Memo.No.CGM/Proj-I,EA&IT/GM.P/DE.P1/ADE.P1/F.Cost Data/D.No.109614 Dt.25-09-14.
Sub:- EPDCL - Cost Data of materials, equipment, H.T & L.T Lines, Services and
33/11KV Substation to be adopted for the year 2014-15 Reg.
* * *
1.
The Cost Data 2014-15 will come into force with effect from the date of 07.10.2014 and
will be in force till next revision takes place.
2.
The field officers are requested to strictly adhere to the following instructions while
sanctioning the estimates.
a) In case where the estimates are pending to be sanctioned on or after the date of
communication of cost data 2014-15, the same should be revised with latest cost data
2014-15.
b) In case, where the applicants paid the necessary charges for the estimates on or before
the date of communication of cost data 2014-15, the estimates need not be revised.
c) In case where the applicants come forwards after the date of communication of
revised cost data 2014-15 and willing to pay the necessary charges for the estimates
sanctioned prior to the date of communication of revised cost data 2014-15, within
the stipulated time as mentioned in the intimation letter from the concerned authority,
the estimates need not be revised upto stipulated time period as communicated in the
estimates.
d) In case where the applicants come forwards after the date of communication of
revised cost data 2014-15 and willing to pay the necessary charges for the estimates
sanctioned prior to the date of communication of revised cost data 2014-15, after
lapse of stipulated time as mentioned in the intimation letter from the concerned
authority, the estimates should be revised with the latest cost data 2014-15.
3.
For service connection estimates in non REC scheme areas and execution of 33/11KV
Substations with other than REC funds, extra amounts should be added are 11% Establishment
and General charges on Materials and 3% contingencies on materials also.
4.
1% Cess is adopted on total cost of the construction as per the rules laid down in the
Building and other construction workers welfare Cess Act 1996.
Sd/-XXXX
Chief General Manager
Projects-I, EA & IT
APEPDCL::VISAKHAPATNAM
To
All Superintending Engineers/
All Divisional Engineers/ADEs/AEs
Copy submitted to the Director/Projects/APEPDCL/Visakhapatnam
Copy submitted to the Director/Operation & Comml./APEPDCL/Visakhapatnam
Copy to:
The Chief General Managers
The Chief Project Manager/REC Ltd., Hyderabad
The Managing Director/RESCO/Anakapalli & Chepurupalli
The Chief Engineer/O & RE/V.S/Hyderabad
The Dy. General Manger/IT/APEPDCL/Visakhapatnam for uploading the Cost Data
2014-15 in EPIMRS
COST DATA
2014-15
INDEX
Sl.
No.
A
B
C
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
Description
Page No.
1
2 - 11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
55
55
56
Sl.
No.
Particulars of items
No. of Span
Wind.pr. W.Load Type of pole
poles/
in
in kg/m2 in kg.
being used
KM Mtrs.
Size of Conductor
Cost
inRs.
33 KV Line
75
280
12
105
413060
33 KV Line
100
280
14
80
439220
11 KV Line
75
140
8 Mtr PSCC
18
60
55 Sqmm AAAC
292780
11 KV Line
100
200
8 Mtr PSCC
17
65
55 Sqmm AAA
293450
11 KV Line
75
140
8 Mtr PSCC
18
60
34 Sqmm AAA
246080
11 KV Line
100
200
8 Mtr PSCC
17
65
34 Sqmm AAA
246750
6.3 KV Line
75
140
8 Mtr PSCC
13
90
34 Sqmm AAAC
156030
6.3 KV Line
100
200
8 Mtr PSCC
13
90
34 Sqmm AAA
162600
75
140
8 Mtr PSCC
16
65
310670
10
100
200
8 Mtr PSCC
18
60
334290
11
75
140
8 Mtr PSCC
16
65
263970
12
100
200
8 Mtr PSCC
18
60
287590
13
75
140
8 Mtr PSCC
16
65
279290
14
100
200
8 Mtr PSCC
15
60
279820
15
75
140
8 Mtr PSCC
16
65
232600
16
100
200
8 Mtr PSCC
15
60
233160
17
75
140
8 Mtr PSCC
16
65
34 Sqmm AAA
203880
18
75
140
8 Mtr PSCC
16
65
174040
19
L.T. AB Cable
75
140
8 Mtr PSCC
16
65
3x16+25 Sqmm
188810
20
L.T. AB Cable
75
140
8 Mtr PSCC
16
65
2x16+25 Sqmm
173910
21
L.T. AB Cable
75
140
8 Mtr PSCC
16
65
1x16+25 Sqmm
157170
22
L.T. AB Cable
100
200
8 Mtr PSCC
16
65
