Hill, Brandon
Dickman, William
Alghaith, Ahmad
Table 1 lists all activities, their durations, predecessors, early and late start and finish, as well as the total
and free float of each activity. Note that the bolded tasks are actually groups for proceeding activities.
Table 1. Project Activities.
ID
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
Task Name
Duration
Planning
Beginning of Project
Design
Start of Design
Predecessors
Early Start
Early Finish
Late Start
Late Finish
0 days
Fri 1/1/16
Fri 1/1/16
Fri 1/1/16
Fri 1/1/16
0 days
Fri 1/1/16
Fri 1/1/16
Fri 1/1/16
Fri 1/1/16
43 days
Fri 1/1/16
Tue 3/1/16
Fri 1/1/16
Wed 3/2/16
Fri 1/1/16
0 days
Fri 1/1/16
Fri 1/1/16
Fri 1/1/16
4 days
Fri 1/1/16
Wed 1/6/16
Wed 1/6/16
14 days
Fri 1/1/16
Wed 1/20/16
Fri 1/1/16
2 days
Thu 1/7/16
Fri 1/8/16
Tue 1/12/16
2 days
Mon 1/11/16
Tue 1/12/16
Fri 1/15/16
3 days
Mon 1/11/16
Wed 1/13/16
Thu 1/14/16
2 days
Fri 1/1/16
Mon 1/4/16
Tue 1/19/16
2 days
8,9
Thu 1/14/16
Fri 1/15/16
Tue 1/19/16
3 days
6,10,11
Thu 1/21/16
Mon 1/25/16
Thu 1/21/16
7 days
11
Mon 1/18/16
Tue 1/26/16
Tue 1/26/16
20 days
12,13SS
Tue 1/26/16
Mon 2/22/16
Tue 1/26/16
5 days
14
Tue 2/23/16
Mon 2/29/16
Tue 2/23/16
Landscape Design
5 days
12
Tue 1/26/16
Mon 2/1/16
Tue 2/23/16
1 day
15,16
Tue 3/1/16
Tue 3/1/16
Tue 3/1/16
Tue 3/1/16
End of Design
0 days
17
Tue 3/1/16
Tue 3/1/16
Wed 3/2/16
Wed 3/2/16
Pre-Construction
14 days
Tue 3/1/16
Mon 3/21/16
Wed 3/2/16
Mon
3/21/16
Community Input
Meeting
Environmental Impact
Assessment
Determine Final Bridge
Placement
Bridge Material
Investigation
Design Bridge Structure
and Foundation
Sign, Illumination, and
Signalization Design
Advertisement of Bid
Documents
Make Copies of Plans
and Specs.
Distribute Plans and
Specs.
Mon
1/11/16
Wed
1/20/16
Wed
1/13/16
Mon
1/18/16
Mon
1/18/16
Wed
1/20/16
Wed
1/20/16
Mon
1/25/16
Wed 2/3/16
Mon
2/22/16
Mon
2/29/16
Mon
2/29/16
0 days
18
Tue 3/1/16
Tue 3/1/16
Wed 3/2/16
Wed 3/2/16
1 day
20
Wed 3/2/16
Wed 3/2/16
Wed 3/2/16
Wed 3/2/16
1 day
21
Thu 3/3/16
Thu 3/3/16
Thu 3/3/16
Thu 3/3/16
Receive Bids
10 days
22
Fri 3/4/16
Thu 3/17/16
Fri 3/4/16
Thu 3/17/16
Receipt of Bids
0 days
23
Thu 3/17/16
Thu 3/17/16
Fri 3/18/16
Fri 3/18/16
Bid Opening
1 day
24
Fri 3/18/16
Fri 3/18/16
Fri 3/18/16
Fri 3/18/16
Pre-Construction
Meeting
1 day
25
Mon 3/21/16
Mon 3/21/16
Mon 3/21/16
Mon
3/21/16
Construction
104 days
Mon 3/21/16
Fri 8/12/16
Tue 3/22/16
Fri 8/12/16
Total
Slack
0
days
0
days
0
days
0
days
3
days
0
days
3
days
4
days
3
days
12
days
3
days
0
days
6
days
0
days
0
days
20
days
0
days
0
days
0
days
0
days
0
days
0
days
0
days
0
days
0
days
0
days
0
days
Free
Slack
0
days
0
days
0
days
0
days
0
days
0
days
0
days
1 day
0
days
12
days
0
days
0
days
6
days
0
days
0
days
20
days
0
days
0
days
0
days
0
days
0
days
0
days
0
days
0
days
0
days
0
days
0
days
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
Start of Construction
Hill, Brandon
Dickman, William
Alghaith, Ahmad
0 days
26
Mon 3/21/16
Mon 3/21/16
Tue 3/22/16
Tue 3/22/16
14 days
28
Tue 3/22/16
Fri 4/8/16
Wed 4/20/16
Mon 5/9/16
2 days
28
Tue 3/22/16
Wed 3/23/16
Tue 3/22/16
Wed
3/23/16
3 days
30,29
Mon 4/11/16
Wed 4/13/16
Tue 5/10/16
Thu 5/12/16
3 days
31SS
Mon 4/11/16
Wed 4/13/16
Tue 5/17/16
Thu 5/19/16
1 day
29SS
Tue 3/22/16
Tue 3/22/16
Thu 5/19/16
Thu 5/19/16
2 days
30
Thu 3/24/16
Fri 3/25/16
Thu 3/24/16
