Sunteți pe pagina 1din 3

Inspection and Test Plan

for Electrical Works (UnderGround


Earthing Works)

TOTAL 3 PAGES
(Including Cover)

PROJECT NAME

: Khabat Thermal Power Plant Units 1&2

Purpose

DOCUMENT NO.

: KP-00+++-CQ712-G0006

For Information

TITLE

: Inspection and Test Plan for Electrical Works


(UnderGround Earthing Works)

OWNER

: Ministry of Electricity (MOE) of


Kurdistan Regional Government

16.04. 2014

Rev.
No.

DATE

First Issue
DESCRIPTION

E.Karaali
PREPARED

For Review
For Approval
For Construction
As-Built

D.znder
S.Kepir
CHECKED

G.apkan

A.Ba

REVIEWED

APPROVED

GAMA POWER SYSTEMS ENG &CONTRACTING,INC.

Owner

Ministry of Electricity (MOE)


of Kurdistan Regional Government
Contractor

POSCO ENGINEERING
& CONSTRUCTION CO., LTD.
Main Subcontractor

GAMA POWER SYSTEMS


ENGINEERING & CONTRACTING,INC.

Inspection and Test Plan


for Grounding

ITP No.

KP-00+++-CQ712-G0006

Rev. No.

Page

1 of 1

Inspection Status
No.

1.1

2.1

2.2

3.1

Item Name

Inspection & Test Activity

Inspection & Test Description

Application Document/Code/Spec. No.

Document Submittal
Subcon
tractor

3rd Party POSCO


/AI
E&C

GAMA

Document Review

KP-00B__-EE210-G6015 Grounding & Lightning


Protection - Technical Specification KP-00+++CY712-G0008Rev A_Method Statement for
Electrical Works (UnderGround Earthing Works)
KP--00B__-EE165-G6024 Grounding and
Lightning Protection Installation Typicals

Electrical Works (UnderGround


Earthing Works) Inspection
Checklist

Visual Inspection

KP-00B__-EE210-G6015 Grounding & Lightning


Protection - Technical Specification KP-00+++CY712-G0008Rev A_Method Statement for
Electrical Works (UnderGround Earthing Works)
KP--00B__-EE165-G6024 Grounding and
Lightning Protection Installation Typicals

Electrical Works (UnderGround


Earthing Works) Inspection
Checklist

Visual inspection

KP-00B__-EE210-G6015 Grounding & Lightning


Protection - Technical Specification KP-00+++CY712-G0008Rev A_Method Statement for
Electrical Works (UnderGround Earthing Works)
KP--00B__-EE165-G6024 Grounding and
Lightning Protection Installation Typicals

Electrical Works (UnderGround


Earthing Works) Inspection
Checklist

Controlling Test Results

KP-00B__-EE210-G6015 Grounding & Lightning


Protection - Technical Specification KP-00+++CY712-G0008Rev A_Method Statement for
Electrical Works (UnderGround Earthing Works)
KP--00B__-EE165-G6024 Grounding and
Lightning Protection Installation Typicals

Electrical Works (UnderGround


Earthing Works) Inspection
Checklist

Remarks

Owner

GENERAL

Review of Technical Documents


(Drawings, Specs, Method statements etc.)

Document Review

Earthing System Installation

Earthing system installation,Visual and Dimensional


Inspection

Above-grounding system installation ,Visual and


Dimensional Inspection

Visual Inspection

Visual inspection

Final

Earthing wire continuity check

Controlling Test Results

Notes) #1
Legend

Doc. No: KP-00+++-CQ712-G0006, Rev.A

P
H
W
S
V
R

Perform
Hold Point
Witness Point
Spot Witness
Surveillance
Report Review

Electrical Works(Underground Earthing Works)


Inspection Checklist

Project Name

KHABAT THERMAL POWER


PLANT UNITS 1&2

Owner Name

Ministry of Electricity (MOE) of Kurdistan


Regional Government

Contractor

POSCO ENGINEERING &


CONSTRUCTION CO., LTD.

Main Subcontractor

GAMA POWER SYSTEMS


ENGINEERING & CONTRACTING INC.

Item Name / Item No


/ Description

Area / Unit
ITP No

KP-00+++-CQ712-G0006

Report No

ITP Item
Date
Rev.

Drawing No
Approximate Date/Time of Pouring Concrete:
No.

ITEM DESCRIPTION

Subcontractor

Check the installed earthing wire mesh is visually proper.

Check that all dimensioning of earthing wire as per the approved drawing are followed
while implementation.

Check that all clamps and other related joints are properly fix as per the typical
installation details attached with the inspection checklist.

Check that continuity of earthing system conductivity is ensured.

All related tests are properly finalized and all wiring routing & joints are completed in
line with installation details and approved drawings.

GAMA

Remarks / Comments

Subcontractor

GAMA

3rd Party / AI

POSCO

Name:

Name:

Name:

Name:

Date:

Date:

Date:

Date:

Sign:

Sign:

Sign:

Sign:

Doc. No: KP-00+++-CQ712-G0006-F01, Rev.A

S-ar putea să vă placă și