EASTERN POWER DISTRIBUTION COMPANY OF A.P.

LIMITED
CORPORATE OFFICE:: VISAKHAPATNAM
Memo.No.CGM/Proj-I,EA&IT/GM.P/DE.P1/ADE.P1/F.Cost Data/D.No.109614 Dt.25-09-14.
Sub:- EPDCL - Cost Data of materials, equipment, H.T & L.T Lines, Services and
33/11KV Substation to be adopted for the year 2014-15 Reg.
* * *
1.
The Cost Data 2014-15 will come into force with effect from the date of 07.10.2014 and
will be in force till next revision takes place.
2.
The field officers are requested to strictly adhere to the following instructions while
sanctioning the estimates.
a) In case where the estimates are pending to be sanctioned on or after the date of
communication of cost data 2014-15, the same should be revised with latest cost data
2014-15.
b) In case, where the applicants paid the necessary charges for the estimates on or before
the date of communication of cost data 2014-15, the estimates need not be revised.
c) In case where the applicants come forwards after the date of communication of
revised cost data 2014-15 and willing to pay the necessary charges for the estimates
sanctioned prior to the date of communication of revised cost data 2014-15, within
the stipulated time as mentioned in the intimation letter from the concerned authority,
the estimates need not be revised upto stipulated time period as communicated in the
estimates.
d) In case where the applicants come forwards after the date of communication of
revised cost data 2014-15 and willing to pay the necessary charges for the estimates
sanctioned prior to the date of communication of revised cost data 2014-15, after
lapse of stipulated time as mentioned in the intimation letter from the concerned
authority, the estimates should be revised with the latest cost data 2014-15.
3.
For service connection estimates in non REC scheme areas and execution of 33/11KV
Substations with other than REC funds, extra amounts should be added are 11% Establishment
and General charges on Materials and 3% contingencies on materials also.
4.
1% Cess is adopted on total cost of the construction as per the rules laid down in the
Building and other construction workers welfare Cess Act 1996.
Sd/-XXXX
Chief General Manager
Projects-I, EA & IT
APEPDCL::VISAKHAPATNAM
To
All Superintending Engineers/
All Divisional Engineers/ADEs/AEs
Copy submitted to the Director/Projects/APEPDCL/Visakhapatnam
Copy submitted to the Director/Operation & Comml./APEPDCL/Visakhapatnam
Copy to:
The Chief General Managers
The Chief Project Manager/REC Ltd., Hyderabad
The Managing Director/RESCO/Anakapalli & Chepurupalli
The Chief Engineer/O & RE/V.S/Hyderabad
The Dy. General Manger/IT/APEPDCL/Visakhapatnam for uploading the Cost Data
2014-15 in EPIMRS

CORPORATE OFFICE :: VISAKHAPATNAM

COST DATA
2014-15

INDEX
Sl.
No.

A
B
C
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44

Description

ABSTRACT of rates of 33 KV / 11 KV / LT Lines


Rates for CENTRALIZED MATERIALS
Cost Data for Hilly and Tribal areas as adopted by Irrigation Department in the State
33 KV Line over 9.1 Mts. PSCC Poles at 105 Mts.Span WL 280 Kgs
33 KV Line over 9.1 Mts. PSCC Poles at 80 Mts.Span WL 280 Kgs
11 KV Line over 8 Mts. PSCC Poles at 60 Mts.Span WL 140 Kgs
11 KV Line over 8 Mts. PSCC Poles at 65 Mts.Span WL 200 Kgs
11 KV Line over 8 Mts. PSCC Poles at 60 Mts.Span WL 140 Kgs
11 KV Line over 8 Mts. PSCC Poles at 65 Mts.Span WL 200 Kgs
6.3 KV Line over 8 Mts. PSCC Poles at 90 Mts.Span WL 140 Kgs
6.3 KV Line over 8 Mts. PSCC Poles at 90 Mts.Span WL 200 Kgs
LT 3 Ph.5 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs
LT 3 Ph.5 Wire line (Horizontal) over 8 Mts. PSCC Poles at 60 Mts.Span WL 200 Kgs
LT 3 Ph.5 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs
LT 3 Ph.5 Wire line (Horizontal) over 8 Mts. PSCC Poles at 60 Mts.Span WL 200 Kgs
LT 3 Ph.4 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs
LT 3 Ph.4 Wire line (Horizontal) over 8 Mts. PSCC Poles at 60 Mts.Span WL 200 Kgs
LT 3 Ph.4 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs
LT 3 Ph.4 Wire line (Horizontal) over 8 Mts. PSCC Poles at 60 Mts.Span WL 200 Kgs
LT 1 Ph. 3 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs
LT 1 Ph. 2 Wire line (Horizontal) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs
L.T.AB Cable (3x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs
L.T.AB Cable (2x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs
L.T.AB Cable (1x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 140 Kgs
L.T.AB Cable (3x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 200 Kgs
L.T.AB Cable (2x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 200 Kgs
L.T.AB Cable (1x16+25 Sqmm) over 8 Mts. PSCC Poles at 65 Mts.Span WL 200 Kgs
Erection of 100 KVA 11/433 KV Conventional Distribution Transformer
Erection of 16 KVA 11/433 KV Conventional Distribution Transformer on single pole structure
Erection of 63 KVA 11/433 KV Conventional Distribution Transformer
Erection of 25 KVA 11/433 KV Conventional Distribution Transformer on single pole structure
Erection of 40 KVA 11/433 KV Conventional Distribution Transformer on single pole structure
Erection of 15 KVA 6.3/0-240V CSP Transformer(Oil immersed) on 9.1Mtr PSCC Pole
Erection of 15 KVA 6.3/0-240V CSP Transformer(Oil immersed) on 8 Mts PSCC Pole
Erection of 15 KVA 6.3/0-240V Amorphous metal core Transformer(Oil immersed) on 8 Mts PSCC Pole
Release of single phase Agl. Service erected on support
Release of poly phase Agl. Service erected on support
Release of 1 ph ( high quality). Domestic & non-domestic service
Release of 1 ph (electronic). Domestic & non-domestic service
Release of 1 ph Domestic & non-domestic service
Release of 3 ph. ( electronic meter) Domestic & non-domestic service
Release of 3 ph. (electronic meter) Domestic & non-domestic service
Release of poly phase ( high quality) Indl.service upto 15 HP
Release of Industrial service with poly phase CT operated meter upto 15 HP
Release of Industrial service with poly phase CT operated meter above 15 HP
Release of Street light service (1 -ph electonic meter)
Erection of 33/11 KV Sub-station with1 No.Power Transformer & 3 Nos. 11 KV feeders
( with 11 KV 2 MVAR Capacitor Bank)

Page No.

1
2 - 11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
55
55
56

DATA FOR R.E. SCHEMES


Abstract of schedule of rates for 2014-15 with modified rates : Cost Data per Km of 33/11 KV/LT Lines

Sl.
No.

Particulars of items

No. of Span
Wind.pr. W.Load Type of pole
poles/
in
in kg/m2 in kg.
being used
KM Mtrs.

Size of Conductor

Cost
inRs.

33 KV Line

75

280

9.1 Mtr. PSCC

12

105

100 Sqmm AAAC

413060

33 KV Line

100

280

9.1 Mtr. PSCC

14

80

100 Sqmm AAA

439220

11 KV Line

75

140

8 Mtr PSCC

18

60

55 Sqmm AAAC

292780

11 KV Line

100

200

8 Mtr PSCC

17

65

55 Sqmm AAA

293450

11 KV Line

75

140

8 Mtr PSCC

18

60

34 Sqmm AAA

246080

11 KV Line

100

200

8 Mtr PSCC

17

65

34 Sqmm AAA

246750

6.3 KV Line

75

140

8 Mtr PSCC

13

90

34 Sqmm AAAC

156030

6.3 KV Line

100

200

8 Mtr PSCC

13

90

34 Sqmm AAA

162600

L.T. 3Ph 5 Wire Line(Horizontal)

75

140

8 Mtr PSCC

16

65

3x55+2x34 Sqmm AAA

310670

10

L.T. 3Ph 5 Wire Line(Horizontal)

100

200

8 Mtr PSCC

18

60

3x55+2x34 Sqmm AAA

334290

11

L.T. 3Ph 5 Wire Line(Horizontal)

75

140

8 Mtr PSCC

16

65

5x34 Sqmm AAAC

263970

12

L.T. 3Ph 5 Wire Line(Horizontal)

100

200

8 Mtr PSCC

18

60

5x34 Sqmm AAAC

287590

13

L.T. 3Ph 4 Wire Line(Horizontal)

75

140

8 Mtr PSCC

16

65

3x55+1x34 Sqmm AAA

279290

14

L.T. 3Ph 4 Wire Line(Horizontal)

100

200

8 Mtr PSCC

15

60

3x55+1x34 Sqmm AAA

279820

15

L.T. 3Ph 4 Wire Line(Horizontal)

75

140

8 Mtr PSCC

16

65

4x34 Sqmm AAA

232600

16

L.T. 3Ph 4 Wire Line(Horizontal)

100

200

8 Mtr PSCC

15

60

4x34 Sqmm AAA

233160

17

L.T. 1Ph 3 Wire Line(Horizontal)

75

140

8 Mtr PSCC

16

65

34 Sqmm AAA

203880

18

L.T. 1Ph 2 Wire Line(Horizontal)

75

140

8 Mtr PSCC

16

65

2x34 Sqmm AAA

174040

19

L.T. AB Cable

75

140

8 Mtr PSCC

16

65

3x16+25 Sqmm

188810

20

L.T. AB Cable

75

140

8 Mtr PSCC

16

65

2x16+25 Sqmm

173910

21

L.T. AB Cable

75

140

8 Mtr PSCC

16

65

1x16+25 Sqmm

157170

22

L.T. AB Cable

100

200

8 Mtr PSCC

16

65

3x16+25 Sqmm

196890

23

L.T. AB Cable

100

200

8 Mtr PSCC

16

65

2x16+25 Sqmm

181990

24

L.T. AB Cable

100

200

8 Mtr PSCC

16

65

1x16+25 Sqmm

165240

25

Erection of 100KVA Conventional Distribution transformer

250720

26

Erection of 63 KVA Conventional Distribution transformer

216,640

27

Erection of 3-Ph 16KVA Conventional Distribution transformer

128560

28

Erection of 3-Ph 25KVA Conventional Distribution transformer

141480

29

Erection of 3-Ph 40KVA Conventional Distribution transformer

176540

30

Erection of 15 KVA S-Ph 6.3 KV/0-240V CSP Oil Immersed Transformer

65880

31

Erection of 15 KVA S-Ph 6.3 KV/0-240V Amorphous metal core Transformer

51730

32

Erection of S-Ph 15 KVA CSP Transformer 9.1M PSCC Pole

51540

33

Release of Single phase Agl. Service erected on support

3380

34

Release of poly phase Agl. Service erected on support

6950

35

Release of single phase domestic and non domestic service with High Quality meter

3720

36

Release of single phase domestic and non domestic service with High Quality meter

3290

37

Release of single phase domestic and non domestic service with High Quality meter

3620

38

Release of single phase domestic and non domestic service with 3 Phase Energy meter

9170

39

Release of single phase domestic and non domestic service with Electronic meter

9020

40

Release of poly phase Industrial service upto 15 H.P with Energy meter

11210

41

Release of poly phase industrial service upto 15 HP with CT meter

16570

42

Release of poly phase Industrial service upto 15 H.P with C.T. operated meter

13290

43

Release of Single Phase Street light service with Electronic Meter

44

Erection of 33/11 K.V. Substation with 1x5MVA power transformer & 3 Nos. 11KV feeders
1

3240
10847000

COST DATA OF CENTRALISED MATERIALS FOR


R.E. AND DISTRIBUTION WORKS
2014-15
Sl.
No.