Fri 3/25/16
5 days
31,32,33
Thu 4/14/16
Wed 4/20/16
Fri 5/20/16
Thu 5/26/16
10 days
35
Thu 4/21/16
Wed 5/4/16
Fri 5/27/16
Thu 6/9/16
Install Cofferdams
4 days
34
Mon 3/28/16
Thu 3/31/16
Mon 3/28/16
Thu 3/31/16
Erect Footings
30 days
37
Fri 4/1/16
Thu 5/12/16
Fri 4/1/16
Thu 5/12/16
Erect Piers
30 days
31,38
Fri 5/13/16
Thu 6/23/16
Fri 5/13/16
Thu 6/23/16
Erect Abutment
10 days
36,34
Thu 5/5/16
Wed 5/18/16
Fri 6/10/16
Thu 6/23/16
Grade to Abutment
4 days
40
Thu 5/19/16
Tue 5/24/16
Tue 6/28/16
Fri 7/1/16
6 days
40,39
Fri 6/24/16
Fri 7/1/16
Fri 6/24/16
Fri 7/1/16
Install Decking
15 days
42,41
Mon 7/4/16
Fri 7/22/16
Mon 7/4/16
Fri 7/22/16
Pave Roadway
8 days
43
Mon 7/25/16
Wed 8/3/16
Mon 7/25/16
Wed 8/3/16
5 days
44
Thu 8/4/16
Wed 8/10/16
Thu 8/4/16
4 days
43
Mon 7/25/16
Thu 7/28/16
Fri 8/5/16
Landscape
3 days
43
Mon 7/25/16
Wed 7/27/16
Mon 8/8/16
As-Built Survey
2 days
43
Mon 7/25/16
Tue 7/26/16
Tue 8/9/16
Construction Complete
0 days
48,47,46,45
Wed 8/10/16
Wed 8/10/16
Thu 8/11/16
Thu 8/11/16
2 days
49
Thu 8/11/16
Fri 8/12/16
Thu 8/11/16
Fri 8/12/16
0 days
50
Fri 8/12/16
Fri 8/12/16
Fri 8/12/16
Fri 8/12/16
Obtain Construction
Permits
Mobilize
Survey Site for
Placements
Stake Contruction Site
Designate Workzone
With Traffic Control
Stock Materials
Demolition of
Obstructions
Wed
8/10/16
Wed
8/10/16
Wed
8/10/16
Wed
8/10/16
0
days
21
days
0
days
21
days
26
days
42
days
0
days
26
days
26
days
0
days
0
days
0
days
26
days
28
days
0
days
0
days
0
days
0
days
9
days
10
days
11
days
0
days
0
days
0
days
0
days
0
days
0
days
0
days
0
days
16
days
0
days
0
days
0
days
0
days
0
days
0
days
0
days
28
days
0
days
0
days
0
days
0
days
9
days
10
days
11
days
0
days
0
days
0
days
Hill, Brandon
Dickman, William
Alghaith, Ahmad
Table 2, which is shown below lists all critical activities, as well as the early start and finish for each.
These are activities that do not have any float. In this table are also the milestones, which are shown in bold.
The final milestone, Open Bridge to Traffic, represents the end of the project.
Table 2. Critical Activities and Milestones.
Critical Activities / Milestones
Early Start
Early Finish
Beginning of Project
Fri 1/1/16
Fri 1/1/16
Start of Design
Fri 1/1/16
Fri 1/1/16
Traffic Study
Fri 1/1/16
Wed 1/20/16
Thu 1/21/16
Mon 1/25/16
Tue 1/26/16
Mon 2/22/16
Tue 2/23/16
Mon 2/29/16
Tue 3/1/16
Tue 3/1/16
End of Design
Tue 3/1/16
Tue 3/1/16
Tue 3/1/16
Tue 3/1/16
Wed 3/2/16
Wed 3/2/16
Thu 3/3/16
Thu 3/3/16
Receive Bids
Fri 3/4/16
Thu 3/17/16
Receipt of Bids
Thu 3/17/16
Thu 3/17/16
Bid Opening
Fri 3/18/16
Fri 3/18/16
Pre-Construction Meeting
Mon 3/21/16
Mon 3/21/16
Start of Construction
Mon 3/21/16
Mon 3/21/16
Mobilize
Tue 3/22/16
Wed 3/23/16
Stock Materials
Thu 3/24/16
Fri 3/25/16
Install Cofferdams
Mon 3/28/16
Thu 3/31/16
Erect Footings
Fri 4/1/16
Thu 5/12/16
Erect Piers
Fri 5/13/16
Thu 6/23/16
Fri 6/24/16
Fri 7/1/16
Install Decking
Mon 7/4/16
Fri 7/22/16
Pave Roadway
Mon 7/25/16
Wed 8/3/16
Thu 8/4/16
Wed 8/10/16
Construction Complete
Wed 8/10/16
Wed 8/10/16
Thu 8/11/16
Fri 8/12/16
Fri 8/12/16
Fri 8/12/16
The network Diagram, which is shown on the next three pages shows all activities by ID number, as
well as the relationships between them. Following the network diagram is the as-planned bar chart which shows
the activities, their connections, and dates.