Documente Academic
Documente Profesional
Documente Cultură
1678MCC
FLC Software
Release 4.3
02
070320
1678MCC R4.3.1
B. Wilke
A. Willscher
01
071218
1678MCC R4.3
B. Wilke
A. Willscher
ED
DATE
CHANGE NOTE
APPRAISAL AUTHORITY
ORIGINATOR
1678MCC R4.3
INSTALLATION & STARTUP HANDBOOK FLC
SOFTWARE
ED
02
3AG 24169 BEAA PCZZA
3/83
ED
02
4/83
TABLE OF CONTENTS
-1
-2
General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Handbook Applicability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Customer Documentation Alcatel 1678 Metro Core Connect . . . . . . . . . . . . . . . . .
Target Audience . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Handbook Change History . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Compliance with European Norms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Safety Norms and Labels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Other Norms and Labels . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
List of Abbreviations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
General Information on AlcatelLucent Customer Documentation . . . . . . . . . . .
Registered Trademarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Agreements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Service Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
9
9
9
10
10
11
11
12
13
14
14
15
15
Preconditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Detailed Description of the FLC Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
-2.2.1
Preparation of the InstallServer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
-2.2.2
Preparation of the FLC . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
-2.2.3
FLC Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
-2.2.4
Start Application on both installed FLCs . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
-2.2.5
Connect the Craft Terminal to the 1678 MCC . . . . . . . . . . . . . . . . . . . . . . . . .
-2.2.6
Get Local Access . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
-2.2.7
Create Main Shelf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
-2.2.8
Reset the MATRIX (SLC) Boards . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
-2.2.9
Set the Host ID and the OSPF Interface for Local Ethernet . . . . . . . . . . . .
-2.2.10
Update the FLC Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
-2.2.11
Configure the NTP Servers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
-2.2.12
Event Log Management (optional) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
-2.2.13
Checks after FLC Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
-2.3 Short Description of the FLC Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
-2.3.1
Preparation of the Installation Procedure . . . . . . . . . . . . . . . . . . . . . . . . . . . .
-2.3.2
FLC Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
-2.3.3
Final configuration steps . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
-2.3.4
Event Log Management (optional) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
-2.3.5
Checks after FLC Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
17
21
21
27
28
46
48
51
52
56
57
60
65
66
68
71
71
72
73
73
73
-3
TROUBLESHOOTING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 75
-4
ED
General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Remarks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Restrictions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Preconditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Start the Installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
77
77
77
78
78
79
02
3AG 24169 BEAA PCZZA
5/83
TABLE OF FIGURES
ED
18
19
23
24
25
26
27
28
31
32
33
35
36
37
37
38
39
40
41
42
43
44
44
46
50
51
52
54
55
56
58
60
61
62
63
64
69
69
70
70
02
3AG 24169 BEAA PCZZA
6/83
ED
02
7/83
ED
02
8/83
1.1
General Information
WARNING
Strict compliance with the instructions and procedures specified in the product documentation (refer to
product release note for the complete list of applicable manuals) is the precondition of the enforceability
of such warranty claims against AlcatelLucent.
Warranty claims which result from noncompliance with the defined procedures cannot be enforced
against AlcatelLucent.
NOTICE
The product specification and/or performance levels contained in this document are for information
purposes only and are subject to change without notice. They do not represent any obligation on the part
of AlcatelLucent.
COPYRIGHT
NOTIFICATION
The technical information of this manual is the property of AlcatelLucent and must not be copied,
reproduced or disclosed to a third party without written consent.
1.2
Handbook Applicability
This handbook refers to the Multiband Multiservice Connect 1678 Metro Core Connect (MCC) R4.3.1
which belongs to the AlcatelLucent Optics Cross Connect product family.
In general the system is referred to as MCC or NE only.
Screen prints are inserted as examples and do not necessarily show the actual Product or Release name
in the windows title.
1.3
Customer Documentation
Service Documentation
The installation of the Craft Terminal is described in the CT Basic Operators Handbook.