SAP Code

Name of the Material

Unit

Rupees

SUBHEAD-I : SUPPORTS AND FIXTURES, IRON, STEEL AND CEMENT

MST00029

RS Joists 150 x 150mm

MT

56155

MST00032

RS Joists 175 x 85mm

MT

56402

MST00030

RS Joists 150 x 75mm

MT

55347

PLS00013

11 mts. PSCC poles 365 Kgs

Each

6250

PLS00004

9.1 mts. PSCC poles 280 Kgs.

Each

3105

PLS00001

8 mts. PSCC poles 140 Kgs.

Each

1504

PLS00002

8 mts. PSCC poles 200 Kgs.

Each

1844

PLS00003

8 mts. PSCC poles 300 Kgs.

Each

2015

PLS00007

11 mts. Spun Poles

Each

11000

10

PLS00008

12.5 mts. Spun Poles

Each

12802

11

MST00025

Rail poles upto 7 Mtrs

MT

84506

12

MST00024

52 Kg (105 lb) Rails (up to 13 mtrs. length)

MT

46895

13

MST00012

MS Channel 100 x 50mm

MT

55000

14

MST00013

MS Channel 75 x 40mm

MT

55000

15

MST00003

MS Angle 65 x 65 x 6mm

MT

54500

16

MST00002

MS Angle 50 x 50 x 6mm

MT

54500

17

MST00014

MS Flat 50 x 6mm

MT

55200

18

MST00015

MS Flat 75 x 8mm

MT

55200

19

MST00019

MS Rod 20mm

MT

55536

20

MST00018

MS Rod 16mm

MT

55250

Cement

MT

5800

21
22

WRS00011

HT Steel wire-4mm

MT

60743

23

WRS00007

GI Stay wire 7/3.15 mm

MT

63738

24

WRS00006

GI Stay wire 7/2.5 mm

MT

65104

25

WRS00005

GI Wire 4 mm

MT

61640.69

26
27

BNT00024
BNT00026

GI Bolts and Nuts with Washers full thread(5/8"X6', 7', 9')


GI Bolts and Nuts with Washers full thread(5/8" X 2 1/2 ', 3', 4')

MT
MT

80628
80628

C R Sheet 1.6mm

MT

42000

M S Plate 12mm/6mm

MT

36600

Torsteel 10mm/12mm

MT

34200

28
29
30

MST00046

Sl.
No

REC
Specification
No.

Unit

Rupees

13/1979

197

33 KV GI Pin

-do-

168

33 KV Post Insulator Stack

-do-

920

33 KV String Insulator Fittings (B&S)

-do-

188

E
E

649
405

SAP CODE

Name of the Material

SUBHEAD-II : INSULATORS AND HARDWARE


1

INS30001

HWR00003

INS30003

HWR00004

5
6

33 KV Pin Insulator

a)33 KV polymer disc insulator/string insulator (B&S)


b)33 KV Polymer Pin Insulator with pins
INS10001

3/1971
(R-1993)

a)11 KV Pin Insulator


b)11 KV Polymer Pin Insulator with Pins
11 KV GI Pin

49

-do-

E
E

143
62.42

HWR00001

INS10008

11 KV Post Insulator

-do-

234

INS10004

11 KV String Insulator (B&S)

-do-

275

10

INS10002

11 KV String Insulator (C&T)

-do-

192

11

HWR00002

11 KV String Insulator Fittings (C&T)

3/1991
(R-1993)

80

12

INS10003

11 KV Polymer string insulator (C&T)

138.85

13

INS00001

LT Pin Insulator

4/1972 D-1
(R-1979)

16.25

14

HWR00015

LT GI Pin

-do-

27

15

INS00002

LT Shackle Insulator

-do-

10

16

HWR00016

LT Shackle Hardware

-do-

34

17

INS10005

HT Guy Insulator

21/1981

28

18

INS00003

LT Guy Insulator

-do-

15.75

19

INS30002

33 KV Solid Core Insulators

-do-

1113

20

INS10006

11 KV Solid Core Insulators for AB Switches

-do-

220.5

21

INS10007

11 KV Solid Core Insulators for 11 KV HG Fuse sets

151

22

1.53 Mts Channel Cross arms without clamp

1418

23

1.07 Mts Channel Cross arms without clamp

511

24

FBR10004

11KV Tapping Cross arm

508

25

FBR30006

Top clamp with cleat (for 33 KV)

375

26

FBR10007

Top clamp with cleat (for 11 KV)

214

27

FBR00012

Top clamp for LT

208

28

FBR30002

Stay set with clamp (for 33 KV)

1146

29

Stay set with clamp (for 11 KV)

424

30

Stay set with clamp (for 6.3 KV)

358

31

Stay set with clamp (for LT)

394

32

FBR00008

LT 3-Ph Cross arm (for 5 Wire line)

435.54

33

FBR00007

LT 3-Ph Cross arm (for 4 Wire line)

327.42

34

FBR00006

LT S-Ph Cross arm (for 3 Wire line)

319

35

FBR00005

LT S-Ph Cross arm (for 2 Wire line)

268

Sl.
No

SAP CODE

36

FBR00002

37

FBR00001

38

HWR00001

39
40

Name of the Material

REC
Specification
No.

Unit

Rupees

Back Clamp for 9.1 Mts PSCC pole

172

Back Clamp for 8 Mts PSCC pole

123

D Clamp for 8.0 M poles

132

Bracing set with double X arms with 9.1 Mts PSCC poles

set

7335

Bracing set with double X arms with 8 Mts PSCC poles

set

6171

41

STR10019

DPC aluminium Winding Wire 1.25 mm

Kg

193

42

STR10021

DPC aluminium Winding Wire 1.6 mm

Kg

193

CDR00011

SUBHEAD - III : CONDUCTORS


ACSR Zebra Conductor

KM

235223

CDR00010

200 Sq.mm Panther Conductor

1/1971
(R-1993)

KM

140627

33/1984
(R-1993)

KM

49166

37/3.0 Sq.mm ACSR


3

CDR00004

100 Sq.mm AAA Conductor or


7/4.26 AAAC

CDR00003

55 Sq.mm AAA Conductor or


(7/3.15 AAAC/RABBIT)

-do-

KM

28149

CDR00002

34 Sq.mm AAA Conductor or


7/2.50 AAAC/Weasel

-do-

KM

17870

SUBHEAD-IV : CABLES
SUBHEAD-IV : (A) LT XLPE SINGLE CORE CABLES
1

2.50 Sq.mm

26/1993
(R-1987)

KM

2627

4.00 Sq.mm

- do -

KM

4172

6.00 Sq.mm

- do -

KM

5253

10.00 Sq.mm

- do -

KM

8343

CBP00011 25.00 Sq.mm

- do -

KM

23072

CBX00001 50.00 Sq.mm

- do -

KM

38146

CBX00002 70.00 Sq.mm

- do -

KM

55149.64

CBX00003 95.00 Sq.mm

- do -

KM

66320.59

CBX00004 120.00 Sq.mm

- do -

KM

76896.46

10

150.00 Sq.mm

- do -

KM

94500

11

185.00 Sq.mm

- do -

KM

115710

SUBHEAD-IV : (B) LT PVC SINGLE CORE CABLES


1

CBX00017

25.00 Sq.mm

KM

22104

CBX00005

50.00 Sq.mm

KM

40479

CBX00006

70.00 Sq.mm

KM

52839

CBX00008

120.00 Sq.mm

KM

77250

Sl.
No

SAP CODE

Name of the Material

REC
Specification
No.

Unit

Rupees

SUBHEAD-IV : (C) LT CONTROL CABLES


1

2 X 2.5 Sq.mm (Cu)

KM

36889

CBP00002 4 X 2.5 Sq.mm (Cu)

KM

83997

CBP00006 10 x 2.5 Sq.mm (Cu)

KM

167596

KM

25000

3 1/2 X 300 sqmm LT XLPE cable

KM

659613

CBX00015 3 1/2 X 185 sqmm LT XLPE cable

KM

448114

3 1/2 X 150 sqmm LT XLPE cable

KM

358432

CBX00014 3 1/2 X 120 sqmm LT XLPE cable

KM

320330

4 x 4.0 Sq.mm (AL)


SUBHEAD-IV : (D) ) LT XLPE CABLES

CBX00016

CBX00013

3 1/2 X 95 sqmm LT XLPE cable

KM

264384

CBX00012

3 1/2 X 70 sqmm LT XLPE cable

KM

183620

3 1/2 X 50 sqmm LT XLPE cable

KM

143795

3 1/2 X 25 sqmm LT XLPE cable

KM

87742

KM

26000

7
8

CBX00010

SUBHEAD -IV: (E) LT AERIAL BUNCHED CABLES


1

CBA00001

1 x 16+25 Sq.mm LT AB Cable

CBA00002

2 x 16+25 Sq.mm LT AB Cable

KM

37276.75

CBA00003

3 x 16+25 Sq.mm LT AB Cable

KM

47316

3 x 70 + 1x16 +1x50 Sqmm LT AB Cable

KM

167000

32/1984

SUBHEAD -IV: (F) LT AERIAL BUNCHED CABLE FITTINGS


1

HWR00019

Suspension Clamp with eye hook

32/1984

175

LT Connector with Insulator Cover

- do -

82

Dead-end Clamp with eye hooks

- do -

113

63/1993

KM

317665.84

SUBHEAD -IV: (G) 11 KV XLPE POWER CABLES


1

CBX10002

3 x 35 Sq.mm

CBX10005 3 x 95 Sq.mm

- do -

KM

454303

CBX10006 3 x 120 Sq.mm

- do -

KM

576934

CBX10007 3 x 185 Sq.mm

- do -

KM

680070

CBX10008 3 x 300 Sq.mm

- do -

KM

1001492

SCB10038

11 KV 3CX35 Sq.mm Heat shrinkable Cable Termination Kits suitable


for Indoor type.