3x16+25 Sqmm
196890
23
L.T. AB Cable
100
200
8 Mtr PSCC
16
65
2x16+25 Sqmm
181990
24
L.T. AB Cable
100
200
8 Mtr PSCC
16
65
1x16+25 Sqmm
165240
25
250720
26
216,640
27
128560
28
141480
29
176540
30
65880
31
51730
32
51540
33
3380
34
6950
35
Release of single phase domestic and non domestic service with High Quality meter
3720
36
Release of single phase domestic and non domestic service with High Quality meter
3290
37
Release of single phase domestic and non domestic service with High Quality meter
3620
38
Release of single phase domestic and non domestic service with 3 Phase Energy meter
9170
39
Release of single phase domestic and non domestic service with Electronic meter
9020
40
Release of poly phase Industrial service upto 15 H.P with Energy meter
11210
41
16570
42
Release of poly phase Industrial service upto 15 H.P with C.T. operated meter
13290
43
44
Erection of 33/11 K.V. Substation with 1x5MVA power transformer & 3 Nos. 11KV feeders
1
3240
10847000
SAP Code
Unit
Rupees
MST00029
MT
56155
MST00032
MT
56402
MST00030
MT
55347
PLS00013
Each
6250
PLS00004
Each
3105
PLS00001
Each
1504
PLS00002
Each
1844
PLS00003
Each
2015
PLS00007
Each
11000
10
PLS00008
Each
12802
11
MST00025
MT
84506
12
MST00024
MT
46895
13
MST00012
MT
55000
14
MST00013
MS Channel 75 x 40mm
MT
55000
15
MST00003
MS Angle 65 x 65 x 6mm
MT
54500
16
MST00002
MS Angle 50 x 50 x 6mm
MT
54500
17
MST00014
MS Flat 50 x 6mm
MT
55200
18
MST00015
MS Flat 75 x 8mm
MT
55200
19
MST00019
MS Rod 20mm
MT
55536
20
MST00018
MS Rod 16mm
MT
55250
Cement
MT
5800
21
22
WRS00011
HT Steel wire-4mm
MT
60743
23
WRS00007
MT
63738
24
WRS00006
MT
65104
25
WRS00005
GI Wire 4 mm
MT
61640.69
26
27
BNT00024
BNT00026
MT
MT
80628
80628
C R Sheet 1.6mm
MT
42000
M S Plate 12mm/6mm
MT
36600
Torsteel 10mm/12mm
MT
34200
28
29
30
MST00046
Sl.
No
REC
Specification
No.
Unit
Rupees
13/1979
197
33 KV GI Pin
-do-
168
-do-
920
-do-
188
E
E
649
405
SAP CODE
INS30001
HWR00003
INS30003
HWR00004
5
6
33 KV Pin Insulator
3/1971
(R-1993)
49
-do-
E
E
143
62.42
HWR00001
INS10008
11 KV Post Insulator
-do-
234
INS10004
-do-
275
10
INS10002
-do-
192
11
HWR00002
3/1991
(R-1993)
80
12
INS10003
138.85
13
INS00001
LT Pin Insulator
4/1972 D-1
(R-1979)
16.25
14
HWR00015
LT GI Pin
-do-
27
15
INS00002
LT Shackle Insulator
-do-
10
16
HWR00016
LT Shackle Hardware
-do-
34
17
INS10005
HT Guy Insulator
21/1981
28
18
INS00003
LT Guy Insulator
-do-
15.75
19
INS30002
-do-
1113
20
INS10006
-do-
220.5
21
INS10007
151
22
1418
23
511
24
FBR10004
508
25
FBR30006
375
26
FBR10007
214
27
FBR00012
208
28
FBR30002
1146
29
424
30
358
31
394
32
FBR00008
435.54
33
FBR00007
327.42
34
FBR00006
319
35
FBR00005
268
Sl.
No
SAP CODE
36
FBR00002
37
FBR00001
38
HWR00001
39
40
REC
Specification
No.
Unit
Rupees
172
123
132
Bracing set with double X arms with 9.1 Mts PSCC poles
set
7335
set
6171
41
STR10019
Kg
193
42
STR10021
Kg
193
CDR00011
KM
235223
CDR00010
1/1971
(R-1993)
KM
140627
33/1984
(R-1993)
KM
49166
CDR00004
CDR00003
-do-
KM
28149
CDR00002
-do-
KM
17870
SUBHEAD-IV : CABLES
SUBHEAD-IV : (A) LT XLPE SINGLE CORE CABLES
1
2.50 Sq.mm
26/1993
(R-1987)
KM
2627
4.00 Sq.mm
- do -
KM
4172
6.00 Sq.mm
- do -
KM
5253
10.00 Sq.mm
- do -
KM
8343
- do -
KM
23072
- do -
KM
38146
- do -
KM
55149.64
- do -
KM
66320.59
- do -
KM
76896.46
10
150.00 Sq.mm
- do -
KM
94500
11
185.00 Sq.mm
- do -
KM
115710
CBX00017
25.00 Sq.mm
KM
22104
CBX00005
50.00 Sq.mm
KM
40479
CBX00006
70.00 Sq.mm
KM
52839
CBX00008
120.00 Sq.mm
KM
77250
Sl.
No
SAP CODE
REC
Specification
No.
Unit
Rupees
KM
36889
KM
83997
KM
167596
KM
25000
KM
659613
KM
448114
KM
358432
KM
320330
CBX00016
CBX00013
KM
264384
CBX00012
KM
183620
KM
143795
KM
87742
KM
26000
7
8
CBX00010
CBA00001
CBA00002
KM
37276.75
CBA00003
KM
47316
KM
167000
32/1984
HWR00019
32/1984
175
- do -
82
- do -
113
63/1993
KM
317665.84
CBX10002
3 x 35 Sq.mm
CBX10005 3 x 95 Sq.mm
- do -
KM
454303
- do -
KM
576934
- do -
KM
680070
- do -
KM
1001492
SCB10038
5763
SCB10037
9910
Sl.
