Sunteți pe pagina 1din 8

MAJOR PROJECTS

Project

Peak
year

Liquids,
1,000 b/d

Gas,
MMscfd

Algeria
El Merk
Ain Tsila

2013
2018

146

IAN/EOR
Bir Seba
Timimoun

2012
2014
2014

15
35
18

Angola
Plutao, Saturna, Venus,
Marte (PSVM)

2012+

150

BP

600
355

Operator
Anadarko
Petroceltic
Sonatrach
Sonatrach
Sonatrach

Development type
Block 208, $3.8 billion oil and condensate, 500-600 boe reserves
Isarene PSC, Illizi basin, 18 initial wells, 106 development wells, 2.1 tcf sales
gas, 67 million bbl condensate, 108 million bbl LPG
Block 212, 80 million bbl of reserves
180 million bbl
37 production wells

Platino, Chumbo, Cesio


Palas, Ceres, Juno, Astrea,
Hebe, Urano, Titania
Terra Miranda, Cordelia,
Portia
Lucapa
Mafumeira Sul

2013+

75

BP

Block 31, 500 million bbl of oil, FPSO, 1.8 million bbl storage, 5,900-6,730 ft
water
Block 18, FPSO, 1,600 m water

2013+

150

BP

Block 31 discoveries, 2,000 m water

2014+
2015+
2014+

150
100
95

BP
Chevron
Chevron

Negage
LNG various felds

2014+
2012+

75
63

Cabaca Norte
Sangos, NGoma
Kizomba D satellites
Kizomba Satellites
Cravo-Lirio-Orquidea-Violeta
(CLOV)
Kaombo-Gindungo, Canela,
Mostarda, Salsa, Louro
Cola, Manjericao, Caril.
Caminhos, Colorau, Alho

2014+
2013
2012+
2012

40
85
125
100

Eni
Eni
ExxonMobil
ExxonMobil

Block 31 discoveries
Block 14, 3,940 ft water
Block 0, Southern Malongo development area, 200 ft water, central processing
and wellhead platforms
Block 14, FPSO 1.5 million bbl storage, 1,500 m water
Onshore, one train, 5.2 million LNG tonnes/year, 10 tcf of associated gas from
Blocks 15, 17, 18, 0, and 14, and nonassociated gas from Blocks 1 and 2
Block 15/06, 500 m water
Block 15/06, leased Xikomba FPSO
Block 15, subsea tiebacks to Kizomba C
Block 15, subsea tiebacks to Kizomba A & B FPSOs, 1,000 m water

2013+

160

Total

Block 17, FPSO

2012+

120

Total

Block 32, 300 million bbl of oil, FPSO, 4,600-5,900 ft water

Total

Block 32 central northeast discoveries

BHP

$1.5 billion subsea development in northern Carnarvon basin, gas piped in 20


in., 96 km pipeline to gas plant at Ashburton North
$15 billion Queensland coalbed methane to LNG, two trains, 8.8 million tonne
capacity, 800 wells by yearend 2014, 6,000 wells over project life

100
670

2014+

Australia
Macedon

2013

Parnui

2014+

Gorgon, Jansz, Io, Chandon,


Geryon, Maenad, Orthrus

2014+

Wheatstone, Iago

2014+

200

20

Chevron
Chevron

1,200

BG

2,545

Chevron

1,000

Chevron

Montara, Skua, Swift-Swallow 2012

40

Kipper-Tuna

2012+

15

Scarborough, Thebe

2013+

Turrum Phase 2

2013

20

Ichthys Plover, Brewster

2016+

100

1,200

Crux

2012+

35

Gladstone LNG
Arrow LNG
Prelude

2015+
2015+
2017+

35

900
1,000
650

Santos
Shell
Shell

Crux
North Rankin 2

2020+
2012+

39

2,500

Shell
Woodside

Pluto, Xena Train 2


Pluto, Xena Train 3
Torosa, Brecknock, Calliance

2013
2014
2013+

800
800
1,400

Woodside
Woodside
Woodside

$1.25 billion Browse LNG project, 14 tcf gas, 370 million bbl condensate

Azerbaijan
Shah Deniz FF

2017+

2,600

BP

$20 billion gas project, 2 platforms, 30 subsea wells

Bangladesh
Bibiyana expansion

2014+

300+

Chevron

$500 million to expand feld production capacity to 1.4 bcfd and 400,000 b/d
of natural gas liquids

Brazil
Frade
Gaviao Azul, Gaviao Real
Waikiki
Waimea
Campos basin shallow water
Aruana test
Aruana
Baleia Azul

2011
2013
2013
2013
2015
2011
2013
2012

100
200
450
15
100
100

Chevron
OGX
OGX
OGX
OGX
Petrobras
Petrobras
Petrobras

Baleia Azul

2014

60

$2.8 billion; production started in 2009, suspended early 2012 at 60,000 b/d
Onshore Parnaiba basin gas felds
BMC-39/40 FPSO connected to well platform, 110 m water
BMC-41, FPSO connected to well platform, 130 m water
FPSOs and TLPs tied back to wellhead platforms
FPSO Cidade Rios das Ostras postsalt
FPSO postsalt
FPSO Cidade de Anchieta, BC-60 heavy oil presalt; started up September
2012
FPSO postsalt

