Sunteți pe pagina 1din 3

02/05/2016

OIL, GAS GATHERING SYSTEMS PLANNED IN GULF - Oil & Gas Journal

OIL, GAS GATHERING SYSTEMS


PLANNED IN GULF
07/17/1995

Units of two large U.S. interstate gas pipeline companies are forming a partnership to build a $60
million gathering system in the Gulf of Mexico.
The proposed system will gather crude oil, gas, and condensate from production facilities in the
Main Pass and Viosca Knoll federal planning areas (52748 bytes).
Wells in the Main Pass area generally arc in relatively shallow water and close to shore, while
Viosca Knoll developments mostly are in deep water of the gulf's Outer Continental Shelf.
Project sponsors are Centana Energy Corp., a unit of Panhandle Eastern Corp., Houston; and
CNG Energy Services Corp., a unit of Consolidated Natural Gas Co., Pittsburgh.
The proposed gathering system's gas and condensate handling facilities and pipeline segments
are to be ready to begin service in first quarter 1996, with oil gathering facilities to go on line in
fourth quarter 1996.
Design of the gathering system will enable it to transport 25,000 b/d of oil, 300 MMcfd of gas, and
5,000 b/d of condensate.
Russell Gifford, president of CNG Energy Services, said Main Pass and Viosca Knoll productive
capacity has surpassed the capacity of gathering lines in the areas.
Adding gathering capacity will allow operators to continue developing reserves in an important
producing area, he said.
In addition, said Centana Pres. Jim Mogg, the project underscores Centana's commitment to
gathering hydrocarbons produced in the Gulf of Mexico.
http://www.ogj.com/articles/print/volume-93/issue-29/in-this-issue/transportation/oil-gas-gathering-systems-planned-in-gulf.html

1/3

02/05/2016

OIL, GAS GATHERING SYSTEMS PLANNED IN GULF - Oil & Gas Journal

MAIN SYSTEM COMPONENTS

Centana and CNG plan to lay 30 miles of 20 in. gas pipeline to an existing Texas Eastern
Transmission Corp. line on Main Pass Block 165 from a structure on Main Pass South & East
Addition Block 225. Plans include laying a 17 mile gas spur from Main Pass 225 to Viosca Knoll
Block 826. Diameter of the latter line was not disclosed.
The project is to include separation, dehydration, condensate handling, and gas compression
facilities on Main Pass 225. Partners are to lay a 6 mile condensate line to connect processing
facilities on Main Pass 225 with Shell Oil Co.'s Cobia pipeline from Shell Offshore Inc.'s Bud
platform in the Main Pass area.
The gathering system's oil component is to consist of a 28 mile line connecting Viosca Knoll
Block 826 with Shell's Cobia line on Main Pass South & East Addition Block 289.
Partners said capacities of the oil line and 17 mile gas spur will be at least 25,000 b/d and 30
MMcfd, respectively. That is the projected output of the spar based production system planned to
develop Neptune field on Block 826. The lines could be larger if other producers in the area
agree to tie into the Centana-CNG gathering system.
Neptune partners Oryx Energy Co., Dallas, and CNG Producing Co., New Orleans, expect to
install the spar in 2,000 It of water on Viosca Knoll 826 in time to start production from the tract
early in 1997 (OGJ, Nov. 21, 1994, p. 33).
Gifford said the project combines Centana's experience designing and operating offshore
gathering pipelines with CNG Energy Services's reserves and operating expertise.
"Technology and experience will be particularly important as oil and gas gathering systems are
extended to production areas in deeper water," he said.
Centana will operate the gathering system's gas and condensate pipelines and CNG Energy
Services the oil line.

Copyright 1995 Oil & Gas Journal. All Rights Reserved.

1455 West Loop South

Home

Events

General Interest

Market Connection

Exploration & Development

White Papers

Drilling & Production

Webcasts

Processing

PennEnergy Jobs

http://www.ogj.com/articles/print/volume-93/issue-29/in-this-issue/transportation/oil-gas-gathering-systems-planned-in-gulf.html

2/3

02/05/2016

OIL, GAS GATHERING SYSTEMS PLANNED IN GULF - Oil & Gas Journal

Houston, Texas 77027

Transportation

Equipment

(713) 621-9720

Unconventional

Research

GIS Data & Maps


Copyright 2016: PennWell Corporation

RSS

All Rights Reserved.


Advertise

About Us

New sletter Subscription

PennWell

Book Store

View All Pennw ell Websites

Privacy Policy

View All Pennw ell Events

Terms & Conditions

Site Map

Contact Us

Webmaster

Magazine Subscription
Mobile

http://www.ogj.com/articles/print/volume-93/issue-29/in-this-issue/transportation/oil-gas-gathering-systems-planned-in-gulf.html

3/3

S-ar putea să vă placă și