SPECIAL ENERGY METER, DATA COLLECTING

& PROCESSING IN EASTERN REGION


(USER MANUAL)
S IKKIM
GA NDA K

B HUT AN

T IS T
II

EA ST ER N C A N A L
GA N D A K

T A LA
5

M ALBASE

NE P AL

S IL IG U R I
B IN A G U R I

G OR A KH P UR

B IR P A R A ( P G )

NJP
M UZ 'F R P U

B O N G 'G A O N

UT T AR
P RAD E S H

P U R N IA ( P G

A LLA H A B A D

ASSAM

D A LKH O LA

BARH

B A L IA
P A TNA

KA H A LG A O N

SARN ATH
KH A G A UL
ARR AH
B IH A R S H A R I

M A LD A

B IH A R

SA SA R A M

FSTP P

S a g a r d ig h i
M A IT H O N ( P G )

J HARK AND

B A KR ESWA R

P A R (P G

B ANG L AD E S H

P U R U L IA

C H H A T T IS G A R H

R ANC HI

W . B E NG AL
A RAM B A

JA M (P G

JEERAT

KO LA G H A T
SUB H A SGR A

R A IG A R H
R O UR KELA

B A R IP A D A

R A IP U R

R e n g a li ( P
G)

S IP A T

T ST P P
M R 'M D A LI

O R IS S A

IN D R A V A T I( P

KO LA R
JA Y P O R E (P G )

G A Z UW A K A

AN D H R A P R AD E S H

POWER SYSTEM OPERATION CORPORATION LTD.


EASTERN REGIONAL LOAD DESPATCH CENTRE
14, Golf Club Road, Tollygunge, Kolkata-700033

SPECIAL ENERGY METER, DATA


COLLECTING & PROCESSING

JANUARY 2011
COMMERCIAL DEPARTMENT

POWER SYSTEM OPERATION CORPORATION LTD.


EASTERN REGIONAL LOAD DESPATCH CENTRE
14, Golf Club Road, Tollygunge, Kolkata-700033

CONTENTS
Title

1.0

Page No.

Introduction.. ..4
1.1. Objective.5
1.2. Ownership...5
1.3. Facilities to be provided at metering location.5
1.4. Right to install energy meter...6
1.5. Acronyms and definitions6

2.0

Special energy meter and its technical specification

07-19

2.1 Special Energy Meter..8


2.1.1
2.1.2
2.1.3
2.1.4
2.1.5

About SEM..8
SEM dimension9
Display list...9
SEM: Technical Specification..10-18
Data Storage...19

2.2 Data Collecting Device (DCD)19

3.0

Metering Configuration..20-57
3.1 General....21
3.2 Types of Meters..21
3.3 Metering arrangement..21
3.3.1

Metering arrangement for NTPC stations..21

3.3.2

Metering arrangement for ICTs.21

3.3.3

Metering arrangement for inter-State transmission lines...22

3.3.4

Metering arrangement for POWERGRID lines.22

3.4 Maintenance of Special Energy Meters...22


3.4.1

Testing and Calibration..22

3.4.2

Periodic testing of accuracy...22

3.4.3

Meter Calibration...22

3.5 Constituent wise location & quantity.23-34


3.5.1

Meter location of interconnected system..23

3.5.2

Location wise list of Meters.24-34

3.6 Fictitious meters35


3.7 Calculation of Net Injection and Drawl..35-57
3.8 Pair Check 58-60

4.0

Processing and Computation of data61-75


4.1 Scheme for collection & dissemination of data.62
4.1.1

General.62

4.1.2

Data collection from different location62

4.1.3

Saving of data..63

4.2

Conversion in text file/ Software used for viewing of data.63-68

4.3

Viewing of npc file/structure of npc file68

4.4

Modification/Editing in Text file .69

4.5

Availability checking.70

4.6

Methods in case of non availability of data.70

4.7

Final processing.70

4.8

Data checking and Validation...73

4.9

Discrepancies..73

4.10 Data forwarding to ERPC...74


4.11 Uploading of data on ERLDC web.74
4.12 Data archive 75

5.0

Flow Chart..

6.0

Future Requirements Of Meter In Eastern Region..


Annexure: A...
Annexure: B...
Annexure: C...

SECTION-1

1.0 Introduction
The power system in country is organized in five electrical regions for operation purpose
system namely North, South, East, West and North-east. Eastern region consists of
seven states i.e. Bihar, Jharkhand, Orissa, West Bengal and Sikkim. Regional Load
Despatch Centers are responsible for scheduling and measuring power within and across
the regions. Measurement of electric energy is being carried out

by interface meters

called Special Energy Meters (SEMs) installed at the peripheries of states and regions
according to Metering regulation notified by CEA. POWERGRID being Central
Transmission Utility (CTU) is responsible for installation of SEMs throughout the
region and Eastern Regional Load Despatch Center is responsible for collection and
processing the metered data.
1.1

Objective

This document is intended to provide the required details of a metering system together
with the capabilities of the special energy meters along with meter configuration, data
collection, availability checking, processing etc, provided to meet the regional energy
metering requirements of the commercial mechanism adopted for bulk power supplies
and inter-State exchanges within and across a Region.
1.2

Ownership

These energy meters are owned by the CTU. All agencies/constituents ensure the
security of the energy meters installed in their respective premises.
1.3

Facilities to be provided at Metering Locations

Each agency/constituent makes available the required space and the required outputs of
the specified current and voltage transformers, to facilitate installation of energy meters
in their premises by CTU for regional energy metering.

1.4

Right to install energy meters

Each constituent/agency extends the necessary assistance to CTU for installation of the
energy meters by providing the required access to their premises and equipments. As and
when requested by CTU, the constituents agencies enable the representatives of CTU to
access, inspect, replace, and test etc. any of these energy meters installed in their
premises in the presence of an authorized representative of the constituents agencies if
deputed.
1.5 Acronyms and definitions
The acronyms and definitions used in this document are listed in the following table:
Definition
NLDC

National Load Despatch Center

ERLDC

Eastern Regional Load Despatch Center

CTU

Central Transmission Utility

STU

State Transmission Utility.

ISGS

Inter State Generating Station.

SEBs

State Electricity Boards

SEM

Special Energy Meter

DCD

Data Collecting Decice

ERPC

Eastern Regional Power Committee

TSTPP

Talcher Super Thermal Power Plant

KHSTPP

Kahalgaon Super Thermal Power Plant

FSTPP

Farakka Super Thermal Power Plant

AMR

Automated Meter-data Reading

SECTION - 2

2.1

2.1.1

Special Energy Meter (SEM)

About SEM
Special Energy Meter (SEM) is a Microprocessor based Energy Meter. For
metering and data logging it is a handful tool along with data collecting device
(DCD) and personal computer. With the use of application software it allows the
user to process metered data.

2.1.2

SEM dimension

2.1.3

Display List
Display Parameters

Display Format

Indicator

i) Meter Serial No

NP5001

ii) Date (year month day)

yymmdd

iii) Time ( hour min. sec. )

hhmmss

iv) Cumulative Wh reading

xxxxx.x

v) Average frequency of the last block

xx.xx

vi) Net Wh transmitted in last block

xx.xx

vii) Average % voltage

xx.xx

viii) Reactive power (VAR)

xxxx.x

ix) Voltage - high VARh register reading

xxxx.x

xxxx.x

x) Voltage - low VARh register reading


9

xi) Real time indication

rtC Fit

xi) Low battery indication

Low Bat

2.1.4 SEM : Technical Specification


1.0

The energy metering system specified herein is used for tariff metering for
bulk, inter-utility power flows, in different Regions of India. One static type
composite meter is installed for each EHV circuit, as a self-contained device for
measurement of active energy (MWh) transmittals in each successive 15 minute
block and certain other functions, as described in the following paragraphs.

2.0

The meters is suitable for being connected directly to voltage transformers


(VTs) having a rated secondary line-to-line voltage of 110V, and to current
transformers (CTs) having a rated secondary current of 1 A (model-A) or 5A
(model-B). Any further transformers/transactions/transducers required for
their functioning is in-built in the meters.
Necessary isolation and/or
suppression is also be built-in, for protecting the meters from surges and
voltage spikes that occur in the VT and CT circuits of extra high voltage
switchyards. The reference frequency is 50Hz.

3.0

The active energy (Wh) measurement is carried out on 3-phase, 4-wire


principle, with an accuracy as per class 0.2 S of IEC-62053-22:2003. In
model-A (for CT secondary rating 1A), the energy is computed directly in CT
and VT secondary quantities, and indicated in watt-hours. The meter
computes the net active energy (Wh) sent out from the substation bus bars
during each successive 15-minutes block, and stores it in its memory along
with plus/minus sign. It also displays on demand the net Wh sent out during
the previous 15-minute block, with a minus sign if there is net Wh export.

4.0

Further, the meter continuously integrates and display on demand the net
cumulative active energy sent out from the substation bus bars upto that time.
The cumulative Wh reading at each midnight is stored in the meters memory.
The register moves backwards when active power flows back to substation
bus bars.

5.0

The meter counts the number of cycles in VT output during each successive
15-minutes block, and divides the same by 900 to arrive at the average
frequency. This is stored in the meters memory as a 2-digit code which is
arrived at by subtracting 49 from the average frequency, multiplying by 50
and neglecting all decimals. For example, 49.89 Hz is recorded as 44. In case
the average frequency is less than 49.0 Hz, it is recorded as 00. In case it is
51.0 Hz or higher, it is recorded as 99. The average frequency of the previous
15-minutes block is also be displayed, on demand in hertz.

10

6.0

The meter continuously computes the average of the RMS values of the three
line-to-neutral VT secondary voltages as a percentage of 63.51 V, and
displays the same on demand.
The accuracy of the voltage
measurement/computation is at least 0.5%, a better accuracy such as 0.2% in
the 95-105% range being desirable.

7.0

The meter also computes the reactive power (VAR) on 3-phase, 4-wire
principle, with an accuracy as specified in clause 11.0, and integrate the
reactive energy (VARh) algebraically into two separate registers, one for the
period for which the average RMS voltage is 103.0% or higher, and the other
for the period for which the average RMS voltage is below 97.0%. The
current reactive power (VAR), with a minus sign if negative and cumulative
reactive energy (VARh) readings of the two registers is displayed on demand.
The readings of the two registers at each midnight are stored in the meters
memory. In model-A (for CT secondary rating of 1 A), the reactive power
and reactive energy transmittals is computed in VAR/VARh directly
calculated in CT and VT secondary quantities. When lagging reactive power
is being sent out from substation bus bars, VAR display have a plus sign or no
sign and VARh registers move forward. When reactive power flow is in the
reverse direction, VAR display have negative sign and VARh registers move
backwards.

8.0

In the model-B (for CT secondary rating of 5A), all computations, displays


and memory storage is similar except that all figures is be one fifth of the
actual Wh, VAR and VARh worked out from CT and VT secondary
quantities.

9.0

The meters are fully complying with all stipulations in IEC standards 6205211:2003 and 62053-22:2003, except those specifically modified by this
specification. The reference ambient temperature is 30 C.

10.0

Errors are reasonable for all power factor angles from 0 to 360.

11.0

For reactive power (VAR) and reactive energy (VARh) measurements, IEC
62053-23:2003 complies with. The accuracy of measurement of reactive
energy is as per class 2.

12.0

Each meter have a test output device (visual) for checking the accuracy of
active energy (Wh) measurement. The preferred pulsing rate is twenty (20)
per Wh for Model-A and four(4) per Wh for model B. It is possible to couple
this device to suitable testing equipment also.

13.0

No rounding off to the next higher last decimal is done for voltage and
frequency displays. All 15 minute Wh figures is however be rounded off to
the nearest last decimal.

11

14.0

The three line-to-neutral voltage is continuously monitored and in case any of


these falls below about 70%, a normally flashing lamp provided on meters
front become steady. It go off it all three voltages fall below 70%. The time
blocks in which such a voltage failure occurs/persists is recorded in the
meters memory. The lamp automatically resumes flashing when all VT
secondary voltages are healthy again. The two VARh registers specified in
clause 7.0 remains stay-put while VT supply is unhealthy.

15.0

The meters normally operate with the power drawn from the VT secondary
circuits. The total burden imposed by a meter for measurement and operation
is not exceeded 10 VA on any of the phases. An automatic backup for
continued operation of the meters calendar-clock, and for retaining all data
stored in its memory, is provided through a long-life battery, which is capable
of supplying the required power for at least 2 years. The meters are supplied
duly fitted with the batteries, which shall not require to be changed for atleast
10 years, as long as total VT supply interruption does not exceed two years.
The battery mounting is designed to facilitate easy battery replacement
without affecting PCB of the meter. The meters dont require any separate
auxiliary supply for their operation. All displays may disappear on loss of VT
supply.

16.0

Each meter has a built-in calendar and clock, having an accuracy of 30


seconds per month or better. The calendar and clock are correctly set at the
manufacturers works. The date (year-month-day) and time (hour-min.-sec.)
are displayed on the meter front (when VT supply has been connected), on
demand. Only limited clock adjustment is possible at site, using the DCD.
When an advance or retard command is given, six subsequent time blocks is
contracted or elongated by ten seconds each. The meter does not accept
another clock correction command for seven days. All clock corrections is
registered in the meters memory and suitably shown on print out of collected
data.

17.0

Each meter has a unique identification code, which is marked permanently on


its front, as well as in its memory. All meters supplied to POWERGRID as
per this specification have their identification code starting with NP, which
shall not be used for any other supplies. NP is followed by a dash and a
four digit running serial number, further followed by a dash and A for
Model-A, and B, for the use with CT secondaries of 1 A and 5 A
respectively.

18.0

Each meters have at least one seven (7)-character, seven-segment electronic


display, for indication of the following (one at a time), on demand:
i)

Processors identification code and model : NP1234 A

ii)
iii)

Date (year month day) : 910329 d


Time ( hour min. sec. ) : 195527 t

12

iv)

Cumulative Wh reading : 12345.6 C

v)

Average frequency of the previous block : 49.89 F

vi)

Net Wh transmittal during the previous block: - 28.75 E

vii)

Average % voltage : 99.2 U

viii)

Reactive power (VAR) : 106.5 r

ix)

Voltage - high VARh register reading : 01234.5 H

x)

Voltage - low VARh register reading : 00123.4 L

xi)

Low battery indication

19.0

A gold plated touch key or push button is provided on the meter front for
switching on the display and for changing from one indication to the next.
(The display shall switch off automatically about one minute after the last
operation of touch key/push button). When the display is switched on, the
parameter last displayed is displayed again, duly updated.

20.0

Each meter has a non-volatile memory in which the following is automatically


stored:
i)

Average frequency for each successive 15-minute block, as a 2-digit


code

ii)

Net Wh transmittal during each successive 15-minute block, upto


second decimal, with plus/minus sign

iii)

Cumulative Wh transmittal at each midnight, in six digits including


one decimal

iv)

Cumulative VARh transmittal for voltage high condition, at each


midnight in six digits including one decimal

v)

Cumulative VARh transmittal for voltage low condition, at each


midnight, in six digits including one decimal

vi)

Date and time blocks of failure of VT supply on any phase, as a star


(*) mark

21.0

The meters store all the above listed data in their memories for a period of ten
(10) days. The data older than ten (10) days get erased automatically.

22.0

Each meter has an optical port on its front for tapping all data stored in its
memory. Portable or hand held data collection devices is also be separately
13

provided for this purpose, one for each substation, to serve as the interface
between the meters specified above and the local personal computer (PC). In
addition to above each meter is provided with a RS-485 port on one of its
sides, from where all the data stored in the meters memory can also be
tapped. The overall intention is to tap the data stored in the meters memories
once a week from any of the two ports mentioned above and transmit the same
to a remote central computer using STD or other communication links,
through the local PC. It shall also be possible to obtain a print out (hard copy)
of all data collected from the meters, using the local PC.
23.0

The whole system is such as to provide a print out (both from the local PC,
and from remote central computer) of the following form:
16
20

55
55

+16.28
+14.93

NP-1234-A 12345.6
00 57
+14.72
01 52
+13.34

56
55

+15.95
+14.26

55
54

01234.5
00123.4
56
+13.83
55
51
+12.76
52

+15.32
+14.85

54 +15.66
56 +15.17

29-03-91
+13.57
53 +12.91
+14.11
52 +15.28

24.0

The meters supplied are housed in compact and sturdy, metallic or moulded
cases of non-rusting construction and/or finish. The cases are designed for
simple mounting on a plane, vertical surface such as a control/relay panel
front. All terminals for CT and VT connections is arranged in a row along the
meters lower side. Terminals have a suitable construction with barriers and
cover, to provide a secure and safe connection of CTs and VTs leads through
stranded copper conductors of 2.5 sq. mm. size.

25.0

All meters of the same model is totally identical in all respects except for their
unique identification codes. They are totally sealed and tamper proof, with no
possibility of any adjustment at site, except for clock correction.

26.0

The meters are safely withstanding the usual fluctuations arising during faults
etc. In particular, VT secondary voltages 115% of rated applied continuously
and 190% of rated for 3.0 seconds, and CT secondary current 150% of rated
applied continuously and 30 times of rated applied for 0.5 seconds shall not
cause any damage to or mal-operation of the meters.

27.0

The meters also withstand without any damage or mal-operation reasonable


mechanical shocks, earthquake forces, ambient temperature variations,
relative humidity etc. They have an IP-51 category dust-tight construction,
and shall be capable of satisfactory operation in an indoor, non-air conditioned
installation.

28.0

The meters continue to function for the remaining healthy phase(s), in case
one or two phases of VT supply fails. In case of a complete VT supply
failure, the computation of average frequency (as per 5.0) shall be done only
for the period during which the VT supply was available in the 15-minute
14

block. Any time block contraction or elongation for clock correction also be
duly accounted for.
29.0

The harmonics preferably be filtered out while measuring Wh, VAR and
VARh, and only fundamental frequency quantities is measured/computed.

30.0

Either the meters have built-in facility (eg. test links in their terminals) for insitu testing, or a separate test block is provided for each meter.

31.0

Portable/hand-held Data Collection Devices (DCD) :


These are tailor-made for tapping all data stored in a meters memory, and
faithfully transferring it to the local PC. Each device are supplied complete
with
i)

a lead with optical head for coupling it to the meter,

ii)

a lead for plugging it to a personal computer;

iii)

an internal battery for powering the devices;

iv)

a case for safely carrying it about

v)

a battery charger

The total arrangements are such that one (1) operation can carry out the whole
operation himself, in about five (5) minutes per meter.
32.0

The DCD has a key for starting the data tapping from the coupled meters
memory, a key to start data transfer to the PC, and a lamp, which would light
up on completion of data collection, remain on while the data is held in the
device and would go off when all data has been transferred to the PC. Data
tapping operation do not erase the data from the meters memory, or effect the
meter operation in any way. The memory of the DCD get automatically
cleared when the data has been transferred to the PC only then the DCD
accepts data from another meter. DCDs also have necessary provision for
meter clock correction. DCDs are compatible with earlier supplied meters of
L&T/SML make in regard to data downloading etc.

33.0

The Contractor provides the necessary software which would enable a local
IBM-Compatible PC to:
(i) accept the data from the DCD and/or from a interface device connected to
the optical port/RS-485 port and store it in its memory in binary read only
format in an user-defined file name(file name format must be ddmmsubstation
name-utility name),

15

(ii) Polling feature along with a task scheduler to run the data downloading
software at a pre-designated date and time repeatedly or by manually selecting
a meter. File naming for such downloaded data should also be in user-defined
format. A detailed activity log shall also be available for each downloading
operation,
(iii) upload/import meter data (binary files) in the software for further
processing. While uploading, there shall be provision to upload all selected
files with single key-stroke

(iv) Convert the binary file(s) to text file(s).There should be provision to


select multiple files based on filename, convert all selected files with single
key-stroke and store the text files in the same location where binary files are
stored.
(v) display the collected data on PCs screen in text format, with
forward/backward rolling,
(vi) print out in text format the data collected from one or more meters,
starting from a certain date and time, as per operators instructions,
(vii) transmit the collected data, in binary format, through an appropriate
communication link to the central computer, starting from a certain date and
time, as per operators instructions, and
(viii) store the collected data, in binary format, on a floppy disc/CD/Pen
Device .
34.0

The above software further ensures that absolutely no tampering (except total
erasures) of the collected metering data is possible during its handling by the
PC. The software is suitable for the commonly available PCs, and supplied to
Owner in a compatible form to enable its easy loading into the PCs available
(or to be installed by the Owner/others) at the various substations.

35.0

Quality Assurance
The quality control procedure to be adopted during manufacture of the
specified equipment to be mutually discussed and finalized in due course,
generally based on the established and proven practices of the manufacturer.

36.0

Testing
All equipment, after final assembly and before dispatch from manufacturers
works, is duly tested to verify that is suitable for supply to the Owner. In
particular, each and every meter is subjected to the following acceptance tests:

16

i)

Verification of compliance with Table 4 under clause 8.1 of IEC62053-22:2003, in both directions of power flow, for class 0.2S.

ii)

Test of the register ratio and the impulse value of the transmitting
device, for both directions.

iii)

Verification that VARh measurement errors are within values


permitted for class 2 in Table 6 of IEC 62053-23 for both directions of
power flow.

iv)

Effect of +10% variation in measuring circuit voltage, on accuracy of


Wh and VARh measurement

v)

Power loss.

vi)

Dielectric properties.

vii)

Starting and running with no-load for Wh and VARh, in both


directions.

viii)

Functional checks for display and memory.

ix)

Accuracy of the calendar and clock.

x)

Accuracy of voltage and frequency measurement.

37.0

Any meter which fails to fully comply with the specification requirements are
liable to be rejected by the Owner. However, the Owner may purchase such
meters at a reduced price in case of marginal non-compliance, at his sole
discretion.

38.0

Acceptance Tests for DCD and PC Software


All DCDs, after final assembly and before despatch from
Contractors/Manufacturers works are duly tested to verify that they are
suitable for supply to the Purchaser. In particular, each and every DCD is
subjected to the following acceptance test:
i)

Functional checks

ii)

Downloading Meter Data from the Meter(s)

iii)

Compatibility with PC Software

iv)

Downloading the meter data on PC

v)

Functioning of advance and retard time commands

17

39.0

vi)

Per meter downloading time verification

vii)

Capacity of DCD for data storage

Type Tests
One (1) out of every hundred (100) meters is subjected to the complete range
of type tests as per IEC-62053-22:2003, IEC-62053-23:2003 and IEC 6205211:2003, after final assembly. In case of any failure to pass all specified tests,
the contractor has to arrange to carry out the requisite
modifications/replacements in the entire lot of meters at his own cost. After
any such modifications and final assembly, two (2) meters selected out of the
lot by the Owners representative is subjected to the full range of type tests.
The lot is accepted by the Owner only after successful type testing.

40.0

The meters used for type testing are separately identified, duly marked, and
supplied to the Owner in case they are fully functional and as good as other
(new) meters, after necessary touching up/refurbishing. In case this is not
possible, the contractor provides their replacements at no extra cost to Owner.

41.0

The Contractor arranges all type testing specified above, and bear all expenses
for the same.

42.0

Installation and Commissioning


The static energy meters specified above are installed at various EHV
substations owned by the Owner, SEBs and other agencies. The exact location
and time-table for installation is finalized by the Owner in due course, and
advised to the contractor, such that contractors responsibility in this respect
ends within six (6) months of completion of all supplies.

43.0

The Contractor is responsible for total installation and commissioning of the


meters (along with test blocks, if supplied separately) as per Owners advice,
including unpacking and inspection on receipt at site, mounting the meters on
existing control and relay panels at an appropriate viewing height, connection
of CT and VT circuits including any required rewiring, functional testing,
commissioning and handing over. The Contractors personnel procure/carry
the necessary tools, equipment, materials and consumables (including
insulated wires, lugs, ferrules, hardware etc.)

44.0

As a part of commissioning of DCDs the Contractor loads the software


specified in clause 33 and 34 into the PCs at the respective substations, and
fully commission the total meter reading scheme. He also imparts the
necessary instructions to substation engineers.

18

2.1.5 Data storage


This 0.2 class accuracy static energy meter can record integrated average frequency and
active energy over every 15 min blocks. The SEM also stores the daily reactive energy
flows in low voltage & high voltage conditions. SEM can store data for 10 days. The text
file (*.NPC) made from coded files (*.MRI,*.DAT, *.DCD) etc includes data of one
complete day corresponding to the day on which reading is taken and 9 days of complete
data for the previous days.