Oil & Gas Journal | Oct. 1, 2012

121001ogj_71 71

90

PTTEP

Greater Gorgon 15 million tonnes/year LNG from 3 trains on Barrow Island and
300 MMscfd domestic gas, 40 tcf of gas, subsea wells tied back to shore
Carnarvon basin gas feld in 650 ft water, 4.5 tcf, 4.3 million tonnes/year, two
LNG trains
Blowout on Montara platform has delayed completion of development, FPSO,
subsea wells in 80 m water
$2.8 billion Gippsland basin gas, Kipper includes initially two subsea completed wells tied back to West Tuna platform
$15-20 billion offshore development with onshore LNG plant, 8 tcf, Carnarvon
basin, 900 m of water
$2.7 billion Marlin B piled steel jacket platform set in 58 m water in the Gippsland basin in the Bass Strait
Northwest Shelf, semisubmersible in 230 m water, onshore LNG plant, 8.4
million tonne/year, 200-km fowline, 9.5 tcf gas, 312 million bbl condensate
Development delayed, Browse basin, 75 million bbl, condensate stripping with
gas reinjection, leased FPSO, 190 m water
Queensland coalbed methane, 2 LNG trains, 7.2 million tonne capacity
Queensland coalbed methane, 2 LNG trains, 7.2 million tonne capacity
Floating LNG, 4 million tonnes LNG/year, 3.25 tcf of gas, 120 million bbl
condensate
Gas production from Crux after condensate operation
$5 billion (Aus.), new platform for low-pressure gas from North Rankin and
Perseus gas felds

175

ExxonMobil

1,190

ExxonMobil

200

ExxonMobil
Inpex
Shell

20
200
110

Petrobras

71

9/24/12 2:23 PM

DRILLING & PRODUCTION

MAJOR PROJECTS (CONTINUED)


Project

Peak
year

Liquids,
1,000 b/d

Carioca test
Carioca Northeast test
Cernambi test (Iracemea)
Cernambi South
FPSO P-67
FPSO P-66
Franco
Guara (Sapinhoa)
Guara North
Jurua, Araracanga
Lula Northeast pilot
Marimba ESP
Maromba
Papa-Terra

2011
2011
2011
2014
2015
2015
2015
2013
2014
2013
2013
2015
2015
2013+

30
15
15
150
150
150
150

Parque das Baleias


Roncador Module 3
Roncador Module 4
Siri
Tiro, Sidon

2014
2012
2013
2014
2012

180
180
100
50
80

Presalt production

2015+

2,500

Cambodia
Aspara Phase 1A

2012+

25

Canada
Clearwater pilot

2011

Clearwater

2013+

11

Dover Phases 1-5

2015+

150

Hangingstone

2014+

12

MacKay River Pilot

2011+

MacKay River Phases

2015+

150

Swan Lake pilot


Terre de Grace Pilot
Terre de Grace Phase 1
Terre de Grace Phase 2
Christina Lake Phase C
Christina Lake Phase D
Christina Lake Phase E
Christina Lake Phase F
Christina Lake Phase G
Christina Lake Phase H
East McMurray
Foster Creek Phase F
Foster Creek Phase G
Foster Creek Phase H
Foster Creek Phase I
Pelican Lake Grand Rapids

2012+
2011+
2012+
2014
2011
2013
2014
2016
2017
2019
2020+
2014
2016
2017
2019
2018+

1
10
40
40
40
40
40
40
40
40
60
30
30
30
25
60

Pelican Lake Grand Rapids


additional phases
Narrows Lake
Steepbank
Telephone Lake
West Kirby
Winefred Lake
Hebron

2020+
2016
2020+
2018+
2020+
2020+
2013+

120
130
30
80
60
60
115

Cenovus
Cenovus
Cenovus
Cenovus
Cenovus
Cenovus
Chevron

SAGD and light hydrocarbon injection (solvent aided process)


SAGD, $1.6 billion (Can.)
SAGD
SAGD
SAGD
SAGD
$5 billion offshore heavy oil, 600 million bbl, 300 km off Newfoundland in
North Atlantic, gravity-based platform in 300 ft water

Hebron Southern Expansion


Ells River
Long Lake Phase 2
Long Lake Phase 3
Long Lake Phase 4
Long Lake South
Long Lake South
Birch Mountain Phase 1
Birch Mountain Phase 2
Gregoire Lake Phase 1
Grouse
Horizon Phases 2/3
Kirby Phase 1
Kirby Phase 2
Leismer
Algar expansion
Amauligak

2013+
2015+
2014+
2016+
2018+
2012+
2012+
2018+
2021+
2023+
2016+
2014+
2013+
2016
2018+
2012
2016+

40
100
72
72
72
70
70
60
60
60
60
135
40
60
30
24
190

Chevron
Chevron
CNOOC
CNOOC
CNOOC
CNOOC
CNOOC
CNRL
CNRL
CNRL
CNRL
CNRL
CNRL
CNRL
CNRL
Connacher
ConocoPhillips

Thermal project
SAGD
SAGD
SAGD
SAGD
SAGD
SAGD
SAGD
SAGD
SAGD, 2014 construction start, 2016 steam injection start
Mine expansion
SAGD, under construction, $1.25 billion (Can.)
SAGD, 2014 construction start, 2016 steam injection start
SAGD
SAGD

72

121001ogj_72 72

Gas,
MMscfd

Operator
Petrobras
Petrobras
Petrobras
Petrobras
Petrobras
Petrobras
Petrobras
Petrobras
Petrobras
Petrobras
Petrobras
Petrobras
Petrobras
Petrobras

150
120
40
100
150
20

Development type
BM-S-09, FPSO Dynamic Producer, Santos basin presalt, 2,140 m water

Petrobras

BM-S-11, Santos basin presalt, 2,140 m water


FPSO presalt
BMS-9 or 11, Santos basin presalt
BMS-9 or 11, Santos basin presalt
FPSO Santos basin presalt
Santos basin presalt, BM-S-9, 2.1 billion boe recoverable
FPSO Santos basin presalt
Solimoes basin, onshore gas
FPSO Cidade de Paraty, Santos basin presalt
FPSO postsalt
FPSO postsalt
BC-20, tension leg well platform P-61 and FPSO P-63, Campos basin, 1,200
m water, 14-17 gravity oil, 700-1,000 million bbl
FPSO P-58
Semisubmersible P-55, Campos basin postsalt, 22 oil, 1,800 m water
FPSO P-62, Campos basin postsalt
BMC-7, fxed platform, FPSO, Campos basin Bandejo block, 13 heavy oil
BMS-40, FPSO Cidade de Itajai, Santos basin, extended well test started
March 2010 to SS Atlantic Zephyr semisubmersible at 20,000 b/d and 16
MMscfd
Includes the installation of 20 production units in 2015-20