5763

SCB10037

11 KV 3CX35 Sq.mm Heat shrinkable Cable Termination Kits suitable


for Outdoor type.

9910

Sl.
No

SAP CODE

Name of the Material

REC
Specification
No.

Unit

Rupees

8914

SCB10047

11 KV 3CX185 Sq.mm Heat shrinkable Cable Termination Kits suitable


for Indoor type.

SCB10042

11 KV 3CX185 Sq.mm Heat shrinkable Cable Termination Kits suitable


for Outdoor type.

11958

10

SCB10058

11KV 3x300 Sqmm Heat shrinkable cable Termination Kits suitable for
Indoor type.

8775

11

SCB10057

11KV 3x300 Sqmm Heat shrinkable cable Termination Kits suitable for
Outdoor type.

13411

12

SCB10028

33KV 3X185Sqmm heat shrinkable cable Termination Kits suitable for


Outdoor type.

23637

13

SCB10068

33KV 3X400Sqmm heat shrinkable cable Termination Kits suitable for


Indoor type.

20565

14

SCB10062

33KV 3X400Sqmm heat shrinkable cable Termination Kits suitable for


Outdoor type.

31176

3x35+35 Sqmm.

KM

219898

3x70+70 Sqmm.

KM

318653

3x120+70 Sqmm.

KM

476000

3x185+70 Sqmm.

KM

621517

KM

1918507.20

KM

1156566

2856190

2959845.30

SUBHEAD - IV (H)11 KV AB Cable (Aluminum)


1
2

CBA10005

SUBHEAD -IV: (I) 33 KV XLPE POWER CABLES


1

CBX30001

3 x 400 Sq.mm

CBX30003

3 x 185 Sq.mm

63/1993

SUBHEAD -V: POWER TRANSFORMERS, CAPACITORS AND


TRASFORMER OIL
1

PTR00005

33/11 KV 3.15 MVA Power Transformer

PTR00006

33/11 KV 5 MVA Power Transformer

PTR00008

33/11 KV 8 MVA Power Transformer

4251490.30

33/11 KV 12.5 MVA Power Transformer

6413000

Transformer Oil

KL

93168.32

4
5

OFO10009

7/1974
(R-1993)

Sl.
No

SAP CODE

Name of the Material

REC
Specification
No.

Unit

Rupees

S-Ph 5 KVA DTR 6.3 KV/0-240 V

24139

1-Phase 10kVA 11kV/250V (CSP) (Aluminium)

27501

SUBHEAD -VI: DISTRIBUTION TRANSFORMERS (CRGO)


1

DTC10001

2
3

DTC10004

S-Ph 16 KVA CSP DTR 6.3 KV/0-240V (Cu)

43671.51

DTC10007

S-Ph 15 KVA CSP DTR 6.3 KV/230-0-230V (Al)

37522

1-Phase 25 KVA (CSP) (Copper)

43590

DTA30016

3-Ph 16 KVA Amorphous/CRGO core conventional type copper wound


DTR with BEE 5 star rating Conventional DTR (Cu)

65749.88

DTA30017

3-Ph 25 KVA Amorphous/CRGO core conventional type copper wound


DTR with BEE 5 star ratingConventional DTR (Cu)

71611.71

58492.28

95500

7(a)

3-Ph 25 KVA Amorphous/CRGO core conventional type Alluminum wound


DTR with BEE 5 star ratingConventional DTR (Cu)
3-Ph 40 KVA Amorphous/CRGO core conventional type copper wound
DTR with BEE 5 star rating Conventional DTR (Cu)

DTA30015

DTA30012

3-Ph 63 KVA Amorphous/CRGO core conventional type copper wound


DTR with BEE 5 star ratingConventional DTR (Cu)

108500

10

DTA30013

3-Ph 100 KVA Amorphous/CRGO core conventional type copper wound


DTR with BEE 5 star rating Conventional DTR (Cu)

137261.94

11

DTA30014

3-Ph 160 KVA Amorphous/CRGO core conventional type copper wound


DTR with BEE 5 star rating Conventional DTR (Cu)

214221.95

250 KVA CSP DTR (Cu)

315618

12
13

DTC30009

315 KVA CSP DTR (Cu) Conventional

464400

14

DTC30110

500 KVA Conventional (Al)

531833

Single Phase 15 KVA Transformer (Amorphous)

37522

521348

413788

224886.06

15

SUBHEAD -VII: SWITCH CONTROL AND PROTECTIVE GEAR


(A) 33KV & 11KV VCBs
12/1979
(R-1993)

BRK30004

33 KV VCB with CRPs & CTs ratio (400-200-100/1-1-1A)

BRK30002

33KV Feeder VCBs with CTs & CR panels

BRK10002

11 KV VCB with CTs & Panels (Feeder Control)

BRK10014

11 KV VCB with CTs & Panels ( LV Control ) without differential protection

321065

BRK10009

11 KV VCB with CTs & Panels ( LV Control ) with differential protection

401546

22/1983

Sl.
No

SAP CODE

Name of the Material

REC
Specification
No.

Unit

Rupees

(B) 33KV & 11KV CTs


1

ITR30028

33 KV CTs 400-200-100/1-1-1A ratio 0.2s class accuracy

23394

ITR30030

33 KV CTs 400-200-100/1-1A ratio 0.5 class accuracy

23394

ITR30019

33 KV CTs (200-100/1-1A) 0.2 class accuracy

23394

ITR30029

33 KV CTs (100-50/1-1A) 0.2 class accuracy

23394

11 KV feeder CTs (400-200-100/1-1A) (0.5 class)

16758

14640

5
6

ITR10015

11 KV CTs (50-25/1-1A)

59/1993

ITR10018

11 KV CTs 200-100/5-5A

14463

ITR10013

a)11 KV CTs 400-200/1-1A

13564

ITR10037

b)11KV CTs 0.2S accuracy of ratio 400-200-100/1-1A

16758

ITR10014

11 KV CTs 200-100/1-1A

13125

10

ITR10023

11 KV CTs (600-300/1-1-0.577A)

15200

(C) 33KV & 11KV PTs - CTs


1

ITR30001

33 KV PT (Single Phase) class 0.5

18960

ITR30020

33 KV PT (Single Phase) class 0.2

18723

ITR30017

33 KV PT (Three Phase) of 0.5 class accuracy

44263

ITR10021

11 KV PT (3 Phase)

18334

ITR10004

11KV C.T.P.T. set 10/5A

30758

43050

19949

11 KV 400 Amps AB Switch Double break

14980

60/1993

(D) AB Switches, LAs, HG Fuse sets, Batteries, Capacitors, RMUs etc.

ABS30004

33 KV 800 Amps AB Switch Double break with solid core insulator

ABS10015

11 KV 800 Amps AB Switch Double break with insulators

43/1987

ABS10009

11 KV 400 Amps AB Switch Double break with insulators

13738

ABS10002

a)11 KV 200 Amps AB Switch (Tilting)Porcelin type

8250

ABS10016

b)11 KV 200 Amps AB Switch (Tilting)polymer

8550

Sl.
No

SAP CODE

ABS10004

a)11 KV 200 Amps AB Switch (Horizontal)

ABS10018

b) 6.3KV Single Phase 100A TT AB switches with insulators

LAS00004

30 KV 10 KA Metal Oxide Lightning Arrester (station type)

LAS00003
(Line type)

Name of the Material

REC
Specification
No.

Unit
E

Rupees
7901
3788.58

16/1981
(R-55/1987)

4336

33 KV Line type Lighting Arrester

1670

LAS00002
(Station type)

9 KV 10 KA Metal Oxide Lighting Arrester

1726

10

LAS00001
(Line type)

9 KV 5 KA Metal Oxide Lighting Arrester

372

11

HGF30002

33 KV HG Fuse set

Set

9450

12

HGF10002

11 KV HG Fuse Set

Set

1649

13

HGF10003

6.3 KV HG Fuse Set

Set

707.20

14

HGF00004

LT HG Fuse Set

Set

1313

15

BAT00027

24 Volts 40 AH Battery set including Battery charger

15900

16

BAT00027

24V, 40 AH Batteries with chargers of conventional type

18220

17

24 Volts 40 AH Battery set without Battery charger

6371

18

12 V, 40 AH SMF Batteries cells

3244

55/1987

19

BAT00015

12 V, 80 AH SMF Batteries cells

8475

20

BAT00020

220 V, 80 AH SMF Batteries and Chargers & DCDB

234824

21

BAT00022

220 V, 80 AH SMF Batteries

201454.41

22

LT Switched capacitors
a

1x9 KVAR

2548

1x10 KVAR

2614

1000000

23

CPT10027

11 KV 2 MVAR Capacitor banks with associated equipment

Type A

Type B with 40 Mtrs HT UG cable

895869

Type C (Indoor Type) with HT UG cable

1295000

24

Sectionalizers

588444

25

Auto - Reclosures

925206

26

BRK00001

11 KV 3 Way RMU (Conventional)

171658

27

BRK00002

11 KV 3 Way RMU (SF6)

269592.50

Sl.
No

SAP CODE

28

BRK00002
(5 way)

REC
Specification
No.

Unit

Rupees

11 KV SF6 5 Way RMU

518040.49

33 KV Indoor twin feeder control panel

285007

33KV twin feeder control and relay panel (220V DC)

147136

31

Indoor type VCB with control panel (LV)

376368

32

Indoor type VCB with control panel (feeder)

274818.43

33

11 VCB for bus coupler

210677

34

11KV switch Fuse unit (SFU)

100000

35

33KV switch Fuse unit (SFU)

200000

36

33KV 3-way RMU without VCB

1020110

37

33KV 3-way RMU with VCB

1445325

38

11KV metering panel with CTS& PTS (Indoor)

150000

39

33KV metering panel with CTS&PTS (Indoor)

300000

29
30

BRK30014

Name of the Material

SUBHEAD -VIII: ENERGY METERS AND METERING EQUIPMENT


1

MTE10002

a) LT Single Phase High quality Meter Class 1 accuracy ( 5-20A)

730

MTE10019

b) 1 Ph 5-30 Meter IR port, Sup Capacitor - PP Box

819

MTE10015

c) LT Single Phase Electronic Energy Meter 2.5 - 10A

447

MTE10019

d) LT Single Phase Class 1 accuracy (push fit type box Non push fit type
TC) 5-30A

796

MTE30001

a) Three Phase Electronic Meter 10A - 40A with P P Box

1940

b) Three Phase High Quality Meter 10 - 40A (Counter type display without
Box)

2150

MCT30036

a) LT 3-Ph Class-0.5 Accuracy CT Operated Electronic TVR Meter 200/5A

6899

MCT30035

b) LT 3-Ph Class-0.5 Accuracy CT Operated Electronic TVR Meter 125/5A

6525

MCT30051

c) LT TVR METER 125/5A CTS IN PP BOX. 0.5S ACCR WITH DLMSDL

6840

MHT10003

a) HT Trivector Meter 0.5 class accuracy(10/5A)

4244

MHT10047

b) HT Trivector Meter 0.5 class accuracy (200/1,100/1A)

3746

MHT10055

c) HTTVR3P4W11KV/110V 10/5A 0.5S 30M DLMS-C

3400.80

MHT30062

d) HTTVR 3P4W 33KV/110V 200/1A 0.2S 30MIN IPDLMS

7560.57

e) HTTVR3P4W11KV/110V 200/1A 0.2S DLMS-C

7560.57

MTE10032

f)Single phase 10-60A Net meter with PP Box

1565

MTE30019

g)Three phase 10-60A Net meter with PP Box

5582

MHT30060

h)(11KV-400KV)/110V,(40A-1000A)ABT Energy meters 0.2S Class

10267

No code

10

Sl.
No

SAP CODE

Name of the Material

REC
Specification
No.