2.2

Data Collecting Device (DCD)

It is basically data collecting device and used to transfer the tapped data from SEM to
PC. It has bi -communication with special energy meter along with personnel computer.
all these is done with communication cable one at DCD end and other at PC.

19

SECTION - 3

20

3.0

Metering Configuration

3.1

General

Meters have been installed so as to enable the measurement/computation of electrical


energy and other specified parameters. Additional 'check / standby' meters have been
provided at appropriate locations so as to facilitate the preparation of weekly regional
energy accounts in case any of the 'main' meters become unsuitable for the purpose.

3.2

Types of Meters

I) Interface Meter: Interface Meter is connected at the point of interconnection


with inter-state transmission system (ISTS) for the purpose of electricity accounting and
billing. Meter shall be owned by CTU.

II) Consumer Meter: Consumer meter means a meter used for accounting and
billing of electricity supplied to the consumer. Meter shall be owned by Licensee.
III)

Energy Accounting Meter: Energy Accounting and Audit Meter means Meter

used for accounting of electricity to various segments of electrical system. Meter shall be
owned by generating company or Licensee.

3.3 Metering Arrangement


3.3.1

Metering arrangement for NTPC stations

Three sets of energy meter i.e. Main, Check and Stand-by energy meters are provided to
calculate the energy sent-out. One set each of Main & Check Meters is provided on all
outgoing feeders and stand-by meters are provided on the EHV side of the generator
transformer (GT) and station supply transformers
3.3.2

Metering arrangement for ICTs

For measurement of energy supply to a constituent/agency through an ICT, the Main


meter is provided on the HV side of the ICT and the Standby meter on the LV side of the
same ICT.

21

3.3.3

Metering arrangement for inter-State transmission lines.

In case of SEB-owned Inter-State transmission lines, say between State 'A' and State B.',
the energy meters are provided at both the ends of the lines. The meter installed at end 'A'
is the Main meter for working out net drawal of SEB 'A' and that installed at other end 'B'
acts as check meter for SEB 'A', and vice-versa.
3.3.4

Metering arrangement for POWERGRID lines

On POWERGRID lines, unless an end is a regional energy accounting point, an Energy


Meter is provided only at one end of each line. The readings recorded by these meters are
being used for information and analysis only, and not for the energy accounting purposes.

3.4

Maintenance of Special Energy Meters

3.4.1

Testing and Calibration

All equipments are duly tested. In particular, each and every meter is being subjected to
acceptance tests as specified by CTU, at the manufacturer's works, before dispatch.
3.4.2
i)

Periodic testing of accuracy

In-situ functional checking and rough testing of accuracy are being carried out for all

meters once a year by the CTU, with portable test equipment complying with IEC-60736,
for type and acceptance testing of energy meters of 1.0 class.
ii)

Full testing for accuracy for every meter is being carried out by the CTU at an

accredited laboratory once every five (5) yrs.


The constituents/agencies may depute one authorized representative to witness the tests.
3.4.3 Meter Calibration
The meters normally need not to be recalibrated. However in case a meter is found to
violate any of its accuracy , functional requirements during the above periodic accuracy
checks, the same is replaced by CTU by a duly tested/certified meter, and the defective
meter is sent back to the manufacturer for appropriate recalibration and re-certification

22

3.5

CONSTITUENT WISE LOCATION AND QUANTITY

Total no of location in Eastern region has 113 and out of which power grid has 23
locations. Total no of real meters are 472 (including tie line with NR, NER, WR, SR end)
in the region at different locations.
S. NO.

CONSTITUENT

NO. OF LOCATION

A-TYPE

B-TYPE

TOTAL

FSTPP (NTPC)

27

27

KhSTPP(NTPC)

41

41

TSTPP(NTPC)

27+9

27+9

BARH (NTPC)

MPL(RB)

BSEB

16

29

34

JSEB

11

20

25

DVC

12

12

17

GRIDCO

13

25

26

10

WBSETCL

13

18

19

11

SIKKIM

12

POWERGRID

23

167

167

13

WR

14

NR

13

13

15

SR

16

NER

17

RANGIT

18

TEESTA

19

BHUTAN

18

18

113

448

24

472

TOTAL

23

3.5.1

METER LOCATION OF INTER CONNECTED SYSTEM

Details of meter location of interconnected system and constituent wise metering


arrangement and metering arrangement at inter state generating stations are shown in
Annexure-A
3.5.2

LOCATION WISE LIST OF METERS

Eastern region has total 113 location and total no of real meter is 472 including Bhutan
till date. Power grid has 23 locations.
S.No.

A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

B
28
29
30
31
32

LOC_ID

METER NO.

CTR

PTR

PLACE OF INSTALLATION OF SEM

METERS INSTALLED IN FSTPP


FK-01
FK-02
FK-03
FK-04
FK-05
FK-06
FK-07
FK-08
FK-09
FK-10
FK-11
FK-12
FK-13
FK-14
FK-15
FK-16
FK-17
FK-18
FK-21
FK-22
FK-23
FK-24
FK-25
FK-26
FK-27
FK-28
FK-29

NP-0430-A
NP-0599-A
NP-0432-A
NP-0421-A
NP-0419-A
NP-0575-A
NP-0565-A
NP-5202-A
NP-5200-A
NP-5228-A
NP-5208-A
NP-5204-A
NP-5223-A
NP-5211-A
NP-5221-A
NP-5213-A
NP-5210-A
NP-0576-A
NP-5220-A
NP-5214-A
NP-5222-A
NP-5209-A
NP-5203-A
NP-5201-A
NP-5212-A
NP-5229-A
NP-5224-A

500
500
500
1000
1000
500
500
1000
1000
1000
1000
1000
1000
1000
1000
1000
500
500
1000
1000
1000
1000
1000
1000
500
1000
1000

3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
2000.0000
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636

400 KV SIDE OF FKK GT-1


400 KV SIDE OF FKK GT-2
400 KV SIDE OF FKK GT-3
400 KV SIDE OF FKK GT-4
400 KV SIDE OF FKK GT-5
400 KV SIDE OF FKK TIE TRANS.-1
400 KV SIDE OF FKK TIE TRANS.-2
400 KV FKK (NTPC) - KHG (NTPC) -1
400 KV FKK (NTPC) - KHG (NTPC) -2
400 KV FKK (NTPC) DGPR (PG) -1
400 KV FKK (NTPC) - DGPR (PG) -2
400 KV FKK (NTPC) - MALDA (PG) -1
400 KV FKK (NTPC) - MALDA (PG) -2
220 KV FKK (NTPC) - LALMATIA (JSEB)
400 KV FKK (NTPC) - JEERAT (WB)
400 KV FKK (NTPC) SAGARDIGHI(WB)
400 KV SIDE OF 400/220 KV FKK ATR
400 KV SIDE OF FKK TIE TRANS.-3
400 KV FKK (NTPC) - JEERAT (WB) -1 (CHK)
400 KV FKK (NTPC) - SUBHASGRAM (CHK)
400 KV FKK (NTPC) - DGPR (PG) -1 (CHK)
400 KV FKK (NTPC) - DGPR (PG) -2 (CHK)
400 KV FKK (NTPC) - KHG (NTPC) -1 (CHK)
400 KV FKK (NTPC) - KHG (NTPC) -2 (CHK)
400 KV SIDE OF 400/220 KV FKK ATR (CHK)
400 KV FKK (NTPC) - MALDA (PG) -1 (CHK)
400 KV FKK (NTPC) - MALDA (PG) -2 (CHK)

METERS INSTALLED IN KHSTPP


KH-01
KH-02
KH-03
KH-04
KH-05

NP-5851-A
NP-5250-A
NP-5850-A
NP-5859-A
NP-5262-A

500
500
500
500
500

3636.3636
3636.3636
3636.3636
3636.3636
1200.0000

24

400 KV SIDE OF KHG GT-1


400 KV SIDE OF KHG GT-2
400 KV SIDE OF KHG GT-3
400 KV SIDE OF KHG GT-4
132 KV SIDE OF KHG STN TRANS-1

S.No.

LOC_ID

METER NO.

CTR

PTR

33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68

KH-06
KH-07
KH-08
KH-09
KH-10
KH-11
KH-12
KH-13
KH-14
KH-15
KH-16
KH-17
KH-18
KH-19
KH-21
KH-22
KH-23
KH-24
KH-25
KH-26
KH-27
KH-28
KH-31
KH-32
KH-33
KH-34
KH-35
KH-36
KH-37
KH-38
KG-01
KG-02
KG-03
KG-04
KG-05
KG-06

NP-5256-A
NP-5258-A
NP-5254-A
NP-5247-A
NP-5257-A
NP-5246-A
NP-5240-A
NP-5239-A
NP-5244-A
NP-5837-A
NP-5251-A
NP-5255-A
NP-5267-A
NP-5261-A
NP-5259-A
NP-5260-A
NP-5242-A
NP-5253-A
NP-5248-A
NP-5241-A
NP-5263-A
NP-5265-A
NP-5245-A
NP-5117-A
NP-5235-A
NP-5118-A
NP-5269-A
NP-5266-A
NP-5264-A
NP-5268-A
NP-5116-A
NP-5852-A
NP-5857-A
NP-5862-A
NP-5863-A
NP-5856-A

500
1000
1000
1000
1000
1000
1000
500
500
500
500
500
500
500
1000
1000
1000
1000
1000
1000
500
500
1000
1000
1000
1000
2000
2000
2000
2000
1000
1000
1000
500
500
500

1200.0000
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
1200.0000
1200.0000
3636.3636
3636.3636
1200.0000
1200.0000
1200.0000
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
1200.0000
1200.0000
1200.0000

C
69
70
71
72
73
74
75
76
77
78

PLACE OF INSTALLATION OF SEM


132 KV SIDE OF KHG STN TRANS-2
400 KV KHG (NTPC) - FKK (NTPC) -1
400 KV KHG (NTPC) - FKK (NTPC) -2
400 KV KHG (NTPC) - MAITHON (PG) -1
400 KV KHG (NTPC) - MAITHON (PG) -2
400 KV KHG (NTPC) - BIHARSHARIF(PG)-1
400 KV KHG (NTPC) - BIHARSHARIF(PG)-2
132 KV KHG (NTPC) - SABOUR (BSEB)
132 KV KHG (NTPC) - LALMATIA (JSEB)
400 KV SIDE OF KHG 400/132 ATR-I 200 MVA
400 KV SIDE OF KHG 400/132 ATR-II 200MVA
132 KV SIDE OF COLONY TRANS-I
132 KV SIDE OF COLONY TRANS-II
132 KV KHG (NTPC) - KHG (BSEB)
400 KV KHG (NTPC) - FKK (NTPC) -1(CH )
400 KV KHG (NTPC) - FKK (NTPC) -2(CHK)
400 KV KHG (NTPC) - MAITHON (PG) -1 (CHK)
400 KV KHG (NTPC) - MAITHON (PG) -2 (CHK)
400 KV KHG (NTPC) BSHARIF(PG)-1(CHK)
400 KV KHG (NTPC) BSHARIF(PG)-2(CHK)
400 KV SIDE OF KHG 400/132 ATR-I (CHK)
400 KV SIDE OF KHG 400/132 ATR-II (CHK)
400 KV KHG-BIHARSARIFF-3
400 KV KHG-BIHARSARIFF-4
400 KV KHG-BIHARSARIFF-3 (CHK)
400 KV KHG-BIHARSARIFF-4 (CHK)
400 KV KHG-PATNA-1
400 KV KHG-PATNA-2
400 KV KHG-PATNA-1 (CHECK)
400 KV KHG-PATNA-2 (CHECK)
400 KV SIDE OF KHG GT-5
400 KV SIDE OF KHG GT-6
400 KV SIDE OF KHG GT-7
132 KV SIDE OF KHG STN TRANS-3
132 KV SIDE OF KHG STN TRANS-4
132 KV SIDE OF KHG STN TRANS-5

METERS INSTALLED IN TSTPP


TL-01
TL-02
TL-03
TL-04
TL-05
TL-06
TL-07
TL-08
TL-09
TL-10

NP-5107-A
NP-5105-A
NP-5108-A
NP-5109-A
NP-5083-A
NP-5084-A
NP-5085-A
NP-5106-A
NP-5103-A
NP-5102-A

1000
1000
500
500
1000
1000
1000
1000
1000
1000

3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
2000.0000
2000.0000

25

400 KV SIDE OF TSTPP GT-1


400 KV SIDE OF TSTPP GT-2
400 KV SIDE OF TSTPP 400/220KV ATR-1
400 KV SIDE OF TSTPP 400/220KV ATR-2
400 KV TSTPP (NTPC) - ROURKELA (PG) -1
400 KV TSTPP (NTPC) - ROURKELA (PG) -2
400 KV TSTPP (NTPC) - RENGALI (PG) -1
400 KV TSTPP (NTPC) - RENGALI (PG) -2
220 KV TSTPP (NTPC) - TTPS (GRIDCO)
220 KV TSTPP (NTPC) - RENGALI HPS (GRIDCO)

S.No.

LOC_ID

METER NO.

CTR

PTR

79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104

TL-11
TL-12
TL-13
TL-14
TL-15
TL-16
TL-17
TL-18
TL-19
TL-21
TL-22
TL-23
TL-24
TL-25
TL-26
TL-27
TL-28
TL-31
TL-32
TL-33
TL-34
TL-45
TL-47
TL-49
TL-51
TL-57

NP-5112-A
NP-5101-A
NP-5081-A
NP-5066-A
NP-5076-A
NP-5069-A
NP-5070-A
NP-5970-A
NP-5067-A
NP-5082-A
NP-5115-A
NP-5110-A
NP-5972-A
NP-5077-A
NP-5113-A
NP-5078-A
NP-5104-A
NP-4094-A
NP-4095-A
NP-4090-A
NP-4097-A
NP-4009-A
NP-4003-A
NP-4001-A
NP-4068-A
NP-4064-A

1000
1000
200
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
500
500
1000
1000
2000
2000
2000
2000
1000
1000
1000
1000
100

2000.0000
2000.0000
2000.0000
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636

D
105
106

E
107
108
109
110
111
112
113
114

F
115
116
117
118
119
120
121

PLACE OF INSTALLATION OF SEM


220 KV TSTPP (NTPC) - M'MUNDALI (GRIDCO) -1
220 KV TSTPP (NTPC) - M'MUNDALI (GRIDCO) -2
220 KV SIDE OF 220/11 KV STATION TRANS. -1
400 KV TSTPP STG-I - STG-II-1
400 KV TSTPP STG-I - STG-II-2
400 KV TSTPP STG-II - STG-I -1
400 KV TSTPP STG-II - STG-I -2
400 KV TSTPP (NTPC) - M'MUNDALI-1 (GRIDCO)
400 KV TSTPP (NTPC) - M'MUNDALI-2 (GRIDCO)
400 KV TSTPP (NTPC)- ROURKELA (PG) -1 (CHK)
400 KV TSTPP (NTPC) - ROURKELA (PG) -2 (CHK)
400 KV TSTPP (NTPC) - RENGALI (PG) -1 (CHK)
400 KV TSTPP (NTPC) - RENGALI (PG) -2 (CHK)
400 KV SIDE OF TSTPP 400/220KV ATR-1 (CHK)
400 KV SIDE OF TSTPP 400/220KV ATR-2 (CHK)
400 KV TSTPP (NTPC) - M'MUNDALI-1 (GRID)-CHK
400 KV TSTPP (NTPC) - M'MUNDALI-2 (GRID)-CHK
400 KV TSTPP HVDC FDR-1(MAIN)
400 KV TSTPP HVDC FDR-2(MAIN)
400 KV TSTPP HVDC FDR-3(MAIN)
400 KV TSTPP HVDC FDR-4(MAIN)
400 KV SIDE OF TSTPP GT-3
400 KV SIDE OF TSTPP GT-4
400 KV SIDE OF TSTPP GT-5
400 KV SIDE OF TSTPP GT-6
220 KV SIDE OF 220/11 KV STN TRANS. -1

METERS INSTALLED IN BARH STPP


BH-01
BH-02

NP-6111-A
NP-6080-A

3000
3000

3636.3636
3636.3636

400 KV BARH (NTPC) KHG (NTPC) -2


400 KV BARH (NTPC) PATNA (PG) -2

METERS INSTALLED IN MPL (RB)


MR-01
MR-02
MR-03
MR-04
MR-05
MR-06
MR-07
MR-08

NP-6517-A
NP-6518-A
NP-0000-A
NP-0000-A
NP-0000-A
NP-0000-A
NP-0000-A
NP-0000-A

1000
1000
0000
0000
0000
0000
0000
0000

3636.3636
3636.3636
0000.0000
0000.0000
0000.0000
0000.0000
0000.0000
0000.0000

400 KV MAITHON RB(MPL) MAITHON (PG)-1


400 KV MAITHON RB(MPL) MAITHON (PG)-1

METERS INSTALLED IN CHUKHA


HPC
CU-01
CU-02
CU-03
CU-04
CU-05
CU-06
CU-07

NP-2529-A
NP-2520-A
NP-2377-A
NP-0580-A
NP-0571-A
NP-0596-A
NP-0483-A

600
600
600
600
600
600
600

2000.0000
2000.0000
2000.0000
2000.0000
2000.0000
2000.0000
2000.0000

26

220 KV CHUKHA (CHPC) - BIRPARA (PG) -1


220 KV CHUKHA (CHPC) - BIRPARA (PG) -2
220 KV CHUKHA (CHPC) - MALBASE (CHPC)
220 KV MALBASE (CHPC) - BIRPARA (PG)
CHUKHA (CHPC) GENERATOR -I
CHUKHA (CHPC) GENERATOR -II
CHUKHA (CHPC) GENERATOR -III

S.No.

LOC_ID

METER NO.

CTR

PTR

122
123
124

CU-08
TH-01
TH-02

NP-0408-A
NP-5828-A
NP-5829-A

600
2000
2000

2000.0000
3636.3636
3636.3636

METERS INSTALLED IN MALBASE


(BHUTAN)

125
126
127
128
129
130
131
132

BT-33
BT-34
BT-35
BT-36
BT-37
BT-38
BT-39
BT-40

H
133
134
135
136
137
138
139
140
141

I
142
143
144
145
146
147
148

J
149
150
151
152
153
154
155
156
157
158
159
160
161

NP-5096-A
NP-5097-A
NP-5099-A
NP-5098-A
NP-5095-A
NP-5100-A
NP-5869-A
NP-5867-A

800
800
800
800
1000
1000
1000
800

2000.0000
2000.0000
2000.0000
2000.0000
3636.3636
3636.3636
3636.3636
2000.0000

PLACE OF INSTALLATION OF SEM


CHUKHA (CHPC) GENERATOR -IV
400 KV TALA (BHUTAN)- BINAGURI - I
400 KV TALA (BHUTAN)- BINAGURI - II

220 KV MALB (BHUTAN) CHUKHA (BHUTAN)


220 KV MALB (BHUTN) SINGIGAON (BHUTN)-I
220 KV MALB (BHUTN) SINGIGAON (BHUTN)-II
220 KV SIDE OF MALBASE (BHUTAN) ICT
400 KV SIDE OF MALBASE (BHUTAN) ICT
400 KV MALBASE (BHUTAN) TALA (BHUTAN)
400 KV MALBASE (BHUTAN) BINAGURI (PG)
220 KV MALBASE (BHUTAN)- BIRPARA (PG)

METERS INSTALLED IN RANGIT


HEP(NHPC)
RG-01
RG-02
RG-03
RG-04
RG-06
RG-07
RG-08
RG-10
RG-11

NP-5919-A
NP-5920-A
NP-5921-A
NP-6503-A
NP-6504-A
NP-5926-A
NP-5918-A
NP-5925-A
NP-6506-A

150
150
150
300
300
200
100
300
300

1200.0000
1200.0000
1200.0000
1200.0000
1200.0000
600.0000
600.0000
1200.0000
1200.0000

132 KV SIDE OF RANGIT GEN.TRANS.- 1


132 KV SIDE OF RANGIT GEN.TRANS.- 2
132 KV SIDE OF RANGIT GEN.TRANS.- 3
132 KV RANGIT (NHPC) - SILIGURI(PG)
132 KV RANGIT (NHPC) - RAMMAM (WB)
66 KV RANGIT (NHPC) - RABANGLA (SIKM)
66 KV SIDE OF RANGIT 66KV/11 KV TRANSF
132 KV RANGIT (NHPC) - MELLI (SIKKIM)
132 KV RANGIT (NHPC) - GANGTOK (PG)

METERS INSTALLED IN TEESTA


HEP(NHPC)
TS-01
TS-02
TS-03
TS-05
TS-06
TS-07
TS-08

NP-5899-A
NP-5900-A
NP-5901-A
NP-5896-A
NP-5898-A
NP-5895-A
NP-5897-A

350
350
350
1000
1000
1000
1000

3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636

400 KV SIDE OF TEESTA GT-1


400 KV SIDE OF TEESTA GT-2
400 KV SIDE OF TEESTA GT-3
400 KV TEESTA-BINAGURI-1 (MAIN)
400 KV TEESTA-BINAGURI-2 (MAIN)
400 KV TEESTA-BINAGURI-1 (CHECK)
400 KV TEESTA-BINAGURI-2 (CHECK)

METER INSTALLED IN CTU


SYSTEM(POWERGRID)
ER-01
ER-02
ER-03
ER-04
ER-05
ER-06
ER-07
ER-08
ER-09
ER-10
ER-11
ER-12
ER-13

NP-6063-A
NP-6069-A
NP-6068-A
NP-6087-A
NP-6456-A
NP-6458-A
NP-6457-A
NP-6459-A
NP-6051-A
NP-6054-A
NP-6529-A
NP-6451-A
NP-6512-A

500
500
500
1000
1000
1000
1000
1000
400
400
1000
1000
800

3636.3636
3636.3636
3636.3636
3636.3636
2000.0000
2000.0000
2000.0000
3636.3636
1200.0000
1200.0000
2000.0000
2000.0000
2000.0000

27

400 KV SIDE OF BSHARIF (PG) 400/220 KV ICT-1


400 KV SIDE OF BSHARIF (PG) 400/220 KV ICT-2
400 KV SIDE OF BSHARIF (PG) 400/220 KV ICT-3
220 KV SIDE OF PURNEA 315 MVA ICT
220 KV DURGAPUR (PG) - PARULIA (DVC) -1
220 KV DURGAPUR (PG) - PARULIA (DVC) -2
220 KV DURGAPUR (PG) - BIDHANNAGAR (WB)
400 KV DURGAPUR (PG) - JAMSHEDPUR (PG)
132 KV ARAH (PG) ARAH (BSEB)
132 KV ARAH (PG) DUMRAO (BSEB)
220 KV MAITHON (PG) KALSWARI (DVC) -1
220 KV MAITHON (PG) KALSWARI (DVC) -2
220 KV PUSAULI (PG) - ARAH -1

S.No.

LOC_ID

METER NO.

