DESIGN SOIL INVESTIGATION WORK PLAN


WEST BRANCH OF BLOODY BROOK
ONONDAGA COUNTY, NEW YORK
PROJECT NO. 129916

February 2011

Submitted to:
Jill Fonte
Environmental Engineer
Lockheed Martin Corporation
Electronics Park
Syracuse, New York

Submitted by:
Shaw Environmental, Inc.
13 British American Boulevard
Latham, New York

TABLE OF CONTENTS ___________________________________________


1.0

INTRODUCTION .............................................................................................................................................. 1

2.0

SOIL SAMPLING AND ANALYSIS PLAN ................................................................................................... 2

2.1
2.2
2.3
3.0

WOODED AREA PROPOSED SAMPLING AND ANALYSIS .................................................................................... 2


RESIDENTIAL/APARTMENT COMPLEX AREA PROPOSED SAMPLING AND ANALYSIS ........................................ 2
COMMERCIAL/LIGHT INDUSTRIAL AREA PROPOSED SAMPLING AND ANALYSIS .............................................. 3

SAMPLING METHODOLOGIES ................................................................................................................... 4

3.1 SAMPLE COLLECTION ...................................................................................................................................... 4


3.1.1
Hand Auger Sample Collection ............................................................................................................. 4
3.1.2
Geoprobe Sample Collection ................................................................................................................. 4
3.2 EQUIPMENT DECONTAMINATION ..................................................................................................................... 5
3.3 GROUND SURFACE RESTORATION .................................................................................................................... 5
3.4 SAMPLE PACKAGING ........................................................................................................................................ 5
3.5 ANALYTICAL PROTOCOLS ................................................................................................................................ 5
3.6 QUALITY CONTROL SAMPLE COLLECTION ....................................................................................................... 6
3.7 DATA VALIDATION .......................................................................................................................................... 6
4.0

GREEN AND SUSTAINABLE REMEDIATION .......................................................................................... 7

5.0

CONTINGENCY PLAN ................................................................................................................................... 8

5.1
5.2
5.3
6.0

WEATHER CONDITIONS .................................................................................................................................... 8


SAMPLER REFUSAL OR LIMITED SAMPLE RECOVERY ...................................................................................... 8
ACCESS ............................................................................................................................................................ 8

SCHEDULE AND REPORTING ................................................................................................................... 10

TABLES________________________________________________________
Table 1
Tables 2A, 2B, and 2C

Summary of Soil Lithology and Analytical Data


Proposed Design Soil Investigation Sample Locations

FIGURES _______________________________________________________
Figure 1
Figure 2
Figure 3
Figure 4A
Figure 4B
Figure 4C

Site Location Map


Site Area Map
Site Map Legend
Proposed Sampling Locations Sheet 1 of 3
Proposed Sampling Locations Sheet 2 of 3
Proposed Sampling Locations Sheet 3 of 3

i
Des Soil Inv WP Feb 2011 Text.doc

1.0

INTRODUCTION

This Design Soil Investigation Work Plan (Work Plan) has been developed by Shaw
Environmental, Inc. (Shaw) on behalf of Lockheed Martin Corporation (Lockheed Martin) and is
being submitted to the New York State Department of Environmental Conservation (NYSDEC)
for approval. This Work Plan describes the sample collection and analysis proposed to be
completed for soil adjacent to the West Branch of Bloody Brook (WBBB) to facilitate
completion of a remedial design. For the purposes of this Work Plan, the site is defined as that
portion of the WBBB and the surrounding area commencing on the southern boundary of the
New York State Thruway (Thruway) and ending at Onondaga Lake Parkway.1 A site location
map has been included as Figure 1. This Work Plan has been prepared based on sampling that
has been conducted at the site by Lockheed Martin, NYSDEC, and Onondaga County between
1994 and 2008. The sampling activities will be performed pursuant to a Voluntary Cleanup
Agreement (VCA) between Lockheed Martin and NYSDEC (Index #: D7-0001-01-09, effective
July 20, 2002).

The term site in the VCA is defined as: a portion of the banks, surface waters and sediments of the West and
Middle Branches of Bloody Brook located in the Town of Salina, which commences downstream of Interstate 90,
the New York State Thruway, and which extends generally southward past the confluence of the West Branch and
the Middle Branch of Bloody Brook, and ends on the upstream side of Onondaga Lake Parkway. After examining
data developed during remedial investigation work in the Middle Branch, NYSDEC determined that no further
action was required for that branch of Bloody Brook. For this reason, the term site in this Work Plan relates only
to those areas within the VCA Site where the remedial program continues to be implemented and remedial action is
expected to be proposed.

1
Des Soil Inv WP Feb 2011 Text.doc

2.0

SOIL SAMPLING AND ANALYSIS PLAN

The objective of this design soil investigation is to continue to characterize the soil found at the
site by delineating the extent of cadmium-impacted soil along the WBBB and will be achieved
by employing a flexible analysis approach. At certain locations, soil samples will be collected
and held at the laboratory and only analyzed depending on the results of other samples. If
analysis of held samples is determined to be necessary, the analysis will be performed within
laboratory and analytical procedure holding times.
This section of the Work Plan summarizes the proposed sample locations, depths, collection
methods, and analysis approach. The location, number, and depth of soil samples are subject to
change based on observations and physical conditions encountered during the sampling activities
and the ability for sampling personnel to safely collect a sample. The sampling and analysis plan
is presented using the three areas (i.e., wooded area, residential/apartment complex area, and
commercial/light industrial area) that make up the site as shown on Figure 2. The sample
locations summarized below are shown on Figures 4A, 4B, and 4C. The analytical results
associated with existing sample locations shown on the figures are presented in Table 1. The
proposed sample locations in the wooded area, residential/apartment complex area and
commercial/light industrial area are presented in Tables 2A, 2B, and 2C. The information
found on Tables 2A, 2B, and 2C corresponds to the sample locations found on Figures 4A, 4B,
and 4C, respectively.

2.1

Wooded Area Proposed Sampling and Analysis

In the wooded area, 15 samples from five locations will be collected and analyzed for cadmium.
At each proposed location, a sample will be collected from depth intervals of 0 to 6 inches, 6 to
12 inches, and 1 to 2 feet with a hand auger, and all 15 samples will be analyzed for cadmium
using United States Environmental Protection Agency (USEPA) SW-846 Method 6010B. The
sample locations proposed to be collected from the wooded area are shown on Figure 4A and the
proposed sample depth intervals, analysis approaches, and collection methods are identified in
Table 2A.

2.2

Residential/Apartment Complex Area Proposed Sampling and Analysis

For the residential/apartment complex area, 707 samples from 151 locations will be collected
from within and adjacent to this area, and submitted to a laboratory. The proposed sample
locations are shown on Figures 4A and 4B. At each proposed location, a sample will be
2
Des Soil Inv WP Feb 2011 Text.doc

collected from each 1 foot depth interval starting from the ground surface to the bottom of each
boring. The end depth proposed at the sample locations in this area were determined from site
specific information (e.g., lithology, current location of brook, historical location of brook, and
existing analytical results) and vary from 2 feet to 16 feet below ground surface. For borings that
extend greater than 4 feet below ground surface in this area, the bottom depth will depend upon
the lithology observed at each location during sample collection. Previous soil sampling at the
site indicated the presence of a clay unit located beneath the elevation of the bottom of the
WBBB. Laboratory analytical results indicate that cadmium concentrations in samples from this
clay unit generally decrease. Borings will be advanced to a depth of approximately 1 foot into
the clay layer or to the proposed sampling depth, whichever of these is encountered first during
advancement of the boring.
Following sample collection, select samples will be sent to the laboratory and analyzed for
cadmium, and other samples will be sent to the laboratory to be held for possible future analysis
depending on the results of other samples. The analysis approach along with the proposed
sample depth intervals and collection methods for each sample located in the
residential/apartment complex area is summarized on Tables 2A and 2B. All samples that are
analyzed will be analyzed for cadmium using USEPA SW-846 Method 6010B.

2.3

Commercial/Light Industrial Area Proposed Sampling and Analysis

In the commercial/light industrial area, 18 samples from three locations will be collected and
analyzed for cadmium. At each proposed location, a sample will be collected from 1 foot depth
intervals using a turf wheel-mounted Geoprobe starting from the ground surface to a depth of 6
feet below ground surface. All 18 samples will be analyzed for cadmium using USEPA SW-846
Method 6010B. The sample locations proposed to be collected from the commercial/light
industrial area are shown on Figure 4C and the proposed sample depth intervals, analysis
approaches, and collection methods are identified in Table 2C.

3
Des Soil Inv WP Feb 2011 Text.doc

3.0

SAMPLING METHODOLOGIES

This section provides information specific to the actual field methods that will be employed in
support of the design soil investigation. Physical sample collection methods (Section 3.1),
equipment decontamination (Section 3.2), ground surface restoration (Section 3.3), sample
packaging (Section 3.4), analytical protocols (Section 3.5), quality control sample collection
(Section 3.6), and data validation (Section 3.7) will be discussed in this section.

3.1

Sample Collection

Two sampling methodologies will be employed in support of the design soil investigation. The
selection of the most optimal sampling method will depend on the physical characteristics of the
sampling location (e.g., access, surface cover, surface slope) and the desired total depth of the
boring. Sampling activities will be performed between the hours of 8:00 am and 5:00 pm, and
every effort will be made to minimize any inconvenience (e.g., noise) to residents of the area.
Sampling documentation will consist of detailed notes made during sampling activities that
include recording of sample locations, sample depth, and site conditions (e.g., weather). These
notes will be recorded in a field notebook. Below is a description of each of the sampling
methodologies which will be considered for each of the boring locations.

3.1.1

Hand Auger Sample Collection

A stainless steel hand auger will be used at locations where samples will be collected at depths
up to 4 feet below ground surface. The soil collected from each advancement of the hand auger
will be thoroughly mixed prior to placement in laboratory supplied sample containers. Physical
observations of the soil will be made for each interval removed with the hand auger. The
samples will be collected and handled using new, disposable nitrile gloves or a decontaminated
stainless steel spoon. The hand auger will be decontaminated, and each of the borings will be
abandoned with the excess soil.

3.1.2

Geoprobe Sample Collection

In all areas with sufficient access, a turf wheel-mounted Geoprobe will be used at locations
where samples will be collected from depths of 4 feet below ground surface or greater. The
Geoprobe will be used to drive the sampling tools into the formation to facilitate the soil sample
collection. The soil samples will be collected in disposable two-foot acetate sleeves. These
sleeves will be removed from the sampling equipment and cut open to expose the soil sample.
4
Des Soil Inv WP Feb 2011 Text.doc

The sample will then be split into 1 foot intervals and thoroughly mixed prior to placement in
laboratory supplied sample containers. The samples will be collected and handled using new,
disposable nitrile gloves or a decontaminated stainless steel spoon. All down hole equipment
will be decontaminated, and each of the borings will be abandoned with the excess soil.

3.2

Equipment Decontamination

Field decontamination will be minimized to the extent practical by using disposable equipment
or pre-cleaned stainless steel spoons. However, as necessary, reusable sampling equipment will
be decontaminated before use. The decontamination procedure will consist of a wash with a
phosphate-fee detergent and potable water and a potable water rinse, followed by a 10% nitric
acid rinse, and a final distilled water rinse. The decontaminated equipment will be allowed to air
dry and will then be placed in a plastic bag or wrapped in aluminum foil to keep the equipment
clean.

3.3

Ground Surface Restoration

All efforts will be made to limit the amount of surficial disturbance (e.g., tread marks/ruts)
potentially caused by the turf wheel-mounted Geoprobe. Any rutted areas will be repaired with
topsoil and grass seed following the completion of the field activities. If large areas require
restoration, appropriate measures (i.e., hay bales) will be implemented to ensure that the work
does not cause increased erosion.

3.4

Sample Packaging

Sample containers will be pre-cleaned by the laboratory and pre-labeled by the field
representative. Sample containers will be packaged in protective coverings, and the sample
custodians will handle the sample containers to minimize the potential for container breakage.
Samples will be kept in a cooler with ice and will be delivered to the laboratory under proper
chain of custody.

3.5

Analytical Protocols

All samples collected pursuant to this Work Plan will be analyzed by a New York State
Department of Health (NYSDOH) Environmental Laboratory Accreditation Program (ELAP)
certified laboratory. The laboratory will provide a NYSDEC Analytical Service Protocol (ASP)
Category B deliverable data package to allow for data validation.
5
Des Soil Inv WP Feb 2011 Text.doc

To support the future validation data needs, quality control samples (blind field duplicate, matrix
spike, and matrix spike duplicate samples) will be collected in the field and will be analyzed by
the laboratory.

3.6

Quality Control Sample Collection

Quality control samples will be collected to provide necessary data for future validation of the
laboratory data, if required. Blind field duplicate, matrix spike, and matrix spike duplicate
samples will be collected at a frequency of 1 for each 20 samples collected.
Based on the quantity of proposed samples to be collected (i.e., 740 samples), approximately 37
blind field duplicate, matrix spike, and matrix spike duplicate samples will be collected at
locations to be determined in the field. Blind field duplicate samples will be created by
collecting double volume for a sample location then splitting the sample volume between two
sample containers to be used for the sample and the blind field duplicate sample. The matrix
spike and matrix spike duplicate samples will be created by providing triple sample volume for a
sample location then splitting the sample volume into three sample containers to be used for the
sample, matrix spike sample, and matrix spike duplicate sample.

3.7

Data Validation

The laboratory will provide a NYSDEC ASP Category B deliverable data package in order to
allow for data validation. Copies of the laboratory reports will be forwarded to a third party data
validator. The data validator will review the project quality control samples, holding times, and
laboratory precision. A validation report will be obtained for each laboratory analytical report.

6
Des Soil Inv WP Feb 2011 Text.doc

4.0

Green and Sustainable Remediation

As summarized in this section, the implementation of green and sustainable practices has been
considered in the development of this Work Plan and will be utilized during the investigation
activities. Energy consumption will be minimized and fewer pollutants and green house gases
will be emitted during sample collection with the use of an all terrain vehicle turf wheel-mounted
Geoprobe verses a full size Geoprobe and, where possible, using a hand augur. The use of the
less intrusive sampling equipment will also minimize disruption to the environment by
preventing unintended impacts to the groundcover and soil (e.g., minimize damage to
groundcover and erosion of soil). In addition, vehicle idling will be reduced with the
requirement that all vehicles and equipment will be shut off when not in use for more than 5
minutes. Mobilization and demobilization to and from the site by all field personnel will be
minimized, and car pooling will be used when feasible. Material management and waste
reduction practices will be implemented for the project. For example, paper usage and
disposal/recycling will be minimized by requesting that all analytical data and analytical reports
be delivered in an electronic format.

7
Des Soil Inv WP Feb 2011 Text.doc

5.0

CONTINGENCY PLAN

This section of the Work Plan has been developed to identify steps that will be taken in response
to events that may reasonably occur during this work. These events include weather conditions,
sample refusal or limited sample recovery, sample analysis, access, other investigation
considerations, and projects of other parties.

5.1

Weather Conditions

During heavy rainfall events, certain sampling points will not be accessible. Therefore, to
protect the safety of sampling personnel, work activities will be cancelled on days where
forecasts predict significant rainfall. Work will resume when the rain event stops. In addition, in
the event that rainfall conditions result in restricted access to sampling locations (as determined
in the field), work activities will be suspended until conditions improve. Similar work
restrictions will apply during periods of heavy snowfall, and work will not be scheduled during
periods of snow cover.

5.2

Sampler Refusal or Limited Sample Recovery

In the event that sampling equipment cannot penetrate the subsurface at the designated sampling
location, or where limited sample recovery will affect data collection, additional efforts will be
made to advance the sampler within the same general location as that proposed in this Work
Plan. In the event of refusal, limited sample recovery, or the presence of obstructions, Lockheed
Martin will not collect the sample and will document the reason for not collecting it.

5.3

Access

The design soil sampling described herein will be conducted within the maintenance easements
granted to Onondaga County and through the consents of private property owners. Lockheed
Martin and Onondaga County have an access agreement to perform activities within the Bloody
Brook Drainage District easement. However, several sampling locations are located outside of
the maintenance easements granted to Onondaga County. Lockheed Martin will attempt to
obtain access for the collection of soil samples at those locations.
If access to complete the scope of investigations described herein is denied, Lockheed Martin
will consult with the NYSDEC regarding potential relocation of any affected sampling
location(s). If relocation is not an option, Lockheed Martin will engage in discussions regarding
8
Des Soil Inv WP Feb 2011 Text.doc

access with the property owner(s) and may collect the sample(s) at a later date. If these
discussions are unsuccessful, Lockheed Martin will notify the NYSDEC in accordance with
paragraph XIV.C. of the VCA for assistance in obtaining access.

