Jomel P. Cua
Pamantasan ng Lungsod ng Maynila
Bachelor of Science in Manufacturing Engineering (BS MfgE)
Manho
ur
24
24
Objective
To
create/
establish
a
checklist
for
production
personnel
during
inspection/
line clearance
To be familiar
in
the
production
process
of
pasta and for
the creation of
5S/GMP
Checklist
1st week
of May
24
2nd week
of May
24
2nd week
of May
24
To
create/
establish
a
checklist
for
production
personnel
during
inspection/
line clearance
To be familiar
in
the
production
process
of
feeds
during
inspection/
line clearance
Applicability to
Curriculum
Safety
Engineering
Safety
Management
Engineering
Management
Machine
Shop
Theory
Workshop Theory
Industrial
Processes
Production
Systems
Instrumentation
and Control
Engineering
Management
Operations
Research
Safety
Engineering
Safety
Management
Engineering
Management
Machine
Shop
Theory
Workshop Theory
Industrial
Processes
Production
Systems
Instrumentation
and Control
Engineering
Management
Operations
Research
Safety
Engineering
Safety
Management
Engineering
Management
Machine
Shop
Theory
Workshop Theory
Activity
Output
5S
Sanitation
Checklist
for PFMC
Flour Mill
(Including
all
equipmen
t)
5S
Sanitation
Checklist
per
floor
per
equipment
for PFMC
Flour Mill
On-Site
Verificatio
n
and
process
familiariz
ation
of
Pasta
Productio
n
Process
familiariza
tion
and
list of all
equipment
and areas
in
MTPCI
Plant
5S
Sanitation
Checklist
for MTPCI
(Including
all
equipmen
t)
5S
Sanitation
Checklist
per
floor
per
equipment
for MTPCI
On-Site
Verificatio
n
and
process
familiariz
ation
of
Feeds
Productio
n
Process
familiariza
tion
and
list of all
equipment
and areas
in
PFMC
Feed mill
5S
Sanitation
Checklist
for PFMC
Feed Mill
(Including
all
equipmen
t)
5S
Sanitation
Checklist
per
floor
per
equipment
for PFMC
Feed Mill
3rd week
of May
24
3rd week
of May
32
4th week
of May
16
4th week
of May
32
4th week
of May /
(May 27,
2016)
May 27,
2016
8
To create a
database
of
all the CAR
received and
their current
status.
To gather all
the necessary
data for the
establishment
and
improvement
of
waste
management
Engineering
Management
Operations
Research
Correctiv
e Action
Requests
Updating
CAR
Status
Google
Sheet
Environmental
Engineering
Safety
Management
Project Feasibility
Study
Undergraduate
Research
Six-Sigma
Environmental
Engineering
Safety
Management
Project Feasibility
Study
Undergraduate
Research
Six-Sigma
Waste
Generatio
n
Data
Gathering
Data
regarding
waste
generated
for
PFMC/MTP
CI
Analysis
of
Data
Gathered
Environmental
Engineering
Safety
Management
Project Feasibility
Study
Undergraduate
Research
Six-Sigma
To check the Presentation
learnings
imparted
to
the
trainee
based on the
QM process.
To have a final Report Making
basis for the
evaluation
grade of the
trainee.
Creation
of
Program
for Waste
Generatio
n
Reduction
Data
interpretat
ion
of
what kind
is
the
most
generated
waste,
area/depar
tment that
greatly
contribute
s in waste
generation
. Also with
the
time
or
the
month
which
generates
most
waste
Program
for waste
generation
reduction
To
convert
gathered data
into
information
that is needed
for
the
establishment
and
improvement
of
waste
management
To establish or
improve
the
current waste
management
program
of
the company
based on the
acquired data
Presentati
on
of
Learnings
Learnings
End
of
Internship
End
of
internship
report
Prepared By:
Noted by:
Emyl V. Fortuny
Management Representative
Conforme:
Jomel P. Cua
BS MfgE