CTR

PTR

162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209

ER-14
ER-15
ER-16
ER-17
ER-18
ER-19
ER-20
ER-21
ER-22
ER-23
ER-24
ER-25
ER-26
ER-27
ER-28
ER-29
ER-30
ER-31
ER-32
ER-33
ER-34
ER-35
ER-36
ER-37
ER-38
ER-39
ER-40
ER-41
ER-42
ER-43
ER-44
ER-45
ER-46
ER-47
ER-48
ER-49
ER-50
ER-51
ER-52
ER-53
ER-54
ER-55
ER-56
ER-57
ER-58
ER-59
ER-60
ER-61

NP-6511-A
NP-6521-A
NP-6447-A
NP-6106-A
NP-6105-A
NP-5882-A
NP-5915-A
NP-5885-A
NP-5883-A
NP-5929-A
NP-5933-A
NP-5932-A
NP-5931-A
NP-5910-A
NP-5991-A
NP-5987-A
NP-5989-A
NP-5990-A
NP-4154-A
NP-4155-A
NP-5957-A
NP-5958-A
NP-5959-A
NP-5884-A
NP-5960-A
NP-6465-A
NP-6464-A
NP-6490-A
NP-6462-A
NP-6463-A
NP-6469-A
NP-5881-A
NP-6491-A
NP-6468-A
NP-6083-A
NP-6084-A
NP-5949-A
NP-5948-A
NP-5945-A
NP-5946-A
NP-5947-A
NP-6093-A
NP-6092-A
NP-5950-A
NP-6476-A
NP-6478-A
NP-6477-A
NP-6479-A

800
1000
1000
500
500
1600
1600
1000
800
1000
1000
1000
1000
1000
1000
1000
500
500
1000
1000
500
500
1000
1000
1600
800
800
800
800
800
600
1600
800
800
600
600
800
800
600
600
600
800
800
600
600
600
800
800

2000.0000
3636.3636
3636.3636
3636.3636
3636.3636
2000.0000
2000.0000
3636.3636
2000.0000
2000.0000
2000.0000
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
2000.0000
2000.0000
3636.3636
3636.3636
2000.0000
2000.0000
3636.3636
3636.3636
3636.3636
2000.0000
2000.0000
2000.0000
2000.0000
2000.0000
1200.0000
2000.0000
2000.0000
2000.0000
1200.0000
1200.0000
2000.0000
2000.0000
1200.0000
1200.0000
1200.0000
2000.0000
2000.0000
1200.0000
1200.0000
1200.0000
2000.0000
2000.0000

28

PLACE OF INSTALLATION OF SEM


220 KV PUSAULI (PG) - ARAH -2
400 KV MAITHON (PG) - MEJIA (DVC)
400 KV MAITHON (PG) - JAMSHEDPUR (PG)
400 KV SIDE OF JAMPUR (PG) 400/220 KV ICT-1
400 KV SIDE OF JAMPUR (PG) 400/220 KV ICT-2
220 KV BINAGURI (PG) - JALPAIGUR (WB)-I
220 KV BARIPADA (PG) - BALASORE (GR)-1
400 KV BINAGURI - BONGAIGAON (NER)-2
220 KV SIDE OF BINAGURI 400/220 KV ICT
220 KV ROURKELA (PG) - TARKERA (GRIDCO) -1
220 KV ROURKELA (PG) - TARKERA (GRIDCO) -2
400 KV ROURKELA (PG) - JAMSHEDPUR (PG) -1
400 KV ROURKELA (PG) - JAMSHEDPUR (PG) -2
400 KV BARIPADA (PG) - KOLAGHAT (WB)
400 KV RENGALI (PG) - BARIPADA (PG)
400 KV RENGALI (PG) - INDRAVATI (PG)
220 KV RENGALI (PG) - RENGALI (GRIDCO) -1
220 KV RENGALI (PG) - RENGALI (GRIDCO) -2
400 KV PURNEA (PG) - MALDA (PG)
400 KV PURNEA (PG) - BINAGURI-1
220 KV JEYPORE (PG) - JEYNAGAR (GRIDCO) -1
220 KV JEYPORE (PG) - JEYNAGAR (GRIDCO) -2
400 KV JEYPORE (PG) - INDRAVATI (PG)
400 KV BINAGURI (PG) - BONGAIGAON (NER)-1
400 KV JEYPORE (PG) - M'MUNDALI (GRIDCO)
220 KV BIRPARA (PG) - CHUKHA (CHPC) -1
220 KV BIRPARA (PG) - CHUKHA (CHPC) -2
220 KV BIRPARA (PG) MALBASE
220 KV BIRPARA (PG) - SALAKATI (PG) -1
220 KV BIRPARA (PG) - SALAKATI (PG) -2
132 KV BIRPARA (PG) - BIRPARA (WBSEB) -1
220 KV BINAGURI (PG) - JALPAIGURI(WB)-2
220 KV BIRPARA (PG) - SILIGURI (PG) -1
220 KV BIRPARA (PG) - SILIGURI (PG) -2
132 KV PURNEA (PG) - PURNEA (BSEB) -3
132 KV PURNEA (PG) - DALKHOLA (WB)
220 KV SILIGURI (PG) - DALKHOLA (PG) -1
220 KV SILIGURI (PG) - DALKHOLA (PG) -2
132 KV SILIGURI (PG) - NBU (WBSEB) -2
132 KV SILIGURI (PG) - NBU-(WBSEB) -1
132 KV SILIGURI (PG) - RANGIT (NHPC)-1&2
220 KV PUSAULI (PG) - DEHRI (BSEB)
220 KV PUSAULI (PG) - SAHUPURI (NR)
132 KV SILIGURI (PG) - MELLI (SIKKIM)
132 KV MALDA (PG) - MALDA (WBSEB) -1
132 KV MALDA (PG) - MALDA (WBSEB) -2
220 KV MALDA (PG) - DALKHOLA (PG) -1
220 KV MALDA (PG) - DALKHOLA (PG) -2

S.No.

LOC_ID

METER NO.

CTR

PTR

210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257

ER-62
ER-63
ER-64
ER-65
ER-66
ER-67
ER-68
ER-69
ER-70
ER-71
ER-72
ER-73
ER-74
ER-75
ER-76
ER-77
ER-78
ER-79
ER-80
ER-81
ER-82
ER-83
ER-84
ER-85
ER-86
ER-87
ER-88
ER-89
ER-90
ER-94
ER-95
ER-96
ER-97
ER-98
ER-99
EM-01
EM-02
EM-03
EM-04
EM-05
EM-06
EM-07
EM-08
EM-09
EM-10
EM-11
EM-12
EM-13

NP-6081-A
NP-6082-A
NP-0415-A
NP-0389-A
NP-6460-A
NP-6461-A
NP-5831-A
NP-6453-A
NP-6449-A
NP-5927-A
NP-5930-A
NP-5992-A
NP-5988-A
NP-5955-A
NP-5951-A
NP-5956-A
NP-6095-A
NP-6094-A
NP-5943-A
NP-5928-A
NP-6514-A
NP-6515-A
NP-5961-A
NP-5962-A
NP-5966-A
NP-5890-A
NP-6475-A
NP-6064-A
NP-6062-A
NP-6516-A
NP-6058-A
NP-6059-A
NP-6513-A
NP-5916-A
NP-5912-A
NP-6026-A
NP-6027-A
NP-6029-A
NP-6030-A
NP-6028-A
NP-6025-A
NP-5086-A
NP-5087-A
NP-5088-A
NP-5888-A
NP-5090-A
NP-5091-A
NP-5092-A

800
800
800
800
500
500
1000
500
500
500
500
500
500
500
800
600
300
300
2000
2000
2000
2000
1000
1000
1000
800
1000
1000
1000
600
300
300
600
400
400
300
300
300
300
300
300
1000
1000
1000
1000
1000
1000
2000

1200.0000
1200.0000
2000.0000
2000.0000
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
2000.0000
3636.3636
1200.0000
1200.0000
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
2000.0000
3636.3636
3636.3636
3636.3636
3636.3636
2000.0000
2000.0000
3636.3636
1200.0000
1200.0000
1200.0000
1200.0000
1200.0000
1200.0000
1200.0000
1200.0000
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636

29

PLACE OF INSTALLATION OF SEM


132 KV PURNEA (PG) - PURNEA (BSEB) -1
132 KV PURNEA (PG) - PURNEA (BSEB) -2
220 KV PURNEA (PG) - DALKHOLA (PG) -1
220 KV PURNEA (PG) - DALKHOLA (PG) -2
400 KV SIDE OF DURGAPUR 400/220 KV ICT -1
400 KV SIDE OF DURGAPUR 400/220 KV ICT -2
400 KV DURGAPUR(PG) BIDHANAGAR(WB)
400 KV SIDE OF MAITHON (PG) 400/220 KV ICT -1
400 KV SIDE OF MAITHON (PG) 400/220 KV ICT -2
400 KV SIDE OF ROURKELA (PG) 400/220 KV ICT -1
400 KV SIDE OF ROURKELA (PG) 400/220 KV ICT -2
400 KV SIDE OF RENGALI (PG) 400/220 KV ICT -1
400 KV SIDE OF RENGALI (PG) 400/220 KV ICT -2
400 KV SIDE OF JEYPORE (PG) 400/220 KV ICT -1
220 KV SIDE OF SILIGURI (PG) 220/132 KV ICT -1
400 KV SIDE OF JEYPORE (PG) 400/220 KV ICT -2
132 KV PUSAULI(PG)-DEHRI(BSEB)
132 KV PUSAULI(PG)-KARMANASA(BSEB)
400 KV ROURKELA-RAIPUR - I
400 KV ROURKELA-RAIPUR - II
400 KV SASARAM (PG) EAST BUS-1
400 KV SASARAM (PG) EAST BUS-2
400 KV JEYPORE (PG) - GAJUWAKA (PG) -1
400 KV JEYPORE (PG) - GAJUWAKA (PG) -2
400 KV INDRAVATI (PG) - INDRAVATI P/H)
220 KV SIDE OF BINAGURI 400/220 KV ICT-2
400 KV MALDA (PG) - PURNEA (PG)
400 KV BIHARSARIFF (PG) - SASARAM (NR) -1
400 KV BIHARSARIFF (PG) - SASARAM (NR) -2
400 KV SIDE OF PUSAULI 400/220KV ICT-2
220 KV SIDE OF ARAH 220/132 KV 100 MVA ICT-1
220 KV SIDE OF ARAH 220/132 KV 100 MVA ICT-2
400 KV SIDE OF PUSAULI 400/220KV ICT-1
132 KV BARIPADA - BARIPADA (GRIDCO)
132 KV BARIPADA - RAIRANGPUR (GRIDCO)
132 KV GANGTOK(PG) - MELLI (SIKKIM)
132 KV GANGTOK(PG) - RANGIT (NHPC)
132 KV SIDE OF GANGTOK 132/66 KV ICT-1
66 KV SIDE OF GANGTOK 132/66 KV ICT-1
132 KV SIDE OF GANGTOK 132/66 KV ICT-2
66 KV SIDE OF GANGTOK 132/66 KV ICT-2
400 KV BINAGURI (PG)-TALA (THP)-1
400 KV BINAGURI (PG)-TALA (THP)-2
400 KV BINAGURI (PG)-MALBASE(PG)-3
400 KV BINAGURI (PG)-TALA (THP)-4
400 KV BINAGURI-PURNEA-1
400 KV BINAGURI-PURNEA-2
400 KV BINAGURI-PURNEA-3

S.No.

LOC_ID

METER NO.

CTR

PTR

258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305

EM-14
EM-15
EM-16
EM-17
EM-18
EM-19
EM-21
EM-22
EM-23
EM-24
EM-25
EM-26
EM-27
EM-28
EM-29
EM-30
EM-31
EM-32
EM-41
EM-42
EM-43
EM-44
EM-45
EM-46
EM-47
EM-48
EM-50
EM-51
EM-52
EM-53
EM-54
EM-55
EM-56
EM-57
EM-58
EM-59
EM-60
EM-61
EM-62
EM-63
EM-64
EM-65
EM-66
EM-67
EM-68
EM-69
EM-71
EM-72

NP-5093-A
NP-5848-A
NP-5845-A
NP-5360-A
NP-5080-A
NP-5847-A
NP-6061-A
NP-6065-A
NP-5071-A
NP-5230-A
NP-5074-A
NP-9981-A
NP-5075-A
NP-5062-A
NP-5073-A
NP-9983-A
NP-5063-A
NP-5061-A
NP-5871-A
NP-5873-A
NP-5872-A
NP-5879-A
NP-5874-A
NP-5877-A
NP-5835-A
NP-5836-A
NP-6086-A
NP-2517-A
NP-2518-A
NP-5273-A
NP-5272-A
NP-5270-A
NP-5271-A
NP-5274-A
NP-5914-A
NP-5911-A
NP-5878-A
NP-5870-A
NP-5839-A
NP-5866-A
NP-5865-A
NP-5832-A
NP-5913-A
NP-5886-A
NP-5887-A
NP-5909-A
NP-5838-A
NP-6056-A

1000
600
600
2000
1600
1600
3000
3000
1000
1000
2000
2000
2000
2000
600
600
800
800
1000
600
800
800
800
1000
1000
1000
600
600
600
2000
2000
600
1000
2000
400
800
600
800
600
1000
800
800
800
1000
1000
1200
2000
800

3636.3636
36,363,636
36,363,636
3636.3636
2000.0000
2000.0000
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
2000.0000
2000.0000
3636.3636
3636.3636
2000.0000
2000.0000
2000.0000
3636.3636
3636.3636
3636.3636
1200.0000
1200.0000
1200.0000
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
1200.0000
2000.0000
3636.3636
2000.0000
3636.3636
2000.0000
2000.0000
2000.0000
2000.0000
3636.3636
3636.3636
3636.3636
3636.3636
2000.0000

30

PLACE OF INSTALLATION OF SEM


400 KV BINAGURI-PURNEA-4
400 KV SIDE OF SUBHASGRAM ICT-1
400 KV SIDE OF SUBHASGRAM ICT-2
400 KV SUBHASGRAM-JEERAT (WBSEB)
220 KV SUBHASGRAM-SUBHASGRAM-1 (WB)
220 KV SUBHASGRAM-SUBHASGRAM-2 (WB)
400 KV BIHARSARIFF-BALIA (NR)-1
400 KV BIHARSHARIFF-BALIA (NR)-2
400 KV MZ'PUR (PG)-BIHARSARIFF-1
400 KV MZ'PUR (PG)-BIHARSARIFF-2
400 KV MZ'PUR (PG)-GORAKHPUR(NR)-1
400 KV MZ'PUR (PG)-GORAKHPUR(NR)-2
400 KV MZ'PUR - PURNEA-1
400 KV MZ'PUR - PURNEA-2
400/220 KV MZ'PUR ICT-2
400/220 KV MZ'PUR ICT-1
220 KV MZ'PUR(PG) - KANTI(BSEB)-1
220 KV MZ'PUR(PG) - KANTI(BSEB)-2
400 KV RANCHI(PG)-MAITHON(PG)-2
400 KV SIDE OF RANCHI ICT-2
220 KV SIDE OF RANCHI ICT-2
220 KV RANCHI - PATRATU (JSEB)
220 KV RANCHI - CHANDIL (JSEB)
400 KV RANCHI-MAITHON-1
400 KV RANCHI SIPAT -I
400 KV RANCHI SIPAT -II
220/132 KV PURNEA ICT-1
220/132 KV PURNEA ICT-2
220/132 KV PURNEA ICT-3
400 KV PATNA (ER) - BALIA (NR)-2
400 KV PATNA - KHG-1
400 KV SIDE OF PATNA ICT-1
220 KV SIDE OF PATNA ICT-1
400 KV PATNA (ER) - BALIA (NR)-1
132 KV BARIPADA (PG) - BALASORE (GRIDCO)-2
132 KV SIDE OF BARIPADA 220/132 KV ICT
400 KV SIDE OF RANCHI ICT-1
220 KV SIDE OF RANCHI ICT-1
400 KV SIDE OF PATNA ICT-2
220 KV SIDE OF PATNA ICT-2
220 KV PATNA - FATUA-1
220 KV PATNA - KHAGAUL-2
220 KV BARIPADA (PG) - BALASORE (GRIDCO)-2
400 KV BINAGURI TEESTA- V- I
400 KV BINAGURI TEESTA- V- II
315 MVA ICT AT BARIPADA
400 KV PATNA KHG-2
220 KV ARAH KHAGAUL - 1

S.No.

LOC_ID

METER
NO.

CTR

PTR

306
307
308
309
310
311
312
313
314
315

EM-73
EM-74
EM-75
EM-76
EM-80
EM-81
EM-82
EM-83
EM-84
EM-85

NP-6057-A
NP-5846-A
NP-6470-A
NP-5072-A
NP-6509-A
NP-6510-A
NP-5876-A
NP-6530-A
NP-6519-A
NP-6520-A

800
2000
300
1000
1000
1000
2000
1000
1000
1000

2000.0000
3636.3636
1200.0000
3636.3636
2000.0000
2000.0000
3636.3636
3636.3636
3636.3636
3636.3636

K
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349

PLACE OF INSTALLATION OF SEM


220 KV ARAH KHAGAUL - 2
400 KV SUBHASHGRAM SAGARDIGHI (WB)
132 KV BIRPARA (PG) BIRPARA (WB) -2
400 KV JAMSHEDPUR (PG)- MEJIA (DVC)
220 KV MAITHON (PG) KNESHWARI (DVC)-3
220 KV MAITHON (PG) KNESHWARI (DVC)-4
400 KV RANCHI (PG)- ROURKELA (PG)-1
400 KV RANCHI (PG)- ROURKELA (PG)-2
400 KV MAITHON (PG)- MAITHON RB (MPL)-1
400 KV MAITHON (PG)- MAITHON RB (MPL)-2

METERS INSTALLED IN BSEB


BI-01
BI-02
BI-03
BI-04
BI-07
BI-10
BI-11
BI-12
BI-13
BI-14
BI-20
BI-21
BI-48
BI-49
BI-50
BI-51
BI-52
BI-53
BI-54
BI-55
BI-56
BI-57
BI-58
BI-59
BI-60
BI-61
BI-62
BI-63
BI-64
BI-66
BI-67
BI-68
BI-69
BI-70

NP-5841-A
NP-5840-A
NP-6088-A
NP-6089-A
NP-6074-A
NP-6076-A
NP-6052-A
NP-0538-A
NP-6053-A
NP-6060-A
NP-5236-A
NP-6085-A
NP-6070-A
NP-6099-A
NP-6098-A
NP-6090-A
NP-0480-A
NP-0426-A
NP-0537-A
NP-6066-A
NP-5842-A
NP-5844-A
NP-6078-A
NP-6073-A
NP-6015-B
NP-6047-B
NP-6097-A
NP-6017-B
NP-6018-B
NP-6013-B
NP-5843-A
NP-5064-A
NP-5065-A
NP-6077-A

1200
1200
600
600
600
150
200
200
800
800
600
600
600
300
300
600
600
600
600
600
600
1200
600
600
120
40
600
60
60
120
800
600
600
600

2000.0000
2000.0000
1200.0000
1200.0000
1200.0000
1200.0000
1200.0000
1200.0000
2000.0000
2000.0000
1200.0000
1200.0000
1200.0000
1200.0000
1200.0000
1200.0000
2000.0000
2000.0000
2000.0000
1200.0000
1200.0000
2000.0000
1200.0000
1200.0000
1200.0000
1200.0000
2000.0000
1200.0000
1200.0000
1200.0000
2000.0000
2000.0000
2000.0000
2000.0000

31

220 KV BSHARIF(BSEB) - BIHARSHARIF(PG)-1


220 KV BSHARIF(BSEB) - BIHARSHARIF(PG)-2
132 KV PURNEA (BSEB) - PURNEA (PG) -1
132 KV PURNEA (BSEB) - PURNEA (PG) -2
132 KV SABOUR (BSEB) - KHG (NTPC)
132 KV KHG (BSEB) - KHG (NTPC)
132 KV ARAH (BSEB) - ARAH (PG)
132 KV DUMRAON (BSEB) - ARAH (PG)
220 KV KHAGAUL(BSEB) - ARAH (PG)-1
220 KV KHAGAUL(BSEB) - ARAH (PG)-2
132 KV KISHANGANJ (BSEB) PURNEA (PG)
132 KV KISHANGANJ (BSEB) DALKHOLA (WB)
132 KV BIHARSHARIFF (BSEB ) TIE AT RAJGIR
132 KV MOHANIA (BSEB) PUSAULI (PG)
132 KV DEHRI (BSEB) PUSAULI (PG)
132 KV PURNEA (BSEB) PURNEA (PG) -3
220 KV BODHGAYA(BSEB) - PATRATU -1 (JSEB)
220 KV BODHGAYA(BSEB) - PATRATU -2 (JSEB)
220 KV BODHGAYA(BSEB) - PATRATU -3 (JSEB)
132 KV RAJGIR (BSEB) - BARHI (DVC)
132 KV BIHARSHARIF (BSEB) - BARHI (DVC)
220 KV BIHARSARIFF (BSEB) - TENUGHAT (JSEB)
132 KV SULTANJ(BS)-SABR -LALMAT(JSEB)-2
132 KV SULTANGANJ (BSEB) - LALMATIA (JSEB)
132 KV SONENAGAR (BSEB) - GARWAH (JSEB)
132 KV SULTANGANJ (BSEB) - DEOGARH (JSEB)
220 KV DEHRI (BSEB) - PUSAULII (PG)
132 KV KARMANAS(BSEB) - CHANDAUL (UP)
132 KV KARMANASA (BSEB) SAHUPURI (UP)-2
132 KV SONENAGAR(BSEB) - RIHAND(UPSEB)
220 KV BSHARIF(BSEB) - BIHARSHARIF(PG)-3
200 KV KANTI (BSEB)-MZ'PUR (PG)-1
200 KV KANTI (BSEB)-MZ'PUR (PG)-2
132 KV SULTANGAN(BS)-SABR -LALMAT(JSEB)-1

S.No.

LOC_ID

METER
NO.

CTR

PTR

PLACE OF INSTALLATION OF SEM

METERS INSTALLED IN JSEB

350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374

JS-01
JS-02
JS-03
JS-04
JS-05
JS-06
JS-07
JS-08
JS-40
JS-51
JS-52
JS-53
JS-54
JS-55
JS-56
JS-57
JS-58
JS-59
JS-60
JS-61
JS-62
JS-63
JS-64
JS-65
JS-66

M
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391

DV-01
DV-03
DV-04
DV-05
DV-08
DV-09
DV-51
DV-53
DV-55
DV-56
DV-57
DV-58
DV-60
DV-61
DV-62
DV-64
DV-65

NP-6103-A
NP-5119-A
NP-6108-A
NP-6109-A
NP-6116-A
NP-6121-A
NP-6122-A
NP-6118-A
NP-6605-B
NP-6102-A
NP-6117-A
NP-6009-B
NP-6004-B
NP-6003-B
NP-6104-A
NP-6119-A
NP-6113-A
NP-0425-A
NP-0434-A
NP-0431-A
NP-6115-A
NP-6107-A
NP-0000-A
NP-6048-B
NP-6110-A

1200
1200
600
800
1200
1200
1200
1200
120
600
300
60
120
120
600
800
400
600
600
1200
1600
600
400
40
200

2000.0000
2000.0000
1200.0000
2000.0000
2000.0000
2000.0000
2000.0000
2000.0000
1200.0000
2000.0000
1200.0000
1200.0000
1200.0000
1200.0000
1200.0000
2000.0000
1200.0000
2000.0000
2000.0000
2000.0000
2000.0000
1200.0000
1200.0000
1200.0000
1200.0000

220 KV RAMCHPUR(JSEB) - JAMSHEDPUR(PG)-1


220 KV RAMCHPUR(JSEB) - JAMSHEDPUR(PG)-2
132 KV LALMATIA (JSEB) - KHG (NTPC)
220 KV LALMATIA (JSEB) - FKK (NTPC)
220 KV CHANDIL (JSEB) RANCHI (PG)
220 KV CHANDIL (JS) CHANDIL (JS) [FUTURE]
220 KV HATIA (JSEB) RANCHI (PG)
220 KV CHANDIL (JS) CHANDIL (JS) [FUTURE]
132 KV PATRATU (JSEB) PATRATU (DVC)-2
220 KV RAMCHPUR (JSEB) - JODA (GRIDCO)
132 KV KENDOPOSI (JSEB) - JODA (GRIDCO)
132 KV GOELKERA (JSEB) - ROURKELA (GRIDCO)
132 KV PATRATU (JSEB) - PATRATU (DVC) -1
132 KV PATRATU (JSEB) - RAMGAR (DV) -TR. BUS
132 KV CHANDIL (JSEB) - MANIQUE (DVC)
220 KV CHANDIL (JSEB) - SANTALDIH (WB)
132 KV GARWA (JSEB) - RIHAND (UPSEB)
220 KV PATRATU(JSEB) - BODHGAYA -1 (BSEB)
220 KV PATRATU(JSEB) - BODHGAYA -2 (BSEB)
220 KV PATRATU(JSEB) - BODHGAYA -3 (BSEB)
220 KV TENUGHAT (JSEB) - BIHARSARIFF (BSEB)
132 KV LALMATIA (JSEB) - SABOUR (BSEB)
132 KV JAPLA (JSEB) - SONENAGAR (BSEB)
132 KV DEOGARH (JSEB) - SULTANGANJ (BSEB)
132 KV JAMTARA (JSEB) - MAITHON (DVC

METERS INSTALLED IN DVC


NP-6563-B
160
2000.0000
NP-6561-B
320
2000.0000
NP-6507-A
2000
3636.3636
NP-6508-A
2000
3636.3636
NP-6492-A
800
2000.0000
NP-6493-A
800
2000.0000
NP-6007-B
160
1200.0000
NP-6006-B
120
1200.0000
NP-6011-B
120
1200.0000
NP-6562-B
40
1200.0000
NP-6008-B
160
2000.0000
NP-0633-B
160
1200.0000
NP-6564-B
320
2000.0000
NP-6558-B
160
1200.0000
NP-6560-B
40
1200.0000
NP-6471-A
800
2000.0000
NP-6559-B
60
1200.0000

220 KV PARULIA (DVC) - PARUL (PG) -1&2(SUM)


220 KV K'NESWARI (DV) - MAITH (PG) -1&2(SUM)
400 KV MEJIA (DVC)- MAITHON(PG)
400 KV MEJIA (DVC)- JAMSHEDPUR (PG)
220 KV K'NESWARI (DVC) - MAITHON (PG) -3
220 KV K'NESWARI (DVC) - MAITHON (PG) -4
132 KV BARHI (DVC) - RAJGIR/BSF (BSEB)
132 KV PATRATU (DVC)-PATRATU(JS)-1&2(SUM)
132 KV MANIQUE (DVC) - CHANDIL (JSEB)
132 KV MAITHON (DVC) - JAMTARA (JSEB)
220 KV JAMSHEDPUR (DVC) - JINDAL(GRIDCO)
132 KV WARIA (DVC) - DPL (WBSEB) -1&2(SUM)
220 KV WARIA (DVC) - BIDHANNAGAR (WB)-1
132 KV KOLAGHAT(DVC) - KOLAGHAT (WB)
132 KV PURULIA (DVC) - PURULIA (WB) [DE-REG]
220 KV WARIA (DVC) - BIDHANNAGAR (WB)-2
132 KV KHPUR (DV) KHGPUR (WB) [DE-REG]

32

S.No.

