Production Planning for


Process Industries
(PP-PI)
Configuration Pack
Published by Team of SAP
Consultants at SAPTOPJOBS
Visit us at www.sap-topjobs.com

Copyright 2008-10@SAPTOPJOBS

All rights reserved. No part of this publication may be reproduced, stored in a


retrieval system, or transmitted in any form, or by any means electronic or
mechanical including photocopying, recording or any information storage and
retrieval system without permission in writing from SAPTOPJOBS

INDEX
1.

PRODUCTION PLANNING - PROCESS INDUSTRIES (PP-PI)

2.

DEFINE PROFILE WITH DEFAULT VALUES

3.

ASSIGN MATERIAL TYPES

10

4.

DEFINE RECIPE STATUS

13

5.

DEFINE RECIPE USAGE

16

6.

DEFINE PRIORITY SEQUENCE FOR AUTO RECIPE SELECTION

19

7.

DEFINE ORDER TYPES

22

8.

DEFINE ORDER TYPE DEPENDENT PARAMETER

26

9.

DEFINE NUMBER RANGE

36

10.

DEFINE CONFIRMATION PROFILE

39

11.

PROCESS MANAGEMENT

47

12.

TRANSPORT PREDEFINED CHARACTERISTICS

50

13.

TRANSPORT PREDEFINED MESSAGE CATEGORIES

52

14.

DEFINE AND SETUP CONTROL RECIPE DESTINATION

57

15.

DEFINE PROCESS MESSAGE CHARACTERISTICS

64

16.

DEFINE AND SETUP MESSAGE DESTINATIONS

69

17.

DEFINE AND SETUP PROCESS MESSAGE CATEGORIES

72

18.

PROCESS INSTRUCTION CATEGORY

78

19.

SUMMARY:-

86

1.

Production Planning - Process Industries (PP-PI)

PP-PI is used in process industries where there are


instructions and activities are to be confirmed during the
process.
PP-PI using process orders without process Instruction and
control recipe also used in many places where there is no need
to get confirmation of intermediate activities performed along
the process.
If the process is long and there are many actions to be
confirmed during the process, it is achieved through the
control recipe and process Instructions.
Following are the steps involved to explain PI in a simple term.
In the Master Recipe, Process Instructions are
attached to the phase.
While creating the process orders, control recipe will
be created, which will contain the process
Instructions.
Control recipe will be sent to the proper destination
or to the operator who has to input the data to
confirm his action performed.
Control recipe will be sent back to the process order
and instructions with data will be available.

Master Data in PP-PI:Bill Of Material:-

List of components along with the required quantity to


manufacture a product.
Resource:Machine and process equipments are termed as Resource. In
discrete it is known as Work center.
Master Recipe:Task list specifying the sequence of operations and its
duration is termed as Master Recipe. In discrete it is known as
Routing.
Master Recipe contains:Sequences of operations are detailed in operation and
phases. Each operation has to have at least one phase.
Duration for each processing is maintained in the phase.
Production version to be used in the master recipe
There are more terminologies about Process Messages and
control recipe, which are explained in the chapter 9.
Configuration explained here are the only extra configuration
settings to be performed for PP-PI.
Balance
configurations
explained
for
the
Discrete
Manufacturing process are same applicable to PP-PI also.
Few Example: - Configuration of BOM item category, Work
center field selection, BOM selection.

2.

Define Profile with Default Values

BACKGROUND:Default values to be displayed while creating Master Recipe


are maintained in Profile.
In a profile you can specify default values for the following
areas:
General recipe data such as control keys and the
increment between
Operation numbers
Recipe graphics
Quality data
When creating or changing a master recipe, you have to enter
a profile. The values of this profile are then offered as default
values in the new recipe or the new recipe objects. You can
either accept or overwrite these values.
SCENARIO:Standard profile will be sufficient. Discuss the standard
Profile.
MENU PATH:IMG Production Planning for Process Industries Master
Data Master Recipe Settings for the task list type
Define profiles with default values

Click

Click
Click
Click

Field name
Control Key
Operation increment

Explanation for field


Default control key to appear
in the master recipe
Incremental number for each
operation.

Field Key
PI Increment
PIC increment

Any user defined field key to


appear in the operation
Process Instruction increment
count
Process Instruction
Characteristic increment

To create new entries,


Click
Maintain the above explained data.
Click
Note: - Profile is a mandatory entry while creating Master
Recipe.

3.