Chevron

Block A, 24-slot platform and FSO, 50-80 m water

Petrobras
Petrobras
Petrobras
Petrobras
Petrobras

Alberta
Oilsands
Alberta
Oilsands
Athabasca
Oil Sands
Athabasca
Oil Sands
Athabasca
Oil Sands
Athabasca
Oil Sands
Andora
BP
BP
BP
Cenovus
Cenovus
Cenovus
Cenovus
Cenovus
Cenovus
Cenovus
Cenovus
Cenovus
Cenovus
Cenovus
Cenovus

SAGD plus solvent (SLP-SAGD), 2012 construction start


SLP-SAGD
$2.5 billion (Can.) SAGD, 4 billion bbl
SAGD
SAGD, 5-year life
SAGD
SAGD, Peace River area
SAGD, $3.5 billion (Can.) for two phases
SAGD
SAGD
SAGD under construction
SAGD
SAGD
SAGD
SAGD
SAGD
SAGD
SAGD
SAGD
SAGD
SAGD
SAGD and light hydrocarbon injection (solvent aided process), 2014 construction start, 2017 steam injection

Oil & Gas Journal | Oct. 1, 2012

9/24/12 2:23 PM

DRILLING & PRODUCTION

MAJOR PROJECTS (CONTINUED)


Project

Peak
year

Parsons Lake

2018+

50

Surmont Phase 2
Jackfsh Phase 2
Jackfsh Phase 3
Jackfsh East
Pike 1A
Pike 1B
Pike 1C
Pike 2
Deep Panuke
Poplar Creek
Poplar Creek expansion
Aspen
Firebag
Hebron
Hibernia South expansion
Kearl Phase 1

2015+
2011
2014+
2018+
2017+
2018+
2019+
2023+
2011+
2014
2017
2015+
2015+
2015+
2012+
2012+

83
35
35
25
35
35
35
35
200
10
40
80
280
130
55
170

Kearl Phase 2
Mackenzie gas project

2015+
2018+

170
10

Sable satellites
Algar Phases 1-2
BlackGold Phase 1
BlackGold Phase 2
Caribou
McMullen Pilot
Pikes Peak
Sunrise Phase 1
Sunrise Phase 2
Cold Lake LASER expansion
Cold Lake Nabiye expansion
Taglu

2013+
2013+
2012
2015+
2011+
2011+
2012
2014+
2016+
2013+
2015+
2015+

5
10
10
20
10
1
9
60
70
20
40

Tamarack Phase 1
Tamarack Phase 2
Hangingstone Phase 1
Gemini pilot
Gemini
Germain pilot
Germain Phase 1
Saleski pilot
Saleski Phase 1
Christina Lake Phase 2B
Christina Lake Phase 3A
Christina Lake Phase 3B
Axe Lake
Taiga Phase 1
Ells River
Lindbergh pilot
Lindbergh
May River Phase 1
May River additional phases
Whitesand expansion
Carmon Creek Phase 1

2018+
2015+
2014+
2011+
2012+
2011+
2012+
2011
2012+
2013+
2015+
2017+
2013+
2014+
2012+
2012+
2014+
2012+
2014+
2011+
2014+

20
30
35
1
10
2
10
2
10
35
75
75
10
25
10
2
12
10
90
2
80

Jackpot mine Phase 1B


Jackpot mine Phase 2
Muskeg River Expansion
Niglintgak

2012+
2014+
2013+
2015+

100
100
115

Orion Phase 2
Pierre River Phase 1
Pierre River Phase 2
Leismer pilot
Leismer commercial
Leismer expansion
Comer
Thornbury
Comer expansion
Hangingstone
Thornbury expansion
Northwest Leismer
South Leismer
Red Earth pilot expansion

2012+
2016+
2016+
2011
2012+
2012+
2012+
2013+
2014+
2016+
2017+
2018+
2020+
2011+