ED
02
3AG 24169 BEAA PCZZA
9/83
1.4
Target Audience
This handbook describes the procedures for the initial installation and start-up of the 1678MCC software.
All rights reserved. Passing on and copying of this
document, use and communication of its contents
not permitted without written authorization.
This handbook is intended for service staff trained for installing and starting-up cross-connect systems.
The operators should have the following technical knowledge:
Detailed knowledge of the Craft Terminal (CT) and First Level Controller (FLC) software and the
combining with the hardware
1.5
Ed.02:
Ed.02 created in March, 2008 contains the following updates for R4.3.1:
Chapter Initial Installation of the FLC Software (modified: Configure NTP Servers using NM/CT not
using aiGuideWizzard).
Chapter Procedure for Post Installation of ION75 (modified: Warning that Event Log Management
must be disabled when installing GMRE).
ED
02
3AG 24169 BEAA PCZZA
10/83
Ed.01:
Ed.01 has been created in December 2007 for product release 4.3. This edition is based on the 3AG 24169
BDAA PCZZA Ed.01 of R4.2. The main updates for R4.3 are:
1.6
Safety
1.7
Refer to the Safety Instructions, 3AL 24198 AAAA, to obtain the following information:
Labels
ED
02
3AG 24169 BEAA PCZZA
11/83
1.8
ED
02
3AG 24169 BEAA PCZZA
12/83
1.9
List of Abbreviations
EM
EMC
ESD
FLC
First Level Controller
FLCCONGI First Level Controller + Control and General Interface Board
FLCSERV First Level Controller + SERVICE Board
ED
GMPLS
GMRE
HPROT
HPROT16
HW
ISSB
ISPB
ISU
LAPD
LAX20
LAX40
MCC
MX
MX160
MX320
MX640
NGTRU
NM
PSF
RIM
SLC
SUT
SW
TIM
TMN
VHM
02
3AG 24169 BEAA PCZZA
13/83
1.10
Handbook Updating
Changes introduced in the same Product Release (same Handbook Part Number)
CDROM Identification
1.11
Registered Trademarks
All other names, products and services mentioned are trademarks of their respective holders
ED
02
3AG 24169 BEAA PCZZA
14/83
1.12
Agreements
Throughout this document the installation personnel are referred to as users. For standard UNIX
procedures the document makes use of UNIX terminology.
User commands appear in the following manner:
command
Names and addresses to be defined by the user are marked with relation marks (<name to be defined>).
Inputs and other actions to be performed by the user are marked with an action point.
Is used to mark pieces of information provided to avoid operational errors that lead to
inconsistent or corrupted data.
1.13
Service Information
In case of problems with the system 1678MCC, contact your Technical Assistance Center or Technical
Excellence Center for information.
ED
02
3AG 24169 BEAA PCZZA
15/83
ED
02
16/83
This document describes the initial installation of both FLCs for the 1678 Metro Core Connect R4.3.1.
NOTE: Screen prints are inserted as examples and do not necessarily show the actual release names.
2.1
Preconditions
The operator has to be familiar with LINUX and Windows2000/WindowsXP operating systems.
Two redundant FLCs have to be available and equipped with an EM04A and a DCR board.
To install both FLCs at the same time, a hub is needed during installation to connect both FLCs to
the CT PC/Laptop.
A DebugCable (console cable) for connection between installServer and FLC (port A) has to be
available (only used during the installation). For PCs/Laptops with only one serial port you also need
a USB to serial converter.
FLC
Installserver PC/Laptop
9 pol DSUB female
1
Length ~ 10 m
to EM
COM1
9600 bd
4
5
E
F
A
B
2
3
4
5
C
D
6
7
8
to DCR
COM2 or
COM5
38400 bd
Line D = GND
COM5 ( usb5toserial )
ED
02
3AG 24169 BEAA PCZZA
17/83
When plugging out the console cable always plug out the FLC side of the cable first to
avoid blocking of the DCR board.
FLC
DCN/HUB
CT
Installserver EM
DCR
LAN Cable
FInterface
Debug Cable
CD-ROMs with
The CORE01J CD has to be copied (inserted) first to the PC/Laptop (refer to 2.2.1 c ).
