Documente Academic
Documente Profesional
Documente Cultură
B HUT AN
T IS T
II
EA ST ER N C A N A L
GA N D A K
T A LA
5
M ALBASE
NE P AL
S IL IG U R I
B IN A G U R I
G OR A KH P UR
B IR P A R A ( P G )
NJP
M UZ 'F R P U
B O N G 'G A O N
UT T AR
P RAD E S H
P U R N IA ( P G
A LLA H A B A D
ASSAM
D A LKH O LA
BARH
B A L IA
P A TNA
KA H A LG A O N
SARN ATH
KH A G A UL
ARR AH
B IH A R S H A R I
M A LD A
B IH A R
SA SA R A M
FSTP P
S a g a r d ig h i
M A IT H O N ( P G )
J HARK AND
B A KR ESWA R
P A R (P G
B ANG L AD E S H
P U R U L IA
C H H A T T IS G A R H
R ANC HI
W . B E NG AL
A RAM B A
JA M (P G
JEERAT
KO LA G H A T
SUB H A SGR A
R A IG A R H
R O UR KELA
B A R IP A D A
R A IP U R
R e n g a li ( P
G)
S IP A T
T ST P P
M R 'M D A LI
O R IS S A
IN D R A V A T I( P
KO LA R
JA Y P O R E (P G )
G A Z UW A K A
AN D H R A P R AD E S H
JANUARY 2011
COMMERCIAL DEPARTMENT
CONTENTS
Title
1.0
Page No.
Introduction.. ..4
1.1. Objective.5
1.2. Ownership...5
1.3. Facilities to be provided at metering location.5
1.4. Right to install energy meter...6
1.5. Acronyms and definitions6
2.0
07-19
About SEM..8
SEM dimension9
Display list...9
SEM: Technical Specification..10-18
Data Storage...19
3.0
Metering Configuration..20-57
3.1 General....21
3.2 Types of Meters..21
3.3 Metering arrangement..21
3.3.1
3.3.2
3.3.3
3.3.4
3.4.2
3.4.3
Meter Calibration...22
3.5.2
4.0
General.62
4.1.2
4.1.3
Saving of data..63
4.2
4.3
4.4
4.5
Availability checking.70
4.6
4.7
Final processing.70
4.8
4.9
Discrepancies..73
5.0
Flow Chart..
6.0
SECTION-1
1.0 Introduction
The power system in country is organized in five electrical regions for operation purpose
system namely North, South, East, West and North-east. Eastern region consists of
seven states i.e. Bihar, Jharkhand, Orissa, West Bengal and Sikkim. Regional Load
Despatch Centers are responsible for scheduling and measuring power within and across
the regions. Measurement of electric energy is being carried out
by interface meters
called Special Energy Meters (SEMs) installed at the peripheries of states and regions
according to Metering regulation notified by CEA. POWERGRID being Central
Transmission Utility (CTU) is responsible for installation of SEMs throughout the
region and Eastern Regional Load Despatch Center is responsible for collection and
processing the metered data.
1.1
Objective
This document is intended to provide the required details of a metering system together
with the capabilities of the special energy meters along with meter configuration, data
collection, availability checking, processing etc, provided to meet the regional energy
metering requirements of the commercial mechanism adopted for bulk power supplies
and inter-State exchanges within and across a Region.
1.2
Ownership
These energy meters are owned by the CTU. All agencies/constituents ensure the
security of the energy meters installed in their respective premises.
1.3
Each agency/constituent makes available the required space and the required outputs of
the specified current and voltage transformers, to facilitate installation of energy meters
in their premises by CTU for regional energy metering.
1.4
Each constituent/agency extends the necessary assistance to CTU for installation of the
energy meters by providing the required access to their premises and equipments. As and
when requested by CTU, the constituents agencies enable the representatives of CTU to
access, inspect, replace, and test etc. any of these energy meters installed in their
premises in the presence of an authorized representative of the constituents agencies if
deputed.
1.5 Acronyms and definitions
The acronyms and definitions used in this document are listed in the following table:
Definition
NLDC
ERLDC
CTU
STU
ISGS
SEBs
SEM
DCD
ERPC
TSTPP
KHSTPP
FSTPP
AMR
SECTION - 2
2.1
2.1.1
About SEM
Special Energy Meter (SEM) is a Microprocessor based Energy Meter. For
metering and data logging it is a handful tool along with data collecting device
(DCD) and personal computer. With the use of application software it allows the
user to process metered data.
2.1.2
SEM dimension
2.1.3
Display List
Display Parameters
Display Format
Indicator
i) Meter Serial No
NP5001
yymmdd
hhmmss
xxxxx.x
xx.xx
xx.xx
xx.xx
xxxx.x
xxxx.x
xxxx.x
rtC Fit
Low Bat
The energy metering system specified herein is used for tariff metering for
bulk, inter-utility power flows, in different Regions of India. One static type
composite meter is installed for each EHV circuit, as a self-contained device for
measurement of active energy (MWh) transmittals in each successive 15 minute
block and certain other functions, as described in the following paragraphs.
2.0
3.0
4.0
Further, the meter continuously integrates and display on demand the net
cumulative active energy sent out from the substation bus bars upto that time.
The cumulative Wh reading at each midnight is stored in the meters memory.
The register moves backwards when active power flows back to substation
bus bars.
5.0
The meter counts the number of cycles in VT output during each successive
15-minutes block, and divides the same by 900 to arrive at the average
frequency. This is stored in the meters memory as a 2-digit code which is
arrived at by subtracting 49 from the average frequency, multiplying by 50
and neglecting all decimals. For example, 49.89 Hz is recorded as 44. In case
the average frequency is less than 49.0 Hz, it is recorded as 00. In case it is
51.0 Hz or higher, it is recorded as 99. The average frequency of the previous
15-minutes block is also be displayed, on demand in hertz.
10
6.0
The meter continuously computes the average of the RMS values of the three
line-to-neutral VT secondary voltages as a percentage of 63.51 V, and
displays the same on demand.
The accuracy of the voltage
measurement/computation is at least 0.5%, a better accuracy such as 0.2% in
the 95-105% range being desirable.
7.0
The meter also computes the reactive power (VAR) on 3-phase, 4-wire
principle, with an accuracy as specified in clause 11.0, and integrate the
reactive energy (VARh) algebraically into two separate registers, one for the
period for which the average RMS voltage is 103.0% or higher, and the other
for the period for which the average RMS voltage is below 97.0%. The
current reactive power (VAR), with a minus sign if negative and cumulative
reactive energy (VARh) readings of the two registers is displayed on demand.
The readings of the two registers at each midnight are stored in the meters
memory. In model-A (for CT secondary rating of 1 A), the reactive power
and reactive energy transmittals is computed in VAR/VARh directly
calculated in CT and VT secondary quantities. When lagging reactive power
is being sent out from substation bus bars, VAR display have a plus sign or no
sign and VARh registers move forward. When reactive power flow is in the
reverse direction, VAR display have negative sign and VARh registers move
backwards.
8.0
9.0
The meters are fully complying with all stipulations in IEC standards 6205211:2003 and 62053-22:2003, except those specifically modified by this
specification. The reference ambient temperature is 30 C.
10.0
Errors are reasonable for all power factor angles from 0 to 360.
11.0
For reactive power (VAR) and reactive energy (VARh) measurements, IEC
62053-23:2003 complies with. The accuracy of measurement of reactive
energy is as per class 2.
12.0
Each meter have a test output device (visual) for checking the accuracy of
active energy (Wh) measurement. The preferred pulsing rate is twenty (20)
per Wh for Model-A and four(4) per Wh for model B. It is possible to couple
this device to suitable testing equipment also.
13.0
No rounding off to the next higher last decimal is done for voltage and
frequency displays. All 15 minute Wh figures is however be rounded off to
the nearest last decimal.
11
14.0
15.0
The meters normally operate with the power drawn from the VT secondary
circuits. The total burden imposed by a meter for measurement and operation
is not exceeded 10 VA on any of the phases. An automatic backup for
continued operation of the meters calendar-clock, and for retaining all data
stored in its memory, is provided through a long-life battery, which is capable
of supplying the required power for at least 2 years. The meters are supplied
duly fitted with the batteries, which shall not require to be changed for atleast
10 years, as long as total VT supply interruption does not exceed two years.
The battery mounting is designed to facilitate easy battery replacement
without affecting PCB of the meter. The meters dont require any separate
auxiliary supply for their operation. All displays may disappear on loss of VT
supply.
16.0
17.0
18.0
ii)
iii)
12
iv)
v)
vi)
vii)
viii)
ix)
x)
xi)
19.0
A gold plated touch key or push button is provided on the meter front for
switching on the display and for changing from one indication to the next.
(The display shall switch off automatically about one minute after the last
operation of touch key/push button). When the display is switched on, the
parameter last displayed is displayed again, duly updated.
20.0
ii)
iii)
iv)
v)
vi)
21.0
The meters store all the above listed data in their memories for a period of ten
(10) days. The data older than ten (10) days get erased automatically.
22.0
Each meter has an optical port on its front for tapping all data stored in its
memory. Portable or hand held data collection devices is also be separately
13
provided for this purpose, one for each substation, to serve as the interface
between the meters specified above and the local personal computer (PC). In
addition to above each meter is provided with a RS-485 port on one of its
sides, from where all the data stored in the meters memory can also be
tapped. The overall intention is to tap the data stored in the meters memories
once a week from any of the two ports mentioned above and transmit the same
to a remote central computer using STD or other communication links,
through the local PC. It shall also be possible to obtain a print out (hard copy)
of all data collected from the meters, using the local PC.
23.0
The whole system is such as to provide a print out (both from the local PC,
and from remote central computer) of the following form:
16
20
55
55
+16.28
+14.93
NP-1234-A 12345.6
00 57
+14.72
01 52
+13.34
56
55
+15.95
+14.26
55
54
01234.5
00123.4
56
+13.83
55
51
+12.76
52
+15.32
+14.85
54 +15.66
56 +15.17
29-03-91
+13.57
53 +12.91
+14.11
52 +15.28
24.0
The meters supplied are housed in compact and sturdy, metallic or moulded
cases of non-rusting construction and/or finish. The cases are designed for
simple mounting on a plane, vertical surface such as a control/relay panel
front. All terminals for CT and VT connections is arranged in a row along the
meters lower side. Terminals have a suitable construction with barriers and
cover, to provide a secure and safe connection of CTs and VTs leads through
stranded copper conductors of 2.5 sq. mm. size.
25.0
All meters of the same model is totally identical in all respects except for their
unique identification codes. They are totally sealed and tamper proof, with no
possibility of any adjustment at site, except for clock correction.
26.0
The meters are safely withstanding the usual fluctuations arising during faults
etc. In particular, VT secondary voltages 115% of rated applied continuously
and 190% of rated for 3.0 seconds, and CT secondary current 150% of rated
applied continuously and 30 times of rated applied for 0.5 seconds shall not
cause any damage to or mal-operation of the meters.
27.0
28.0
The meters continue to function for the remaining healthy phase(s), in case
one or two phases of VT supply fails. In case of a complete VT supply
failure, the computation of average frequency (as per 5.0) shall be done only
for the period during which the VT supply was available in the 15-minute
14
block. Any time block contraction or elongation for clock correction also be
duly accounted for.
29.0
The harmonics preferably be filtered out while measuring Wh, VAR and
VARh, and only fundamental frequency quantities is measured/computed.
30.0
Either the meters have built-in facility (eg. test links in their terminals) for insitu testing, or a separate test block is provided for each meter.
31.0
ii)
iii)
iv)
v)
a battery charger
The total arrangements are such that one (1) operation can carry out the whole
operation himself, in about five (5) minutes per meter.
32.0
The DCD has a key for starting the data tapping from the coupled meters
memory, a key to start data transfer to the PC, and a lamp, which would light
up on completion of data collection, remain on while the data is held in the
device and would go off when all data has been transferred to the PC. Data
tapping operation do not erase the data from the meters memory, or effect the
meter operation in any way. The memory of the DCD get automatically
cleared when the data has been transferred to the PC only then the DCD
accepts data from another meter. DCDs also have necessary provision for
meter clock correction. DCDs are compatible with earlier supplied meters of
L&T/SML make in regard to data downloading etc.
33.0
The Contractor provides the necessary software which would enable a local
IBM-Compatible PC to:
(i) accept the data from the DCD and/or from a interface device connected to
the optical port/RS-485 port and store it in its memory in binary read only
format in an user-defined file name(file name format must be ddmmsubstation
name-utility name),
15
(ii) Polling feature along with a task scheduler to run the data downloading
software at a pre-designated date and time repeatedly or by manually selecting
a meter. File naming for such downloaded data should also be in user-defined
format. A detailed activity log shall also be available for each downloading
operation,
(iii) upload/import meter data (binary files) in the software for further
processing. While uploading, there shall be provision to upload all selected
files with single key-stroke
The above software further ensures that absolutely no tampering (except total
erasures) of the collected metering data is possible during its handling by the
PC. The software is suitable for the commonly available PCs, and supplied to
Owner in a compatible form to enable its easy loading into the PCs available
(or to be installed by the Owner/others) at the various substations.
35.0
Quality Assurance
The quality control procedure to be adopted during manufacture of the
specified equipment to be mutually discussed and finalized in due course,
generally based on the established and proven practices of the manufacturer.
36.0
Testing
All equipment, after final assembly and before dispatch from manufacturers
works, is duly tested to verify that is suitable for supply to the Owner. In
particular, each and every meter is subjected to the following acceptance tests:
16
i)
Verification of compliance with Table 4 under clause 8.1 of IEC62053-22:2003, in both directions of power flow, for class 0.2S.
ii)
Test of the register ratio and the impulse value of the transmitting
device, for both directions.
iii)
iv)
v)
Power loss.
vi)
Dielectric properties.
vii)
viii)
ix)
x)
37.0
Any meter which fails to fully comply with the specification requirements are
liable to be rejected by the Owner. However, the Owner may purchase such
meters at a reduced price in case of marginal non-compliance, at his sole
discretion.
38.0
Functional checks
ii)
iii)
iv)
v)
17
39.0
vi)
vii)
Type Tests
One (1) out of every hundred (100) meters is subjected to the complete range
of type tests as per IEC-62053-22:2003, IEC-62053-23:2003 and IEC 6205211:2003, after final assembly. In case of any failure to pass all specified tests,
the contractor has to arrange to carry out the requisite
modifications/replacements in the entire lot of meters at his own cost. After
any such modifications and final assembly, two (2) meters selected out of the
lot by the Owners representative is subjected to the full range of type tests.
The lot is accepted by the Owner only after successful type testing.
