Sunteți pe pagina 1din 7

Contractor

Owner

Main Subcontractor

PROJECT NAME: Khabat Thermal Power Plant Units 1&2


OWNER: Ministry of Electricity of Kurdistan Regional Goverment
CONTRACTOR: POSCO Engineering & Construction Co. Ltd.
MAIN SUBCONTRACTOR: GAMA Power Systems Engineering &
Contracting Inc.
PROJE REFERENCE NO:
Re
v
A

Revision
Date
15.09.201
5

Description
For Review

Revision History
Created by
Checked by
A.E.
AKMAN

Emission
Status

Return
Status

B. GKCE

Vendor doc No.:

Vendor Logo

Approved by

Document Code :

Title, Subtitle

CT
TEST REPORT

Format
A4

Rev. A

Date
15.09.2015

Lang.
En

Date
15.09.2015

Project: Khabat Thermal Power Plant Units 1&2

Project No.

ISSUE DATE
15/09/2015

ENG. N
CT TEST REPORT

SH/OF
2/7

CLIENT N

REV.

Summary

Page

Revision
A

LIST OF REQUIRED TEST EQUIPMENT

CHARACTERISTICS

MECHANICAL CHECKS

ELECTRICAL CHECKS

5. INSULATION RESISTANCE MEASUREMENT

6. POLARITY CHECK

7. SECONDARY RESISTANCE MEASUREMENT

8. RATIO CHECKS

9. BURDEN TEST

10. SATURATION CURVES

KESR Mh. Elektrik


ti.
Date
Name
Signature

Project: Khabat Thermal Power Plant Units 1&2

Project No.

ISSUE DATE
15/09/2015

ENG. N
CT TEST REPORT

SH/OF
3/7

CLIENT N

REV.

1. LIST OF REQUIRED TEST EQUIPMENT


Test equipment
Manufacturer / Type

Revision

Serial No

OMICRON / CPC 100

FLUKE / 179

MEGGER / S2-552/2

SVERKER / 760

KESR Mh. Elektrik


ti.
Date
Name
Signature

Project: Khabat Thermal Power Plant Units 1&2

Project No.

ISSUE DATE
15/09/2015

ENG. N
CT TEST REPORT

SH/OF
4/7

CLIENT N

REV.

2. CHARACTERISTICS
Phase
R

Phase
S

Phase
T

S1-S3

S1-S3

S1-S3

S1-S3

S1-S3

S1-S3

S1-S3

S1-S3

S1-S3

S1-S3

S1-S3

S1-S3

Manufacturer
Year
Type
Ith

CORE N 1:
Reference
Ratio
Serial Number
Power
Class

CORE N 2:
Reference
Ratio
Serial Number
Power
Class

CORE N 3:
Reference
Ratio
Serial Number
Power
Class

CORE N 4:
Reference
Ratio
Serial Number
Power
Class

KESR Mh. Elektrik


ti.
Date
Name
Signature

Project: Khabat Thermal Power Plant Units 1&2

Project No.

ISSUE DATE
15/09/2015

ENG. N
CT TEST REPORT

SH/OF
5/7

CLIENT N

REV.

3. MECHANICAL CHECKS
Designation

Phase
R

Phase
S

Phase
T

Phase
R

Phase
S

Phase
T

Phase
R

Phase
S

Phase
T

Visual inspection
Orientation (P1/P2)
Name plate
HV connections indentification
LV connections identification
Connections tighteness
No gas leakage

4.

ELECTRICAL CHECKS
Designation
Grounding
Primary connections
Secondary connections

5.

INSULATION RESISTANCE MEASUREMENT


Reference

Applied voltage and time

1S1-1S2-1S3

500 Vdc 1 mn

2S1-2S2-2S3

500 Vdc 1 mn

3S1-3S2-3S3

500 Vdc 1 mn

4S1-4S2-4S3

500Vdc 1mn

KESR Mh. Elektrik


ti.
Date
Name
Signature

Project No.

Project: Khabat Thermal Power Plant Units 1&2

ISSUE DATE
15/09/2015

ENG. N
CT TEST REPORT

SH/OF
6/7

CLIENT N

REV.

6. POLARITY CHECK
Phase
R

Secondary

Phase
S

Phase
T

Phase
S

Phase
T

1S1-1S3
2S1-2S3
3S1-3S3
4S1-4S3

7. SECONDARY RESISTANCE MEASUREMENT


Winding

Theorical value

1S1-1S3

2S1-2S3

3S1-3S3

4S1-4S4

Ambiant Temperature: 18 C

KESR Mh. Elektrik


ti.
Date
Name
Signature

Phase
R

Project No.

Project: Khabat Thermal Power Plant Units 1&2

ISSUE DATE
15/09/2015

ENG. N
CT TEST REPORT

SH/OF
7/7

CLIENT N

REV.

8. RATIO CHECK
Phase

Winding

Primary current
value

Secondary current
measured value

Theorical
Ratio

Calculated Ratio

1S1-1S3
2S1-2S3

3S1-3S3
4S1-4S3
1S1-1S3
2S1-2S3

3S1-3S3
4S1-4S3
1S1-1S3
2S1-2S3

3S1-3S3
4S1-4S3

9. BURDEN TEST
Winding

Injected current value

1S1 - 1S3
2S1 - 2S3
3S1 3S3
4S1 - 4S3

10.

SATURATION CURVES

See attached reports :

KESR Mh. Elektrik


ti.
Date
Name
Signature

Phase
R

Phase
S

Phase
T

Results