ED
The following data has to be available for the configuration of the FLC (after installation):
Area address and System ID (has to be unique; default system ID is the MAC address of
EMService board). For an address example see Figure 15. on page 36.
02
3AG 24169 BEAA PCZZA
18/83
The following data has to be available (requested by the aiGuideWizzard tool, but not in the order
given below).
x.y.z.14
x.y.z.12
x.y.z.2
x.y.z.3
x.y.z.4
x.y.z.5
Required OSI DCN protocol stack NM (QB3, RFC1006) Area address and System ID of NM
Other IP Hosts
A properly installed and configured CT PC/Laptop according to the CT Installation description in the
CT Basic Operators Handbook (chapter Software Installation):
ED
two serial interfaces (COM1/COM2) or one serial and one USB interface (requires USB2
serial adapter, COM1/COM5)
e.g.
02
3AG 24169 BEAA PCZZA
19/83
A terminal emulation program (e.g. Tera Term Pro) used as terminal to the console of EM04A
and DCR boards.
A hexcalculator (for calculating the MACaddress of the FLC from EM board label)
The installServer has to be rebooted after each changing of its LAN configuration (LAN or
FInterface connection)
If you use a Laptop or Notebook PC as installServer, disable the power save option.
Disable the firewall on the installServer PC/Laptop during the installation procedure!
ED
02
3AG 24169 BEAA PCZZA
20/83
2.2
This chapter describes the installation of both FLCs at the same time.
The whole installation has to be executed as user install.
All screen prints shown in this handbook are examples and do not necessarily show the actual product
or release names.
2.2.1
a)
rm rf bin
b)
Delete already available SKY and/or ION builds on your installServer which are not required anymore
(to provide enough space on disk).
Delete the old SKY/ION directories in C:/ALCATEL/release.
Delete the old SKY/ION links in the /home/install directory.
c)
Insert the CORE CDROM into the CDROM drive. If the Software copy tool does not start
automatically, make sure that the Autostart feature of Windows is enabled for the CDROM drive.
Then remove and insert the CDROM into the CDROM drive again.
ED
02
3AG 24169 BEAA PCZZA
21/83
ED
02
3AG 24169 BEAA PCZZA
22/83
d)
ED
02
3AG 24169 BEAA PCZZA
23/83
Insert the ION CD into the CDROM drive if required (only GMRE environment).
e)
Setup of the sibdl tool by executing the following command using the Windows2000/WindowsXP
explorer:
C:\ALCATEL\release\CORE01J\FLC\pack\rawloader\SIBDL_setup_2_2_0.exe
Double click on the file SIBDL_setup_2_2_0.exe
Select English (United States) as language in the Choose Setup Language dialog and press the
OK button.
Select the C:\ALCATEL\SIBDL_2.2.0 directory.
The View readme file button can be deselected. Press the Finish button at the end of the sibdl
setup.
Close the readme.txt file with File > Exit in case of selected View readme file button.
The SIBDL tool is installed now.
ED
02
3AG 24169 BEAA PCZZA
24/83
g)
Adapt the network configuration of the installServer PC/Laptop to the network configuration of the
FLC. Use therefore a free IP address in the subnet of the FLC to be installed.
Only one LAN interface has to be configured on the installServer! Disable all other LAN
connection used before (example: LAN used for FInterface, PCMCIA or a second LAN
interface).
Start > Settings > Network and DialUp connections
Select Local Area Connection > Properties
ED
02
3AG 24169 BEAA PCZZA
25/83
ED
02
26/83
Configure the IP Configuration of the installServer using the Use the following IP address dialog.
The configuration of DNS server is not necessary.
2.2.2
a)
Connect both FLC LAN interfaces via a hub to the installServer PC/Laptop.
b)
Connect the console cable between the COM1 and COM2/COM5 of the installServer PC/Laptop with
the console interface on the FLC. Refer to Figure 1. on page 17.