40.0
The meters used for type testing are separately identified, duly marked, and
supplied to the Owner in case they are fully functional and as good as other
(new) meters, after necessary touching up/refurbishing. In case this is not
possible, the contractor provides their replacements at no extra cost to Owner.
41.0
The Contractor arranges all type testing specified above, and bear all expenses
for the same.
42.0
43.0
44.0
18
2.2
It is basically data collecting device and used to transfer the tapped data from SEM to
PC. It has bi -communication with special energy meter along with personnel computer.
all these is done with communication cable one at DCD end and other at PC.
19
SECTION - 3
20
3.0
Metering Configuration
3.1
General
3.2
Types of Meters
II) Consumer Meter: Consumer meter means a meter used for accounting and
billing of electricity supplied to the consumer. Meter shall be owned by Licensee.
III)
Energy Accounting Meter: Energy Accounting and Audit Meter means Meter
used for accounting of electricity to various segments of electrical system. Meter shall be
owned by generating company or Licensee.
Three sets of energy meter i.e. Main, Check and Stand-by energy meters are provided to
calculate the energy sent-out. One set each of Main & Check Meters is provided on all
outgoing feeders and stand-by meters are provided on the EHV side of the generator
transformer (GT) and station supply transformers
3.3.2
21
3.3.3
In case of SEB-owned Inter-State transmission lines, say between State 'A' and State B.',
the energy meters are provided at both the ends of the lines. The meter installed at end 'A'
is the Main meter for working out net drawal of SEB 'A' and that installed at other end 'B'
acts as check meter for SEB 'A', and vice-versa.
3.3.4
3.4
3.4.1
All equipments are duly tested. In particular, each and every meter is being subjected to
acceptance tests as specified by CTU, at the manufacturer's works, before dispatch.
3.4.2
i)
In-situ functional checking and rough testing of accuracy are being carried out for all
meters once a year by the CTU, with portable test equipment complying with IEC-60736,
for type and acceptance testing of energy meters of 1.0 class.
ii)
Full testing for accuracy for every meter is being carried out by the CTU at an
22
3.5
Total no of location in Eastern region has 113 and out of which power grid has 23
locations. Total no of real meters are 472 (including tie line with NR, NER, WR, SR end)
in the region at different locations.
S. NO.
CONSTITUENT
NO. OF LOCATION
A-TYPE
B-TYPE
TOTAL
FSTPP (NTPC)
27
27
KhSTPP(NTPC)
41
41
TSTPP(NTPC)
27+9
27+9
BARH (NTPC)
MPL(RB)
BSEB
16
29
34
JSEB
11
20
25
DVC
12
12
17
GRIDCO
13
25
26
10
WBSETCL
13
18
19
11
SIKKIM
12
POWERGRID
23
167
167
13
WR
14
NR
13
13
15
SR
16
NER
17
RANGIT
18
TEESTA
19
BHUTAN
18
18
113
448
24
472
TOTAL
23
3.5.1
Eastern region has total 113 location and total no of real meter is 472 including Bhutan
till date. Power grid has 23 locations.
S.No.
A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
B
28
29
30
31
32
LOC_ID
METER NO.
CTR
PTR
NP-0430-A
NP-0599-A
NP-0432-A
NP-0421-A
NP-0419-A
NP-0575-A
NP-0565-A
NP-5202-A
NP-5200-A
NP-5228-A
NP-5208-A
NP-5204-A
NP-5223-A
NP-5211-A
NP-5221-A
NP-5213-A
NP-5210-A
NP-0576-A
NP-5220-A
NP-5214-A
NP-5222-A
NP-5209-A
NP-5203-A
NP-5201-A
NP-5212-A
NP-5229-A
NP-5224-A
500
500
500
1000
1000
500
500
1000
1000
1000
1000
1000
1000
1000
1000
1000
500
500
1000
1000
1000
1000
1000
1000
500
1000
1000
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
2000.0000
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
NP-5851-A
NP-5250-A
NP-5850-A
NP-5859-A
NP-5262-A
500
500
500
500
500
3636.3636
3636.3636
3636.3636
3636.3636
1200.0000
24
S.No.
LOC_ID
METER NO.
CTR
PTR
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
KH-06
KH-07
KH-08
KH-09
KH-10
KH-11
KH-12
KH-13
KH-14
KH-15
KH-16
KH-17
KH-18
KH-19
KH-21
KH-22
KH-23
KH-24
KH-25
KH-26
KH-27
KH-28
KH-31
KH-32
KH-33
KH-34
KH-35
KH-36
KH-37
KH-38
KG-01
KG-02
KG-03
KG-04
KG-05
KG-06
NP-5256-A
NP-5258-A
NP-5254-A
NP-5247-A
NP-5257-A
NP-5246-A
NP-5240-A
NP-5239-A
NP-5244-A
NP-5837-A
NP-5251-A
NP-5255-A
NP-5267-A
NP-5261-A
NP-5259-A
NP-5260-A
NP-5242-A
NP-5253-A
NP-5248-A
NP-5241-A
NP-5263-A
NP-5265-A
NP-5245-A
NP-5117-A
NP-5235-A
NP-5118-A
NP-5269-A
NP-5266-A
NP-5264-A
NP-5268-A
NP-5116-A
NP-5852-A
NP-5857-A
NP-5862-A
NP-5863-A
NP-5856-A
500
1000
1000
1000
1000
1000
1000
500
500
500
500
500
500
500
1000
1000
1000
1000
1000
1000
500
500
1000
1000
1000
1000
2000
2000
2000
2000
1000
1000
1000
500
500
500
1200.0000
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
1200.0000
1200.0000
3636.3636
3636.3636
1200.0000
1200.0000
1200.0000
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
1200.0000
1200.0000
1200.0000
C
69
70
71
72
73
74
75
76
77
78
NP-5107-A
NP-5105-A
NP-5108-A
NP-5109-A
NP-5083-A
NP-5084-A
NP-5085-A
NP-5106-A
NP-5103-A
NP-5102-A
1000
1000
500
500
1000
1000
1000
1000
1000
1000
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
2000.0000
2000.0000
25
S.No.
LOC_ID
METER NO.
CTR
PTR
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
TL-11
TL-12
TL-13
TL-14
TL-15
TL-16
TL-17
TL-18
TL-19
TL-21
TL-22
TL-23
TL-24
TL-25
TL-26
TL-27
TL-28
TL-31
TL-32
TL-33
TL-34
TL-45
TL-47
TL-49
TL-51
TL-57
NP-5112-A
NP-5101-A
NP-5081-A
NP-5066-A
NP-5076-A
NP-5069-A
NP-5070-A
NP-5970-A
NP-5067-A
NP-5082-A
NP-5115-A
NP-5110-A
NP-5972-A
NP-5077-A
NP-5113-A
NP-5078-A
NP-5104-A
NP-4094-A
NP-4095-A
NP-4090-A
NP-4097-A
NP-4009-A
NP-4003-A
NP-4001-A
NP-4068-A
NP-4064-A
1000
1000
200
1000
1000
1000
1000
1000
1000
1000
1000
1000
1000
500
500
1000
1000
2000
2000
2000
2000
1000
1000
1000
1000
100
2000.0000
2000.0000
2000.0000
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
D
105
106
E
107
108
109
110
111
112
113
114
F
115
116
117
118
119
120
121
NP-6111-A
NP-6080-A
3000
3000
3636.3636
3636.3636
NP-6517-A
NP-6518-A
NP-0000-A
NP-0000-A
NP-0000-A
NP-0000-A
NP-0000-A
NP-0000-A
1000
1000
0000
0000
0000
0000
0000
0000
3636.3636
3636.3636
0000.0000
0000.0000
0000.0000
0000.0000
0000.0000
0000.0000
NP-2529-A
NP-2520-A
NP-2377-A
NP-0580-A
NP-0571-A
NP-0596-A
NP-0483-A
600
600
600
600
600
600
600
2000.0000
2000.0000
2000.0000
2000.0000
2000.0000
2000.0000
2000.0000
26
S.No.
LOC_ID
METER NO.
CTR
PTR
122
123
124
CU-08
TH-01
TH-02
NP-0408-A
NP-5828-A
NP-5829-A
600
2000
2000
2000.0000
3636.3636
3636.3636
125
126
127
128
129
130
131
132
BT-33
BT-34
BT-35
BT-36
BT-37
BT-38
BT-39
BT-40
H
133
134
135
136
137
138
139
140
141
I
142
143
144
145
146
147
148
J
149
150
151
152
153
154
155
156
157
158
159
160
161
NP-5096-A
NP-5097-A
NP-5099-A
NP-5098-A
NP-5095-A
NP-5100-A
NP-5869-A
NP-5867-A
800
800
800
800
1000
1000
1000
800
2000.0000
2000.0000
2000.0000
2000.0000
3636.3636
3636.3636
3636.3636
2000.0000
NP-5919-A
NP-5920-A
NP-5921-A
NP-6503-A
NP-6504-A
NP-5926-A
NP-5918-A
NP-5925-A
NP-6506-A
150
150
150
300
300
200
100
300
300
1200.0000
1200.0000
1200.0000
1200.0000
1200.0000
600.0000
600.0000
1200.0000
1200.0000
NP-5899-A
NP-5900-A
NP-5901-A
NP-5896-A
NP-5898-A
NP-5895-A
NP-5897-A
350
350
350
1000
1000
1000
1000
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
NP-6063-A
NP-6069-A
NP-6068-A
NP-6087-A
NP-6456-A
NP-6458-A
NP-6457-A
NP-6459-A
NP-6051-A
NP-6054-A
NP-6529-A
NP-6451-A
NP-6512-A
500
500
500
1000
1000
1000
1000
1000
400
400
1000
1000
800
3636.3636
3636.3636
3636.3636
3636.3636
2000.0000
2000.0000
2000.0000
3636.3636
1200.0000
1200.0000
2000.0000
2000.0000
2000.0000
27
S.No.
LOC_ID
METER NO.
CTR
PTR
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
ER-14
ER-15
ER-16
ER-17
ER-18
ER-19
ER-20
ER-21
ER-22
ER-23
ER-24
ER-25
ER-26
ER-27
ER-28
ER-29
ER-30
ER-31
ER-32
ER-33
ER-34
ER-35
ER-36
ER-37
ER-38
ER-39
ER-40
ER-41
ER-42
ER-43
ER-44
ER-45
ER-46
ER-47
ER-48
ER-49
ER-50
ER-51
ER-52
ER-53
ER-54
ER-55
ER-56
ER-57
ER-58
ER-59
ER-60
ER-61
NP-6511-A
NP-6521-A
NP-6447-A
NP-6106-A
NP-6105-A
NP-5882-A
NP-5915-A
NP-5885-A
NP-5883-A
NP-5929-A
NP-5933-A
NP-5932-A
NP-5931-A
NP-5910-A
NP-5991-A
NP-5987-A
NP-5989-A
NP-5990-A
NP-4154-A
NP-4155-A
NP-5957-A
NP-5958-A
NP-5959-A
NP-5884-A
NP-5960-A
NP-6465-A
NP-6464-A
NP-6490-A
NP-6462-A
NP-6463-A
NP-6469-A
NP-5881-A
NP-6491-A
NP-6468-A
NP-6083-A
NP-6084-A
NP-5949-A
NP-5948-A
NP-5945-A
NP-5946-A
NP-5947-A
NP-6093-A
NP-6092-A
NP-5950-A
NP-6476-A
NP-6478-A
NP-6477-A
NP-6479-A
800
1000
1000
500
500
1600
1600
1000
800
1000
1000
1000
1000
1000
1000
1000
500
500
1000
1000
500
500
1000
1000
1600
800
800
800
800
800
600
1600
800
800
600
600
800
800
600
600
600
800
800
600
600
600
800
800
2000.0000
3636.3636
3636.3636
3636.3636
3636.3636
2000.0000
2000.0000
3636.3636
2000.0000
2000.0000
2000.0000
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
2000.0000
2000.0000
3636.3636
3636.3636
2000.0000
2000.0000
3636.3636
3636.3636
3636.3636
2000.0000
2000.0000
2000.0000
2000.0000
2000.0000
1200.0000
2000.0000
2000.0000
2000.0000
1200.0000
1200.0000
2000.0000
2000.0000
1200.0000
1200.0000
1200.0000
2000.0000
2000.0000
1200.0000
1200.0000
1200.0000
2000.0000
2000.0000
28
S.No.
LOC_ID
METER NO.
CTR
PTR
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
ER-62
ER-63
ER-64
ER-65
ER-66
ER-67
ER-68
ER-69
ER-70
ER-71
ER-72
ER-73
ER-74
ER-75
ER-76
ER-77
ER-78
ER-79
ER-80
ER-81
ER-82
ER-83
ER-84
ER-85
ER-86
ER-87
ER-88
ER-89
ER-90
ER-94
ER-95
ER-96
ER-97
ER-98
ER-99
EM-01
EM-02
EM-03
EM-04
EM-05
EM-06
EM-07
EM-08
EM-09
EM-10
EM-11
EM-12
EM-13
NP-6081-A
NP-6082-A
NP-0415-A
NP-0389-A
NP-6460-A
NP-6461-A
NP-5831-A
NP-6453-A
NP-6449-A
NP-5927-A
NP-5930-A
NP-5992-A
NP-5988-A
NP-5955-A
NP-5951-A
NP-5956-A
NP-6095-A
NP-6094-A
NP-5943-A
NP-5928-A
NP-6514-A
NP-6515-A
NP-5961-A
NP-5962-A
NP-5966-A
NP-5890-A
NP-6475-A
NP-6064-A
NP-6062-A
NP-6516-A
NP-6058-A
NP-6059-A
NP-6513-A
NP-5916-A
NP-5912-A
NP-6026-A
NP-6027-A
NP-6029-A
NP-6030-A
NP-6028-A
NP-6025-A
NP-5086-A
NP-5087-A
NP-5088-A
NP-5888-A
NP-5090-A
NP-5091-A
NP-5092-A
800
800
800
800
500
500
1000
500
500
500
500
500
500
500
800
600
300
300
2000
2000
2000
2000
1000
1000
1000
800
1000
1000
1000
600
300
300
600
400
400
300
300
300
300
300
300
1000
1000
1000
1000
1000
1000
2000
1200.0000
1200.0000
2000.0000
2000.0000
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
2000.0000
3636.3636
1200.0000
1200.0000
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
2000.0000
3636.3636
3636.3636
3636.3636
3636.3636
2000.0000
2000.0000
3636.3636
1200.0000
1200.0000
1200.0000
1200.0000
1200.0000
1200.0000
1200.0000
1200.0000
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
29
S.No.
LOC_ID
METER NO.