No
SAP CODE
REC
Specification
No.
Unit
Rupees
8914
SCB10047
SCB10042
11958
10
SCB10058
11KV 3x300 Sqmm Heat shrinkable cable Termination Kits suitable for
Indoor type.
8775
11
SCB10057
11KV 3x300 Sqmm Heat shrinkable cable Termination Kits suitable for
Outdoor type.
13411
12
SCB10028
23637
13
SCB10068
20565
14
SCB10062
31176
3x35+35 Sqmm.
KM
219898
3x70+70 Sqmm.
KM
318653
3x120+70 Sqmm.
KM
476000
3x185+70 Sqmm.
KM
621517
KM
1918507.20
KM
1156566
2856190
2959845.30
CBA10005
CBX30001
3 x 400 Sq.mm
CBX30003
3 x 185 Sq.mm
63/1993
PTR00005
PTR00006
PTR00008
4251490.30
6413000
Transformer Oil
KL
93168.32
4
5
OFO10009
7/1974
(R-1993)
Sl.
No
SAP CODE
REC
Specification
No.
Unit
Rupees
24139
27501
DTC10001
2
3
DTC10004
43671.51
DTC10007
37522
43590
DTA30016
65749.88
DTA30017
71611.71
58492.28
95500
7(a)
DTA30015
DTA30012
108500
10
DTA30013
137261.94
11
DTA30014
214221.95
315618
12
13
DTC30009
464400
14
DTC30110
531833
37522
521348
413788
224886.06
15
BRK30004
BRK30002
BRK10002
BRK10014
321065
BRK10009
401546
22/1983
Sl.
No
SAP CODE
REC
Specification
No.
Unit
Rupees
ITR30028
23394
ITR30030
23394
ITR30019
23394
ITR30029
23394
16758
14640
5
6
ITR10015
11 KV CTs (50-25/1-1A)
59/1993
ITR10018
11 KV CTs 200-100/5-5A
14463
ITR10013
13564
ITR10037
16758
ITR10014
11 KV CTs 200-100/1-1A
13125
10
ITR10023
11 KV CTs (600-300/1-1-0.577A)
15200
ITR30001
18960
ITR30020
18723
ITR30017
44263
ITR10021
11 KV PT (3 Phase)
18334
ITR10004
30758
43050
19949
14980
60/1993
ABS30004
ABS10015
43/1987
ABS10009
13738
ABS10002
8250
ABS10016
8550
Sl.
No
SAP CODE
ABS10004
ABS10018
LAS00004
LAS00003
(Line type)
REC
Specification
No.
Unit
E
Rupees
7901
3788.58
16/1981
(R-55/1987)
4336
1670
LAS00002
(Station type)
1726
10
LAS00001
(Line type)
372
11
HGF30002
33 KV HG Fuse set
Set
9450
12
HGF10002
11 KV HG Fuse Set
Set
1649
13
HGF10003
Set
707.20
14
HGF00004
LT HG Fuse Set
Set
1313
15
BAT00027
15900
16
BAT00027
18220
17
6371
18
3244
55/1987
19
BAT00015
8475
20
BAT00020
234824
21
BAT00022
201454.41
22
LT Switched capacitors
a
1x9 KVAR
2548
1x10 KVAR
2614
1000000
23
CPT10027
Type A
895869
1295000
24
Sectionalizers
588444
25
Auto - Reclosures
925206
26
BRK00001
171658
27
BRK00002
269592.50
Sl.
No
SAP CODE
28
BRK00002
(5 way)
REC
Specification
No.
Unit
Rupees
518040.49
285007
147136
31
376368
32
274818.43
33
210677
34
100000
35
200000
36
1020110
37
1445325
38
150000
39
300000
29
30
BRK30014
MTE10002
730
MTE10019
819
MTE10015
447
MTE10019
d) LT Single Phase Class 1 accuracy (push fit type box Non push fit type
TC) 5-30A
796
MTE30001
1940
b) Three Phase High Quality Meter 10 - 40A (Counter type display without
Box)
2150
MCT30036
6899
MCT30035
6525
MCT30051
6840
MHT10003
4244
MHT10047
3746
MHT10055
3400.80
MHT30062
7560.57
7560.57
MTE10032
1565
MTE30019
5582
MHT30060
10267
No code
10
Sl.
No
SAP CODE
REC
Specification
No.
Unit
Rupees
11 KV Metering cubicles
ITR10039
39326.78
ITR10040
41678.92
42886.03
41678.92
41678.92
ITR10029
ITR10006
ITR10042
29989.87
39014.76
ITR10041
39014.76
42886.03
BXS00024
250
BXS00024
420
1647
8
9
5731
10
BXS00022
7342.06
11
BXS00021
1963.50
12
6750
13
408
14
BXS00034
11194
15
BXS00035
4500
EMT00020
418
EMT00022
497.26
EMT00006
2471
8145
CAH00101Hand held
Hand Held Computers with Printer
Collection
machines
OMT10004
CMRI
30700
OMT10049
6000
11
For hilly and tribal areas, the following EXTRA RATES are allowed over and above
approved cost data of labour.
a. 25% extra is allowed for the works located within the interior Agency / Tribal limits.