The console cable has to be plugged in on both serial interfaces of the installServer.
Otherwise the DCR board may be blocked.
ED
02
3AG 24169 BEAA PCZZA
27/83
2.2.3
FLC Installation
2.2.3.1
a)
Open two console windows for each FLC on the installServer PC/Laptop.
EM board (COM1; 9600 baud)
DCR board (COM2/COM5; 38400 baud)
b)
Configure the Console window (installServer <> EM) using the serial interface COM1.
COM1
c)
Baud Rate
Data
Parity
Stop
Flow control
Scroll buffer
9600
8 bit
none
1 bit
none
500 lines
Configure the Console window (installServer <> DCR) using the interface COM2 or COM5.
COM2/COM5 Baud Rate
Data
Parity
Stop
Flow control
Scroll buffer
38400
8 bit
none
1 bit
none
500 lines
ED
02
3AG 24169 BEAA PCZZA
28/83
2.2.3.2
a)
b)
Press the reset button on the FLC once (for less than 3 seconds) to reset the DCR board.
c)
sending a break command on the DCR console window when requested (pSH+> prompt)
or
Hit any key in the DCR console window when requested (=> prompt)
How to stop the boot sequence depends on the already installed rawloader/boot loader version. After
stopping the boot sequence you will get the pSH+> or => prompt.
d)
e)
ED
=> reset
02
3AG 24169 BEAA PCZZA
29/83
2.2.3.3
During installation both FLC LAN interfaces must be connected via a hub to the
installServer PC/Laptop.
a)
b)
HINT:
ED
If you want to use an existing configuration, choose the related NE name from the list
and click on the Load button.
02
3AG 24169 BEAA PCZZA
30/83
You can modify the NE name/location using special characters after installation (in the
Network Element Synthesis View of the NM/CT).
ED
02
3AG 24169 BEAA PCZZA
31/83
CORE01J
SKY5530A
ION7505Y
ED
02
3AG 24169 BEAA PCZZA
32/83
ED
02
33/83
10
10
83
10
83
254
10
10
83
10
ED
02
3AG 24169 BEAA PCZZA
34/83
NOTE:
ED
02
3AG 24169 BEAA PCZZA
35/83
FLC
DCR board
EM board
The stack is being configured automatically for both QB3 and RFC1006!
ED
02
3AG 24169 BEAA PCZZA
36/83
Enter the used stack configuration (Area address and System ID) for the 1678MCC.
ED
02
3AG 24169 BEAA PCZZA
37/83
Select both FLCs to be installed. Check the network cables. If done, select I have checked the
network cables.
MenMon> rst
ED
02
3AG 24169 BEAA PCZZA
38/83
ED
02
39/83
ED
02
3AG 24169 BEAA PCZZA
40/83
2.2.3.4
a)
The netboot_xxx.img should download now. Do not stop the booting sequence on the EM
console.
ED
02
3AG 24169 BEAA PCZZA
41/83
SKY5530A
SKY5530A
SKY5530A
SKY5530A
After loading of the netbootxxx.img image, the netboot linux will be uncompressed and installed on
the FLC. This netboot linux will trigger the CORE build installation (copy and unpack of the
montavista linux) on the EM and DCR board.
c)
d)
The ION installation will be started automatically (only if the ION installation is required).
e)
ED
02
3AG 24169 BEAA PCZZA
42/83
Ignore the displayed Errors or Warnings as long as the status report shows 0 errors, 0 warnings
and the aiGuide was SUCCESSFUL message appears.
ED
02
3AG 24169 BEAA PCZZA
43/83
f)
Due to the fact that the installation is running automatically, the installation can only be observed.
Other debugging hints are:
On installServer:
If BOOTP requests are not responded you may stop the aiGuideWizzard.
After stopping the aiGuideWizzard, execute the following command in a cygwin window
on the installServer:
> /home/install/installserver/bin/installserver dhcpreport
This command will print out all detected incoming BOOTP requests and you willll easily
see if you got an request with an unexpected MAC address.
with ps ef the running daemons can be checked. This can be alternatively checked via:
./installserver/bin/installserver status.