N
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417

O
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434

LOC_ID

METER NO.

CTR

PTR

PLACE OF INSTALLATION OF SEM

METERS INSTALLED IN GRIDCO


OR-01
OR-02
OR-03
OR-04
OR-05
OR-06
OR-07
OR-08
OR-09
OR-10
OR-11
OR-12
OR-13
OR-14
OR-51
OR-52
OR-53
OR-54
OR-55
OR-56
OR-57
OR-59
OR-60
OR-61
OR-62
OR-63

NP-5934-A
NP-5935-A
NP-5984-A
NP-5985-A
NP-5963-A
NP-5964-A
NP-5969-A
NP-5976-A
NP-5981-A
NP-5982-A
NP-5986-A
NP-0553-A
NP-5967-A
NP-5977-A
NP-0383-A
NP-5939-A
NP-5937-A
NP-6502-A
NP-0624-B
NP-5940-A
NP-5941-A
NP-5944-A
NP-5906-A
NP-5908-A
NP-5907-A
NP-5904-A

600
600
600
600
600
600
1000
1000
600
600
800
600
1000
1000
200
400
600
800
120
600
600
800
600
400
400
600

2000.0000
2000.0000
2000.0000
2000.0000
2000.0000
2000.0000
3636.3636
3636.3636
2000.0000
2000.0000
2000.0000
2000.0000
3636.3636
3636.3636
1200.0000
1200.0000
2000.0000
2000.0000
2000.0000
2000.0000
2000.0000
2000.0000
1200.0000
1200.0000
1200.0000
2000.0000

220 KV TARKERA (GRIDCO) - ROURKELA (PG) -1


220 KV TARKERA (GRIDCO) - ROURKELA (PG) -2
220 KV RENGALI (GRIDCO) - RENGALI (PG) -1
220 KV RENGALI (GRIDCO) - RENGALI (PG) -2
220 KV JEYNAGAR (GRIDCO) - JEYPORE (PG) -1
220 KV JEYNAGAR (GRIDCO) - JEYPORE (PG) -2
400 KV M'MUNDALI (GRIDCO) - TSTPP (NTPC) -1
400 KV M'MUNDALI (GRIDCO) - TSTPP (NTPC) -2
220 KV M'MUNDALI (GRIDCO) - TSTPP (NTPC) -1
220 KV M'MUNDALI (GRIDCO) - TSTPP (NTPC) -2
220 KV RENGALI (GRIDCO) - TSTPP (NTPC)
220 KV TTPS (GRIDCO) - TSTPP (NTPC)
400 KV INDRAVATI P/H (GRIDCO) INDVATI (PG)
400 KV M'MUNDALI (GRIDCO)- JEYPORE (PG)
132 KV ROKELA (GRIDCO) - GOELKERA (JSEB)
132 KV JODA (GRIDCO) - KENDPOSI (JSEB)
220 KV JODA (GRIDCO) RAMCHPUR (JSEB)
220 KV JINDAL (GRIDCO) - JAMSHEDPUR (DVC)
220 KV JODA BUS COUPLER
220 KV BUDHIPADAR (GRIDCO) - RAIGAR(WR) -1
220 KK BUDHIPADAR (GRIDCO) - KORBA (WR) -2
220 KK BUDHIPADAR (GRIDCO) - KORBA (WR) -3
220 KV BALASORE(GRIDCO)-BARIPADA(PG)-1
132 KV BARIPADA(GRIDCO)-BARIPADA(PG)
132 KV RAIRANGPUR(GRIDCO)-BARIPADA(PG)
220 KV BALASORE(GRIDCO)-BARIPADA(PG)-2

METERS INSTALLED IN WBSEB


WB-01
WB-02
WB-03
WB-04
WB-05
WB-06
WB-07
WB-08
WB-09
WB-10
WB-11
WB-12
WB-13
WB-51
WB-52
WB-53
WB-54

NP-6489-A
NP-6474-A
NP-5952-A
NP-5953-A
NP-6480-A
NP-6472-A
NP-6486-A
NP-6445-A
NP-6446-A
NP-6487-A
NP-5917-A
NP-6482-A
NP-6483-A
NP-6484-A
NP-6455-A
NP-6488-A
NP-6485-A

600
600
600
600
600
600
800
1000
1000
1000
600
2000
2000
800
600
800
800

1200.0000
1200.0000
1200.0000
1200.0000
1200.0000
1200.0000
2000.0000
3636.3636
3636.3636
3636.3636
1200.0000
3636.3636
3636.3636
2000.0000
2000.0000
2000.0000
2000.0000

33

132 KV BIRPARA (WB) - BIRPARA (PG) -1


132 KV BIRPARA (WB) - BIRPARA (PG) -2
132 KV NBU(WB) - NJP(PG)/MOINAGURI(WB)
132 KV NBU(WB) - NJP(PG)
132 KV MALDA (WB) - MALDA (PG) -1
132 KV MALDA (WB) - MALDA (PG) -2
220 KV BIDHANNAGAR (WB) - PARULIA (PG)
400 KV JEERAT (WB) - FKK (NTPC)
400 KV JEERAT (WB) - SUBHASGRAM
400 KV KOLAGHAT (WB) - BARIPADA (PG)
132 KV RAMMAM (WB) - RANGIT (NHPC)
400 KV SAGARDIGHI (WB) FKK (NTPC)
400 KV SAGARDIGHI (WB) SUBHASHGRAM (PG)
220 KV BIDHANNAGAR (WB) - WARIA (DVC)-1
132 KV DALKHOLA (WB) - KISHANGANG (BSEB)
220 KV SANTALDIH (WB) - CHANDIL (JSEB)
220 KV BIDHANNAGAR (WB) - WARIA (DVC)-2

435
436

P
437
438
439
440
441

Q
442
443
444
445
446
447

R
448
449
450
451

S
452
453
454
455
456
457
458
459
460
461
462
463
464

T
465
466
467
468
469
470
471
472

LOC_ID

METER NO.

CTR

PTR

WB-59
WB-60

NP-5994-A
NP-0612-B

200
240

600.0000
1200.0000

PLACE OF INSTALLATION OF SEM


66 KV KALIMPONG (WB) - MELLI (SIKKIM)
132 KV DPL (WB) - WARIA (DVC) -1&2(SUM)

METERS INSTALLED IN SIKKIM


SM-01
SM-02
SM-03
SM-04
SM-51

NP-6481-A
NP-5995-A
NP-5996-A
NP-5997-A
NP-5849-A

300
300
150
300
300

600
1200.0000
1200.0000
2000.0000
600.0000

66 KV RABANGLA (SIKKIM) - RANGIT (NHPC)


132 KV MELLI (SIKKIM) - SILIGURI (PG)
132 KV MELLI (SIKKIM) - GANGTOK (PG)
132 KV MELLI (SIKKIM) - RANGIT (NHPC)
66 KV MELLI (SIKKIM) - KALIMPONG (WB)

METERS INSTALLED IN NER-ER


NE-81
NE-82
NE-83
NE-84
NE-85
NE-86

NP-5304-A
NP-5303-A
NP-5305-A
NP-0364-A
NP-5313-A
NP-5318-A

800
800
300
300
1000
1000

2000.0000
2000.0000
1200.0000
1200.0000
3636.3636
3636.3636

220 KV SALAKATI (PG) - BIRPARA(PG)-1


220 KV SALAKATI (PG) - BIRPARA(PG)-2
132 KV SALAKATI (PG) - GELEPHU (BHUTAN)
132 KV GELEPHU (BHUTAN) - SALAKATI (PG)
400 KV BONGAIGAON (PG) - BINAGURI -1
400 KV BONGAIGAON (PG) - BINAGURI-2

METERS INSTALLED IN SR-ER


DC-01
DC-02
DC-03
DC-04

NP-5376-A
NP-5377-A
NP-5378-A
NP-5379-A

2000
2000
2000
2000

3636.3636
3636.3636
3636.3636
3636.3636

GAJUWAKA (PG) HVDC STN (SOUTH BUS) -1


GAJUWAKA (PG) HVDC STN (SOUTH BUS) -2
GAJUWAKA (PG) HVDC STN (EAST BUS) -1
GAJUWAKA (PG) HVDC STN (EAST BUS) -2

METERS INSTALLED IN NR-ER


NR-01
NR-02
NR-03
NR-05
NR-06
NR-07
NR-08
NR-09
NR-10
NR-11
NR-12
NR-13
NR-14

NP-3052-A
NP-5043-A
NP-1530-A
NP-1529-A
NP-1292-A
NP-1295-A
NP-1296-A
NP-6101-A
NP-6091-A
NP-5010-A
NP-5009-A
NP-5406-A
NP-5345-A

2000
2000
800
400
400
400
400
2000
2000
2000
2000
2000
2000

3636.3636
3636.3636
2000.0000
1200.0000
1200.0000
1200.0000
1200.0000
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636

400 KV BALIA (NR)- PATNA (ER)-1


400 KV BALIA (NR)- PATNA (ER)-2
220 KV SAHUPURI (NR) - PUSAULI (PG)
132 KV SAHUPURI (NR) - K'NASA (BSEB)-2
132 KV CHANDAULI (NR) - K'NASA
132 KV RIHAND(NR) - SONENAGAR (BSEB)
132 KV RIHAND(NR) - GARWA (JSEB)
SASARAM (PG) NORTH BUS-1 SARNATH
SASARAM (PG) NORTH BUS-2 ALLAHABAD
400 KV G'RKPUR(NR) - MZ'PUR(ER)-1
400 KV G'RKPUR(NR) - MZ'PUR(ER)-2
400 KV BALIA - BIHARSHARIFF (ER)-1
400 KV BALIA - BIHARSHARIFF (ER)--2

METRS INSTALLED IN WR-ER


CS-54
CS-55
CS-56
CS-57
CS-58
CS-59
CS-60
CS-61

NP-2122-A
NP-2133-A
NP-2104-A
NP-5713-A
NP-5714-A
NP-2465-A
NP-6245-A
NP-6253-A

800
800
600
1000
1000
1000
2000
2000

2000.0000
2000.0000
2000.0000
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636

34

220 KV KORBA (WR) - BUDIPADAR (ER)-2


220 KV KORBA (WR) - BUDIPADAR (ER)-3
220 KV RAIGAR(WR) - BUDIPADAR (ER)
400 KV RAIGAR(WR) - ROURKELA (ER)-1
400 KV RAIGAR(WR) - ROURKELA (ER)-2
400 KV KORBA (WR) - VINDHYACHAL (WR)
400 KV SIPAT (WR) RANCHI- 1
400 KV SIPAT (WR) RANCHI- 2

3.6

FICTITIOUS METERS
Sometimes it is required to treat a combination of METERS as a single entity. e.g.
(i)

Total drawal of an SEB

(ii)

Total relief from a generating station

(iii)

Total transaction of energy between two regions.

In this case, these items can be treated as just like a single meter, we call it as
FICTITIOUS METER (FICTMTRS). The following listed meters are called
FICTMTRS used to simplify the calculation process. Every fictitious meter consists
and basically summation of certain no of Real meters. Real meters are the actual
meters which are placed at different location and store the raw data. E.g.
START
01 (FK-92)

M9

+(FK-08) +(FK-09) +(FK-10) +(FK-11)


+(FK-12) +(FK-13) +(FK-17) +(FK-15) +(FK-16)
..
100 (RN-97) M2
+(RN-95) -(RN-96)
101 (RN-99)

M1

(RN-95)*3.8/100
END
-----------------------------------------------------------------------------------------------------------The detail list of FICTITIOUS METERS are given in ANNEXURE-B
3.7 CALCULATION OF NET INJECTION AND DRAWL

35

M E T E R IN G AR R A N G E M E N T A T
F A R AK K A S T P S (3 X 2 0 0 + 2 X 5 0 0 M W )

K 'G A O N
1

FK -08
FK -25

K 'G A O N
2

FK -09
FK -26

D GPR
2

D GPR
1

FK -10
FK -23

FK -11
FK -24

M A LD A
1

FK-12
FK-29

M A LD A
2

FK -13
FK -28

JEERA T -1

FK-15
FK-21

JEERA T -2

FK -16
FK -22

400 KV
FK -01

FK-02

G-1

FK-03

G-2

FK -04

G-3

FK -05

G-4

FK-06

G-5

FK -07

FK -17
FK -27

FK -18

A UX T RA N S (T IE)
220 K V
FK -14

LA LM A T IA

Following Main and Back up Meters are used for calculating Farakka Net Injection:
MAIN METERS

FEEDER NAME

BACK UP METERS

LOC ID

LOC ID

FK-08

400 KV FARAKKA- KHG-I

FK-25

FK-09

400 KV FARAKKA- KHG-II

FK-26

FK-10

400 KV FARAKKA- DGPR (PG)-I

FK-23

FK-11

400 KV FARAKKA- DGPR (PG)-II

FK-24

FK-12

400 KV FARAKKA- MALDA (PG)-I

FK-28

FK-13

400 KV FARAKKA- MALDA (PG)-II

FK-29

FK-14

220 KV FARAKKA- LALMATIA (JSEB)

JS-04

FK-15

400 KV FARAKKA- JEERAT (WB)

WB-08

FK-16

400 KV FARAKKA- SAGARDIGHI (WB)

WB-12

FK-17

HV SIDE OF 400/220 KV ATR

FK-27

For Net injection of Farakka one Fictitious meter FK-92 is used.


(FK-92)

+(FK-08)

+(FK-09)

+(FK-10)

+(FK-11)

+(FK-12)

+(FK-13)

+(FK-15)

+(FK-16) +(FK-17)

36

M E T E R IN G A R R A N G E M E N T A T
K AH AL G A O N S T P S (4 X 2 1 0 M W + 3 X 5 0 0 M W )

B S H A R IF F -1
F A R A K K A -1

K H -0 7
K H -2 1

F A R A K K A -2

M A IT H O N -1 M A IT H O N -2

K H -0 8
K H -2 2

K H -0 9
K H -2 3

K H -0 2

K H -0 3

B S F -3

B S H A R IF F -2

K H -1 0
K H -2 4

K H -1 1
K H -2 5

K H -1 2
K H -2 6

K H -3 1
K H -3 3

B a rh

P a t n a -1

B S F -4

K H -3 2
K H -3 4

K H -35
K H -37

K H -3 6
K H -3 8

400 K V
K H -0 1

K H -0 4

K G-0 2

K G-0 1

K H -2 7
K H -1 5

K G-0 3

K H 28
K H -1 6
K A H A L GA O N
K H -1 9

G -1

G -2

G-4

G-3

K H -0 5

G-5

K H -0 6

G-6

K H -1 7

CO LO N Y

G -7

132 K V

K H -1 8 K H -1 3

132 K V

SA BO U R

K H -1 4

L A L M A T IA

11K V A U X

Following Main and Back up Meters are used for calculating Kahalgaon Net Injection :
MAIN METERS

FEEDER NAME

BACK UP METERS

LOC ID

LOC ID

KH-07

400 KV KHG- FARAKKA-I

KH-21

KH-08

400 KV KHG- FARAKKA-II

KH-22

KH-09

400 KV KHG- MAITHON (PG)-I

KH-23

KH-10

400 KV KHG- MAITHON (PG)-II

KH-24

KH-11

400 KV KHG- BSHARIFF (PG)-I

KH-25

KH-12

400 KV KHG- BSHARIFF (PG)-II

KH-26

KH-13

132 KV KHG-SABOUR (BESEB)

BI-07

KH-14

132 KV KHG-LALMATIA (JSEB)

JS-03

KH-19

132 KV KHG-KHG (BESEB)

BI-10

KH-31

400 KV KHG- BSHARIFF (PG)-III

KH-33

KH-32

400 KV KHG- BSHARIFF (PG)-IV

KH-34

KH-35

400 KV KHG- PATNA (PG)-I

KH-37

KH-36

400 KV KHG- BARH (NTPC)

KH-38

For Net injection of Kahalgaon one Fictitious meter KG-92 is used.


(KG-92) = (KH-85) = +(KH-07) +(KH-08) +(KH-09) +(KH-10)

+(KH-11)

+(KH-12) +(KH-31) +(KH-32) +(KH-35)

+(KH-36)

+(KH-13) +(KH-14) +(KH-19)

37

M E T E RING ARRANG E M E NT AT
T AL C HE R S T P S (2 X 500 M W)

TO HVDC STA TION TA LCHER


ROURKELA -2
ROURKELA -1
RENGA LI-1

TL-06
TL-22

TL-05
TL-21

TL-07
TL-23

FDR-I

RENGA LI-2

TL-15

TL-14
4 0 0 KV
S tag e -I

TL-02

TL-01

G-1

TL-03
TL-25

T L -3 2
T L -4 2

T L -3 1
T L -4 1

TL-08
TL-24
TL-17

FDR-II FDR-III FDR-IV


T L -3 3
T L -4 3

T L -3 4

TL-16

4 0 0 KV
S tag e -II

TL-04
TL-26

220KV

G-2
TL-13
TL-10

TL-09

11 KV
(A UX)

TTPS-1

TL-11

TL-12

RENGA LI DUBURI-1 DUBURI-2


PS

Following Main and Back up Meters are used for calculating Talcher Net Injection :
MAIN METERS

FEEDER NAME

BACK UP METERS

LOC ID

LOC ID

TL-03

HV SIDE 400/220 KV ATR-1

TL-09+TL-10

TL-04

HV SIDE 400/220 KV ATR-1

TL-11+TL-12

TL-05

400 KV TALCHER-ROURKELA (PG)-I

TL-21

TL-06

400 KV TALCHER-ROURKELA (PG)-II

TL-22

TL-07

400 KV TALCHER-RENGALI (PG)-I

TL-23

TL-08

400 KV TALCHER-RENGALI (PG)-II

TL-24

TL-13

HV SIDE 220/11 KV STN TRF.

TL-13

TL-14

400 KV TALCHER STG-I- STG-II-1

TL-16

TL-15

400 KV TALCHER STG-I- STG-II-2

TL-17

TL-18

400 KV TALCHER-MMUNDLI (GR)-I

OR-07

TL-19

400 KV TALCHER-MMUNDLI (GR)-II

OR-08

For Net injection of Talcher one fictitious meter TL-92 is used.


(TL-92)

= +(TL-81) +(TL-05) +(TL-06) +(TL-07) +(TL-08) +(TL-14)


+(TL-15) +(TL-18) +(TL-19)

[ where TL-81 (Fictitious Meter) = +(TL-03) +(TL-04) -(TL-13)]

38

METERING ARRANGEMENT AT RANGIT

RG 01

RG02

RG03

RANGIT
RG06

RG10

RG 09

RG 04

RG11

RG 07

RAMAM

EM02

RG08

EM01

GANGTOK
EM 03

EM 05

EM 04

EM 06

66 kV
SM031

SM041

MELLI

RABANGLA

SILIGURI

Following Main and Back up Meters are used for calculating Rangit Net Injection:
MAIN METERS

FEEDER NAME

BACK UP METERS

LOC ID

LOC ID

RG-04

132 KV RANGIT - SILIGURI

ER-54

RG-06

132 KV RANGIT - RAMMAM

WB-11

RG-07

66 KV RANGIT - RABANGLA

SM-01

RG-10

132 KV RANGIT - MELLI

SM-04

RG-11

132 KV RANGIT GANTOK

EM-02

For Net injection of Rangit one Fictitious meter RG-92 is used.


(RG-92) = +(RG-04)

+(RG-06)

+(RG-07)

39

+(RG-10)

+(RG-11)

METERING ARRANGEMENT AT TEESTA

N. SILIGURI-

N. SILIGURI-2

CVT

CVT

B/C
C

GT-3
3x70 MVA(1-)
13.8/400 kV

GT-2
3x70 MVA(1-)
13.8/400 kV

U-3
170MW

U-2
170MW

BUS PT

GT-3
3x70 MVA(1-)
13.8/400 kV

100VA
400 V/ 110 V/
100V each

U-1
170MW

TEESTA STAGE -V HPS

Following Main and Back up Meters are used for calculating Teesta Net Injection :
MAIN METERS

FEEDER NAME

LOC ID

BACK UP METERS
LOC ID

TS-05

400 KV TEESTA-BINAGURI(PG)-I

TS-07

TS-06

400 KV TEESTA-BINAGURI(PG)-II

TS-08

For Net injection of Teesta one Fictitious meter TS-92 is used.


(TS-92) = +(TS-05)

+(TS-06)

40

METERING ARRANGEMENT AT TALA AND CHUKHA

CU05

CU06 CU 07

CU 08

TALA
SINGHIGAON

BT38

BT37

BT36

BT35

CU 03

BT34

CU02

CU 01

BT33

BT 39

BIR.(W)

BT40

ER 44

BIRPARA

ER 46

ER 47

ER 41

ER 22

EM 7 EM 7 EM 10

ER 40
ER 43

ER 39

SALAKATI

ER 42

EM 9

BINAGURI

Following Main and Back up Meters are used for calculating Tala and Chukha Net
Injection :
MAIN METERS

FEEDER NAME

BACK UP METERS

LOC ID

LOC ID

EM-07

400 KV BINAGURI (PG) - TALA (THP)-I

TH-01

EM-08

400 KV BINAGURI (PG) - TALA (THP)-II

TH-02

EM-09

400 KV BINAGURI (PG) MALBASE

BT-39

EM-10

400 KV BINAGURI (PG) - TALA (THP)-IV

-------

ER-39

220 KV BIRPARA (PG) - CHUKHA (CHP)-I

CU-01

ER-40

220 KV BIRPARA (PG) - CHUKHA (CHP)-II

CU-02

ER-41

220 KV BIRPARA (PG) MALBASE

BT-40

BT-33

220 KV MALBASE (BHUT)- CHUKHA (CHP)

CU-03

BT-38

400 KV MALBASE (BHUT) - TALA (THP)

-------

For Net injection of Tala and Chukha Fictitious meters TH-91 & CU-91
are used respectively.
(TH-91) = +(BT-38)

+(EM-07) +(EM-08) +(EM-10) -(BT-99)


[Where BT-99 is a FICTITIOUS Meter]
(BT-99) = +(BT-33) +(BT-38) -(ER-41) -(EM-09)

(CU-91) = +(ER-39)

+(ER-40) +(BT-33)

41

METERING ARRANGEMENT AT MAITHON RIGHT BANK (MPL)

MAITHON(PG)-2 MAITHON(PG)-1

CHECK

CHECK

MR-02

MR-01

400 KV MAITHON RB BUS

STANDBY

STANDBY

GT-1

GT-2

G-1

STANDBY

STANDBY
AUX. TR-1

AUX. TR-2

G-2

Following Main and Back up Meters are used for calculating Maithon Right Bank (MPL)
Net Injection :

MAIN METERS

FEEDER NAME

BACK UP METERS

LOC ID

LOC ID

MR-01

400 KV MAITHON RB (MPL)) - MAITHON (PG)-I

EM-84

MR-02

400 KV MAITHON RB (MPL)) - MAITHON (PG)-II

EM-85

For Net injection of Maithon RB (MPL), Fictitious meters MR-92 is used.