CTR
PTR
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
EM-14
EM-15
EM-16
EM-17
EM-18
EM-19
EM-21
EM-22
EM-23
EM-24
EM-25
EM-26
EM-27
EM-28
EM-29
EM-30
EM-31
EM-32
EM-41
EM-42
EM-43
EM-44
EM-45
EM-46
EM-47
EM-48
EM-50
EM-51
EM-52
EM-53
EM-54
EM-55
EM-56
EM-57
EM-58
EM-59
EM-60
EM-61
EM-62
EM-63
EM-64
EM-65
EM-66
EM-67
EM-68
EM-69
EM-71
EM-72
NP-5093-A
NP-5848-A
NP-5845-A
NP-5360-A
NP-5080-A
NP-5847-A
NP-6061-A
NP-6065-A
NP-5071-A
NP-5230-A
NP-5074-A
NP-9981-A
NP-5075-A
NP-5062-A
NP-5073-A
NP-9983-A
NP-5063-A
NP-5061-A
NP-5871-A
NP-5873-A
NP-5872-A
NP-5879-A
NP-5874-A
NP-5877-A
NP-5835-A
NP-5836-A
NP-6086-A
NP-2517-A
NP-2518-A
NP-5273-A
NP-5272-A
NP-5270-A
NP-5271-A
NP-5274-A
NP-5914-A
NP-5911-A
NP-5878-A
NP-5870-A
NP-5839-A
NP-5866-A
NP-5865-A
NP-5832-A
NP-5913-A
NP-5886-A
NP-5887-A
NP-5909-A
NP-5838-A
NP-6056-A
1000
600
600
2000
1600
1600
3000
3000
1000
1000
2000
2000
2000
2000
600
600
800
800
1000
600
800
800
800
1000
1000
1000
600
600
600
2000
2000
600
1000
2000
400
800
600
800
600
1000
800
800
800
1000
1000
1200
2000
800
3636.3636
36,363,636
36,363,636
3636.3636
2000.0000
2000.0000
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
2000.0000
2000.0000
3636.3636
3636.3636
2000.0000
2000.0000
2000.0000
3636.3636
3636.3636
3636.3636
1200.0000
1200.0000
1200.0000
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
1200.0000
2000.0000
3636.3636
2000.0000
3636.3636
2000.0000
2000.0000
2000.0000
2000.0000
3636.3636
3636.3636
3636.3636
3636.3636
2000.0000
30
S.No.
LOC_ID
METER
NO.
CTR
PTR
306
307
308
309
310
311
312
313
314
315
EM-73
EM-74
EM-75
EM-76
EM-80
EM-81
EM-82
EM-83
EM-84
EM-85
NP-6057-A
NP-5846-A
NP-6470-A
NP-5072-A
NP-6509-A
NP-6510-A
NP-5876-A
NP-6530-A
NP-6519-A
NP-6520-A
800
2000
300
1000
1000
1000
2000
1000
1000
1000
2000.0000
3636.3636
1200.0000
3636.3636
2000.0000
2000.0000
3636.3636
3636.3636
3636.3636
3636.3636
K
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
NP-5841-A
NP-5840-A
NP-6088-A
NP-6089-A
NP-6074-A
NP-6076-A
NP-6052-A
NP-0538-A
NP-6053-A
NP-6060-A
NP-5236-A
NP-6085-A
NP-6070-A
NP-6099-A
NP-6098-A
NP-6090-A
NP-0480-A
NP-0426-A
NP-0537-A
NP-6066-A
NP-5842-A
NP-5844-A
NP-6078-A
NP-6073-A
NP-6015-B
NP-6047-B
NP-6097-A
NP-6017-B
NP-6018-B
NP-6013-B
NP-5843-A
NP-5064-A
NP-5065-A
NP-6077-A
1200
1200
600
600
600
150
200
200
800
800
600
600
600
300
300
600
600
600
600
600
600
1200
600
600
120
40
600
60
60
120
800
600
600
600
2000.0000
2000.0000
1200.0000
1200.0000
1200.0000
1200.0000
1200.0000
1200.0000
2000.0000
2000.0000
1200.0000
1200.0000
1200.0000
1200.0000
1200.0000
1200.0000
2000.0000
2000.0000
2000.0000
1200.0000
1200.0000
2000.0000
1200.0000
1200.0000
1200.0000
1200.0000
2000.0000
1200.0000
1200.0000
1200.0000
2000.0000
2000.0000
2000.0000
2000.0000
31
S.No.
LOC_ID
METER
NO.
CTR
PTR
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
JS-01
JS-02
JS-03
JS-04
JS-05
JS-06
JS-07
JS-08
JS-40
JS-51
JS-52
JS-53
JS-54
JS-55
JS-56
JS-57
JS-58
JS-59
JS-60
JS-61
JS-62
JS-63
JS-64
JS-65
JS-66
M
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
DV-01
DV-03
DV-04
DV-05
DV-08
DV-09
DV-51
DV-53
DV-55
DV-56
DV-57
DV-58
DV-60
DV-61
DV-62
DV-64
DV-65
NP-6103-A
NP-5119-A
NP-6108-A
NP-6109-A
NP-6116-A
NP-6121-A
NP-6122-A
NP-6118-A
NP-6605-B
NP-6102-A
NP-6117-A
NP-6009-B
NP-6004-B
NP-6003-B
NP-6104-A
NP-6119-A
NP-6113-A
NP-0425-A
NP-0434-A
NP-0431-A
NP-6115-A
NP-6107-A
NP-0000-A
NP-6048-B
NP-6110-A
1200
1200
600
800
1200
1200
1200
1200
120
600
300
60
120
120
600
800
400
600
600
1200
1600
600
400
40
200
2000.0000
2000.0000
1200.0000
2000.0000
2000.0000
2000.0000
2000.0000
2000.0000
1200.0000
2000.0000
1200.0000
1200.0000
1200.0000
1200.0000
1200.0000
2000.0000
1200.0000
2000.0000
2000.0000
2000.0000
2000.0000
1200.0000
1200.0000
1200.0000
1200.0000
32
S.No.
N
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
O
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
LOC_ID
METER NO.
CTR
PTR
NP-5934-A
NP-5935-A
NP-5984-A
NP-5985-A
NP-5963-A
NP-5964-A
NP-5969-A
NP-5976-A
NP-5981-A
NP-5982-A
NP-5986-A
NP-0553-A
NP-5967-A
NP-5977-A
NP-0383-A
NP-5939-A
NP-5937-A
NP-6502-A
NP-0624-B
NP-5940-A
NP-5941-A
NP-5944-A
NP-5906-A
NP-5908-A
NP-5907-A
NP-5904-A
600
600
600
600
600
600
1000
1000
600
600
800
600
1000
1000
200
400
600
800
120
600
600
800
600
400
400
600
2000.0000
2000.0000
2000.0000
2000.0000
2000.0000
2000.0000
3636.3636
3636.3636
2000.0000
2000.0000
2000.0000
2000.0000
3636.3636
3636.3636
1200.0000
1200.0000
2000.0000
2000.0000
2000.0000
2000.0000
2000.0000
2000.0000
1200.0000
1200.0000
1200.0000
2000.0000
NP-6489-A
NP-6474-A
NP-5952-A
NP-5953-A
NP-6480-A
NP-6472-A
NP-6486-A
NP-6445-A
NP-6446-A
NP-6487-A
NP-5917-A
NP-6482-A
NP-6483-A
NP-6484-A
NP-6455-A
NP-6488-A
NP-6485-A
600
600
600
600
600
600
800
1000
1000
1000
600
2000
2000
800
600
800
800
1200.0000
1200.0000
1200.0000
1200.0000
1200.0000
1200.0000
2000.0000
3636.3636
3636.3636
3636.3636
1200.0000
3636.3636
3636.3636
2000.0000
2000.0000
2000.0000
2000.0000
33
435
436
P
437
438
439
440
441
Q
442
443
444
445
446
447
R
448
449
450
451
S
452
453
454
455
456
457
458
459
460
461
462
463
464
T
465
466
467
468
469
470
471
472
LOC_ID
METER NO.
CTR
PTR
WB-59
WB-60
NP-5994-A
NP-0612-B
200
240
600.0000
1200.0000
NP-6481-A
NP-5995-A
NP-5996-A
NP-5997-A
NP-5849-A
300
300
150
300
300
600
1200.0000
1200.0000
2000.0000
600.0000
NP-5304-A
NP-5303-A
NP-5305-A
NP-0364-A
NP-5313-A
NP-5318-A
800
800
300
300
1000
1000
2000.0000
2000.0000
1200.0000
1200.0000
3636.3636
3636.3636
NP-5376-A
NP-5377-A
NP-5378-A
NP-5379-A
2000
2000
2000
2000
3636.3636
3636.3636
3636.3636
3636.3636
NP-3052-A
NP-5043-A
NP-1530-A
NP-1529-A
NP-1292-A
NP-1295-A
NP-1296-A
NP-6101-A
NP-6091-A
NP-5010-A
NP-5009-A
NP-5406-A
NP-5345-A
2000
2000
800
400
400
400
400
2000
2000
2000
2000
2000
2000
3636.3636
3636.3636
2000.0000
1200.0000
1200.0000
1200.0000
1200.0000
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
NP-2122-A
NP-2133-A
NP-2104-A
NP-5713-A
NP-5714-A
NP-2465-A
NP-6245-A
NP-6253-A
800
800
600
1000
1000
1000
2000
2000
2000.0000
2000.0000
2000.0000
3636.3636
3636.3636
3636.3636
3636.3636
3636.3636
34
3.6
FICTITIOUS METERS
Sometimes it is required to treat a combination of METERS as a single entity. e.g.
(i)
(ii)
(iii)
In this case, these items can be treated as just like a single meter, we call it as
FICTITIOUS METER (FICTMTRS). The following listed meters are called
FICTMTRS used to simplify the calculation process. Every fictitious meter consists
and basically summation of certain no of Real meters. Real meters are the actual
meters which are placed at different location and store the raw data. E.g.
START
01 (FK-92)
M9
M1
(RN-95)*3.8/100
END
-----------------------------------------------------------------------------------------------------------The detail list of FICTITIOUS METERS are given in ANNEXURE-B
3.7 CALCULATION OF NET INJECTION AND DRAWL
35
M E T E R IN G AR R A N G E M E N T A T
F A R AK K A S T P S (3 X 2 0 0 + 2 X 5 0 0 M W )
K 'G A O N
1
FK -08
FK -25
K 'G A O N
2
FK -09
FK -26
D GPR
2
D GPR
1
FK -10
FK -23
FK -11
FK -24
M A LD A
1
FK-12
FK-29
M A LD A
2
FK -13
FK -28
JEERA T -1
FK-15
FK-21
JEERA T -2
FK -16
FK -22
400 KV
FK -01
FK-02
G-1
FK-03
G-2
FK -04
G-3
FK -05
G-4
FK-06
G-5
FK -07
FK -17
FK -27
FK -18
A UX T RA N S (T IE)
220 K V
FK -14
LA LM A T IA
Following Main and Back up Meters are used for calculating Farakka Net Injection:
MAIN METERS
FEEDER NAME
BACK UP METERS
LOC ID
LOC ID
FK-08
FK-25
FK-09
FK-26
FK-10
FK-23
FK-11
FK-24
FK-12
FK-28
FK-13
FK-29
FK-14
JS-04
FK-15
WB-08
FK-16
WB-12
FK-17
FK-27
+(FK-08)
+(FK-09)
+(FK-10)
+(FK-11)
+(FK-12)
+(FK-13)
+(FK-15)
+(FK-16) +(FK-17)
36
M E T E R IN G A R R A N G E M E N T A T
K AH AL G A O N S T P S (4 X 2 1 0 M W + 3 X 5 0 0 M W )
B S H A R IF F -1
F A R A K K A -1
K H -0 7
K H -2 1
F A R A K K A -2
M A IT H O N -1 M A IT H O N -2
K H -0 8
K H -2 2
K H -0 9
K H -2 3
K H -0 2
K H -0 3
B S F -3
B S H A R IF F -2
K H -1 0
K H -2 4
K H -1 1
K H -2 5
K H -1 2
K H -2 6
K H -3 1
K H -3 3
B a rh
P a t n a -1
B S F -4
K H -3 2
K H -3 4
K H -35
K H -37
K H -3 6
K H -3 8
400 K V
K H -0 1
K H -0 4
K G-0 2
K G-0 1
K H -2 7
K H -1 5
K G-0 3
K H 28
K H -1 6
K A H A L GA O N
K H -1 9
G -1
G -2
G-4
G-3
K H -0 5
G-5
K H -0 6
G-6
K H -1 7
CO LO N Y
G -7
132 K V
K H -1 8 K H -1 3
132 K V
SA BO U R
K H -1 4
L A L M A T IA
11K V A U X
Following Main and Back up Meters are used for calculating Kahalgaon Net Injection :
MAIN METERS
FEEDER NAME
BACK UP METERS
LOC ID
LOC ID
KH-07
KH-21
KH-08
KH-22
KH-09
KH-23
KH-10
KH-24
KH-11
KH-25
KH-12
KH-26
KH-13
BI-07
KH-14
JS-03
KH-19
BI-10
KH-31
KH-33
KH-32
KH-34
KH-35
KH-37
KH-36
KH-38
+(KH-11)
+(KH-36)
37
M E T E RING ARRANG E M E NT AT
T AL C HE R S T P S (2 X 500 M W)
TL-06
TL-22
TL-05
TL-21
TL-07
TL-23
FDR-I
RENGA LI-2
TL-15
TL-14
4 0 0 KV
S tag e -I
TL-02
TL-01
G-1
TL-03
TL-25
T L -3 2
T L -4 2
T L -3 1
T L -4 1
TL-08
TL-24
TL-17
T L -3 4
TL-16
4 0 0 KV
S tag e -II
TL-04
TL-26
220KV
G-2
TL-13
TL-10
TL-09
11 KV
(A UX)
TTPS-1
TL-11
TL-12
Following Main and Back up Meters are used for calculating Talcher Net Injection :
MAIN METERS
FEEDER NAME
BACK UP METERS
LOC ID
LOC ID
TL-03
TL-09+TL-10
TL-04
TL-11+TL-12
TL-05
TL-21
TL-06
TL-22
TL-07
TL-23
TL-08
TL-24
TL-13
TL-13
TL-14
TL-16
TL-15
TL-17
TL-18
OR-07
TL-19
OR-08
38
RG 01
RG02
RG03
RANGIT
RG06
RG10
RG 09
RG 04
RG11
RG 07
RAMAM
EM02
RG08
EM01
GANGTOK
EM 03
EM 05
EM 04
EM 06
66 kV
SM031
SM041
MELLI
RABANGLA
SILIGURI
Following Main and Back up Meters are used for calculating Rangit Net Injection:
MAIN METERS
FEEDER NAME
BACK UP METERS
LOC ID
LOC ID
RG-04
ER-54
RG-06
WB-11
RG-07
66 KV RANGIT - RABANGLA
SM-01
RG-10
SM-04
RG-11
EM-02
+(RG-06)
+(RG-07)
39
+(RG-10)
+(RG-11)
N. SILIGURI-
N. SILIGURI-2
CVT
CVT
B/C
C
GT-3
3x70 MVA(1-)
13.8/400 kV
GT-2
3x70 MVA(1-)
13.8/400 kV
U-3
170MW
U-2
170MW
BUS PT
GT-3
3x70 MVA(1-)
13.8/400 kV
100VA
400 V/ 110 V/
100V each
U-1
170MW
Following Main and Back up Meters are used for calculating Teesta Net Injection :
MAIN METERS
FEEDER NAME
LOC ID
BACK UP METERS
LOC ID
TS-05
400 KV TEESTA-BINAGURI(PG)-I
TS-07
TS-06
400 KV TEESTA-BINAGURI(PG)-II
TS-08
+(TS-06)
40
CU05
CU06 CU 07
CU 08
TALA
SINGHIGAON
BT38
BT37
BT36
BT35
CU 03
BT34
CU02
CU 01
BT33
BT 39
BIR.(W)
BT40
ER 44
BIRPARA
ER 46
ER 47
ER 41
ER 22
EM 7 EM 7 EM 10
ER 40
ER 43
ER 39
SALAKATI
ER 42
EM 9
BINAGURI
Following Main and Back up Meters are used for calculating Tala and Chukha Net
Injection :
MAIN METERS
FEEDER NAME
BACK UP METERS
LOC ID
LOC ID
EM-07
TH-01
EM-08
TH-02
EM-09
BT-39
EM-10
-------
ER-39
CU-01
ER-40
CU-02
ER-41
BT-40
BT-33
CU-03
BT-38
-------
For Net injection of Tala and Chukha Fictitious meters TH-91 & CU-91
are used respectively.