Unit

Rupees

11 KV Metering cubicles
ITR10039

a) 10/5 A class 0.2S(O/D) accuracy

39326.78

ITR10040

b) 20/5 A(O/D),0.2S Class accuracy

41678.92

c)20/5 A(I/D),0.2S Class accuracy

42886.03

d) 30/5A(O/D),0.2S Class accuracy

41678.92

e) 40/5A(O/D),0.2S Class accuracy

41678.92

ITR10029

ITR10006

f) 40/5A(I/D),0.5S Class accuracy

ITR10042

g) 75/5 A(O/D),0.2S Class accuracy

29989.87
39014.76

ITR10041

h) 60/5 A, (O/D),0.2S Class accuracy

39014.76

i)10/5 A class 0.2S(I/D) accuracy

42886.03

BXS00024

Moulded Box for Single Phase service

250

BXS00024

Moulded Box for 3 Phase service

420

Moulded box for CT Meter(Poly phase)

1647

8
9

BXS00004 HT Meter Box

5731

10

BXS00022

A Type Distribution type BOX

7342.06

11

BXS00021

B Type Distribution type BOX

1963.50

12

SMC Meter Box with fixing clamps (3 phase meters)

6750

13

SMC Meter Box with fixing clamps (S- phase meters)

408

14

BXS00034

LT Distribution Boxes (SMC) suitable for duble feeder

11194

15

BXS00035

LT Distribution Boxes (SMC) suitable for single feeder

4500

SUBHEAD -IX: EARTHING MATERIALS


1

EMT00020

GI Earth pipe 40 mm , (1.8 mts. Length)

418

EMT00022

GI Earth pipe 40 mm (2.5 mts. Length)

497.26

EMT00006

CI Earth pipe 80mm dia, (2.5 mts. Length)

2471

8145

SUBHEAD -X: OTHER MATERIALS

CAH00101Hand held
Hand Held Computers with Printer
Collection
machines

OMT10004

CMRI

30700

OMT10049

IAMR unit for DTRs

6000

11

COST DATA FOR HILLY AND TRIBAL AREAS


AS ADOPTED BY IRRIGATION DEPARTMENT IN THE STATE

For hilly and tribal areas, the following EXTRA RATES are allowed over and above
approved cost data of labour.
a. 25% extra is allowed for the works located within the interior Agency / Tribal limits.
(i.e.) for the works located within and upto 16 Kilometers from any all weather route
inside Agency/Tribal.
a. 40% extra is allowed for the works located within the interior Agency / Tribal Area
i.e., for the works located beyond 16 Kilometers from any all weather route inside
Agency/Tribal.
Note:
1 No extra percentage is permissible in respect of Forest produce such as Bamboo,
Rellu grass and all materials obtained from outside the Agency/Tribal.
2

The extra percentage under Agency/Tribal areas allowance may be allowed on the
labour component and on the labour charges in the rates for conveyance of
materials.

The extra percentage on cost of materials in Agency/Tribal areas can be allowed on


the labour component only, if they are manufactured in the Agency/Tribal areas
itself except Forest produce.

12

1. R.E.C. - Construction Standard No. M11/1979 (R-1989)


Costdata per Km of 33 KV Line with 100 Sq.mm AAA Conductor over 9.1 Mts.
PSCC Poles at 105 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 280 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

9.1 M PSCC Pole

12

3105

Each

37260

1.53M Cross Arm (Channel) without clamps

10

1418

Each

14180

Top Clamp with cleat

10

375

Each

3750

Back Clamp

10

172.00

Each

1720

Stay sets with clamps

1146

Each

6876

Bracing Set with double cross arm

7335

Set

7335

100 Sq.mm AAA Conductor

3.06

49166

K.M.

150448

33 KV Pin - Insulator with Pin

33

365

Each

12045

Strain Insulator set with metal parts( 3x 11 KV B&S


Insulator with 33 KV Hard ware fitting)

1013

Set

6078

10

Concreting of Pole, Stay sets & Base concreting

LS

LS

LS

34162

11

Misc. Items like coil earthing, pipe earthing, dangerboards, bolts & nuts, etc.

LS

LS

LS

5160

Total Cost of Material


3% storage & handling charges on items (1) to (9)
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess

239692

Total
or say

13

279014
7191
8370
69754
13951
30692
4090
413061
413,060

2. R.E.C. - Construction Standard No. M11/1979 (R-1989)


Costdata per Km of 33 KV Line with 100 Sq.mm AAA Conductor over 9.1 Mts.
PSCC Poles at 80 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 280 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

9.1 M PSCC Pole

14

3105

Each

43470

1.53M Cross Arm (Channel) without clamps

12

1418

Each

17016

Top Clamp with cleat

12

375.00

Each

4500

Back Clamp

12

172

Each

2064

Stay sets with clamps

1146

Each

6876

Bracing Set with double cross arm

100 Sq.mm AAA Conductor

7335

Set

7335

3.06

49166

K.M.

150448

33 KV Pin - Insulator with Pin

39

365

Each

14235

Strain Insulator set with metal parts

1013

Set

6078

10

Concreting of Pole, Stay sets & Base concreting

LS

LS

LS

38704.38

11

Misc. Items like coil earthing, pipe earthing, dangerboards, bolts & nuts, etc.

LS

LS

LS

6020

Total Cost of Material

296746

3% storage & handling charges on items (1) to (9)

252022

7561

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

14

8902
74187
14837
32642
4349
439224
439,220

3. R.E.C. - Construction Standard No. A-5/1972


Costdata per Km of 11 KV Line with 55 Sq.mm AAA Conductor over 8 Mts.
PSCC Poles at 60 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8.0 M PSCC Pole

18

1504

Each

27072

1.07M Cross Arm (Channel) without clamps

16

511

Each

8176

Top Clamp with cleat

16

214

Each

3424

Back Clamp

16

123

Each

1968

Stay sets with clamps

424

Each

2544

Bracing Set with double cross arm

6171

Set

6171

55 Sq.mm AAA Conductor

3.06

28149

K.M.

86136

11 KV Pin - Insulator with Pin

51

111

Each

5682

Strain Insulator set with metal parts

272

Set

1632

10

Concreting of Pole, Stay sets & Base concreting

LS

LS

LS

47789

11

Misc. Items like coil earthing, pipe earthing, dangerboards, bolts & nuts, etc.

LS

LS

LS

7740

Total Cost of Material

198334

3% storage & handling charges on items (1) to (9)

142805

4284

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

15

5950
49583
9917
21817
2899
292783
292,780

4. R.E.C. - Construction Standard No. A-5/1972


Costdata per Km of 11 KV Line with 55 Sq.mm AAA Conductor over 8 Mts.
PSCC Poles at 65 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8.0 M PSCC Pole

17

1844

Each

31348

1.07M Cross Arm (Channel) without clamps

15

511

Each

7665

Top Clamp with cleat

15

214

Each

3210

Back Clamp

15

123

Each

1845

Stay sets with clamps

424

Each

2544

Bracing Set with double cross arm

55 Sq.mm AAA Conductor

8
9
10
11

6171

Set

6171

3.06

28149

K.M.

86136

11 KV Pin - Insulator with Pin

48

111

Each

5348

Strain Insulator set with metal parts

272

Set

1632

Concreting of Pole, Stay sets & Base concreting

LS

LS

LS

45518

Misc. Items like coil earthing, pipe earthing, dangerboards, bolts & nuts, etc.

LS

LS

LS

7310

Total Cost of Material

198727

3% storage & handling charges on items (1) to (9)

145899

4377

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

16

5962
49682
9936
21860
2905
293449
293,450

5. R.E.C. - Construction Standard No. A-5/1972


Costdata per Km of 11 KV Line with 34 Sq.mm AAA Conductor over 8 Mts.
PSCC Poles at 60 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8 M PSCC Pole

18

1504.00

Each

27072

1.07M Cross Arm (Channel) without clamps

16

511

Each

8176

Top Clamp with cleat

16

214

Each

3424

Back Clamp

16

123

Each

1968

Stay sets with clamps

424

Each

2544

Bracing Set with double cross arm

34 Sq.mm AAA Conductor

6171

Set

6171

3.06

17870

K.M.

54682

11 KV Pin - Insulator with Pin

51

111

Each

5682

Strain Insulator set with metal parts

272

Set

1632

10

Concreting of Pole, Stay sets & Base concreting

LS

LS

LS

47789

11

Misc. Items like coil earthing, pipe earthing, dangerboards, bolts & nuts, etc.

LS

LS

LS

7740

Total Cost of Material

166880

3% storage & handling charges on items (1) to (9)

111351

3341

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

17

5006
41720
8344
18357
2436
246084
246,080

6. R.E.C. - Construction Standard No. A-5/1972


Costdata per Km of 11 KV Line with 34 Sq.mm AAA Conductor over 8 Mts.
PSCC Poles at 65 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8 PSCC Pole

17

1844

Each

31348

1.53M Cross Arm (Channel) without clamps

15

511

Each

7665

Top Clamp with cleat

15

214

Each

3210

Back Clamp

15

123

Each

1845

Stay sets with clamps

424

Each

2544

Bracing Set with double cross arm

34 Sq.mm AAA Conductor

6171

Set

6171

3.06

17870

K.M.

54682

11 KV Pin - Insulator with Pin

48

111

Each

5348

Strain Insulator set with metal parts

272

Set

1632

10

Concreting of Pole, Stay sets & Base concreting

LS

LS

LS

45518

11

Misc. Items like coil earthing, pipe earthing, dangerboards, bolts & nuts, etc.

LS

LS

LS

7310

Total Cost of Material

167273

3% storage & handling charges on items (1) to (9)

114445

3433

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

18

5018
41818
8364
18400
2443
246748
246,750

7. R.E.C. - Construction Standard No. A-17/1972


Costdata per Km of 6.3 KV S-ph Line with 34 Sq.mm AAA Conductor over 8 Mts.
PSCC Poles at 90 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8 M PSCC Pole

13

1504

Each

19552

Top Clamp with cleat

10

214

Each

2140

D clamp

10

132

Each

1320

MS Stay sets

358

Each

2148

34 Sq.mm AAA Conductor

2.04

17870

K.M.

