Sunteți pe pagina 1din 2

P T P E T ROKI MI A GRE S I K

FM-38-5012

BREAKDO WN O F MATERIAL

Sheet

1 of 1

Date of

7-12-2010 Rev 1

No. Document
P T P E T ROKI MI A GRE S I K

Works Name

SA UNIT (PHOSPHORIC ACID AND BY PRODUCT PLANT)

Drawing Reff. Num.

Assumption (reffer to existing)

Works Area

PIPING

CIVIL

NON RKAP

EKSTERN

M ECHANICAL

Investation Type

RKAP

NO.

JOB DESCRIPTION

ELECTRICAL

VOLUME

INSTRUMENT

UNIT

Civil Scope

III

Section : SA (Sulphuric Acid) Unit

Engineering Works

Ls

Sheed For Dump Hoppers (28.D.1001A/B) & Pits For

m2

Sulphur Melting Unit


c

Structure For Fill 1001 A/B

Sulphur Open Storage (247 m x52 m)

m2

Support column concrete tripper conveyor.

m1

Gallery conveyor.

m1

Mini pile, floor and concrete wall with thickness 100 cm.

m2

Open conveyor at Sulfureic Acid Unit, from Sulfuric Acid Unit

m1

and to Sulfuric Acid Unit


( walway at left side and right side using gratting).
5

Tower conveyor at, from & to Sulfuric Acid Unit

ea

Structure For Sulphur Furnace 28.A.1101

m2

Structure for Sulphur 28.E.1102

(6 m length, 3.8 m width, 7.3 m height), size reference only.


m2

(4.5 m length, 2 m width, 5.6 m height), size reference only.


g

Stage For 28.R.1201 (2.4 m length, 1.2 m width, 28 m height)

m2

, size reference only.


h

Stage for 28.E.1203 (2.5m length, 1.8 m width, 6.3 m height),

m2

, size reference only.


i

Structure for 28.E.1205 & 28.E.1102

m2

(1 m length ,0.8 m width, 8 m height), size reference only.


j

Blower house (17 m length,15 m width, 9.9 m height)

m2

, size reference only.


k

Sheed for Acid Loading Station( 20.75 m length, 1.2 m width

m2

6.42 m height), size reference only.


l

Foundation & Pile D1301, D1302, D1303, E1301A, E1301B,

m2

E1302, E1303, E1304, T1301, T1302, T1303 (44 m length,


21.5 m width), size reference only.
m

Foundation & Pile R 1201 Converter ( 13,5 m)

m2

, size reference only.


n

2 Foundation & E1201 Heat Exchanger Pile ( 4,2m)

m2

, size reference only.


o

Two foundation & E1203/1204 Economizer pile

m2

(6.3 m length, 5m width) , size reference only.


p

Foundation & E1205 Start Up Heater Pile ( 3,7m)

m2

Foundation & E1102 Steam Super Heater pile

m2

(5.4m length, 3.7m width plus supporting pipe


, size reference only.
r

D1007, D1101,D1102,E1103 foundation

m3

B1101Sulfur Furnace Foundation & Pile

m2

(19.61m length, 4 m width), size reference only.


t

B1104 Waste Heat Boiler Foundation & Pile

m2

(9.8m length, 2.9 m width)


u

C1101, P1005A/B, P1103, P1102A/B, D1103,M1103 Foundation

m3

Fd1, Fd2, Fd3, Fd4, Fd5, Fd6, E1104 Foundation

m3

B1101-1, B1104-1 Neutralizer Foundation (+Acid Proof Brick)

ls

, size reference only.


x

TK 1001 Filtured Sulphur Storage Foundation ( 15,8 m)

Paving & Road for SA

m2

UNIT PRICE

TOTAL

INFINITUDE

Paving

m2

Road (10 m & 7,5 m) + drainage

m1

D.1303 Stack Foundation & Stack Frame Buffer

ls

(diameter 2.2 m, 100 m height), size reference only.

Sub Total
Over head 10%
Estimated By
Checked By
Approved By

Total
Rounded

Notes :
1

BOM/Job Description List and items of work to follow the form provided by PG

The volume recalculated more carefully.

Work items that have not signed for added.

Bill of Material (BOM) & Volume of work is fully the responsibility of the Contractor (EPC work).
TOR, PFD, Specification & Images into the handle

5
6
7

Brochure material & certificate that does not exist so equipped.


Specifications & bassic drawings that do not have to be equipped.

If the volume can not be shown it can be made by lumsump , means it will adjust the detail drawings that was made.

Material specifications made according to Work Plan and Terms of Technical Requirements.
dengan gambar detail yang dibuat.