60
100
100
10
10
20
40
40
40
20
20
20
20
3

Red Earth commercial

2013+

10

Oil & Gas Journal | Oct. 1, 2012

121001ogj_73 73

Liquids,
1,000 b/d

Gas,
MMscfd

1,700
190

Operator

Development type

ConocoPhillips Northwest Territories, 1.8 tcf gas, awaiting $7.8 billion (Can.) 760-mile, 1.2
bcfd Mackenzie Delta pipeline, $3.5 billion (Can.) gas gathering system,
$4.9 billion (Can.) anchor felds
ConocoPhillips SAGD, $1.1 billion (Can.), four phases, Phase 2 under construction
Devon
SAGD, $1 billion (Can.), 300 million bbl
Devon
SAGD, 2012 construction start, 300 million bbl
Devon
SAGD, 2016 construction start
Devon
SAGD, 2016 construction start
Devon
SAGD, 2017 construction start
Devon
SAGD, 2017 construction start
Devon
SAGD, 2021 construction start
Encana
Platform and 4 producing wells, 250 km southeast of Halifax
E-T
Electrothermal heating
E-T
Electrothermal heating
ExxonMobil
ExxonMobil
ExxonMobil
ExxonMobil
ExxonMobil
$10.9 billion (Can.) Phase 1 mine, 4.6 billion bbl over 40 years, Phase 1
under construction
ExxonMobil
Mine
ExxonMobil
Northwest Territories, awaiting $7.8 billion (Can.) 750-mile, 1.7 bcfd Mackenzie Delta pipeline, $3.5 billion (Can.) gas gathering system, $4.9 billion
(Can.) anchor felds
ExxonMobil
Subsea tieback to Sable platform off Nova Scotia
Grizzly
$500 million (Can.) SAGD
Harvest
$300 million (Can.) SAGD
Harvest
$540 million (Can.) SAGD, 2013 construction start, 2015 steam injection start
Husky
SAGD, Cold Lake area
Husky
SAGD
Husky
Saskatchewan thermal
Husky
$1.9 billion (Can.) SAGD, 49 well pairs
Husky
$1.9 billion (Can.) SAGD
Imperial Oil
Liquid addition to steam for enhanced recovery
Imperial Oil
$1.3 billion (Can.) Cold Lake Phases 14-16, cyclic steam, horizontal wells
Imperial Oil
Northwest Territories, 3 tcf gas, awaiting $7.8 billion (Can.) 750-mile, 1.2 bcfd
Mackenzie Delta pipeline, $3.5 billion (Can.) gas gathering system,
$4.9 billion (Can.) anchor felds
Ivanhoe
SAGD, $1.25 billion (Can.), 2012 construction start, 2013 steam injection start
Ivanhoe
SAGD
JACOS
$1.2 billion (Can.) SAGD, 1.7 billion bbl, construction start in late 2011
Koch
SAGD, Cold Lake area
Koch
SAGD, Cold Lake area
Laricina
SAGD, Cold Lake area
Laricina
SAGD, Cold Lake area
Laricina
SAGD in carbonates, under construction
Laricina
SAGD in carbonates
MEG
$1.4 billion (Can.) SAGD under construction
MEG
SAGD
MEG
SAGD
Oilsands Quest SAGD, Northwest Saskatchewan
Osum
SAGD-CSS, Cold Lake area
Patch
SAGD
Pengrowth
SAGD pilot, Cold Lake area
Pengrowth
SAGD
Petrobank
Toe-to-heel air injection (THAI)
Petrobank
Toe-to-heel air injection (THAI)
Petrobank
Toe-to-heel air injection (THAI)
Shell
$3.45 billion (Can.) cyclic steam, Peace River area, 2011 construction start,
2014 steam injection start
Shell
Mine
Shell
Mine
Shell
Mine
Shell
Northwest Territories, 1.8 tcf gas, awaiting $7.8 billion (Can.) 760-mile, 1.2
bcfd Mackenzie Delta pipeline, $3.5 billion (Can.) gas gathering system,
$4.9 billion (Can.) anchor felds
Shell
SAGD, Cold Lake area
Shell
Mine
Shell
Mine
Statoil
SAGD pilot, start production January 2011
Statoil
SAGD with upgrader
Statoil
SAGD with upgrader
Statoil
SAGD with upgrader
Statoil
SAGD with upgrader
Statoil
SAGD
Statoil
SAGD
Statoil
SAGD
Statoil
SAGD
Statoil
SAGD
Southern
Pacifc
Cyclic steam, Peace River area
Southern
Pacifc
Cyclic steam, Peace River area

73

9/24/12 2:23 PM

DRILLING & PRODUCTION

MAJOR PROJECTS (CONTINUED)


Project

Peak
year

STP-McKay

2012+

24

Chard Phase 1
Firebag Phase 3
Firebag Phase 4
Firebag Phase 5
Firebag Phase 6
Fort Hills Phase 1
Fort Hills debottlenecking
Lewis Phase 1
Lewis Phase 2
MacKay River expansion
Meadow Creek Phase 1
Meadow Creek Phase 2
Voyageur South
Harper pilot
Legend Lake Phase 1
Legend Lake Phase 2
West Ellis Phase 1
West Ellis Phase 2
West Ellis Phase 3
Thickwood Phase 1
Thickwood additional phases
Syncrude expansion Stage 3
Syncrude Stage 4
Equinox
Frontier Phase 1
Frontier Phase 2
Frontier Phase 3
Northern Lights Phase 1
Northern Lights Phase 2
Joslyn North

2012+
2013
2014
2016+
2014+
2016+
2018+
2012+
2012+
2012+
2012+
2012+
2012+
2011+
2013+
2015+
2012+
2014+
2016+
2013+
2015+
2012+
2015+
2020+
2016+
2019+
2022+
2016+
2018+
2018+

40
68
68
62
68
165
25
40
40
40
40
40
120
1
10
40
10
40
30
10
40
46
140
37
80
80
80
57
57
100

Southern
Pacifc
Suncor
Suncor
Suncor
Suncor
Suncor
Suncor
Suncor
Suncor
Suncor
Suncor
Suncor
Suncor
Suncor
Sunshine
Sunshine
Sunshine
Sunshine
Sunshine
Sunshine
Sunshine
Sunshine
Syncrude
Syncrude
Teck
Teck
Teck
Teck
Total
Total
Total

China
Chuandongbei, Tieshanpo,
Dukouhe-Qilibei,
and Luojiazhai

2011

558

Chevron

2013+
2015

300
200
320

Husky
Husky
Shell

Sichuan Province processing plants and gas felds with 5 tcf of gas, 8-17%
H2S, 5-10% CO2; second phase to start production in 2013
$6.5 billion, 4-6 tcf discovery, 1,345 m water South China Sea Block 29/26
Block 29/29
Horizontal and multilateral tight gas development in Ordos basin, Inner Mongolia; started up March 2007

Shell
Total

Develop more tight gas sands and increase plateau output beyond 320 MMcfd
Unconventional tight gas sands, Ordos Block, Inner Mongolia, 18.85 tcf gas,
discovered 2002, production started in 2002