Assign Material Types

BACKGROUND:Only materials of the material types allocated in this step can


be allocated to a master recipe at the header level, that is, as
the material to be produced.
SCENARIO:Discuss the material type assignment setting.
MENU PATH:IMG Production Planning for Process Industries Master
Data Master Recipe Settings for the task list type
Assign Material types
Click

Click

Maintain Task List type. E.g. 2 to indicate Master Recipe


Maintain Material type. E.g. FERT to indicate Finished goods.

Click

4.

Define Recipe status

BACKGROUND:The recipe status determines:


Whether a recipe is released for use in process orders
Whether a recipe is released for costing
Whether a consistency check is carried out before the
recipe is posted
When a master recipe is created, a status must be assigned to
it. This status can later be changed according to the
processing stage of the recipe.
Together with the recipe usage, the recipe status is used to
create priority sequences that serve as a basis for the
automatic selection of recipes during order creation, capacity
planning and costing.
SCENARIO:Define / Discuss the Recipe status.
MENU PATH:IMG Production Planning for Process Industries Master
Data Master Recipe Data for the Recipe Header Define
Recipe status
Click

Field Name
Status
Description
Rellnd

Cstng

Cons.chk.

Description and Value


Number identifying the status
of the master recipe
Description to the status
created
Indicates Release status of the
recipe. If the recipe is not
released, it can not be used to
create process order.
Indicates relevancy to costing.
Status number with this
check box will be considered
during costing run.
Indicates to carryout the
consistency check
automatically while saving.

To create new status,


Click
Maintain the data as explained above

Click

5.

Define Recipe usage

BACKGROUND:The recipe usage determines:


The purpose or area, for which a recipe is created
example, the chemical, the pharmaceutical or the food
industry
When you create a master recipe, you must assign a recipe
usage to it.
You can create several recipes with different recipe usages for
one material.
SCENARIO:Create Recipe usage
MENU PATH:IMG Production Planning for Process Industries Master
Data Master Recipe Data for the Recipe Header Define
Recipe usage
Click

Click
Field name
Usage
Description

DCr

Field description and value


Number identifying the usage.
E.g. 1
Description of the usage. E.g.
Production indicates this
usage is for process order
creation.
Dynamic Modification Criteria
to change the inspection scope
dynamically if required.
001 for material base to
change the inspection scope.

002 for material and customer


combination to change the
inspection scope.
003 for material and vendor
combination to change the
inspection scope.
Optional entry can be left
blank if no Dynamic
Modification Criteria is
required.

Click

6.

Define Priority sequence for Auto Recipe


Selection

BACKGROUND:Priority sequences are defined according to which master


recipes are selected in the following cases:
for order creation
for costing
Each priority sequence is identified by a selection ID.
The selection criteria are:
task list type (2 for master recipe)
task list (recipe) usage
task list (recipe) status
Priority sequence will be determined within a selection ID by
defining selection priorities for different value combinations of
these selection criteria.
During the automatic selection of recipes, the system chooses
the recipe with the highest priority.
Use
The selection of recipes is carried out automatically
if you have not maintained a production version and
if you have entered a corresponding key for the
parameter "Master recipe selection" in the order type

SCENARIO:Define the Automatic recipe selection.


MENU PATH:IMG Production Planning for Process Industries Master
Data Master Recipe Define priority sequence for
Automatic Recipe Selection
Click

Field name
ID

Field description and Value


Selection id number. E.g. 04
Selection priority. E.g. 1 to
indicate first priority in the id
group 04.
Task list type. E.g. 2 to
indicate Master recipe
Usage. E.g. 1 to indicate the
recipe usage number 1 to be
picked up.
Status of the recipe to be
picked up. E.g. 4 will first
pickup the recipe with status
number 4 i.e. Released status
as first priority

Above settings are for selection id 04 with selection priority 1.


Similarly maintain rest of the selection priority 2,3 and 4 as
shown above in the screen.
Click

7.

Define Order types

BACKGROUND
An order type covers control information that is required for
managing orders. Order type must be assigned to each order.
The order type defines the following:
Order category
CO (Controlling) Partner update
Order classification
Open item management
Settlement profile
Retention period of the order
Number assignment
Status management

SCENARIO:Define / Discuss an Order type


MENU PATH:-

IMG Production Planning for Process Industries Process


Order Master Data Order Define Order Types
Click

To create new entries, it is suggested to copy from the SAP


standard order type PI01.
Select PI01
Click

Field name
Order category
Order type
Description

Field description and value


Internally defined field with
predefined value as 40.
Field referring the order type.
E.g. YA70 to define your own
order type
Description to the order type.
E.g. Process order (internal

number)-IND6
Leave the rest of the fields with the existing entries.
Click
Click

8.

