SAUDI ARAMCO ID/PID - REV 1 - 5/18/05 (Standards Cutoff - August 2004)

SAUDI ARAMCO TYPICAL INSPECTION PLAN


Hydrostatic Testing of On-Plot Piping

SATIP No.

PROJECT TITLE:

WBS/BI/JO/NO.

ITEM
NO.

1.0

PROJECT PHASE &


Activity Code

TASK / ACTIVITY

APPROVED DATE

SATIP-A-004-02

QUALITY
PROCEDURE

QUALITY
RECORD

DISCIPLINE:

MECHANICAL

25-May-05
CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ASSIGNMENTS
CNTRCTR

SAUDI
ARAMCO

REMARKS

DOCUMENT REVIEW

1.1

Hydrostatic testing Procedure

SAIC-A-2001

RH1

RH1

1.2

Review of Test Package Preparation

SAIC-A-2003

RH1

R2

1.3

Line Flushing or Internal Cleanliness


Procedure

SAIC-L-2001

RH1

RH1

1.4

Lay-Up Procedure

SAIC-A-2007

RH1

R1

Verification of Testing Media for


Hydrostatic Testing

SAIC-A-2008

SAIC-A-2008
SATR-A-2014

RH1

R1

3.1

Pre-Test Punch Listing

SAIC-A-2010

SATR-A-2007

H1

H1

In Conjunction with SATIP-L-350-01

3.2

Internal Cleanliness or Flushing

SAIC-L-2017

SAIC-L-2017
SATR-A-2008

H1

H1

In Conjunction with SATIP-L-350-01

Forms SATR-A-2003 & SATR-A-2004 shall be


used for 24-hr recorded hydrostatic test, Ie;
underground piping or piping whose joints are
covered before pressure testing.

2.0

This is in conjunction with SATIP-L-350-01or with


the applicable piping/equipment SATIP.

MATERIAL RECEIVING

2.1
3.0

* See Note 1 (General Notes)

APPLICATION

3.3

Test Preparation & Verification of


Testing equipment (including safety
requirements)

3.4

Filling & Pressurization

SAIC-A-2013

3.5

Visual Inspection at Test Pressure

SAIC-A-2015

3.6

Pneumatic Testing of Reinforcing pads


covering Pressure containing Welds

SAIC-A-2016

SAIC-A-2009

SATR-A-2002
SATR-A-2003
SATR-A-2004
SATR-A-2005
SATR-A-2006
SATR-A-2001
for test
Manifold)
SAIC-A-2009

H1

W1

SAIC-A-2013

W1

H1

H1

W1

W1

SAIC-A-2015
SATR-A-2001
SAIC-A-2016
SATR-A-2001

Page 1 of 2

SAUDI ARAMCO ID/PID - REV 1 - 5/18/05 (Standards Cutoff - August 2004)

SAUDI ARAMCO TYPICAL INSPECTION PLAN


Hydrostatic Testing of On-Plot Piping

SATIP No.

PROJECT TITLE:

WBS/BI/JO/NO.

ITEM
NO.

4.0

PROJECT PHASE &


Activity Code

TASK / ACTIVITY

APPROVED DATE

SATIP-A-004-02

QUALITY
PROCEDURE

QUALITY
RECORD

DISCIPLINE:

25-May-05

MECHANICAL

CONTRACTOR/SUBCONTRACTOR

INSPECTION RESPONSIBILITY
ASSIGNMENTS
CNTRCTR

SAUDI
ARAMCO

REMARKS

POST- TEST

4.1

De-Pressurization & Water Disposal

SAIC-A-2017

SAIC-A-2017

W1

4.2

Lay-up

SAIC-A-2018

SATR-A-2009

H1

W1

GENERAL NOTES
1

The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust
the levels of Saudi Aramco participation based upon the Contractors performance.

Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization.

Witness:
QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC
organization representative is not present.

Hold:
QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in
attendance.

If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

LEGEND
W1

100% Witness Inspection/Test

H2

Sample Hold Point for QC Inspection or Test

RH1 100% Review and Approval of Documents

W2

Sample Witness Inspection/Test

R1

100% Review of Documents

RH2 Sample Review and Approval of Documents

H1

100% Hold Point for QC Inspection or Test

R2

sample Review of Documents

Page 2 of 2