9
Des Soil Inv WP Feb 2011 Text.doc

6.0

SCHEDULE AND REPORTING

Upon NYSDEC approval of this Work Plan, implementation of the design soil investigation will
begin. Within 30 days of approval, Lockheed Martin will begin organizing the field team as well
as begin contacting private property owners to gain access for sampling activities. It is unknown
how long it will take to obtain access; however, once access has been granted, Lockheed Martin
anticipates that sampling activities will take approximately 7 weeks to complete. Lockheed
Martin will verbally communicate progress, schedule and potential access issues to the NYSDEC
Project Manager and summarize the activities in the monthly project progress reports. Once all
the sampling results are available from the laboratory (approximately 2 weeks following the last
sample collected), the laboratory data package will be forwarded for data validation. Following
receipt of the data validation report(s), Lockheed Martin will develop and provide to NYSDEC a
report including a table and a figure summarizing all of the design soil investigation results. In
addition, Lockheed Martin will provide to each property owner the design soil investigation
results from their property including a table and figure summarizing those results.

10
Des Soil Inv WP Feb 2011 Text.doc

TABLES

Table 1
Summary of Soil Lithology and Analytical Data
Design Soil Investigation Work Plan
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID

B-1
B-2
B-3
B-4
B-5
B-6
B-7
B-8
B-9
B-10
B-11

B-12

DI 07 01
DI-07-01

DI-07-02

DI-07-03

DI-09-01

Sampling
Interval
0' - 2.5'
2.5' - 12'
7' -8'
0' - 5'
5' - 14'
0' - 2'
2' - 12'
0' - 1.5'
1.5' - 12'
0.80' - 1.5'
1.5' - 7.5'
0' - 1.5'
1.5' - 10'
0' - 2.5'
2.5' - 10'
0' - 1'
1' - 10'
0' - 1.5'
1.5' - 10'
0' - 4'
4' - 8'
8' - 12'
0' - 4'
4' - 8'
8' - 12'
0' - 1'
1' - 2'
2' - 3'
3' - 4'
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' -8'
8' - 9'
9' -10'
10' - 11'
0 - 1'
1 - 2'
2 - 3'
3 - 4'
4 - 5'
5 - 6'
6 - 7'

Brook
Elevation
(ft)

Sample
Elevation
(ft)

Sample
Relation to
Brook Level

General Lithology

Collection
Date

Result (mg/kg)

Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium

---------------------------------------------------------------------------------------------

---------------------------------------------------------------------------------------------

---------------------------------------------------------------------------------------------

------------------------------------------------Silt and Sand/Gravel and Organics


Silty Clay/Gravel
Silt and Sand
Silt and Clay
Silty Clay/Gravel and Organics
Silt and Clay/Gravel
Silt and Clay/Gravel
Silt and Sand/Clay
Silt and Sand/Clay
Silt and Sand/Clay
Silt and Clay/Gravel and Organics
Silt and Clay
Silt and Clay
Silty Clay
Silt and Sand/Clay and Gravel
Silt and Clay
Silty Clay/Sand
Silt and Sand
Silty Clay/Sand
Silty Clay to Sand
Sand/Clay to Silty Clay

11/25/2003
11/25/2003
11/25/2003
11/24/2003
11/24/2003
11/24/2003
11/24/2003
11/24/2003
11/24/2003
11/24/2003
11/24/2003
11/24/2003
11/24/2003
11/24/2003
11/24/2003
11/24/2003
11/24/2003
11/25/2003
11/25/2003
3/5/2004
3/5/2004
3/5/2004
3/5/2004
3/5/2004
3/5/2004
8/14/2009
8/14/2009
8/14/2009
8/14/2009
8/14/2009
8/14/2009
8/14/2009
8/14/2009
8/14/2009
8/14/2009
8/14/2009
8/14/2009
8/14/2009
8/14/2009
8/14/2009
8/14/2009
8/14/2009
8/14/2009
8/14/2009
8/14/2009
8/14/2009

1.5
<0.63
<0.59
<0.61 [<0.61]
<0.64
<0.63
<0.71
<0.54
7.5
0.97
<0.59
2
2.5
0.72
0.93
<0.62
<0.57
7
0.95
0.74 [0.63]
0.87
0.66
<0.61
0.69
<0.58
28 8
28.8
32.2 [36.1]
20.7
1.16
32.4
5.98
10.8
12.1
6.11
5.25
0.422
0.535
7.38
3.39
5.06
73
<0.267
<0.261
0.277 J
1.49
<0.243

Cadmium

---

---

---

Sand and Silt, Trace Organics and Gravel

9/21/2009

0.601

Cadmium

---

---

---

Sand and Silt, Trace Organics and Gravel

9/21/2009

0.270

Cadmium
Cadmium
Cadmium
Cadmium
Cadmium

-----------

-----------

-----------

Sand and Silt, Trace Organics and Gravel

9/21/2009

5.74

Silt and Sand, Trace Gravel


Sand and Silt
Silt and Sand, Trace Gravel
Silt

9/21/2009
9/21/2009
9/21/2009
9/21/2009

0.246
0.254
4.21
9.12

Analyte

Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium

1 of 23
Table 1_Soil.xls

Table 1
Summary of Soil Lithology and Analytical Data
Design Soil Investigation Work Plan
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID
DI-09-02

DI-11-01

DI-11-02

DI-11-03

DI-32A-01

DI-32C-01

DI-32C-02

DI-33-01

EPSOIL-2
EPSOIL-3
EPSOIL-4
OCDDS-4
OCDDS-5

Sampling
Interval
0 - 1'
1 - 2'
2 - 3'
3 - 4'
4 - 5'
5 - 6'
6 - 7'
0' - 1'
1' - 2'
2' - 3'
3' - 4'
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' -8'
8' - 9'
9' -10'
10' - 11'
0 - 1'
1 - 2'
2 - 3'
3 - 4'
4 - 5'
5 - 6'
6 - 7'
0 - 1'
1 - 2'
2 - 3'
9 - 10'
10 - 11'
0 - 1'
1 - 2'
2 - 3'
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
0' - 1'
0' - 1'
0' - 1'
0" - 6"
0" - 6"
0" - 6"
0" - 6"

Analyte
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
C
d i
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
-Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
PCBs
Cadmium
PCBs

Brook
Elevation
(ft)

Sample
Elevation
(ft)

Sample
Relation to
Brook Level

General Lithology

Collection
Date

----------------------------------------------------------------------------------------------------------

----------------------------------------------------------------------------------------------------------

----------------------------------------------------------------------------------------------------------

Sand and Silt, Organics


Sand and Silt, Organics
Sand and Silt, Organics and Trace Clay
Silt and Sand, Trace Organics
Silt and Sand, Trace Organics
Silty Clay and Fine Sand
Fine Sand and Silt
Silt and Sand/ Organics and Gravel
Silt with Sand/Organics and Clay
Silt with Sand/Clay and Gravel
Silt with Sand/Clay and Gravel
Silt with Gravel/Organics
Silt with Clay/Gravel and Organics
Silt with Gravel
Silt
Silt with Gravel
Silt with Gravel
Silt and Clay/Organics and Gravel
Silt and Clay/Organics and Gravel
Silt with Gravel/Organics
Silt with Gravel/Organics
Silt with Gravel/Organics
Silt with Gravel/Organics, Some Sand
Silt with Gravel/Organics, Some Sand
Silt with Gravel/Organics, Some Sand
Silt/Clay
Silty Clay/Sand
Silty Clay/Sand
Silt, Organics and Gravel
Sand and Silt, Gravel
Sand and Silt, Gravel
Sand and Silt, Gravel
Sand and Silt, Gravel
Sand and Silt, Gravel
No recovery; refusal.
Sand and Silt, Organics
Sand and Silt, Gravel
Sand and Silt, Gravel
Silty Clay
Silty Clay
Sand and Silt, Organics
Sand and Silt, Organics
Silt and Sand, Trace Clay
Gravel/Silt and Sand
Sitly Clay with Gravel
Sitly Clay with Gravel
Sitly Clay with Gravel/Organics
Sitly Clay with Gravel/Organics
---------------

9/21/2009
9/21/2009
9/21/2009
9/21/2009
9/21/2009
9/21/2009
9/21/2009
8/14/2009
8/14/2009
8/14/2009
8/14/2009
8/14/2009
8/14/2009
8/14/2009
8/14/2009
8/14/2009
8/14/2009
8/14/2009
8/14/2009
8/14/2009
8/14/2009
8/14/2009
8/14/2009
8/14/2009
8/14/2009
8/14/2009
8/14/2009
8/14/2009
9/21/2009
9/21/2009
9/21/2009
9/21/2009
9/21/2009
9/21/2009
9/21/2009
9/21/2009
9/21/2009
9/21/2009
9/21/2009
9/21/2009
9/21/2009
9/21/2009
9/21/2009
8/11/2009
8/11/2009
8/11/2009
8/11/2009
8/11/2009
10/2001
10/2001
10/2001
10/1996
10/1996
10/1996
10/1996

2 of 23
Table 1_Soil.xls

Result (mg/kg)
3.45
10.7
0.982
0.77
9.40
5.76
3.55
7.21
6.38
3.76
49
0.431 [0.276]
0.062 J
0.266
0.240
0.213 J
0.074 J
<0.261
0.523
0.154 J
0.327
<0.253
0.061 J
<0.243
<0.250
<0.265
<0.235
<0.267
0.276 [0.215 J]
1.72
4.71
0.591
78.6
6.53
NS
0.444
1.19
0.238 [0.180 J]
<0.255
<0.235
0.460
1.32
0.164 J
2.26
2.48
2.05 [2.74]
3.95
2.73
29.6
75.6
4.5
3.8
0.042
26.4
0.193

Table 1
Summary of Soil Lithology and Analytical Data
Design Soil Investigation Work Plan
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID
OCDDS-6
OCDDS-7
OCDDS-10
Pre-SS-P1
Post-SS-P1
SA-SB-01-01

SA-SB-01-02

SA-SB-01-03

SA-SB-01-04

Sampling
Interval

Analyte

Brook
Elevation
(ft)

Sample
Elevation
(ft)

Sample
Relation to
Brook Level

General Lithology

Collection
Date

Result (mg/kg)

0" - 6"
0" - 6"
0" - 6"
0" - 6"
0" - 6"
0" - 6"
--------0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
8' - 9'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
8' - 9'
9' - 10'

Cadmium
PCBs
Cadmium
PCBs
Cadmium
PCBs
Cadmium
PCBs
Cadmium
PCBs
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium

--------------------372.6
372.6
372.6
372.6
372.6
372.6
372.6
372.6
372.6
372.6
372.6
372.6
372.6
372.6
372.6
372.6
372.6
372.6
372.6
372.6
372.6
372.6
372.6
372.6
372.6
372.6
372.6
372.6
372.6
372.6
372.6
372.6
372.6
372.6
372.6
372.6
372.6
372.6

--------------------377.74
376.74
375.74
374.74
373.74
372.74
371.74
370.74
378.76
377.76
376.76
375.76
374.76
373.76
372.76
371.76
370.76
379.72
378.72
377.72
376.72
375.72
374.72
373.72
372.72
371.72
370.72
381.29
380.29
379.29
378.29
377.29
376.29
375.29
374.29
373.29
372.29
371.29

--------------------Above
Above
Above
Above
Above
At
Below
Below
Above
Above
Above
Above
Above
Above
At
Below
Below
Above
Above
Above
Above
Above
Above
Above
At
Below
Below
Above
Above
Above
Above
Above
Above
Above
Above
Above
At
Below

--------------------Sand
Sand/Wood
Clayey Sand
Clayey Sand
Clayey Sand
Organic Silt/Sand
Organic Silt/Sand to Clayey Sand
Clayey Sand
Sand
Sand
Sand
Sand
Sand
Sand
Sand to Organic Silt/Sand
g
Organic
Silt/Sand
Clayey Sand
Topsoil
Topsoil
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Organic Silt/Sand
Organic Silt/Sand to Silty Clay
Silty Clay
Sand
Sand
Silty Sand
Silty Sand to Silty Clay
Silty Clay
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand to Organic Silt/Sand
Organic Silt/Sand to Clay

10/1996
10/1996
10/1996
10/1996
10/1996
10/1996
4/17/1997
4/17/1997
5/15/1997
5/15/1997
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003

0.14
<0.025
80.5
0.801
0.4
<0.025
1.3
<0.026
0.14
<0.026
6.3
15.8
3.4
<0.59
<0.58
442
0.86
4.3
5.09
1.87
<0.593
<0.581
<0.574
<0.583
431
46.1
<0.670
3.36
2.64
6.48 [3.86]
<0.611
<0.58
<0.592
<0.60
401
52.1
<0.668
2.36
1.36
<0.597
<0.623
<0.590 [<0.593]
<0.589
<0.597
<0.608
<0.608
79.1
0.85

3 of 23
Table 1_Soil.xls

Table 1
Summary of Soil Lithology and Analytical Data
Design Soil Investigation Work Plan
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID
SA-SB-02-01

SA-SB-02-02

SA-SB-02-03
SA
SB 02 03

SA-SB-02-04

Sampling
Interval

Analyte

Brook
Elevation
(ft)

Sample
Elevation
(ft)

Sample
Relation to
Brook Level

General Lithology

Collection
Date

Result (mg/kg)

0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
8' - 9'
9' - 10'
10' - 11'
11' - 12'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
8' - 9'
9' - 10'
10' - 11'
11' - 12'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
8' - 9'
9' - 10'
10' - 11'
11' - 12'
12' - 13'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
8' - 9'
9' - 10'
10' - 11'
11' - 12'
12' - 13'
13' - 14'

Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
C d i
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium

371.7
371.7
371.7
371.7
371.7
371.7
371.7
371.7
371.7
371.7
371.7
371.7
371.7
371.7
371.7
371.7
371.7
371.7
371.7
371.7
371.7
371.7
371.7
371.7
371.7
371.7
371.7
371 7
371.7
371.7
371.7
371.7
371.7
371.7
371.7
371.7
371.7
371.7
371.7
371.7
371.7
371.7
371.7
371.7
371.7
371.7
371.7
371.7
371.7
371.7
371.7
371.7
371.7
371.7
371.7
371.7

378.60
377.60
376.60
375.60
374.60
373.60
372.60
371.60
370.60
369.60
368.60
367.60
366.60
380.20
379.20
378.20
377.20
376.20
375.20
374.20
373.20
372.20
371.20
370.20
369.20
368.20
381.79
381 79
380.79
379.79
378.79
377.79
376.79
375.79
374.79
373.79
372.79
371.79
370.79
369.79
368.79
385.39
384.39
383.39
382.39
381.39
380.39
379.39
378.39
377.39
376.39
375.39
374.39
373.39
372.39
371.39

Above
Above
Above
Above
Above
Above
Above
At
Below
Below
Below
Below
Below
Above
Above
Above
Above
Above
Above
Above
Above
At
At
Below
Below
Below
Above
Ab
Above
Above
Above
Above
Above
Above
Above
Above
Above
At
Below
Below
Below
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above

Topsoil
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Organic Silt/Sand
Organic Silt/Sand
Sandy Clay
Sand to Silty Clay
Silty Clay to Organic Silt/Sand
Organic Silt/Sand/ Gravel
Silty Clay
Topsoil
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand to Organic Silt/Sand
Organic Silt/Sand
Organic Silt/Sand
Organic Silt/Sand to Silty Clay
Silty Clay
Silty Clay
Topsoil
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Organic Silt/Sand
Silty Sand
Organic Silt/Sand
Organic Silt/Sand to Clayey Silt
Clayey Silt to Silty Clay
Silty Clay
Topsoil
Silty Sand
Silty Sand
Silty Sand to Sand
Sand
Sand
Sand
Sand
Sand
Sand
Organic Silt/Sand
Silt/Sand
Silt/Sand
Silt/Sand
Silt/Sand to Organic Silt/Sand

10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003

4.4
1.4
<0.55 [1.4]
<0.55
<0.54
1.6
322
<0.7
<0.59
<0.61
<0.65
<0.68
<0.57
1.02
0.761
<0.552
<0.577
<0.559
<0.577
<0.611
282
144
121
6.6
<0.62
<0.632
<0.652
0 652
<0.621
<0.568
<0.571
<0.578
<0.568
<0.590
<0.585
0.682
39.2
<0.678
13.6
<0.668
<0.613
<0.698
<0.659
<0.602
<0.588
<0.550
<0.590
<0.564
<0.566
<0.578
<0.584
<0.610
<0.621
<0.629 [<0.620]
<0.636
98.4

