Sunteți pe pagina 1din 10

IL&FS Tamilnadu Power Company Ltd.

2X600MW Thermal Power Plant


DEPARTMENT: MECHANICAL MAINTENANCE
DOC.REF..NO:

ILFS/MECH/BLR/SMP/01

WORK INSTRUCTION TITLE: MAINTENANCE OF BOILER DRUM


REV.NO : 00

DATE: 15.10.2015

PAGE 1 of 10

STANDARD MAINTENANCE PROCEDURE


FOR
BOILER DRUM

Revision status Record:

IL&FS Tamilnadu Power Company Ltd.


2X600MW Thermal Power Plant
DEPARTMENT: MECHANICAL MAINTENANCE

WORK INSTRUCTION TITLE: MAINTENANCE OF BOILER DRUM

DOC.REF..NO:

ILFS/MECH/BLR/SMP/01
Revision No. Date

Page no.

REV.NO : 00

DATE: 15.10.2015

Details of Changes

PAGE 2 of 10

Reason for changes

AMENDMENT HISTORY
Sl
no.
1

Amendment Description
a. Inclusion of new hazard controls
b. Version change

Current Ver.
No.
00

Current
Rev.No
00

Issue Date
28.09.2015

IL&FS Tamilnadu Power Company Ltd.


2X600MW Thermal Power Plant
DEPARTMENT: MECHANICAL MAINTENANCE
DOC.REF..NO:

WORK INSTRUCTION TITLE: MAINTENANCE OF BOILER DRUM


REV.NO : 00

ILFS/MECH/BLR/SMP/01

Table of contents
1. Purpose
2. Scope
3. Responsibility
4. Procedure
4.10 objectives
4.20 Specifications
4.30 Details of risks and Hazards involved
4.40 Safety precautions required
4.50 Isolation Procedure
4.60 T&P required including special Tools & Spares
5. Maintenance Frequency
6. Work Procedure
7. Checks before release of Permit
8. Quality
9. References
10. Appendix-A Mechanical Record Structure
11. PM Check list

DATE: 15.10.2015

PAGE 3 of 10

IL&FS Tamilnadu Power Company Ltd.


2X600MW Thermal Power Plant
DEPARTMENT: MECHANICAL MAINTENANCE
DOC.REF..NO:

WORK INSTRUCTION TITLE: MAINTENANCE OF BOILER DRUM


REV.NO : 00

ILFS/MECH/BLR/SMP/01

DATE: 15.10.2015

PAGE 4 of 10

1.0 PURPOSE:
The purpose for this SMP is to give a safe and trouble free procedure to carry out the maintenance
activities of BOILER DRUM.
2.0 SCOPE:

S.No
1.
2.

UNIT
UNIT-I
UNIT-II

Equipment Name
BOILER DRUM
BOILER DRUM

Equipment Code
(As per Block diagram Coding)
(As per Block diagram Coding)

3.0 RESPONSIBILITY:

1) Designation
Staff Level I (Maintenance Engineer)

2)
Primary

Responsibility

Staff Level-II (Section In-Charge )

Secondary

HOD (Mech. Maintenance )

Overall responsibility

Note: Other department to be intimated: (Main Plant Operation, C&I, Electrical, Fire&
Safety)

4.0 PROCEDURE
4.10 OBJECTIVE:

IL&FS Tamilnadu Power Company Ltd.


2X600MW Thermal Power Plant
DEPARTMENT: MECHANICAL MAINTENANCE
DOC.REF..NO:

ILFS/MECH/BLR/SMP/01

WORK INSTRUCTION TITLE: MAINTENANCE OF BOILER DRUM


REV.NO : 00

DATE: 15.10.2015

PAGE 5 of 10

The objective of this procedure is to ensure systematic work instructions for maintenance crew to ensure hassle
free maintenance and safe work procedure.

4.20

GENERAL SPECIFICATION OF BOILER DRUMS:-

Length

27998 MM

Internal dia.

1778 MM

Material specification

SA 299

Thickness
Weight
Turbo separators

185 (Max), 155 (Min)


247.67 MT
110 (per separator capacity-17.72TPH) Nos

Screen driers

148 Nos

Riser tubes

80 Nos

Saturated link connections

26 Nos

Down comers

6 Nos

Safety Valves

6 Nos

Feed Links

3 No

Design pressure
Design metal temp
Max operating pressure

210.0 Kg/cm2
369C
197.0 Kg/cm2

IL&FS Tamilnadu Power Company Ltd.


2X600MW Thermal Power Plant
DEPARTMENT: MECHANICAL MAINTENANCE
DOC.REF..NO:

ILFS/MECH/BLR/SMP/01

WORK INSTRUCTION TITLE: MAINTENANCE OF BOILER DRUM


REV.NO : 00

DATE: 15.10.2015

PAGE 6 of 10

4.30 DETAILS OF RISKS & HAZARDS INVOLVED:

Failure of lifting tools & tackles.


Contact with hot surface.
Exposure to process liquid.
Suffocation due to confined area.