(TH-91) = +(BT-38)
(CU-91) = +(ER-39)
+(ER-40) +(BT-33)
41
MAITHON(PG)-2 MAITHON(PG)-1
CHECK
CHECK
MR-02
MR-01
STANDBY
STANDBY
GT-1
GT-2
G-1
STANDBY
STANDBY
AUX. TR-1
AUX. TR-2
G-2
Following Main and Back up Meters are used for calculating Maithon Right Bank (MPL)
Net Injection :
MAIN METERS
FEEDER NAME
BACK UP METERS
LOC ID
LOC ID
MR-01
EM-84
MR-02
EM-85
+ (MR-02)
42
BSARIFF
(C)
PATRATU
J
S
E
(M
BODHGAYA
BI 01
JS 59
BI 52
JS 60
BI 53
BI 02
JS 61
BI 54
BSF
BI 67
(C)
TENUGHAT
JS 62
LALMATIA
(M
(C)
(M
JS 63
JAPLA
(C)
BI 57
SABOUR
(M
BI 60
(C)
ER 02
ER 03
PURNIA
(C)
(M
SULTANGANJ
ER 62
BI 04
ER 63
ARRAH
(C)
DUMRAO (C)
(M
ARRAH
ER 10
(M
ARRAH
KISHANGANJ
BI 13
BI 14
(C
(M
KGAON
BI 07
(C)
(M
RAJGIR
BI 55
BSF
DV 51
(M
C
RIHAND (C)
(M
NR 07
CHANDAULI
(C)
(M
BI 66
KARMNASA
(M
NR 05
(C)
KGAON
(M
KGAON
KH 19
DEHRI
(C)
BI 62
DEHRI
(C)
PUSAULI
(M
ER 55
ER 78
BI 50
MOHANIA
BI 63
(C)
KH 13
BI 10
BI 56
SONENAGAR
NR 06
SAHUPURI
C
E
N
T
R
A
L
BI 61
DALKHOLA
BARHI
ARRAH
ER 09
SABOUR
N
R
(M
BI 11
KHAGAUL (C)
PURNIA
BI 03
BI 12
JS 65
W
B
(M
ER 48
SONENAGAR
JS 64
DEOGARH
ER 01
BI 58
SULTANGANJ
BI 59
(M
(C) BSARIFF
KARMNASA
PUSAULI
BI 49
BI 64
KANTI
BI 68
ER 79
(M
(C)
MUZPUR
EM 31
BI 69
EM 32
KHAGAUL
400 KV
220 KV
132 KV
(M) ---- MAIN
(C) ----- CHECK
(C)
(M
PATNA
EM 65
FATUAH
43
(C)
(M
PATNA
EM 64
S
E
C
T
O
R
44
B
S
E
BI 52
JS 59
BI 53
JS 60
BI 54
BSF
JS 61
(M) TENUGHAT
(C)
BI 57
(C)
SABOUR
JS 63
BI 59
SONENAGAR (C)
SULTANGANJ
BI 61
JS 65
SANTALDIH
(M
(C)
ER 17
RCHANDRAPUR
(M
(C)
LALMATIA
JS 57
ER 18
(C
(M
D
V
DV 56
PATRATU
(M
DV 53
LALMATIA
JAMTAR
A JS 66
(C)
(M
FARAKKA
E
LALMATIA
JS 54
C
G
R
I
D
C
O
NR
(M
JODA
OR 53
CHANDIL
DV 55
JS 56
(C)
(M
(C)
LALMATIA
OR 52
(C)
(M
JS 03
KGAON
KH 14
JS 51
PATRATU
(C)
(M
(M
RANCHI
EM 44
JS 52 /
(C)
FARAKKA
FK 14
KENDPOSI
JODA
CHANDIL
(C)
(M
RANCHI
EM 45
GOELKERA
JS 53
OR 51
RIHAND
NR- 08
(M
RAMCHANDRAPUR
(M
ROURKELA
(C)
JS 04
JS 55
(C)
(M
GARWA
JS 58
400 KV
220 KV
132 KV
(M) ---- MAIN
(C) ----- CHECK
45
C
E
N
T
R
A
L
FK 14
PATRATU
BC
MANIQUE
KGAON
KH 14
JS 03
JS 04
(M
JAMPUR
CHANDIL
WB 53
MAITHON
JAMPUR
(C)
JS 02
(M) JAPLA
JS 64
(M)
DEOGARH
(C)
(M
JS 01
LALMATIA
BI 58
BI 60
WB
SEB
RCHANDRAPUR
JS 62
(M)
SULTANGANJ (C)
(M) PATRATU
(C)
BODHGAYA
S
E
C
T
O
R
FEEDER NAME
BACK UP METERS
LOC ID
ER-17
ER-18
}
}DV-53
OR-53
OR-52
OR-51
DV-55
WB-53
NR-08
BI-57
BI-58+BI-70
BI-60
BI-61
DV-56
JS-07
JS-05
JS-04
JS-03
(JS-81)
(JS-82)
(JS-83)
(JS-84)
(JS-85)
=
=
=
=
=
+(JS-01)
-(FK-14)
+(JS-51)
-(DV-53)
-(BI-57)
+(JS-02)
-(KH-14)
-(OR-52)
-(DV-55)
-(BI-58)
-(EM-44) -(EM-45)
+(JS-53)
-(DV-56)
-(BI-70) -(BI-60) -(BI-61)
[Presently Some Check Meters are Used For JSEB Calculation due to non availability of Main meter]]
46
B
S
E
B
RAJGIR
(C
(M BARHI
DV 51
BI 55
BSF
(C
(M) BARHI
BI 56
D
KOLAGHAT
(M)
KOLAGHAT
PARULIA
DV 61
B
S
BIDHANNAGAR
WB 51
(M)
(C
WB 54
WARIA
DV 60
DV 58
WB 60
G
R
I
D
C
O
JINDAL
(C
(M
(C (M
MAITHON
ER 11
ER 12
DV 08
EM 80
DV 09
EM 81
S
E
C
T
O
R
DV 53
BC
CHANDIL
(M
(M MANIQUE
DV 55
JS 56
JS 66
JAMSHEDPUR
EM 76
PATRATU
(M)
JS 55
JAMTARA
KALYANESWARI
ER 15
DV 57
JS 54
J
S
E
B
MAITHON
JAMSHEDPUR
OR 54
PATRATU
MEJIA
DV 05
KALYANESWARI
DV 03
(M) WARIA
(C
ER 05
ER 06
DV 04
C
DPL
(M) PARULIA
MEJIA
DV 64
E
B
(C
DV 01
C
E
N
T
R
A
L
(C
(M
400 KV
220 KV
132 KV
(M) ---- MAIN
(C) ----- CHECK
MAITHON
DV 56
47
FEEDER NAME
BACK UP METERS
LOC ID
ER-15
EM-76
BI-81
JS-54
JS-56
JS-66
OR-54
WB-60
WB-51
DV-61
WB-54
}
}DV-01
}
}DV-03
DV-08
DV-09
48
(C)
TARKERA
RAMCHANDRAPUR
J
S
E
B
(C)
(M
JS 51
KENDPOSI
(C)
(M
GOELKERA (C)
(M
OR 01
ER 23
OR 53
OR 02
ER 24
JODA
ROURKELA
JS 53
OR 51
(M
BC
D
V
C
JODA
OR 52
JS 52
(C)
OR 55
(M
DV 57
MERAMUNDALI
OR 14
(C)
MERAMUNDALI
(C)
JINDAL
OR 54
D
C
RAIGARH
CS 56
KORBA
(C)
(M
(C)
CS 54
KORBA
JEYPORE
ER-38
TSTPP
(M
OR 9
TL 11
OR 10
TL 12
MERAMUNDALI
OR 07
TSTPP
TL 27
MERAMUNDALI
OR 08
TSTPP
TL 28
RENGALI PH
BUDHIPADAR
OR 56
BUDHIPADAR
TSTPP
TL 10
OR 11
(M
(C)
OR 12
RENGALI
(M
(C)
TALCHER TPS
C
S
E
B
(M
JODA
I
JAMSHEDPUR
ROURKELA
(M
TSTPP
TL 09
(C)
(M
RENGALI
ER 30
OR 03
OR 04
ER 31
OR 57
(C)
CS 55
JAYANAGAR
OR 05
BUDHIPADAR
OR 59
(C)
(M
ER 35
OR 06
INDRAVATI
OR 13
BALASORE
OR 60
BARIPADA
OR 61
RRANGPUR
400 KV
220 KV
132 KV
(M) ---- MAIN
(C) ---- CHECK
OR 62
49
JEYPORE
ER 34
(C)
(M
INDRAVATI
ER 86
BARIPADA
ER 20
BARIPADA
ER 98
BARIPADA
ER 99
C
E
N
T
R
A
L
S
E
C
T
O
R
FEEDER NAME
400 KV MMUNDLI (GR)- TSTPP(NTPC)-1
400 KV MMUNDLI (GR)- TSTPP(NTPC)-2
132 KV ROURKELA (GR) - GOELKERA (JSEB)
132 KV JODA (GR) - KENDIPOSI (JSEB)
220 KV JODA (GR) - RCHANDARPUR (JSEB)
220 KV JINDAL (GR) - JAMSHEDPUR (DVC)
220 KV BUDHIPADAR (GR)-RAIGARH (WR)-1
220 KV BUDHIPADAR (GR)-KORBA (WR)-2
220 KV BUDHIPADAR (GR)- KORBA(WR)-3
220 KV TSTPP (NTPC) - TTPS (GR)
220 KV TSTPP (NTPC) RENGALI HPS (GR)
220 KV TSTPP (NTPC) MMUNDLI (GR)-1
220 KV TSTPP (NTPC) MMUNDLI (GR)-2
220 KV BARIPADA (PG)- BALASORE (GR)-1
220 KV ROURKELA (PG)-TARKERA (GR)-1
220 KV ROURKELA (PG)-TARKERA (GR)-2
220 KV RENGALI (PG) - RENGALI (GR)-1
220 KV RENGALI (PG) - RENGALI (GR)-2
220 KV JEYPORE (PG) - JEYNAGAR (GR)-1
220 KV JEYPORE (PG) - JEYNAGAR (GR)-2
400 KV JEYPORE (PG) MMUNDLI (GR)
400 KV INDRAVATI (PG) INDRAVATI (GR)
132 KV BARIPADA (PG) BARIPADA (GR)
132 KV BARIPADA (PG) RAIRANGPUR (GR)
220 KV BARIPADA (PG) BALASORE (GR)-2
BACK UP METERS
LOC ID
TL-27
TL-28
JS-53
JS-52
JS-51
DV-57
CS-56
CS-54
CS-55
OR-12
OR-11
OR-09
OR-10
OR-60
OR-01
OR-02
OR-03
OR-04
OR-05
OR-06
OR-14
OR-13
OR-61
OR-62
OR-63
50
S
I
K
K
I
M
J
S
E
B
BIRPARA (C)
W
MELLI (C)
SM 51
(M
66 kv
KALINGPONG
WB 01
ER 44
WB 02
E M 75
NBU (C)
WB 59
(M NJP
ER 52
WB 04
WB 03
ER 53
SAGARDIGIHI 400KV
CHANDIL (C)
(M) SANTALDIH
WB 53
JS 57
WB-12
B
V
KOLAGHAT
DV 61
WARIA
(M
(C)
KOLAGHAT
(M
MALDA (C)
WARIA
WB 05
ER 58
WB 06
ER 59
S
E
ER 07
WB 07
C
(C) FARAKA T
JEERAT (M
FK 15
WB 08
O
KOLAGHAT (M (C)BARIPADA
R
(M PARULIA
ER 27
(C)RANGIT
RAMAM (M
WB 11
RG 06
WB 54
(C)
(M
NEW JALPAIGURI
BIDHANNAGAR
DV 60
(M BINAGURI
WB 51
ER 19
ER 45
JEERAT (M
(M DPL
WARIA(C)
400 KV
220 KV
132 KV
(M) ----(C) -----
(C) SUBHASGRAM
EM 17
WB 09
WB 60
DV 58
SGRAM(C
(M SUBHASGRAM
SGRAM
(C)
SAGARDIGHI
(C) (M
WB 13
BIDHANAGAR
ER 68
MAIN
CHECK
51
C
E
N
T
R
A
L
MALDA
WB 10
BIDHANNAGAR
DV 64
Farakka
FK-16
(M)
BNAGAR (C)
(M BIRPARA
(M
EM 18
EM 19
SUBHASGRAM
EM 74
PARULIA
FEEDER NAME
BACK UP METERS
LOC ID
LOC ID
WB-08
FK-15
WB-09
EM-17
WB-10
ER-27
WB-11
RG-06
WB-12
FK-16
WB-13
EM-74
WB-51
DV-60
WB-54
DV-64
WB-60
DV-58
ER-07
WB-07
ER-19
--------
ER-44
WB-01
ER-45
--------
ER-52
WB-04
ER-53
WB-03
ER-58
WB-05
ER-59
WB-06
ER-68
ER-68
EM-18
EM-18
EM-19
EM-19
EM-75
WB-02
DV-61
DV-61
For Net Drawal of West Bengal one Fictitious meter WB-91 is used.