Define order type dependent parameter

BACKGROUND:Parameters that are valid for each order type and plant are
defined here. The parameters are split up as follows:
Master data
Here, you define the data that influences master data
selection or order master data maintenance.
The screen contains the following indicators:
Master Recipe Selection
Recipe selection ID
Application defines how the BOM alternatives are
selected.
Cost accounting
Here, you define the parameters relevant for cost
accounting, such as costing variants for planned and
actual costs and a results analysis key.
General data
Here, you define the following parameters:
Substitute MRP controller/substitute production
scheduler. These are proposed when you create process
orders if an MRP controller or production scheduler is
not specified in the material master.

CopyPlannedOrdSchedg - defines that scheduling of the


planned order is transferred unchanged to the process
order.
SCENARIO:Create an order type dependent parameter in Plant IND6 for
order type YA70
MENU PATH:IMG Production Planning for Process Industries Process
Order Master Data Order Define Order TypeDependent parameters
Click
It is always suggested to create new one by copying from
standard sap settings.

Select 3000 and PI01 order type by pressing grey box in the
left
Click

Field Name
Plant
Order type
Production Version

Field description and Value


Key identifying the plant.
E.g. IND6
Key identifying the order type
already created.
E.g. YA70.
Selection of production during
process order creation.

E.g. Select Automatic


selection of production
version.
Tick in this check box will
check the components when
exploding the Bill Of Material.
Leave this blank.

Recipe selection

Selection ID

Indicator specifying that an


order of this order type
requires approval.
If you have set this indicator,
the entire order or parts of it
can only be released if the
order has status Approval
granted. Leave it blank.
Operation screen will be
checked when transferring the
data from Master recipe into
the order. Tick this check box.
Specifies whether a master
recipe is selected when you
create a process order and
how it is selected. E.g Select
Master recipe proposed
Manual selection.
Key which specifies the
priorities according to which,
master recipe will be selected.
When you create the orders,
they are automatically
assigned status Order
record required. This status is
deleted when you archive the
order record. Only then can
you archive and delete the
orders.
If the entry tool is on,

system automatically
branches to the operation's
detail screen after you
create an operation in the
routing.
Increment for each operation.
E.g. 0010 will make
incremental order of 10.
Click

tab screen

Key indicates when to create


the reservation to the
components.
E.g. 3 will create the
reservation to the component

as soon as the order is


created.
Key identifies the right BOM
application.
E.g. Process manufacturing
will ensure selection of PI01.
Click

Maintain the entry as shown above screen.

Contents are same as to that of Production order type entries.


Hence it is not repeated here.
Click
Below displayed is the controlling tab screen detail.

Entries here (costing variant planned and actual, results


analysis key and default rule) are maintained in discussion
with Controlling Module.
Click

Maintain the entry as shown above. This is mainly to display


the information in the reports of missing parts list.

Click
Note: - You will get a message No1 entry copied.
Click
Click

9.

Define Number Range

BACKGROUND:Each order is uniquely identified by an order number within


one client.
You allocate each order to a number range group via the order
type. You can allocate several order types to the same number
range and thus the same interval.
There are two types of number assignment:
Internal number assignment
When you create an order, the SAP System automatically
assigns a consecutive number from the number range
that you have defined.
External number assignment
When you create an order, you must specify a number
from the allowed number range.
SCENARIO:Define Number range for order type YA70
MENU PATH:IMG Production Planning for Process Industries Process
Order Master Data Order Number Ranges Define
Number Range for Orders

Click

To display the number range assignment Click


To maintain the number range assignment click

Note:- Since the new order type has been created through
copying from standard sap order type, automatically number
range has been assigned.

If the order type has not been assigned with the number
range, it will appear at the bottom.

Click
To select and assign the number range
Go to below in the screen where list of Not Assigned order will
be displayed
Click on the order type
Click

select element

Tick the check box where it is to be assigned. E.g. as shown


below
Click
Click

10. Define Confirmation profile


BACKGROUND:This confiugration setting enables to define the confirmation
profile for single screen entry.
Confirmation profile is used in transaction COR6N for
performing confirmation.
Process order confirmation can be performed using COR6N
transaction. This transaction similar to CO11N has the ability
define the tab fields to be displayed to the user by which more
option can be exercised.
In order to use this, it is required to understand the
confirmation profile configuration.
SCENARIO:Define Confirmation profile.
MENU PATH:IMG Production Planning for Process Industries Process
Order Operations Confirmation Single entry Screen
Define Single Screen Entry
Click

Click
Maintain the entry as shown below

Note:- click
the

at
to view how the header to look.