Pacifc
Rubiales

Increase Rubiales and Piriri blocks production to 170,000 b/d

Eni
Total
Total
Chevron

Yanga satellite, 110 m water

Liwan 3-1, 34.-2


Liwan 29-1
Changbei
Changbei extended
development phase
South Sulige

2012

Colombia
Rubiales expansion

2011+

Liquids,
1,000 b/d

Gas,
MMscfd

3,000

50

Congo (Brazzaville)
Tar sands project
Libondo
Moho North
Lianzi

2012
2011
2012
2015+

39
8

East Timor and JPDA


Kitan

2011

40

Sunrise, Troubadour

2016

30

Ecuador
Pungarayacu

2013

100

Egypt
Seth

2012

Equatorial Guinea
Alen (Belinda)
Aseng

46

3,000

Operator

$415 million (Can.) SAGD, 2012 steam injection start


SAGD, under construction
SAGD, production started July 2011
SAGD under construction
$1.7 billion (Can.) SAGD
SAGD
Mine, upgrader, 2.8 billion bbl
Mine, upgrader
SAGD, 3 billion bbl
SAGD
$1 billion SAGD
SAGD, $800 million (Can.), 1.3 billion bbl
Mine
SAGD
SAGD
SAGD
SAGD
SAGD
SAGD
SAGD
SAGD
Mine and processing
$2.3 billion (Can.) mine and processing
$2.5 billion (Can.) mine
$6 billion (Can.) mine
Mine
Mine
Mine
Mine
$6 billion (Can.) mine

Congo-Angola shared zone; 27-mile electrically heated fow line to BBLT


platform off Angola

Woodside

JPDA Block 06-105, Timor Sea, FPSO, 3 subsea wells, 1,000 ft water, 30-40
million bbl of oil; started up October 2011
Floating LNG, 4 million tonnes/year LNG, 5.13 tcf of gas, 250 million bbl of
condensate, 90-550 m of water, foating LNG, 7 subsea wells at start-up with
26 wells at full development

Ivanhoe

Block 20, 4.5+ billion bbl heavy oil

27

Eni

Phase 1 started up June 2012 toward 170 MMcfd from 2 wells to develop 240
bcf; Phase 2 to add 2 wells to top 250 MMcfd by end-2012

2013

30

Noble

2012

80

Noble

$1.1-1.5 billion, 247 million boe, gas recycling, fxed platform in 25 ft water,
use Aseng FPSO for liquids
220 million boe, two four-slot subsea manifolds tied back to FPSO in 3,000 ft
water, 1.6 million bbl storage

Falkland Islands
Sea Lion

2016+

120

Rockhopper

$2 billion, FPSO in 450 m water, 350 million bbl of 29.2 gravity oil

Gabon
Anguille redevelopment

2011

30

Total

$2 billion, new wells and facilities to add 150 million bbl, feld on production
since 1966

74

121001ogj_74 74

Eni

Development type

580

Oil & Gas Journal | Oct. 1, 2012

9/24/12 2:23 PM

DRILLING & PRODUCTION

MAJOR PROJECTS (CONTINUED)


Project

Peak
year

Liquids,
1,000 b/d

Ghana
Jubilee

2011

120

India
Bhagyam

2012

40

Indonesia
Gendalo, Gehem

2013+

31

Caltex 3
South Belut
Suban 3
Coalbed methane
Pagerungan Utara
Terang, Sirasun, Batur

2013+
2013+
2013+
2013
2011
2012

35
15
15
6
300

Banyu Urip

2013

165

15

Cepu gas
East Natuna
Abadi
Senoro-Toili
Ruby

2015+
2019+
2016+
2014+
2013

13
8

210
1,100
650
250
100

Matindok
Jambaran-Tiung Biru

2014+
2015+

23

290

Iran
Azadegan North Phase 2
Yadavaran

2014
2013

30
85

NIOC
NIOC

Heavy oil
Medium oil

Iraq
Rumaila expansion
Al-Ahdab

2013+
2020+

1,850
120

BP
CNPC

Halfaya expansion
Tawke
West Qurna expansion
Badra
West Qurna 2
Hamrin
Subba-Luhais expansion
Gharraf

2013+
2012+
2015+
2013+
2013+
2012+
2012+
2012+

500
200
2,045
170
1,800
60
240
230

CNPC
DNO
ExxonMobil
Gazprom
Lukoil
OGI
Petrel
Petronas

17.7 billion bbl feld


$3.9 billion, 670 million bbl, start production in 2012 and ramp-up to peak in
2022
5 billion bbl
1.748 billion bbl in place
21 billion bbl, west of Basra

Majnoun expansion
Najima
Qayara

2013+
2013+
2013+

1,750
110
120

Shell
Sonangol
Sonangol

Ireland
Corrib

2013+

320

Shell

Subsea wells in 350-m water tied back to shore with 83-km, 20-in. fowline

Israel
Tamar

2013+

850

Noble

Dalit
Leviathan

2016

350

Noble
Noble

$2.8 billion, subsea wells tied to dual 160-mile, 16-in. fowlines to shore, 9 tcf,
5,000 ft water; development drilling under way
Tamar Phase 2
17 tcf resource; drilled successful appraisal well in 2011

Italy
Tempa Rossa

2015

50

20

Total

$700 million, 200 million bbl of heavy oil, S. Apennines

Kazakhstan
Karachaganak Expansion III
Aktote
Kashagan Phase 1

2012+
2015+
2012+

50
360

BG
Eni
Eni

Kashagan future phases

2013

1,260

$8 billion expansion
Coventure operated
$29 billion, 3.6 billion bbl of oil, carbonate reef, 10-30 ft water, 45 gravity oil,
19% H2S, production start in 2011, 1.2 million bo/d from all phases
12 billion bbl