On the FLC:
g)
Wait until the installation is completed using the console window (refer to Figure 23. ), the
aiGuide.trace file of the the FLC installation wizard window.
Do not press the Exit button until the installation is finished.
If the installation is finished successfully (message aiGuide was SUCCESSFUL appears in the
aiGuide.trace file or the console window) complete the installation by clicking on the Exit button
in the FLC installation wizard window.
ED
02
3AG 24169 BEAA PCZZA
44/83
h)
ED
Check the date on the EM and DCR board via the date command. Both boards must have the same
date and time.
02
3AG 24169 BEAA PCZZA
45/83
2.2.4
In R4.3.1. the application is not started automatically anymore. Therefore you have to start the application
on both FLCs as follows:
Log in on emServ and start the application:
start
SSUDiag c startAppl
Check that emServ comes up in active state and the emCong comes up in passive state:
SSUDiag c getEquipInfo
ED
02
3AG 24169 BEAA PCZZA
46/83
All persistency domains should have the state S for synchronized. The state of CSServer persistency
on the passive FLC can be ignored, also the state of GMRE_PM and GMRE_MA persistency, if ION is
not installed. With only one FLC in the system the status is per definition shown as S (synchronized).
Execute following commands to check the CSServer persistency on both FLCs:
log
tail 10 F_CSServer
Display on screen:
<data> <time> >Recovery saveConfigData: Save config data
successfully finished<
ED
02
3AG 24169 BEAA PCZZA
47/83
2.2.5
Connect the preinstalled and configured CT (LowerLayerManES required) with the 1678MCC according
to the customer network using the FInterface.
The installServer has to be rebooted, if the FInterface LAN configuration was changed!
If the CT is running on the installServer disconnect all used serial interfaces COM1 and COM2/5. Plug
out the FLC debug cable. Plug in the FInterface cable to the COM1 interface (refer to Figure 2). The
FInterface must always be connected to the active FLC.
The FLC redundancy is not supported for FInterface connections. After an FLC switch
the FInterface connection will be broken. In this case reconnect the FInterface cable
to the new active FLC.
Check the Alcatel Lower Layer Settings.
Menu
Start > Programs > Alcatel > Lower Layers > Lower Layers Settings
Choose:
Serial Port
COM1
Default
Start the CT by double click the Alcatel 1320CT icon or via menu START > Alcatel 1320CT.
A new NE appears in the map window on the CT.
Select the NE connected via FInterface.
Select Start Supervision from the context menu (right mouse button) to start the supervision.
ED
02
3AG 24169 BEAA PCZZA
48/83
ED
02
49/83
Troubleshooting:
Sometimes it can happen that the connection to the NE is not established. In this case shutdown the
LowerLayerManES by pressing the Shutdown button (see Figure 26. ) and close an already open Map
using the menu Map > Exit. Start the CT again by double clicking the Alcatel 1320CT icon .
If the problem still exists, kill the QIA process on the active FLC.
ED
02
3AG 24169 BEAA PCZZA
50/83
2.2.6
Look at the key symbol icon to find out, if the CT has local access to the NE. This icon is located in the
Management State Control Panel, which is presented at the right side in every View and looks like either
or
If the icon has a green frame as shown above, the CT already has local access to the NE. If not, you have
to request local access from the OS as follows:
Select Access State > Requested from the Supervision menu.
In the confirmation dialog box that opens, click on OK and wait until the color of the icons frame changes to
green.
ED
02
3AG 24169 BEAA PCZZA
51/83
2.2.7
Be patient after pressing the Submit button. The Submit button will be grayed until the
equipment provisioning has been performed. Check for successful provisioning
response in the message window of the dialog box.
In case of negative provisioning response (i.e. the recent provisioning failed due to any
reason), retry according to the given error message in the dialog:
Both FLCs should be the 66MHz version (default value). Asynchronous balanced mode
is allowed. In case of type mismatch alarm the configuration has to be changed using
the Equipment View of NM/CT corresponding to the hardware:
select FLC
Set > choose the FLC type > ok
If a wrong FLC type is equipped, DCC channels and LAPDs will be deactivated. A correct
FLC type resolves the problem.