(WB-91)
(WB-81) = -(ER-44) -(ER-52) -(ER-53) -(ER-58) -(ER-59) -(ER-07) -(ER-19) -(ER-45) -(ER-68)
-(EM-18) -(EM-19) -(EM-75)
(WB-82) = +(WB-08) +(WB-09) +(WB-10) +(WB-11) +(WB-12) +(WB-13)
(WB-84) = -(DV-61) +(WB-51) +(WB-54) +(WB-60)
[ONLY ONE METER (DV-61) IS INSTALLED AT DVC END OF KOLAGHAT-KOLAGHAT LINE ]
52
S
I
W
B KALIMPONG
(C)
S
66 kv
E WB-59
B
K
(M MELLI
SM-51
C
E
RABANGLA (C)
(M RANGIT N
T
RG 07
66
SM 01
(C)
(M
RANGIT R
MELLI
A
SM 04
132
RG 10
L
SM 02
MELLI
SM 03
EM 04
400 KV
220 KV
132 KV
(M) ---- MAIN
(C) ----- CHECK
53
NJP
MELLI
EM 06
ER 57
S
GANGTOK E
C
EM 01
T
O
EM 03
R
132/66
kV
GANGTOK
EM 05
MAIN METERS
FEEDER NAME
BACK UP METERS
LOC ID
SM-01
LOC ID
66 KV RABANGLA RANGIT (NHPC)
RG-07
SM-02
ER-57
SM-03
EM-01
RG-10
SM-04
SM-51
WB-59
EM-03
EM-04
EM-05
EM-06
-(RG-07)
-(EM-05)
54
MAIN METERS
FEEDER NAME
BACK UP METERS
LOC ID
LOC ID
NR-05
BI-64
NR-06
BI-63
NR-07
BI-66
NR-08
JS-58
EM-21
NR-13
EM-22
NR-14
EM-25
NR-11
EM-26
NR-12
EM-53
NR-01
EM-57
NR-02
ER-56
NR-03
ER-82
ER-83
}NR-09
ER-94
ER-97
}NR-10
= -(NR-61)
-(EM-21)
55
2. WR Net Drawl
Following Main and Back up Meters are used for calculating WR Net drawal:
MAIN METERS
FEEDER NAME
BACK UP METERS
LOC ID
LOC ID
OR-56
CS-56
OR-57
CS-54
OR-59
CS-55
EM-47
CS-60
EM-48
CS-61
ER-80
CS-57
ER-81
CS-58
3. SR Net Drawl
Following Main and Back up Meters are used for calculating SR Net drawal:
MAIN METERS
FEEDER NAME
BACK UP METERS
LOC ID
LOC ID
ER-84
DC-03
ER-85
DC-04
TL-14
TL-16
TL-15
TL-17
56
FEEDER NAME
BACK UP METERS
LOC ID
LOC ID
NE-81
ER-42
NE-82
ER-43
NE-83
NE-84
NE-85
ER-37
NE-86
ER-21
+(NE-82)
+(NE-83)
57
+(NE-85)
+(NE-86)
3.8
PAIRS.DAT file
This file gives the LOC-ID of main meter and standby meter and the permitted
pair tolerance for each pair. Main meters are those which are connected on 400 kV side
of ICT or generator side of power station or sending end of inter state lines. The
standby/check meters are on the other end. Standby meters are connected in reverse
polarity so that sum of both MWh is zero in ideal condition. Suppose the power flow is
from main meter to standby meter, the main meter gives a +ve value and standby meter
gives a ve value and vice versa. Tolerance value in MWh for a 15 min block in +ve
direction & -ve direction is given in this PAIRS.DAT, depending upon transformer /Line
loses & CT/PT errors.
The given tolerance value towards +ve side is called X value. The tolerance value
towards ve side is called Y value.
PAIRS.DAT
MAIN
STANDBY
X
Y
LINE DETAILS
----------------------------------------------------------------------BI-01
ER-01
2.0
1.5
BIHARS'F-BIHARSARIFF-1 |
BI-02
ER-02
2.0
1.5
BIHARS'F-BIHARSARIFF-2 | BSEB
BI-67
ER-03
2.0
1.5
BIHARS'F-BIHARSARIFF-3 |
ER-62
BI-03
2.0
1.5
PURNIA-PURNIA-1
|
ER-63
BI-04
2.0
1.5
PURNIA-PURNIA-2
|
ER-48
BI-51
1.5
1.0
PURNEA-PURNEA-3
KH-13
BI-07
2.0
1.5
KAHALGAON-SABOUR
|
KH-19
BI-10
2.0
1.5
KAHALGAON-KAHALGAON
|
ER-09
BI-11
1.5
1.0
ARAH-ARAH
|
ER-10
BI-12
1.5
1.0
ARAH-DUMRAON
|
JS-01
ER-17
2.0
1.5
RAMCH'PUR-JAMSHEDPUR-1
|
JS-02
ER-18
2.0
1.5
RAMCH'PUR-JAMSHEDPUR-2
|JSEB
FK-14
JS-04
2.0
1.5
FARAKKA-LALMATIA
|
KH-14
JS-03
2.0
1.5
KAHALGAON-LALMATIA
|
ER-91
DV-01
2.0
1.5
PARULIA-PARULIA
| DVC
ER-92
DV-03
2.5
1.5
MAITHON-KALYANSWARI |
ER-23
OR-01
1.5
1.5
ROURKELA-TARKERA-1 |
ER-24
OR-02
1.5
1.5
ROURKELA-TARKERA-2 |
TL-10
OR-11
2.0
2.0
TSTPP-RENGALI PH
|
TL-09
OR-12
1.5
1.0
TSTPP-TTPS
|
TL-11
OR-09
2.0
1.5
TSTPP-MERAMNDLI-1 | GRIDCO
TL-12
OR-10
2.0
1.5
TSTPP-MERAMNDLI-2 |
ER-30
OR-03
2.0
1.5
RENGALI-RENGALI-1 |
ER-31
OR-04
2.0
1.5
RENGALI-RENGALI-2 |
ER-34
OR-05
2.0
1.5
JEYPORE-JAYNAGAR-1 |
ER-35
OR-06
2.0
1.5
JEYPORE-JAYNAGAR-2 |
ER-86
OR-13
2.0
2.0
INDRAVATI-INDRAVATI|
58
ER-38
ER-44
ER-52
ER-53
ER-58
ER-59
ER-07
ER-42
ER-43
ER-37
ER-21
ER-84
ER-85
SR-91
ER-82
ER-83
NR-03
NR-05
NR-06
NR-07
NR-08
ER-55
EM-17
FK-70
FK-12
FK-08
FK-09
FK-10
FK-11
FK-15
FK-16
FK-13
KH-09
KH-10
KH-11
KH-12
KH-15
KH-16
KH-31
KH-32
KH-35
TL-81
TL-03
TL-04
TL-05
TL-06
TL-07
TL-08
CU-91
RG-04
RG-07
RG-06
OR-56
OR-57
OR-59
ER-80
ER-81
NR-61
OR-14
WB-01
WB-04
WB-03
WB-05
WB-06
WB-07
NE-81
NE-82
NE-85
NE-86
DC-03
DC-04
SR-92
ER-89
ER-90
ER-56
BI-64
BI-63
BI-66
JS-58
BI-62
WB-09
FK-27
FK-68
FK-65
FK-66
FK-63
FK-64
FK-61
FK-62
FK-69
KH-63
KH-64
KH-65
KH-66
KH-67
KH-68
KH-69
KH-70
EM-54
TL-82
TL-65
TL-66
TL-61
TL-62
TL-63
TL-64
CU-92
ER-54
SM-01
WB-11
CS-56
CS-54
CS-55
CS-57
CS-58
NR-62
2.0
1.5
2.0
2.0
1.0
1.0
2.5
1.5
1.5
2.0
2.0
2.0
2.0
1.5
2.0
2.0
1.5
1.5
1.5
1.5
1.5
1.5
3.0
2.0
2.0
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
2.0
1.5
1.5
1.5
1.5
1.5
1.5
1.0
1.0
1.0
1.0
1.5
1.5
1.5
1.5
1.5
2.0
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
2.5
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
2.5
1.5
2.0
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.0
1.0
1.0
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.5
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
JEYP-MMNDLI
|
BIRPARA-BIRPARA
|
NJP-NBU-2
|
NJP-NBU-1
|
MALDA-MALDA-1
|
MALDA-MALDA-2
| WBSEB
PARULIA-BID'NAGAR |
BIRPARA-SALAKATI-1 |
BIRPARA-SALAKATI-2 | NER
BINAGURI-BONGAIGAON|
PURNEA-BONGAIGAON |
JEYPORE-GAJUWAKA-1
|
JEYPORE-GAJUWAKA-2
|
GAJK(EAST)-GAJK(SOUTH)
SASARAM(E)-BIHARSARIF-1 |
SASARAM(E)-BIHARSARIF-2 |
SAHUPURI-PUSAULI
|
SAHUPURI-KARMANASA
|NR
CHANDAULI-KARMANASA
|
RIHAND-SONENAGAR
|
RIHAND-GARWA
|
PUSAULI-DEHRI
SUBHASGRAM-JEERAT
FARAKKA-ATR-400KVSID|
FKK-MLD-1 MAIN-CHK |
FKK-KHL-1 MAIN-CHK | FARAKKA
FKK-KHL-2 MAIN-CHK |
FKK-DGP-1 MAIN-CHK |
FKK-DGP-2 MAIN-CHK |
FKK-JRT-1 MAIN-CHK |
FKK-JRT-1 MAIN-CHK |
FKK-MLD-2 MAIN-CHK |
KHL-MTN-1 MAIN-CHK
| KAHALGAON
KHL-MTN-2 MAIN-CHK
|
KHL-BSF-1 MAIN-CHK
|
KHL-BSF-2 MAIN-CHK
|
KHL ATR-1 MAIN-CHK
|
KHL-ATR-2 MAIN-CHK
|
KHL-BSF-3 MAIN-CHK
KHL-BSF-4 MAIN-CHK
KHL-PAT-1
TALCHER-ATR/LINE
|
TAL-ATR-1 MAIN-CHK |
TAL-ATR-2 MAIN-CHK |
TAL-RKL-1 MAIN-CHK | TALCHER
TAL-RKL-2 MAIN-CHK |
TAL-REN-2 MAIN-CHK |
TAL-REN-1 MAIN-CHK |
CHUKHA RCPT-BIRP OUT
RANGIT - SILIGURI
RANGIT - MELLI
RANGIT - RAMMAM
BUDIPADAR - RAIGARH 1
BUDIPADAR - KORBA 2
BUDIPADAR - KORBA 3
ROURKELA - RAIPUR 1
ROURKELA - RAIPUR 2
SASARAM EAST_SASARAM NORTH
59
ER-57
SM-02
1.5
1.0
SILIGURI-MELLI
EM-01
SM-03
1.0
1.0
GANGTOK-MELLI
RG-11
EM-02
1.5
1.O
RANGIT-GANGTOK
EM-31
BI-68
1.5
1.0
MUZAFFARPUR-KANTI-1
EM-32
BI-69
1.5
1.0
MUZAFFARPUR-KANTI-2
EM-25
NR-11
1.5
1.0
MUZZAFARPUR-GORAKHPUR-1
EM-26
NR-12
1.5
1.0
MUZZAFARPUR-GORAKHPUR-2
EM-39
EM-09
1.5
1.0
MALBASE-BINAGURI
EM-40
ER-41
1.5
1.0
MALBASE-BIRPARA
EC-62
EC-61
1.5
1.0
SUBHAS ICTS-SUBHAS 220 KV
EM-38
EC-63
2.0
1.0
TALA MALBASE-MALBASE ICT MAL BINA
FK-16
EC-64
2.0
1.0
FARAKKA-SUBHAS 400 KV BUS
KH-35
EM-54
1.5
1.0
KAHALGAON-PATNA-2
EM-53
NR-02
1.5
1.0
PATNA - BALIA-2
EM-57
NR-01
1.5
1.0
PATNA - BALIA-1
EM-55
EM-56
1.0
0.5
PATNA ICT_400 - PATNA ICT_220
EC-66
EC-68
1.5
1.0
MTN_RAN_FDR-RANCHI ICTS(400)
EC-66
EC-65
1.0
0.5
MTN_RAN_FDR-RANCHI 220 KV FDRS
EC-68
EC-69
1.0
0.5
RANCHI 400 ICTS-RANCHI 220 ICTS
EC-67
EC-70
1.0
0.5
ARA 220 XTN-ARA 132 KV FEEDERS
EM-37
EM-36
0.5
0.5
MALBASE 400KV ICT-220 KV ICT
EM-21
NR-13
1.5
0.5
400 KV BIHARSHARIFF-BALIA-1
EM-22
NR-14
1.5
0.5
400 KV BIHARSHARIFF-BALIA-2
EC-71
EC-72
1.0
0.5
GANGTOK 132/66 KV ICTS
EC-73
EC-74
1.0
0.5
PATNA 400/220 KV ICTS
TS-05
TS-07
1.5
1.0
TEESTA-BINAGURI-1
TS-06
TS-08
1.5
1.0
TEESTA-BINAGURI-2
EM-47
CS-60
2.0
2.0
RANCHI SIPAT -1
EM-48
CS-61
2.0
2.0
RANCHI SIPAT -2
---------------------------------------------------------------------JS-57
WB-53
2.0
1.5
CHANDIL-SANTALDIH
| WB-JSEB
WB-52
BI-51
1.5
1.0
DALKHOLA-PURNEA
| WB-BSEB
DV-51
BI-81
1.5
1.0
BARHI-RAJGIR/BSF | DVC-BSEB
JS-51
OR-53
3.0
3.0
RAMCHANDRAPUR-JODA |
JS-53
OR-51
1.0
1.0
GOILKERA-ROURKELA
|JSEB-GRIDCO
OR-52
JS-52
1.0
1.0
JODA-KENDPOSI
|
JS-54
DV-53
1.0
1.0
PATRATU-PATRATU
|JSEB-DVC
DV-57
OR-54
1.5
2.0
JAMSHEDPUR-JODA | DVC-GRIDCO
DV-60
WB-51
1.5
2.0
BIDHANNAGAR-WARIA | DVC-WB
WB-10
ER-27
2.0
2.0
KOLAGHAT-BARIPADA | WB-GRIDCO
BI-57
JS-62
1.0
1.0
B'SARIFF-TENUGHAT
|
BI-83
JS-63
1.0
1.0
SBR/SLTGNJ-LALMATIA |
BI-60
JS-64
1.0
1.0
SONENAGAR-GARWA
|
BI-61
JS-65
2.0
2.0
DEOGARH-SULTANGANJ |
JS-66
DV-56
1.0
1.0
JAMTARA-MAITHON
|
WB-59
SM-51
1.0
1.0
KALIMPONG-MELLI
----------------------------------------------------------------------END
-------------------------------------------------------------------------------
60
SECTION- 4
61
4.0
one data collecting device, data of about ten SEM can be collected sequentially and at
once dumped into PC. For dumping into PC the software given by supplier of SEM has to
be used. After downloading the metered data of seven days from each meter location, the
respective constituents agencies send the data normally through e-mail from specific
location to ERLDC. These data should reach ERLDC latest by Tuesday so that it doesnt
cause any delay in processing. Special energy meters are either SECURE METERS
LIMITED (SML) or L&T Make. These raw metered data are non readable type (non
editable and naturally tamperproof). SML make meters have *.MRI or *.AMR file and
L&T make metres have *.DAT file. Since these files are non readable files, so these files
have to be converted to *.NPC file which is readable and editable. It is better to make
NPC file at RLDC to reduce human error.