(MR-92) = + (MR-01)

+ (MR-02)

42

METER LOCATIONS IN BSEB


INTER-CONNECTED SYSTEM
(M

BSARIFF

(C)

PATRATU

J
S
E

(M

BODHGAYA

BI 01

JS 59

BI 52

JS 60

BI 53

BI 02

JS 61

BI 54
BSF

BI 67

(C)

TENUGHAT
JS 62
LALMATIA

(M

(C)

(M

JS 63

JAPLA

(C)

BI 57
SABOUR

(M

BI 60

(C)

ER 02
ER 03

PURNIA

(C)

(M

SULTANGANJ

ER 62

BI 04

ER 63

ARRAH

(C)

DUMRAO (C)

(M

ARRAH
ER 10

(M

ARRAH

KISHANGANJ

BI 13
BI 14

(C

(M

KGAON

BI 07

(C)

(M

RAJGIR
BI 55
BSF

DV 51

(M

C
RIHAND (C)

(M

NR 07
CHANDAULI

(C)

(M

BI 66
KARMNASA

(M

NR 05

(C)

KGAON

(M

KGAON
KH 19

DEHRI

(C)

BI 62
DEHRI

(C)

PUSAULI

(M

ER 55
ER 78

BI 50
MOHANIA

BI 63

(C)

KH 13

BI 10

BI 56

SONENAGAR

NR 06
SAHUPURI

C
E
N
T
R
A
L

BI 61

DALKHOLA

BARHI

ARRAH
ER 09

SABOUR

N
R

(M

BI 11

KHAGAUL (C)

PURNIA

BI 03

BI 12

JS 65

W
B

(M

ER 48

SONENAGAR

JS 64
DEOGARH

ER 01

BI 58
SULTANGANJ
BI 59

(M

(C) BSARIFF

KARMNASA

PUSAULI

BI 49

BI 64
KANTI
BI 68

ER 79

(M

(C)

MUZPUR
EM 31

BI 69

EM 32

KHAGAUL

400 KV
220 KV
132 KV
(M) ---- MAIN
(C) ----- CHECK

(C)

(M

PATNA
EM 65

FATUAH

43

(C)

(M

PATNA
EM 64

S
E
C
T
O
R

BSEB NET DRAWAL


Following Main and Back up Meters are used for calculating BSEB Net drawal:
MAIN METERS
FEEDER NAME
BACK UP METERS
LOC ID
LOC ID
BI-01
220 KV BSHARIFF (BSEB) BSHARIFF (PG)-1
ER-01
BI-02
220 KV BSHARIFF (BSEB) BSHARIFF (PG)-2
ER-02
BI-13
132 KV KHAGAUL (BSEB) - ARAH (PG)-1
EM-72
BI-14
132 KV KHAGAUL (BSEB) - ARAH (PG)-2
EM-73
BI-21
132 KV KISHANGANJ (BSEB) DALKHOLA (WB)
WB-52
BI-48
132 KV BSHARIFF (BSEB) BARHI-T AT RAJGIR
}
BI-55
132 KV RAJGIR (BSEB)-BARHI (DVC)
} DV-51
BI-56
132 KV BSHARIFF (BSEB) BARHI-T
}
BI-57
220 KV BSHARIFF (BSEB) - TENUGHAT (JSEB)
JS-62
BI-58
132 KV SULTANGANJ (BSEB) - SABR LALM (JSEB)-2
}
BI-70
132 KV SULTANGANJ (BSEB) - SABR LALM (JSEB)-2
} JS-63
BI-60
132 KV SONNAGAR (BSEB) - JAPLA (JSEB)
JS-64
BI-61
132 KV SULTANGANJ (BSEB) DEOGARH (JSEB)
JS-65
BI-63
132 KV KARAMNASA (BSEB) CHANDAULI (NR)
NR-06
BI-64
132 KV KARAMNASA (BSEB) SAHUPURI (NR)
NR-05
BI-66
132 KV SONNAGAR (BSEB) RIHAND (NR)
NR-07
BI-67
220 KV BSHARIFF (BSEB) BSHARIFF (PG)-3
ER-03
BI-68
220 KV KANTI (BSEB) MUZAFFARPUR (PG)-1
EM-31
BI-69
220 KV KANTI (BSEB) MUZAFFARPUR (PG)-2
EM-32
ER-09
132 KV ARAH (PG)-ARAH (BSEB)
BI-11
ER-10
132 KV ARAH (PG)-DUMRAO (BSEB)
BI-12
ER-48
132 KV PURNEA (PG) - PURNEA (BSEB) - 3
BI-51
ER-49
132 KV PURNEA (PG) KISHANGANJ (BSEB)
----ER-55
220 KV PUSAULI (PG) - DEHRI (BSEB)
BI-62
ER-62
132 KV PURNEA (PG) - PURNEA (BSEB) 1
BI-03
ER-63
132 KV PURNEA (PG) - PURNEA (BSEB) 2
BI-04
ER-78
132 KV PUSAULI (PG) - DEHRI (BSEB)
BI-50
ER-79
132 KV PUSAULI (PG) - KARAMNASA (BSEB)
----EM-55
400 KV OF PATNA ICT-1
EM-56
EM-62
400 KV OF PATNA ICT-2
EM-63
KH-13
132 KV KAHALGAON (NTPC) SABOUR (BSEB)
BI-07
KH-19
132 KV KAHALGAON (NTPC) KAHALGAON (BSEB)
BI-10

For Net Drawal of Bihar one Fictitious meter BI-91 is used


(BI-91) =+(BI-21)+(BI-81)+(BI-82)+(BI-84)+(BI-85)-(KH-19)-(KH-13)
[Where BI-81, BI-82, BI-84 & BI-85 are FICTITIOUS Meters]
(BI-81) = +(BI-55) +(BI-56) +(BI-48)
(BI-82) = +(BI-01) +(BI-02) +(BI-67) -(ER-62) -(ER-63) -(ER-48) -(ER-78) -(ER-79) -(ER-55) -(ER-09)
-(ER-10) +(BI-13) +(BI-14) +(BI-68) +(BI-69) -(EM-55) -(EM-62) -(ER-49)
(BI-84) = +(BI-57) +(BI-58) +(BI-70) +(BI-60)+(BI-61)
(BI-85) = +(BI-63) +(BI-64) +(BI-66)

44

METER LOCATIONS IN JSEB


INTER-CONNECTED SYSTEM

B
S
E

BI 52

JS 59

BI 53

JS 60

BI 54
BSF

JS 61
(M) TENUGHAT

(C)

BI 57
(C)
SABOUR

JS 63
BI 59

SONENAGAR (C)

SULTANGANJ
BI 61

JS 65

SANTALDIH

(M

(C)

ER 17

RCHANDRAPUR

(M

(C)

LALMATIA

JS 57

ER 18

(C

(M

D
V

DV 56
PATRATU

(M

DV 53

LALMATIA

JAMTAR
A JS 66

(C)

(M

FARAKKA

E
LALMATIA

JS 54

C
G
R
I
D
C
O
NR

(M

JODA
OR 53

CHANDIL

DV 55

JS 56

(C)

(M

(C)

LALMATIA

OR 52

(C)

(M

JS 03

KGAON
KH 14

JS 51
PATRATU

(C)

(M

(M

RANCHI
EM 44

JS 52 /

(C)

FARAKKA
FK 14

KENDPOSI

JODA

CHANDIL

(C)

(M

RANCHI
EM 45

GOELKERA
JS 53

OR 51

RIHAND
NR- 08

(M

RAMCHANDRAPUR

(M

ROURKELA

(C)

JS 04

JS 55

(C)

(M

GARWA
JS 58

400 KV
220 KV
132 KV
(M) ---- MAIN
(C) ----- CHECK
45

C
E
N
T
R
A
L

FK 14

PATRATU

BC

MANIQUE

KGAON
KH 14

JS 03

JS 04

(M

JAMPUR

CHANDIL

WB 53

MAITHON

JAMPUR

(C)

JS 02

(M) JAPLA
JS 64
(M)
DEOGARH

(C)

(M

JS 01

LALMATIA

BI 58

BI 60

WB
SEB

RCHANDRAPUR

JS 62
(M)

SULTANGANJ (C)

(M) PATRATU

(C)

BODHGAYA

S
E
C
T
O
R

JSEB NET DRAWAL


Following Main and Back up Meters are used for calculating JSEB Net drawal:
MAIN METERS
LOC ID
JS-01
JS-02
JS-40
JS-54
JS-51
JS-52
JS-53
JS-56
JS-57
JS-58
JS-62
JS-63
JS-64
JS-65
JS-66
EM-44
EM-45
FK-14
KH-14

FEEDER NAME

BACK UP METERS

220 KV RCHANDARPUR (JSEB) JSHEDPUR (PG)-1


220 KV RCHANDARPUR (JSEB) JSHEDPUR (PG)-2
132 KV PATRATU (JSEB) - PATRATU (DVC)-2
132 KV PATRATU (JSEB) - PATRATU (DVC)-1
220 KV RCHANDARPUR (JSEB) JODA (GR)
132 KV KENDIPOSI (JSEB) - JODA (GR)
132 KV GOELKERA (JSEB)-ROURKELA (GR)
132 KV CHANDIL (JSEB)- MANIQUI (DVC)
220 KV CHANDIL (JSEB) - SANTALDIH (WBSEB)
132 KV GARWA (JSEB) - RIHAND (NR)
220 KV TENUGHAT (JSEB) - BIHARSHARIFF (BSEB)
132 KV LALMATIA (JSEB) SABOUR (BSEB)
132 KV JAPLA (JSEB) SONNAGAR (BSEB)
132 KV DEOGARH (JSEB) SULTANGANJ (BSEB)
132 KV JAMTARA (JSEB) MAITHON (DVC)
220 KV RANCHI (PG) HATIA (JSEB)
220 KV RANCHI (PG) CHANDIL (JSEB)
220 KV FARAKKA (NTPC) LALMATIA (JSEB)
132 KV KAHALGAON (NTPC) LALMATIA (JSEB)

LOC ID
ER-17
ER-18
}
}DV-53
OR-53
OR-52
OR-51
DV-55
WB-53
NR-08
BI-57
BI-58+BI-70
BI-60
BI-61
DV-56
JS-07
JS-05
JS-04
JS-03

For Net Drawal of Jharkhand one Fictitious meter JS-91 is used


(JS-91) = +(JS-81) +(JS-82) +(JS-83) +(JS-84) +(JS-85) -(WB-53)
-(NR-08)
[Where JS-81, JS-82, JS-83, JS-84 & JS-85 are FICTITIOUS Meters]

(JS-81)
(JS-82)
(JS-83)
(JS-84)
(JS-85)

=
=
=
=
=

+(JS-01)
-(FK-14)
+(JS-51)
-(DV-53)
-(BI-57)

+(JS-02)
-(KH-14)
-(OR-52)
-(DV-55)
-(BI-58)

-(EM-44) -(EM-45)
+(JS-53)
-(DV-56)
-(BI-70) -(BI-60) -(BI-61)

[Presently Some Check Meters are Used For JSEB Calculation due to non availability of Main meter]]

46

METER LOCATIONS IN DVC


INTER-CONNECTED SYSTEM

B
S
E
B

RAJGIR

(C

(M BARHI
DV 51

BI 55
BSF

(C

(M) BARHI

BI 56

D
KOLAGHAT

(M)

KOLAGHAT

PARULIA

DV 61

B
S

BIDHANNAGAR
WB 51

(M)

(C

WB 54

WARIA
DV 60

DV 58

WB 60

G
R
I
D
C
O

JINDAL

(C

(M

(C (M

MAITHON
ER 11
ER 12

DV 08

EM 80

DV 09

EM 81

S
E
C
T
O
R

DV 53
BC

CHANDIL

(M

(M MANIQUE
DV 55

JS 56

JS 66

JAMSHEDPUR
EM 76

PATRATU

(M)

JS 55

JAMTARA

KALYANESWARI

ER 15

DV 57

JS 54

J
S
E
B

MAITHON

JAMSHEDPUR

OR 54

PATRATU

MEJIA
DV 05

KALYANESWARI
DV 03

(M) WARIA

(C

ER 05
ER 06

DV 04

C
DPL

(M) PARULIA

MEJIA

DV 64

E
B

(C

DV 01

C
E
N
T
R
A
L

(C

(M

400 KV
220 KV
132 KV
(M) ---- MAIN
(C) ----- CHECK

MAITHON
DV 56

47

DVC NET DRAWAL


Following Main and Back up Meters are used for calculating DVC Net drawal:
MAIN METERS
LOC ID
DV-04
DV-05
DV-51
DV-53
DV-55
DV-56
DV-57
DV-58
DV-60
DV-61
DV-64
ER-05
ER-06
ER-11
ER-12
EM-80
EM-81

FEEDER NAME

BACK UP METERS

400 KV MEJIA (DVC) MAITHON (PG)


400 KV MEJIA (DVC) JAMSHEDPUR (PG)
132 KV BARHI (DVC) - BIHARSHARIFF (BSEB)
132 KV PATRATU (DV)-PATRATU (DV) 1&2 SUM
132 KV MANIQUE (DVC) - CHANDIL (JSEB)
132 KV MAITHON (DVC) - JAMTARA (JSEB)
220 KV JAMSHEDPUR (DVC)-JINDAL (GR)
132 KV WARIA (DVC)-DPL (WB)- 1&2 SUM
220 KV WARIA (DVC) BIDHANAGAR (WB)-1
132 KV KOLAGHAT (DVC) KOLAGHAT (WB)
220 KV WARIA (DVC) BIDHANAGAR (WB)-2
220 KV DURGAPUR (PG) PARULIA (DVC)-1
220 KV DURGAPUR (PG) PARULIA (DVC)-2
220 KV MAITHON (PG) KLNESHWARI (DVC)-1
220 KV MAITHON (PG) KLNESHWARI (DVC)-2
220 KV MAITHON (PG) KLNESHWARI (DVC)-3
220 KV MAITHON (PG) KLNESHWARI (DVC)-4

LOC ID
ER-15
EM-76
BI-81
JS-54
JS-56
JS-66
OR-54
WB-60
WB-51
DV-61
WB-54
}
}DV-01
}
}DV-03
DV-08
DV-09

For Net Drawal of DVC one Fictitious meter OR-91 is used


(DV-91) = -(ER-91) -(ER-92) -(EM-80) -(EM-81) +(DV-04) +(DV-05)
+(DV-81) +(DV-82) +(DV-57)
[Where ER-91, ER-92, DV-81 & DV-82 are FICTITIOUS Meters]

(ER-91) = +(ER-05) +(ER-06)


(ER-92) = +(ER-11) +(ER-12)
(DV-81) = +(DV-51) +(DV-55) +(DV-56) +(DV-53)
(DV-82) = +(DV-60) +(DV-64) +(DV-61) +(DV-58)

48

METER LOCATIONS IN GRIDCO


INTER-CONNECTED SYSTEM

(C)

TARKERA
RAMCHANDRAPUR

J
S
E
B

(C)

(M

JS 51
KENDPOSI

(C)

(M

GOELKERA (C)

(M

OR 01

ER 23

OR 53

OR 02

ER 24

JODA

ROURKELA

JS 53

OR 51

(M
BC

D
V
C

JODA

OR 52

JS 52

(C)

OR 55

(M

DV 57

MERAMUNDALI
OR 14

(C)

MERAMUNDALI

(C)

JINDAL
OR 54

D
C
RAIGARH
CS 56
KORBA

(C)

(M

(C)

CS 54
KORBA

JEYPORE
ER-38
TSTPP

(M

OR 9

TL 11

OR 10

TL 12

MERAMUNDALI
OR 07

TSTPP
TL 27

MERAMUNDALI
OR 08

TSTPP
TL 28

RENGALI PH

BUDHIPADAR
OR 56
BUDHIPADAR

TSTPP
TL 10

OR 11

(M

(C)

OR 12

RENGALI

(M

(C)

TALCHER TPS

C
S
E
B

(M

JODA

I
JAMSHEDPUR

ROURKELA

(M

TSTPP
TL 09

(C)

(M

RENGALI
ER 30

OR 03
OR 04

ER 31

OR 57

(C)

CS 55

JAYANAGAR
OR 05

BUDHIPADAR
OR 59

(C)

(M

ER 35

OR 06
INDRAVATI
OR 13
BALASORE
OR 60
BARIPADA
OR 61
RRANGPUR

400 KV
220 KV
132 KV
(M) ---- MAIN
(C) ---- CHECK

OR 62

49

JEYPORE
ER 34

(C)

(M

INDRAVATI
ER 86
BARIPADA
ER 20
BARIPADA
ER 98
BARIPADA
ER 99

C
E
N
T
R
A
L
S
E
C
T
O
R

GRIDCO NET DRAWAL


Following Main and Back up Meters are used for calculating Gridco Net drawal:
MAIN METERS
LOC ID
OR-07
OR-08
OR-51
OR-52
OR-53
OR-54
OR-56
OR-57
OR-59
TL-09
TL-10
TL-11
TL-12
ER-20
ER-23
ER-24
ER-30
ER-31
ER-34
ER-35
ER-38
ER-86
ER-98
ER-99
EM-58

FEEDER NAME
400 KV MMUNDLI (GR)- TSTPP(NTPC)-1
400 KV MMUNDLI (GR)- TSTPP(NTPC)-2
132 KV ROURKELA (GR) - GOELKERA (JSEB)
132 KV JODA (GR) - KENDIPOSI (JSEB)
220 KV JODA (GR) - RCHANDARPUR (JSEB)
220 KV JINDAL (GR) - JAMSHEDPUR (DVC)
220 KV BUDHIPADAR (GR)-RAIGARH (WR)-1
220 KV BUDHIPADAR (GR)-KORBA (WR)-2
220 KV BUDHIPADAR (GR)- KORBA(WR)-3
220 KV TSTPP (NTPC) - TTPS (GR)
220 KV TSTPP (NTPC) RENGALI HPS (GR)
220 KV TSTPP (NTPC) MMUNDLI (GR)-1
220 KV TSTPP (NTPC) MMUNDLI (GR)-2
220 KV BARIPADA (PG)- BALASORE (GR)-1
220 KV ROURKELA (PG)-TARKERA (GR)-1
220 KV ROURKELA (PG)-TARKERA (GR)-2
220 KV RENGALI (PG) - RENGALI (GR)-1
220 KV RENGALI (PG) - RENGALI (GR)-2
220 KV JEYPORE (PG) - JEYNAGAR (GR)-1
220 KV JEYPORE (PG) - JEYNAGAR (GR)-2
400 KV JEYPORE (PG) MMUNDLI (GR)
400 KV INDRAVATI (PG) INDRAVATI (GR)
132 KV BARIPADA (PG) BARIPADA (GR)
132 KV BARIPADA (PG) RAIRANGPUR (GR)
220 KV BARIPADA (PG) BALASORE (GR)-2

BACK UP METERS
LOC ID
TL-27
TL-28
JS-53
JS-52
JS-51
DV-57
CS-56
CS-54
CS-55
OR-12
OR-11
OR-09
OR-10
OR-60
OR-01
OR-02
OR-03
OR-04
OR-05
OR-06
OR-14
OR-13
OR-61
OR-62
OR-63

For Net Drawal of Gridco one Fictitious meter OR-91 is used


(OR-91) = +(OR-81) +(OR-82) +(OR-83) +(TL-82) +(OR-07) +(OR-08)
-(DV-57) -(ER-38)
[Where OR-81, OR-82, OR-83 & TL-82 are FICTITIOUS Meters]
(OR-81) = -(ER-23) -(ER-24) -(ER-30) -(ER-31) -(ER-34) -(ER-35)
-(ER-86) -(ER-20) -(EM-58)
(OR-82) = +(OR-51) +(OR-52) +(OR-53) -(ER-98) -(ER-99)
(OR-83) = +(OR-56) +(OR-57) -(CS-55)
(TL-82) = -(TL-09) -(TL-10) -(TL-11) -(TL-12)
[OR-54 & OR-59 is FAULTY so DV-57 & CS-55 is used respectively for GRIDCO Net Drawl]

50

METER LOCATIONS IN WBSEB


INTER-CONNECTED SYSTEM

S
I
K
K
I
M
J
S
E
B

BIRPARA (C)

W
MELLI (C)
SM 51

(M
66 kv

KALINGPONG

WB 01

ER 44

WB 02

E M 75

NBU (C)

WB 59

(M NJP
ER 52

WB 04

WB 03

ER 53

SAGARDIGIHI 400KV

CHANDIL (C)

(M) SANTALDIH

WB 53

JS 57

WB-12

B
V

KOLAGHAT
DV 61
WARIA

(M

(C)

KOLAGHAT

(M

MALDA (C)

WARIA

WB 05

ER 58

WB 06

ER 59

S
E
ER 07
WB 07
C
(C) FARAKA T
JEERAT (M
FK 15
WB 08
O
KOLAGHAT (M (C)BARIPADA
R
(M PARULIA

ER 27

(C)RANGIT

RAMAM (M
WB 11

RG 06

WB 54

(C)

(M

NEW JALPAIGURI

BIDHANNAGAR

DV 60

(M BINAGURI

WB 51

ER 19
ER 45
JEERAT (M

(M DPL

WARIA(C)

400 KV
220 KV
132 KV
(M) ----(C) -----

(C) SUBHASGRAM
EM 17

WB 09

WB 60

DV 58

SGRAM(C

(M SUBHASGRAM

SGRAM

(C)

SAGARDIGHI

(C) (M

WB 13
BIDHANAGAR
ER 68

MAIN
CHECK
51

C
E
N
T
R
A
L

MALDA

WB 10

BIDHANNAGAR

DV 64

Farakka
FK-16

(M)

BNAGAR (C)

(M BIRPARA

(M

EM 18
EM 19

SUBHASGRAM
EM 74
PARULIA

WBSEB NET DRAWAL


Following Main and Back up Meters are used for calculating West Bengal Net drawal:
MAIN METERS

FEEDER NAME

BACK UP METERS

LOC ID

LOC ID

WB-08

400 KV JEERAT(WB) FARAKKA (NTPC)

FK-15

WB-09

400 KV JEERAT(WB) SGRAM (PG)

EM-17

WB-10

400 KV KOLAGHAT (WBSEB) - BARIPADA (PG)

ER-27

WB-11

132 KV RAMMAM (WB) - RANGIT (NHPC)

RG-06

WB-12

400 KV SAGARDIGHI - FARAKKA (NTPC)

FK-16

WB-13

400 KV SAGARDIGHI (WB) SGRAM (PG)

EM-74

WB-51

220 KV BIDHANNAGAR (WB)-WARIA (DVC)-1

DV-60

WB-54

220 KV BIDHANNAGAR (WB)-WARIA (DVC)-2

DV-64

WB-60

132 KV DPL (WB) - WARIA (DVC) -1&2(SUM)

DV-58

ER-07

220 KV DURGAPUR (PG) - BIDHANNAGAR (WB)

WB-07

ER-19

220 KV BINAGURI (PG) - JALPAIGURI (WB)-I

--------

ER-44

132 KV BIRPARA (PG) - BIRPARA (WB)-1

WB-01

ER-45

220 KV BINAGURI (PG)-JALPAIGURI (WB)-2

--------

ER-52

132 KV SILIGURI (PG) - NBU (WB) -2

WB-04

ER-53

132 KV SILIGURI (PG) - NBU (WB) -1

WB-03

ER-58

132 KV MALDA (PG) - MALDA (WBSEB) -1

WB-05

ER-59

132 KV MALDA (PG) - MALDA (WBSEB) -2

WB-06

ER-68

400 KV DURGAPUR (PG) - BIDHANNAGAR (WB)

ER-68

EM-18

220 KV SGRAM (PG)-SUBHASGRAM-1(WB)

EM-18

EM-19

220 KV SGRAM (PG)-SUBHASGRAM-2(WB)

EM-19

EM-75

132 KV BIRPARA (PG)-BIRPARA (WB)-2

WB-02

DV-61

132 KV KOLAGHAT (DVC) - KOLAGHAT (WB)

DV-61

For Net Drawal of West Bengal one Fictitious meter WB-91 is used.
(WB-91)

= +(WB-81) +(WB-82) +(WB-84) +(WB-52) +(WB-53) +(WB-59)


[Where WB-81, WB-82, WB-83 are FICTITIOUS Meters]

(WB-81) = -(ER-44) -(ER-52) -(ER-53) -(ER-58) -(ER-59) -(ER-07) -(ER-19) -(ER-45) -(ER-68)
-(EM-18) -(EM-19) -(EM-75)
(WB-82) = +(WB-08) +(WB-09) +(WB-10) +(WB-11) +(WB-12) +(WB-13)
(WB-84) = -(DV-61) +(WB-51) +(WB-54) +(WB-60)
[ONLY ONE METER (DV-61) IS INSTALLED AT DVC END OF KOLAGHAT-KOLAGHAT LINE ]

52

METER LOCATIONS IN SIKKIM


INTER-CONNECTED SYSTEM

S
I
W
B KALIMPONG
(C)
S
66 kv
E WB-59
B

K
(M MELLI
SM-51

C
E
RABANGLA (C)
(M RANGIT N
T
RG 07
66
SM 01
(C)
(M
RANGIT R
MELLI
A
SM 04
132
RG 10
L
SM 02

MELLI
SM 03
EM 04

400 KV
220 KV
132 KV
(M) ---- MAIN
(C) ----- CHECK

53

NJP

MELLI

EM 06

ER 57

S
GANGTOK E
C
EM 01
T
O
EM 03
R
132/66
kV
GANGTOK

EM 05

SIKKIM NET DRAWAL


Following Main and Back up Meters are used for calculating Sikkim Net drawal:

MAIN METERS

FEEDER NAME

BACK UP METERS

LOC ID
SM-01

LOC ID
66 KV RABANGLA RANGIT (NHPC)

RG-07

SM-02

132 KV MELLI- SILIGURI (PG)

ER-57

SM-03

132 KV MELLI-GANGTOK (PG)

EM-01

RG-10

132 KV MELLI-RANGIT (NHPC)

SM-04

SM-51

66 KV MELLI KALIMPONG (WB)

WB-59

EM-03

HV SIDE 132/66 KV ICT-I GANGTOK

EM-04

EM-05

HV SIDE 132/66 KV ICT-II GANGTOK (PG)

EM-06

For Net Drawal of Sikkim one Fictitious meter SM-91 is used.