4 of 23
Table 1_Soil.xls

Table 1
Summary of Soil Lithology and Analytical Data
Design Soil Investigation Work Plan
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID
SA-SB-03-01

SA-SB-03-02

SA-SB-03-03

SA-SB-03-04

SA-SB-04-01

Sampling
Interval

Analyte

Brook
Elevation
(ft)

Sample
Elevation
(ft)

Sample
Relation to
Brook Level

General Lithology

Collection
Date

Result (mg/kg)

0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
8' - 9
8
9'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
8' - 9'
9' - 10'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
8' - 9'
9' - 10'
10' - 11'

Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium

370.6
370.6
370.6
370.6
370.6
370.6
370.6
370.6
370.6
370.6
370.6
370.6
370.6
370.6
370.6
370.6
370.6
370.6
370.6
370.6
370.6
370.6
370.6
370.6
370.6
370.6
370.6
370.6
370.6
370.6
370.6
370.6
370.6
370.6
370.6
370.6
370.6
370.8
370.8
370.8
370.8
370.8
370.8
370.8
370.8
370.8
370.8
370.8
370.8

375.50
374.50
373.50
372.50
371.50
370.50
369.50
376.72
375.72
374.72
373.72
372.72
371.72
370.72
369.72
368.72
378.06
377.06
376.06
375.06
374.06
373.06
372.06
371.06
370.06
369.06
379.39
378.39
377.39
376.39
375.39
374.39
373.39
372.39
371.39
370.39
369.39
379.69
378.69
377.69
376.69
375.69
374.69
373.69
372.69
371.69
370.69
369.69
368.69

Above
Above
Above
Above
Above
At
Below
Above
Above
Above
Above
Above
Above
At
Below
Below
Above
Above
Above
Above
Above
Above
Above
Above
At
Below
Above
Above
Above
Above
Above
Above
Above
Above
Above
At
Below
Above
Above
Above
Above
Above
Above
Above
Above
Above
At
Below
Below

Topsoil
Silty Sand
Silty Sand
Silty Sand
Silty Sand to Organic Silt/Sand
Organic Silt/Sand
Clayey Sand to Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Organic Silt/Sand
Organic Silt/Sand
Organic Silt/Sand
Organic Silt/Sand
Topsoil
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand to Organic Silt/Sand
Organic Silt/Sand
Organic Silt/Sand to Organic Silty Clay
Organic Silty Clay
Topsoil
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand to Organic Sandy Silt
Organic Sandy Silt to Silty Clay
Silty Sand
Topsoil
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Clay/Silt
Clay/Silt
Clay/Silt
Clay/Silt
Clay/Silt
Organic Silt/Sand
Clay

10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003

23.8
31.8
28.2
2.8
153
372
1.8
4.22
4.15
<0.566
<0.605
<0.608
142
36.6
3.58
<0.726
<0.713
<0.638
<0.583 [<0.582]
<0.604
<0.633
<0.661
34.8
14.1
<0.707
<0.677
<0.717
<0.629
<0.600
<0.590 [<0.590]
<0.578
<0.605
<0.610
<0.622
19.0
<0.749
1.61
<0.654
<0.613
<0.589
<0.566
<0.572
<0.573
<0.610
<0.583
<0.629
7.84
<0.671
3.73

5 of 23
Table 1_Soil.xls

Table 1
Summary of Soil Lithology and Analytical Data
Design Soil Investigation Work Plan
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID
SA-SB-04-02

SA-SB-04-03

SA-SB-04-04

SA-SB-05-02

SA-SB-05-03

Sampling
Interval

Analyte

Brook
Elevation
(ft)

Sample
Elevation
(ft)

Sample
Relation to
Brook Level

General Lithology

Collection
Date

Result (mg/kg)

0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
8' - 9'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6
5
6'
6' - 7'
7' - 8'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
8' - 9'
9' - 10'
10' - 11'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
8' - 9'
9' - 10'

Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium

370.8
370.8
370.8
370.8
370.8
370.8
370.8
370.8
370.8
370.8
370.8
370.8
370.8
370.8
370.8
370.8
370.8
370.8
370.8
370.8
370.8
370.8
370.8
370.8
370.8
370.8
370.8
370.8
369.9
369.9
369.9
369.9
369.9
369.9
369.9
369.9
369.9
369.9
369.9
369.9
369.9
369.9
369.9
369.9
369.9
369.9
369.9
369.9
369.9
369.9
369.9

377.96
376.96
375.96
374.96
373.96
372.96
371.96
370.96
369.96
368.96
377.06
376.06
375.06
374.06
373.06
372.06
371.06
370.06
369.06
376.90
375.90
374.90
373.90
372.90
371.90
370.90
369.90
368.90
376.93
375.93
374.93
373.93
372.93
371.93
370.93
369.93
368.93
367.93
366.93
365.93
376.62
375.62
374.62
373.62
372.62
371.62
370.62
369.62
368.62
367.62
366.62

Above
Above
Above
Above
Above
Above
Above
At
Below
Below
Above
Above
Above
Above
Above
Above
Above
At
Below
Above
Above
Above
Above
Above
Above
At
Below
Below
Above
Above
Above
Above
Above
Above
Above
At
Below
Below
Below
Below
Above
Above
Above
Above
Above
Above
Above
At
Below
Below
Below

Topsoil
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand to Sand
Sand to Silty Sand
Silty Clay to Organic Clayey Silt
Organic Silt/Sand
Organic Silt/Sand
Topsoil
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand to Organic Silt/Sand
Organic Silt/Sand
Topsoil
Silty Sand
Sandy Silt
Sandy Silt
Silty Sand
Silty Sand
Silty Sand to Organic Silt/Sand
Organic Silt/Sand
Silty Sand
Topsoil
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Clayey Silt
Clayey Silt
Sandy Silt
Sandy Silt to Organic Clayey Silt
Organic Clayey SIlt
Organic Clayey Silt
Organic Clayey Silt
Topsoil
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Clayey Silt
Organic Clayey Silt
Organic Clayey Silt
Organic Clayey Silt
Clayey Silt
Clayey Silt

10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003

<0.677
<0.597
<0.602
<0.586
<0.602
<0.573
<0.613 [<0.595]
139
1.73
11.9
2.7
2.17
<0.588
<0.561
<0.617
<0.603
<0.635
1,920
199
7.4
5.3
<0.62
<0.56
<0.59
<0.58
84.7
112
456
1.4
1.4
<0.58
1.4
<0.60
<0.60
12.5
<0.58
<0.59
5.1
5.9
8.1
1.51
<0.607
<0.588
<0.581
<0.579
<0.607
2.5
0.587
20.5
21.8
<0.661

6 of 23
Table 1_Soil.xls

Table 1
Summary of Soil Lithology and Analytical Data
Design Soil Investigation Work Plan
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID
SA-SB-05-04

SA-SB-06-01

SA-SB-06-02

SA-SB-06-03

SA-SB-06-04

SA-SB-07-01

Sampling
Interval

Analyte

Brook
Elevation
(ft)

Sample
Elevation
(ft)

Sample
Relation to
Brook Level

General Lithology

Collection
Date

Result (mg/kg)

0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
8' - 9'
9' - 10'
10' - 11'
11' - 12'
12' - 13'
13' - 14'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
8' - 9'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
8' - 9'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
8' - 9'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
8' - 9'
0" - 2"

Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
C
Cadmium
d i
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium

369.9
369.9
369.9
369.9
369.9
369.9
369.9
369.9
369.9
369.9
369.9
369.9
369.9
369.9
369.9
365.5
365.5
365.5
365.5
365.5
365.5
365.5
365.5
365.5
365.5
365.5
365.5
365 5
365.5
365.5
365.5
365.5
365.5
365.5
365.5
365.5
365.5
365.5
365.5
365.5
365.5
365.5
365.5
365.5
365.5
365.5
365.5
365.5
365.5
365.5
365.5
365.5
365.5
365.5
365.5
365.5
364.8

375.98
374.98
373.98
372.98
371.98
370.98
369.98
368.98
367.98
366.98
365.98
364.98
363.98
362.98
361.98
371.39
370.39
369.39
368.39
367.39
366.39
365.39
364.39
363.39
362.39
372.31
371.31
371 31
370.31
369.31
368.31
367.31
366.31
365.31
364.31
363.31
372.74
371.74
370.74
369.74
368.74
367.74
366.74
365.74
364.74
363.74
372.98
371.98
370.98
369.98
368.98
367.98
366.98
365.98
364.98
363.98
372.10

Above
Above
Above
Above
Above
Above
At
Below
Below
Below
Below
Below
Below
Below
Below
Above
Above
Above
Above
Above
Above
At
Below
Below
Below
Above
Above
Ab
Above
Above
Above
Above
Above
At
Below
Below
Above
Above
Above
Above
Above
Above
Above
At
Below
Below
Above
Above
Above
Above
Above
Above
Above
At
Below
Below
Above

Topsoil
Silty Sand
Silty Sand
Silty Sand
Organic clayey Silt
Organic Silty Clay
Organic Silty Clay
Organic Silty Clay
Organic Clayey Silt
Organic Clayey Silt
Organic Sand/Silt
Organic Sand/Silt
Silty Sand
Organic Silt/Sand
Organic Silt/Sand
Topsoil
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand to Organic Clayey Silt
Organic Clayey Silt
Silty Clay
Topsoil
Sil
S d
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand to Organic Clayey Silt
Organic Clayey Silt
Organic Clayey Silt to Silty Clay
Organic Clayey Silt
Silty Clay
Topsoil
Silty Sand
Organic Silt/Sand
Silty Sand
Silty Sand
Silty Sand
Organic Clayey Silt
Organic Clayey Silt
Clayey Silt to Clay
Clay
Topsoil
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Fill
Organic Clayey Silt
Organic Clayey Silt
Clay to Silty Clay
Clay
Topsoil

10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003

4.3
3.6
27.9
<0.57
11.8
7.5
2.4
12.0
11.3
20.9
<0.72
<0.85
<0.63
<0.68
<0.68
8.5
6.5
<0.54
1.1
41.7
2.6
3.4
<0.60
<0.63
<0.65
2.49
1
1.09
09 [1
[1.77]
77]
<0.567
<0.522
0.703
30.3
60.1
1.44
6.18
7.35
1.22
<0.611
<0.566
<0.579
<0.585
7.63
64.4
<0.668
<0.625
<0.634
1.13
<0.605
<0.561
<0.573
<0.554
1.78
88.1
<0.693
<0.678
<0.636
4.6

7 of 23
Table 1_Soil.xls

Table 1
Summary of Soil Lithology and Analytical Data
Design Soil Investigation Work Plan
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID
SA-SB-07-02
SA-SB-07-03
SA-SB-07-04
SA-SB-216-01

SA-SB-216-02

SA-SB-216-03

SA-SB-216-04
SB-01
SB-02
SB-03
SB-04
SB-05
SB-06

Sampling
Interval

Analyte

Brook
Elevation
(ft)

Sample
Elevation
(ft)

Sample
Relation to
Brook Level

General Lithology

Collection
Date

Result (mg/kg)

0" - 2"
0" - 2"
0" - 2"
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
8' - 9'
9' - 10'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
8' - 9'
9' - 10'
10' - 11'
11' - 12'
12' - 13'
13' - 14'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
8' - 9'
9' - 10'
0' - 1'
1' - 2'
0" - 2"
0' - 1'
0' - 1'
1' - 2'
0' - 1'
1' - 2'
0' - 1'
1' - 2'
0' - 1'
1' - 2'
0' - 1'
1' - 2'

Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium

364.8
364.8
364.8
368.8
368.8
368.8
368.8
368.8
368.8
368.8
368.8
368.8
368.8
368.8
368.8
368.8
368.8
368.8
368.8
368.8
368.8
368.8
368.8
368.8
368.8
368.8
368.8
368.8
368.8
368.8
368.8
368.8
368.8
368.8
368.8
368.8
368.8
368.8
368.8
368.8
368.8
368.8
-------------------------

371.71
371.04
370.10
375.03
374.03
373.03
372.03
371.03
370.03
369.03
368.03
367.03
366.03
365.03
376.08
375.08
374.08
373.08
372.08
371.08
370.08
369.08
368.08
367.08
366.08
365.08
364.08
363.08
362.08
376.12
375.12
374.12
373.12
372.12
371.12
370.12
369.12
368.12
367.12
366.12
375.23
374.23
-------------------------

Above
Above
Above
Above
Above
Above
Above
Above
Above
At
Below
Below
Below
Below
Above
Above
Above
Above
Above
Above
Above
Above
Below
Below
Below
Below
Below
Below
Below
Above
Above
Above
Above
Above
Above
Above
At
Below
Below
Below
Above
Above
-------------------------

Topsoil
Topsoil
Topsoil
Topsoil
Silty Sand
Silty Sand
Silty Sand
Clayey Silt
Clayey Silt
Clayey Silt
Clayey Silt
Clayey Silt
Clayey Silt
Organic Clayey Silt
Topsoil
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Organic Clayey Silt
Organic Clayey Silt
Silty Clay
Silty Clay
Organic Clayey Silt
Organic Clayey Silt
Silty Clay
Silty Sand
Silty Sand
Topsoil
Silty Sand
Silty Sand
Silty Sand
Silty Clay
Silty Clay
Sandy Silt
Sandy Silt
Sandy Silt
Sandy Silt
Organic Silt/Sand
Silty Sand
Silty Sand
-------------------------

10/24/2003
10/24/2003
10/24/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
10/22/2003
11/2001
11/2001
11/2001
11/2001
11/2001
11/2001
11/2001
11/2001
11/2001
11/2001
11/2001
11/2001

1.0
0.845
0.839
3.3
3.9
<0.59
<0.56
0.65
24.9
0.77
4.7
<0.65
20.6
<0.654
1.26
0.659
<0.588
<0.617
<0.602
5.38
14.5
1.57 [0.823]
<0.68
0.903
<0.756
<0.719
<0.62
<0.616
<0.60
<0.652
<0.60
<0.598
<0.617
<0.624
1.54
<0.632
<0.641
<0.713
<0.635
<0.635
<0.59
<0.57
10.5
1.64
203
503
37
30.1
30.4
34.2
41.1
98.2
11.3
8.04

8 of 23
Table 1_Soil.xls

Table 1
Summary of Soil Lithology and Analytical Data
Design Soil Investigation Work Plan
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID
SB-07
SB-08
SB-09
SB-10
SB-11
SB-12
SB-13
SB-14
SB-15
SB-16
SB-17
SB-18
SB-19
SB-20
SB-21
SB-22
SB-23
SB 24
SB-24
SB-25
SB-26
SB-27
SB-28
SB-29
SB-30
SB-31
SB-32
SB-33
SB-34
SB-35
SB-36
SB-37
SB-38
SB-39
SB-40
SB-41
SB-42
SB-43
SB-44
SB-45
SB-46
SB-47
SB-48
SB-49
SB-50

Sampling
Interval

Analyte

0' - 1'
1' - 2'
0' - 1'
0' - 1'
1' - 2'
0' - 1'
1' - 2'
0' - 1'
0' - 1'
0' - 1'
1' - 2'
0' - 1'
1' - 2'
0' - 1'
1' - 2'
0' - 1'
1' - 2'
0' - 1'
0' - 1'
0" - 2"
0" - 2"
0" - 2"
0" - 2"
0' - 1'
0" - 2"
0" - 2"
0" - 2"
0" - 2"
0" - 2"
0" - 2"
0" - 2"
0" - 2"
0" - 2"
0" - 2"
0" - 2"
0" - 2"
0" - 2"
0" - 2"
0" - 2"
0" - 2"
0" - 2"
0" - 2"
0" - 2"
0" - 2"
0" - 2"
0" - 2"
0" - 2"
0" - 2"
0" - 2"
0" - 2"
0" - 2"
0" - 2"

Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
C
d i
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium

Brook
Elevation
(ft)

Sample
Elevation
(ft)

Sample
Relation to
Brook Level

General Lithology

-------------------------------------------------------

-------------------------------------------------------

-------------------------------------------------------

-------------------------------------------------------

-------------------------------------------------

-------------------------------------------------

-------------------------------------------------

-------------------------------------------------

9 of 23
Table 1_Soil.xls

Collection
Date

Result (mg/kg)