36455

11 K.V.Pin-Insulator with Pin

11

111

Each

1226

Strain Insulator set

272

Set

1088

Concreting of Pole,Stay sets & Base concreting

L.S.

36433

Misc. Items like coil earthing,


pipe earthings, danger-boards, bolts
& nuts, etc.

L.S.

5590

Total Cost of Material

105952

3% storage & handling charges on items (1) to (7)

63929

1918

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

19

3179
26488
5298
11655
1545
156034
156,030

8. R.E.C. - Construction Standard No. A-17/1972


Costdata per Km of 6.3 KV S-ph Line with 34 Sq.mm AAA Conductor over 8 Mts.
PSCC Poles at 90 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8 M PSCC Pole

13

1844.00

Each

23972

Top Clamp with cleat

10

214

Each

2140

D clamp

10

132

Each

1320

MS Stay sets

358

Set

2148

34 Sq.mm AAA Conductor

2.04

17870

K.M.

36455

11 K.V.Pin-Insulator with Pin

11

111

Each

1226

Strain Insulator set

272

Set

1088

Concreting of Pole,Stay sets &


Base concreting

L.S.

36433

Misc. Items like coil earthing,


pipe earthings, danger-boards, bolts
& nuts, etc.

L.S.

5590

Total Cost of Material

110372

3% storage & handling charges on items (1) to (7)

68349

2050

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

20

3311
27593
5519
12141
1610
162596
162,600

9. R.E.C. - Construction Standard No. B-5/1972


Costdata per Km of LT 3-Ph 5 Wire Line(Horizontal formation ) with
3 x 55 Sq.mm + 2 x 34 Sq.mm AAAC over 8 Mts.
PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8 M PSCC Pole

16

1504.00

Each

24064

L.T. 3 Phase cross arms

18

436

Each

7840

Back Clamp

18

123

Each

2214

Stay sets

394

Each

1576

55 Sq.mm AAA Conductor

3.06

28149

K.M.

86136

34 Sq.mm AAA Conductor

2.04

17870

K.M.

36455

Shakle Insulator set

42

44

Set

1848

L.T.pin insulator with pin

48

43.25

Set

2076

C.I. Knob

16

12

Each

192

10

Concreting of Pole,Stay sets &


Base concreting

L.S.

40943

Misc. Items like coil earthing,


pipe earthings, danger-boards, bolts
& nuts, etc.

L.S.

6880

11

Total Cost of Material

210224

3% storage & handling charges on items (1) to (9)

162401

4872

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

21

6307
52556
10511
23125
3076
310671
310,670

10.
R.E.C. - Construction Standard No. B-5/1972
Costdata per Km of LT 3-Ph 5 Wire Line(Horizontal formation ) with
3 x 55 Sq.mm + 2 x 34 Sq.mm AAAC over 8 Mts.
PSCC Poles at 60 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8 M PSCC Pole

18

1844

Each

33192

L.T. 3 Phase cross arms

20

436

Each

8711

Back Clamp

20

123

Each

2460

LT Stay sets

394

Each

1576

55 Sq.mm AAA Conductor

3.06

28149

K.M.

86136

34 Sq.mm AAA Conductor

2.04

17870

K.M.

36455

Shakle Insulator set

42

44

Set

1848

L.T.pin insulator with pin

56

43

Set

2422

C.I. Knob

18

12

Each

216

10

Concreting of Pole,Stay sets &

L.S.

45485

L.S.

7740

Base concreting
11

Misc. Items like coil earthing,


pipe earthings, danger-boards, bolts
& nuts, etc.
Total Cost of Material

226241

3% storage & handling charges on items (1) to (9)

173016

5190

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

22

6787
56560
11312
24887
3310
334288
334,290

11. R.E.C. - Construction Standard No. B-5/1972


Costdata per Km of LT 3-Ph 5 Wire Line(Horizontal formation ) with
5 x 34 Sq.mm AAAC over 8 Mts.
PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8 M PSCC Pole

16

1504.00

Each

24064

L.T. 3 Phase cross arms

18

436

Each

7840

Back Clamp

18

123

Each

2214

LT Stay sets

394

Each

1576

34 Sq.mm AAA Conductor

5.10

17870

K.M.

91137

Shakle Insulator set

42

44

Set

1848

L.T.pin insulator with pin

48

43

Set

2076

C.I. Knob

16

12

Each

192

Concreting of Pole,Stay sets &


Base concreting

L.S.

40943

Misc. Items like coil earthing,


pipe earthings, danger-boards, bolts
& nuts, etc.

L.S.

6880

10

Total Cost of Material

178770

3% storage & handling charges on items (1) to (8)

130947

3928

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

23

5363
44693
8939
19665
2614
263971
263,970

12.
R.E.C. - Construction Standard No. B-5/1972
Costdata per Km of LT 3-Ph 5 Wire Line(Horizontal formation ) with
5 x 34 Sq.mm AAAC over 8 Mts.
PSCC Poles at 60 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8 M PSCC Pole

18

1844

Each

33192

L.T. 3 Phase cross arms

20

436

Each

8711

Back Clamp

20

123

Each

2460

LT Stay sets

394

Each

1576

34 Sq.mm AAA Conductor

5.10

17870

K.M.

91137

Shakle Insulator set

42

44

Set

1848

L.T.pin insulator with pin

56

43

Set

2422

C.I. Knob

18

12

Each

216

Concreting of Pole,Stay sets &


Base concreting

L.S.

45485

Misc. Items like coil earthing,


pipe earthings, danger-boards, bolts
& nuts, etc.

L.S.

7740

10

Total Cost of Material

194787

3% storage & handling charges on items (1) to (8)

141562

4247

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

24

5844
48697
9739
21427
2847
287588
287,590

13.
R.E.C. - Construction Standard No. B-12/1981
Costdata per Km of LT 3-Ph 4 Wire Line(Horizontal formation ) with
3 x 55 Sq.mm + 1 x 34 Sqmm AAAC over 8 Mts.
PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8 M PSCC Pole

16

1504.00

Each

24064

L.T. 3 Phase cross arms

18

327

Each

5894

Back Clamp

18

123

Each

2214

LT Stay sets

394

Each

1576

55 Sqmm AAA Conductor

3.06

28149

K.M.

86136

34 Sq.mm AAA Conductor

1.02

17870

K.M.

18227

Shakle Insulator set

32

44

Set

1408

L.T.pin insulator with pin

36

43.25

Set

1557

C.I. Knob

16

12

Each

192

10

Concreting of Pole,Stay sets &


Base concreting

L.S.

40943

Misc. Items like coil earthing,


pipe earthings, danger-boards, bolts
& nuts, etc.

L.S.

6880

11

Total Cost of Material

189091

3% storage & handling charges on items (1) to (9)

141268

4238

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

25

5673
47273
9455
20800
2765
279295
279,290

14.
R.E.C. - Construction Standard No. B-12/1981
Costdata per Km of LT 3 Ph 4 Wire Line(Horizontal formation ) with
3 x 55 Sq.mm + 1 x 34 Sqmm AAAC over 8 Mts.
PSCC Poles at 60 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8 M PSCC Pole

15

1844.00

Each

27660

L.T. 3 Phase cross arms

17

327

Each

5566

Back Clamp

17

123

Each

2091

LT Stay sets

394

Each

1576

55 Sqmm AAA Conductor

3.06

28149

K.M.

86136

34 Sq.mm AAA Conductor

1.02

17870

K.M.

18227

Shakle Insulator set

32

44

Set

1408

L.T.pin insulator with pin

33

43

Set

1427

C.I. Knob

15

12

Each

180

10

Concreting of Pole,Stay sets &


Base concreting

L.S.

38672

Misc. Items like coil earthing,


pipe earthings, danger-boards, bolts
& nuts, etc.

L.S.

6450

11

Total Cost of Material

189393

3% storage & handling charges on items (1) to (9)

144271

4328

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

26

5682
47348
9470
20833
2771
279824.97
279,820

15. R.E.C. - Construction Standard No. B-12/1981


Costdata per Km of LT 3-Ph 4 Wire Line(Horizontal formation )
with 4 x 34 Sqmm AAAC over 8 Mts.
PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8 M PSCC Pole

16

1504.00

Each

24064

L.T. 3 Phase cross arms

18

327

Each

5894

Back Clamp

18

123

Each

2214

LT Stay sets

394

Each

1576

34 Sq.mm AAA Conductor

4.08

17870

K.M.

72910

Shakle Insulator set

32

44

Set

1408

L.T.pin insulator with pin

36

43

Set

1557

C.I. Knob

16

12

Each

192

Concreting of Pole,Stay sets &


Base concreting

L.S.

40943

Misc. Items like coil earthing,


pipe earthings, danger-boards, bolts
& nuts, etc.

L.S.

6880

10

Total Cost of Material

157638

3% storage & handling charges on items (1) to (8)

109815

3294

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

27

4729
39410
7882
17340
2303
232597
232,600

16. R.E.C. - Construction Standard No. B-12/1981


Costdata per Km of LT 3-Ph 4 Wire Line(Horizontal formation )
with 4 x 34 Sqmm AAAC over 8 Mts.
PSCC Poles at 60 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8 M PSCC Pole

15

1844

Each

27660

L.T. 3 Phase cross arms

17

327

Each

5566

Back Clamp

17

123

Each

2091

LT Stay sets

394

Each

1576

34 Sq.mm AAA Conductor

4.08

17870

K.M.

72910

Shakle Insulator set

32

44

Set

1408

L.T.pin insulator with pin

33

43

Set

1427

C.I. Knob

17

12

Each

204

Concreting of Pole,Stay sets &


Base concreting

L.S.

38672

Misc. Items like coil earthing,


pipe earthings, danger-boards, bolts
& nuts, etc.

L.S.

6450

10

Total Cost of Material

157964

3% storage & handling charges on items (1) to (8)

112842

3385

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

28

4739
39491
7898
17376
2309
233162
233,160

17. R.E.C. - Construction Standard No. B-14/1981


Costdata per Km of LT S-Ph 3 Wire Line(Horizontal formation )
with 34 Sqmm AAAC over 8 Mts.
PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8 M PSCC Pole

16

1504.00

Each

24064

L.T. 1 Phase cross arms

18

319

Each

5742

Back Clamp

18

123

Each

2214

LT Stay sets

394

Each

1576

34 Sq.mm AAA Conductor

3.06

17870

K.M.

54682

Shakle Insulator set

22

44

Set

968

L.T.pin insulator with pin

24

43

Set

1038

C.I. Knob

16

12

Each

192

Concreting of Pole,Stay sets &


Base concreting

L.S.