After selecting, click

to view it

Click
Similarly it can be done in the detail area also

Right side maintain the desired text for each area

Note:- Tick at the closed check box indicates that by default


this tab screen is closed. User has to open if required.

Click

to view

Click
Click
Click
Click

Click the desired profile as Standard profile.


Click
Click

Impact of this configuration in Master Data /


Transaction
While performing the confirmation using COR6N, screen will
appear as per the setting maintained here.

11. Process Management


Friends,
Configurations similar to that of discrete production process
are
BOM Selection
Task List selection
Availability check
Scheduling
Confirmation parameter
Now the next important settings related to PP-PI are the
process instructions and process messages.
Before we go ahead, lets discuss some of the important
terminologies and definitions related to Process Instructions
and process messages.
Control Recipe Destination:The control recipe destination specifies
The technical address to which a control recipe is
transferred
How the transfer takes place (for example, initiated by
R/3 or by process control)

Process Instruction Characteristics:A characteristic of a characteristics group released for use in


process instructions.
Process instruction characteristics are allocated to process
instructions either directly or via the instruction category.
Together with the corresponding characteristic values, they
determine:
The information transferred or requested in a process
instruction (for example, the status of a control recipe)
How the requested data is to be processed (for example,
the message category to be used to report the data)
Process Message Characteristics:A characteristic in a characteristic group which has been
released for use in process messages. Process message
characteristics are allocated to process message categories.
Together with the corresponding characteristic values, they
determine the content of a process message.
Process Message Categories:The process message category specifies:
The characteristics to be allocated to a process message,
i.e. the information to be sent
The message destinations to which a process message is
to be sent.

Process Instruction categories:The process instruction category specifies:


the type of process instruction (for example, process
parameter or process data request)
the characteristics of this process instruction, that is, the
information to be sent via this instruction

12. Transport predefined Characteristics


BACKGROUND:In this step, transport the process instruction characteristics
and process message characteristics predefined by SAP from
the SAP reference client to the logon client.
You need these characteristics
For the message categories predefined by SAP
To create your own message and process instruction
categories
Note:The names of the characteristics predefined by SAP all start
with PPPI_.
You cannot change these characteristics in your logon client.
After carrying out this step, the standard characteristics are
available in all Plants in the client.
When you import these characteristics, the system will issue a
Warning which informs you that this data is of type "A".
Ignore this message.
SCENARIO:Copy the characteristics to the new client.

MENU PATH:IMG Production Planning for Process Industries Process


Management Standard Settings Transport Predefined
Characteristics
Click

Message will be displayed as shown above in the system after


performing this task.
Click

13. Transport Predefined Message Categories


BACKGROUND:Predefined (by SAP) message categories will be copied to the
required new client In this step as Customizing settings.
These message categories are required for:
The link to PP, MM and QM
The link to higher-level systems (linking of external
requirements)
status management in the case of orders and control
recipes
The predefined message categories are copied together with all
their assignments (assignments of characteristics, estinations
and destination-specific target fields).
Note:First characteristics for process management predefined by
SAP have to be copied before performing this step.
SCENARIO:Copy the standard Process message categories (created by
SAP) to the new client.
MENU PATH:-

IMG Production Planning for Process Industries Process


Management Standard Settings Transport Predefined
Message Categories
Click

Enter the Target Plant. Desired plant where it is to be copied.


E.g. IND6
Click

Click on
Click

to display the list of message categories

Click

Click
Click

to copy

Click
Click

to display the list of message destinations

Click

to copy

Click

Click
Click
Click

to display the list of message categories

Click

to copy

Click
Click
Note:This above settings of copying the standard settings created by
SAP will be sufficient to work with process instructions.