11/2001
11/2001
11/2001
11/2001
11/2001
11/2001
11/2001
11/2001
11/2001
11/2001
11/2001
11/2001
11/2001
11/2001
11/2001
11/2001
11/2001
11/2001
11/2001
06/2002
06/2002
06/2002
06/2002
06/2002
06/2002
06/2002
06/2002
06/2002
06/2002
06/2002
06/2002
06/2002
06/2002
06/2002
06/2002
06/2002
06/2002
06/2002
06/2002
06/2002
06/2002
06/2002
06/2002
06/2002
06/2002
06/2002
06/2002
06/2002
06/2002
06/2002
06/2002
06/2002

42.1
34.3
5.78
81.5
191
108
114
9.82
2.11
14.4
<0.666
52.2
26.2 [9.8]
30.2
44.8
28.9
27.7
32.1
6.25
34.7
10.9
82.3
12.2
0.68
27.1
15.8
15
8
3.76
8.34
11.9
10.9
10.5
39.3
22.9
35.2
11.3
3.79
19.0
26.6
11.3
22.4
16.8
6.52
47.3
5.65
7.77
101
17.5
96.1
35.6
29.6
21.6
1.3

Table 1
Summary of Soil Lithology and Analytical Data
Design Soil Investigation Work Plan
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID
SB-51

SB-52

SB-53

SB-54

SB-55

SB-56
SB-57

SB-58
SB-59

SB-60

SB-61

SB-62
SB-63
SB-64
SB-65
SB-66

SB-67
SB-68

SB-69
SB-70

Sampling
Interval

Analyte

Brook
Elevation
(ft)

Sample
Elevation
(ft)

Sample
Relation to
Brook Level

General Lithology

Collection
Date

Result (mg/kg)

0' - 1'
1' - 2'
2' - 3'
3' - 4'
0' - 1'
1' - 2'
2' - 3'
3' - 4'
0' - 1'
1' - 2'
2' - 3'
3' - 4'
0' - 1'
1' - 2'
2' - 3'
3' - 4'
0' - 1'
1' - 2'
2' - 3'
3' - 4'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
0
0" - 2
2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
0' - 1'
1' - 2'
2' - 3'
3' - 4'
0' - 1'
1' - 2'
2' - 3'
3' - 4'
2' - 3'
3' - 4'
0" - 2"
0" - 2"
2' - 3'
3' - 4'
0' - 1'
1' - 2'
2' - 3'
3' - 4'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
0" - 2"
2' - 3'
3' - 4'

Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium

-----------------------------------------------------------------------------------------------------------------

-----------------------------------------------------------------------------------------------------------------

-----------------------------------------------------------------------------------------------------------------

Topsoil
Sandy Silt
Sandy Silt
Sandy Silt
Topsoil
Clayey Silt
Clayey Silt
Clayey Silt
Topsoil
Sandy Silt
Sandy Silt
Sandy Silt
Topsoil
Sandy Silt
Sandy Silt/Peat
Peat
Sandy Silt
Sandy Silt
Clayey Silt
Peat
--Top Soil
Sandy Silt
Sandy Silt/Peat
Peat
--Sandy Silt
Sandy Silt
Sandy Silt
Sandy Silt
Silty Sand
Clayey Silt
Clayey Silt
Clayey Silt/Peat
Sandy Silt
Sandy Silt
Silty Sand
Silty Sand/Peat
Sandy Silt
Silty Sand
----Sandy Silt
Sandy Silt
Silty Sand
Clayey Silt
Clayey Silt
Clayey Silt
--Silty Sand
Silty Sand
Sandy Silt
Sandy Silt
--Silty Sand
Sandy Silt

11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002

266
146
4.9
7.2
14.9
22.1
1.8
<0.67
<0.61
<0.58
<0.56
<0.55
1.7
<0.58
438
1,800
47.7
27.0
35.8
440
64.6
195
98.9
219
420
197
42.5
310
84.5
636
7.8
10.9
4.5
139
134
22.9
26.2
864
263
208
22.6
1.1
6.5
23.4
29.7
24.2
1.1
<0.60
20.9
31.4
18.0
3.6
11.6
10.3
12.7
4.8

10 of 23
Table 1_Soil.xls

Table 1
Summary of Soil Lithology and Analytical Data
Design Soil Investigation Work Plan
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID
SB-71

SB-72
SB-73
SB-74

SB-75

SB-76

SB-77

SB-78
SB-79

SB-80

SB-81

SB-82

SB-83

SB-84
SB-85

Sampling
Interval

Analyte

0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
2' - 3'
3' - 4'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
0" - 6"
6" - 12"
1' - 2'
2' - 3'
3' - 4'
0" - 6"
6" - 12"
1' - 2'
2' - 3'
3' - 4'
0" - 6"
6" - 12"
1' - 2'
2' - 3
2
3'
3' - 4'
3' - 4'
0" - 6"
6" - 12"
0' - 1'
1' - 2'
3' - 4'
0" - 6"
6" - 12"
0' - 4'
4' - 8'
8' - 12'
0" - 6"
6" - 12"
1' - 2'
2' - 3'
3' - 4'
0" - 6"
6" - 12"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
0" - 6"
6" - 12"
0' - 4'
4' - 8'
2' - 3'
3' - 4'
0' - 1'

Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Lithology
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium

Brook
Elevation
(ft)

Sample
Elevation
(ft)

Sample
Relation to
Brook Level

---------------------------------------------------------------------------

---------------------------------------------------------------------------

---------------------------------------------------------------------------

-------------------------------------

-------------------------------------

------------------------------------11 of 23

Table 1_Soil.xls

General Lithology
--Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand/Clay
--Silty Sand
Silty Sand
Fill
Fill/Sandy Silt
--Sand & Gravel
Sand, Silt, Clay
Sand, Silt, Clay
Clay
--Clayey Silt
Clayey Silt
Clayey Silt
Silty Sand
Gravelly Sand
Gravelly Sand
Gravelly Sand/Clayey Silt
Clayey Silt/ Sand
Silty Sand
Clay
----Sandy Silt
Sandy Silt
Clay
----Fill
Fill/Peat
Peat/Sand and Gravel
Sandy Silt
Sandy Silt
Sand
Clay
----Sandy Silt
Clayey Silt
Sandy Silt
Sandy Silt
----Clay/Fill
Clay/Wood/Peat
Peat
Sand
---

Collection
Date

Result (mg/kg)

11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002

23.2
18.6
1.7
17.0
48.4
1.7
4.3
37.6
25.0
3.8
1.4
<0.62
1.3
0.67
<0.58
<0.57
<0.61
0.73
<0.58
<0.61
1.2
<0.52
18.9
1.1
<0.55
<0 56
<0.56
<0.57
<0.58
1.9
0.96
NA
<0.57
1.2
11.7
7.3
18.4
22.6
<0.87
49.9
7.4
8.4
1.6
<0.63
1.7
1.6
NA
<0.61
1.6
1.3
<0.52
<0.51
<0.55
<0.65
11.4
<0.79
32.1

Table 1
Summary of Soil Lithology and Analytical Data
Design Soil Investigation Work Plan
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID
SB-201

SB-202

SB-203

SB-204

SB-205

SB-206

SB-207

SB-208

SB-209

SB-210

SB-211

Sampling
Interval

Analyte

Brook
Elevation
(ft)

Sample
Elevation
(ft)

Sample
Relation to
Brook Level

General Lithology

Collection
Date

Result (mg/kg)

0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
0' - 1'
1' - 2'
2' - 3'
3' - 4'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
0' - 1'
1' - 2'
2' - 3'
3' - 4'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
0" - 6"
6" - 12"
0' - 1'
1' - 2'
2' - 3'
3' - 4'

Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Lithology
Cadmium
Cadmium
Cadmium

-------------------------------------------------------------------------------------------------------------

-------------------------------------------------------------------------------------------------------------

-------------------------------------------------------------------------------------------------------------

--Sandy Silt
Sandy Silt
Sandy Silt
Sand
--Sandy Silt
Silty Sand
Sandy Silt
Sandy Silt/Peat
--Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand/Peat
--Topsoil
Fill
Fill/Sandy Silt
Sandy Silt/Peat
--p
Topsoil
Sandy Silt
Sandy Silt/Peat
Peat
Topsoil
Sandy Silt
Sandy Silt
Silty Sand
--Silty Sand
Silty Sand
Silty Sand
Sandy Silt
--Sandy Silt
Silty Sand
Silty Sand
Silty Sand
--Silty Sand
Silty Sand
Silty Sand
Silty Sand
----Sandy Silt
Cobbles, Sand
Cobbles, Sand
Sandy Silt

11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002
11/2002

0.61
<0.61
<0.58
<0.55
<0.56
7.5
20.4
18.4
8.7
2,330
8.7
6.1
<0.58
2.0
353
98.1
47.6
80.4
219
2.5
16.4
2.6
148
291
31.7
29.4
1.2
79.8
82.6
45.8
233
71.4
125
32.7
63.7
27.3
600
41.7
14.7
11.8
14.3
10.0
10.7
4.9
3.8
7.6
1.9
<0.54
3.6
6.8
NA
<0.60
<0.56
<0.61

12 of 23
Table 1_Soil.xls

Table 1
Summary of Soil Lithology and Analytical Data
Design Soil Investigation Work Plan
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID
SB-212

SB-217

SB-218

SB-219

SB-220

SB-221

SB-222

Sampling
Interval

Analyte

Brook
Elevation
(ft)

Sample
Elevation
(ft)

Sample
Relation to
Brook Level

General Lithology

Collection
Date

Result (mg/kg)

0" - 6"
6" - 12"
1' - 2'
2' - 3'
3' - 4'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
0" - 2"
0' - 1'
1' - 2'
2' - 3'

Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium

----------384.5
384.5
384.5
384.5
384.5
384.5
384.5
384.5
384.5
384.5

----------389.18
388.18
387.18
386.18
385.18
384.18
390.79
389.79
388.79
387.79

----------Above
Above
Above
Above
Above
At
Above
Above
Above
Above

--Silty Sand
Sandy Silt
Sandy Silt
Sandy Silt
Organic Silt/Sand
Organic Silt/Sand
Organic Silt/Sand
Sandy Silt
Clayey Silt
Till
Topsoil
Silty Sand
Silty Sand
Fill

11/2002
11/2002
11/2002
11/2002
11/2002
10/29/2003
10/29/2003
10/29/2003
10/29/2003
10/29/2003
10/29/2003
10/29/2003
10/29/2003
10/29/2003
10/29/2003

8.0
2.6
<0.59
<0.62
<0.75
1.5
6.0
2.1
0.68
<0.65
<0.53
1.0
0.76
<0.60
<0.60

3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'

Cadmium
Cadmium
Cadmium
Cadmium
Lithology
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Lithology
Lithology
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Lithology

384.5
384.5
384.5
384.5
384.5
383.5
383.5
383.5
383.5
383 5
383.5
383.5
383.5
383.5
383.5
383.5
383.5
383.5
383.5
383.5
383.5
383.5
383.5
383.5
382.1
382.1
382.1
382.1
382.1
382.1
382.1
382.1
382.1
382.1
382.1
382.1
382.1
382.1

386.79
385.79
384.79
383.79
382.79
385.96
384.96
383.96
382.96
381 96
381.96
380.96
379.96
378.96
377.96
388.56
387.56
386.56
385.56
384.56
383.56
382.56
381.56
380.56
384.32
383.32
382.32
381.32
380.32
379.32
383.87
382.87
381.87
380.87
379.87
378.87
377.87
376.87

Above
Above
At
Below
Below
Above
Above
At
Below
Below
Below
Below
Below
Below
Above
Above
Above
Above
Above
At
Below
Below
Below
Above
Above
At
Below
Below
Below
Above
Above
At
Below
Below
Below
Below
Below

Fill to Organic Silt Sand to Silt/Sand/ Gravel

10/29/2003

Silt/Sand/ Gravel
Silt/Sand/ Gravel/Peat
Till
Till
Topsoil
Topsoil
Organic Silt/Sand
Organic Silt/Sand
Organic Silt/Sand
Silt/Sand/ Cobble
Till
Till
Till
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silt/Sand/ Gravel/Cobble
Silt/Sand/ Gravel/Cobble
Silt/Sand/ Gravel/Cobble
Silt/Sand/ Gravel/Cobble
Topsoil
Silty Sand
Silty Sand to Organic Silt/Sand
Organic Silt/Sand
Sandy Silt to Till
Till
Topsoil
Organic Silt/Sand
Silty Sand
Silty Sand
Organic Silt/Sand
Organic Silt/Sand
Till
Till

10/29/2003
10/29/2003
10/29/2003
10/29/2003
10/30/2003
10/30/2003
10/30/2003
10/30/2003
10/30/2003
10/30/2003
10/30/2003
10/30/2003
10/30/2003
10/30/2003
10/30/2003
10/30/2003
10/30/2003
10/30/2003
10/30/2003
10/30/2003
10/30/2003
10/30/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003

13 of 23
Table 1_Soil.xls

<0.67
<0.63
<0.56
<0.55
NA
247
466 [29]
40.5
270
2 200
2,200
153
<0.54
NA
NA
1.5
<0.60
<0.57
<0.56
<0.58
<0.54
<0.56
<0.54
<0.56
65.1
59.1
1,430
2,090
13.3
<0.56
508
434
36.4
1.3
0.65
8.1
<0.53
NA

Table 1
Summary of Soil Lithology and Analytical Data
Design Soil Investigation Work Plan
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID
SB-223

SB-224

SB-225

SB-226

SB-227

SB-228

SB-229

Sampling
Interval

Analyte

Brook
Elevation
(ft)

Sample
Elevation
(ft)

Sample
Relation to
Brook Level

General Lithology

Collection
Date

Result (mg/kg)

0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7
7' - 8
8'
8' - 9'
9' - 10'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6'-7'
7' - 8'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'

Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Lithology
Lithology
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium

381.5
381.5
381.5
381.5
381.5
381.5
381.5
381.5
381.5
381.5
381.5
381.5
381.5
381.5
381.5
381.5
381.5
379.2
379.2
379.2
379.2
379.2
379.2
379.2
379.2
379.2
379.2
379.2
379.2
379.2
379.2
379.2
379.2
379.2
379.2
379.2
379.2
384.4
384.4
384.4
384.4
384.4
383.1
383.1
383.1
383.1
369.9
369.9
369.9
369.9
369.9
369.9
369.9
369.9
369.9

380.90
379.90
378.90
377.90
376.90
375.90
374.90
373.90
372.90
382.28
381.28
380.28
379.28
378.28
377.28
376.28
375.28
381.14
380.14
379.14
378.14
377.14
376.14
375.14
374.14
373.14
372.14
371.14
380.59
379.59
378.59
377.59
376.59
375.59
374.59
373.59
372.59
386.29
385.29
384.29
383.29
382.29
384.13
383.13
382.13
381.13
376.82
375.82
374.82
373.82
372.82
371.82
370.82
369.82
368.82

Below
Below
Below
Below
Below
Below
Below
Below
Below
Above
At
Below
Below
Below
Below
Below
Below
Above
Above
At
Below
Below
Below
Below
Below
Below
Below
Below
Above
At
Below
Below
Below
Below
Below
Below
Below
Above
Above
At
Below
Below
Above
At
Below
Below
Above
Above
Above
Above
Above
Above
Above
At
Below

Organic Silt/Sand
Organic Silt/Sand
Organic Silt/Sand
Organic Silt/Sand
Organic Silt/Sand
Till
Till
Till
Till
Silty Sand
Silty Sand
Silty Sand
Organic Silt/Sand
Organic Silt/Sand to Till
Till
Till
Till
Silty Sand
Silty Sand
Silty Sand
Organic Silt/Sand
Organic Silt/Sand
Organic Silt/Sand
Silty Sand/Gravel/Cobbles
Silty Sand/Gravel/Cobbles
Silty Sand/Gravel/Cobbles
Silty Sand/Gravel/Cobbles
Silty Sand/Gravel/Cobbles
Silty Sand
Silty Sand
Organic Silt/Sand
Organic Silt/Sand
Organic Silt/Sand
Till
Till
Till
Till
Topsoil
Silty Sand
Silty Sand
Sandy Silt
Organic Silt/Sand to Till
Topsoil
Silty Sand To Silty Clay
Silty Sand
Silty Sand/ Gravel
Topsoil
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Organic Silt/Sand
Organic Silt/Sand to Clayey Silt
Clayey Silt to Silty Clay

10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/27/2003
10/27/2003
10/27/2003
10/27/2003
10/27/2003
10/27/2003
10/27/2003
10/27/2003
10/27/2003
10/27/2003
10/28/2003
10/27/2003
10/27/2003
10/27/2003
10/27/2003
10/27/2003
10/27/2003
10/27/2003
10/27/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003
10/21/2003