In Equipment View of NM/CT select Configuration > Equipment Provisioning to open the
Equipment Provisioning dialog.
To create the Main Shelf (Rack) select the 1678MCCsdhNE icon and choose the Edit > Create >
Rack menu option.
ED
02
3AG 24169 BEAA PCZZA
52/83
ED
02
3AG 24169 BEAA PCZZA
53/83
To create the NGTRU Shelf select the Rack icon and choose the Edit > Create > Shelf menu
option.
ED
02
3AG 24169 BEAA PCZZA
54/83
To create the Main Shelf (MCC 1678) select the Rack icon and choose the Edit > Create > Shelf
menu option.
ED
02
3AG 24169 BEAA PCZZA
55/83
According to the system configuration different Matrix Size must be configured. The following matrix sizes
are supported:
1K
160G
2K
320G
4K
640G (default)
Select the correct matrix size.
Dependent on the type of FLC and matrix board select the appropriate clock rate:
DS1 (1.5 Mb/s)
E1 (2Mb/s)
Press OK button.
Press Submit button.
Zoom in the new created mainShelf by double clicking on the Equipment View.
2.2.8
The SLC boards are not correctly configured after startAppl. Therefore the SLC boards must be reset
using the csReset command (first the passive SLC board). Execute the following commands on the
active FLC:
appl@emServA88(LogFiles)$ start
appl@emServA88(STARTUP)$ csReset MX640GEA icecold
appl@emServA88(STARTUP)$ csReset MX640GEB icecold
ED
02
3AG 24169 BEAA PCZZA
56/83
2.2.9
Set the Host ID and the OSPF Interface for Local Ethernet
If LAPD is to be configured, the Host ID has to be set. When running a GMRE application the Host ID and
OSPF Interface for Local Ethernet have to be set.
2.2.9.1
Configure Host ID
ED
02
3AG 24169 BEAA PCZZA
57/83
2.2.9.2
ED
02
3AG 24169 BEAA PCZZA
58/83
ED
02
3AG 24169 BEAA PCZZA
59/83
2.2.10
The Update of the FLC configuration using the EP tool is described in the following section.
Select Configuration > Equipment Provisioning
Select Edit > CS Configuration
SKY5530A
SKY5530A
ION7505Y
ION7505Y
In case of installation with ION (NE with GMRE), configure GMRE Node Address and Install Server IP
Address as follows:
ED
02
3AG 24169 BEAA PCZZA
60/83
In case of installation without ION (NE without GMRE), configure GMRE Node Address and Install
Server IP Address as follows:
Do not click on the OK button. Click on Other IP Hosts for further configuration.
ED
02
3AG 24169 BEAA PCZZA
61/83
Do not click on the OK button. Click on OSI DCN for further configuration.
ED
02
3AG 24169 BEAA PCZZA
62/83
Enter the NSAP address of the manager in the NSAP Address field:
Enter the name of the transport selector in the TSEL text field:
PCCT: 1102
SH: 010x
Enter the name of the session selector in the SSEL text field: 00
Enter the name of the presentation selector in the PSEL text field: 1D
Click on the add button to add the configuration data to the list
ED
02
3AG 24169 BEAA PCZZA
63/83
Examples:
ED
02
3AG 24169 BEAA PCZZA
64/83
2.2.11
Enter the correct IP address for the main NTP server. Optional a second NTP server (spare) can be
configured. Then press the ok button and wait until NRTCS alarm is cleared on both FLCs.
The configuration of the main NTP server is mandatory. Do not use FLC or ES64
addresses as NTP server address.
Enable the firewall on the installServer PC/Laptop.
ED
02
3AG 24169 BEAA PCZZA
65/83
2.2.12
2.2.12.1
Enabling
The Event Log Management (described in the ELB Rel 2.X Operators Handbook) is by default disabled
in the system software. To enable this feature you have to run a script on the active EM board.