Kuwait
Kuwait North redevelopment

2012

450

Libya
Area 47

2014+

50-100

Sirte basin redevelopment

2012+

200

Malaysia
Damar gas
Teluk
Gumusut-Kakap
Malikai

2012+
2012+
2013+
2012+

150
150

76

121001ogj_76 76

Gas,
MMscfd
160

1,100

600

1,600
850

Operator

Development type

Tullow

FPSO, 1 million bbl storage, 1,500 m water, started up December 2010

Cairn

Onshore Rajasthan, started up January 2012

Chevron

Kutei basin, Makassar Strait off East Kalimantan, 6,000 ft water, two FPUs,
subsea drill centers, domestic gas and gas to Bontang LNG for export
ConocoPhillips
ConocoPhillips
ConocoPhillips
Eni
ENRG
Oil development off Kangean Island
ENRG
Gas felds off Kangean Island, spread-moored FPSO with 340 MMscfd gas
processing capacity and 700,000 bbl storage in 100 m water
ExxonMobil
$2.6 billion, Cepu block, onshore Java, 50 wells drilled from four well pads,
60-mile pipeline to 2 million bbl FSO moored off Tuban, initial production of
20,000 b/d started in 2009
ExxonMobil
ExxonMobil
46 tcf of gas, 70% carbon dioxide, South China Sea, former Natuna D Alpha
Inpex
Crude-condensate, Masela block, foating LNG, 4.5 million tonnes/year
Medco
Central Sulawesi gas for $2.8 billion Donggi-Senoro LNG, 2 million tonnes/year
Pearl Energy
$500 million, Sebuku PSC in Makassar Strait, 50-200 m of water, wellhead
platform bridge linked to production platform, 315 km 14-in. pipeline to
Totals Senipah onshore gas plant, gas sales to fertilizer plant
Pertamina
Central Sulawesi gas for Donggi-Senoro LNG, 2 million tonnes/year
Pertamina
Cepu block gas

Eni

1.3 billion bbl, southwest of Kirkuk


1.3 billion bbl, southern Iraq
1.2 billion bbl, initial 50,000 b/d in 2012 with production increasing to
230,000 b/d plateau in 2016
12.6 billion bbl, 28-35 gravity, 30 miles north of Basra
Heavy 17.1 oil

KPC
Medco
Oxy

200
350

ExxonMobil
ExxonMobil
Shell
Shell

Develop 18 oil discoveries with 588 million boe contingent resource in Ghadames basin
$5 billion over 5 years, increase to 300,000 bo/d from 100,000 bo/d, develop
2.5 billion bbl of oil

Semisubmersible, 1,250 m water, off Sabah


1,850 m water, off Sabah

Oil & Gas Journal | Oct. 1, 2012

9/24/12 2:23 PM

DRILLING & PRODUCTION

MAJOR PROJECTS (CONTINUED)


Project
Mozambique
Golfnho/Atum
Prosperidade
Mamba/Coral

Peak
year

Liquids,
1,000 b/d

Gas,
MMscfd

Operator

Development type

2019+

Anadarko
Anadarko
Eni

10-30+ tcf estimated recoverable gas resource


17-30+ tcf estimated recoverable gas resource
70+ tcf estimated recoverable gas resource

Myanmar
Shwe, Shwe Phyu, Mya

2014

Daewoo

Develop 5+ tcf of Rakhine basin gas for transport via 770-km pipeline to
Kunming, China

Namibia
Kudu

2014+

Tullow

$7 billion, PL 003, 170 m water, 1.8 tcf gas reserves for power plants

Niger
Agadem block

2011

20

CNPC

Oil is shipped through a 463-km pipeline to a 20,000 b/d re nery at Zinder,


Niger. CNPC has ve oil discoveries on the block

Nigeria
Ebok

2011

35

Afren

OML 67, 55 km off Nigeria in 140 ft water, 12-slot wellhead platform, mobile
jack up production unit and FSO. Production started March 2011, 24 gravity
oil

Agbami 2
Nigeria GTL
Nsiko
Brass LNG
Bosi

2011+
2011+
2012+
2012+
2013+

100
33
100
135

Chevron
Chevron
Chevron
Eni
ExxonMobil

Erha North Phase 2


Etim-Asasa pressure
maintenance
LNG IPP Project
Satellite projects Phase 1
Satellite projects Phase 2-4
Uge
Usari pressure maintenance
Bonga North, Northwest

2013+

50

ExxonMobil

2012+
2013+
2011+
2013+
2013+
2013+
2013+

50
70
300
110
50
150

Bonga Southwest
Gbaran Ubie Phase 1
NLNG 7
Egina
Usan

2013+
2012+
2012
2012
2012

140
70
1,600
200
180

105
1,000
175

Shell
Shell
Shell
Total
Total

Norway
Skarv-Idun

2011

90

665

BP

Valhall redevelopment
Eko sk South
Eld sk II
Goliat
Edvard Grieg (Luno)-Draupne
Brynhild
Dagny
Gullfaks South
Luva
Marulk
Trestakk
Valemon
Visund South
Hild

2011
2013+
2013+
2013
2016
2014
2015+
2014
2013
2012
2013
2015
2012
2016

150
70
70
100
130
12
65

175

BP
ConocoPhillips
ConocoPhillips
Eni
Lundin
Lundin
Statoil
Statoil
Statoil
Statoil
Statoil
Statoil
Statoil
Total

Papua New Guinea


Hides, Angore, Juha
(PNG gas)

2014

30

Stanley condensate

2014

Horizon

$10-11 billion, gas from elds in Southern Highlands to 6.6 million tonne/year
LNG plant at Port Moresby
$300 million project to recover condensate from gas cycled from Cretaceous
Elevala sandstone at 3,060 m

Peru
Paiche, Dorado, Pirana

2018

60

Perenco

Block 67, Maranon basin, 12-21 gravity oil, 248-mile pipeline, 190 directional
wells from 18 pads; production to start in 2013

Qatar
Barzan Phase 1

2013

85

1,400

ExxonMobil

1.5 bcfd for local markets

Russia
Sakhalin-1 Arkutun-Dagi
Sakhalin-1 Gas

2013+
2013

90
30

800

ExxonMobil
ExxonMobil

Kovykta

2015+

Offshore platform
Gas pipeline from Chayvo, Odoptu, and Arkutun-Dagi offshore elds totaling
17 tcf
70 tcf gas, awaiting pipelines for regional sales and sales to China