937
1,960
389
7.5
2.5 [2.8]
26.6
<0.55
<0.533
<0.545
9.6
3.1
897
1,630
212
17.5
<0.54
<0.546
70.9
28.5
5.2
1,240
8.6
1,140
<0.50
<0.51
<0.52
NA
NA
151
15.4
124
4.2 [3.9]
0.80
4.3
<0.55
<0.53
<0.53
41.7
63.8
235
86.4
13.7
12.6
1.5 [1.1]
<0.59
5.6
1.4
1.9
0.67
<0.61 [<0.60]
<0.61
103
1,390
247
2.7

14 of 23
Table 1_Soil.xls

Table 1
Summary of Soil Lithology and Analytical Data
Design Soil Investigation Work Plan
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID
SB-230

SB-231

SB-232

SB-400

SB-401

Sampling
Interval
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
8' - 9'
9' - 10'
10' - 11'
11' - 12'
12' - 13'
13' - 14'
14' - 15'
0" - 6"
6" - 12"
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
0" - 6"
6" - 12"
1' - 2'
2' - 3'
3' - 4'
4' - 5'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' -8 '
8' - 9'
9' - 10'
10' - 11'
11' - 12'
12' - 13'
13' - 14'
14' - 15'
15' - 16'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'

Analyte

Brook
Elevation
(ft)

Sample
Elevation
(ft)

Sample
Relation to
Brook Level

General Lithology

Collection
Date

Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Lithology
Lithology
Lithology
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium

367.6
367.6
367.6
367.6
367.6
367.6
367.6
367.6
367.6
367.6
367.6
367.6
367.6
367.6
367.6
367.6
362.5
362.5
362.5
362.5
362.5
362.5
362.5
362.5
362.5
362.5
362.5
362.5
362.5
362.5
362.5
383.5
383.5
383.5
383.5
383.5
383.5
383.5
383.5
383.5
383.5
383.5
383.5
383.5
383.5
383.5
383.5
383.5
384.4
384.4
384.4
384.4
384.4

376.54
375.54
374.54
373.54
372.54
371.54
370.54
369.54
368.54
367.54
366.54
365.54
364.54
363.54
362.54
361.54
366.68
365.68
364.68
363.68
362.68
361.68
360.68
359.68
358.68
365.99
364.99
363.99
362.99
361.99
360.99
391.92
390.92
389.92
388.92
387.92
386.92
385.92
384.92
383.92
382.92
381.92
380.92
379.92
378.92
377.92
376.92
375.92
387.39
386.37
385.37
384.37
383.37

Above
Above
Above
Above
Above
Above
Above
Above
Above
At
Below
Below
Below
Below
Below
Below
Above
Above
Above
Above
At
Below
Below
Below
Below
Above
Above
Above
Above
Below
Below
Above
Above
Above
Above
Above
Above
Above
Above
At
Below
Below
Below
Below
Below
Below
Below
Below
Above
Above
Above
At
Below

Topsoil
Sandy Silt
Fill
Fill
Silty Sand
Silty Sand
Silty Sand to Silty Clay
Organic Silty Clay
Organic Silty Clay
Silty Clay
Silty Clay
Organic Silty Clay
Silty Clay
Silty Clay
Silty Clay
Silty Clay
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand to Organic Clayey Silt
Organic Clayey Silt
Organic Clayey Silt
Sand/Gravel/ Shells
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand to Organic Clayey Silt
Organic Clayey Silt
Topsoil
Topsoil
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand/ Gravel
Silty Sand/ Gravel
Sand
Sand
Silty Sand/ Gravel
Silty Sand/ Gravel
Silty Sand/ Gravel
Silty Sand/ Gravel
Silty Sand/ Gravel
Silty Sand/ Gravel
Organic Silt/Sand
Organic Silt/Sand
Organic Silt/Sand
Organic Silt/Sand to Till
Till

10/23/2003
10/23/2003
10/23/2003
10/23/2003
10/23/2003
10/23/2003
10/23/2003
10/23/2003
10/23/2003
10/23/2003
10/23/2003
10/23/2003
10/23/2003
10/23/2003
10/23/2003
10/23/2003
11/3/2003
11/3/2003
11/3/2003
11/3/2003
11/3/2003
11/3/2003
11/3/2003
11/3/2003
11/3/2003
11/3/2003
11/3/2003
11/3/2003
11/3/2003
11/3/2003
11/3/2003
10/30/2003
10/30/2003
10/30/2003
10/30/2003
10/30/2003
10/30/2003
10/30/2003
10/30/2003
10/30/2003
10/30/2003
10/30/2003
10/30/2003
10/30/2003
10/30/2003
10/30/2003
10/30/2003
10/30/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003

15 of 23
Table 1_Soil.xls

Result (mg/kg)
23.5
10.1
5.2 [1.50]
<0.57
0.81
<0.60
<0.61
6.0
<0.65 [<0.68]
<0.62
<0.59
<0.67
<0.62
NA
NA
NA
1.0
0.82
0.72
<0.60
<0.64
<0.63
<0.68
<0.59
<0.74
23.9
21.6
40.8
5.3
<0.71
<0.70
<0.72
<0.59
<0.56
<0.54
<0.53
<0.55
<0.55
<0.53
<0.54
<0.55
<0.54
<0.56
<0.53
<0.56
<0.54
<0.55
<0.54
489
771
61.5
35.6
<0.55

Table 1
Summary of Soil Lithology and Analytical Data
Design Soil Investigation Work Plan
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID
SB-402

SB-403

SB-404

SB-405

SB-406

SB-407

Sampling
Interval

Analyte

Brook
Elevation
(ft)

Sample
Elevation
(ft)

Sample
Relation to
Brook Level

General Lithology

Collection
Date

Result (mg/kg)

0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
8' - 9'
9' - 10'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'

Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Lithology
Lithology
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Lithology
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Lithology
Lithology
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Lithology

384.5
384.5
384.5
384.5
384.5
384.5
384.5
384.5
383.5
383.5
383.5
383.5
383.5
382.4
382.4
382.4
382.4
382.4
382.4
382.4
382.4
381.5
381.5
381.5
381.5
381 5
381.5
381.5
381.5
381.5
381.5
379.2
379.2
379.2
379.2
379.2
379.2
379.2
379.2
379.2
379.2
379.2
377.6
377.6
377.6
377.6
377.6
377.6
377.6
377.6

389.59
388.59
387.59
386.59
385.59
384.59
383.59
382.59
385.52
384.52
383.52
382.52
381.52
385.59
384.59
383.59
382.59
381.59
380.59
379.59
378.59
384.96
383.96
382.96
381.96
380 96
380.96
379.96
378.96
377.96
376.96
381.26
380.26
379.26
378.26
377.26
376.26
375.26
374.26
373.26
372.26
371.26
380.91
379.91
378.91
377.91
376.91
375.91
374.91
373.91

Above
Above
Above
Above
Above
At
Below
Below
Above
Above
At
Below
Below
Above
Above
Above
At
Below
Below
Below
Below
Above
Above
Above
At
Below
Below
Below
Below
Below
Above
Above
At
Below
Below
Below
Below
Below
Below
Below
Below
Above
Above
Above
At
Below
Below
Below
Below

Organic Silt/Sand
Organic Silt/Sand
Organic Silt/Sand
Organic Silt/Sand /Gravel
Organic Silt/Sand /Gravel
Organic Silt/Sand /Gravel
Organic Silt/Sand /Gravel to Sand
Till
Topsoil
Organic Silt/Sand
Organic Silt/Sand
Silt/Sand/ Gravel/Cobble
Silt/Sand/ Gravel/Cobble
Topsoil
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Till
Till
Till
Topsoil
Silty Sand
Silty Sand
Sand/Gravel
Fill
Fill
Silty Sand
Till
Till
Gravel
Gravel
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Sand/Gravel/Cobbles
Sand/Gravel/Cobbles
Topsoil
Silty Sand
Silty Sand
Organic Silt/Sand
Organic Silt/Sand
Organic Silt/Sand to Peat
Till
Till

10/29/2003
10/29/2003
10/29/2003
10/29/2003
10/29/2003
10/29/2003
10/29/2003
10/29/2003
10/30/2003
10/30/2003
10/30/2003
10/30/2003
10/30/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/27/2003
10/27/2003
10/27/2003
10/27/2003
10/27/2003
10/27/2003
10/27/2003
10/27/2003
10/27/2003
10/27/2003
10/30/2003
10/30/2003
10/30/2003
10/30/2003
10/30/2003
10/30/2003
10/30/2003
10/30/2003

22.0
<0.69
<0.63
<0.68
<0.63
<0.64
<0.61 [<0.61]
<0.56
17.8
16.3
38.3
89.1
5.3
11.4
9.8 [10.3]
1.3
<0.57
<0.54
<0.53
NA
NA
2.0
<0.61
<0.64
<0.56
<0 60
<0.60
<0.63
<0.54
<0.53
NA
4.6
0.92
<0.56
<0.52 [<0.55]
<0.55
<0.56
<0.53
<0.53
<0.54
NA
NA
392
170
0.86
<0.59 [<0.58]
<0.60
49.1
<0.56
NA

16 of 23
Table 1_Soil.xls

Table 1
Summary of Soil Lithology and Analytical Data
Design Soil Investigation Work Plan
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID
SB-408

SB-409

SB-410

SB-411

SB-412

Sampling
Interval

Analyte

Brook
Elevation
(ft)

Sample
Elevation
(ft)

Sample
Relation to
Brook Level

General Lithology

Collection
Date

Result (mg/kg)

0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
8' - 9'
9' - 10'
10' - 11'
11' - 12'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
8' - 9'
9' - 10'
10' - 11'
11' - 12
11
12'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'

Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Lithology
Lithology
Lithology
Lithology
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium

377.6
377.6
377.6
377.6
377.6
377.6
377.6
377.6
377.6
377.6
377.6
377.6
377.6
376.2
376.2
376.2
376.2
376.2
376.2
376.2
376.2
376.2
376.2
376.2
376.2
376 2
376.2
376.2
376.2
376.2
376.2
376.2
376.2
376.2
376.2
376.2
376.2
376.2
376.2
376.2
376.2
376.2
376.2
376.2
376.2
376.2
376.2
376.2
376.2
376.2
376.2
376.2

382.11
381.11
380.11
379.11
378.11
377.11
376.11
375.11
374.11
373.11
372.11
371.11
370.11
380.44
379.44
378.44
377.44
376.44
375.44
374.44
373.44
372.44
371.44
370.44
369.44
368 44
368.44
378.99
377.99
376.99
375.99
374.99
373.99
372.99
379.09
378.09
377.09
376.09
375.09
374.09
373.09
372.09
371.09
378.81
377.81
376.81
375.81
374.81
373.81
372.81
371.81
370.81

Above
Above
Above
Above
Above
At
Below
Below
Below
Below
Below
Below
Below
Above
Above
Above
Above
At
Below
Below
Below
Below
Below
Below
Below
Below
Above
Above
Above
At
Below
Below
Below
Above
Above
Above
At
Below
Below
Below
Below
Below
Above
Above
Above
At
Below
Below
Below
Below
Below

Topsoil
Silty Sand
Silty Sand
Silty Sand
Sand/Gravel/Cobbles
Sand/Gravel/Cobbles
Sand/Gravel/Cobbles
Clayey Silt
Clayey Silt
Clayey Silt
Clayey Silt
Silty Sand
Silty Sand
Topsoil
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand
Silty Sand to Organic Silt/Sand
Organic Silt/Sand
Sand/Gravel
Peat to Organic Silt/Sand
Organic Silt/Sand to Sand/Gravel
Sand/Gravel
Till
Silty Sand
Silty Sand
Silty Sand
Silty Sand to Peat
Peat
Peat to Clayey Silt
Organic Silt/Sand
Topsoil
Silty Sand
Silty Sand
Organic Silt/Sand
Organic Silt/Sand
Organic Silt/Sand
Organic Silt/Sand to Sand/Gravel
Sand
Sand to Till
Topsoil
Silty Sand
Silty Sand
Peat
Peat to Organic Silt/Sand
Organic Silt/Sand
Organic Silt/Sand
Till
Till

10/28/2003
10/27/2003
10/27/2003
10/27/2003
10/27/2003
10/27/2003
10/27/2003
10/27/2003
10/27/2003
10/27/2003
10/27/2003
10/27/2003
10/27/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003
10/28/2003

4.7
1.1
<0.62
<0.54
<0.52
<0.52
<0.52
<0.56
<0.54
NA
NA
NA
NA
153
61.6
0.7
<0.57
<0.59
4.4
992 [1,360]
2.4
0.96
1,540
1.2
<0.56
<0 53
<0.53
2.2
1.6
16.3
4,230
7.7
463
1.4
15.6
3.6
4.3
<1.0
<0.78
2.1
<0.63
<0.60 [<0.63]
<0.56
29.3
11.4
71.8
2,360
1,140
1,730
13.6
16.3
1.1

17 of 23
Table 1_Soil.xls

Table 1
Summary of Soil Lithology and Analytical Data
Design Soil Investigation Work Plan
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID
SB-413

SB-414

SB-415

SB-416

SB-417

Sampling
Interval

Analyte

Brook
Elevation
(ft)

Sample
Elevation
(ft)

Sample
Relation to
Brook Level

General Lithology

Collection
Date

Result (mg/kg)

0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8
8'
7
8' - 9'
9' - 10'
10' - 11'
11' - 12'
12' -13'
13' - 14'
14' - 15'
15' -16'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'

Lithology
Lithology
Lithology
Lithology
Lithology
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Lithology
Lithology
Lithology
Lithology
Lithology
Lithology
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium

372.6
372.6
372.6
372.6
372.6
372.6
372.6
372.6
373.0
373.0
373.0
373.0
373.0
373.0
373.0
373.0
373.0
366.0
366.0
366.0
366.0
366.0
366.0
366.0
366.0
366.0
366.0
366.0
366.0
366.0
366.0
366.0
366.0
366.0
366.3
366.3
366.3
366.3
366.3
366.3
366.3
366.3
366.3
365.7
365.7
365.7
365.7
365.7
365.7
365.7
365.7
365.7

377.15
376.15
375.15
374.15
373.15
372.15
371.15
370.15
379.56
378.56
377.56
376.56
375.56
374.56
373.56
372.56
371.56
373.06
372.06
371.06
370.06
369.06
368.06
367.06
366.06
365.06
364.06
363.06
362.06
361.06
360.06
359.06
358.06
357.06
372.03
371.03
370.03
369.03
368.03
367.03
366.03
365.03
364.03
371.96
370.96
369.96
368.96
367.96
366.96
365.96
364.96
363.96

Above
Above
Above
Above
Above
At
Below
Below
Above
Above
Above
Above
Above
Above
Above
At
Below
Above
Above
Above
Above
Above
Above
Above
At
Below
Below
Below
Below
Below
Below
Below
Below
Below
Above
Above
Above
Above
Above
Above
At
Below
Below
Above
Above
Above
Above
Above
Above
At
Below
Below

Sand
Sand
Sand to Silty Sand
Silty Sand
Organic Silt/Sand
Organic Silt/Sand
Organic Clayey Sand
Organic Silt/Sand
Topsoil
Sandy Silt
Sandy Silt
Sandy Silt
Sandy Silt
Organic Silt/Sand
Organic Silt/Sand to Clayey Silt
Organic Clayey Silt
Organic Silt/Sand
Topsoil
Silty Sand
Silty Sand
Silty Sand
Silty Sand to Clayey Silt
Silty Sand
Silty Sand
Silty Sand
Organic Silt/Sand
Silty Clay
Silty Clay to Silty Sand
Silty Sand to Silty Clay
Silty Clay
Silty Clay
Silty Clay
Silty Clay
Silty Clay
Topsoil
Silty Sand
Silty Sand
Silty Sand
Organic Silt/Sand
Organic Silt/Sand
Organic Silt/Sand
Silty Clay
Silty Clay
Topsoil
Topsoil
Clayey Silt
Clayey Silt
Organic Clayey Silt
Organic Clayey Silt
Organic Clayey Silt
Organic Clayey Silt to Clay
Silty Sand

10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/20/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/23/2003
10/23/2003
10/23/2003
10/23/2003
10/23/2003
10/23/2003
10/23/2003
10/23/2003
10/23/2003
10/23/2003
10/23/2003
10/23/2003
10/23/2003
10/23/2003
10/23/2003
10/23/2003
10/23/2003
10/23/2003
10/23/2003
10/23/2003
10/23/2003
10/23/2003
10/23/2003
10/23/2003
10/23/2003
10/23/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003
10/24/2003