(i.e.) for the works located within and upto 16 Kilometers from any all weather route
inside Agency/Tribal.
a. 40% extra is allowed for the works located within the interior Agency / Tribal Area
i.e., for the works located beyond 16 Kilometers from any all weather route inside
Agency/Tribal.
Note:
1 No extra percentage is permissible in respect of Forest produce such as Bamboo,
Rellu grass and all materials obtained from outside the Agency/Tribal.
2
The extra percentage under Agency/Tribal areas allowance may be allowed on the
labour component and on the labour charges in the rates for conveyance of
materials.
12
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
12
3105
Each
37260
10
1418
Each
14180
10
375
Each
3750
Back Clamp
10
172.00
Each
1720
1146
Each
6876
7335
Set
7335
3.06
49166
K.M.
150448
33
365
Each
12045
1013
Set
6078
10
LS
LS
LS
34162
11
Misc. Items like coil earthing, pipe earthing, dangerboards, bolts & nuts, etc.
LS
LS
LS
5160
239692
Total
or say
13
279014
7191
8370
69754
13951
30692
4090
413061
413,060
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
14
3105
Each
43470
12
1418
Each
17016
12
375.00
Each
4500
Back Clamp
12
172
Each
2064
1146
Each
6876
7335
Set
7335
3.06
49166
K.M.
150448
39
365
Each
14235
1013
Set
6078
10
LS
LS
LS
38704.38
11
Misc. Items like coil earthing, pipe earthing, dangerboards, bolts & nuts, etc.
LS
LS
LS
6020
296746
252022
7561
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
14
8902
74187
14837
32642
4349
439224
439,220
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
18
1504
Each
27072
16
511
Each
8176
16
214
Each
3424
Back Clamp
16
123
Each
1968
424
Each
2544
6171
Set
6171
3.06
28149
K.M.
86136
51
111
Each
5682
272
Set
1632
10
LS
LS
LS
47789
11
Misc. Items like coil earthing, pipe earthing, dangerboards, bolts & nuts, etc.
LS
LS
LS
7740
198334
142805
4284
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
15
5950
49583
9917
21817
2899
292783
292,780
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
17
1844
Each
31348
15
511
Each
7665
15
214
Each
3210
Back Clamp
15
123
Each
1845
424
Each
2544
8
9
10
11
6171
Set
6171
3.06
28149
K.M.
86136
48
111
Each
5348
272
Set
1632
LS
LS
LS
45518
Misc. Items like coil earthing, pipe earthing, dangerboards, bolts & nuts, etc.
LS
LS
LS
7310
198727
145899
4377
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
16
5962
49682
9936
21860
2905
293449
293,450
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
8 M PSCC Pole
18
1504.00
Each
27072
16
511
Each
8176
16
214
Each
3424
Back Clamp
16
123
Each
1968
424
Each
2544
6171
Set
6171
3.06
17870
K.M.
54682
51
111
Each
5682
272
Set
1632
10
LS
LS
LS
47789
11
Misc. Items like coil earthing, pipe earthing, dangerboards, bolts & nuts, etc.
LS
LS
LS
7740
166880
111351
3341
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
17
5006
41720
8344
18357
2436
246084
246,080
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
8 PSCC Pole
17
1844
Each
31348
15
511
Each
7665
15
214
Each
3210
Back Clamp
15
123
Each
1845
424
Each
2544
6171
Set
6171
3.06
17870
K.M.
54682
48
111
Each
5348
272
Set
1632
10
LS
LS
LS
45518
11
Misc. Items like coil earthing, pipe earthing, dangerboards, bolts & nuts, etc.
LS
LS
LS
7310
167273
114445
3433
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
18
5018
41818
8364
18400
2443
246748
246,750
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
8 M PSCC Pole
13
1504
Each
19552
10
214
Each
2140
D clamp
10
132
Each
1320
MS Stay sets
358
Each
2148
2.04
17870
K.M.
36455
11
111
Each
1226
272
Set
1088
L.S.
36433
L.S.
5590
105952
63929
1918
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
19
3179
26488
5298
11655
1545
156034
156,030
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
8 M PSCC Pole
13
1844.00
Each
23972
10
214
Each
2140
D clamp
10
132
Each
1320
MS Stay sets
358
Set
2148
2.04
17870
K.M.
36455
11
111
Each
1226
272
Set
1088
L.S.
36433
L.S.
5590
110372
68349
2050
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
20
3311
27593
5519
12141
1610
162596
162,600
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
8 M PSCC Pole
16
1504.00
Each
24064
18
436
Each
7840
Back Clamp
18
123
Each
2214
Stay sets
394
Each
1576
3.06
28149
K.M.
86136
2.04
17870
K.M.
36455
42
44
Set
1848
48
43.25
Set
2076
C.I. Knob
16
12
Each
192
10
L.S.
