Sunteți pe pagina 1din 5

XV PILE FOUNDATION

Quantity
Description
Sl.
Unit
required
No.
2
3
1
4
1 Single under reamed pile foundation with RCC
M20 using 12mm size black hard granite
(Crusher broken) stone chips including cost of
boring but excluding cost of M.S./Tor steel and
labour charges for cutting, bending and binding
of steel.
Single under ream pile
a) 375 mm dia and 6.0 metre long
Per 1 pile
Excavation of bore hole (assuming two pits can
be constructed per day)
Boring Mistry(Special)
2 Nos Each
150 winch operator
0.5 Nos Each
Hire & running charges of
1/2 Day per day
Tripod
Bentonite power
2.5 Bag eachBag
Overhead Charges 10% on material, labour & machinaries.

Rate
Rs. P
5

80.00
110.00
450.00

160.00
55.00
225.00

103.00

257.50
69.75

Total
R.C.C. M20
Volume of concrete

= 3.14 d 2 x L + 4.13 d3
4

Amount
Rs. P
6

767.25
=

= 3.14x (.375)2 x 6 + 4.13(.375) 3


4
= 0.66 + 0.22 =
0.88 Cum
0.88 cum 1 Cum
2231.30
1963.54
0.284 qntl. 1 qntl
341.00
96.84

(Rate as per 4 of R.C.C.)


Add- Cost of 10% extra cement

Say Rs.

Total
2827.60

2827.64

(i) For each additional depth of 0.5m beyond initial


depth of 6.0 m add extra to the rate
Per 1 Pile
Excavation of bore hole - Take 6% of item 1(a)
R.C.C.M20
(Rate same as item No.4 of R.C.C.)
Add- Cost of 10% extra) cement

(ii) For each less depth of 0.5m from the initial


depth of 6.0m deduct from the rate
Per 1 Pile
Rate same as item NO.1(a) (i)

0.055 cum
0.0178 cum

-209-

1 cum
1 qntl

2231.30
341

46.04
122.72
6.07

say Rs.

Total
174.83
174.80 / Each

174.80

Remarks
7

Description
Quantity
Sl.
Rate
Unit
required
No.
Rs. P
2
1
3
4
5
b) 300mm dia and 6.0m long
Per 1 Pile
Excavation of bore hole- Take 90% of the rate in item No.1(a)
R.C.C. M20
Volume of concrete = 3.14 d 2 x L + 4.13 d3
4
= 3.14x (0.30)2 x 6 + 4.13(0.30) 3
4
= 0.424 + 0.111 =
(Rate same as item No.1 of R.C.C.)
Add-Cost of 10% extra) cement

690.53

0.535 Cum

0.535 cum 1 cum


0.17288 qntl. 1 qntl

2231.30
1193.75
341
58.95
Total =
1943.22
Say Rs.
1943.20 / Each

(i) For each additional depth of 0.5m beyond initial


depth of 6.0m add extra to the rate.
Per 1 Pile
Excavation of bore hole- Take 6% of the rate in item 1(a)
R.C.C.M20
(Rate same as item No.1 of R.C.C.)
0.035 cum
Add- Cost of 10% extra) cement
0.0113 qntl.

46.04
1 cum
1 qntl

Say Rs.
(ii) For each less depth of 0.5m from the initial
depth of 6.0m deduct from the rate
Per 1 Pile
Rate same as item No. 1b (i)

Amount
Rs. P
6

2231.30
341

Total =
127.98
128.00 / Each

128.00

c) 250mm dia and 6.0m long


Per 1 Pile
Excavation of bore hole- Take 83% of the rate in item 1(a)
R.C.C.M20
Volume of concrete =
3.14x (0.25) 2 x 6 + 4.13(0.25) 3
4
= 0.294 + 0.065 =
(Rate same as item No.1 of R.C.C.)
Add- Cost of 10% extra) cement

0.359 cum
0.1159 qntl.

636.82

0.359 Cum
1 cum
1qntl

Say Rs.

-210-

78.10
3.85

2231.30
341

801.04
39.52

Total =
1477.38
1477.40 / Each

Remarks
7

Description
Quantity
Sl.
required
No.
2
1
3
(i) For each additional depth of 0.5m beyond initial
depth of 6.0m add extra to the rate.
Per 1 Pile
Excavation of bore hole- Take 6% of the rate in item 1(a)
R.C.C.M20
(Rate same as item No.4 of R.C.C.)
0.0245 cum
Add- Cost of 10% extra) cement
0.0079 qntl.

Rate
Rs. P
5

Unit
4

Amount
Rs. P
6

Remarks
7

46.035
1 cum
1 qntl

Say Rs.