78

121001ogj_78 78

1,300

700
20
80

135
4
185
600

35
40

120

940

2,500

ExxonMobil
ExxonMobil
ExxonMobil
ExxonMobil
ExxonMobil
ExxonMobil
Shell

ExxonMobil

Gazprom

$2.9 billion
OPL 249
$7 billion, 2 trains LNG associated gas and gas from OML 60 and 61 gas elds
$2 billion, FPSO, 2 million bbl storage, 1,700 m water, 500 million bbl of oil,
2.5 tcf gas
Subsea tieback to Erha FPSO

15 wellhead platforms, 800 million bbl of oil


OPL 214, 4,100 ft water
Subsea tiebacks in 4,000 ft water to Bonga FPSO in 4,000 ft water, 600 million
bbl of oil
FPSO, 840 million bbl of oil
30 wells and gas gathering facilities in Bayelsa state, Niger Delta
Bonny Island, 8 million tonnes/year
OML 130, 1,500 m water
$2 billion, OPL 138, FPSO, 2 million bbl storage, 23 producing wells and 19
water and gas injection wells, 2,395-2,790 ft water, 500 million bbl oil. Production started rst quarter 2012
Skarv FPSO oil and gas development, Idun subsea tieback to Skarv in 390 m
water, reserves 105 million bbl liquids and 1.7 tcf gas
New platform
Barents Sea, cylindrical FPSO, 1,000 ft water
$4 billion, PL 338, 11 producers, 4 water injectors
Block 7/7, 3 wells tied back to UK Pierce FPSO, 22 million bbl, 80 m water
NOK 8.5-billion, 6-well project on PL 050 to recover 65 million boe

PL 40 and 43, develop 1978 discovery in 100-120 m water, 190 million boe
recoverable

Oil & Gas Journal | Oct. 1, 2012

9/24/12 2:23 PM

DRILLING & PRODUCTION

MAJOR PROJECTS (CONTINUED)


Project

Peak
year

Liquids,
1,000 b/d

Gas,
MMscfd

Shtokman

2016+

2,400

Gazprom

Shtokman additional phases


Yuzhno-Russkoye
Khvalynskoye

2019
2013+
2016

6,600

Gazprom
Gazprom
Lukoil

Vankor
West Salym, Western Siberia
Verkhnechonskoye
Kharyaga Phase 3

2013
2013
2015
2011

Saudi Arabia
Arabiyah
Hasbah
Karan

2015+
2015+
2013

Manifa

2013+

900

Thailand
Platong II

2011

18

Manora

2014

15

Bongkot South

2012

330

PTTEP

Trinidad & Tobago


Angostura gas Phase II

2011

280

BHP

Juniper (Corallita, Lantana)

2012

UAE
ADCO expansions
Shah sour gas

2012+
2014+

1,000
120
143
100
30

Rosneft
Shell
TNK-BP
Total
1,000
800
1,800

560
50

Operator

Aramco
Aramco
Aramco
Aramco

330

Chevron
Pearl Energy

BP
ADCO
ADCO

On indefnite hold; 130 tcf, Barents Sea, Phase 1 includes 3 subsea templates
with 20 producers fowing to a FPSO and 36-in. pipelines tied to a 7.5 million
tonne/year LNG plant
On indefnite hold
2nd pipeline to Germany completed
Caspian Sea, 25 m water, 12 tcf gas, 265 million bbl oil, and 148 million bbl
NGL
900 million bbl proved and probable; Krasnoyarsk Kray, western East Siberia
Started production in late 2004
1 billion bbl resource, 2010 production start
Yamal-Nenets, feld under production since 1986
High sulfur gas
High sulfur gas
$8 billion, offshore 9 tcf Khuff gas feld, 110-km pipeline to Khursaniyah gas
plant, 5 production platform complexes in 40-60 m water, started producing
July 2011 at 120 MMscfd
$1 billion, Arab heavy (cover image of this issue)
$3.1 billion, processing platform, 12,000 ton topsides, 5 wellhead platforms,
320 km from shore, 200 ft water
Central production and processing platform with FSO in 50 m water, 1,6002,200 m reservoir depth
$1 billion, 17,000-tonne topsides and 5,000-tonne steel jacket for central
processing platform. High H2S gas. Started in April 2012
$400 million new platform in Greater Angostura gas feld in Block 2c, May
2011 production start
Gas felds, platform or subsea completions in 360 ft water

Upper Zakum redevelopment 2013

750

ExxonMobil

Onshore 1 bcfd gas gathering facilities for 23% H2S and 10% CO2 gas to
produce 500 MMcfd methane, 33,000 b/d condensate, 4,400 tons/day NGL,
and 9.200 tons/day of elemental sulfur
$2 billion, light oil, 50 billion bbl with only 10% recovered to date

Uganda
Lake Albert rift basin

2015+

200

Tullow

1 billion bbl of oil discovered

UK
Fyne

2013

19

Antrim

Kinnoull

2013

35

30

BP

Cheviot

2013

25

50

ATP

Block 21/28a, 80-90 m water, subsea tieback to 3rd party infrastructure or


stand-alone
UK Block 16/23, 103 m water, 3 subsea wells tied back 28-km to the Andrews
platform, 90 million bbl, 46.2 gravity
Blocks 2/106, 2/15a, 3/1, 500 million boe, octabuoy reusable octagonal ring
pontoon drilling and production unit, 500-9,500 ft of water

Schiehallion, Loyal
redevelopment
Alder
Rosebank

2016
2014
2015+

130
9

125
80

Golden Eagle, Peregrine


Ekofsk South

2014+
2014

70
70

CNOOC
ConocoPhillips

Eldfsk II
Jasmin

2015
2013

70
86

ConocoPhillips
ConocoPhillips

Huntington

2012

27

60

Fram
Laggan-Tormore

2015+
2011

20
90

140

US
Caesar, Tonga

2012+

44

Lucius

2014

80

Galapagos (Isabela,
Santiago, Santa Cruz)
Kaskida
Liberty

2012+
2015
2012

50

Mad Dog 2
Big Foot
Jack, St. Malo

2014+
2014+
2013+

100
63
150

Alpine West (CD5)