Since the Event Log Management heavily affects the performance of Fast Restoration, it must not be
used together with GMRE/NP.
Do not enable this feature on NEs with GMRE/NP.
Perform the following steps to enable the Event Log Management:
~
Set logRecordsPersistent entry in MIBApplic.cfg to true. The MIB process will be restarted.
~
In case of CT:
Change to directory /ALCATEL/CTKv3.3.0/elb/conf and open file LogBrowsing.cfg :
cd /ALCATEL/CTKv3.3.0/elb/conf
vi LogBrowsing.cfg
Replace DIRECT with NESIM, safe and close the file LogBrowsing.cfg and restart the CT.
~
In all cases:
Open the Event Log Browser using NM/CT.
ED
02
3AG 24169 BEAA PCZZA
66/83
2.2.12.2
Disabling
To disable this feature you have to run a script on the active EM board.
All rights reserved. Passing on and copying of this
document, use and communication of its contents
not permitted without written authorization.
Set logRecordsPersistent entry in MIBApplic.cfg to false. The MIB process will be restarted.
ED
02
3AG 24169 BEAA PCZZA
67/83
2.2.13
2.2.13.1
Check if the configured time server is already selected. To do this, use the following command and check
on emServ, emCong, dcrSer and dcrCong, whether the listed external time sources are synchronized
(reach = 377):
appl@emServA83(appl)$ ntpq p
appl@emCongA83(appl)$ ntpq p
ED
02
3AG 24169 BEAA PCZZA
68/83
appl@dcrServA83(appl)$ ntpq p
appl@dcrCongA83(appl)$ ntpq p
Check, whether the NTP servers are reachable. If the value No is displayed:
ED
02
3AG 24169 BEAA PCZZA
69/83
2.2.13.2
Fan Speed
The fan speed can be read on pShell / telnet session to the ACTIVE SLC with command:
pSH+> eq getPot 22 4 0
pSH+> eq getPot 22 4 1
pSH+> eq getPot 22 4 2
pSH+> eq getPot 25 4 0
pSH+> eq getPot 25 4 1
pSH+> eq getPot 25 4 2
This value is then stored in persistent memory of the fan, i.e. it survives a power down of the fan drawer,
shelf controller or complete shelf like the fan speed setting in factory.
ED
02
3AG 24169 BEAA PCZZA
70/83
2.3
This is the short description of the initial installation and start-up of the 1678MCC software. This
description has been written for well trained personal. For details see the description in Chapter 2.2.
This installation procedure describes the installation of both FLC at the same time. Therefore, a hub is
needed to connect the CT PC/Laptop to both FLCs.
The whole installation must be executed as user install.
2.3.1
2.3.1.1
a)
b)
Delete already available SKY and ION builds on your installServer which are not required anymore
(to provide enough space on disk).
c)
Insert the CORE, SKY and ION CDROM successively into the CDROM drive. Begin with the CORE
CDROM.
d)
Adapt the network configuration of the installServer PC/Laptop to the network configuration of the
FLC.
e)
Configure the two serial interfaces (console connection) to the DCR and EM boards.
2.3.1.2
a)
Connect both FLC LAN interfaces via a hub to the installServer PC/Laptop.
b)
Connect the console cable between the COM1 and COM2/COM5 of the installServer PC/Laptop with
the console interface on the FLC. Refer to Figure 1.
ED
02
3AG 24169 BEAA PCZZA
71/83
2.3.2
FLC Installation
2.3.2.1
COM1
DCR board
COM2/COM5
2.3.2.2
<>
a)
b)
c)
d)
or
=> ver
f)
2.3.2.3
a)
or
=> reset
./aiGuideWizzard
b)
Enter the required FLC configuration data in the aiGuideWizzard. Do not press the Start
installation button.
c)
Reboot the FLC by pressing the reset button for about 3 seconds. Interrupt the booting sequence
by pressing the ESC button in the EM console just after the message Init ECC memory...
appears.