40943
L.S.
6880
11
210224
162401
4872
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
21
6307
52556
10511
23125
3076
310671
310,670
10.
R.E.C. - Construction Standard No. B-5/1972
Costdata per Km of LT 3-Ph 5 Wire Line(Horizontal formation ) with
3 x 55 Sq.mm + 2 x 34 Sq.mm AAAC over 8 Mts.
PSCC Poles at 60 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
Sl.
No.
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
8 M PSCC Pole
18
1844
Each
33192
20
436
Each
8711
Back Clamp
20
123
Each
2460
LT Stay sets
394
Each
1576
3.06
28149
K.M.
86136
2.04
17870
K.M.
36455
42
44
Set
1848
56
43
Set
2422
C.I. Knob
18
12
Each
216
10
L.S.
45485
L.S.
7740
Base concreting
11
226241
173016
5190
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
22
6787
56560
11312
24887
3310
334288
334,290
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
8 M PSCC Pole
16
1504.00
Each
24064
18
436
Each
7840
Back Clamp
18
123
Each
2214
LT Stay sets
394
Each
1576
5.10
17870
K.M.
91137
42
44
Set
1848
48
43
Set
2076
C.I. Knob
16
12
Each
192
L.S.
40943
L.S.
6880
10
178770
130947
3928
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
23
5363
44693
8939
19665
2614
263971
263,970
12.
R.E.C. - Construction Standard No. B-5/1972
Costdata per Km of LT 3-Ph 5 Wire Line(Horizontal formation ) with
5 x 34 Sq.mm AAAC over 8 Mts.
PSCC Poles at 60 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
Sl.
No.
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
8 M PSCC Pole
18
1844
Each
33192
20
436
Each
8711
Back Clamp
20
123
Each
2460
LT Stay sets
394
Each
1576
5.10
17870
K.M.
91137
42
44
Set
1848
56
43
Set
2422
C.I. Knob
18
12
Each
216
L.S.
45485
L.S.
7740
10
194787
141562
4247
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
24
5844
48697
9739
21427
2847
287588
287,590
13.
R.E.C. - Construction Standard No. B-12/1981
Costdata per Km of LT 3-Ph 4 Wire Line(Horizontal formation ) with
3 x 55 Sq.mm + 1 x 34 Sqmm AAAC over 8 Mts.
PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
Sl.
No.
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
8 M PSCC Pole
16
1504.00
Each
24064
18
327
Each
5894
Back Clamp
18
123
Each
2214
LT Stay sets
394
Each
1576
3.06
28149
K.M.
86136
1.02
17870
K.M.
18227
32
44
Set
1408
36
43.25
Set
1557
C.I. Knob
16
12
Each
192
10
L.S.
40943
L.S.
6880
11
189091
141268
4238
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
25
5673
47273
9455
20800
2765
279295
279,290
14.
R.E.C. - Construction Standard No. B-12/1981
Costdata per Km of LT 3 Ph 4 Wire Line(Horizontal formation ) with
3 x 55 Sq.mm + 1 x 34 Sqmm AAAC over 8 Mts.
PSCC Poles at 60 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
Sl.
No.
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
8 M PSCC Pole
15
1844.00
Each
27660
17
327
Each
5566
Back Clamp
17
123
Each
2091
LT Stay sets
394
Each
1576
3.06
28149
K.M.
86136
1.02
17870
K.M.
18227
32
44
Set
1408
33
43
Set
1427
C.I. Knob
15
12
Each
180
10
L.S.
38672
L.S.
6450
11
189393
144271
4328
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
26
5682
47348
9470
20833
2771
279824.97
279,820
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
8 M PSCC Pole
16
1504.00
Each
24064
18
327
Each
5894
Back Clamp
18
123
Each
2214
LT Stay sets
394
Each
1576
4.08
17870
K.M.
72910
32
44
Set
1408
36
43
Set
1557
C.I. Knob
16
12
Each
192
L.S.
40943
L.S.
6880
10
157638
109815
3294
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
27
4729
39410
7882
17340
2303
232597
232,600
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
8 M PSCC Pole
15
1844
Each
27660
17
327
Each
5566
Back Clamp
17
123
Each
2091
LT Stay sets
394
Each
1576
4.08
17870
K.M.
72910
32
44
Set
1408
33
43
Set
1427
C.I. Knob
17
12
Each
204
L.S.
38672
L.S.
6450
10
157964
112842
3385
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
28
4739
39491
7898
17376
2309
233162
233,160
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
8 M PSCC Pole
16
1504.00
Each
24064
18
319
Each
5742
Back Clamp
18
123
Each
2214
LT Stay sets
394
Each
1576
3.06
17870
K.M.
54682
22
44
Set
968
24
43
Set
1038
C.I. Knob
16
12
Each
192
L.S.
40943
L.S.
6880
10
138299
90476
2714
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
4149
34575
6915
15213
2019
203884
203,880
Note : Substitute the cost of 8 mts PSCC pole in above data for wind pressure of 100 kgs/Sqmts,
and working load of 200 kgs
29
18.
