Sunteți pe pagina 1din 6

No.

FTC no.

Reference

Status

1 1
.

HFY3-3125-CIV-DWG0008

accepted 21st Dec. 31st Dec.

2 2

.
3 3

4 4

.
5 5

.
6 6

8 8

111

12###

13###

Issuing
date

Replay
date

HFY3-3125-CIV-DWGaccepted 26th Dec. 18th Jan.


0015
HFY3-3125-ELE-LAY-0004 accepted 26th Dec. 12th Jan.
HFY3-3125-ARC-DWG0001
HFY3-3125-CIV-DWG01112
HFY3-3125-CIV-DWG0008

accepted 26th Dec. 8th Jan.

accepted 6th Jan.

8th Jan.

HFY3-3125-CIV-LAY-0002 accepted 13TH Jan. 18Th Jan.

HFY3-3125-CIV-DWGaccepted 4th Feb


0004_0 ; HFY3-3125-CIVDWG-0002_0

9th Feb.

HFY3-3125-CIV-LAY-0001

9th Feb.

HFY3-3125-CIV-LAY-0001

4th Feb
accepted

description
Type of material used for upstream and
downstream slopes
Adding hot water supply line for GRs
OHTL coordinates
GRs and GTs external finishes

Downstream materials and level

Width of ditch segment (D-A)

culvert/ brick wall alignment

collecting ditch levels

No.

TQ no.
1 1
.

2 2

Reference
HFY3-SD-CIV-DW-00001

3 3

.
4 4

.
6 5
.

HFY3-3125-ELE-LAY-0004_0 Accepte B104-Apr-15


d
HFY3-3125-ARC-DWGAccepte B104-Apr-15
0001_1
d
HFY3-3125-CIV-DWGREJECTE B114-Jun-15
0008_0
D

B104-Apr-15

HFY3-GEN-PLO-DWG-00001 Accepte B122-Jun-15


d

B124-Jun-15

HFY3-3125-ARC-DWG-0001 Accepte B103-Jul-15


d

B105-Jul-15

HFY3-3125-CIV-LAY-0001

Accepte B108-Jul-15
d

B109-Jul-15

HFY3-3125-CIV-LAY-0001

Accepte B125-Jul-15
d

B126-Jul-15

HFY3-RB-CIV-DWG-01071

Accepte B131-Jul-15
d

B112-Aug-15

9 6

107

118

129

141

151

181
.

.
191

Status
Issuing date Replay date
REJECTE 6TH Mar.2015 8th Mar. 2015
D
HFY3-3125-CIV-DWG-0015_ Accepte B101-Apr-15 B104-Apr-15
d

HFY3-GEN-PLO-DWG-00001

B110-Apr-15
B115-Jun-15

HFY3-3125-CIV-DWG-003

Accepte B110-Aug-15 B111-Aug-15


d
HFY3-GEN-PLO-DWG-00001 Accepte B108-Aug-15 B124-Aug-15
d
HFY3-GEN-PLO-DWG-00001 Accepte B108-Aug-15 B109-Aug-15
d

211
4
.

221
5
.

231

HFY3-3125-ARC-DWG-0001 Accepte B110-Aug-15 B124-Aug-15


d

HFY3-3125-ARC-DWG-0002
HFY3-3125-CIV-DWG-0008 Accepte B113-Aug-15 B124-Aug-15
d
HFY3-SD-CIV-DWG-01112

Accepte B121-Sep-15 B126-Sep-15


d

241
7
.

HFY3-3125-CIV-DWG-0009 Accepte B111-Oct-15 B115-Oct-15


d

25

HFY3-3125-CIV-DWG-0008 Accepte B118-Oct-15 B120-Oct-15


d

261
9
.
272

0
.
29

HFY3-3125-CIV-DWG-0014 Rejected B128-Oct-15 B109-Nov-15

302
2
.

HFY3-3125-CIV-LAY-0001

Accepte B106-Nov-15 B111-Nov-15


d

HFY3-3125-CIV-DWG-0008 Accepte 8/Des/2015


d
HFY3-3125-CIV-LAY-0001

8/Des/2015

Rejected 12/Des/2015 22/Des/2015

description
Option To Be Considered For
Ditch Size

RAIN STORM
COLLECTION POOL
CLARIFICATION FOR
CULVERT
CLARIFICATION FOR
CULVERT
Changing the Solid
Blocks to Brick Blocks in
Guard Towers
Relocation of storm
collection pool no. 4
Changing the Solid
Blocks to Brick Blocks in
Guard Towers
Increasing the widths
ditch from 24m -30m
Increasing the widths
ditch from 30m -35m
Changing the
coordinates
Rain storm collection
pool
Relocation of GT#6
elevated water tank
structure
Exceeding the distance
of the distance between
Elevated WT.4 septic
tank of GRS
Fixing steel frame for the
GTs

Changing the width of


the dam bed width
Changing the steel
sections for the steel
fence

Changing the
reinforcement for both
column and beam in the
GTs
Using river sand
Relocating the (EWH) to
be (as-built) drawings
Collecting storm ditch
intersection with ramps
Installing new sand layer
Net distance between
R.C. retaining walls for
main Gates

S-ar putea să vă placă și