40943

Misc. Items like coil earthing,


pipe earthings, danger-boards, bolts
& nuts, etc.

L.S.

6880

10

Total Cost of Material

138299

3% storage & handling charges on items (1) to (8)

90476

2714

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

4149
34575
6915
15213
2019
203884
203,880

Note : Substitute the cost of 8 mts PSCC pole in above data for wind pressure of 100 kgs/Sqmts,
and working load of 200 kgs

29

18.
R.E.C. - Construction Standard No. B-14/1981
Costdata per Km of LT S-Ph 2 Wire Line(Horizontal formation )
with 2 x 34 Sqmm AAAC over 8 Mts.
PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8 M PSCC Pole

16

1504.00

Each

24064

L.T. 1 Phase cross arms

18

268

Each

4824

Back Clamp

18

123

Each

2214

LT Stay sets

34 Sq.mm AAA Conductor

394

Each

1576

2.04

17870

K.M.

36455

Shakle Insulator set

12

44

Set

528

L.T.pin insulator with pin

12

43

Set

519

C.I. Knob

16

12

Each

192

Concreting of Pole,Stay sets &


Base concreting

L.S.

40943

Misc. Items like coil earthing,


pipe earthings, danger-boards, bolts
& nuts, etc.

L.S.

6880

10

Total Cost of Material

118195

3% storage & handling charges on items (1) to (8)

70372

2111

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

30

3546
29549
5910
13001
1723
174036
174,040

19. R.E.C. - Construction Standard No. B-32/1984


Costdata per Km of LT line with 3 x 16 + 25 Sqmm AB Cable over 8 Mts.
PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8 M PSCC Pole

16

1504.00

Each

24064

Suspension clamp assembly with eye hook

12

175

Each

2100

Dead end clamp assembly with eye hook

113

Each

678

LT Stay sets

394

Set

1576

L.T. A.B. Cable 3 x 16 + 25 Sqmm

47316

K.M.

47316

Insulated connectors with covers

56

82.00

Each

4592

Concreting of Pole,Stay concreting &


L.S.

40943

L.S.

6880

Base concreting
8

Misc. Items like coil earthing,


bolts & nuts, etc.
Total Cost of Material

128149

3% storage & handling charges on items (1) to (6)

80326

2410

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

31

3844
32037
6407
14096
1869
188814
188,810

20.
R.E.C. - Construction Standard No. B-32/1984
Costdata per Km of LT line with 2 x 16 + 25 Sqmm AB Cable over 8 Mts.
PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8 M PSCC Pole

16

1504.00

Each

24064

Suspension clamp assembly with eye hook

12

175

Each

2100

Dead end clamp assembly with eye hook

113

Each

678

LT Stay sets

394

Set

1576

L.T. A.B. Cable 2 x 16 + 25 Sqmm

37277

K.M.

37277

Insulated connectors with covers

56

82.00

Each

4592

Concreting of Pole,Stay concreting &


L.S.

40943

L.S.

6880

Base concreting
8

Misc. Items like coil earthing,


bolts & nuts, etc.

Total Cost of Material

118110

3% storage & handling charges on items (1) to (6)

70287

2109

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

32

3543
29528
5906
12992
1722
173909
173,910

21. R.E.C. - Construction Standard No. B-32/1984


Costdata per Km of LT line with 1 x 16 + 25 Sqmm AB Cable over 8 Mts.
PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8 M PSCC Pole

16

1504.00

Each

24064

Suspension clamp assembly with eye hook

12

175

Each

2100

Dead end clamp assembly with eye hook

113

Each

678

LT Stay sets

394

Set

1576

L.T. A.B. Cable 1 x 16 + 25 Sqmm

26000

K.M.

26000

Insulated connectors with covers

56

82.00

Each

4592

Concreting of Pole,Stay concreting &


L.S.

40943

L.S.

6880

Base concreting
8

Misc. Items like coil earthing,


bolts & nuts, etc.

Total Cost of Material

106833

3% storage & handling charges on items (1) to (6)

59010

1770

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

33

3205
26708
5342
11752
1556
157166
157,170

22.
R.E.C. - Construction Standard No. B-32/1984
Costdata per Km of LT line with 3 x 16 + 25 Sqmm AB Cable over 8 Mts.
PSCC Poles at 65 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8 M PSCC Pole

16

1844

Each

29504

Suspension clamp assembly with eye hook

12

175

Each

2100

Dead end clamp assembly with eye hook

113

Each

678

LT Stay sets

394

Set

1576

L.T. A.B. Cable 3 x 16 + 25 Sqmm

47316

K.M.

47316

Insulated connectors with covers

56

82.00

Each

4592

Concreting of Pole,Stay concreting &


L.S.

40943

L.S.

6880

Base concreting
8

Misc. Items like coil earthing,


bolts & nuts, etc.
Total Cost of Material

133589

3% storage & handling charges on items (1) to (6)

85766

2573

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

34

4008
33397
6679
14695
1949
196891
196,890

23.
R.E.C. - Construction Standard No. B-32/1984
Costdata per Km of LT line with 2 x 16 + 25 Sqmm AB Cable over 8 Mts.
PSCC Poles at 65 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8 M PSCC Pole

16

1844

Each

29504

Suspension clamp assembly with eye hook

12

175

Each

2100

Dead end clamp assembly with eye hook

113

Each

678

LT Stay sets

394

Set

1576

L.T. A.B. Cable 2 x 16 + 25 Sqmm

37277

K.M.

37277

Insulated connectors with covers

56

82.00

Each

4592

Concreting of Pole,Stay concreting &


L.S.

40943

L.S.

6880

Base concreting
8

Misc. Items like coil earthing,


bolts & nuts, etc.

Total Cost of Material

123550

3% storage & handling charges on items (1) to (6)

75727

2272

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

35

3707
30888
6178
13591
1802
181986
181,990

24.
R.E.C. - Construction Standard No. B-32/1984
Costdata per Km of LT line with 1 x 16 + 25 Sqmm AB Cable over 8 Mts.
PSCC Poles at 65 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
Sl.
No.

Particulars

Qty.

Rate
in Rs.

Per
Unit

Amount
in Rs.

8 M PSCC Pole

16

1844

Each

29504

Suspension clamp assembly with eye hook

12

175

Each

2100

Dead end clamp assembly with eye hook

113

Each

678

LT Stay sets

394

Set

1576

L.T. A.B. Cable 1 x 16 + 25 Sqmm

26000

K.M.

26000

Insulated connectors with covers

56

82.00

Each

4592

Concreting of Pole,Stay concreting & Base


concreting

L.S.

40943

Misc. Items like coil earthing, bolts & nuts, etc.

L.S.

6880

Total Cost of Material

112273

3% storage & handling charges on items (1) to (6)

64450

1934

3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say

36

3368
28068
5614
12350
1636
165243
165,240

25. R.E.C. - CONSTRUCTION STANDARD SPECIFICATION NO. F3&F4/1981


COST DATA FOR ERECTION OF 100KVA-11KV/433V CONVENTIONAL TRANSFORMER

Sl. No.

Particulars

Cost of Material
(Rs.)

Labour & Transport


(Rs.)

11 KV/433V 100KVA Conventional Transformer

137262

4,563

Erection of 11 KV AB Switch (200A) Horizantal

7901

956

D.P.Structure (Including all Earthing)

28819

9,702

Erection of 11 KV H.G. Fuse set

1649

583

Installation of L.T.H.G. Fuse sets (2 Nos.) including


connections

2626

1,166

LT Metering arrangements with CTs including cable


connections and cleat arrangement

9003

940

Installation of A type distribuion box

7342

162

Installation of HT Lightening Arrestors (3No.s)

1116

605

Misc. Items

500

Total Cost of Material


3% storage & handling charges on items (1) to (8)
3% Contingencies on Materials

196,218
5872

18,677

5887

Labour & Transport

18,677

11% Estt. & Genl. Charges on Materials

21584

1% cess

2482
Total Cost in Rs.
or say :

250,719
250,720

Note: Whenever a DTR is required in R-APDRP Towns, one IAMR unit, one LT TVR meter and its
accessories should be included in the estimate.

37

26.

COST DATA FOR ERECTION OF 63KVA-11KV/433V CONVENTIONAL TRANSFORMER

Sl. No.

Particulars

Cost of Material
(Rs.)

Labour & Transport


(Rs.)

108500

4,563

11 KV/433V 63KVA ,5 Star,Amorphous/CRGO with


Conventional Distribution Transformer

Erection of 11 KV AB Switch (200A)

7901

956

D.P.Structure (Including all Earthing)

28819

9,702

Erection of 11 KV H.G. Fuse set

1649

583

Installation of L.T.H.G. Fuse sets (2 Nos.) including


connections

2626

1,166

LT Metering arrangements with CTs including cable


connections and cleat arrangement

9003

940

Installation of A type distribuion box

7342

162

Installation of HT Lightning Arrestors with earth


connection

1116

605

Misc. Items

420

Total Cost of Material

167,376

3% storage & handling charges on items 1 to 8

5,009

3% Contingencies on Materials

5,021

Labour & Transport

18,677

11% Estt. & Genl. Charges on Materials

18411

1% cess

2,145

Total Cost in Rs.


or say :

18,677

216,639
216,640

Note: Whenever a DTR is required in R-APDRP Towns, one IAMR unit, one LT TVR meter and its
accessories should be included in the estimate.

38

27.
Cost Data For Erection of 3 Phase 16 KVA-11KV/433V
Conventional Distribution Transformer On Single Pole Structure

Sl. No.

Particulars

Cost of Material
(Rs.)

Labour & Transport


(Rs.)

11 KV/433V 16KVA Conventional Distribution


Transformer

65750

1,616

Erection of 11 KV AB Switch (200A)

7901

956

Single Pole.Structure with 9.1Mtr PSCC Pole


(Including Earthing)

13186

3,448

Erection of 11 KV H.G. Fuse set

1649

583

CT Distribution box including CT wiring with 1x25


sqmm XLPE cable and cleat wiring

12067

940

Misc. Items(Danger boards,Bolts &Nuts,Concreting


etc.)

1650

214

102203

7757

Total Cost of Material

3% storage & handling charges on items (1) to (5)

3,017

3% Contingencies on Materials

3,066

Labour & Transport

7,757

11% Estt. & Genl. Charges on Materials

11242

1% cess

1,273

Total Cost in Rs.


or say :

128,558
128,560

Note: Whenever a DTR is required in R-APDRP Towns, one IAMR unit, one LT TVR meter and its
accessories should be included in the estimate.

39

28.
Cost Data For Erection of 3 Phase 25 KVA-11KV/433V
Conventional Distribution Transformer On Single Pole Structure

Sl. No.

Particulars

Cost of Material
(Rs.)

Labour & Transport


(Rs.)

