PRICE
SCHEDULE
REFERENCE
DESCRIPTION
ACTUAL
UOM AS PER QTY AS PER
MEASURED
CONTRACT CONTRACT
QTY
230
225
span
10
10
15
12
No.
Quantity Measured by
( Contractor Name)
Quantity Witnessed by
(DPC Engineer)
Quantity Accepted By
(Client-DPC)
REMARKS/NOTE
S
Quantity Accepted By
(Client-DPC)
DPC
11 KV NETWORK IMPROVEMENT AND INTERLINK WORKS IN ZONE-3 : 11KV & LV REFURBISHMENT WORK AT H
Price
Schedule
Refernace
DESCRIPTION
Supply and installation of 11 KV OH line with 1320mm
creepage insulators , 150sq.mm 'SAX' conductor, including
Poles, Stays, Lightning arrestor, erathing , etc.( Special Wadi
protection Concrete tp be provided for poles and stays as per
OES & as per OES Drg no. MEW/PL/CL/019)
Page 5/14
DPC
11 KV NETWORK IMPROVEMENT AND INTERLINK WORKS IN ZONE-3 : 11KV & LV REFURBISHMENT WORK AT H
Price
Schedule
Refernace
10
10
DESCRIPTION
Quantity Measured by
( Contractor Name)
Quantity Witnessed by
(DPC Engineer)
Page 6/14
DPC
11 KV NETWORK IMPROVEMENT AND INTERLINK WORKS IN ZONE-3 : 11KV & LV REFURBISHMENT WORK AT H
Price
Schedule
Refernace
11
11
12
12
13
13
14
14
15
15
16
16
DESCRIPTION
17
17
18
18
19
19
Page 7/14
DPC
11 KV NETWORK IMPROVEMENT AND INTERLINK WORKS IN ZONE-3 : 11KV & LV REFURBISHMENT WORK AT H
Price
Schedule
Refernace
20
20
21
21
22
22
23
23
24
24
DESCRIPTION
Quantity Measured by
( Contractor Name)
Quantity Witnessed by
(DPC Engineer)
Page 8/14
DPC
11 KV NETWORK IMPROVEMENT AND INTERLINK WORKS IN ZONE-3 : 11KV & LV REFURBISHMENT WORK AT H
Price
Schedule
Refernace
DESCRIPTION
Page 9/14
SFO
ASURMENT SHEET
Actual
Measured QTY
Original
Contract QTY
Unit
8.00
8.00
KM
7.00
2.00
KM
0.50
0.00
KM
0.50
0.00
KM
LS
LS
LS
REMARKS &
NOTES
Page 10/14
SFO
ASURMENT SHEET
Actual
Measured QTY
Original
Contract QTY
Unit
No
No
1,500
1,651
Mtr
REMARKS &
NOTES
.
Quantity Accepted By
(Client-DPC)
Page 11/14
SFO
ASURMENT SHEET
Actual
Measured QTY
Original
Contract QTY
Unit
500
508
Mtr
15
nos
50
Mtr
20
10
Mtr
10
61
Mtr
LS
Nos
Nos
30
84
Nos
REMARKS &
NOTES
Page 12/14
SFO
ASURMENT SHEET
Actual
Measured QTY
Original
Contract QTY
Unit
Nos
12
Nos
57
42
Nos
16
Nos
15.0
10.6
KM
REMARKS &
NOTES
.
Quantity Accepted By
(Client-DPC)
Page 13/14
SFO
ASURMENT SHEET
Actual
Measured QTY
Original
Contract QTY
Unit
REMARKS &
NOTES
Page 14/14