62
4.1.3
4.2
After receiving the data, MRI file and DAT file is converted into TEXT file called NPC.
This conversion is done with the help of respective software. MRI file is converted into
NPC with the software called SMARTGRID supplied by the Manufacturers and DAT file
is converted into NPC with the help of VINCOM software.
For Secure Meter: SMARTGRID
For L&T Meter:
A)
VINCOM
63
Step-II:
Go to Data option on menu & click to Convert for conversion of mri file into
npc file.
64
After conversion mri files along with npc files are transferred into respective location
wise folder in C:\READINGS\Mmyy\....
A)
to SEM_DATA folder in C: drive before converting to text file (i.e NPC file).
Following are the steps to convert dat file into text file.
Step-I : Login the VINCOM software after click on VINCOM icon on desktop
65
Step-II:
Step-III:
Browse button to select the file and import one selected dat file at a time.
66
Step-IV:
67
Step V: Finally conversion takes place. And click on ok and after each import and
conversion finally close the application software.
After conversion dat files along with npc files are transferred into respective location
wise folder in C:\READINGS\Mmyy\....
4.3 Viewing of npc file/structure of npc file
(i)
There is one week heading for each meter data which gives the start date and end
For every day data there is a day heading that gives METER NO, three register
readings at 0000 HRS of the day, and date of the day e.g.
NP-4201-A 63895.0
97845.8
74358.6
12-10-07
Three cumulative registers are (i) WH register (ii) VAR register at high voltage (>103%)
(iii) VAR register at low voltage (<97%).
68
One day data consists of 96 blocks. Each for 15 min is organised in 6 lines e.g.
63895.0
97845.8
74358.6
12-10-07
00 14 +11.50 00
+11.10 08
+10.89 04
+10.34 01
+10.38 00 +10.21 06
+10.56 00
+10.48 06
+10.20 11
+10.33 00
+10.05 12 +10.30 07
+10.68 02
+10.66 12
+10.65 05
+11.01
..
..
..
Each line contains 16 blocks i.e. data for 4 hours. Time is followed by 16 blocks and
starting Time is in HOURS (2 digits) is given at the start of each line. Each block
contains a frequency code and WH for the 15 min. Freq code is of 2 digits and range is
from 00 to 99.
In between frequency code and WH there may be a * mark if there is any voltage
problem (V<70% during any instant in the 15 min). If any correction is done during the
15 min, there may be a aa or rr corresponding to advance or retard of the clock.
There may also be a case of voltage problem and time correction occurring in the same
15 min block.
At the end of 96 blocks the algebraic SUM of WH of all block is also given. One NPC
file may consist of data for one meter or more than one meter. Data for each meter starts
with a week heading. After receiving the data from all locations for a week, they can be
combined to make a complete file for the week. A program APPEND.EXE is given for
that purpose.
4.4
where dd and mm correspond to the week for which data is being processed. Also extra
69
meter readings to be deleted from the text file which is not required and if some
correction of date etc is required it is done in the text file and saved into corresponding
folder from where data have been received. These are normally saved in folder named as
READINGS.
4.5
Availability Checking
This is done to ensure whether data from all location has received or not. This is
checked by running software called REA2006 and we check for location from where data
has received or not received, if the data has not received, then the concerned agency or
person is contacted telephonically to send the data.
4.6
If Main meter reading is not available then check meter reading is used as
substitute for any particular location in FICTMTRS.CFG file.
II.
Another alternative is to use other end data in case of non availability of data.
III.
Sometimes data are sent from different location by email attachment but required
proper data is not found in attachment. In that case the concerned agency or person is
asked to resend the data again.
4.7
Final Processing
APPEND.EXE simply combines all *.NPC files starting with the same ddmm.
REA 2006 processes the text file (NPC file) of SEM (special energy meter) for
completeness, correctness and computation. NPC file may contain Data for a few
METERS or ALL METERS in the region (ddmmSREA.NPC) which obtained
using append program for a few days (usually 9 days).
(ii)
The program takes special care to check the data at every stage. The NPC file is
first checked for syntax correctness. Then creating a database by splitting the data
into day wise and meter wise files, so that further processing is easier.
(iii)
Various checks can be carried out on the data to check both data validity and
strength of the meter to record data properly.
(iv)
(v)
(vi)
Option is made available to change the freq code tolerance (temporarily) for
frequency analysis and to modify temporarily each pairs to get approximate pairs
tolerance value for analysis of each pair.
II.
Data Correctness
III.
IV.
Compute ENERGY
V.
Compute FICTMTRS
VI.
MWH output
After creation of data base ENERGY is computed (compute ENERGY option) and
computation of FICTMTRS is done for the seven days of the corresponding week. After
that MWH output is calculated for the week. With the above steps the constituents Net
Drawl, Regions Net drawl and ISGS Net Generation, etc for the week is calculated.
Regional loss is calculated after adding total bilateral of the week in net central sector
generation. Details of FICTIOUS METERS used for computation of Net injection as well
Net drawl is shown in Annexure-B.
72
4.9
I)
II)
III)
for every week and these are used during final processing of data. These discrepancies
are forwarded to ERPC (Eastern Regional Power Committee) along with Raw and
processed data. These discrepancies are also uploaded on ERLDC web along with ISGS
injection and Constituents drawl.
73
4..10
Eastern regional Power committee (ERPC). Contents of the data which is forwarded to
ERPC are:
1) Raw data of each location
2) Constituent wise processed data
3) Processed MWH data
4) Day wise meter data
5) Configuration file of the week
6) Discrepancies, if any
7) Any other information, if required
4.11
loss and discrepancies if any, is uploaded on the ERLDC web site (http://www.erldc.org)
for the concerned week. Weekly UI calculations are being done by ERPC. As requested
by constituents, processed meter data as per calculations of ERLDC are being uploaded
just for the sake of gross comparison only.
74
4.12
Data Archives
A data archive for processed data along with raw data of every week is
maintained on PC to take care of any future dispute. Back up for Data Archive is also
maintained either on CD or Hard disc. The data archive structure is as follows:
Meter Archive
Year1
Month1
Week1
Year2
Month2
Week2
Readings
Month..12
Week3
Dist
Year...n
Week4
Sembase
Relevant
FICTMTRS data
75
SECTION - 5
69
Collection of weekly SEM data and furnishing the processed error free data to RPC
to enable them to issue weekly UI energy charges and monthly REA
Start
Collect if any ,details of SEMs newly installed during the
accounting week and update dat.files
Master.dat , Pairs.dat
and Fictmtrs.dat
Yes
Is received
data correct
No
Yes
Send data non- receipt
status report to locations
Has all
data
received
No
Yes
Data validation report
Yes
Any major
discrepancy
observed in the
validation report
No
Compute blockwise energy in MWh of each sem for
all 7 days as well as that of fictmeters using
REA2006 programe
Any major
discrepancy
observed in the
validation report
Yes
No
1
70
Daywise graphs
2
1
Make necessary
adjustments in the
computation formula
Discrepancy
report
Implemented schedule
of 7days of the
accounting week
Master.dat file
UI suspention details if
any from GM dept
No action
Yes
No
Collect implemented schedule of those days
and furnish to RPC to enable them to issue
previous month REA.
End
71
Report of total
regional injection
and drawal of all
7 days of the
week
To RLDC
website
To MS,RPC
Compute average %
difference of total region
injection and total drawal of
beneficiaries of all 7 days
which is the actual loss %
during the week
End
72
To real time
dispatch dept to
be used in the
dispatch
schedule
Start
Discrepancy in data
received
RLDC receives
error free data
Problem
solved
Yes
No
RLDC analyse and advice CTU for
accu check of the SEM or check for
any other problems at site
Yes
Problem
solved
No
RLDC again analyse and advice CTU to
replace the meter and inform RLDC
Meter replaced by CTU
`
Collect details of the
new SEM installed
End
73
Incorporate changes
in the master file
Start
Receive
synchronisation
programe of new grid
elements
Check whether
covered in the
future SEM
requirement
projections
No
Yes
Yes
Intimate RTS the reqirement of
SEMs and advice to install before
synchronisation
Receives the
details of
SEMs installed
74
No
No
action
Start
TCC ,OCC
minutes,Monthly
progress report of
RPC
CEA metering
regulations,RPC
board decisions and
CERC guide lines
End
CEA metering
regulations,RPC
board decisions and
CERC guide lines
75
SECTION - 6
76
6.0
Type of
line/
Requirement
of Meter
One
End
Remarks
Other
End
Subhasgram - Jagatballavpur
Jamshedpur - Guptamoni
Baripada - Guptamoni
Baripada - Mehendasol
Baripada - Duburi
Durgapur - Sagardighi
Durgapur - DPL
Durgapur - Bidhannagar
Durgapur - PPSP
Maithon - Maithon Right Bank
Maithon - Mejia P.S
Maithon - Mejia P.S
Maithon - PPSP
Jamshedpur - PPSP
Gajuwaka(SR) - Berhampur
Biharsharif - Kodarma P.S
Gaya - Kodarma P.S
Gaya - Dumka P.S
Maithon - Dumka P.S
Ranchi - Maithon Right Bank
Ranchi - Raghunathpur
Maithon - Raghunathpur
Ranchi - Raghunathpur
TSTPP - Berhampur
Jeypore - Bolangir
Rourkela - Raigarh(WR)
Rourkela - Jharsuguda
Raigarh - Jharsuguda
Rengali - Bolangir
Indravati Bolangir
Jeypore - Bolangir
Sasaram - Daltonganj
Kishangarh pooling Station
Subhasgram - Haldia
Muzaffarpur- Begusarai
Biharshariff - Begusarai
Purnea - Begusarai
400 Kv D/C
400 Kv D/C
400 Kv S/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv S/C
400 Kv S/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv S/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv S/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv S/C
400 Kv S/C
400 Kv S/C
400 Kv D/C
400 Kv D/C
220 Kv D/C
220 Kv D/C
220 Kv D/C
2
2
2
2
2
1
1
2
2
2
2
2
1
2
2
2
4
1
2
2
8
2
2
2
2
2
2
1
2
2
2
2
1
1
4
2
2
2
2
2
4
4
4
2
4
2
2
2
2
1
2
2
1
1
1
2
2
2
2
2
54
73
4
4
4
4
4
4
4
4
2
2
2
FSTPP - KhSTPP
TSTPP - Rourkela
NKSTPP - Gaya
NKSTPP - Ranchi
Barh - KhSTPP
Barh STPP -Patna
Barh STPP- Purnea
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
77
8
9
10
11
12
13
18
19
20
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv S/C
400 Kv S/C
400 Kv D/C
400 Kv S/C
4
4
4
4
2
4
2
2
2
4
1
2
2
52
23
2
2
2
2
2
2
1
2
2
2
2
2
2
2
2
2
C. ISTS to ISTS
1
2
3
4
5
6
7
9
10
11
12
13
Jamshedpur - Durgapur
Jamshedpur - Maithon
Jamshedpur - Baripada
Maithon - Durgapur
Biharshariff - Purnea
Biharshariff - Sasaram
Biharshariff - Balia (NR)
Ranchi - Rourkela
Rourkela - Raigarh(WR)
Binaguri - Bongaigaon(NER)
Biharshariff - Lakisarai
Gaya - Maithon
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv S/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
2
2
21
18
5x800
3X630
3X630
4x250
2X500
2X500
4X250
4X250
3X335
3X630+1X350
4X660
4X250
3X350
4X300
4X500
3X335
2X315+2X200
4X300
5
3
3
4
2
2
4
4
3
4
4
4
3
4
4
3
4
4
3
3
3
2
2
2
4
2
3
3
3
4
2
3
3
2
3
3
3X335
4X300
4X300
D. GENERATORS
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
4X600
78
79
60
E. 765 KV LINES
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Gaya - Sasaram
Gaya - Balia(NR)
Gaya 765/400 Kv Transformer
Sasaram - Fatehpur(NR)
Sasaram 765/400 Kv Transformer
Ranchi - WR Pooling station
Ranchi 765/400 Kv Transformer
Angul - Dhenkanol
Angul - Jharsuguda
Angul 765/400 Kv Transformer
Angul -Barnala
Dhenkanol - Jharsuguda
Dhenkanol 765/400 Kv Transformer
Jharsuguda - Dharamjoygarh (WR)
Jharsugua 765/400 Kv Transformer
Tilaya - Gaya
Tilaya - NR Pool
Tilaya 765/400 Kv Transformer
765 Kv S/C
765 Kv S/C
2
765 Kv S/C
2
765 Kv D/C
2
765 Kv D/C
765 Kv D/C
2
AC/DC conv
765 Kv D/C
2
2X765 Kv D/C
2
765 Kv S/C
765 Kv S/C
2
1
1
4
1
4
2
4
2
2
4
4
2
4
4
4
2
2
4
2
2
51
4
4
4
8
8
4
4
4
4
4
4
4
4
4
4
4
4
8
4
4
4
8
2
2
2
4
4
2
2
2
2
2
2
2
2
104
54
4
4
1
1
1
2
4
2
2
1
1
1
2
2
F. IPP Ties
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
Tata- Dhenkanol
Visa - Dhenkanol
Adhunik - Dhenkanol
Navbharat - Dhenkanol
Lanco - Dhenkanol
CESC- Dhenkanol
GMR- Angul
Jindal - Angul
Bhusan - Angul
Monet - Angul
Mahanadi - Angul
Essar - Angul
KVK- Duburi
KVK - Mehendasol
Adhunik -Mejia
Adhunik - Jamshedpur
Chitrapur - Ranchi
Essar - Ranchi
Essar - Corporate
Essar - Electrosteel
IND BHARAT - Jharsuguda
Sterlite - Jharsuguda
G.