NA
NA
NA
NA
NA
2.2
3.5
<0.85
34.9
96.1
16.0
14.7 [13.9]
5,350
120
6.9
1.3
<0.72
1.6
0.99
2.3
<0.60
<0.59
2.1
<0.60
<0.55
<0.61 [<0.59]
<0.64
<0.57
NA
NA
NA
NA
NA
NA
44.4
20.2
6.8
1.1
123
16.8
0.79
<0.62
<0.65
5.9
16.2
3.0
0.86
109.0
18.4
<0.73
<0.63
<0.73

18 of 23
Table 1_Soil.xls

Table 1
Summary of Soil Lithology and Analytical Data
Design Soil Investigation Work Plan
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID
SB-418

SB-419

SB-420

SB-421

SB-422

SB-423

SB-424

SB-425

Sampling
Interval

Analyte

Brook
Elevation
(ft)

Sample
Elevation
(ft)

Sample
Relation to
Brook Level

0" - 6"
6" - 12"
1' - 2'
2' - 3'
3' - 4'
4' - 5'
0" - 6"
6" - 12"
1' - 2'
2' - 3'
3' - 4'
4' - 5'
0" - 6"
6" - 12"
1' - 2'
2' - 3'
3' - 4'
4' - 5'
0" - 6"
6" - 12"
1' - 2'
2' - 3'
3' - 4'
4' - 5'
0" - 6"
6" - 12"
1' - 2'
2' - 3'
3' - 4'
4' - 5'
0" - 6"
6" - 12"
0' - 2'
2' - 4'
4' - 6'
6' - 8'
0" - 6"
6" - 12"
0' - 2'
2' - 4'
4' - 6'

Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium

364.2
364.2
364.2
364.2
364.2
364.2
364.1
364.1
364.1
364.1
364.1
364.1
364.1
364.1
364.1
364.1
364.1
364.1
364.1
364.1
364.1
364.1
364.1
364.1
364.1
364.1
364.1
364.1
364.1
364.1
364.2
364.2
364.2
364.2
364.2
364.2
364.5
364.5
364.5
364.5
364.5

369.94
368.94
367.94
366.94
365.94
364.94
370.41
369.41
368.41
367.41
366.41
365.41
370.42
369.42
368.42
367.42
366.42
365.42
371.01
370.01
369.01
368.01
367.01
366.01
370.64
369.64
368.64
367.64
366.64
365.64
371.94
370.94
369.94
367.94
365.94
363.94
371.98
370.98
369.98
367.98
365.98

Above
Above
Above
Above
Above
At
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Below
Above
Above
Above
Above
Above

6' - 8'
8' - 10'
10' - 12'
0" - 6"
6" - 12"
0' - 2'
2' - 4'
4' - 6'
6' - 8'

Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium

364.5
364.5
364.5
364.1
364.1
364.1
364.1
364.1
364.1

363.98
361.98
359.98
371.79
370.79
369.79
367.79
365.79
363.79

At
Below
Below
Above
Above
Above
Above
Above
At

8' - 10'
10' - 12'

Cadmium
Cadmium

364.1
364.1

361.79
359.79

Below
Below

19 of 23
Table 1_Soil.xls

General Lithology
Fill
Fill
Fill
Silty Sand/ Gravel
Silty Sand to Organic Clayey Silt
Organic Clayey Silt
Fill
Fill
Fill
Fill
Fill
Organic Clayey Silt
Fill
Fill
Fill
Fill
Fill to Organic Clayey Silt
Organic Clayey Silt
Fill
Fill
Fill
Fill
Fill
Silty Sand
Fill
Fill
Fill
Fill
Fill to Organic Clayey Silt
Organic Clayey Silt
Asphalt
Sand/Gravel
Asphalt/ Sand/ Gravel/ Fill
Fill
Fill to Sand
Clay
Asphalt
Fill
Fill
Fill to Sand/Gravel/Cobbles
Sand/Gravel/Cobbles to Silty Sand
Silty Sand to Organic Silty Clay to Organic
Clay
Organic Clay
Sand to Clay
Asphalt
Silty Sand/ Gravel/Cobbles
Asphalt/ Silty Sand/ Gravel/Cobbles
Silty Sand/ Gravel/Cobbles to Sand
Sand to Organic Clayey Silt
Organic Clayey Silt to Clay
Silty Clay to Clay to Sand/Gravel to Clay to
Sand w/ Shells
Sand w/shells to Clay

Collection
Date

Result (mg/kg)

11/3/2003
11/3/2003
11/3/2003
11/3/2003
11/3/2003
11/3/2003
11/3/2003
11/3/2003
11/3/2003
11/3/2003
11/3/2003
11/3/2003
11/3/2003
11/3/2003
11/3/2003
11/3/2003
11/3/2003
11/3/2003
11/3/2003
11/3/2003
11/3/2003
11/3/2003
11/3/2003
11/3/2003
11/3/2003
11/3/2003
11/3/2003
11/3/2003
11/3/2003
11/3/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003

0.96
0.70
0.75
<0.55
25.1
0.65
1.8
0.8
1.7
0.58
2.5
1.3
64.0
87.1
63.5
1.9
2.9
1.1
1.9
0.60
1.3
3.6 [3.1]
<0.54
<0.52
53.5
57.7
2.5
0.62
1.2
0.62
<0.53
<0.52
<0.54
<0.56
<0.56 [<0.28]
<0.63
<0.53
<0.57
<0.59
<0.57
<0.58

10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003

<0.62
<0.61
<0.61
<0.53
<0.55
<0.54
<0.55
22.0
<0.63
6.8
<0.59

Table 1
Summary of Soil Lithology and Analytical Data
Design Soil Investigation Work Plan
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID
SB-426

SB-427

SB-428

SB-429
SB 429

SB-430

SB-431

Sampling
Interval

Analyte

Brook
Elevation
(ft)

Sample
Elevation
(ft)

Sample
Relation to
Brook Level

0" - 6"
6" - 12"
0' - 2'
2' - 4'
4' - 6'
6' - 8'
8' - 10'

Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium

363.0
363.0
363.0
363.0
363.0
363.0
363.0

371.98
370.98
369.98
367.98
365.98
363.98
361.98

Above
Above
Above
Above
Above
At
Below

10' - 12'
0" - 6"
6" - 12"
0' - 2'
2' - 4'
4' - 6'
6' - 8'
8' - 10'
10' - 12'
0" - 6"
6" - 12"
0' - 2'
2' - 4'
4' - 6'
6' - 8'
8' - 10'
10' - 12'
0" - 6"
6" - 12"
0' - 2'
2' - 4'
4' - 6'

Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
C d i
Cadmium
Cadmium
Cadmium
Cadmium

363.0
363.0
363.0
363.0
363.0
363.0
363.0
363.0
363.0
363.0
363.0
363.0
363.0
363.0
363.0
363.0
363.0
363.0
363 0
363.0
363.0
363.0
363.0

359.98
371.91
370.91
369.91
367.91
365.91
363.91
361.91
359.91
370.79
369.79
368.79
366.79
364.79
362.79
360.79
358.79
372.73
372 73
371.73
370.73
368.73
366.73

Below
Above
Above
Above
Above
Above
At
Below
Below
Above
Above
Above
Above
Above
At
Below
Below
Above
Ab
Above
Above
Above
Above

6' - 8'
8' - 10'
10' - 12'
12' - 14'
14' - 16'
0" - 6"
6" - 12"
0' - 2'
2' - 4'
4' - 6'
6' - 8'
8' - 10'
10' - 12'
0" - 6"
6" - 12"
0' - 2'
2' - 4'
4' - 6'
6' - 8'
8' - 10'
10' - 12'

Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium

363.0
363.0
363.0
363.0
363.0
362.9
362.9
362.9
362.9
362.9
362.9
362.9
362.9
362.9
362.9
362.9
362.9
362.9
362.9
362.9
362.9

364.73
362.73
360.73
358.73
356.73
373.62
372.62
371.62
369.62
367.62
365.62
363.62
361.62
374.38
373.38
372.38
370.38
368.38
366.38
364.38
362.38

Above
At
Below
Below
Below
Above
Above
Above
Above
Above
Above
At
Below
Above
Above
Above
Above
Above
Above
Above
At

20 of 23
Table 1_Soil.xls

General Lithology

Collection
Date

Result (mg/kg)

10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003

<0.58
<0.58
<0.56
<0.55 [<0.56]
28.9
21.1
11.7

Fill
Fill
Fill
Silt/Sand/ Gravel/Cobble
Organic Clayey Silt
Organic Clayey Silt
Organic Clayey Silt to Sand w/Shells
Clay to Organic Silty Clay to Silty Sand
w/Shells
Fill
Fill
Fill
Fill
Fill to Gravel/Sand/ Ceramic
Organic Silty Clay
Sand w/shells to Clay
Silty Clay, Wood @ 10'
Sand/Gravel/Cobbles
Sand/Gravel/Cobbles
Sand/Gravel/Cobbles
Sand/Gravel/Cobbles
Sand/Gravel/Cobbles
Organic Silty Clay (ceramics @ 6'') to Clay
Clay
Organic Silty Sand to Sand w/Shells
Fill
Fill
Fill
Fill
Clay

10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003

Silty Sand/ Gravel, Organic Clay, Ceramics

10/31/2003

Ceramics to Organic Clayey Silt


Organic Clayey Silt
Organic Clayey Silt
Clay to Sand/Gravel/ Shells
Fill
Fill
Fill
Fill
Fill
Concrete to Sand/Gravel to Silty Sand
Silty Sand
Gravel/Cobbles/Shells to Silty Clay
Fill
Fill
Fill
Fill to Sand/Gravel
Silt/Sand/ Gravel to Fill
Fill
Cobbles/Ceramic to Silty Sand to Ceramics
Organic Silty Clay

10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003

10/31/2003

<0.789
<0.59
<0.59
<0.58
<0.55
0.85
4.8
<0.750
<0.832
<0.57
<0.55
<0.54
<0.55
<0.56
28.7
<0.693
1.02
<0
<0.60
60
0.58
<0.54
<0.55
0.67 [0.62]
<0.54
5.7
0.73
0.99
<0.71
<0.56
0.59
<0.57
0.57
<0.57
<0.55
<0.59
2.5
<0.54
<0.54
<0.54
3.0
0.78
0.71
<0.57
3.3

Table 1
Summary of Soil Lithology and Analytical Data
Design Soil Investigation Work Plan
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID
SB-432

SB-433

SB-434

SB-435

SB-436

SB-437

SB-438

SB-439

SB-440

SB-441

Sampling
Interval

Analyte

Brook
Elevation
(ft)

Sample
Elevation
(ft)

Sample
Relation to
Brook Level

0" - 6"
6" - 12"
1' - 2'
2' - 3'
3' - 4'
4' - 5'
0" - 6"
6" - 12"
0' - 2'
2' - 4'
4' - 6'
6' - 8'
8' - 10'
10' - 12'
0" - 6"
6" - 12"
0' - 2'
2' - 4'
4' - 6'
6' - 8'

Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium

362.5
362.5
362.5
362.5
362.5
362.5
362.8
362.8
362.8
362.8
362.8
362.8
362.8
362.8
363.0
363.0
363.0
363.0
363.0
363.0

364.60
363.60
362.60
361.60
360.60
359.60
371.73
370.73
369.73
367.73
365.73
363.73
361.73
359.73
371.77
370.77
369.77
367.77
365.77
363.77

Above
Above
At
Below
Below
Below
Above
Above
Above
Above
Above
Above
Below
Below
Above
Above
Above
Above
Above
Above

8' - 10'
10' - 12'
0" - 2"
0' - 1'
1 - 2'
2
1'
2' - 3'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
0" - 2"
0' - 1'
1' - 2'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
0" - 2"
0' - 1'
1' - 2'
2' - 3'

Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium

363.0
363.0
384.4
384.4
384.4
384.4
384.4
384.4
384.4
384.4
384.4
384.4
384.4
384.4
384.4
384.4
384.4
384.4
384.4
384.4
382.4
382.4
382.4
383.1
383.1
383.1
383.1
383.1
383.1
381.5
381.5
381.5
381.5

361.77
359.77
389.14
388.14
387.14
386.14
388.91
387.91
386.91
385.91
390.63
389.63
388.63
387.63
386.63
387.97
386.97
385.97
384.97
383.97
387.12
386.12
385.12
387.3
386.3
385.3
384.3
383.3
382.3
383.56
382.56
381.56
380.56

Below
Below
Above
Above
Above
Above
Above
Above
Above
At
Above
Above
Above
Above
Above
Above
Above
Above
Above
At
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
At
Below

21 of 23
Table 1_Soil.xls

General Lithology
Organic Silt/Sand
Organic Silt/Sand
Silty Sand
Silty Sand
Silty Sand to Organic Clayey Silt
Sand/Gravel/ Shells
Fill
Fill
Fill
Fill
Fill
Fill to Silty Sand/ Ceramics
Organic Clayey Silt
Organic Clayey Silt
Fill
Fill
Fill
Fill
Fill
Fill to Silty Sand/ Ceramics
Organic Clayey Silt/ Ceramics to
Sand/Gravel/ Shells
Sand/Gravel/ Shells
Organic Silty Sand
Silty Sand
Silty Sand
Till
Organic Silt
Organic Silt
Organic Silt
Organic Silt
Organic Silt
Organic Silt
Organic Silt
Silt
Silt
Organic Silty Sand
Organic Silty Sand
Organic Silty Sand
Silty Sand
Silty Sand
Organic Silty Sand
Organic Silty Sand
Organic Silty Sand
Silty Sand
Silty Sand
Sand
Sand
Sand
Sand
Organic Silty Sand
Organic Silty Sand
Organic Silty Sand
Silty Sand

Collection
Date

Result (mg/kg)

11/3/2003
11/3/2003
11/3/2003
11/3/2003
11/3/2003
11/3/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003
10/31/2003

13.8
<0.50
3.0
<0.64
<0.75
<0.75
0.66
1.0
0.99
0.66
1.2
<0.57
0.8
<0.70
0.61
0.68
<0.57
1.9
1.3
1.3 [<0.54]

10/31/2003
10/31/2003
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004

<0.78
<0.79
394
166
24.4
4.43 [4.87]
42.8
23.4
2.55
<0.736
1.33
<0.655
<0.644
<0.596
<0.605
3.84
1.91
1.03
4.63
5.65
1.34
<0.641
<0.634 [<0.628]
1.45
<0.644
<0.614
<0.576
<0.590
<0.610
2.37
13.4
7.13
2.37

Table 1
Summary of Soil Lithology and Analytical Data
Design Soil Investigation Work Plan
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID
SB-442

SB-443

SB-444

SB-445

SB-446
SB-447
SB-448

SB-449

SB-450

SB-451

Sampling
Interval

Analyte

Brook
Elevation
(ft)

Sample
Elevation
(ft)

Sample
Relation to
Brook Level

General Lithology

Collection
Date

Result (mg/kg)

0" - 2"
0' - 1'
1' - 2'
2' - 3'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
0" - 2"
0" - 2"
0" - 2"
0' - 1'
1
1' - 2
2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
8' - 9'
9' - 10'
10' - 11'
11' - 11.5'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 4.5'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'

Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium

379.2
379.2
379.2
379.2
379.2
379.2
379.2
379.2
379.2
377.6
377.6
377.6
377.6
377.6
377.6
377.6
377.6
377.6
377.6
377.6
377.6
367.2
367.2
367.2
367.2
367.2
367.2
367.2
367.2
367.2
367.2
367.2
367.2
367.2
367.2
367.2
367.2
367.2
367.2
367.2
367.2
367.2
367.2
367.2
367.2
367.2
367.2
367.2
367.2
367.2
367.2
367.2
367.2
367.2

381.8
380.8
379.8
378.8
381.02
380.02
379.02
378.02
377.02
381.08
380.08
379.08
378.08
377.08
376.83
380.95
379.95
378.95
377.95
376.95
376.05
379.08
380.24
380.65
379.65
378.65
377.65
376.65
375.65
374.65
383.38
382.38
381.38
380.38
379.38
378.38
377.38
376.38
375.38
374.38
372.38
371.38
370.88
377.94
378.94
377.94
376.94
375.94
375.44
377.97
376.97
375.97
374.97
373.97

Above
Above
At
Below
Above
Above
At
Below
Below
Above
Above
Above
Above
At
Below
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above