R.E.C. - Construction Standard No. B-14/1981
Costdata per Km of LT S-Ph 2 Wire Line(Horizontal formation )
with 2 x 34 Sqmm AAAC over 8 Mts.
PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
Sl.
No.
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
8 M PSCC Pole
16
1504.00
Each
24064
18
268
Each
4824
Back Clamp
18
123
Each
2214
LT Stay sets
394
Each
1576
2.04
17870
K.M.
36455
12
44
Set
528
12
43
Set
519
C.I. Knob
16
12
Each
192
L.S.
40943
L.S.
6880
10
118195
70372
2111
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
30
3546
29549
5910
13001
1723
174036
174,040
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
8 M PSCC Pole
16
1504.00
Each
24064
12
175
Each
2100
113
Each
678
LT Stay sets
394
Set
1576
47316
K.M.
47316
56
82.00
Each
4592
40943
L.S.
6880
Base concreting
8
128149
80326
2410
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
31
3844
32037
6407
14096
1869
188814
188,810
20.
R.E.C. - Construction Standard No. B-32/1984
Costdata per Km of LT line with 2 x 16 + 25 Sqmm AB Cable over 8 Mts.
PSCC Poles at 65 Mts. Span, 75 Kg/Sq.Mt wind pressure, working load 140 Kgs.
Sl.
No.
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
8 M PSCC Pole
16
1504.00
Each
24064
12
175
Each
2100
113
Each
678
LT Stay sets
394
Set
1576
37277
K.M.
37277
56
82.00
Each
4592
40943
L.S.
6880
Base concreting
8
118110
70287
2109
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
32
3543
29528
5906
12992
1722
173909
173,910
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
8 M PSCC Pole
16
1504.00
Each
24064
12
175
Each
2100
113
Each
678
LT Stay sets
394
Set
1576
26000
K.M.
26000
56
82.00
Each
4592
40943
L.S.
6880
Base concreting
8
106833
59010
1770
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
33
3205
26708
5342
11752
1556
157166
157,170
22.
R.E.C. - Construction Standard No. B-32/1984
Costdata per Km of LT line with 3 x 16 + 25 Sqmm AB Cable over 8 Mts.
PSCC Poles at 65 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
Sl.
No.
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
8 M PSCC Pole
16
1844
Each
29504
12
175
Each
2100
113
Each
678
LT Stay sets
394
Set
1576
47316
K.M.
47316
56
82.00
Each
4592
40943
L.S.
6880
Base concreting
8
133589
85766
2573
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
34
4008
33397
6679
14695
1949
196891
196,890
23.
R.E.C. - Construction Standard No. B-32/1984
Costdata per Km of LT line with 2 x 16 + 25 Sqmm AB Cable over 8 Mts.
PSCC Poles at 65 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
Sl.
No.
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
8 M PSCC Pole
16
1844
Each
29504
12
175
Each
2100
113
Each
678
LT Stay sets
394
Set
1576
37277
K.M.
37277
56
82.00
Each
4592
40943
L.S.
6880
Base concreting
8
123550
75727
2272
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
35
3707
30888
6178
13591
1802
181986
181,990
24.
R.E.C. - Construction Standard No. B-32/1984
Costdata per Km of LT line with 1 x 16 + 25 Sqmm AB Cable over 8 Mts.
PSCC Poles at 65 Mts. Span, 100 Kg/Sq.Mt wind pressure, working load 200 Kgs.
Sl.
No.
Particulars
Qty.
Rate
in Rs.
Per
Unit
Amount
in Rs.
8 M PSCC Pole
16
1844
Each
29504
12
175
Each
2100
113
Each
678
LT Stay sets
394
Set
1576
26000
K.M.
26000
56
82.00
Each
4592
L.S.
40943
L.S.
6880
112273
64450
1934
3% Contingencies on Materials
Labour
Transport
11% Estt. & Genl. Charges On Materials
1% cess
Total
or say
36
3368
28068
5614
12350
1636
165243
165,240
Sl. No.
Particulars
Cost of Material
(Rs.)
137262
4,563
7901
956
28819
9,702
1649
583
2626
1,166
9003
940
7342
162
1116
605
Misc. Items
500
196,218
5872
18,677
5887
18,677
21584
1% cess
2482
Total Cost in Rs.
or say :
250,719
250,720
Note: Whenever a DTR is required in R-APDRP Towns, one IAMR unit, one LT TVR meter and its
accessories should be included in the estimate.
37
26.
Sl. No.
Particulars
Cost of Material
(Rs.)
108500
4,563
7901
956
28819
9,702
1649
583
2626
1,166
9003
940
7342
162
1116
605
Misc. Items
420
167,376
5,009
3% Contingencies on Materials
5,021
18,677
18411
1% cess
2,145
18,677
216,639
216,640
Note: Whenever a DTR is required in R-APDRP Towns, one IAMR unit, one LT TVR meter and its
accessories should be included in the estimate.
38
27.
Cost Data For Erection of 3 Phase 16 KVA-11KV/433V
Conventional Distribution Transformer On Single Pole Structure
Sl. No.
Particulars
Cost of Material
(Rs.)
