Industrial training is one of condition that compulsory to be filled by students of College Poly-Tech
Mara Kuala Lumpur to keep condition to get degree recognition. Industrial training also one of
Bcs(Hons) Business Information Technology with International Business subject that must be
completed to fulfill in second year that is 14 January 2013 until 8 March 2013 equivalent to 8weeks.
iLa NaBiLa
Follow

Wednesday, 6 March 2013

Blog Archive

Training Progress Week - 8

2013 (8)
March (8)
Training Progress Week - 8
Traning Progress Week - 7

Date :4 /03/2013- 8/03/2013

Training Progress Week - 6

Activity :

Training Progress Week - 5


Training Progress Week - 4
Training Progress Week - 3

This is my last week for internship progress .


Im so happy becaused I had learned so many
things and experienced in this new field of work.

Assalammualaikum and Thanks for viewing my


blog.

Training Progress Week - 2


Training Progress Week - 1

About Me
iLa NaBiLa
Follow

Posted by iLa NaBiLa at 12:17


Reactions:

funny (0)

interesting (0)

1 comment:
+2 Recommend this on Google

http://ilanabilas.blogspot.com.ng/

cool (2)

19

Hi, my name is
Nabilah Binti Ahmad
Termizi. I was born
on 23 May 1990 at Hospital Taiping
Perak. I am 23 this year. I lived at
Rawang, Selangor. Im the eldest of 6
siblings. Currently im studying at Kolej
Poly-Tech Mara Kuala Lumpur and
taking Degree in International
Business.

Page 1 of 6

INTERNSHIP LOGBOOK

5/5/16, 12:22 PM

View my complete profile

Traning Progress Week - 7


0

Date : 25/02/2013 - 1/03/2013

Activity :

In this week I work at office. I maintain and


update filing, inventory, mailing, and database
systems, either manually or using a computer.
Ive operate office machines, such as photocopiers
and scanners to make a duplicate file, facsimile
machines to sent letter to other organization, and
make report on personal computers.
Compile, copy, sort, and file records of office
activities, business transactions, and other
activities. Check all the mail bills, contracts,
policies, invoices to prevent a complained such as
unpaid bills, reply letter form other organization.
Complete work schedules, manage calendars and
arrange appointments for my supervisor.

Posted by iLa NaBiLa at 12:16


Reactions:

funny (0)

interesting (0)

cool (2)

No comments:
+1 Recommend this on Google

Training Progress Week - 6


Date : 18/02/2-13 -22/02/2013

Activity :

I went to construction site with my supervisor to


learned and watched what kind of job and task
http://ilanabilas.blogspot.com.ng/

Page 2 of 6

INTERNSHIP LOGBOOK

5/5/16, 12:22 PM

that had in construction site. What I learned is


driveway construction method.
The contractor shall provide all labor, materials
and equipment necessary to construct one asphalt
driveway at the pump station as shown on the
detailed drawings.
I had met with the workers and the contractor
discussed about the work on site.
I also handled a problem on site such as gas pipe
leaking, upgrading the pump station to called the
contractor to repair or upgrading the pump
station.
Arranged the equipment requirement on site
manage the delivery schedule on time.

Posted by iLa NaBiLa at 12:15


Reactions:

funny (0)

interesting (0)

cool (0)

1 comment:
+1 Recommend this on Google

Training Progress Week - 5


Date : 11/02/2013 - 15/02/2013

Activity :

Chinese New Year Public Holidays.

Posted by iLa NaBiLa at 12:14


Reactions:

funny (0)

interesting (0)

cool (0)

No comments:
+1 Recommend this on Google

http://ilanabilas.blogspot.com.ng/

Page 3 of 6

INTERNSHIP LOGBOOK

5/5/16, 12:22 PM

Training Progress Week - 4


Date : 4/02/2013 8/02/2013

Activity :
This week I had learned new experience. I
followed my supervisor to attend a meeting and
meet clients at construction site about the project
been held.
My supervisor teach me how to handle a meeting
with clients. Before the meeting, I need to prepare
some documents and proposal that I need to
present with my supervisor.
In the meeting environment, I learned many
things that can be useful in my career.
Posted by iLa NaBiLa at 12:13
Reactions:

funny (0)

interesting (0)

cool (1)

No comments:
+1 Recommend this on Google

Training Progress Week - 3


Date: 28/01/2013 1/2/2013

Activity :

Supervisor helps me how to write a Letter of


Award. This letter is the of confirmation to
show that the place is undertaken by our
company.
Supervisor insist to taught me how make a
template. Template consist of all project
location had been done by the company. We
also need to key in and calculate total profit
and company loss.
http://ilanabilas.blogspot.com.ng/

Page 4 of 6

INTERNSHIP LOGBOOK

5/5/16, 12:22 PM

The supervisor also gave ways to track


construction supply inventory in and out and
how to approve supply orders.
All project proposal requirement are been
handled by me that I arranged the document in
files store. All file I managed according to
alphabet orders.
The supervisor told me that I have the ability to
learned in multitasking and meet changing
deadlines

Posted by iLa NaBiLa at 12:12


Reactions:

funny (0)

interesting (0)

cool (1)

No comments:
+2 Recommend this on Google

Training Progress Week - 2


Date : 21/1/2013 25/1/2013

Activity :

Learning how to do Microsoft Excel formula.


Microsoft Excel formula used in the process of
data entry. So when I do the process of storing
data and entering data I would use the formula to
facilitate key in any data. This way and formula
have been taught by my supervisor. He want me to
learn and taught the easy way when to do data
entry. In this process I can learn new things and
will be useful in the future.
I also had been assist how to maintaining files and
databases. Supervisor taught me the way to
organized collection of data. The data is typically
organized to relevant aspects. The utilization of
databases is now spread to such a wide degree that
virtually every technology and product relies on
http://ilanabilas.blogspot.com.ng/

Page 5 of 6

INTERNSHIP LOGBOOK

5/5/16, 12:22 PM

databases.
The supervisor assist me how to prepare report,
correspondence and template. He construct how
to make a report after construction site
visit, During the site visit, we were exposed to
various construction methods, machineries and
also had the chance to observe the construction of
pump station.

Posted by iLa NaBiLa at 12:10


Reactions:

funny (2)

interesting (1)

cool (3)

1 comment:
+2 Recommend this on Google

Home

Older Posts

Subscribe to: Posts (Atom)

Fish
Safari Power Saver
Click to Start Flash Plug-in

Watermark template. Powered by Blogger.

There was an error in this gadget

http://ilanabilas.blogspot.com.ng/

Page 6 of 6

S-ar putea să vă placă și