SESSION PLAN

Trainer name: MOHAMAD ZAKRY BIN HASHIM


Task from unit of competency: CU 1 LV SWITCHBOARD INSTALLATION &
MAINTENANCE
Training outcome(s) for session: By the end of the session,
1.
2.
3.
4.
5.

Site visit and site evaluation/survey determined


Categories and functionality of LV Switchboard determined
Type of tools, equipment and materials identified
Visual inspection for physical checked
Visual inspection checked according to drawing

Target group: LECTURER


Session: One (1) / Jul 2015
Duration: 120 minutes
Material/resources:
1. Lukisan Elektrik, Abdul Samad bin Hj Hanif cetakan 7, tahun 2000
2. LS1, Specification For Low Voltage. Internal. Electrical Installation,
May 2014
3. Eaton Wiring Manual 2011 - Electrical circuit symbols
Time
Topic
Materials/resour
ces
5 mins
- Ice breaking / Warmer
Youtube Ice
- Check student attendance
breaking
- Check student attitude

5
mins

Introduction (GLOSS)
Get attention did you know that low
voltage switchboard can receive supply from
two feeders?
Link to outcomes All building should have
switchboard panel. For example to distribute
power supply from level to level. We will
build on those skills in this session.
Outcomes today we are going to learn how
to draw four line switchboard schematic
drawing in safe manner and meet MSIEC
60364 standard and electrical regulations.
Structure first I ll teach to you theory
switchboard requirement, then Ill show you

step by step about symbols reading and


drawing. Then each of you will have a go.
Safety In practical, well using right tools
for drawing and use right PPE when do
simple switching.
Stimulate you can implement this skills
when you teach this to your student.
35
minute
s

Theory
i.

Safety procedures and requirements for


electrical works
ii.
Occupational Safety and Health compliance
iii.
Reference standard for electrical
installations works such as: Energy Commission Act 2001
Electricity Supply Act 1990 (Act 447)
Electrical Regulation 1994
MS 1936: 2006 / IEC 60364
MS 1979: 2007 (COP)
Electrical Installation of Buildings Code
of practice (COP)
Based on latest instruction by regulatory
body
Departmental Of Environment (DOE) Act
and Regulation
iv.
Procedure of site visit and evaluation/survey
v.
Technique layout drawing
vi.
Various categories and function of LV
Switchboard components: Circuit breaker component
vii.
Various type of tools, equipment and
materials:Trolley
Water leveling
Pull lift
Rubber Mat
Exhaust Fan
CPR chart
Schematic Diagram
viii.
Visual inspection for physical
Scratched
Damaged
Loose Connection
Crack
Dented
ix.
Visual inspection according to drawing

Lukisan Elektrik,
Abdul Samad bin
Hj Hanif cetakan
7, tahun 2000
LS1, Specification
For Low Voltage.
Internal. Electrical
Installation, May
2014

x.
xi.
xii.

70
minute
s

Transportation and Logistic


LV Switchboard Adjustment
LV Switchboard Fixing

Activity
Circuit Drawing Carry out drawing of
Switchboard Wiring Installation
Assessments
Quiz Answer 3 question within 5 minutes

Eaton Wiring
Manual 2011 Electrical circuit
symbols
LS1, Specification
For Low Voltage.
Internal. Electrical
Installation, May
2014

5
minute
s

Conclusion/summary (OFF)
Outcome
Suitable for three phase installation over
than 100A
Complete drawing must meet
requirements of Electrical Act 1990,
Electrical Rules 1994 and Standard MS
IEC 60364:2003 Electrical Installations
of Building
Feedback
Learners did well to carry out switchboard
wiring drawing.
Future
Learners should be able to do installation
and maintenance when they need to do it.