11 KV/433V 25KVA Conventional Distribution


Transformer

71612

1,616

Erection of 11 KV AB Switch (200A)

7901

956

Single Pole.Structure with 9.1Mtr PSCC Pole


(Including Earthing)

13186

3,448

Erection of 11 KV H.G. Fuse set

1649

583

CT Distribution box including CT wiring with 1x50


sqmm XLPE cable and cleat wiring

17300

940

Misc. Items(Danger boards,Bolts &Nuts,Concreting


etc.)

1500

196

113,148

7,739

Total Cost of Material

3% storage & handling charges on items (1) to (5)

3,349

3% Contingencies on Materials

3,394

Labour & Transport

7,739

11% Estt. & Genl. Charges on Materials

12446

1% cess

1,401

Total Cost in Rs.


or say :

141,478
141,480

Note: Whenever a DTR is required in R-APDRP Towns, one IAMR unit, one LT TVR meter and its
accessories should be included in the estimate.

40

29.
Cost Data For Erection of 3 Phase 40 KVA-11KV/433V
Conventional Distribution Transformer On Single Pole Structure

Sl. No.

Particulars

Cost of Material
(Rs.)

Labour & Transport


(Rs.)

11 KV/433V 40KVA Conventional Distribution


Transformer

95500

1,616

Erection of 11 KV AB Switch (200A)

7901

956

Single Pole.Structure with 9.1Mtr PSCC Pole


(Including Earthing)

13186

3,448

Erection of 11 KV H.G. Fuse set

1649

583

CT Distribution box including CT wiring with 1x70


sqmm XLPE cable and cleat wiring

23082

940

Misc. Items(Danger boards,Bolts &Nuts,Concreting


etc.)

1500

196

142,818

7,739

Total Cost of Material

3% storage & handling charges on items (1) to (5)

4,240

3% Contingencies on Materials

4,285

Labour & Transport

7,739

11% Estt. & Genl. Charges on Materials

15710

1% cess

1,748

Total Cost in Rs.


or say :

176,539
176,540

Note: Whenever a DTR is required in R-APDRP Towns, one IAMR unit, one LT TVR meter and its
accessories should be included in the estimate.

41

30. Cost Data For Erection of Single Phase 15 KVA-6.3KV/0-240V


CSP Transformer(Oil immersed) On 9.1Mtr PSCC Pole Support

Sl. No.

Particulars

Cost of Material
(Rs.)

Labour & Transport


(Rs.)

9.1 Mtr PSCC Pole

3105

994

15KVA Single Phase CSP Distribution Transformer

37522

437

Mounting arrangements for transformer

2743

618

Earthing with 1No 2.5 Mts Long 75 mm CI earth


pipe

3160

431

Distribution box with 1 No 100A Fuse unit and cleat


wiring with 50 sqmm XLPE cable & LT side arm with
strut

5865

303

Misc. Items(Danger boards,Bolts &Nuts,Concreting


etc.)

1000

Total Cost of Material

53,395

3% storage & handling charges on items (1) to (5)

1,572

3% Contingencies on Materials

1,602

Labour & Transport

2,783

11% Estt. & Genl. Charges on Materials

5873

1% cess

652

Total Cost in Rs.


or say :

2,783

65,877
65,880

Note: Whenever a DTR is required in R-APDRP Towns, one IAMR unit, one LT TVR meter and its
accessories should be included in the estimate.

42

31.

R.E.C. - CONSTRUCTION STANDARD SPECIFICATION NO. F3&F4/1981


COST DATA FOR ERECTION OF 15KVA SINGLE PHASE 6.3KV/0-240V
C.S.P TRANSFORMER (OIL IMMERSED) ON EXISTING 8M PSCC SUPPORT

Sl.No.

Particulars

Qty.

Rate in
Rs.

Per Unit

Amount in
Rs.

15KVA Single Phase CSP Distribution Transformer

1 No.

37,522

Each

37,522

Mounting arrangements for Transformer

1 Set

2,743

Each

2,743

Pipe earthing

1 No.

810

Each

810

Misc. Items

L.S.

L.S.

L.S.

500

Total Cost of Material

41,575

3% storage & handling charges on items (1) to (3)

1,232

3% Contingencies on Materials

1,247

Labour & Transport

2,592

11% Estt. & Genl. Charges On Materials

4,573

1% Cess
Total Cost in Rs.
Or say :

512
51,732
51,730

Note: Whenever a DTR is required in R-APDRP Towns, one IAMR unit, one LT TVR meter and its
accessories should be included in the estimate.

43

32.

R.E.C. - CONSTRUCTION STANDARD SPECIFICATION NO. F3&F4/1981


COST DATA FOR ERECTION OF 15KVA SINGLE PHASE 6.3KV/0-240V
AMORPHOUS METAL CORE C.S.P TRANSFORMER (OIL IMMERSED)
ON EXISTING 8M PSCC SUPPORT

Sl.No.

Particulars

Qty.

Rate in
Rs.

Per Unit

Amount in
Rs.

15 KVA Oil Immersed Single Phase 6.3KV/0-240V


Amorphous Metal Core Transformer

1 No.

37,522

Each

37,522

Mounting arrangements for Transformer

1 Set

2,743

Each

2,743

Pipe earthing

1 No.

810

Each

810

Misc. Items

L.S.

L.S.

L.S.

500

Total Cost of Material

41,575

3% storage & handling charges on items (1) to (3)

1,232

3% Contingencies on Materials

1,247

Labour & Transport

2,403

11% Estt. & Genl. Charges On Materials

4,573

1% Cess
Total Cost in Rs.
Or say :

510
51,541
51,540

Note: Whenever a DTR is required in R-APDRP Towns, one IAMR unit, one LT TVR meter and its
accessories should be included in the estimate.

44

33.

R.E.C. - CONSTRUCTION STANDARD SPECIFICATION NO. H1&H3/1981

COST DATA FOR SINGLE PHASE AGRICULTURE SERVICE ERECTED ON SUPPORT

Sl.No.

Particulars

Qty.

Rate in
Rs.

Per Unit

Amount in
Rs.

1 Phase (5-30A) Energy meter

879

Each

879

1 Phase 15A M.C.B./Fuse Unit

201

Each

201

P.V.C. Cable 6 Sq.mm Single Core

20

28

Each

560

Moulded Distribution Box

250

Each

250

P.V.C. Bends 38mm

22

Each

22

Bolts, Nuts etc.

L.S.

L.S.

L.S.

80

Total Cost of Material

1,992

3% Contingencies

60

Labour & Transport

1,076

11% Estt. & Genl. Charges

219

1% Cess
Total Cost in Rs.
Or say :

33
3,380
3,380

45

34. R.E.C. - CONSTRUCTION STANDARD SPECIFICATION NO. H6&H8/1981


COST DATA FOR RELEASE OF POLY PHASE AGRICULTURE SERVICE ERECTED ON
SUPPORT
Sl.No.

Particulars

Qty.

Rate in
Rs.

Per Unit

Amount in
Rs.

3 Phase (10A-40A ) Energy meter

1,940

Each

1,940

3 Phase 40A M.C.B./Fuse Unit (3 Nos.)

729

Each

729

P.V.C. Cable 6 Sq.mm Single Core

30

28

Each

840

Moulded Distribution Box

420

Each

420

Installation of 2KVAR Capacitor

500

500

Misc. items such as Bolts, Nuts & Board


etc.

L.S.

L.S.

L.S.

80

Total Cost of Material

4,509

3% Contingencies

135

Labour & Transport

1,739

11% Estt. & Genl. Charges

496

1% Cess
Total Cost in Rs.
Or say :

69
6,948
6,950

46

35. R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H1 TO H3/1981


COST DATA FOR DOMESTIC AND NON-DOMESTIC SERVICE CONNECTION (SINGLE PHASE)
WITH QUALITY METER

Sl. No.

Particulars

Single Phase electronic Energy Meter


5-30A,IRPort withPP Box

Rate

Chargable to
Qty .
Amount

Chargable to
Qty.
Amount

Amount in
Rs.

819

819

819

15A M.C.B./Fuse Unit

120/E

201

201

P.V.C. Cable single core 2.5 Sq.mm

20/M

Moulded Distribution Box

250/E

G.I. Wire No.8

60/Kg

1 Kg.

60

60

P.V.C. Pipe 20mm

25/M

2M

50

50

P.V.C. Bends 20mm

5/E

2 Nos.

10

10

Misc.

L.S

85

85

1270

1405

2675

3% Contingencies on Materials

38

42

80

Labour & Transport

202

430

633

11% Estt. & Genl. Charges

140

155

294

1% Cess
Total Cost in Rs.
Or say :

1650

2032

37
3,719
3,720

Total

Note :

Item Nos. 4 to 7 are to be borne & arranged


by the Consumer.

47

60
1

1200

250

1200
250

36. R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H1 TO H3/1981


COST DATA FOR DOMESTIC AND NON-DOMESTIC SERVICE CONNECTION (SINGLE PHASE)
WITH ELECTRONIC METER

Sl. No.

Particulars

Single Phase electronic Energy Meter


2.5-10A

Rate

Chargable to
DISCOM
Qty .
Amount

Chargable to
Consumer
Qty.
Amount

Amount in
Rs.

447

447

447

15A M.C.B./Fuse Unit

115/E

201

201

P.V.C. Cable single core 2.5 Sq.mm

20/M

Moulded Distribution Box

250/E

G.I. Wire No.8

60/Kg

1 Kg.

60

60

P.V.C. Pipe 20mm

25/M

2M

50

50

P.V.C. Bends 20mm

5/E

2 Nos.

10

10

Misc.

L.S

85

85

1200

250.00

1200
250

Total

898

1405

2303

3% Contingencies on Materials

27

42

69

Labour & Transport

202

430

633

11% Estt. & Genl. Charges

99

155

253

1226

2032

33
3,290
3,290

1% Cess
Total Cost in Rs.
Or say :
Note :

60

Item Nos. 4 to 7 are to be borne & arranged


by the Consumer.

48

37. R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H1 TO H3/1981


COST DATA FOR DOMESTIC AND NON-DOMESTIC SERVICE CONNECTION (SINGLE PHASE)
WITH QUALITY METER

Sl. No.

Particulars

Single Phase Quality Energy Meter


5-20A

Rate

Chargable to
DISCOM
Qty .
Amount

Chargable to
Consumer
Qty.
Amount

Amount in
Rs.

730

730

730

15A M.C.B./Fuse Unit

120/E

201

201

P.V.C. Cable single core 2.5 Sq.mm

20/M

Moulded Distribution Box

250/E

G.I. Wire No.8

60/Kg

1 Kg.

60

60

P.V.C. Pipe 20mm

25/M

2M

50

50

P.V.C. Bends 20mm

5/E

2 Nos.

10

10

Misc.