Organic Silt
Organic Silty Sand
Organic Silty Sand
Sandy Silty Clay
Organic Silty Sand
Silty Sand
Silty Sand
Organic Silt
Silty Sandy Clay
Topsoil
Sandy Silt
Sandy Silt
Sandy Silt
Sandy Silt
Sandy Silt
Silty Sand
Silty Sand
Silty Clay
Silty Clay
Organic Silt
Silty Sand
Topsoil
Topsoil
Sandy Silt
Silty Sand
Sandy Silt
Sandy Silt
Sandy Silt
Sandy Silt
Sand & Silt
Organic Silt
Organic Silt
Organic Clayey Silt
Clayey Silt
Clayey Silt
Clayey Silt
Silty Clay
Clayey Silt
Organic Silt
Silt
Sandy Silt
Organic Silt
Sandy Silt
Sandy Silt
Sandy Silt
Sand
Organic Clayey Silt
Silt
Silty Sand
Clayey Silt
Organic Sandy Silt
Sandy Silt
Sandy Silt
Silty Sand

4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/29/2004
4/29/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/28/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004

4.74
0.685
<0.618
<0.618
31.4
0.962
<0.663
<0.871
<0.624
84.7
71.3
6.06
28.4
1.05
0.973
135
11.3
5.31
1.28
1,910 [2,710]
58.4
10.9
<0.814
4.15
1.66
<0.608
0.608
<0.605
3,800
2,120
16.9
0.909
<0.665
<0.605
<0.609
<0.613
<0.64
<0.619
84.7
2,220
8.27
14.6
18.3
8.21
33.5
27.3
26.9
38.0
10.4
1.44
10.4
9.4
3.53 [0.671]
196
1,390

22 of 23
Table 1_Soil.xls

Table 1
Summary of Soil Lithology and Analytical Data
Design Soil Investigation Work Plan
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID
SB-452

SB-453

SB-454
SB-455

SB-456

SB-457

SB-458

SB-459

SSSWP-1
SSSWP-2
SSSWP-3
SSSWP-4
SSSWP-5

Sampling
Interval

Analyte

Brook
Elevation
(ft)

Sample
Elevation
(ft)

Sample
Relation to
Brook Level

General Lithology

Collection
Date

Result (mg/kg)

0" - 2"
0' - 1'
1' - 2'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
0" - 2"
0' - 1'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
0" - 2"
0' - 1'
1' - 2'
2' -2.25'
0" - 2"
0' - 1'
1' - 2'
0" - 2"
0' - 1'
1' - 2'
2' - 3'
0" - 6"
6" - 24"
0" - 6"
6" - 15"
0" - 6"
6" - 24"
0" - 6"
6" - 24"
0" - 6"
6" - 24"

Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium
Cadmium

373.0
373.0
373.0
369.9
369.9
369.9
369.9
369.9
369.9
369.9
369.9
369.9
376.6
367.6
366.3
366.3
366.3
366.3
366.3
366.3
373.0
373.0
373.0
373.0
373.0
373.0
373.0
384.4
384.4
384.4
384.4
384.4
384.4
384.4
384.4
384.4
384.4
384.4
---------------------

381.8
380.8
379.8
376.77
375.77
374.77
373.77
372.77
371.77
370.77
369.77
368.77
376.79
375.79
372.43
371.43
370.43
369.43
368.43
367.43
384.58
383.58
382.58
381.58
380.58
379.58
378.58
387.53
386.53
385.53
384.53
387.06
386.06
385.06
387.63
386.63
385.63
384.63
---------------------

Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
At
Below
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
Above
At
---------------------

Topsoil
Topsoil
Clayey Silt
Topsoil
Sandy Silt
Sandy Silt
Sandy Silt
Clayey Silt
Clayey Silt
Clayey Silt
Clayey Silt
Clayey Silt
Topsoil
Silty Sand
Topsoil
Sandy Silt
Clayey Silt
Clayey Silt
Clayey Silt
Clayey Silt
Topsoil
Clayey Silt
Silt
Sandy Silt
Clayey Silt
Clayey Silt
Sandy Silt
Organic Silt
Organic Silt
Sandy Silt
Sandy Silt
Organic Sandy Silt
Organic Sandy Silt
Silt
Clayey Silt
Clayey Silt
Organic Clayey Silt
Organic Clayey Silt
---------------------

4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
4/29/2004
12/19/2007
12/19/2007
12/19/2007
12/19/2007
12/19/2007
12/19/2007
12/19/2007
12/19/2007
12/19/2007
12/19/2007

1.84
<0.654
<0.623
2.26
4.03
<0.590
<0.612
<0.623
3.29
91.9
130
<0.734
4.9
7.5
3.8
2.31
<0.615
<0.602
7.04
<0.681
<0.658
<0.607
<0.620
<0.619
<0.605
<0.588
1.46
253
84.5
12.5
3.9
446
188
15.5
27.0
21.6
1.96
30.3
7.0 [10.8]
25.8
2.2
0.62
0.77
<0.05
4.7
<0.04
3.2
0.28

Notes:
1. ---: Information not available
2. NA: Not analyzed
3. The lithologic descriptions identified in the table represent the predominant lithologic classification for the respective intervals.
4. Duplicate results are presented in brackets.
5. J - Analyte detected at a level less than the Reporting Limit and greater than or equal to the Method Detection Limit. Concentrations within this
range are estimated.

23 of 23
Table 1_Soil.xls

TABLE 2A
Proposed Design Soil Investigation Sample Locations
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID

SSSWP-1R

SSSWP-1N

SSSWP-1S

SSSWP-1E

SSSWP-1W

DI-18-01

DI-18-02

Depth
Interval

Analysis
Approach1

Wooded Area
Analyze
0" - 6"
Analyze
6" - 12'
1' - 2'
Analyze
Analyze
0" - 6"
Analyze
6" - 12'
1' - 2'
Analyze
Analyze
0" - 6"
Analyze
6" - 12'
1' - 2'
Analyze
Analyze
0" - 6"
Analyze
6" - 12'
1' - 2'
Analyze
Analyze
0" - 6"
Analyze
6" - 12'
1' - 2'
Analyze
Residential/Apartment Complex Area
Analyze
0' - 1'
Analyze
1' - 2'
Analyze
2' - 3'
3' - 4'
Analyze
0' - 1'
Hold2
1' - 2'
Hold2
2' - 3'
Hold2
3' - 4'
Hold2

DI-18-03

0' - 1'
1' - 2'

DI-40-01

0' - 1'
1' - 2'
2' - 3'
3' - 4'

Hold2
Hold2
Analyze
Analyze
Analyze
Analyze

DI-40-03

0' - 1'
1' - 2'

DI-51-01

0' - 1'
1' - 2'
2' - 3'
3' - 4'

Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Analyze
Analyze
Analyze
Analyze

0' - 1'
1' - 2'
2' - 3'
3' - 4'

Hold2
Hold2
Hold2
Hold2

DI-40-02

DI-51-02

0' - 1'
1' - 2'
2' - 3'
3' - 4'

Page 1 of 11

Collection Method

Hand Auger

Hand Auger

Hand Auger

Hand Auger

Hand Auger

Hand Auger

Hand Auger

Hand Auger

Hand Auger

Hand Auger

Hand Auger

Hand Auger

Hand Auger

TABLE 2A
Proposed Design Soil Investigation Sample Locations
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID

Depth
Interval

DI-51-03

0' - 1'
1' - 2'

DI-02-01

0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
8' - 9'
9' - 10'

DI-02-02

0' - 1'
1' - 2'
2' - 3'
3' - 4'

DI-02-03

0' - 1'
1' - 2'

DI-SB-01-05

0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
8' - 9'
9' - 10'

DI-23-01

0' - 1'
1' - 2'
2' - 3'
3' - 4'

Analysis
Approach1
Hold2
Hold2
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze

DI-23-03

0' - 1'
1' - 2'

DI-24-01

0' - 1'
1' - 2'
2' - 3'
3' - 4'

Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Analyze
Analyze
Analyze
Analyze

0' - 1'
1' - 2'
2' - 3'
3' - 4'

Hold2
Hold2
Hold2
Hold2

DI-23-02

DI-24-02

0' - 1'
1' - 2'
2' - 3'
3' - 4'

Page 2 of 11

Collection Method

Hand Auger

Wheel-Mounted Geoprobe
(Turf Wheel)

Hand Auger

Hand Auger

Wheel-Mounted Geoprobe
(Turf Wheel)

Hand Auger

Hand Auger

Hand Auger

Hand Auger

Hand Auger

TABLE 2A
Proposed Design Soil Investigation Sample Locations
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID

Depth
Interval

DI-24-03

0' - 1'
1' - 2'

DI-25-01

0' - 1'
1' - 2'
2' - 3'
3' - 4'

DI-25-02

0' - 1'
1' - 2'
2' - 3'
3' - 4'

DI-25-03

0' - 1'
1' - 2'

DI-03-01

0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'

DI 03 02
DI-03-02

DI-03-03

0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
8' - 9'
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
8' - 9'
9' - 10'

Analysis
Approach1
Hold2
Hold2
Analyze
Analyze
Analyze
Analyze
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze

Page 3 of 11

Collection Method

Hand Auger

Hand Auger

Hand Auger

Hand Auger

Wheel-Mounted Geoprobe
(Turf Wheel)

Wheel-Mounted Geoprobe
(Turf Wheel)

Wheel-Mounted Geoprobe
(Turf Wheel)

TABLE 2A
Proposed Design Soil Investigation Sample Locations
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID

DI-03-04

DI-03-05

DI-28-01

DI-28-02

DI-28-03
DI-29-01

DI-29-02

DI-29-03

Depth
Interval

0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
8' - 9'
9' - 10'
10' - 11'
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
8' - 9'
9' - 10'
10' - 11'
11' - 12'
0' - 1'
1' - 2'
2' - 3'
3' - 4'
0' - 1'
1' - 2'
2' - 3'
3' - 4'
0' - 1'
1' - 2'
0' - 1'
1' - 2'
2' - 3'
3' - 4'
0' - 1'
1' - 2'
2' - 3'
3' - 4'
0' - 1'
1' - 2'

Analysis
Approach1
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Analyze
Analyze
Analyze
Analyze
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2

Page 4 of 11

Collection Method

Wheel-Mounted Geoprobe
(Turf Wheel)

Wheel-Mounted Geoprobe
(Turf Wheel)

Hand Auger

Hand Auger

Hand Auger

Hand Auger

Hand Auger

Hand Auger

TABLE 2A
Proposed Design Soil Investigation Sample Locations
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID

DI-31-01

DI-31-02

Approach1

0' - 1'
1' - 2'
2' - 3'
3' - 4'

Analyze
Analyze
Analyze
Analyze

0' - 1'
1' - 2'
2' - 3'
3' - 4'

Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Analyze
Analyze
Analyze
Analyze

DI-31-03

0' - 1'
1' - 2'

DI-43-01

0' - 1'
1' - 2'
2' - 3'
3' - 4'

DI-43-02

0' - 1'
1' - 2'
2' - 3'
3' - 4'

DI-43-03

0' - 1'
1' - 2'

DI 19 01
DI-19-01

0' - 1'
1' - 2'
2' - 3'
3' - 4'

DI-19-02

0' - 1'
1' - 2'
2' - 3'
3' - 4'

DI-19-03

0' - 1'
1' - 2'

DI-20-01

0' - 1'
1' - 2'
2' - 3'
3' - 4'

DI-20-02

Analysis

Depth
Interval

0' - 1'
1' - 2'
2' - 3'
3' - 4'

DI-20-03

0' - 1'
1' - 2'

DI-41-01

0' - 1'
1' - 2'
2' - 3'
3' - 4'

Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Analyze
Analyze
Analyze
Analyze
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Analyze
Analyze
Analyze
Analyze
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Analyze
Analyze
Analyze
Analyze

Page 5 of 11

Collection Method

Hand Auger

Hand Auger

Hand Auger

Hand Auger

Hand Auger

Hand Auger

Hand Auger

Hand Auger

Hand Auger

Hand Auger

Hand Auger

Hand Auger

Hand Auger

TABLE 2A
Proposed Design Soil Investigation Sample Locations
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID

DI-41-02

Depth
Interval

0' - 1'
1' - 2'
2' - 3'
3' - 4'

DI-41-03

0' - 1'
1' - 2'

DI-60-01

0' - 1'
1' - 2'
2' - 3'
3' - 4'

DI-60-02

0' - 1'
1' - 2'
2' - 3'
3' - 4'

DI-60-03

0' - 1'
1' - 2'

DI-60-04

0' - 1'
1' - 2'

DI-61-01

0' - 1'
1' - 2'
2' - 3'
3' - 4'

DI-61-02

0' - 1'
1' - 2'
2' - 3'
3' - 4'

DI-61-03

0' - 1'
1' - 2'

DI-61-04

0' - 1'
1' - 2'

DI-52-01

0' - 1'
1' - 2'
2' - 3'
3' - 4'

DI-52-02

0' - 1'
1' - 2'
2' - 3'
3' - 4'

DI-52-03

0' - 1'
1' - 2'

DI-52-04

0' - 1'
1' - 2'

DI-53-01

0' - 1'
1' - 2'
2' - 3'
3' - 4'

Analysis
Approach1
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Analyze
Analyze
Analyze
Analyze
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Analyze
Analyze
Analyze
Analyze
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Analyze
Analyze
Analyze
Analyze
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Analyze
Analyze
Analyze
Analyze

Page 6 of 11

Collection Method

Hand Auger

Hand Auger

Hand Auger

Hand Auger

Hand Auger
Hand Auger

Hand Auger

Hand Auger

Hand Auger
Hand Auger

Hand Auger

Hand Auger

Hand Auger
Hand Auger

Hand Auger

TABLE 2A
Proposed Design Soil Investigation Sample Locations
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID

DI-53-02

Depth
Interval

0' - 1'
1' - 2'
2' - 3'
3' - 4'

DI-53-03

0' - 1'
1' - 2'

DI-53-04

0' - 1'
1' - 2'

DI-54-01

0' - 1'
1' - 2'
2' - 3'
3' - 4'

DI-54-02

0' - 1'
1' - 2'
2' - 3'
3' - 4'

DI-54-03

0' - 1'
1' - 2'

DI-42-01

0' - 1'
1' - 2'
2' - 3'
3' - 4'

DI-42-02

0' - 1'
1' - 2'
2' - 3'
3' - 4'

DI-42-03

0' - 1'
1' - 2'

DI-01-01

0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
8' - 9'
9' - 10'
10' - 11'
11' - 12'
12' - 13'

Analysis
Approach1
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Analyze
Analyze
Analyze
Analyze
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Analyze
Analyze
Analyze
Analyze
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze

Page 7 of 11

Collection Method

Hand Auger

Hand Auger
Hand Auger

Hand Auger

Hand Auger

Hand Auger

Hand Auger

Hand Auger

Hand Auger

Wheel-Mounted Geoprobe
(Turf Wheel)

TABLE 2A
Proposed Design Soil Investigation Sample Locations
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID

DI-01-02

DI-01-03

DI-21-01

DI-21-02

Depth
Interval

0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
8' - 9'
9' - 10'
10' - 11'
11' - 12'
12' - 13'
13' - 14'
14' - 15'
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
8' - 9'
9' - 10'
10' - 11'
11' - 12'
12' - 13'
13' - 14'
14' - 15'
15' - 16'
0' - 1'
1' - 2'
2' - 3'
3' - 4'
0' - 1'
1' - 2'
2' - 3'
3' - 4'

DI-21-03

0' - 1'
1' - 2'

DI-22-01

0' - 1'
1' - 2'
2' - 3'
3' - 4'

Analysis
Approach1
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Analyze
Analyze
Analyze
Analyze
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Analyze
Analyze
Analyze
Analyze

Page 8 of 11

Collection Method

Wheel-Mounted Geoprobe
(Turf Wheel)

Wheel-Mounted Geoprobe
(Turf Wheel)

Hand Auger

Hand Auger

Hand Auger

Hand Auger

TABLE 2A
Proposed Design Soil Investigation Sample Locations
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID

DI-22-02

DI-22-03
DI-26-01

Depth
Interval

0' - 1'
1' - 2'
2' - 3'
3' - 4'
0' - 1'
1' - 2'
0' - 1'
1' - 2'
2' - 3'
3' - 4'
0' - 1'
1' - 2'
2' - 3'
3' - 4'

Analysis
Approach1
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Analyze
Analyze
Analyze
Analyze

DI-26-03

0' - 1'
1' - 2'

DI-17-01

0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
8' - 9'

Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze

0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
8' - 9'
9' - 10'

Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2

DI-26-02

DI-17-02

Page 9 of 11

Collection Method

Hand Auger

Hand Auger

Hand Auger

Hand Auger

Hand Auger

Wheel-Mounted Geoprobe
p
(Turf Wheel)

Wheel-Mounted Geoprobe
(Turf Wheel)

TABLE 2A
Proposed Design Soil Investigation Sample Locations
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID

DI-17-03

DI-17-04

DI-27-01

DI-27-02

Depth
Interval

0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
8' - 9'
9' - 10'
10' - 11'
11' - 12'
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
8' - 9'
9' - 10'
10' - 11'
11' - 12'
12' - 13'
0' - 1'
1' - 2'
2' - 3'
3' - 4'
0' - 1'
1' - 2'
2' - 3'
3' - 4'

DI-27-03

0' - 1'
1' - 2'

DI-SB-03-05

0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
8' - 9'
9' - 10'

Analysis
Approach1
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Analyze
Analyze
Analyze
Analyze
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze

Page 10 of 11

Collection Method

Wheel-Mounted Geoprobe
(Turf Wheel)

Wheel-Mounted Geoprobe
(Turf Wheel)

Hand Auger

Hand Auger

Hand Auger

Wheel-Mounted Geoprobe
(Turf Wheel)

TABLE 2A
Proposed Design Soil Investigation Sample Locations
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID

DI-30-01

DI-30-02

Approach1

0' - 1'
1' - 2'
2' - 3'
3' - 4'

Analyze
Analyze
Analyze
Analyze

0' - 1'
1' - 2'
2' - 3'
3' - 4'

Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Analyze
Analyze
Analyze
Analyze

DI-30-03

0' - 1'
1' - 2'

DI-44-01

0' - 1'
1' - 2'
2' - 3'
3' - 4'

DI-44-02

DI-44-03

Analysis

Depth
Interval

0' - 1'
1' - 2'
2' - 3'
3' - 4'
0' - 1'
1' - 2'

Hold2
Hold2
Hold2
Hold2
Hold2
Hold2

Collection Method

Hand Auger

Hand Auger

Hand Auger

Hand Auger

Hand Auger

Hand Auger

Notes:
1. As indicated in the table, certain samples will be collected and held at the laboratory
and will be analyzed based on the results of other samples. If analysis of held samples is
determined to be necessary, the analysis will be performed within laboratory and analytical
procedure holding times. All samples that are analyzed will be analyzed for cadmium
using USEPA SW-846 Method 6010B.
2. Analysis is contingent on results from successive samples listed above and from
samples at consecutive depth intervals. Samples will not be analyzed if results are less
than 2.5 parts per million (ppm) for depth intervals in the top two feet and if results are less
than 10 ppm for depth intervals below 2 feet.