2231.30
341

54.67
2.69

Total
103.40
103.40 / Each

(ii) For each less depth of 0.5m from the initial


depth of 6.0m deduct from the rate
Per 1 Pile
Rate same as item No. 1(c)(i)
2 Double under reamed pile foundation with
R.C.C. M20 using 12mm size black hard granite
(crusher broken)stone chips including cost of
boreholes but excluding cost of M.S. rod/Tor
steel and labour chrages for cutting, bending and
binding of steel.
a) 375 mm dia and 6.0 m long
Per 1 pile
Excavation of bore holecost sam as item no. 1(a)
Add- 25% extra for double under ream2
3
Volume of concrete =
3.14x (.375) x 6 + 8.26(.375)
=
(Rate same as item No.4 of R.C.C.)
Add- Cost of 10% extra cement

4
0.66 + 0.44 =
1.1 cum
0.3553 qntl.

103.40

767.25
191.81

1.10 Cum
2231.30
2454.43
341
121.16
Total
3534.65
Say Rs.
3534.60 / Each
1 cum
1 qntl

(i) For each additional depth of 0.5m beyond initial


depth of 60m deduct from the rate
Per 1 Pile
Rate same as item No.1a(i)
-

174.80 / Each

(ii) For each less depth of 0.5m from the initial


depth of 6.0m deduct from the rate
Per 1 Pile
Rate same as item No.1a(ii)

174.80 / Each

b) 300mm dia and 6.0m long


Per 1 Pile
Excavation of bore hole- Take 90% of the rate in item 2(a)
R.C.C.M20
Volume of concrete =
3.14x (0.30)2 x 6 + 8.26(0.3) 3
=

4
0.424 + 0.223 =

-211-

863.16

0.65 Cum

Sl.
No.
1

Description

Quantity
required
3
0.647 cum
0.209 qntl.

2
(Rate same as item No.4 of R.C.C.)
Add- Cost of 10% extra) cement

Rate
Rs. P
5
2231.30
341

Unit
4
1 cum
1 qntl

Amount
Remarks
Rs. P
6
7
1443.65
71.27

Say Rs.

Total =
2378.08
2378.10 / Each

(i) For each additional depth of 0.5m beyond initial


depth of 6.0m add extra to the rates
Per 1 Pile
Rate same as item No.1b(i)
-

128.00 / Each

(ii) For each less depth of 0.5m from the initial


depth of 6.0m deduct from the rate
Per 1 Pile
Rate same as item No.1b(ii)

128.00 / Each

c)

250mm dia and 6.0m long


Per 1 Pile
Excavation of bore hole- Take 83% of the rate in item 2(a)
R.C.C. M20
Volume of concrete = 3.14x (0.25)2 x 6 + 8.26(0.25) 3
4
= 0.294 + 0.129 =
(Rate same as item No.4 of R.C.C.)
Add- Cost of 10% extra) cement

0.423 cum
0.1366 qntl.

796.02

0.423 Cum
1 cum
1 qntl

2231.30
943.84
341
46.58
Total =
1786.44
Say Rs.
1786.40 / Each

(i) For each additional depth of 0.5m beyond initial


depth of 6.0m add extra to the rates
Per 1 Pile
Rate same as item No.1c(i)
-

103.40 / Each

(ii) For each less depth of 0.5m from the initial


depth of 6.0m deduct from the rate
Per 1 Pile
Rate same as item No.1c(ii)

103.40 / Each

-212-

Description
Quantity
Sl.
Rate
Unit
required
No.
Rs. P
2
1
3
4
5
d) 450mm dia and 6.0m long
Per 1 Pile
Excavation of bore hole- cost same as item No. 2(a)
Add 55% extra R.C.C. M20
Volume of concrete = 3.14x (0.45)2 x 6 + 8.26(0.45) 3
4
= 0.954 + 0.752 =

(Rate same as item No.4 of R.C.C.)


Add- Cost of 10% extra) cement

1.706 cum
0.551 qntl.

(ii) For each less depth of from the initial depth


of 6 m deduct from the rate
Per 1 Pile
Rate same as item d(.I)

Remarks
7

959.06
527.48

1.706 Cum

1 cum
1 qntl

Say Rs.
(i) For each additional depth of 0.5 m beyond
initial depth of 6.0 m add extra to the rate.
Per 1 Pile
Excavation of the bore hole - Take 5% of item (a)
RCC M20
Rate as per item No. 4 of R.C.C.
Add-cost of 10% extra cement

Amount
Rs. P
6

2231.30
341

3806.60
187.89

Total =
5481.04 /Each
5481.00 / Each

74.33
0.0795 cum
0.0257 qntl

1 cum
1 qntl

2231.30
341
Total
Or Say

177.39
8.76
260.48
260.50

260.50 /Each

Note :
(I) Rate of RCC items have been arrived on crusher broken chips. If hand broken chips are to be used,
the difference in cost is to be subtracted to arrive at the finished rate.
(ii) 10 percent excess on the above rates will be allowed for the works being executed inside the jail premises.