(SM-91) = +(SM-51)
-(EM-03)

-(RG-07)
-(EM-05)

-(RG-10) +(SM-02) +(SM-03)

[SM-01 IS FAULTY RG-07 IS USED FOR SIKKIM NET DRAWL]

54

INTER-REGIONAL NET INJECTION/DRAWL


1. NR Net Drawl
Following Main and Back up Meters are used for calculating NR Net drawal:

MAIN METERS

FEEDER NAME

BACK UP METERS

LOC ID

LOC ID

NR-05

132 KV SAHUPURI (NR) KNASA (BSEB)

BI-64

NR-06

132 KV CHANDAULI (NR) KNASA (BSEB)

BI-63

NR-07

132 KV RIHAND (NR) -SONNAGAR (BSEB)

BI-66

NR-08

132 KV RIHAND (NR)-GARWA (JSEB)

JS-58

EM-21

400 KV BSHARIFF(ER) BALIA (NR)-1

NR-13

EM-22

400 KV BSHARIFF(ER) BALIA (NR)-2

NR-14

EM-25

400 KV MUZPUR(ER) GORAKHPUR (NR)-1

NR-11

EM-26

400 KV MUZPUR(ER) GORAKHPUR (NR)-2

NR-12

EM-53

400 KV PATNA(ER) BALIA (NR)-1

NR-01

EM-57

400 KV PATNA(ER) BALIA (NR)-2

NR-02

ER-56

220 KV PUSAULI(ER) - SAHUPURI (NR)

NR-03

ER-82

400 KV SASARAM EAST BUS-1

ER-83

400 KV SASARAM EAST BUS-2

}NR-09

ER-94

400 KV SIDE PUSAULI ICT-2

ER-97

400 KV SIDE PUSAULI ICT-1

}NR-10

For Net Drawal of NR one Fictitious meter NR-91 is used.


(NR-91)

= -(NR-61)
-(EM-21)

-(ER-56) +(NR-05) +(NR-06) +(NR-07) +(NR-08)


-(EM-22) -(EM-25) -(EM-26) -(EM-53) -(EM-57)
[Where NR-61 is a FICTITIOUS Meter]

(NR-61) = -(ER-82) -(ER-83) -(ER-94) -(ER-97)

55

2. WR Net Drawl
Following Main and Back up Meters are used for calculating WR Net drawal:
MAIN METERS

FEEDER NAME

BACK UP METERS

LOC ID

LOC ID

OR-56

220 KV BUDHIPADAR (ER) RAIGARH (WR) -1

CS-56

OR-57

220 KV BUDHIPADAR (ER) KORBA (WR) -2

CS-54

OR-59

220 KV BUDHIPADAR (ER) KORBA (WR) -3

CS-55

EM-47

400 KV RANCHI (ER)-SIPAT (WR) -1

CS-60

EM-48

400 KV RANCHI (ER)-SIPAT (WR) -2

CS-61

ER-80

400 KV ROURKELA(ER) RAIGARH (WR)-1

CS-57

ER-81

400 KV ROURKELA(ER) RAIGARH (WR)-2

CS-58

For Net Drawal of WR one Fictitious meter WR-91 is used.


(WR-91) = -(OR-56) -(OR-57) -(OR-59) -(ER-80) -(ER-81) -(EM-47)
-(EM-48)

3. SR Net Drawl
Following Main and Back up Meters are used for calculating SR Net drawal:
MAIN METERS

FEEDER NAME

BACK UP METERS

LOC ID

LOC ID

ER-84

400 KV JEYPORE (ER) GAZUWAKA (SR) -I

DC-03

ER-85

400 KV JEYPORE (ER) GAZUWAKA (SR) -II

DC-04

TL-14

400 KV TSTPP STG-I STG-II

TL-16

TL-15

400 KV TSTPP STG-I STG-II

TL-17

For Net Drawal of SR one Fictitious meter SR-91 is used.


(SR-91) = -(ER-84) -(ER-85) -(TL-14) -(TL-15)

56

4. NER Net Drawl


Following Main and Back up Meters are used for calculating NER Net drawal:
MAIN METERS

FEEDER NAME

BACK UP METERS

LOC ID

LOC ID

NE-81

220 KV SALAKATI (NER) BIRPARA (ER) -I

ER-42

NE-82

220 KV SALAKATI (NER) BIRPARA (ER) -II

ER-43

NE-83

132 KV SALAKATI (PG) GELEPHU (BHUTN)

NE-84

NE-85

400 KV BONGAIGAON (NER) BINAGURI(ER)-I

ER-37

NE-86

400 KV BONGAIGAON (NER) BINAGURI(ER)-II

ER-21

For Net Drawal of NER one Fictitious meter NE-91 is used.


(NE-91) = +(NE-81)

+(NE-82)

+(NE-83)

57

+(NE-85)

+(NE-86)

3.8

PAIRS.DAT file
This file gives the LOC-ID of main meter and standby meter and the permitted

pair tolerance for each pair. Main meters are those which are connected on 400 kV side
of ICT or generator side of power station or sending end of inter state lines. The
standby/check meters are on the other end. Standby meters are connected in reverse
polarity so that sum of both MWh is zero in ideal condition. Suppose the power flow is
from main meter to standby meter, the main meter gives a +ve value and standby meter
gives a ve value and vice versa. Tolerance value in MWh for a 15 min block in +ve
direction & -ve direction is given in this PAIRS.DAT, depending upon transformer /Line
loses & CT/PT errors.
The given tolerance value towards +ve side is called X value. The tolerance value
towards ve side is called Y value.

PAIRS.DAT
MAIN
STANDBY
X
Y
LINE DETAILS
----------------------------------------------------------------------BI-01
ER-01
2.0
1.5
BIHARS'F-BIHARSARIFF-1 |
BI-02
ER-02
2.0
1.5
BIHARS'F-BIHARSARIFF-2 | BSEB
BI-67
ER-03
2.0
1.5
BIHARS'F-BIHARSARIFF-3 |
ER-62
BI-03
2.0
1.5
PURNIA-PURNIA-1
|
ER-63
BI-04
2.0
1.5
PURNIA-PURNIA-2
|
ER-48
BI-51
1.5
1.0
PURNEA-PURNEA-3
KH-13
BI-07
2.0
1.5
KAHALGAON-SABOUR
|
KH-19
BI-10
2.0
1.5
KAHALGAON-KAHALGAON
|
ER-09
BI-11
1.5
1.0
ARAH-ARAH
|
ER-10
BI-12
1.5
1.0
ARAH-DUMRAON
|
JS-01
ER-17
2.0
1.5
RAMCH'PUR-JAMSHEDPUR-1
|
JS-02
ER-18
2.0
1.5
RAMCH'PUR-JAMSHEDPUR-2
|JSEB
FK-14
JS-04
2.0
1.5
FARAKKA-LALMATIA
|
KH-14
JS-03
2.0
1.5
KAHALGAON-LALMATIA
|
ER-91
DV-01
2.0
1.5
PARULIA-PARULIA
| DVC
ER-92
DV-03
2.5
1.5
MAITHON-KALYANSWARI |
ER-23
OR-01
1.5
1.5
ROURKELA-TARKERA-1 |
ER-24
OR-02
1.5
1.5
ROURKELA-TARKERA-2 |
TL-10
OR-11
2.0
2.0
TSTPP-RENGALI PH
|
TL-09
OR-12
1.5
1.0
TSTPP-TTPS
|
TL-11
OR-09
2.0
1.5
TSTPP-MERAMNDLI-1 | GRIDCO
TL-12
OR-10
2.0
1.5
TSTPP-MERAMNDLI-2 |
ER-30
OR-03
2.0
1.5
RENGALI-RENGALI-1 |
ER-31
OR-04
2.0
1.5
RENGALI-RENGALI-2 |
ER-34
OR-05
2.0
1.5
JEYPORE-JAYNAGAR-1 |
ER-35
OR-06
2.0
1.5
JEYPORE-JAYNAGAR-2 |
ER-86
OR-13
2.0
2.0
INDRAVATI-INDRAVATI|

58

ER-38
ER-44
ER-52
ER-53
ER-58
ER-59
ER-07
ER-42
ER-43
ER-37
ER-21
ER-84
ER-85
SR-91
ER-82
ER-83
NR-03
NR-05
NR-06
NR-07
NR-08
ER-55
EM-17
FK-70
FK-12
FK-08
FK-09
FK-10
FK-11
FK-15
FK-16
FK-13
KH-09
KH-10
KH-11
KH-12
KH-15
KH-16
KH-31
KH-32
KH-35
TL-81
TL-03
TL-04
TL-05
TL-06
TL-07
TL-08
CU-91
RG-04
RG-07
RG-06
OR-56
OR-57
OR-59
ER-80
ER-81
NR-61

OR-14
WB-01
WB-04
WB-03
WB-05
WB-06
WB-07
NE-81
NE-82
NE-85
NE-86
DC-03
DC-04
SR-92
ER-89
ER-90
ER-56
BI-64
BI-63
BI-66
JS-58
BI-62
WB-09
FK-27
FK-68
FK-65
FK-66
FK-63
FK-64
FK-61
FK-62
FK-69
KH-63
KH-64
KH-65
KH-66
KH-67
KH-68
KH-69
KH-70
EM-54
TL-82
TL-65
TL-66
TL-61
TL-62
TL-63
TL-64
CU-92
ER-54
SM-01
WB-11
CS-56
CS-54
CS-55
CS-57
CS-58
NR-62

2.0
1.5
2.0
2.0
1.0
1.0
2.5
1.5
1.5
2.0
2.0
2.0
2.0
1.5
2.0
2.0
1.5
1.5
1.5
1.5
1.5
1.5
3.0
2.0
2.0
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
2.0
1.5
1.5
1.5
1.5
1.5
1.5
1.0
1.0
1.0
1.0
1.5
1.5
1.5
1.5
1.5
2.0

1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
2.5
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
2.5
1.5
2.0
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.0
1.0
1.0
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

JEYP-MMNDLI
|
BIRPARA-BIRPARA
|
NJP-NBU-2
|
NJP-NBU-1
|
MALDA-MALDA-1
|
MALDA-MALDA-2
| WBSEB
PARULIA-BID'NAGAR |
BIRPARA-SALAKATI-1 |
BIRPARA-SALAKATI-2 | NER
BINAGURI-BONGAIGAON|
PURNEA-BONGAIGAON |
JEYPORE-GAJUWAKA-1
|
JEYPORE-GAJUWAKA-2
|
GAJK(EAST)-GAJK(SOUTH)
SASARAM(E)-BIHARSARIF-1 |
SASARAM(E)-BIHARSARIF-2 |
SAHUPURI-PUSAULI
|
SAHUPURI-KARMANASA
|NR
CHANDAULI-KARMANASA
|
RIHAND-SONENAGAR
|
RIHAND-GARWA
|
PUSAULI-DEHRI
SUBHASGRAM-JEERAT
FARAKKA-ATR-400KVSID|
FKK-MLD-1 MAIN-CHK |
FKK-KHL-1 MAIN-CHK | FARAKKA
FKK-KHL-2 MAIN-CHK |
FKK-DGP-1 MAIN-CHK |
FKK-DGP-2 MAIN-CHK |
FKK-JRT-1 MAIN-CHK |
FKK-JRT-1 MAIN-CHK |
FKK-MLD-2 MAIN-CHK |
KHL-MTN-1 MAIN-CHK
| KAHALGAON
KHL-MTN-2 MAIN-CHK
|
KHL-BSF-1 MAIN-CHK
|
KHL-BSF-2 MAIN-CHK
|
KHL ATR-1 MAIN-CHK
|
KHL-ATR-2 MAIN-CHK
|
KHL-BSF-3 MAIN-CHK
KHL-BSF-4 MAIN-CHK
KHL-PAT-1
TALCHER-ATR/LINE
|
TAL-ATR-1 MAIN-CHK |
TAL-ATR-2 MAIN-CHK |
TAL-RKL-1 MAIN-CHK | TALCHER
TAL-RKL-2 MAIN-CHK |
TAL-REN-2 MAIN-CHK |
TAL-REN-1 MAIN-CHK |
CHUKHA RCPT-BIRP OUT
RANGIT - SILIGURI
RANGIT - MELLI
RANGIT - RAMMAM
BUDIPADAR - RAIGARH 1
BUDIPADAR - KORBA 2
BUDIPADAR - KORBA 3
ROURKELA - RAIPUR 1
ROURKELA - RAIPUR 2
SASARAM EAST_SASARAM NORTH

59

ER-57
SM-02
1.5
1.0
SILIGURI-MELLI
EM-01
SM-03
1.0
1.0
GANGTOK-MELLI
RG-11
EM-02
1.5
1.O
RANGIT-GANGTOK
EM-31
BI-68
1.5
1.0
MUZAFFARPUR-KANTI-1
EM-32
BI-69
1.5
1.0
MUZAFFARPUR-KANTI-2
EM-25
NR-11
1.5
1.0
MUZZAFARPUR-GORAKHPUR-1
EM-26
NR-12
1.5
1.0
MUZZAFARPUR-GORAKHPUR-2
EM-39
EM-09
1.5
1.0
MALBASE-BINAGURI
EM-40
ER-41
1.5
1.0
MALBASE-BIRPARA
EC-62
EC-61
1.5
1.0
SUBHAS ICTS-SUBHAS 220 KV
EM-38
EC-63
2.0
1.0
TALA MALBASE-MALBASE ICT MAL BINA
FK-16
EC-64
2.0
1.0
FARAKKA-SUBHAS 400 KV BUS
KH-35
EM-54
1.5
1.0
KAHALGAON-PATNA-2
EM-53
NR-02
1.5
1.0
PATNA - BALIA-2
EM-57
NR-01
1.5
1.0
PATNA - BALIA-1
EM-55
EM-56
1.0
0.5
PATNA ICT_400 - PATNA ICT_220
EC-66
EC-68
1.5
1.0
MTN_RAN_FDR-RANCHI ICTS(400)
EC-66
EC-65
1.0
0.5
MTN_RAN_FDR-RANCHI 220 KV FDRS
EC-68
EC-69
1.0
0.5
RANCHI 400 ICTS-RANCHI 220 ICTS
EC-67
EC-70
1.0
0.5
ARA 220 XTN-ARA 132 KV FEEDERS
EM-37
EM-36
0.5
0.5
MALBASE 400KV ICT-220 KV ICT
EM-21
NR-13
1.5
0.5
400 KV BIHARSHARIFF-BALIA-1
EM-22
NR-14
1.5
0.5
400 KV BIHARSHARIFF-BALIA-2
EC-71
EC-72
1.0
0.5
GANGTOK 132/66 KV ICTS
EC-73
EC-74
1.0
0.5
PATNA 400/220 KV ICTS
TS-05
TS-07
1.5
1.0
TEESTA-BINAGURI-1
TS-06
TS-08
1.5
1.0
TEESTA-BINAGURI-2
EM-47
CS-60
2.0
2.0
RANCHI SIPAT -1
EM-48
CS-61
2.0
2.0
RANCHI SIPAT -2
---------------------------------------------------------------------JS-57
WB-53
2.0
1.5
CHANDIL-SANTALDIH
| WB-JSEB
WB-52
BI-51
1.5
1.0
DALKHOLA-PURNEA
| WB-BSEB
DV-51
BI-81
1.5
1.0
BARHI-RAJGIR/BSF | DVC-BSEB
JS-51
OR-53
3.0
3.0
RAMCHANDRAPUR-JODA |
JS-53
OR-51
1.0
1.0
GOILKERA-ROURKELA
|JSEB-GRIDCO
OR-52
JS-52
1.0
1.0
JODA-KENDPOSI
|
JS-54
DV-53
1.0
1.0
PATRATU-PATRATU
|JSEB-DVC
DV-57
OR-54
1.5
2.0
JAMSHEDPUR-JODA | DVC-GRIDCO
DV-60
WB-51
1.5
2.0
BIDHANNAGAR-WARIA | DVC-WB
WB-10
ER-27
2.0
2.0
KOLAGHAT-BARIPADA | WB-GRIDCO
BI-57
JS-62
1.0
1.0
B'SARIFF-TENUGHAT
|
BI-83
JS-63
1.0
1.0
SBR/SLTGNJ-LALMATIA |
BI-60
JS-64
1.0
1.0
SONENAGAR-GARWA
|
BI-61
JS-65
2.0
2.0
DEOGARH-SULTANGANJ |
JS-66
DV-56
1.0
1.0
JAMTARA-MAITHON
|
WB-59
SM-51
1.0
1.0
KALIMPONG-MELLI
----------------------------------------------------------------------END
-------------------------------------------------------------------------------

60

SECTION- 4

61

4.0

PROCESSING & COMPUTATION OF DATA

4.1 Scheme for collection and dissemination of data


4.1.1 General
While CTU has the overall responsibility for supplying the meter data to ERLDC
on a weekly basis, the respective constituents agencies, in whose premises the energy
meters are installed, normally down-load the metered data from each of the meters on a
weekly basis or as and when requested by the ERLDC. The respective constituents
agency ensures that the data is down loaded in the specified time schedule. ERLDC, in
consultation with the constituents, prepares a scheme for the timely collection of the
metered data from each meter location and its further transmission to the ERLDC. The
constituent/agency shall also ensure the security of the metered data up to its delivery to
the ERLDC and seven days thereafter. All constituents shall provide the required
assistance/co-operation to ERLDC. Each station is also requested to keep back up of all
data systematically that are sent to ERLDC.
4.1.2

Data Collection from different location


At each metering locations data is to be collected from SEM once in a week. With

one data collecting device, data of about ten SEM can be collected sequentially and at
once dumped into PC. For dumping into PC the software given by supplier of SEM has to
be used. After downloading the metered data of seven days from each meter location, the
respective constituents agencies send the data normally through e-mail from specific
location to ERLDC. These data should reach ERLDC latest by Tuesday so that it doesnt
cause any delay in processing. Special energy meters are either SECURE METERS
LIMITED (SML) or L&T Make. These raw metered data are non readable type (non
editable and naturally tamperproof). SML make meters have *.MRI or *.AMR file and
L&T make metres have *.DAT file. Since these files are non readable files, so these files
have to be converted to *.NPC file which is readable and editable. It is better to make
NPC file at RLDC to reduce human error.

62

4.1.3

Saving of Raw Data

Data after downloading attachments is saved in computer in a folder (e.g.


SEM_DATA). Since these data are in MRI or DAT file these files need conversion into
TEXT file (although some location sends NPC files along with both MRI and DAT files).
But it is better to convert MRI and DAT file into NPC file at ERLDC to reduce human
error. After converting into NPC file these are stored in a folder called as READINGS.

4.2

Conversion into Text File/Software for Data Viewing

After receiving the data, MRI file and DAT file is converted into TEXT file called NPC.
This conversion is done with the help of respective software. MRI file is converted into
NPC with the software called SMARTGRID supplied by the Manufacturers and DAT file
is converted into NPC with the help of VINCOM software.
For Secure Meter: SMARTGRID
For L&T Meter:

A)

VINCOM

SECURE METER (SMARTGRID Software): All mri files are

transferred to SEM_DATA folder in C: drive before converting to text file(i.e


NPC file). Following are the steps to convert mri file into text file
.Step-I : Login the SMARTGRID software after click on SMARTGRID icon on desktop.

63

Step-II:

Go to Data option on menu & click to Convert for conversion of mri file into

npc file.

Step-III: Select all mri file to be converted into text file

64

After conversion mri files along with npc files are transferred into respective location
wise folder in C:\READINGS\Mmyy\....

A)

L&T METER (VINCOM Software): All *.DAT files are transferred

to SEM_DATA folder in C: drive before converting to text file (i.e NPC file).
Following are the steps to convert dat file into text file.
Step-I : Login the VINCOM software after click on VINCOM icon on desktop

65

Step-II:

Step-III:

Click on Import from Data option on menu.

Browse button to select the file and import one selected dat file at a time.

66

Step-IV:

After importing convert into text file.

67

Step V: Finally conversion takes place. And click on ok and after each import and
conversion finally close the application software.

After conversion dat files along with npc files are transferred into respective location
wise folder in C:\READINGS\Mmyy\....
4.3 Viewing of npc file/structure of npc file
(i)

There is one week heading for each meter data which gives the start date and end

date for which data is available e.g.


WEEK FROM 0000 HRS OF 12-10-07 TO 1230 HRS OF 22-10-07
(ii)

For every day data there is a day heading that gives METER NO, three register
readings at 0000 HRS of the day, and date of the day e.g.

NP-4201-A 63895.0

97845.8

74358.6

12-10-07

Three cumulative registers are (i) WH register (ii) VAR register at high voltage (>103%)
(iii) VAR register at low voltage (<97%).
68

METER NO is of 9 characters, usually starting with NP (e.g. NP-0139-A). Character A


or B depending upon whether the meter is with 1 AMP CT or 5 Amp CT
(iii)

One day data consists of 96 blocks. Each for 15 min is organised in 6 lines e.g.

WEEK FROM 0000 HRS OF 12-10-07 TO 1230 HRS OF 22-10-07


NP-4201-A

63895.0

97845.8

74358.6

12-10-07

00 14 +11.50 00

+11.10 08

+10.89 04

+10.34 01

+10.38 00 +10.21 06

+10.56 00

+10.48 06

+10.20 11

+10.33 00

+10.05 12 +10.30 07

+10.68 02

+10.66 12

+10.65 05

+11.01

..

..

..

