ILFS/MECH/BLR/SMP/01
DATE: 15.10.2015
PAGE 1 of 10
DOC.REF..NO:
ILFS/MECH/BLR/SMP/01
Revision No. Date
Page no.
REV.NO : 00
DATE: 15.10.2015
Details of Changes
PAGE 2 of 10
AMENDMENT HISTORY
Sl
no.
1
Amendment Description
a. Inclusion of new hazard controls
b. Version change
Current Ver.
No.
00
Current
Rev.No
00
Issue Date
28.09.2015
ILFS/MECH/BLR/SMP/01
Table of contents
1. Purpose
2. Scope
3. Responsibility
4. Procedure
4.10 objectives
4.20 Specifications
4.30 Details of risks and Hazards involved
4.40 Safety precautions required
4.50 Isolation Procedure
4.60 T&P required including special Tools & Spares
5. Maintenance Frequency
6. Work Procedure
7. Checks before release of Permit
8. Quality
9. References
10. Appendix-A Mechanical Record Structure
11. PM Check list
DATE: 15.10.2015
PAGE 3 of 10
ILFS/MECH/BLR/SMP/01
DATE: 15.10.2015
PAGE 4 of 10
1.0 PURPOSE:
The purpose for this SMP is to give a safe and trouble free procedure to carry out the maintenance
activities of BOILER DRUM.
2.0 SCOPE:
S.No
1.
2.
UNIT
UNIT-I
UNIT-II
Equipment Name
BOILER DRUM
BOILER DRUM
Equipment Code
(As per Block diagram Coding)
(As per Block diagram Coding)
3.0 RESPONSIBILITY:
1) Designation
Staff Level I (Maintenance Engineer)
2)
Primary
Responsibility
Secondary
Overall responsibility
Note: Other department to be intimated: (Main Plant Operation, C&I, Electrical, Fire&
Safety)
4.0 PROCEDURE
4.10 OBJECTIVE:
ILFS/MECH/BLR/SMP/01
DATE: 15.10.2015
PAGE 5 of 10
The objective of this procedure is to ensure systematic work instructions for maintenance crew to ensure hassle
free maintenance and safe work procedure.
4.20
Length
27998 MM
Internal dia.
1778 MM
Material specification
SA 299
Thickness
Weight
Turbo separators
Screen driers
148 Nos
Riser tubes
80 Nos
26 Nos
Down comers
6 Nos
Safety Valves
6 Nos
Feed Links
3 No
Design pressure
Design metal temp
Max operating pressure
210.0 Kg/cm2
369C
197.0 Kg/cm2
ILFS/MECH/BLR/SMP/01
DATE: 15.10.2015
PAGE 6 of 10
Keep the fire extinguishers ready within reachable limit for any emergency.
Asbestos hand gloves to be used.
Ensure use of periodically tested proper lifting tools & tackles.
Use of earplug and Boiler suit is mandatory along with other general PPEs.
Ensure good housekeeping of in around the area of maintenance.
Put barricade tapes around the equipment under maintenance.
Proper Illumination and ensure the oxygen level availability at the work place.
Exhaust fan to be in use to avoid suffocation due to confined space.
All PPE to be worn while working inside the drum.
Permit Type: Permit to work, Hot work permit, Height work permit.
Permit Approving Authority: Shift in charge
SPECIFICATI
ON
QUANTITY
1 No
1 No
1 No
DOC.REF..NO:
ILFS/MECH/BLR/SMP/01
4
REV.NO : 00
DATE: 15.10.2015
SL. NO.
1
2
PAGE 7 of 10
2 Nos
QUANTITY
1Kg
1 No
Job title
Frequency of maintenance
Annually/Opportunity
6. WORK PROCEDURE:
A. PM PROCEDURE.
B. CONDITION BASED MAINTENANCE
ILFS/MECH/BLR/SMP/01
DATE: 15.10.2015
PAGE 8 of 10
Cleaning of drum inside to be done after the completion of work, avoiding wiping up off magnetite layer.
Groove between the manhole door and drum to be cleaned & new spiral gasket should be installed &
handled carefully.
After final inspection all the man holes are to be closed.
7. QUALITY CHECKS:
All the parameters, activities are maintained within limit as per the OEM standards.
8. CHECKS BEFORE RELEASE OF PERMIT:
All Tools & materials and manpower are removed.
Clean the maintenance area properly.
Ensure safety protection cover / guards are fitted in its position.
9.0 REFERENCE
OEM Manual.
10. APPENDIX- A Mechanical Record Structure
Daily Report./ Condition monitoring ( Field staff observation Note Book)
PM Checklist. (Ref No: ILFS/MMD/BLR/BOILER DRUM/PM/01)
ILFS/MECH/BLR/SMP/01
DATE: 15.10.2015
Date:
PAGE 9 of 10
ILFS/MECH/BLR/SMP/01
DATE: 15.10.2015
PAGE 10 of 10