65750
1,616
7901
956
13186
3,448
1649
583
12067
940
1650
214
102203
7757
3,017
3% Contingencies on Materials
3,066
7,757
11242
1% cess
1,273
128,558
128,560
Note: Whenever a DTR is required in R-APDRP Towns, one IAMR unit, one LT TVR meter and its
accessories should be included in the estimate.
39
28.
Cost Data For Erection of 3 Phase 25 KVA-11KV/433V
Conventional Distribution Transformer On Single Pole Structure
Sl. No.
Particulars
Cost of Material
(Rs.)
71612
1,616
7901
956
13186
3,448
1649
583
17300
940
1500
196
113,148
7,739
3,349
3% Contingencies on Materials
3,394
7,739
12446
1% cess
1,401
141,478
141,480
Note: Whenever a DTR is required in R-APDRP Towns, one IAMR unit, one LT TVR meter and its
accessories should be included in the estimate.
40
29.
Cost Data For Erection of 3 Phase 40 KVA-11KV/433V
Conventional Distribution Transformer On Single Pole Structure
Sl. No.
Particulars
Cost of Material
(Rs.)
95500
1,616
7901
956
13186
3,448
1649
583
23082
940
1500
196
142,818
7,739
4,240
3% Contingencies on Materials
4,285
7,739
15710
1% cess
1,748
176,539
176,540
Note: Whenever a DTR is required in R-APDRP Towns, one IAMR unit, one LT TVR meter and its
accessories should be included in the estimate.
41
Sl. No.
Particulars
Cost of Material
(Rs.)
3105
994
37522
437
2743
618
3160
431
5865
303
1000
53,395
1,572
3% Contingencies on Materials
1,602
2,783
5873
1% cess
652
2,783
65,877
65,880
Note: Whenever a DTR is required in R-APDRP Towns, one IAMR unit, one LT TVR meter and its
accessories should be included in the estimate.
42
31.
Sl.No.
Particulars
Qty.
Rate in
Rs.
Per Unit
Amount in
Rs.
1 No.
37,522
Each
37,522
1 Set
2,743
Each
2,743
Pipe earthing
1 No.
810
Each
810
Misc. Items
L.S.
L.S.
L.S.
500
41,575
1,232
3% Contingencies on Materials
1,247
2,592
4,573
1% Cess
Total Cost in Rs.
Or say :
512
51,732
51,730
Note: Whenever a DTR is required in R-APDRP Towns, one IAMR unit, one LT TVR meter and its
accessories should be included in the estimate.
43
32.
Sl.No.
Particulars
Qty.
Rate in
Rs.
Per Unit
Amount in
Rs.
1 No.
37,522
Each
37,522
1 Set
2,743
Each
2,743
Pipe earthing
1 No.
810
Each
810
Misc. Items
L.S.
L.S.
L.S.
500
41,575
1,232
3% Contingencies on Materials
1,247
2,403
4,573
1% Cess
Total Cost in Rs.
Or say :
510
51,541
51,540
Note: Whenever a DTR is required in R-APDRP Towns, one IAMR unit, one LT TVR meter and its
accessories should be included in the estimate.
44
33.
Sl.No.
Particulars
Qty.
Rate in
Rs.
Per Unit
Amount in
Rs.
879
Each
879
201
Each
201
20
28
Each
560
250
Each
250
22
Each
22
L.S.
L.S.
L.S.
80
1,992
3% Contingencies
60
1,076
219
1% Cess
Total Cost in Rs.
Or say :
33
3,380
3,380
45
Particulars
Qty.
Rate in
Rs.
Per Unit
Amount in
Rs.
1,940
Each
1,940
729
Each
729
30
28
Each
840
420
Each
420
500
500
L.S.
L.S.
L.S.
80
4,509
3% Contingencies
135
1,739
496
1% Cess
Total Cost in Rs.
Or say :
69
6,948
6,950
46
Sl. No.
Particulars
Rate
Chargable to
Qty .
Amount
Chargable to
Qty.
Amount
Amount in
Rs.
819
819
819
120/E
201
201
20/M
250/E
60/Kg
1 Kg.
60
60
25/M
2M
50
50
5/E
2 Nos.
10
10
Misc.
L.S
85
85
1270
1405
2675
3% Contingencies on Materials
38
42
80
202
430
633
140
155
294
1% Cess
Total Cost in Rs.
Or say :
1650
2032
37
3,719
3,720
Total
Note :
47
60
1
1200
250
1200
250
Sl. No.
Particulars
Rate
Chargable to
DISCOM
Qty .
Amount
Chargable to
Consumer
Qty.
Amount
Amount in
Rs.
447
447
447
115/E
201
201
20/M
250/E
60/Kg
1 Kg.
60
60
25/M
2M
50
50
5/E
2 Nos.
10
10
Misc.
L.S
85
85
1200
250.00
1200
250
Total
898
1405
2303
3% Contingencies on Materials
27
42
69
202
430
633
99
155
253
1226
2032
33
3,290
3,290
1% Cess
Total Cost in Rs.
Or say :
Note :
60
48
Sl. No.
Particulars
Rate
Chargable to
DISCOM
Qty .
Amount
Chargable to
Consumer
Qty.
Amount
Amount in
Rs.