14. Define and setup control recipe destination


BACKGROUND:This configuration setting enables to define the control recipe
destination.
A control recipe destination defines the following:
Whether the process instruction of a phase is transferred
to an external system or is converted into an R/3 PI sheet
for a line operator
Which system or line operator processes the process
instructions of a phase
An operation can contain many phases.
Each phase can have different control recipe destination.
In the process order, one control recipe can be created for each
control recipe destination.
Make the following settings for the control recipe destinations
you want to use in your plant:
Define the control recipe destinations as below.
-

Information on the type of signature used in PI sheets (for


example, signature with password check or digital
signature)

Data that controls system performance during PI sheet


display

Details on the sequence in which material-related


process instructions are generated in the process order

Assign the process instruction categories that are


suitable for this control system.
Specify the process instructions that are to be generated
in the process order when a control recipe is created for a
control recipe destination.
Below three Steps are to be performed:1. Define control recipe destinations
2. Assign process instruction categories
3. Set process instructions to be generated automatically
SCENARIO:Define / Discuss control recipe destinations.
MENU PATH:IMG Production Planning for Process Industries Process
Management Control Recipe / PI sheets Control Recipe
Destination Define and Setup Control Recipe Destinations
Click

Enter Plant. E.g IND6


Click

Click
be sufficient.

to create new entries. Standard setting should

Field Name
Plant
Ctrol Rec.Destin.
Description of control recipe
Destination
Destination Type

Address

Click
Click
Click

Field description and Value


Enter plant code. E.g. IND6
Code identifying the control
recipe destination. E.g. 06
Enter the control recipe
description. E.g. PI Sheet.
Destination for process
Instructions to be sent via
control recipe. E.g 1 indicates
the Control recipe transfer to
R3 PI sheet.
Name or group of line operator
who maintains the PI sheet.
E.g. Group 1.

Select 01 destination by clicking left side grey box


Double click
screen.

in the left side of the

. Maintain the entry if it is required to default


Click
certain process instruction other wise leave it blank. It can be
maintained at recipe level.

Screen without any Process instruction for your reference: -

Field name
Position

Sequence
Instruction category

Field description and value


PI position in the control
recipe to be maintained. 01
refers to at the start of the
control recipe and 05 refers to
at the start of the phase.
Number defining the
sequence.
Instruction category to which
PI are to be generated.

Click
Click
Lick
Note:Process Instructions will be determined from the Instruction
Category. No need to assign the PI to the destination type 01.
However Process Instructions to be generated will define the
position of PI in the control recipe.

It is only optional entry. Process Instructions can be defined


inside the master recipe also.

15. Define Process Message Characteristics


BACKGROUND:Process message characteristics in addition to the existing
created by SAP, can be created if required.
SCENARIO:Create Process message characteristics
MENU PATH:IMG Production Planning for Process Industries Process
Management Process Messages Process Message
Characteristics Define characteristics for Process Message
Click

Double Click

Enter the characteristic name as LOT_QUANTITY

Click

Maintain the data


Description
Characteristics group

Status
Data Type
Number of digit incase of numeric data
Click
Click

Additional information
Automatic value assignment

Maintain the data if automatic value is to be assigned.


Table

01 will refer the Process order header. Press F4 to


Display more choices

Field

Select the desire field. E.g GAMNG refers to order


quantity.
Will ensure automatic assignment of value

Click
Click
Note:- Most of the standard Process message characteristics
can be used to meet the requirements. New characteristics can
be created as explained above.

16. Define and Setup Message Destinations


BACKGROUND:Define the following setting for the message destinations:
Define the message destinations with their addresses.
Message destinations are defined per plant.
Assign destinations to messages via the message category
or directly in the process message.
SCENARIO:Define and setup Message Destinations
MENU PATH:IMG Production Planning for Process Industries Process
Management Process Messages Process Message
Destinations Define and Setup Message Destinations
Click

Enter Plant E.g IND6

Click

By default required standard settings will be available.


Field Name
Destination
Description
Type
Destination address
Note:-

Field description and Value


Key identifying destination
Description of the destination
Destination type. E.g 01
indicates the R3 Function
module
Name of the function module
to be called.

Below are the example of SAP standard function module and


definitions.
Function module
COCI_CONFIRM_ACTIVITY
Confirmation of activities
COCI_CONFIRM_MATERIAL_CONS
Posting of goods issues
COCI_CONFIRM_MATERIAL_MOVEMENT
Posting of general goods movements
COCI_CONFIRM_MATERIAL_PROD
Posting of goods receipts
COCI_CONFIRM_OPERATION
Confirmation of processing time events
COCI_CONFIRM_TIMETICKET
Confirmation of time ticket

Click

17. Define and Setup Process Message Categories


BACKGROUND:Every process message that you want to send via process
management must be assigned to a process instruction
category.
In this section, define the message categories that you want to
use in your plant.
For each message category, specify
the information to be contained in messages of the
category (via characteristic assignments)
the destination to which the messages should be sent
the destination fields to which the values of the
individual message characteristics should be transferred