Each line contains 16 blocks i.e. data for 4 hours. Time is followed by 16 blocks and
starting Time is in HOURS (2 digits) is given at the start of each line. Each block
contains a frequency code and WH for the 15 min. Freq code is of 2 digits and range is
from 00 to 99.
In between frequency code and WH there may be a * mark if there is any voltage
problem (V<70% during any instant in the 15 min). If any correction is done during the
15 min, there may be a aa or rr corresponding to advance or retard of the clock.
There may also be a case of voltage problem and time correction occurring in the same
15 min block.
At the end of 96 blocks the algebraic SUM of WH of all block is also given. One NPC
file may consist of data for one meter or more than one meter. Data for each meter starts
with a week heading. After receiving the data from all locations for a week, they can be
combined to make a complete file for the week. A program APPEND.EXE is given for
that purpose.
4.4

Modification/Editing in Text file


After conversion into Text file (NPC file) every file is renamed as ddmm.NPC

where dd and mm correspond to the week for which data is being processed. Also extra

69

meter readings to be deleted from the text file which is not required and if some
correction of date etc is required it is done in the text file and saved into corresponding
folder from where data have been received. These are normally saved in folder named as
READINGS.
4.5

Availability Checking
This is done to ensure whether data from all location has received or not. This is

checked by running software called REA2006 and we check for location from where data
has received or not received, if the data has not received, then the concerned agency or
person is contacted telephonically to send the data.
4.6

Methods used in case of Non availability of data


In case of non availability of data from any location, there are different alternative

methods to evaluate the data.


I.

If Main meter reading is not available then check meter reading is used as
substitute for any particular location in FICTMTRS.CFG file.

II.

Another alternative is to use other end data in case of non availability of data.

III.

There is another approach to evaluate data by applying Kirchhofs law at BUS


from where data is not available but this approach is not always valid..

Sometimes data are sent from different location by email attachment but required
proper data is not found in attachment. In that case the concerned agency or person is
asked to resend the data again.
4.7

Final Processing
APPEND.EXE simply combines all *.NPC files starting with the same ddmm.

The combined file name is ddmmSREA.NPC. It is better to make a single file


ddmmSREA.NPC which includes all the data for one week. This can be given as the
input to the data processing program. (REA2006 at the create DATA base option) This
total file can be stored easily as a back up file also.
70

MASTER FREQUENCY METER:


It is an special energy meter whose recorded frequency code is used as standard freq code
and is used for region, NR. ER, WR and NER ( NEW Grid) and the constituent within
the above mentioned Region for any calculation such as Unscheduled interchange (UI)
etc. This meter is installed at Korba (WR) end of Korba-Vindhyanchal line. Meter No is
NP-2465-A. This meter recorded data is sent by WRLDC to every other RLDC weekly.
Durgapur meter NP-6461-A is used as back up Master Freq Meter in case any block ,any
day or any week data is not available at Korba end installed Master Freq Meter due to
any reason such as opening of line or Meter Failure etc.
REA 2006
(i)

REA 2006 processes the text file (NPC file) of SEM (special energy meter) for
completeness, correctness and computation. NPC file may contain Data for a few
METERS or ALL METERS in the region (ddmmSREA.NPC) which obtained
using append program for a few days (usually 9 days).

(ii)

The program takes special care to check the data at every stage. The NPC file is
first checked for syntax correctness. Then creating a database by splitting the data
into day wise and meter wise files, so that further processing is easier.

(iii)

Various checks can be carried out on the data to check both data validity and
strength of the meter to record data properly.

(iv)

Energy in MWH and MVARH is computed from WH and VARH using


corresponding CTR and PTRs. Wherever a pair is available (e.g. 400 KV and 220
kV side of ICT) computed energy is compared and data correction is done,
accordingly (for * marked blocks). Load curve can be plotted if required,
Drawal, share and overdrawal/underdrawal are computed using the FICTMTRS
(fictitious meters) concept.

(v)

Output file can be made as desired by the user by making appropriate


configuration file.
71

(vi)

Option is made available to change the freq code tolerance (temporarily) for
frequency analysis and to modify temporarily each pairs to get approximate pairs
tolerance value for analysis of each pair.

Following are the activities before creating data base.


First it is checked for the location from where data has not been received. If data is not
received from some location then it is asked to send the data. After receiving all the data
from each and every location, again all NPC file is combined together by
APPEND.EXE command and SREA file is created. After that it is gone through data
correctness stage. If status is not found ok then corresponding data file is edited that has
caused the error. Then Data base is created.
So finally by running REA2006 software we go through final processing with the
following steps.
I.

Location of data not received

II.

Data Correctness

III.

Create Data base

IV.

Compute ENERGY

V.

Compute FICTMTRS

VI.

MWH output

After creation of data base ENERGY is computed (compute ENERGY option) and
computation of FICTMTRS is done for the seven days of the corresponding week. After
that MWH output is calculated for the week. With the above steps the constituents Net
Drawl, Regions Net drawl and ISGS Net Generation, etc for the week is calculated.
Regional loss is calculated after adding total bilateral of the week in net central sector
generation. Details of FICTIOUS METERS used for computation of Net injection as well
Net drawl is shown in Annexure-B.

72

4.8 Data check and its validation


By data checking and its validation we go through to verify or cross check that
whether meter is recording data correctly or not. So by going through all check files ie.
MWH output files, it is observed for any mismatch or discrepancies.
Following are the check files:
A.

Net bus check of Substations


These provide the net bus of all important substations in the Region. In case any

discrepancies it is noted and observed.


B. Net bus check of Generators
These file gives the net bus of ISGS of the Region. In case any discrepancies it is noted
and observed.
C. Pair- Check (End to End)
By going through these pairs file we observe and check for any mismatch at the two ends
of transmission lines. It is investigated for any deviation other than tolerance value.
So Identification on metering error can be done broadly through three categories of check
files as mentioned.

4.9

I)

Net Bus of Sub- Stations

II)

Net Bus of ISGS

III)

Pair Check of end to end


Discrepancies
If there is any discrepancy in the weeks data processing, it is listed out in register

for every week and these are used during final processing of data. These discrepancies
are forwarded to ERPC (Eastern Regional Power Committee) along with Raw and
processed data. These discrepancies are also uploaded on ERLDC web along with ISGS
injection and Constituents drawl.

73

4..10

Data forwarding to ERPC


Processed data of the week along with raw data and discrepancies is forwarded to

Eastern regional Power committee (ERPC). Contents of the data which is forwarded to
ERPC are:
1) Raw data of each location
2) Constituent wise processed data
3) Processed MWH data
4) Day wise meter data
5) Configuration file of the week
6) Discrepancies, if any
7) Any other information, if required
4.11

Uploading of data on ERLDC web


Constituent wise net drawl and central sector Net generation along with region

loss and discrepancies if any, is uploaded on the ERLDC web site (http://www.erldc.org)
for the concerned week. Weekly UI calculations are being done by ERPC. As requested
by constituents, processed meter data as per calculations of ERLDC are being uploaded
just for the sake of gross comparison only.

74

4.12

Data Archives
A data archive for processed data along with raw data of every week is

maintained on PC to take care of any future dispute. Back up for Data Archive is also
maintained either on CD or Hard disc. The data archive structure is as follows:

Meter Archive

Year1

Month1

Week1

Year2

Month2

Week2

Readings

Month..12

Week3

Dist

Location wise raw meter data


Relevant SREA
file

Year...n

Week4

Sembase

Processed MWH Data

Constituent wise processed data


Discrepancies

Relevant
FICTMTRS data

DATA ARCHIVE STRUCTURE

75

Day wise meter data

SECTION - 5

69

Collection of weekly SEM data and furnishing the processed error free data to RPC
to enable them to issue weekly UI energy charges and monthly REA
Start
Collect if any ,details of SEMs newly installed during the
accounting week and update dat.files

Master.dat , Pairs.dat
and Fictmtrs.dat

Receipt of previous weeks raw sem data from locations by e-mail

Using soft ware provided by SEM supplier convert to txt.file(npc file)

Using REA2006 programe check correctness and completenss of


the converted data and create data base as and when data
received

Yes

Get correct data from


location again

Is received
data correct

No

Yes
Send data non- receipt
status report to locations

Has all
data
received

No

Yes
Data validation report

Make a note of discrepancy in any of


the SEMs affecting injection/drawal
computation and changes to be
made in injection/drawal
computation due to discrepancy or
due to newly added SEMs.

Using REA2006 soft ware checks for voltage problem,frequency


,time correction and ASM problem of the complete data received

Yes

Any major
discrepancy
observed in the
validation report

No
Compute blockwise energy in MWh of each sem for
all 7 days as well as that of fictmeters using
REA2006 programe

Day wise file of MWh report


of all SEMs generated

Data validation report

Validation of data of pre defined pairs for


tolerences using pair check option in
REA2006 programe

The daywise MWH graphs of pre-defined


pair meters and loss in selected bus
sections are also plotted for visualization
of variation

Any major
discrepancy
observed in the
validation report

Yes

No
1

70

Daywise graphs

2
1

Compute blockwise energy in MWh injection of


all ISGS and beneficiary drawal for all 7 days
using REA2006 software

Make necessary
adjustments in the
computation formula

Computation method as per CEA


regulations/CERC directives/ RPC
board decisions

Report generation using REA2006 software-Daywise


beneficiary drawals, ISGS and IR injections ,Other
region frq.code

Discrepancy
report

Furnish to RPC in soft copy as a


folder with name of the week

Implemented schedule
of 7days of the
accounting week

Master.dat file
UI suspention details if
any from GM dept

No action

On second working day


of next month,check
whether data upto last
day of previous month
furnished to RPC

Yes

No
Collect implemented schedule of those days
and furnish to RPC to enable them to issue
previous month REA.

End

71

Issuing notional loss for dispatch schedule


Start

Report of total
regional injection
and drawal of all
7 days of the
week

To RLDC
website

To MS,RPC

Compute average %
difference of total region
injection and total drawal of
beneficiaries of all 7 days
which is the actual loss %
during the week

Intimate the computed


actual loss% which is
notional loss % for the
follwing week

End

72

To real time
dispatch dept to
be used in the
dispatch
schedule

Addressing problems at site regarding SEMs

Start

Receive problems with


respect to
SEM,DCD,cable,downloading
software through email,telephone,letter

Time drift report ,voltage


failure intimation from the
locations

RLDC analyse and instruct


site to check
connections,cables,battery,ad
vance/retard time of SEM

Discrepancy in data
received
RLDC receives
error free data

Problem
solved

Yes

No
RLDC analyse and advice CTU for
accu check of the SEM or check for
any other problems at site

Yes

CTU attend the problem

Problem
solved

No
RLDC again analyse and advice CTU to
replace the meter and inform RLDC
Meter replaced by CTU

`
Collect details of the
new SEM installed

End

73

Incorporate changes
in the master file

Instruction to install SEM s at new locations

Start

Receive
synchronisation
programe of new grid
elements

Check whether
covered in the
future SEM
requirement
projections

No

Whether the new


element affect
the regional
injection and
drawal

Yes
Yes
Intimate RTS the reqirement of
SEMs and advice to install before
synchronisation

RTS installs the SEMs

Receives the
details of
SEMs installed

Incorporate in the master file


End

74

No

No
action

Projection of SEM requirement for future long term planning

Start
TCC ,OCC
minutes,Monthly
progress report of
RPC

Prepare list of new elements


affecting regional injection and
drawal to be commissioned in
the region during the period

Estimate the the requirement of


additional SEMs/DCDs to meet
the expansion

CEA metering
regulations,RPC
board decisions and
CERC guide lines

Intimate the requirement to the


concerned RTS for procurement

End

CEA metering
regulations,RPC
board decisions and
CERC guide lines

75

SECTION - 6

76

6.0

REQUIREMENT OF METER IN ER UNDER XI TH PLAN (UPTO 2012)

S.N Description of line

Type of
line/

Requirement
of Meter
One
End

Remarks

Other
End

A . ISGS / ISTS to State


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37

Subhasgram - Jagatballavpur
Jamshedpur - Guptamoni
Baripada - Guptamoni
Baripada - Mehendasol
Baripada - Duburi
Durgapur - Sagardighi
Durgapur - DPL
Durgapur - Bidhannagar
Durgapur - PPSP
Maithon - Maithon Right Bank
Maithon - Mejia P.S
Maithon - Mejia P.S
Maithon - PPSP
Jamshedpur - PPSP
Gajuwaka(SR) - Berhampur
Biharsharif - Kodarma P.S
Gaya - Kodarma P.S
Gaya - Dumka P.S
Maithon - Dumka P.S
Ranchi - Maithon Right Bank
Ranchi - Raghunathpur
Maithon - Raghunathpur
Ranchi - Raghunathpur
TSTPP - Berhampur
Jeypore - Bolangir
Rourkela - Raigarh(WR)
Rourkela - Jharsuguda
Raigarh - Jharsuguda
Rengali - Bolangir
Indravati Bolangir
Jeypore - Bolangir
Sasaram - Daltonganj
Kishangarh pooling Station
Subhasgram - Haldia
Muzaffarpur- Begusarai
Biharshariff - Begusarai
Purnea - Begusarai

400 Kv D/C
400 Kv D/C
400 Kv S/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv S/C
400 Kv S/C
400 Kv D/C
400 Kv D/C
400 Kv D/C

400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv S/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv S/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv S/C
400 Kv S/C
400 Kv S/C
400 Kv D/C
400 Kv D/C
220 Kv D/C
220 Kv D/C
220 Kv D/C

2
2
2
2
2
1
1
2
2

2
2
2
1
2
2
2
4
1
2

2
8
2
2
2
2

2
2
1
2
2
2
2
1
1
4
2
2
2
2
2
4
4
4
2
4
2
2
2
2
1
2
2
1
1
1
2

LILO existing Baripada-Kolaghat


LILO future B'pada-Mehendasol

LILO (existing M-J Line)


LILO Future MTN-JSR
LILO Future MTN-JSR

LILO existing KhSTPP- Maithon


LILO existing Ranchi-Maithon
LILO existing Ranchi-Maithon

LILO existing Rourkela-Raigarh


LILO existing Rourkela-Raigarh
LILO Rengali -Indravati
LILO Rengali -Indravati
LILO existing Jeypore-M'mundali
for DC side

2
2
2
2

54

73

4
4
4
4
4
4
4

4
2
2
2

B. ISGS to ISGS/ ISTS


1
2
3
4
5
6
7

FSTPP - KhSTPP
TSTPP - Rourkela
NKSTPP - Gaya
NKSTPP - Ranchi
Barh - KhSTPP
Barh STPP -Patna
Barh STPP- Purnea

400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C

77

LILO existing KhSTPP-Patna


LILO existing KhSTPP-Patna
LILO future Purnea-BSF

8
9
10
11
12
13
18
19
20

Barh STPP- Biharshariff


Barh STPP- Balia(NR)
Barh STPP - Gorakhpur (NR)
Nabinagar P.S - Sasaram
KhSTPP - Lakisarai
KhSTPP - Dumka P.S
Teesta Lower Dam 3 - Binaguri
Teesta Lower Dam 4 - Binaguri
Teesta LD 3 - Teesta LD-4

400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv S/C
400 Kv S/C
400 Kv D/C
400 Kv S/C

4
4
4
4

LILO future Purnea-BSF

2
4
2

2
2
4
1
2
2

52

23

2
2
2
2
2
2
1
2
2
2

2
2
2
2
2
2

LILO existing KhSTPP-B'sariff


LILO existing KhSTPP-Maithon

C. ISTS to ISTS
1
2
3
4
5
6
7
9
10
11
12
13

Jamshedpur - Durgapur
Jamshedpur - Maithon
Jamshedpur - Baripada
Maithon - Durgapur
Biharshariff - Purnea
Biharshariff - Sasaram
Biharshariff - Balia (NR)
Ranchi - Rourkela
Rourkela - Raigarh(WR)
Binaguri - Bongaigaon(NER)
Biharshariff - Lakisarai
Gaya - Maithon

400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv S/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C

2
2

21

18

5x800
3X630
3X630
4x250
2X500
2X500
4X250
4X250
3X335
3X630+1X350
4X660
4X250
3X350
4X300
4X500
3X335
2X315+2X200
4X300

5
3
3
4
2
2
4
4
3
4
4
4
3
4
4
3
4
4

3
3
3
2
2
2
4
2
3
3
3
4
2
3
3
2
3
3

3X335

4X300

4X300

LILO existing Khstpp - B'shariff

D. GENERATORS
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26

Tilaya STPP (4000 MW)


Barh STPP
North Karanpura STPP
Nabinagar Power station
Dumka STPP (CESC)
Kodarma STPP
Tata(1000 MW)
Visa (1000 MW)
Adhunik (1005 MW)
Navbharat(2240MW)
Lanco (2640 MW)
CESC (1000 MW)
GMR (1050 MW)
Jindal (1200 MW)
Bhusan (2000 MW)
Monet (1005 MW)
Mahanadi (1030 MW)
Essar (1200 MW)
KVK (600 MW)
Adhunik (1005 MW)
Chitrapur (540 MW)
Essar - (1200 MW)
Corporate (660 mw)
Electrosteel (1200 MW)
IND BHARAT(700 MW)
Sterlite (2400 MW)

4X600

78

79

60

19 meters will be required after 2012

E. 765 KV LINES
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

Gaya - Sasaram
Gaya - Balia(NR)
Gaya 765/400 Kv Transformer
Sasaram - Fatehpur(NR)
Sasaram 765/400 Kv Transformer
Ranchi - WR Pooling station
Ranchi 765/400 Kv Transformer
Angul - Dhenkanol
Angul - Jharsuguda
Angul 765/400 Kv Transformer
Angul -Barnala
Dhenkanol - Jharsuguda
Dhenkanol 765/400 Kv Transformer
Jharsuguda - Dharamjoygarh (WR)
Jharsugua 765/400 Kv Transformer
Tilaya - Gaya
Tilaya - NR Pool
Tilaya 765/400 Kv Transformer

765 Kv S/C
765 Kv S/C
2
765 Kv S/C
2
765 Kv D/C
2
765 Kv D/C
765 Kv D/C
2
AC/DC conv
765 Kv D/C
2
2X765 Kv D/C
2
765 Kv S/C
765 Kv S/C
2

1
1
4
1
4
2
4
2
2
4
4
2
4
4
4
2
2
4

2
2

51

4
4
4
8
8
4
4
4
4
4
4
4
4
4
4
4
4
8
4
4
4
8

2
2
2
4
4
2
2
2
2
2
2
2
2

104

54

4
4
1
1
1
2
4

2
2
1
1
1
2
2

F. IPP Ties
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

Tata- Dhenkanol
Visa - Dhenkanol
Adhunik - Dhenkanol
Navbharat - Dhenkanol
Lanco - Dhenkanol
CESC- Dhenkanol
GMR- Angul
Jindal - Angul
Bhusan - Angul
Monet - Angul
Mahanadi - Angul
Essar - Angul
KVK- Duburi
KVK - Mehendasol
Adhunik -Mejia
Adhunik - Jamshedpur
Chitrapur - Ranchi
Essar - Ranchi
Essar - Corporate
Essar - Electrosteel
IND BHARAT - Jharsuguda
Sterlite - Jharsuguda

G.

SIKKM SYSTEM

1
2
3

Teesta-1 - Pooling stn


Teesta-2 - Pooling stn
Lachung - BOP
Lachung - Bhimkyong
Bhimkyong - BOP
Teesta 2- BOP
Teesta-3 - Mangan

4
5
6
7

400 Kv D/C
400 Kv D/C
400 Kv D/C
2x400 Kv D/C
2x400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
2x400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
2x400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
2x400 Kv D/C

400 kv D/C
400 kv D/C
220 kv S/C
220 kv S/C
220 kv S/C
220 kv D/C
400 kv D/C

79

2
2
2
4
4
4
2
4

LILO existing MTN - JSR


LILO existing MTN - JSR

LILO of Lachung - BOP line (1 line)


LILO of Lachung - BOP line (1 line)

8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37

Rangyong- Mangan
Pannan - Mangan
Dikchu - Mangan
Chakungchu - Mangan
Teesta-VI - New Melli
Jorethang - New Melli
Jorethang - Rangit IV
Rangit IV - New Melli
Sadamangdher - Common stn
Common stn - New Melli
Ting ting - Coomon stn
Tashiding - Common stn
Ralong - Common stn
Chuzachen - Rangpo
Rolep - Rangpo
Bhasme - Rongpo
Bhasme - Rongnichu
Rongnichu - Rongpo
Teesta-2 pooling point - Mangan
Mangan - New pooling stn( K'ganj)
Mangan - New Melli
Dikchu - Gangtok
New Melli - Kishanganj
Rangpo - New Melli
Gangtok - Rangpo
Melli - Rangpo
Gangtok - Rangpo
Rangit - Rangpo
Teesta V - New Melli
Binaguri - New Melli

132 KV D/C
400 kv D/C
132 kv D/C
132 KV D/C
220 kv D/C
220 kv S/C
220 kv S/C
220 kv S/C
220 kv D/C
220 kv D/C
220 kv D/C
220 kv D/C
220 kv D/C
132 KV D/C
132 KV D/C
220 kv S/C
220 kv S/C
220 kv S/C
400 kv D/C
400 kv D/C
400 kv D/C
132 kv D/C
400 kv D/C
220 kv D/C
132 kv S/C
132 kv S/C
132 kv S/C
132 kv S/C
400 kv D/C
400 kv D/C

2
4
2
2
2
1
1
1
2
2
2
2
2
2
2
1
1
1
2
2
2
2
2
2

61
H.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

GENERATING UNITS AT
SIKKIM
Teesta -III
Teesta -II
Panan
Teesta-I
Rongyong
Dikchu
BOP (Chungtang)
Bhimkyong
Lachung
Chakungchu
Teesta-VI

1200
8X60
5X60
5X60
2X30
2X48
3X33
3X33
3X33
3X30
4X125

Jorethang
Rangit-IV
Tashiding
Tingting
Rongnichu
Chuzachen
Rolep

2X48
3X40
2X40
3X30
2X48
3X33
2X40

80

8
5
5
2
2
3
3
3
3
4
2
3
2
3
2
3
2

2
2
2
2
2
1
1
1
2
2
2
2
2
2
2
1
1
1
2
2
2
2
2
2
1
1
1
1
2
2

61

LILO of Jorethang - New Melli (1 line)


LILO of Jorethang - New Melli (1 line)

LILO of Bhasme-Rongpo (1line)


LILO of Bhasme-Rongpo (1line)

LILO of Gangtok - Melli line


LILO of Gangtok - Rangit line
LILO of Teesta V- Binaguri line

64 meters will be required at


2013

19
20

Sadamangher
Bhasme

2X35.5
2X25.5

2
2

59

481

TOTAL

41 Meters will be required at


2013

237 718

19 meters will be required at 2013 for the IPP and other generating system
64 meters will be required at 2013 for dedicated transmission system in Sikkim
41 Meters will be required at 2013 for generating stations at Sikkim
TOTAL 124 meters will be required at 2013 for SIKKIM SYSTEM

594
60

Total no of meter required upto 2012


Spare @ 10%

654

GRAND TOTAL

81

82

ANNEXURE-A

METER LOCATIONS IN C. SECTOR


INTER-CONNECTED SYSTEM
(C)

(M

BSARIFF
BI 01

BHUTAN
GALEGPHU

(C)

BSARIFF
ER 01

NE84

BI 02

ER 02

NE83

BI 67

ER 03

ER 87

NE85

(M KGAON

ER 21

NE86/

(M
(M

BINAGURI

SABOUR

(C)

BI 07

B
S
E
B

KH 13

KGAON

KGAON

BI 10
PURNIA

(C)

KH 19
PURNIA

(M)

BI 03

ER 62

BI 04

ER 63
ER 48

BI 51
KHAGAUL (C)

(M

(M

(C)

ARRAH
ER 09

BI 11
DUMRAO (C)

(M

BI 12
DEHRI

(C)

BI 62
DEHRI

(C)

(M

ARRAH
ER 10
PUSAULI
ER 55

BI 62

ER 78

MOHANIA

PUSAULI

BI 68

ER 79
MUZPUR
EM 31

BI 69

EM 32

BI 49
KANTI

(M

KHAGAUL
FATUAH

(C)

(C)

(C)

RCHANDRAPUR

(M

ER 18

(M

JS 04

FK 14

LALMATIA

(C)

(M

JS 03
PATRATU

FARAKKA

ER 82

NR-09
NR-10
SAHUPURI
NR-03
(C) GORKHPUR

ER-56
MUZPUR (M

NR-11

EM-25

(M

(C)

NR-13

EM-21
EM-22
PATNA

(M

(C)

EM-57

NR-14
BALIA
NR-01
NR-02

EM-53
PARULIA

(C)PARULIA

(M

DV 01

ER 05
ER 06
EM 80
EM 81

NR-12
BALIA

N
R

DV 08

(M

MAITHON
ER 11

DV 09

(M

(C)

KALYANESWARI

DV 03
/

(M

(C)RAIPUR

ER-8 0

CS-57

ER-8 1

CS-58

EM-47 RANCHI (M)


EM-48
GAJUWAKA

C) SIPAT CS-60

W
R

CS-61

(M

(C) GAJUWAKA(S)

DC-03

DC-01

DC-04

DC-02

SR

KGAON
KH 14

(C)

(M

RANCHI
EM 44

CHANDIL

(C) SASARAM(N)

ER 83
PUSAULI

ROURKELA

JAMPUR

(M

SASARAM(E)

EM-26
BSF

N
E
R

NE82

(M

JS 02

(C)

ER 43

ER 12

(C)

SALAKATI
NE81

EM 65
PATNA
EM 64

E
R

(C)

ER 42

PATNA

ER 17

LALMATIA

S
E
C
T
O
R

(M

(M

JS 01

J
S
E
B

ARRAH

BI 13
BI 14
ARRAH

C
.