Lookout (CD6)
Hadrian North
Hadrian South

2013+
2013+
2015+
2012+

10
15
100

80

121001ogj_80 80

500

Development type

BP
Chevron
Chevron

E.On Ruhrgas
Shell
Total
Anadarko

450

Anadarko
BP
BP
BP

15

BP
Chevron
Chevron

100
300

Replacement FPSO, west of Shetlands, 425 m water


West of Britannia feld, HPHT, potential subsea development
West of Shetland 2004 discovery in 3,658 ft water; FEED starts in second half
2012
$3.3 billion, Block 20/1, 140-150 million bbl, two platforms, 90-120 m water
New platform 2/4z, subsea facilities 2/4VB, 35 production and 8 water injection wells
New platform 2/7S, 30 production and 7 water injection wells
Central North Sea J-block gas-condensate feld with 8 wells in 85 m water to
produce through tieback to Judy platform
Subsea/FPSO development of 30 million boe, 90% oil, in 90 m water; production start-up expected in fourth quarter 2012
West of Shetlands, gas-condensate felds, 600 m water, Block 205/5a
Green Canyon blocks, $1.3 billion, 200-400 million boe reserves, 4 wells tied
back to Constitution spar; started up in March 2012
Keathley Canyon Blocks 874, 875, 918, 919, truss spar, 7,100 ft water, subsalt Pliocene and Miocene sands at about 20,000 ft, 300+ boe reserves
Subsea tiebacks to NaKika, 130 million boe; started up in June 2012
Keathley Canyon Block 292, Lower Tertiary feld in 5,900 ft water
Project suspended indefnitely in July 2012; Alaska light oil discovered in
1997, wells with record departures of 34,000-44,000 ft
Mississippi Canyon Block 826, 1,370 m water
Walker Ridge Block 29, 5,268 ft water
Walker Ridge Blocks 714, 715, 759, 673, 674, 677, 678, 7,000 ft water, 500
million bbl, 26,550-ft reservoir depth

ConocoPhillips
ConocoPhillips
ExxonMobil
ExxonMobil

Oil & Gas Journal | Oct. 1, 2012

9/24/12 2:23 PM

DRILLING & PRODUCTION

MAJOR PROJECTS (CONTINUED)


Project

Peak
year

Julia Phase 1
Point Thomson/Alaska gas

2015+
2014+

Tip Top, Hogsback


Piceance tight gas
future phases
Tubular Bells
Ozona
Mandy

2013+
2013
2014+
2012
2011+

5
60
10
15

Gunfint-Freedom
Cascade, Chinook

2015
2012

140
80

Cardamom

2014

50

Shell

Olympus

2015+

100

Shell

Stones
Vito

2013+
2015+

80
100

Shell
Shell

Venezuela
Loran
Junin 5
Perla

2012+
2018
2013

240
140

Chevron
Eni
Eni

Junin 6
Junin 2
Junin 4
Carabobo 1
Carabobo 3
Corocoro
San Cristobal
Plataforma Deltana
Dragon, Patao
Mariscal Sucre
Mariscal Sucre expansion
Yucal Placer expansion

2014+
2014+
2015+
2014+
2014+
2012+
2012+
2012+
2012+
2012+
2013+
2012+

450
200
400
400
400
70

Vietnam
Vietnam gas project
Chim Sao

2013+
2011

4
25

82

121001ogj_82 82

Liquids,
1,000 b/d
30
70

Gas,
MMscfd

Operator

4,500

ExxonMobil
ExxonMobil

2,060

ExxonMobil

780
12

ExxonMobil
Hess
Marathon
LLOG

16

Noble Energy
Petrobras

600
600
600
300

Gazprom
Pdvsa
Pdvsa
Pdvsa
Pdvsa
Pdvsa
Pdvsa
Pdvsa
Pdvsa
Pdvsa
Pdvsa
Ypergas

490
25

Chevron
Premier

400

Development type
Initial condensate production, gas awaiting the $20-41 billion, 4.6-bcfd Alaska
gas pipeline
La Barge expansion Wyoming gas
Colorado tight gas sands
Mississippi Canyon Block 726, 4,334 ft water
Garden Banks Block 515, 3,000 ft water, single-well tieback
Mississippi Canyon Block 199, 3 wells tied back to Matterhorn TLP, 10-30
million boe
Mississippi Canyon Blocks 948 and 949, seven subsea wells, 250 million boe
FPSO, 600,000 bbl storage, Walker Ridge 206 and 469, 8,300 ft water, startups Chinook September 2012, Cascade February 2012
Recover 140 million boe from a reservoir below 25,000 ft TVD in 2,700 ft
water on Garden Banks 427
Mississippi Canyon Blocks 762-764, 805-807, 850, and 851 TLP, 900 m
water, former Mars B
Walker Ridge Block 508, 9,576 ft water
Mississippi Canyon Blocks 984 and 985, 4,240 ft water, 200 million boe
5 tcf of gas
Orinoco heavy oil
14+ tcf in 70 m water, Gulf of Venezuela, countrys largest gas-condensate
discovery
$24 billion Orinoco heavy oil, 40,000 b/d target in 2013
Orinoco heavy oil
Orinoco heavy oil
9 billion bbl of heavy oil
Orinoco heavy oil
West Paria Gulf
Block 2, Manatee area, 6 tcf LNG project
38 tcf off Venezuela and 21 tcf off Trinidad and Tobago
Offshore gas felds in 130 m water
Offshore gas
Offshore gas
Guarico state; further develop high-pressure gas and carbon dioxide reservoir
to triple mid-2012 output of 100 MMcfd
$4.3 billion, Block B
Unmanned well platforms 115 m water, FPSO; averaged 30,000 b/d and 30
MMcfd in frst half 2012

Oil & Gas Journal | Oct. 1, 2012

9/24/12 2:23 PM

S-ar putea să vă placă și