Internship Activity Schedule

Philippine Foremost Milling Corporation


Corporate QA Total Quality Management Department
Name:
University:
Curriculum:
Date
Last week
of April
(Up
to
April 26,
2016)

Last week
of
April
(Up
to
April 29,
2016)

Jomel P. Cua
Pamantasan ng Lungsod ng Maynila
Bachelor of Science in Manufacturing Engineering (BS MfgE)
Manho
ur

24

24

Objective
To
create/
establish
a
checklist
for
production
personnel

during
inspection/

line clearance

To be familiar
in
the
production

process
of
pasta and for
the creation of
5S/GMP

Checklist

1st week
of May

24

2nd week
of May

24

2nd week
of May

24

To
create/
establish
a
checklist
for
production
personnel

during
inspection/

line clearance

To be familiar
in
the
production

process
of
feeds

and for the


creation
of
5S/GMP
Checklist
To
create/
establish
a
checklist
for
production
personnel

during
inspection/

line clearance

Applicability to
Curriculum
Safety
Engineering
Safety
Management
Engineering
Management
Machine
Shop
Theory
Workshop Theory
Industrial
Processes
Production
Systems
Instrumentation
and Control
Engineering
Management
Operations
Research
Safety
Engineering
Safety
Management
Engineering
Management
Machine
Shop
Theory
Workshop Theory
Industrial
Processes
Production
Systems
Instrumentation
and Control
Engineering
Management
Operations
Research
Safety
Engineering
Safety
Management
Engineering
Management
Machine
Shop
Theory
Workshop Theory

Activity

Output

5S
Sanitation
Checklist
for PFMC
Flour Mill
(Including
all
equipmen
t)

5S
Sanitation
Checklist
per
floor
per
equipment
for PFMC
Flour Mill

On-Site
Verificatio
n
and
process
familiariz
ation
of
Pasta
Productio
n

Process
familiariza
tion
and
list of all
equipment
and areas
in
MTPCI
Plant

5S
Sanitation
Checklist
for MTPCI
(Including
all
equipmen
t)

5S
Sanitation
Checklist
per
floor
per
equipment
for MTPCI

On-Site
Verificatio
n
and
process
familiariz
ation
of
Feeds
Productio
n

Process
familiariza
tion
and
list of all
equipment
and areas
in
PFMC
Feed mill

5S
Sanitation
Checklist
for PFMC
Feed Mill
(Including
all
equipmen
t)

5S
Sanitation
Checklist
per
floor
per
equipment
for PFMC
Feed Mill

3rd week
of May
24

3rd week
of May

32

4th week
of May

16

4th week
of May

32

4th week
of May /
(May 27,
2016)

May 27,
2016
8

To create a
database
of
all the CAR
received and
their current
status.
To gather all
the necessary
data for the
establishment
and

improvement
of
waste
management

Engineering
Management
Operations
Research

Correctiv
e Action
Requests
Updating

CAR
Status
Google
Sheet

Environmental
Engineering
Safety
Management
Project Feasibility
Study
Undergraduate
Research
Six-Sigma
Environmental
Engineering
Safety
Management
Project Feasibility
Study
Undergraduate
Research
Six-Sigma

Waste
Generatio
n
Data
Gathering

Data
regarding
waste
generated
for
PFMC/MTP
CI

Analysis
of
Data
Gathered

Environmental
Engineering
Safety
Management
Project Feasibility
Study
Undergraduate
Research
Six-Sigma
To check the Presentation
learnings
imparted
to
the
trainee
based on the
QM process.
To have a final Report Making
basis for the
evaluation
grade of the
trainee.

Creation
of
Program
for Waste
Generatio
n
Reduction

Data
interpretat
ion
of
what kind
is
the
most
generated
waste,
area/depar
tment that
greatly
contribute
s in waste
generation
. Also with
the
time
or
the
month
which
generates
most
waste
Program
for waste
generation
reduction

To
convert
gathered data
into

information
that is needed
for
the
establishment
and
improvement
of
waste
management

To establish or
improve
the
current waste
management
program
of
the company
based on the
acquired data

Presentati
on
of
Learnings

Learnings

End
of
Internship

End
of
internship
report

Prepared By:

Noted by:

Emyl V. Fortuny

Carla Gracia M. Orca

Management Representative

Deputy Management Representative

Conforme:

Jomel P. Cua