730
730
730
120/E
201
201
20/M
250/E
60/Kg
1 Kg.
60
60
25/M
2M
50
50
5/E
2 Nos.
10
10
Misc.
L.S
85
85
1181
1405
2586
3% Contingencies on Materials
35
42
78
202
430
633
130
155
284
Total
60
1
1200
250.00
250
1% Cess
36
1200
1549
49
2032
3,616
3,620
Sl. No.
Particulars
Rate
Chargable to
DISCOM
Qty .
Amount
Chargable to
Consumer
Qty.
Amount
Amount in
Rs.
1940.00
1940
1940
1477/E
1477
1477
420/E
420
420
28/M
120
3360
3360
60/Kg
1 Kg.
60
60
25/M
2M
50
50
5/E
2 Nos.
10
10
Misc.
L.S
95
95
Note :
Total
3837
3575
7412
3% Contingencies on Materials
115
107
222
202
430
633
422
393
815
1% Cess
Total Cost in Rs.
Or say :
4577
4506
91
9,173
9,170
50
Chargable to
Consumer
Qty.
Amount
Amount in
Rs.
Sl. No.
Particulars
Rate
1940.00
1940
1940
1477/E
1477
1477
28/M
120 Mts.
3360
3360
60/Kg
1 Kg.
60
60
25/M
2M
50
50
5/E
2 Nos.
10
10
Misc.
L.S
95
95
Total
3417
3575
6992
3% Contingencies on Materials
103
107
210
405
557
961
376
393
769
1% Cess
Total Cost in Rs.
Or say :
4300
4632
89
9,022
9,020
51
40.
Sl. No.
Particulars
Rate
Chargable to
DISCOM
Qty .
Amount
Chargable to
Consumer
Qty.
Amount
Amount in
Rs.
1940
1940
1940
1477/E
1477
1477
1647/E
1647
1647
43/M
80
3440
3440
60/Kg
1 Kg.
60
60
41.4/M
2M
83
83
22/E
2 Nos.
44
44
L.S
75
125
200
Total
5139
3752
8891
3% Contingencies
154
113
267
405
557
961
565
413
978
1% Cess
Total Cost in Rs.
Or say :
6263
4834
111
11,208
11,210
52
Sl. No.
Particulars
Rate
Chargable to
DISCOM
Qty .
Amount
Chargable to
Consumer
Qty.
Amount
Amount in
Rs.
6525.00
6525
6525
1477/E
1477
1477
43/M
120
5160
5160
60/Kg
1 Kg.
60
60
41.4/M
2M
83
83
22/E
2 Nos.
44
44
L.S
75
125
200
Total
8077
5472
13549
3% Contingencies
242
164
406
405
557
961
888
602
1490
1% Cess
164
9613
53
6795
16,571
16,570
42.
Chargable to
DISCOM
Qty.
Amount
Chargable to
Consumer
Qty.
Amount
Amount in
Rs.
Sl. No.
Particulars
Rate
6899.00
43/M
80
3440
3440
60/Kg
1 Kg.
60
60
41.4/M
2M
83
83
22/E
2 Nos.
44
44
L.S
75
100
175
Total
6974
3727
10701
3% Contingencies
209
112
321
405
557
961
767
410
1177
6899
6899
1% Cess
132
8355
54
4805
13,292
13,290
43.
Sl. No.
1 No.
796
Each
796
1 No.
201
Each
201
1 No.
400
Each
400
15 M
24
360
2 Mts
40
79
2 No.
6.0
Each
12
1 No.
250
Each
250
L.S.
L.S.
L.S.
50
Total
2,148
3% Contingenics
64
759
236
1% Cess
32
3,240
3,240
55
Particulars
Qty.
Rate
(Rs. in lakhs)
LS
As per local
conditions
Unit
Amount
(Rs. in lakhs)
0.000
LS
LS
0.061
LS
LS
5.000
LS
LS
10.000
0.600
LS
LS
0.660
LS
LS
1.500
LS
LS
3.000
LS
LS
1.200
Control Cables
LS
LS
1.080
Structural Steel
15
0.562
MT
8.423
Transformers
a) 33/11KV, 5 MVA Power Transformer
29.598
Each
29.598
0.657
Each
0.657
2.249
Each
6.747
3.211
Each
3.211
0.330
Each
0.330
0.330
Each
0.330
0.183
Each
0.183
0.043
Each
0.260
0.017
Each
0.050
0.017
Each
0.155
0.017
Each
0.052
0.431
Each
1.292
0.199
Each
0.399
0.150
Each
1.198
0.079
Each
0.079
0.095
Each
0.095
10.000
Each
10.000
0.182
Each
0.729
9
a)
b)
10
a)
b)
11
a)
12
a)
b)
c)
d)
13
a)
b)
c)
d)
e)
14
15
16
LS
Sub Total
Erection and transport and commissioning charges on items 7 to 15 at 10%
Contingencies on items 7 to 15 at 3%
T&P Charges on items No. 7 to 15 at 1%
Establishment and General Charges at 11%
1% Cess
Total Rs. in Lakhs
1.815
88.704
6.379
1.914
0.638
9.757
1.074
108.466
108.470
56