L.S

85

85

1181

1405

2586

3% Contingencies on Materials

35

42

78

Labour & Transport

202

430

633

11% Estt. & Genl. Charges

130

155

284

Total

60
1

1200

250.00

250

1% Cess

36

Total Cost in Rs.


Or say :
Note :

1200

1549

Item Nos. 4 to 7 are to be borne & arranged


by the Consumer.

49

2032

3,616
3,620

38. R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H1 TO H3/1981


COST DATA FOR DOMESTIC AND NON-DOMESTIC SERVICE CONNECTION (THREE PHASE)

Sl. No.

Particulars

Rate

Chargable to
DISCOM
Qty .

Amount

Chargable to
Consumer
Qty.

Amount

Amount in
Rs.

Three Phase electronic Energy Meter 1040A

1940.00

1940

1940

3 Phase 60A M.C.B./Fuse Unit

1477/E

1477

1477

Moulded Distribution Box

420/E

420

420

P.V.C. Cable single core 6 Sq.mm

28/M

120

3360

3360

G.I. Wire No.8

60/Kg

1 Kg.

60

60

P.V.C. Pipe 20mm

25/M

2M

50

50

P.V.C. Bends 20mm

5/E

2 Nos.

10

10

Misc.

L.S

95

95

Note :

Total

3837

3575

7412

3% Contingencies on Materials

115

107

222

Labour & Transport

202

430

633

11% Estt. & Genl. Charges

422

393

815

1% Cess
Total Cost in Rs.
Or say :

4577

4506

91
9,173
9,170

Item Nos. 4 to 7 are to be borne & arranged


by the Consumer.

50

39. R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H1 TO H3/1981


COST DATA FOR DOMESTIC AND NON-DOMESTIC SERVICE CONNECTION (THREE PHASE)
WITH ELECTRONIC METER
Chargable to
DISCOM
Qty .
Amount

Chargable to
Consumer
Qty.
Amount

Amount in
Rs.

Sl. No.

Particulars

Rate

3 Phase Electronic Energy Meter Housed in


box 10-40A

1940.00

1940

1940

3 phase 60A M.C.B./Fuse Unit

1477/E

1477

1477

P.V.C. Cable single core 6 Sq.mm

28/M

120 Mts.

3360

3360

G.I. Wire No.8

60/Kg

1 Kg.

60

60

P.V.C. Pipe 20mm

25/M

2M

50

50

P.V.C. Bends 20mm

5/E

2 Nos.

10

10

Misc.

L.S

95

95

Total

3417

3575

6992

3% Contingencies on Materials

103

107

210

Labour & Transport

405

557

961

11% Estt. & Genl. Charges

376

393

769

1% Cess
Total Cost in Rs.
Or say :

4300

4632

89
9,022
9,020

Note : Item Nos. 4 to 7 are to be borne & arranged by the Consumer.

51

40.

Sl. No.

R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H-5/1981


POLY PHASE SERVICE CONNECTION CHARGES FOR
ERECTION OF 1 NO. INDUSTRIAL SERVICE (UPTO 15 H.P.)

Particulars

Poly Phase Energy Meter housed 10 40A

Rate

Chargable to
DISCOM
Qty .
Amount

Chargable to
Consumer
Qty.
Amount

Amount in
Rs.

1940

1940

1940

3 phase 60A M.C.B./Fuse unit

1477/E

1477

1477

Moulded Box for CT Meter

1647/E

1647

1647

P.V.C. Cable single core 10 Sq.mm

43/M

80

3440

3440

G.I. Wire No.8

60/Kg

1 Kg.

60

60

P.V.C. Pipe 38mm

41.4/M

2M

83

83

P.V.C. Bends 38mm

22/E

2 Nos.

44

44

Misc. items viz. link clips, wooden box,


Bolts & Nuts.

L.S

75

125

200

Total

5139

3752

8891

3% Contingencies

154

113

267

Labour & Transport

405

557

961

11% Estt. & Genl. Charges

565

413

978

1% Cess
Total Cost in Rs.
Or say :

6263

4834

111
11,208
11,210

52

41. R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H-5/1981


COST DATA FOR POLY PHASE SERVICE CONNECTION CHARGES FOR
ERECTION OF 1 NO. INDUSTRIAL SERVICE (UPTO 15 H.P.) (C T METER)

Sl. No.

Particulars

Rate

Chargable to
DISCOM
Qty .
Amount

Chargable to
Consumer
Qty.
Amount

Amount in
Rs.

3 Phase LTTVR 125/5A,0.5cLASS without


DLMS

6525.00

6525

6525

3 phase 60A M.C.B./Fuse unit

1477/E

1477

1477

P.V.C. Cable single core 10 Sq.mm

43/M

120

5160

5160

G.I. Wire No.8

60/Kg

1 Kg.

60

60

P.V.C. Pipe 38mm

41.4/M

2M

83

83

P.V.C. Bends 38mm

22/E

2 Nos.

44

44

Misc. items viz. link clips, wooden box,


Bolts & Nuts.

L.S

75

125

200

Total

8077

5472

13549

3% Contingencies

242

164

406

Labour & Transport

405

557

961

11% Estt. & Genl. Charges

888

602

1490

1% Cess

164

Total Cost in Rs.


Or say :

9613

53

6795

16,571
16,570

42.

R.E.C.-CONSTRUCTION STANDARD SPECIFICATION NO.H-5/1981


COST DATA FOR POLY PHASE SERVICE CONNECTION FOR
ERECTION OF 1 NO. INDUSTRIAL SERVICE (ABOVE 15 H.P.) (C.T. METER)

Chargable to
DISCOM
Qty.
Amount

Chargable to
Consumer
Qty.
Amount

Amount in
Rs.

Sl. No.

Particulars

Rate

L.T. 3-Phase class-0.5 Accuracy CT


Operated(200/5A) Energy Meter Housed in
a box

6899.00

P.V.C. Cable single core 10 Sq.mm

43/M

80

3440

3440

G.I. Wire No.8

60/Kg

1 Kg.

60

60

P.V.C. Pipe 38mm

41.4/M

2M

83

83

P.V.C. Bends 38mm

22/E

2 Nos.

44

44

Misc. items viz. link clips, wooden box,


Bolts & Nuts.

L.S

75

100

175

Total

6974

3727

10701

3% Contingencies

209

112

321

Labour & Transport

405

557

961

11% Estt. & Genl. Charges

767

410

1177

6899

6899

1% Cess

132

Total Cost in Rs.


Or say :

8355

54

4805

13,292
13,290

43.
Sl. No.

COST DATA FOR STREET LIGHT SERVICE CONNECTION (SINGLE PHASE)


Rate
Amount
Particulars
Qty.
Per Unit
in Rs.
in Rs.

LT 1 phase Electronic Meter 5-30A

1 No.

796

Each

796

1 phase 15A M.C.B./Fuse Unit

1 No.

201

Each

201

Light sensitive switch

1 No.

400

Each

400

P.V.C. Cable 4 Sq.mm Single Core

15 M

24

360

P.V.C. Pipe 25mm

2 Mts

40

79

P.V.C. Bends 25mm

2 No.

6.0

Each

12

Moulded Distribution Box

1 No.

250

Each

250

Wooden, plugs, clamps, bolts,


nuts link clips etc

L.S.

L.S.

L.S.

50

Total

2,148

3% Contingenics

64

Labour & Transport

759

11% Estt. & Genl. Charges

236

1% Cess

32

Total Cost in Rs.


Or say :

3,240
3,240

55

44. DETAILED ESTIMATE FOR ERECTION OF 1No. 33/11 KV SUBSTATION


WITH (NT) X 5 MVA POWER TRANSFORMERS AND NF = 3 NO. 11 KV FEEDERS
Sl.
No

Particulars

1(a) Lands and Rights


(b) Plantation of Trees
Control Room and Consumer service centre
2
(including furniture)
3
Station Auxillaries
Peripheral, Security Fencing, Approach road, retaing wall around switchward with
a)
gravel filling, gate and bore well
b) Yard lighting

Qty.

Rate
(Rs. in lakhs)

LS

As per local
conditions

Unit

Amount
(Rs. in lakhs)
0.000

LS

LS

0.061

LS

LS

5.000

LS

LS

10.000
0.600

c) Fire fighting Equipment

LS

LS

0.660

d) P&T Phone and wireless set

LS

LS

1.500

Foundations for structures, PTRs & breakers

LS

LS

3.000

Bus bars, Jumpers, Connectors claps etc.

LS

LS

1.200

Control Cables

LS

LS

1.080

Structural Steel

15

0.562

MT

8.423

Transformers
a) 33/11KV, 5 MVA Power Transformer

29.598

Each

29.598

b) 11KV/ 415V 16KVA Stn. Transformer

0.657

Each

0.657

2.249

Each

6.747

3.211

Each

3.211

0.330

Each

0.330

0.330

Each

0.330

0.183

Each

0.183

0.043

Each

0.260

0.017

Each

0.050

0.017

Each

0.155

0.017

Each

0.052

0.431

Each

1.292

0.199

Each

0.399

0.150

Each

1.198

0.079

Each

0.079

0.095

Each

0.095

10.000

Each

10.000

0.182

Each

0.729

9
a)
b)
10
a)
b)
11
a)
12
a)
b)
c)
d)
13
a)
b)
c)
d)
e)
14
15
16

Circiut Breakres (including trivector meters)


20 KA 11 kv feeder VCB including Control panel and CTs (NF=3)
20 KA 11 kv LV VCB including Control panel and CTs
Control Circiut Panels
AC Supply Panel
DC Aunnciation Panel
Instrument Transformers
11kv P.T (3 Phase)
Lightning Arrestors
33KV 10KA station type
33KV 10KA Line type
11KV Line Type (NFX3)
11KV Station Type 10 KA
Isolating Switches
33KV 800A double break centrally operated Horizantal AB Switch
11KV 800A double break centrally operated Horizantal AB Switch (NT X 1+1)
11KV 400A Horizantal AB Switch (NF X 2+2)
11KV 200A Horizantal AB Switch for station transformer
33KV Horn Gap Fuse Set (1XNT)
2MVAR 11KV Capacitor Bank along with Associated Equipment
24V, 40 AH Battery Set including Battery Charger
Earthing of PTR, VCBs, AB Swicthes, Strucutres with 75x8mm GI Flat

LS

Sub Total
Erection and transport and commissioning charges on items 7 to 15 at 10%
Contingencies on items 7 to 15 at 3%
T&P Charges on items No. 7 to 15 at 1%
Establishment and General Charges at 11%
1% Cess
Total Rs. in Lakhs

1.815
88.704

6.379
1.914
0.638
9.757
1.074
108.466
108.470

Or say (Rs. lakhs)


Note : NF = No. of 11 KV Feeders, The number of outgoing feeders at substation limited to the demand in MVA i.e. if substation demand is 5
MVA, the number of feeders should not exceed five.