint Work with Labour
Guidelines for Sand
Guidelines for Shuttering
Guidelines for Stone Blast
Guidelines for White Cement

Guidelines for Foundation


Guidelines for Cement Concrete 1:6:12
320
1050
975

18679.68
26082
12109.5
8694
65565.18
Guidelines for Brick Work in Foundation with
Cement Mortar 1:6

975
320
6

6210
3632.85
5564.16
37260
52667.01
Guidelines for Horizontal DPC with Cement
Concrete 1:2:4( 40MM)

60
320
1300
1400

621
1266.84
993.6
3229.2
6955.2
13065.84
Guidelines for Earth Work in Excavation in
Foundation and Filling under Floors
24840

24840
Guidelines for Super Structure
Guidelines for RCC without Steel Cement
Concrete 1:1.5:3
20
1400
1300
320

13662
37260
31298.4
14531.4
63987.84
160739.64

50
70

7452
124200
1738.8
133390.8

Guidelines for MS Steel For RCC

Guidelines for Brick Work in Super Structure


Cement Mortar 1:6
320
975
6

18630
14307.84
9687.6
107308.8
149934.24
Guidelines for Brick Tile Tracing on Roof

220
975
320
7
60

2459.16
1210.95
3576.96
13662
34776
1266.84
56951.91
Guidelines for Rain Water Pipe

500

9315
3105
12420
Guidelines for Flooring
Guidelines for Ceramic Glaze Tiles Flooring
300X300 MM First Quality with course

800
320
850
320

97372.8
7389.9
1055.7
6756.48

975
600
1300

16953.3
6706.8
1614.6
16146
153995.58
Guidelines for Plastering/Wall tiles
Guidelines for Plaster on Ceiling (Roof)
Cement Mortar 1:4

975
320

2421.9
4371.84
4968
11761.74
Guidelines for Plaster on Walls Cement
Mortar 1:4

320
975

19872
15897.6
7265.7
43035.3
Guidelines for Cement Pointing Cement
Mortar 1:2

975
320

1210.95
14904
3974.4
20089.35
Guidelines for Glazed Tiles in Dado or
Skirting in Bathroom snd Kitchen Walls

800

49680
49680
Guidelines for Door,Window,Cupboard
shutter,Iron Grills
Guidelines for Hardwood Door

utter,Iron Grills
4380

81599.4
81599.4
Guidelines for Hardwood Frame Including
Labour

201

112338.9
112338.9
Guidelines for Hardwood Window

1030

38377.8
38377.8
Guidelines for Hard Wood Frame and
Commercial Plyboard Shutter

4590

22803.12
22803.12
Guidelines for Iron Grilling with Labour

70

21735
21735
Guidelines for Paint
Guidelines for Paint on Wooden Doors and
Windows

60

14904
14904
Guidelines for Oil Bound Distemper with
Filling on Walls

62

32341.68
32341.68
Guidelines for Exterior Finish Cement Paint
Snowcem

35
Sub Total:

6520.5
6520.5
1278756.99
127875.699
127875.699
63937.8495
1598446.238

ed on the square feet of constructed area and would help you in understanding breakup of

upport@gharexpert.com)
Price Quoted by Vendor 1

Vendor 2

Price Quoted by Vendor 2