Pursuant to Section 64 of the Electricity Act 2003, Noida Power Company Limited submitted the petition of Aggregate Revenue Requirement (ARR) & Tariff for FY 2015-16 on 28th Nov'2014 before U. P. Electricity
Regulatory Commission, Lucknow. Consequent upon admittance of the petition, the Hon'ble Commission vide its Tariff Order dated 18th June 2015 has approved the ARR & Tariff for FY 2015-2016. In accordance with the
provision of Electricity Act 2003 and the Tariff Order passed by the Hon'ble Commission on the ARR Petition, the General Public and the Electricity Consumers of Greater Noida are hereby informed about the abstract of
Rates and Charges of different category of consumers as approved by the Hon'ble Commission.
CONSUMER
CATEGORY / SUB-CATEGORY
LMV-1
(ii)
(b)
(c)
(d)
LMV-2
LMV-3
LMV-4
LMV-5
LMV-6
SCHEDULE
CONSUMER
CATEGORY / SUB-CATEGORY
LMV-6
Rs.180.00 / kW / Month
Rs. 200.00 / kW / Month
From 1st January 2016,Tariff for unmetered
category of LMV-1(a) shall be increased by 10%.
Metered:
Fixed Charge:
Rs. 50.00 / kW / Month
Energy Charge:
Rs. 2.20 / kWh
Supply at single point for bulk loads:
Fixed Charge
Rs. 80.00 / kW / Month
Energy Charge
Rs. 5.35 / kWh
Other Metered Domestic Consumers: (For All Loads)
Fixed Charge
Rs.80.00 / kW / Month
Energy Charge
Upto 150 kWh / Month
Rs. 4.10 /kWh
151-300 kWh / Month
Rs. 4.60 / kWh
301-500 kWh / Month
Rs. 5.10 / kWh
Above 500 kWh/Month
Rs. 5.65 / kWh
Life Line Consumers: With contracted load of 1.00 kW, Energy
consumption upto 150 kWh/ Month
Fixed Charge
Rs. 50.00 / kW / Month
Energy Charge (0-50 Units)
Rs. 2.00 / kWh
Energy Charge (51-150 Units)
Rs.3.00 / kWh
(b)
Date: 19.06.2015
Fixed Charge
Minimum Charge
NIL
LMV-7
LMV-8
LMV-9
1700 hrs-2200hrs
(+) 15.00%
Optional TOD Structure for Specific Consumer
TOD Rates
0600 hrs-2200 hrs
Restricted to 15% of Contracted Load
2200 hrs-0600 hrs
(-) 15.00%
PUBLIC WATER WORKS:
(a) Consumers getting supply other than "Rural Schedule"
Fixed Charge
Rs.230.00 / kW / Month
Energy Charge
Rs. 7.0 / kWh
(b) Consumers getting supply as per "Rural Schedule"
Fixed Charge
Consumers getting supply as per Rural
Schedule shall be eligible for a Rebate of
Energy Charge
7.50% on fixed charge and energy charge as
given for under other than rural schedule.
STATE TUBE WELLS :
(i) Metered
Fixed Charge
Rs. 200.00 / BHP / Month
Energy Charge
Rs. 6.70 / kWh
(ii) Un-Metered
Fixed Charge
Rs.1800.00 / BHP / Month
TEMPORARY SUPPLY:
Un-Metered
Fixed Charges for Illumination / Public Address /
ceremonies for loads upto 20 kW / connection plus
Rs.100.00 / kW / day for each additional kW
Fixed charges for temporary shops set-up during
festivals/melas and having load up to 2 KW
Metered
Fixed Charge
(i) Individual Residential Construction
(ii) Others
Energy Charge
(i) Individual Residential Construction
(ii) Others
Minimum Charge:
HV-1
HV-2
2. For Consumers at 11 kV
BASE RATE :For Hour Linked Tariff
Demand Charges (Rs /kVA/Month)
Energy Charge (Rs / kVAh)
3. For Supply above 11 kV and up to 66 kV
BASE RATE :For Hour Linked Tariff
Demand Charges (Rs /kVA/Month)
Energy Charge (Rs / kVAh)
Minimum Charge (Rs / kVA /Month)
TOD Rates
2200hrs-0600 hrs
0600 hrs-1700 hrs
1700 hrs-2200hrs
Optional TOD Structure for Specific Consumer
0600 hrs-2200 hr
2200 hrs-0600hrs
(B) Rural Schedule:
In addition to above, Regulatory Surcharge @ 8% shall be applicable over the above rates. Late payment surcharge shall be levied @
1.25% per month up-to first three months of delay and subsequently @ 2.00% per month of delay. The above Rate and Charges as
approved by Hon'ble U. P. Electricity Commission shall become effective after 7 days from the date of this publication on the electricity
consumers of Noida Power Company Limited and shall be applicable till issuance of next Tariff Order. The aforesaid Tariff Order,
approved Tariffs & Rate Schedule are also available at the websites of Hon'ble U. P. Electricity Regulatory Commission at