SCENARIO:Define and setup process Message categories


MENU PATH:IMG Production Planning for Process Industries Process
Management Process Messages Define and Setup
Message Categories
Click

Enter Plant. E.g IND6


Click

Note:Above displayed message categories are assigned to plant


IND6
Lets look Characteristics for PI_CONS message category

Select PI_CONS by pressing left grey box


Double Click
screen

in the left side of the

Above shown characteristics are attached to the message


category PI_ CONS
Lets look at the destinations to the PPPI_BATCH
Select PPPI_BATCH by clicking the left grey box
Double click

To the message categories there are many message


characteristics were attached. Now there are only selected
characteristics attached specific to the destination.
Lets look at the characteristics attached to the PI01 and to the
PI04 destination.
Select PI01 by clicking grey box in the left
Double click
the screen

Important Note:-

in the left side of

Though there are many message characteristics attached to


the message category, to the destination PI01only
PPPI_PROCESS_ORDER characteristic is attached
Click
Similarly repeat for PI04

Click

till you reach the main IMG screen

We have discussed
Control recipe destination definition
Message characteristics
Message Destinations

Message categories
Now lets discuss Process Instruction characteristics.

18. Process Instruction Category


BACKGROUND:-

In this section, define the process instruction categories you


want to use in your plant. For each instruction category,
specify
The process instruction type to which it pertains
The information transferred in the process instructions
(via characteristic assignments)
When creating a process instruction in the master recipe or
process order, you must assign it to a process instruction
category.
Thus, the settings you make here are used as a reference for
the process instruction. Except for the process instruction
type, you can change all settings in the process instruction.
SCENARIO:Discuss the process Instruction category
MENU PATH:IMG Production Planning for Process Industries Process
Management Process Instructions Define Process
Instruction Category (General)
Click
Enter Plant. E.g IND6

Click

Field Name
Instr Cat
Description
ProcessInstr.Type***

Field description and Value


Key identifying the instruction
category. E.g ACONS_1
Description identifying the
instruction category
Number identifying the
instruction type.

*** Instruction type describes the type of process Instruction


1-- Refers to Process Parameter

It is used in PI Instruction to attach some notes, any text


details through Long text
2 Refers to Process Data Request
It is used whenever there is a need to get the data as
input
3 Message subscription
A process instruction that specifies that process
control is to send a message every time a specific
event, for example, a goods receipt, occurs.
4 Process Data calculation formula
A type of process instruction that specifies that a
value must be calculated in the PI sheet. This value is
then sent to a particular destination using a process
message.
5 Inspection Result Request
The inspection results request specifies the operations
and phases for which inspection results must be
recorded. For these operations and phases, the function
for recording inspection results can be accessed
directly from within the PI sheet.
6 Dynamic Function Call
Process instruction which enables the line operator to
call a user-defined function module from within the PI
sheet.
Depending on the function module, this option can be
used to access order confirmation or material quantity
calculation or to start a user defined function module.

7 Sequence Definition
It is used to define the PI sheet entry sequence

Lets try to look at the list of characteristics assigned to the


process Instruction category ACONS_1
Select ACONS_1 by clicking the grey box in the left
Double click
the screen

in the left side of

Here any newly created characteristics can also be attached if


required.
Note:Field Name
No
Characteristics***

Field description and Value


Serial number for
characteristics
Process Instruction
Characteristics. Here we have
to mention the PI
characteristics predefined by

Check box under T


Check box under A

Check box under V

SAP.
Indicates the Text message to
be captured through this
characteristic.
Tick in this check box
indicates, value will be
assigned automatically. If not
manually value can be
assigned.
Tick in this check box
indicates, value will be
assigned automatically only.

Note ***
PPPI_MESSAGE_CATEGORY characteristics decides the
correct function area / module where the data are to be
collected.
PPPI_PROCESS_ORDER characteristics will get the process
order number.
PPPI_REQUESTED_VALUE characteristics will be used where
ever it is required to get the value from the destination.
To have better understanding, Lets look at the another
Instruction category with type 2.
Click

Select CONS_1
Double click
the screen

in the left side of

Note:First characteristic is PPPI_DATA_REQUEST_TYPE which will


diver to the goods issue module. Always first characteristic
should be the one which takes to the right module.
In the above,
PPPI_REQUESTED_VALUE is assigned to get the quantity
of material consumed. Whenever it is required to get the
input this characteristic is to be used.
Click

19. Summary:Guys, I am sure, you are now equipped to configure the SAP
PP-PI production process with process messages according to
the business blue print with this configuration manual.