SIKKM SYSTEM
1
2
3
4
5
6
7
400 Kv D/C
400 Kv D/C
400 Kv D/C
2x400 Kv D/C
2x400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
2x400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
2x400 Kv D/C
400 Kv D/C
400 Kv D/C
400 Kv D/C
2x400 Kv D/C
400 kv D/C
400 kv D/C
220 kv S/C
220 kv S/C
220 kv S/C
220 kv D/C
400 kv D/C
79
2
2
2
4
4
4
2
4
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
Rangyong- Mangan
Pannan - Mangan
Dikchu - Mangan
Chakungchu - Mangan
Teesta-VI - New Melli
Jorethang - New Melli
Jorethang - Rangit IV
Rangit IV - New Melli
Sadamangdher - Common stn
Common stn - New Melli
Ting ting - Coomon stn
Tashiding - Common stn
Ralong - Common stn
Chuzachen - Rangpo
Rolep - Rangpo
Bhasme - Rongpo
Bhasme - Rongnichu
Rongnichu - Rongpo
Teesta-2 pooling point - Mangan
Mangan - New pooling stn( K'ganj)
Mangan - New Melli
Dikchu - Gangtok
New Melli - Kishanganj
Rangpo - New Melli
Gangtok - Rangpo
Melli - Rangpo
Gangtok - Rangpo
Rangit - Rangpo
Teesta V - New Melli
Binaguri - New Melli
132 KV D/C
400 kv D/C
132 kv D/C
132 KV D/C
220 kv D/C
220 kv S/C
220 kv S/C
220 kv S/C
220 kv D/C
220 kv D/C
220 kv D/C
220 kv D/C
220 kv D/C
132 KV D/C
132 KV D/C
220 kv S/C
220 kv S/C
220 kv S/C
400 kv D/C
400 kv D/C
400 kv D/C
132 kv D/C
400 kv D/C
220 kv D/C
132 kv S/C
132 kv S/C
132 kv S/C
132 kv S/C
400 kv D/C
400 kv D/C
2
4
2
2
2
1
1
1
2
2
2
2
2
2
2
1
1
1
2
2
2
2
2
2
61
H.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
GENERATING UNITS AT
SIKKIM
Teesta -III
Teesta -II
Panan
Teesta-I
Rongyong
Dikchu
BOP (Chungtang)
Bhimkyong
Lachung
Chakungchu
Teesta-VI
1200
8X60
5X60
5X60
2X30
2X48
3X33
3X33
3X33
3X30
4X125
Jorethang
Rangit-IV
Tashiding
Tingting
Rongnichu
Chuzachen
Rolep
2X48
3X40
2X40
3X30
2X48
3X33
2X40
80
8
5
5
2
2
3
3
3
3
4
2
3
2
3
2
3
2
2
2
2
2
2
1
1
1
2
2
2
2
2
2
2
1
1
1
2
2
2
2
2
2
1
1
1
1
2
2
61
19
20
Sadamangher
Bhasme
2X35.5
2X25.5
2
2
59
481
TOTAL
237 718
19 meters will be required at 2013 for the IPP and other generating system
64 meters will be required at 2013 for dedicated transmission system in Sikkim
41 Meters will be required at 2013 for generating stations at Sikkim
TOTAL 124 meters will be required at 2013 for SIKKIM SYSTEM
594
60
654
GRAND TOTAL
81
82
ANNEXURE-A
(M
BSARIFF
BI 01
BHUTAN
GALEGPHU
(C)
BSARIFF
ER 01
NE84
BI 02
ER 02
NE83
BI 67
ER 03
ER 87
NE85
(M KGAON
ER 21
NE86/
(M
(M
BINAGURI
SABOUR
(C)
BI 07
B
S
E
B
KH 13
KGAON
KGAON
BI 10
PURNIA
(C)
KH 19
PURNIA
(M)
BI 03
ER 62
BI 04
ER 63
ER 48
BI 51
KHAGAUL (C)
(M
(M
(C)
ARRAH
ER 09
BI 11
DUMRAO (C)
(M
BI 12
DEHRI
(C)
BI 62
DEHRI
(C)
(M
ARRAH
ER 10
PUSAULI
ER 55
BI 62
ER 78
MOHANIA
PUSAULI
BI 68
ER 79
MUZPUR
EM 31
BI 69
EM 32
BI 49
KANTI
(M
KHAGAUL
FATUAH
(C)
(C)
(C)
RCHANDRAPUR
(M
ER 18
(M
JS 04
FK 14
LALMATIA
(C)
(M
JS 03
PATRATU
FARAKKA
ER 82
NR-09
NR-10
SAHUPURI
NR-03
(C) GORKHPUR
ER-56
MUZPUR (M
NR-11
EM-25
(M
(C)
NR-13
EM-21
EM-22
PATNA
(M
(C)
EM-57
NR-14
BALIA
NR-01
NR-02
EM-53
PARULIA
(C)PARULIA
(M
DV 01
ER 05
ER 06
EM 80
EM 81
NR-12
BALIA
N
R
DV 08
(M
MAITHON
ER 11
DV 09
(M
(C)
KALYANESWARI
DV 03
/
(M
(C)RAIPUR
ER-8 0
CS-57
ER-8 1
CS-58
C) SIPAT CS-60
W
R
CS-61
(M
(C) GAJUWAKA(S)
DC-03
DC-01
DC-04
DC-02
SR
KGAON
KH 14
(C)
(M
RANCHI
EM 44
CHANDIL
(C) SASARAM(N)
ER 83
PUSAULI
ROURKELA
JAMPUR
(M
SASARAM(E)
EM-26
BSF
N
E
R
NE82
(M
JS 02
(C)
ER 43
ER 12
(C)
SALAKATI
NE81
EM 65
PATNA
EM 64
E
R
(C)
ER 42
PATNA
ER 17
LALMATIA
S
E
C
T
O
R
(M
(M
JS 01
J
S
E
B
ARRAH
BI 13
BI 14
ARRAH
C
.
BIRPARA
BONGAIGAON
(C)
(M
RANCHI
EM 45
83
400 KV
220 KV
132 KV
(M) ---- MAIN
(C) ----- CHECK
(C)
(M
ROURKELA
OR 01
OR 02
(C)
(M
OR 9
OR 10
(C)
(M
TSTPP
TL 11
TSTPP
TL 10
OR 11
TALCHER TPS
(M
(C)
OR 12
TSTPP
TL 09
BALASORE
(C)
(M
BARIPADA
OR 60
I
D
C
O
MERAMUNDALI
OR 07
TSTPP
TL 27
OR 08
TL 28
RENGALI
(C)
(C)
(M
(M
ER 30
OR03
OR 04
JAYNAGAR
RENGALI
ER 31
(C)
(M
JEYPORE
OR 05
ER 34
OR 06
ER 35
MERAMUNDALI
OR 14
INDRAVATI
OR 13
BARIPADA
OR 61
RRANGPUR
OR 62
BALASORE
JEYPORE
ER 38
C
.
BARIPADA
ER 99
BARIPADA
EM 58
(C)
S
E
C
T
O
R
EM 06
GANGTOK
NJP
MELL
ER-57
SM 02
GANGTOK
SM 03
(M
WB 05
ER 59
WB 06
(M
BIRPARA
(C) BIRPARA
ER 44
WB 01
(M
(C) NBU
WB 04
ER 52
ER 53
WB 03
PARULIA
(M
FARAKKA
FK 15
FARAKKA
(C)
(M
JEERAT
(C)
SAGARDIGHI
WB 12
KOLAGHAT
(M
WB 10
RANGIT
WB 08
FK 16
BARIPADA (C)
(M
(C)
WB 11
BINAGURI
ER 19
(M
NJP
ER 45
SUBHASGRAM
(C)
(M
EM 17
SUBHASGRAM
(M
(C) SUBHASGRAM
(C) SUBHASGRAM
EM 74
PARULIA
JEERAT
WB 09
(M
(M
(C)
S
E
RAMAM
RG 06
ER 68
WB 07
EM 19
SUBHASHGRAM
84
BNAGAR
(C)
ER 07
EM 18
400 KV
220 KV
132 KV
(M) ---- MAIN
(C) ----- CHECK
MALDA
(C)
ER 58
NJP
S
I
K
K
I
M
MELL
EM 01
ER 27
E
R
MELLI
EM 04
132/66k
MALDA
ER 86
ER 98
RABANGLA
EM 05
INDRAVATI
BARIPADA
(M
EM 03
ER 20
66kV (C)
SM 01
RANGIT
RG 10
TL 12
RENGALI PH
(M
RG 07
ER 24
MERAMUNDALI
RANGIT
ER 23
SAGARDIGHI
WB 13
PPSP
CU05
RG 01 RG02 RG03
SINGHIGAON
RANGIT
RG10
RG 09
RG 04
RG06
EM02
RG08
CU 03
BT38
GANGTOK
EM01 EM 03
EM 04
BT37
BT36
BT34
BT35
BT 39
EM 05
BT33
BT40
BIR.(W)
ER 44
EM 06
BIRPARA
ER 46
ER 41
ER 47
ER 39
ER 40
ER 22
ER 42
ER 43
66 kV
CU 01
CU02
RG11
RG 07
RAMAM
CU 08
TALA
SM03
1
SM04
1
RABANGLA
NE 85
NE 86
MELLI
SALAKATI
BONGAIGAON
ER 37
EM 7 EM 7 EM 10
EM 9
ER 23
BINAGURI
BINAGURI
TEESTA
NJP (WBSEB)
SILIGURI
ER 51
ER50
ER76
NR
ER 53 ER54
ER52
NBU
EM25
EM26
MUZAFFARPUR EM23
EM27
EM24
ER 33
EM28
EM30
PURNEA
EM29
ER 09 / 4153A
ER 65
389A
ER 63
KANTI (BS)
ER 62
411A
ER 64
415A
ER 49
415A
DALKHOLA
PUR(B)
BALIA
SARNATH
SASARAM (N)
MALDA(W)
ALLAHABAD
DEHRI
ER 78
KARMANASA
ER 83
SAHUPURI
ER 59
ER 58
SASARAM (E)
ER 79
ER 61
ER 82
ER 60
ER 56
ER 14 ER 13
ER 88
ER 55
DEHRI
ER 90/2375A
ER 89/2374A
ARRAH
ER 9
ARRAH
ER 10
BI 14
DUMRAO
BI 13
ER 01
BSHARIFF(BSEB)
KH 31
EM 55
KG 03 KG 02 KG 01
KAHALGAON
KH 32 KH 12 KH 11
KH 10 KH 09
EM 56
EM 53
ER 02
KHAGAUL
FATUA
EM 57
MALDA
ER 03
KH 35 KH 36
NR 01
BSF
KH 01 KH 02 KH 03 KH04
KH 07
KH 08
KH 15
KAHALGAON(B)
KH 16
KH 19
KH 14
KH 13
KH 17 KH 18
KH 05 KH 06
EM 54
PATNA
LALMATIA
SABOUR
BALIA
NR 02
MAITHON
85
BS 09
FARAKKA
PART-II
KAHALGAON
HATIA
MPL RB
CHANDIL
MALDA
FK14
559A
SIPAT
EM 44
EM 45
RANCHI
FK12
FK 10
FK 11
KAHALGAON
FK17
FK 08
FK 09
EM 43
FK15
FK 13
EM 42
FK 01 FK 02
EM-83
EM-82
EM-84
MAITHON
ER 15
TIE
TRA
FK 06 FK 07 FK 18
EM 41
EM 46
FARAKKA
FK 16
ER16
FK 05
EM-85
ER 68
ER70
ER69
FK 03 FK 04
DURGAPUR
ER 11
ER 66
ER 12 EM 80 EM 81
BNAGAR(WB)
ER 67
MEJIA
ER 07
ER 06
ER 05
KSWARI
PARULIA
BIDHANNGR
WB 08/397A
JEERAT
JAMSHEDPUR
WB 09
ER 08
ER18
ER 17
BS1 05
BS 06
EM 17
KOLAGHAT
EM 15
WB 10/476A
RAIGARH
WB 09/471A
RAMCHANDAR PUR
EM 19
SUBHASGRAM
ER 81
ER 26
ER 80
ER 71
ER 25
ROURKELA
SUBHASGRAM
ER 72
ER 27
ER 24
EM 16
EM 18
BARIPADA
EM 69
ER 23
BALASORE(GR)
TARKERA
RENGALI(G)
BARIPADA(GR)
ER 30
ER 31
ER 73
ER 74/556A
ER29
469A
RAIRANGPUR(GR
) BALASORE(GR)
ER 28 / 600A / 1000
RENGALI
RENGALI PS
TL05
TL06
TL 27
INDRAVATI PG
TL07
TL08
TL 28 TL 03
TL 04
ER 86
INDRAVATI PG
JEYPORE
ER 36
ER 85
ER75
TL 02
TL 13
TL 01
TL 11
TL 12
TL 10
TTPS
TL 38
ER 84
MERAMUNDALI
ER77
ER 34
TL 09
TALCHER STPP
ER 35
GAJUWAKA(S)
SR
DC-3
DC-4
SR
GAJUWAKA(E)
JEYNAGAR
86
400 KV
220 KV
132 KV
ANNEXURE-B
FICTITIOUS METERS (FICTMTRS.CFG)
START
01
(FK-92)
M9
+(FK-08)
+(FK-09) +(FK-10) +(FK-11)
+(FK-12)
+(FK-13) +(FK-17) +(FK-15) +(FK-16)
02
(FK-93)
M9
+(FK-15)
+(FK-22)
+(FK-23) +(FK-24)
+(FK-25)
+(FK-26)
+(FK-27) +(FK-28) +(FK-29)
03
(KH-81)
M4
+(KH-01)
+(KH-02)
+(KH-03)
+(KH-04)
04
(KG-81)
M2
-(KG-03) -(KG-06)
05
(KH-82)
M6
+(KH-81)
+(KH-15) +(KH-16)
-(KH-13)
-(KH-14)
-(KH-19)
06
(KH-83)
M2
+(KH-81)
+(KG-81)
07
(KH-84)
M2
+(KH-83)
-(KH-82)
08
(KH-85)
M13
+(KH-07)
+(KH-08) +(KH-09) +(KH-10) +(KH-11) +(KH-12)
+(KH-31)
+(KH-32) +(KH-35) +(KH-36) +(KH-13) +(KH-14) +(KH-19)
09
(KH-86)
M13
+(KH-21)
+(KH-22) +(KH-23) +(KH-24) +(KH-25) +(KH-26)
+(KH-33)
+(KH-34) +(KH-37) +(KH-38) +(KH-13) +(KH-14) +(KH-19)
10
(KG-92)
M2
(KG-81) -(KG-81)
