FTC no.
Reference
Status
1 1
.
HFY3-3125-CIV-DWG0008
2 2
.
3 3
4 4
.
5 5
.
6 6
8 8
111
12###
13###
Issuing
date
Replay
date
8th Jan.
9th Feb.
HFY3-3125-CIV-LAY-0001
9th Feb.
HFY3-3125-CIV-LAY-0001
4th Feb
accepted
description
Type of material used for upstream and
downstream slopes
Adding hot water supply line for GRs
OHTL coordinates
GRs and GTs external finishes
No.
TQ no.
1 1
.
2 2
Reference
HFY3-SD-CIV-DW-00001
3 3
.
4 4
.
6 5
.
B104-Apr-15
B124-Jun-15
B105-Jul-15
HFY3-3125-CIV-LAY-0001
Accepte B108-Jul-15
d
B109-Jul-15
HFY3-3125-CIV-LAY-0001
Accepte B125-Jul-15
d
B126-Jul-15
HFY3-RB-CIV-DWG-01071
Accepte B131-Jul-15
d
B112-Aug-15
9 6
107
118
129
141
151
181
.
.
191
Status
Issuing date Replay date
REJECTE 6TH Mar.2015 8th Mar. 2015
D
HFY3-3125-CIV-DWG-0015_ Accepte B101-Apr-15 B104-Apr-15
d
HFY3-GEN-PLO-DWG-00001
B110-Apr-15
B115-Jun-15
HFY3-3125-CIV-DWG-003
211
4
.
221
5
.
231
HFY3-3125-ARC-DWG-0002
HFY3-3125-CIV-DWG-0008 Accepte B113-Aug-15 B124-Aug-15
d
HFY3-SD-CIV-DWG-01112
241
7
.
25
261
9
.
272
0
.
29
302
2
.
HFY3-3125-CIV-LAY-0001
8/Des/2015
description
Option To Be Considered For
Ditch Size
RAIN STORM
COLLECTION POOL
CLARIFICATION FOR
CULVERT
CLARIFICATION FOR
CULVERT
Changing the Solid
Blocks to Brick Blocks in
Guard Towers
Relocation of storm
collection pool no. 4
Changing the Solid
Blocks to Brick Blocks in
Guard Towers
Increasing the widths
ditch from 24m -30m
Increasing the widths
ditch from 30m -35m
Changing the
coordinates
Rain storm collection
pool
Relocation of GT#6
elevated water tank
structure
Exceeding the distance
of the distance between
Elevated WT.4 septic
tank of GRS
Fixing steel frame for the
GTs
Changing the
reinforcement for both
column and beam in the
GTs
Using river sand
Relocating the (EWH) to
be (as-built) drawings
Collecting storm ditch
intersection with ramps
Installing new sand layer
Net distance between
R.C. retaining walls for
main Gates