4.40 SAFETY PRECAUTIONS REQUIRE:

Keep the fire extinguishers ready within reachable limit for any emergency.
Asbestos hand gloves to be used.
Ensure use of periodically tested proper lifting tools & tackles.
Use of earplug and Boiler suit is mandatory along with other general PPEs.
Ensure good housekeeping of in around the area of maintenance.
Put barricade tapes around the equipment under maintenance.
Proper Illumination and ensure the oxygen level availability at the work place.
Exhaust fan to be in use to avoid suffocation due to confined space.
All PPE to be worn while working inside the drum.

Permit Type: Permit to work, Hot work permit, Height work permit.
Permit Approving Authority: Shift in charge

4.50 ISOLATION PROCEDURE


All drains and vents to be opened.
Isolating valves of re-circulation valve to be kept closed.
Isolate Balancing Leak off line.

4.60 T&P REQUIRED INCLUDING SPECIAL TOOLS & SPARES REQUIRED.


SL. NO.
1
2
3

TYPE OF THE TOOL


Oil Pump
Grease Gun
Screw Driver

SPECIFICATI
ON

QUANTITY
1 No
1 No
1 No

IL&FS Tamilnadu Power Company Ltd.


2X600MW Thermal Power Plant
DEPARTMENT: MECHANICAL MAINTENANCE

WORK INSTRUCTION TITLE: MAINTENANCE OF BOILER DRUM

DOC.REF..NO:

ILFS/MECH/BLR/SMP/01
4

REV.NO : 00

DATE: 15.10.2015

Oil Can with closed cap

SL. NO.
1
2

PAGE 7 of 10

2 Nos

TYPE OF THE MATERIAL


Soft Cotton Cloth
Rustolene

QUANTITY
1Kg
1 No

5.0 FREQUENCY OF MAINTENANCE


Sl no.

Job title

Preventive Maintenance activities: As per the


check list.ref.no: ILFS/MMD/BLR/PM/01

Frequency of maintenance

Annually/Opportunity

6. WORK PROCEDURE:
A. PM PROCEDURE.
B. CONDITION BASED MAINTENANCE

A) OVERHAULING WORK INSTRUCTIONS


Check the pressure & temp of boiler drum.
Both side manhole doors to be opened.
Installation of cooling fan required on one side of the drum man hole door for the proper and effective
cooling / avoid suffocation.
After the cooling inspection to be done inside, ensure that drum inside temperature should be within 35C
Proper checking of the turbo separator, perforated plate, wedge pin, chemical dosing line, CBD line, and
inside tray condition.
After the inspection if both perforated plate & turbo separators are out of position, then put the perforated
plate in position first & then the separator.
After the maintenance and alignment of perforated plate and turbo separator, then the wedge pin should
be locked.
After maintenance all tools & foreign materials are to be removed from the drum inside.

IL&FS Tamilnadu Power Company Ltd.


2X600MW Thermal Power Plant
DEPARTMENT: MECHANICAL MAINTENANCE
DOC.REF..NO:

ILFS/MECH/BLR/SMP/01

WORK INSTRUCTION TITLE: MAINTENANCE OF BOILER DRUM


REV.NO : 00

DATE: 15.10.2015

PAGE 8 of 10

Cleaning of drum inside to be done after the completion of work, avoiding wiping up off magnetite layer.
Groove between the manhole door and drum to be cleaned & new spiral gasket should be installed &
handled carefully.
After final inspection all the man holes are to be closed.

7. QUALITY CHECKS:
All the parameters, activities are maintained within limit as per the OEM standards.
8. CHECKS BEFORE RELEASE OF PERMIT:
All Tools & materials and manpower are removed.
Clean the maintenance area properly.
Ensure safety protection cover / guards are fitted in its position.
9.0 REFERENCE
OEM Manual.
10. APPENDIX- A Mechanical Record Structure
Daily Report./ Condition monitoring ( Field staff observation Note Book)
PM Checklist. (Ref No: ILFS/MMD/BLR/BOILER DRUM/PM/01)

IL&FS Tamilnadu Power Company Ltd.


2X600MW Thermal Power Plant
DEPARTMENT: MECHANICAL MAINTENANCE
DOC.REF..NO:

ILFS/MECH/BLR/SMP/01

WORK INSTRUCTION TITLE: MAINTENANCE OF BOILER DRUM


REV.NO : 00

DATE: 15.10.2015

PM CHECHKLIST :( Ref No ILFS/MMD/BLR/BOILER DRUM/PM//01)


Name of the Equipment: BOILER DRUM - 01
Work Permit No:

Date:

PAGE 9 of 10

IL&FS Tamilnadu Power Company Ltd.


2X600MW Thermal Power Plant
DEPARTMENT: MECHANICAL MAINTENANCE
DOC.REF..NO:

ILFS/MECH/BLR/SMP/01

WORK INSTRUCTION TITLE: MAINTENANCE OF BOILER DRUM


REV.NO : 00

DATE: 15.10.2015

PAGE 10 of 10

S-ar putea să vă placă și