11
(KH-92)
M2
(KH-85) -(KG-92)
12
(TL-81)
M3
+(TL-03)
+(TL-04)
-(TL-13)
13
(TL-82)
M4
-(TL-09)
-(TL-10)
-(TL-11)
-(TL-12)
14
(TL-92)
M9
+(TL-81)
+(TL-05) +(TL-06)
+(TL-07)
+(TL-08)
+(TL-14)
+(TL-15)
+(TL-18)
+(TL-19)
15
(TL-93)
M11
+(TL-21)
+(TL-22)
+(TL-23)
+(TL-24)
+(TL-25)
+(TL-26)
-(TL-13)
+(TL-16)
+(TL-17)
+(TL-27) +(TL-28)
16
(CU-91)
M3
+(ER-39)
+(ER-40)
+(BT-33)
17
(CU-92)
M6
+(ER-42)
+(ER-43)
+(ER-44)
+(ER-46) +(ER-47) +(EM-75)
18
(RG-91)
M4
+(RG-01)
+(RG-02)
+(RG-03)
+(RG-08)
19
(RG-92)
M5
+(RG-04)
+(RG-06)
+(RG-07)
+(RG-10)
+(RG-11)
20
(BI-81)
M3
+(BI-55)
+(BI-56) +(BI-48)
21
(BI-82)
M18
+(BI-01)
+(BI-02) +(BI-67)
-(ER-62)
-(ER-63)
-(ER-48)
-(ER-78) -(ER-79)
-(ER-55)
-(ER-09)
-(ER-10)
+(BI-13)
87
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
+(BI-14)
(BI-83)
+(BI-58)
(BI-84)
-(JS-59)
(BI-85)
+(BI-63)
(BI-91)
+(BI-21)
(JS-81)
+(JS-01)
(JS-82)
-(FK-14)
(JS-83)
+(JS-51)
(JS-84)
-(DV-53)
(JS-85)
+(JS-59)
(JS-91)
+(JS-81)
+(JS-85)
(ER-91)
+(ER-05)
(ER-92)
+(ER-11)
(DV-81)
+(DV-51)
(DV-82)
+(DV-60)
(DV-91)
-(ER-91)
+(DV-81)
(SM-91)
+(SM-51)
-(EM-03)
(OR-81)
-(ER-23)
-(ER-34)
(OR-82)
+(OR-51)
(OR-83)
+(OR-56)
(OR-91)
+(OR-81)
+(OR-07)
(WB-81)
-(ER-44)
-(ER-19)
(WB-82)
+(WB-08)
(WB-84)
-(DV-61)
(WB-91)
(WB-81)
+(BI-68)
M2
+(BI-59)
M7
-(JS-60)
M3
+(BI-64)
M7
-(DV-51)
M4
+(JS-02)
M2
-(KH-14)
M3
-(OR-52)
M3
-(DV-55)
M7
+(JS-60)
M7
+(JS-82)
-(WB-53)
M2
+(ER-06)
M2
+(ER-12)
M4
+(DV-55)
M4
+(DV-64)
M9
-(ER-92)
+(DV-82)
M7
-(RG-07)
-(EM-05)
M9
-(ER-24)
-(ER-35)
M5
+(OR-52)
M3
+(OR-57)
M8
+(OR-82)
+(OR-08)
M12
-(ER-52)
-(ER-45)
M6
+(WB-09)
M4
+(WB-51)
M6
+(WB-82)
+(BI-69)
-(EM-55)
-(EM-62)
-(ER-49)
+(BI-61)
+(BI-66)
+(BI-82)
+(BI-84)
-(EM-44)
-(EM-45)
+(JS-53)
-(DV-56)
-(BI-57) -(BI-58)
-(BI-70) -(BI-60)
+(JS-83)
-(NR-08)
+(JS-84)
+(DV-56)
+(DV-53)
+(DV-61)
+(DV-58)
-(EM-80)
+(DV-57)
-(EM-81)
-(RG-10)
+(SM-02)
-(ER-30)
-(ER-86)
-(ER-31)
-(ER-20)
+(OR-53)
-(ER-98)
+(DV-04)
-(BI-61)
+(DV-05)
+(SM-03)
-(EM-58)
-(ER-99)
-(CS-55)
+(OR-83)
-(DV-57)
-(ER-53)
-(ER-68)
+(WB-10)
+(TL-82)
-(ER-38)
-(ER-58)
-(EM-18)
-(ER-59)
-(EM-19)
-(ER-07)
-(EM-75)
-(RG-06)
+(WB-12)
+(WB-13)
+(WB-54)
+(WB-60)
+(WB-84)
+(WB-53)
88
+(WB-59)
+(WB-52)
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
(NE-71)
+(NE-81)
(NE-72)
+(NE-85)
(NE-91)
+(NE-83)
(SR-91)
-(ER-84)
(SR-92)
+(DC-01)
(WR-91)
-(OR-83)
(NR-61)
-(ER-82)
(NR-62)
-(NR-09)
(NR-91)
-(NR-61)
-(EM-21)
(BT-99)
+(BT-33)
(BT-66)
+(BT-34)
(TH-91)
+(BT-38)
(TH-92)
(EM-12)
(FK-62)
-(FK-22)
(FK-63)
-(FK-23)
(FK-64)
-(FK-24)
(FK-67)
-(FK-27)
(FK-68)
-(FK-28)
(FK-69)
-(FK-29)
(FK-70)
-(FK-17)
(KH-63)
-(KH-23)
(KH-64)
-(KH-24)
(KH-65)
-(KH-25)
(KH-66)
-(KH-26)
(KH-67)
-(KH-27)
(KH-68)
-(KH-28)
(KH-69)
-(KH-33)
M2
+(NE-82)
M2
+(NE-86)
M3
+(NE-71)
+(NE-72)
M4
-(ER-85) -(TL-14)
-(TL-15)
M4
+(DC-02) +(TL-14)
+(TL-15)
M5
-(ER-80) -(ER-81)
-(EM-47) -(EM-48)
M4
-(ER-83)
-(ER-94) -(ER-97)
M2
-(NR-10)
M12
-(ER-56)
+(NR-05)
+(NR-06)
+(NR-07)
+(NR-08)
-(EM-22)
-(EM-25)
-(EM-26)
-(EM-53)
-(EM-57)
M4
+(BT-38) -(ER-41)
-(EM-09)
M2
+(BT-35)
M5
+(EM-07)
+(EM-08)
+(EM-10)
-(BT-99)
M6
+(EM-13)
+(ER-21)
+(BT-37)
-(ER-22) -(ER-33)
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
M1
89
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
(KH-70)
-(KH-34)
(TL-61)
-(TL-21)
(TL-62)
-(TL-22)
(TL-63)
-(TL-23)
(TL-64)
-(TL-24)
(TL-65)
-(TL-25)
(TL-66)
-(TL-26)
(EC-95)
-(ER-20)
(EC-61)
-(EM-18)
(EC-62)
(EM-15)
(EC-63)
(BT-37)
(EC-64)
-(EC-62)
(EC-65)
(EM-44)
(EC-66)
(EM-41)
(EC-67)
(ER-95)
(EC-68)
(EM-42)
(EC-69)
(EM-43)
(EC-70)
-(ER-09)
(EC-71)
(EM-03)
(EC-72)
(EM-04)
(EC-73)
(EM-55)
(EC-74)
(EM-56)
(TC-91)
(EM-07)
(ER-39)
(TS-92)
(TS-05)
(MR-92)
(MR-01)
(RN-95)
+(FK-92)
-(TH-91)
(RN-96)
M1
M1
M1
M1
M1
M1
M1
M1
M2
-(EM-19)
M2
+(EM-16)
M2
+(BT-39)
M2
-(EM-17)
M2
+(EM-45)
M4
+(EM-46) +(EM-47) +(EM-48)
M2
-(ER-96)
M2
+(EM-60)
M2
+(EM-61)
M2
-(ER-10)
M2
+(EM-05)
M2
+(EM-06)
M2
+(EM-62)
M2
+(EM-63)
M7
+(EM-08)
+(EM-09)
+(EM-10)
+(ER-40)
+(ER-41)
M2
+(TS-06)
M2
+(MR-02)
M9
+(KH-92)
+(KG-92)
+(TL-92)
-(NE-83)
+(RG-92)
+(TS-92)
M10
90
-(CU-91)
+(MR-92)
100
-(BI-91)
-(SM-91)
(RN-97)
+(RN-95)
-(JS-91) -(DV-91)
-(NE-91) -(SR-91)
M2
-(RN-96)
-(OR-91)
-(WR-91)
-(WB-91)
-(NR-91)
END
-----------------------------------------------------------------------------------------------------------
91
ANNEXURE-C
DATA COLLECTING LOCATION IN EASTERN REGION & CONTACT NO DETAILS
Concerned
Person/Stn name
Contact No.
Contact No.
POWERGRID
1
Ara
06182-234125/233085
SUDIP DAS
HANSRAJ
9431820255
09431815689
Baripada
06792-279298/279280
MR. BEHRA
S.P.KAR
9437575638
9437575657
Birpara
S.K.SIL
9434748294
Biharsarif
06112-290607
AK GOYAL
Durgapur
0343-2562915/ 2563297
M.S.DATA
Gangtok
03592-250181/251259
T BARUA
9434748299
Indravati
06673-252296/ 252301/252429
MR.EKKA
9937651156
Jeypore
06854-231634/ 232155
ESHWAR RAO
9437962178/176
Jamshedpur
0657-3294096/ 3293751
10
Malda
11
Maithon
0341-2531489/
9434740039(CM)
12
Malbase
00975-17604606
MR. PHUNTSHOK
KHATRI SB
9434748261
9434748039
9434740039
9434748285
9434748301
07032 (VOIP)
009755272805
13
Muzaffarpur
0621-2273166
M.K.JHA
A SRIVASTAV
9431820298
9431820294
14
Patna
9431820234
JAGAT RAM
ENAYAT SHAMEEM
9431820252
9939624037
15
Purnea
06454-222409/ 222363,
RAJESH
SR ENGINEER
9431821127
9431820310
16
Ranchi
0651-6450205/204
PRADEEP VERMA
9431820337
17
Rengali
06760-277258/ 277254
S. NAIK
RATRA
9437962194
9437962197
18
Rourkela
0661-2600009/ 2600202/
94370 41202
J R YADAV
9437575652
19
Siliguri
0353-2568851/ 2568801/03561248001
20
N. sILIGURI
21
Sasaram
22
subhashgram
T DAS
BHASKAR
MANAS PAUL
P MANI
PANKAJ KUMAR
SUMIT KUMAR
B.S.RAUT RAY
9474379038
9434748230
9434748210
9434748270
9431820322
9431820327
9434748254
23
Salakati(NER)
03661-282309/282407
S.K. SINGH
24
Rihand
05446-252042
SHAILENDRA
9434740009
9415458662
08808050906
25
NERLDC
03642231933/2231714(Comml)
9436335371
022-28302209
USHA
SUITTE
735022 (VOIP)
98694044539
25
WRLDC
09431820315
9431821123
9434748028/8031
9434740025
9431815721
06187-225527/ 225737
92
ANJANI KUMAR
SANTOSH
N KUMAR
SARKAR
28202690/28314609
EPABX
26
NRLDC
011-26854585
NEERAJ
27
SRLDC
080-22263463
RATI NAYAR
9910907949
9650009856
9449599189
03512-226120/ 226121/
226145/226147
S. NAG
ZULFIKAR
9434039376
9434751554
R K MANDAL
ASHOK SARKAR
S. PRADHAN
S K.SAHOO
S K MISHRA
H. SAHA
P K DAS
9431600132
9874824541
9437040520
9437041796
9800048849
9800003939
9800003801
S. No
GENERATING STATIONS
Farakka
Kahalgoan
Talcher
Rangit
06429-272354/272175// 222643/
222234/ 222246/ 222649
06760-247405/247407/ 247409
9437213961
03595-250845/ 250636
Teesta-v
03592-247210
DVC(Bihar)
0612-2233684/ 2262427
ANEES
9955997175
WBSEB/DVC
S. GANGULY
TINKU
9830086119
9903213518
GRIDCO
0671-2315184/ 2300803/
PRAKASH RAY
94370 00004
JHARKAND
ARINDAM BOSE
SHAKIL
Sikkim
03595-270204/9434084228
9835505108
9430730503
9434012129
03592248204
9006533874
9431490821
9430957073
BSEB
7
8
9
MELLI
A K SINGH
MITHILES
PANDIT
9934279317/bhagalpur
BIharShariff
Sabour
0641-2451657/ 2451656
Sultanganj
9430862343
INJILA KUMARI
9430862343
Dehri
06184-253141
U P SAHNI
9431845268
11
Sonnagar
9204319122
12
Pipri(UP)
08808050906
KALIMPONG
0355-2255542
DVC
06450 (252700)/252266
10
23591927
13
WBSEB
23591930-44
26886232(CLD)
23557788
06540 - 234837(CLD)
14
JSEB, Patratu
15
06540-234634
0651-2490423/ 2490835/
2508290/ 25083816
0651-2505413
R. B. BAL
B K CHAURAS
GM TRANSMISSION
JITENDRA KISHORE(CRITL)
BSEB
16
17
NTPC, Kol
NTH, Kol
18
L&T
19
20
Sanjay ghosh
RChandarpur
ERPC(9432490594)
9431707321
21
GRIDCO SLDC
0674-2748961
22
JINDAL/Gridco
DAS sb(9437000261)
(0612) 2504285/2227557
SLDC
22823530/ 22821755
27791231/ 27791531
SUKRAM
PARI
SUSHIL
SHYAM KEJRIWAL
JODA
SENGUPTA
TARKERA
22823302
93
9433429115
9830962879
9836732853
9831919509
09437336402
9437306390
0661-2664479
Fax 2748509
2748089
94