Page 11 of 11

TABLE 2B
Proposed Design Soil Investigation Sample Locations
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID

Depth
Interval

Analysis

Collection Method

Approach1

Residential/Apartment Complex Area


DI-05-01

DI-32-01

DI-32-02

0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
0' - 1'
1' - 2'
2' - 3'
3' - 4'
0' - 1'
1' - 2'
2' - 3'
3' - 4'

DI-32-03

0' - 1'
1' - 2'

DI-08-01

0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'

DI-08-02

0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'

DI-46-01

0' - 1'
1' - 2'

DI-46-02

0' - 1'
1' - 2'

DI-47-01

0' - 1'
1' - 2'
2' - 3'
3' - 4'

DI-47-02

DI-47-03

Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze

Wheel-Mounted Geoprobe
(Turf Wheel)

Hand Auger

Hold
Hold2
Hold2
Hold2
Hold2
Hold2
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Analyze
Analyze
Hold2
Hold2
Analyze
Analyze
Analyze
Analyze

0' - 1'
1' - 2'
2' - 3'
3' - 4'
0' - 1'
1' - 2'

Page 1 of 7

Hold2
Hold2
Hold2
Hold2
Hold2
Hold2

Hand Auger

Hand Auger

Wheel-Mounted Geoprobe
(Turf Wheel)

Wheel-Mounted Geoprobe
(Turf Wheel)

Hand Auger
Hand Auger

Hand Auger

Hand Auger

Hand Auger

TABLE 2B
Proposed Design Soil Investigation Sample Locations
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID

DI-55-01

DI-55-02

Approach1

0' - 1'
1' - 2'
2' - 3'
3' - 4'

Analyze
Analyze
Analyze
Analyze

0' - 1'
1' - 2'
2' - 3'
3' - 4'

Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Analyze
Analyze
Analyze
Analyze

DI-55-03

0' - 1'
1' - 2'

DI-57-01

0' - 1'
1' - 2'
2' - 3'
3' - 4'

DI-57-02

0' - 1'
1' - 2'
2' - 3'
3' - 4'

DI-58-01

0' - 1'
1' - 2'

DI
58 02
DI-58-02

0 - 1'
1
0'
1' - 2'
2' - 3'
3' - 4'

DI-13-01

DI-13-02

DI-13-03

Analysis

Depth
Interval

0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'

Hold3
Hold3
Hold3
Hold3
Analyze
Analyze
Hold4
Hold4
Hold4
Hold4
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze

Page 2 of 7

Collection Method

Hand Auger

Hand Auger

Hand Auger

Hand Auger

Hand Auger

Hand Auger

Hand Auger

Wheel-Mounted Geoprobe
(Turf Wheel)

Wheel-Mounted Geoprobe
(Turf Wheel)

Wheel-Mounted Geoprobe
(Turf Wheel)

TABLE 2B
Proposed Design Soil Investigation Sample Locations
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID

DI-13-04

DI-13-05

DI-13-06

DI-14-01

DI-14-02

DI-15-01

Depth
Interval

0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7
6
7'
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'

Analysis
Approach1
Hold3
Hold3
Hold3
Hold3
Hold3
Hold3
Hold3
Hold3
Hold3
Hold3
Hold3
Hold3
Hold3
Hold3
Hold3
Hold3
Hold3
Hold3
Hold3
Hold3
Hold3
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Hold3
Hold3
Hold3
Hold3
Hold3
Hold3
Hold3
Hold3
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze

Page 3 of 7

Collection Method

Wheel-Mounted Geoprobe
(Turf Wheel)

Wheel-Mounted Geoprobe
(Turf Wheel)

Wheel-Mounted Geoprobe
(Turf Wheel)

Wheel-Mounted Geoprobe
(Turf Wheel)

Wheel-Mounted Geoprobe
(Turf Wheel)

Wheel-Mounted Geoprobe
(Turf Wheel)

TABLE 2B
Proposed Design Soil Investigation Sample Locations
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID

DI-15-02

DI-15-03

DI-15-04

DI-SB-07-01

DI-SB-07-02

DI-SB-07-03

Analysis

Depth
Interval

Approach1

0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'

Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze

0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'

0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'

Hold3
Hold3
Hold3
Hold3
Hold3
Hold3
Hold3
Hold3
Hold3
Hold3
Hold3
Hold3
Hold3
Hold3
Hold3
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze

0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'

Hold
Hold3
Hold3
Hold3
Hold3
Hold3
Hold3

0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7
6
7'
7' - 8'
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'

Page 4 of 7

Collection Method

Wheel-Mounted Geoprobe
(Turf Wheel)

Wheel-Mounted Geoprobe
(Turf Wheel)

Wheel-Mounted Geoprobe
(Turf Wheel)

Wheel-Mounted Geoprobe
(Turf Wheel)

Wheel-Mounted Geoprobe
(Turf Wheel)

Wheel-Mounted Geoprobe
(Turf Wheel)

TABLE 2B
Proposed Design Soil Investigation Sample Locations
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID

DI-04-01

Depth
Interval

0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
8' - 9'

DI-04-02

0' - 1'
1' - 2'

DI-06-01

0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'

DI-06-02

DI-06-03

DI-45-01

DI-45-02

Analysis
Approach1

Analyze
Hold5
Hold5
Hold5
Hold5
Analyze
Analyze
Analyze
Analyze
Hold2
Hold2
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze

0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'

Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze

0' - 1'
1' - 2'
2' - 3'
3' - 4'

Hold2
Hold2
Hold2
Hold2

0' - 1'
1' - 2
1
2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'
0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'

Collection Method

Page 5 of 7

Wheel-Mounted Geoprobe
(Turf Wheel)

Hand Auger

Wheel-Mounted Geoprobe
(Turf Wheel)

Wheel-Mounted Geoprobe
(Turf Wheel)

Wheel-Mounted Geoprobe
(Turf Wheel)

Wheel-Mounted Geoprobe
(Turf Wheel)

Hand Auger

TABLE 2B
Proposed Design Soil Investigation Sample Locations
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID

Depth
Interval

DI-45-03

0' - 1'
1' - 2'

DI-SB-05-05

0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'
6' - 7'
7' - 8'

DI-09-03

0' - 1'
1' - 2'

DI-09-04

0' - 1'
1' - 2'

DI-48-01

0' - 1'
1' - 2'
2' - 3'
3' - 4'

DI-48-02

0' - 1'
1' - 2'
2' - 3
2
3'
3' - 4'

DI-48-03

0' - 1'
1' - 2'

DI-10-01

0' - 1'
1' - 2'

DI-49-01

0' - 1'
1' - 2'
2' - 3'
3' - 4'

Analysis
Approach1
Hold2
Hold2
Hold5
Hold5
Hold5
Hold5
Hold5
Analyze
Analyze
Analyze
Analyze
Analyze
Hold
Hold2
Analyze
Analyze
Analyze
Analyze
Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Analyze
Analyze
Analyze
Analyze
Analyze
Analyze

DI-49-03

0' - 1'
1' - 2'

DI-34-01

0' - 1'
1' - 2'
2' - 3'
3' - 4'
0' - 1'
1' - 2'
2' - 3'
3' - 4'

Hold3
Hold3
Hold3
Hold3

DI-34-02

0' - 1'
1' - 2'
2' - 3'
3' - 4'

Hand Auger

Wheel-Mounted Geoprobe
(Turf Wheel)

Hand Auger

Hold2
Hold2
Hold2
Hold2
Hold2
Hold2
Analyze
Analyze
Analyze
Analyze

DI-49-02

Collection Method

Page 6 of 7

Hand Auger

Hand Auger

Hand Auger

Hand Auger
Hand Auger

Hand Auger

Hand Auger

Hand Auger

Hand Auger

Hand Auger

TABLE 2B
Proposed Design Soil Investigation Sample Locations
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID

DI-59-01

DI-59-02

Analysis

Depth
Interval

Approach1

0' - 1'
1' - 2'
2' - 3'
3' - 4'

Analyze
Analyze
Analyze
Analyze

Hand Auger

0' - 1'
1' - 2'
2' - 3'
3' - 4'

Hold3
Hold3
Hold3
Hold3

Hand Auger

Collection Method

Notes:
1. As indicated in the table, certain samples will be collected and held at the
laboratory and will be analyzed based on the results of other samples. If analysis of
held samples is determined to be necessary, the analysis will be performed within
laboratory and analytical procedure holding times. All samples that are analyzed will
be analyzed for cadmium using USEPA SW-846 Method 6010B.
2. Analysis is contingent on results from successive samples listed above and from
samples at consecutive depth intervals. Samples will not be analyzed if results are
less than 2.5 parts per million (ppm) for depth intervals in the top two feet and if results
are less than 10 ppm for depth intervals below 2 feet.
3. Analysis is contingent on results from successive samples listed above and from
samples at consecutive depth intervals. Samples will not be analyzed if results are
less than 4.3 ppm for depth intervals in the top two feet and if results are less than 10
ppm for depth intervals below 2 feet.
4. Analysis is contingent on results from samples collected at DI-58-01 and DI-13-03.
Samples will not be analyzed if results are less than 4.3 ppm for depth intervals in the
top two feet and if results are less than 10 ppm for depth intervals below 2 feet.
5. Analysis is contingent on results from samples at consecutive depth intervals.
Samples will not be analyzed if results are less than 2.5 ppm for depth intervals in the
top two feet and if results are less than 10 ppm for depth intervals below 2 feet.

Page 7 of 7

TABLE 2C
Proposed Design Soil Investigation Sample Locations
West Branch of Bloody Brook
Bloody Brook Voluntary Cleanup Program
Onondaga County, New York

Boring ID

Depth
Interval

Analysis
Approach1

Collection Method

Commercial/Light Industrial Area


DI-16-01

DI-16-02

DI-16-03

0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'

Analyze
Analyze
Analyze
Analyze
Analyze
Analyze

Wheel-Mounted
Geoprobe (Turf Wheel)

0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'

Analyze
Analyze
Analyze
Analyze
Analyze
Analyze

Wheel-Mounted
Geoprobe (Turf Wheel)

0' - 1'
1' - 2'
2' - 3'
3' - 4'
4' - 5'
5' - 6'

Analyze
Analyze
Analyze
Analyze
Analyze
Analyze

Wheel-Mounted
Geoprobe (Turf Wheel)

N t
Notes:
1. Samples will be analyzed for cadmium using USEPA SW-846 Method 6010B.

Page 1 of 1

FIGURES

"

0:

'"'"
'"
"
z'"
-.,
~~

cz

NEW YORK

~o
E
a

~~

"t" ~

s CO

----------~~~ "

:i "'"fd
~

PBrk

1i~

PKINS.

LOCKHEED MARTIN CORPORATION

SYRACUSE. NEW YORK


DESIGN SOIL INVESTIGATION
WORK PLAN

APPROXIMATE SCALE

~i~5ii;Z~iiii~i ~~:;;;;~~i
o
2000
4000

FIGURE 1
SITE LOCATION MAP

REFERENCE:
NYSDOT 7.5 MIN TOPOGRAPHIC MAP OF SYRACUSE WEST.
QUADRANGLE 1990, SCALE: ,. -

FEET

2000'.

WEST BRANCH OF BLOODY BROOK

ONONDAGA COUNTY, NEW YORK

RO
AD
OO
L
LI
VE
RP
OL
D
DRI V
E
SUNF
LOW
ER

NEW YORK STATE THRUWAY

LEGEND
CURRENT BROOK ALIGNMENT

LOCKHEED MARTIN CORPORATION


SYRACUSE, NEW YORK
DESIGN SOIL INVESTIGATION WORK PLAN

LATHAM, NY

DATE DESIGNED BY DRAWN BY CHECKED BY APPROVED BY DRAWING


NUMBER 129916D2_FIG_2
NME
NME
01/19/11
NME
MJS
OFFICE

L:\Matt\LMC-GIS\MXD\1229916_Fig_2.mxd

ON
N
O

GA
A
D

K
LA

R
PA

AY
W
K

WOODED AREA
RESIDENTIAL-APARTMENT COMPLEX AREA
COMMERCIAL-LIGHT INDUSTRIAL AREA

150 300

600

900 Feet

FIGURE 2
SITE AREA MAP
WEST BRANCH OF BLOODY BROOK
ONONDAGA COUNTY, NEW YORK

..I<.0

..(J)
(J)

>-S
lD~

Dc
W

>1c::
a..

WETLAND

a..~
:c:

CB0
DSO DS

1-1-

S
>--

BLOODY BROOK DRAINAGE DISTRICT EASEMENT

lD~
DC

NYS THRUWAY EASEMENT

~1

PROPERTY BORDER

5~
:c:

--,s65_ _

----

t5

Ol
Ol
N

-"'-OHW-"'-

OVERHEAD WIRES
RETAINING WALL

w:C:

GUARD RAIL

0 .....

UTILITY MANHOLE

---0-----0--

"<:

>
:

SANITARY MANHOLE

Ul

&.

+
x

367.4

*
0

'-0

DRAINAGE MANHOLE

NYS PLANE COORDINATE SYSTEM NORTHING

TOWN/VILLAGE BORDER

;::- ........
a.
~

N 1,131,000

UNDERGROUND DRAIN LINE

R'w'

'" ~>:
" I.L.:C:
l.L.ilS

CULVERT
NYS PLANE COORDINATE SYSTEM EASTING

7+50

1-1)..

FLAG POLE

E 924,000

~'l5.~

C====::J

DRAINAGE STRUTURES

AERIAL SURVEY GROUND CONTROL POINT

WEST BRANCH OF BLOODY BROOK CENTERLINE

ZI-

DC

BL 115

1-1-

S
filS

TOPOGRAPHIC CONTOUR LINE

FP

CATCH BASIN

~----o

GABIONS (ROCK-FILLED WIRE CAGES)


CHANNEL CENTERLINE SURVEY STATION
TOPOGRAPHIC SPOT ELEVATION
CONIFEROUS TREE
DECIDUOUS TREE
LIGHT POLE
UTILITY POLE / GUY WIRE

RAILROAD TRACKS

.2'
III
CD

:><:

Shaw EnvIronmental. Inc.

LOCKHEED MARTIN CORPORATION


SYRACUSE, NEW YORK
DESIGN SOIL INVESTIGATION WORK PLAN
FIGURE 3
SITE MAP LEGEND
WEST BRANCH OF BLOODY BROOK
ONONDAGA COUNTY, NEW YORK

S-ar putea să vă placă și