BIRPARA

BONGAIGAON

(C)

(M

RANCHI
EM 45

83

400 KV
220 KV
132 KV
(M) ---- MAIN
(C) ----- CHECK

METER LOCATIONS IN C. SECTOR


INTER-CONNECTED SYSTEM
TARKERA

(C)

(M

ROURKELA

OR 01
OR 02

(C)

(M

OR 9
OR 10

(C)

(M

TSTPP
TL 11

TSTPP
TL 10

OR 11
TALCHER TPS

(M

(C)

OR 12

TSTPP
TL 09

BALASORE

(C)

(M

BARIPADA

OR 60

I
D
C
O

MERAMUNDALI
OR 07

TSTPP
TL 27

OR 08

TL 28

RENGALI

(C)

(C)

(M

(M

ER 30

OR03
OR 04
JAYNAGAR

RENGALI
ER 31

(C)

(M

JEYPORE

OR 05

ER 34

OR 06

ER 35

MERAMUNDALI
OR 14
INDRAVATI
OR 13
BARIPADA
OR 61
RRANGPUR
OR 62
BALASORE

JEYPORE
ER 38

C
.

BARIPADA
ER 99
BARIPADA
EM 58

(C)

S
E
C
T
O
R

EM 06

GANGTOK
NJP

MELL

ER-57

SM 02

GANGTOK

SM 03

(M

WB 05

ER 59

WB 06

(M

BIRPARA

(C) BIRPARA

ER 44

WB 01

(M

(C) NBU
WB 04

ER 52
ER 53

WB 03

PARULIA

(M

FARAKKA
FK 15
FARAKKA

(C)

(M

JEERAT

(C)

SAGARDIGHI
WB 12
KOLAGHAT

(M

WB 10

RANGIT

WB 08

FK 16
BARIPADA (C)

(M

(C)

WB 11

BINAGURI
ER 19

(M

NJP

ER 45
SUBHASGRAM

(C)

(M

EM 17
SUBHASGRAM

(M

(C) SUBHASGRAM
(C) SUBHASGRAM

EM 74
PARULIA

JEERAT
WB 09

(M
(M

(C)

S
E

RAMAM

RG 06

ER 68

WB 07

EM 19
SUBHASHGRAM

84

BNAGAR

(C)

ER 07

EM 18

400 KV
220 KV
132 KV
(M) ---- MAIN
(C) ----- CHECK

MALDA

(C)

ER 58

NJP

S
I
K
K
I
M

MELL

EM 01

ER 27

E
R

MELLI
EM 04

132/66k

MALDA

ER 86

ER 98

RABANGLA

EM 05

INDRAVATI

BARIPADA

(M

EM 03

ER 20

66kV (C)

SM 01

RANGIT
RG 10

TL 12

RENGALI PH

(M

RG 07

ER 24

MERAMUNDALI

RANGIT

ER 23

SAGARDIGHI
WB 13
PPSP

METER LOCATIONS IN CENTRAL SECTOR TRANSMISSION SYSTEM


PART-I
CU06 CU 07

CU05

RG 01 RG02 RG03

SINGHIGAON

RANGIT
RG10

RG 09

RG 04

RG06

EM02

RG08

CU 03

BT38

GANGTOK

EM01 EM 03
EM 04

BT37

BT36

BT34

BT35

BT 39

EM 05

BT33
BT40

BIR.(W)

ER 44

EM 06
BIRPARA

ER 46

ER 41

ER 47

ER 39

ER 40

ER 22

ER 42

ER 43

66 kV

TS01 TS01 TS03

CU 01

CU02

RG11

RG 07

RAMAM

CU 08

TALA

SM03
1

SM04
1

RABANGLA

NE 85
NE 86

MELLI

SALAKATI

BONGAIGAON

ER 37

EM 7 EM 7 EM 10

EM 9
ER 23

BINAGURI

BINAGURI

TEESTA
NJP (WBSEB)

SILIGURI

ER 51

ER50

ER76

NR

ER 53 ER54

ER52

NBU
EM25

EM26

MUZAFFARPUR EM23

EM27
EM24

ER 33

EM28

EM30

PURNEA

EM29

ER 09 / 4153A
ER 65
389A
ER 63

KANTI (BS)

ER 62
411A

ER 64
415A

ER 49
415A

DALKHOLA

PUR(B)
BALIA
SARNATH
SASARAM (N)

MALDA(W)

ALLAHABAD
DEHRI

ER 78

KARMANASA

ER 83

SAHUPURI

ER 59

ER 58

SASARAM (E)

ER 79

ER 61

ER 82

ER 60

ER 56
ER 14 ER 13

ER 88

ER 55

DEHRI

ER 90/2375A

ER 89/2374A

ARRAH

ER 9
ARRAH

ER 10

BI 14

DUMRAO

BI 13

ER 01

BSHARIFF(BSEB)
KH 31

EM 55

KG 03 KG 02 KG 01

KAHALGAON

KH 32 KH 12 KH 11
KH 10 KH 09

EM 56

EM 53

ER 02

KHAGAUL

FATUA

EM 57

MALDA

ER 03

KH 35 KH 36

NR 01

BSF

KH 01 KH 02 KH 03 KH04

KH 07
KH 08

KH 15

KAHALGAON(B)

KH 16
KH 19
KH 14

KH 13

KH 17 KH 18

KH 05 KH 06

EM 54

PATNA
LALMATIA

SABOUR

BALIA
NR 02

MAITHON

85

BS 09

FARAKKA

PART-II
KAHALGAON

HATIA

MPL RB

CHANDIL

MALDA

FK14
559A

SIPAT
EM 44

EM 45

RANCHI

FK12

FK 10

FK 11

KAHALGAON

FK17

FK 08

FK 09

EM 43

FK15

FK 13

EM 42
FK 01 FK 02

EM-83

EM-82

EM-84

MAITHON
ER 15

TIE
TRA

FK 06 FK 07 FK 18

EM 41

EM 46

FARAKKA

FK 16

ER16

FK 05

EM-85

ER 68

ER70

ER69

FK 03 FK 04

DURGAPUR
ER 11

ER 66

ER 12 EM 80 EM 81

BNAGAR(WB)

ER 67

MEJIA
ER 07

ER 06

ER 05

KSWARI

PARULIA

BIDHANNGR
WB 08/397A

JEERAT

JAMSHEDPUR

WB 09

ER 08

ER18

ER 17
BS1 05

BS 06

EM 17

KOLAGHAT

EM 15

WB 10/476A

RAIGARH

WB 09/471A

RAMCHANDAR PUR

EM 19

SUBHASGRAM
ER 81

ER 26

ER 80
ER 71

ER 25

ROURKELA
SUBHASGRAM

ER 72

ER 27
ER 24

EM 16

EM 18

BARIPADA
EM 69

ER 23

BALASORE(GR)
TARKERA

RENGALI(G)
BARIPADA(GR)

ER 30

ER 31

ER 73

ER 74/556A
ER29
469A

RAIRANGPUR(GR
) BALASORE(GR)

ER 28 / 600A / 1000

RENGALI
RENGALI PS

TL05

TL06
TL 27

INDRAVATI PG

TL07

TL08

TL 28 TL 03

TL 04

ER 86
INDRAVATI PG

JEYPORE

ER 36

ER 85

ER75

TL 02

TL 13

TL 01

TL 11

TL 12

TL 10

TTPS

TL 38
ER 84

MERAMUNDALI

ER77
ER 34

TL 09

TALCHER STPP

ER 35

GAJUWAKA(S)
SR

DC-3
DC-4

SR

GAJUWAKA(E)

JEYNAGAR

86

400 KV
220 KV
132 KV

ANNEXURE-B
FICTITIOUS METERS (FICTMTRS.CFG)
START
01
(FK-92)
M9
+(FK-08)
+(FK-09) +(FK-10) +(FK-11)
+(FK-12)
+(FK-13) +(FK-17) +(FK-15) +(FK-16)
02
(FK-93)
M9
+(FK-15)
+(FK-22)
+(FK-23) +(FK-24)
+(FK-25)
+(FK-26)
+(FK-27) +(FK-28) +(FK-29)
03
(KH-81)
M4
+(KH-01)
+(KH-02)
+(KH-03)
+(KH-04)
04
(KG-81)
M2
-(KG-03) -(KG-06)
05
(KH-82)
M6
+(KH-81)
+(KH-15) +(KH-16)
-(KH-13)
-(KH-14)
-(KH-19)
06
(KH-83)
M2
+(KH-81)
+(KG-81)
07
(KH-84)
M2
+(KH-83)
-(KH-82)
08
(KH-85)
M13
+(KH-07)
+(KH-08) +(KH-09) +(KH-10) +(KH-11) +(KH-12)
+(KH-31)
+(KH-32) +(KH-35) +(KH-36) +(KH-13) +(KH-14) +(KH-19)
09
(KH-86)
M13
+(KH-21)
+(KH-22) +(KH-23) +(KH-24) +(KH-25) +(KH-26)
+(KH-33)
+(KH-34) +(KH-37) +(KH-38) +(KH-13) +(KH-14) +(KH-19)
10
(KG-92)
M2
(KG-81) -(KG-81)
11
(KH-92)
M2
(KH-85) -(KG-92)
12
(TL-81)
M3
+(TL-03)
+(TL-04)
-(TL-13)
13
(TL-82)
M4
-(TL-09)
-(TL-10)
-(TL-11)
-(TL-12)
14
(TL-92)
M9
+(TL-81)
+(TL-05) +(TL-06)
+(TL-07)
+(TL-08)
+(TL-14)
+(TL-15)
+(TL-18)
+(TL-19)
15
(TL-93)
M11
+(TL-21)
+(TL-22)
+(TL-23)
+(TL-24)
+(TL-25)
+(TL-26)
-(TL-13)
+(TL-16)
+(TL-17)
+(TL-27) +(TL-28)
16
(CU-91)
M3
+(ER-39)
+(ER-40)
+(BT-33)
17
(CU-92)
M6
+(ER-42)
+(ER-43)
+(ER-44)
+(ER-46) +(ER-47) +(EM-75)
18
(RG-91)
M4
+(RG-01)
+(RG-02)
+(RG-03)
+(RG-08)
19
(RG-92)
M5
+(RG-04)
+(RG-06)
+(RG-07)
+(RG-10)
+(RG-11)
20
(BI-81)
M3
+(BI-55)
+(BI-56) +(BI-48)
21
(BI-82)
M18
+(BI-01)
+(BI-02) +(BI-67)
-(ER-62)
-(ER-63)
-(ER-48)
-(ER-78) -(ER-79)
-(ER-55)
-(ER-09)
-(ER-10)
+(BI-13)

87

22
23
24
25
26
27
28
29
30
31

32
33
34
35
36

37

38

39
40
41

42

43
44
45

+(BI-14)
(BI-83)
+(BI-58)
(BI-84)
-(JS-59)
(BI-85)
+(BI-63)
(BI-91)
+(BI-21)
(JS-81)
+(JS-01)
(JS-82)
-(FK-14)
(JS-83)
+(JS-51)
(JS-84)
-(DV-53)
(JS-85)
+(JS-59)
(JS-91)
+(JS-81)
+(JS-85)
(ER-91)
+(ER-05)
(ER-92)
+(ER-11)
(DV-81)
+(DV-51)
(DV-82)
+(DV-60)
(DV-91)
-(ER-91)
+(DV-81)
(SM-91)
+(SM-51)
-(EM-03)
(OR-81)
-(ER-23)
-(ER-34)
(OR-82)
+(OR-51)
(OR-83)
+(OR-56)
(OR-91)
+(OR-81)
+(OR-07)
(WB-81)
-(ER-44)
-(ER-19)
(WB-82)
+(WB-08)
(WB-84)
-(DV-61)
(WB-91)
(WB-81)

+(BI-68)
M2
+(BI-59)
M7
-(JS-60)
M3
+(BI-64)
M7
-(DV-51)
M4
+(JS-02)
M2
-(KH-14)
M3
-(OR-52)
M3
-(DV-55)
M7
+(JS-60)
M7
+(JS-82)
-(WB-53)
M2
+(ER-06)
M2
+(ER-12)
M4
+(DV-55)
M4
+(DV-64)
M9
-(ER-92)
+(DV-82)
M7
-(RG-07)
-(EM-05)
M9
-(ER-24)
-(ER-35)
M5
+(OR-52)
M3
+(OR-57)
M8
+(OR-82)
+(OR-08)
M12
-(ER-52)
-(ER-45)
M6
+(WB-09)
M4
+(WB-51)
M6
+(WB-82)

+(BI-69)

-(EM-55)

-(EM-62)

-(ER-49)

+(BI-57) +(BI-58) +(BI-70) +(BI-60)

+(BI-61)

+(BI-66)
+(BI-82)

+(BI-84)

-(EM-44)

-(EM-45)

+(BI-85) -(KH-19) -(KH-13)

+(JS-53)
-(DV-56)
-(BI-57) -(BI-58)

-(BI-70) -(BI-60)

+(JS-83)
-(NR-08)

+(JS-84)

+(DV-56)

+(DV-53)

+(DV-61)

+(DV-58)

-(EM-80)
+(DV-57)

-(EM-81)

-(RG-10)

+(SM-02)

-(ER-30)
-(ER-86)

-(ER-31)
-(ER-20)

+(OR-53)

-(ER-98)

+(DV-04)

-(BI-61)

+(DV-05)

+(SM-03)

-(EM-58)
-(ER-99)

-(CS-55)
+(OR-83)
-(DV-57)
-(ER-53)
-(ER-68)
+(WB-10)

+(TL-82)
-(ER-38)
-(ER-58)
-(EM-18)

-(ER-59)
-(EM-19)

-(ER-07)
-(EM-75)

-(RG-06)

+(WB-12)

+(WB-13)

+(WB-54)

+(WB-60)

+(WB-84)

+(WB-53)

88

+(WB-59)

+(WB-52)

46
47
48
49
50
51
52
53
54

55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72

(NE-71)
+(NE-81)
(NE-72)
+(NE-85)
(NE-91)
+(NE-83)
(SR-91)
-(ER-84)
(SR-92)
+(DC-01)
(WR-91)
-(OR-83)
(NR-61)
-(ER-82)
(NR-62)
-(NR-09)
(NR-91)
-(NR-61)
-(EM-21)
(BT-99)
+(BT-33)
(BT-66)
+(BT-34)
(TH-91)
+(BT-38)
(TH-92)
(EM-12)
(FK-62)
-(FK-22)
(FK-63)
-(FK-23)
(FK-64)
-(FK-24)
(FK-67)
-(FK-27)
(FK-68)
-(FK-28)
(FK-69)
-(FK-29)
(FK-70)
-(FK-17)
(KH-63)
-(KH-23)
(KH-64)
-(KH-24)
(KH-65)
-(KH-25)
(KH-66)
-(KH-26)
(KH-67)
-(KH-27)
(KH-68)
-(KH-28)
(KH-69)
-(KH-33)

M2
+(NE-82)
M2
+(NE-86)
M3
+(NE-71)
+(NE-72)
M4
-(ER-85) -(TL-14)
-(TL-15)
M4
+(DC-02) +(TL-14)
+(TL-15)
M5
-(ER-80) -(ER-81)
-(EM-47) -(EM-48)
M4
-(ER-83)
-(ER-94) -(ER-97)
M2
-(NR-10)
M12
-(ER-56)
+(NR-05)
+(NR-06)
+(NR-07)
+(NR-08)
-(EM-22)
-(EM-25)
-(EM-26)
-(EM-53)
-(EM-57)
M4
+(BT-38) -(ER-41)
-(EM-09)
M2
+(BT-35)
M5
+(EM-07)
+(EM-08)
+(EM-10)
-(BT-99)
M6
+(EM-13)
+(ER-21)
+(BT-37)
-(ER-22) -(ER-33)
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1

89

73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95

96
97
98

99

(KH-70)
-(KH-34)
(TL-61)
-(TL-21)
(TL-62)
-(TL-22)
(TL-63)
-(TL-23)
(TL-64)
-(TL-24)
(TL-65)
-(TL-25)
(TL-66)
-(TL-26)
(EC-95)
-(ER-20)
(EC-61)
-(EM-18)
(EC-62)
(EM-15)
(EC-63)
(BT-37)
(EC-64)
-(EC-62)
(EC-65)
(EM-44)
(EC-66)
(EM-41)
(EC-67)
(ER-95)
(EC-68)
(EM-42)
(EC-69)
(EM-43)
(EC-70)
-(ER-09)
(EC-71)
(EM-03)
(EC-72)
(EM-04)
(EC-73)
(EM-55)
(EC-74)
(EM-56)
(TC-91)
(EM-07)
(ER-39)
(TS-92)
(TS-05)
(MR-92)
(MR-01)
(RN-95)
+(FK-92)
-(TH-91)
(RN-96)

M1
M1
M1
M1
M1
M1
M1
M1
M2
-(EM-19)
M2
+(EM-16)
M2
+(BT-39)
M2
-(EM-17)
M2
+(EM-45)
M4
+(EM-46) +(EM-47) +(EM-48)
M2
-(ER-96)
M2
+(EM-60)
M2
+(EM-61)
M2
-(ER-10)
M2
+(EM-05)
M2
+(EM-06)
M2
+(EM-62)
M2
+(EM-63)
M7
+(EM-08)
+(EM-09)
+(EM-10)
+(ER-40)
+(ER-41)
M2
+(TS-06)
M2
+(MR-02)
M9
+(KH-92)
+(KG-92)
+(TL-92)
-(NE-83)
+(RG-92)
+(TS-92)
M10

90

-(CU-91)
+(MR-92)

100

-(BI-91)
-(SM-91)
(RN-97)
+(RN-95)

-(JS-91) -(DV-91)
-(NE-91) -(SR-91)
M2
-(RN-96)

-(OR-91)
-(WR-91)

-(WB-91)
-(NR-91)

END
-----------------------------------------------------------------------------------------------------------

91

ANNEXURE-C
DATA COLLECTING LOCATION IN EASTERN REGION & CONTACT NO DETAILS

S.No Stn Name

Concerned
Person/Stn name

Contact No.

Contact No.

POWERGRID
1

Ara

06182-234125/233085

SUDIP DAS
HANSRAJ

9431820255
09431815689

Baripada

06792-279298/279280

MR. BEHRA
S.P.KAR

9437575638
9437575657

Birpara

03563-266222/ 266224/ 266196,

S.K.SIL

9434748294

Biharsarif

06112-290607

AK GOYAL

Durgapur

0343-2562915/ 2563297

M.S.DATA

Gangtok

03592-250181/251259

T BARUA

9434748299

Indravati

06673-252296/ 252301/252429

MR.EKKA

9937651156

Jeypore

06854-231634/ 232155

ESHWAR RAO

9437962178/176

Jamshedpur

0657-3294096/ 3293751

10

Malda

03512-278447/ 278355/ 278715

11

Maithon

0341-2531489/
9434740039(CM)

12

Malbase

00975-17604606

MR. PHUNTSHOK
KHATRI SB

9434748261
9434748039
9434740039
9434748285
9434748301
07032 (VOIP)
009755272805

13

Muzaffarpur

0621-2273166

M.K.JHA
A SRIVASTAV

9431820298
9431820294

14

Patna

9431820234

JAGAT RAM
ENAYAT SHAMEEM

9431820252
9939624037

15

Purnea

06454-222409/ 222363,

RAJESH
SR ENGINEER

9431821127
9431820310

16

Ranchi

0651-6450205/204

PRADEEP VERMA

9431820337

17

Rengali

06760-277258/ 277254

S. NAIK
RATRA

9437962194
9437962197

18

Rourkela

0661-2600009/ 2600202/
94370 41202

J R YADAV

9437575652

19

Siliguri

0353-2568851/ 2568801/03561248001

20

N. sILIGURI

21

Sasaram

22

subhashgram

T DAS
BHASKAR
MANAS PAUL
P MANI
PANKAJ KUMAR
SUMIT KUMAR
B.S.RAUT RAY

9474379038
9434748230
9434748210
9434748270
9431820322
9431820327
9434748254

23

Salakati(NER)

03661-282309/282407

S.K. SINGH

24

Rihand

05446-252042

SHAILENDRA

9434740009
9415458662
08808050906

25

NERLDC

03642231933/2231714(Comml)

M HUSAIN/ MR. SAHA

9436335371

022-28302209

USHA
SUITTE

735022 (VOIP)
98694044539

25

WRLDC

09431820315
9431821123
9434748028/8031
9434740025

9431815721

06187-225527/ 225737

92

ANJANI KUMAR
SANTOSH
N KUMAR
SARKAR

28202690/28314609

EPABX

26

NRLDC

011-26854585

NEERAJ

27

SRLDC

080-22263463

RATI NAYAR

9910907949
9650009856
9449599189

03512-226120/ 226121/
226145/226147

S. NAG
ZULFIKAR

9434039376
9434751554

R K MANDAL
ASHOK SARKAR
S. PRADHAN
S K.SAHOO
S K MISHRA
H. SAHA
P K DAS

9431600132
9874824541
9437040520
9437041796
9800048849
9800003939
9800003801

S. No

GENERATING STATIONS

Farakka

Kahalgoan

Talcher

Rangit

06429-272354/272175// 222643/
222234/ 222246/ 222649
06760-247405/247407/ 247409
9437213961
03595-250845/ 250636

Teesta-v

03592-247210

DVC(Bihar)

0612-2233684/ 2262427

ANEES

9955997175

WBSEB/DVC

24663068/ 98300 86119

S. GANGULY
TINKU

9830086119
9903213518

GRIDCO

0671-2315184/ 2300803/

PRAKASH RAY

94370 00004

JHARKAND

0657-2494070/ 94311 85848

ARINDAM BOSE
SHAKIL

Sikkim

03595-270204/9434084228

9835505108
9430730503
9434012129
03592248204
9006533874
9431490821
9430957073

BSEB

7
8
9

MELLI
A K SINGH
MITHILES
PANDIT

9934279317/bhagalpur
BIharShariff

Sabour

0641-2451657/ 2451656

Sultanganj

9430862343

INJILA KUMARI

9430862343

Dehri

06184-253141

U P SAHNI

9431845268

11

Sonnagar

9204319122

12

Pipri(UP)

08808050906
KALIMPONG

0355-2255542

DVC

06450 (252700)/252266

10

23591927
13

WBSEB

23591930-44
26886232(CLD)
23557788
06540 - 234837(CLD)

14

JSEB, Patratu

15

06540-234634
0651-2490423/ 2490835/
2508290/ 25083816
0651-2505413

R. B. BAL
B K CHAURAS

98351 58662/ 0651 2403816

GM TRANSMISSION

0612-2233229/ 98350 03805

JITENDRA KISHORE(CRITL)

BSEB
16
17

NTPC, Kol
NTH, Kol

18

L&T

19
20

Sanjay ghosh
RChandarpur

ERPC(9432490594)
9431707321

21

GRIDCO SLDC

0674-2748961

22

JINDAL/Gridco

DAS sb(9437000261)

(0612) 2504285/2227557
SLDC

22823530/ 22821755
27791231/ 27791531
SUKRAM
PARI
SUSHIL
SHYAM KEJRIWAL
JODA
SENGUPTA
TARKERA

22823302

93

9433429115
9830962879
9836732853
9831919509
09437336402
9437306390
0661-2664479
Fax 2748509
2748089

94