ED
02
3AG 24169 BEAA PCZZA
72/83
d)
MenMon> eedef
MenMon> rst
e)
Press Start Installation button in the aiGuideWizzard just after the following message appears:
Searching for server (BOOTP) ... .
This operation will start the FLC installation.
2.3.3
a)
b)
c)
d)
e)
f)
g)
h)
i)
2.3.4
a)
2.3.5
a)
b)
Fan Speed.
ED
02
3AG 24169 BEAA PCZZA
73/83
ED
02
74/83
TROUBLESHOOTING
3.1
If the system does not come up after FLC installation, check wether the I/O boards and LAX boards have
the correct versions of FPGA Goblin. The correct version are:
The folowing example shows how to check the version of FPGA Goblin. The version is contained in the
FPGA register 0 and 1. In the example below the FPGA register 0 contains 3, while the FPGA register
1 contains 5, which means the version of the Goblin is 3.5.
Open a telnet session to the active SLC and enter the commands written in bold:
Telnet+> hw_cfg
HWCFGDRV devicedriver
HWCFGDRV devicedriver
ED
02
3AG 24169 BEAA PCZZA
75/83
Select : 2
Insert slot board: 3
0 version
1 hidden_version
2 flash_op
3 fpga_download
Insert register address : 1
FPGA register 1 = 0x5 > Second Byte of Goblin version: 5 > Version: 3.5
ED
02
3AG 24169 BEAA PCZZA
76/83
4.1
General Information
This chapter describes the actions and steps necessary for the post installation of ION75 executed via
NM on a running system with SKY55<label>.
Since the Event Log Management heavily affects the performance of Fast Restoration, it
must not be used together with GMRE/NP. Disable this feature before installing GMRE
(see chapter 2.2.12.2 on page 67).
4.2
Remarks
The active FLC can used as installServer in the installSWRelease call if the software is present in
the directory /packages/aiGuide/tmp.install/ION75 <label>.
Be aware that the installation software allways automatically downloads the software packages from
the partner FLC if they are in the directory /packages/aiGuide/tmp.install/ION75 <label>, even
if an NM is specified as installServer. This is an internal performance improvement for the installation
of the seconds FLC.
# check if an sshd
# daemon is running
# to stop an old one
4.3
ED
Restrictions
Since the Event Log Management heavily affects the performance of Fast Restoration, it must not
be used together with GMRE/NP. If not done yet disable this feature before installing GMRE (see
chapter 2.2.12.2 on page 67).
02
3AG 24169 BEAA PCZZA
77/83
4.4
Requirements
An OMSG Alcatel 1678MCC installed with redundant FLC boards and NM.
Current Handbook.
For typing the following Unix commands xterm terminals are used.
4.5
Preconditions
FLCCongi must be the active one, FLCService board must be passive. Also the SSU process must
be reachable on both FLCs. Test this as user appl on both EM boards with:
SSUDiag c getEquipInfo
ED
02
3AG 24169 BEAA PCZZA
78/83
4.6
SSUDiag c shutAppl
tools
./installSWRelease installServer=<IPaddress_NM>
\
gmreServiceSWRelease=ION75<label> force
\
host=localhost gmreNodeAddress=<GMRE_Node_Address>
SSUDiag c startAppl
Wait until the persistency is synchronized and check it on the active emCongi as user appl:
isPersSync
ED
02
3AG 24169 BEAA PCZZA
79/83
SSUDiag c shutAppl
PersSync active
SSUDiag c startAppl
tools
./installSWRelease installServer=<IPaddress_NM>
\
gmreCongiSWRelease=ION75<label> force
\
host=localhost gmreNodeAddress=<GMRE_Node_Address>
ED
02
3AG 24169 BEAA PCZZA
80/83
SSUDiag c stopSSU
PersCreate passive
SSUDiag c startSSU
SSUDiag c startAppl
Wait until the persistency is synchronized and check it on the both FLC (EM board):
PersSync
SSUDiag c switch
ED
02
3AG 24169 BEAA PCZZA
81/83
ED
02
82/83
ENDOFDOCUMENT
ED
02
83/83