Documente Academic
Documente Profesional
Documente Cultură
DEPARTMENT:
SHEET 1 OF 11
Engineering / Mechanical
Spec.No: 00/05/TS011
REV: C1
STANDARD TECHNICAL
SPECIFICATION
FOR
HYDRAULIC SYSTEMS
This Standard Technical Specification is subject to change without prior notice. The most
current issue will at all times be located on the Nordural web site, www.nordural.is.
REV
A
C1
BY
TBA
EFB/G
DATE
18.10.2000
07.06.2004
CHKD
APPROVED
EFB
OJ
NORURL - ENGINEERING
REVISIONS
FOR REVIEW
Issued for construction
NORURL
NORDIC ALUMINUM
TABLE OF CONTENTS
SPECIFICATION PREFACE SHEET..................................................................................................... 1
1.
GENERAL ......................................................................................................................................... 3
1.1
1.2
1.3
1.4
1.5
1.6
2.
3.
System drawings.................................................................................................................... 4
Drawing format..................................................................................................................... 4
Acceptance of a system design .............................................................................................. 4
THE FLUID, CHOICE AND TREATMENT ........................................................................... 4
Choice of fluid ....................................................................................................................... 4
FILTRATION ................................................................................................................................ 5
Location of the filters ............................................................................................................ 5
Filter arrangement ................................................................................................................ 5
Filter sizing ........................................................................................................................... 5
Added filtration (on request from Norurl)......................................................................... 5
THE RESERVOIR..................................................................................................................... 6
Construction .......................................................................................................................... 6
Capacity ................................................................................................................................ 6
Impermeability (on request from Norurl).......................................................................... 6
Equipment ............................................................................................................................. 6
Returns and drains ................................................................................................................ 7
THERMAL EXCHANGERS .................................................................................................... 7
Heating the fluid (on a request from Norurl) .................................................................... 7
Fluid cooling ......................................................................................................................... 7
HYDRAULIC PUMPS ..................................................................................................................... 8
HYDRAULIC CYLINDERS .............................................................................................................. 8
HYDRAULIC VALVES ................................................................................................................... 8
Directional valves ................................................................................................................. 8
Main pressure relief valve..................................................................................................... 9
Pressure-, isolator- and flow valves...................................................................................... 9
Assembly on a drilled manifold ............................................................................................. 9
PIPING AND FITTINGS .............................................................................................................. 10
Hydraulic piping ................................................................................................................. 10
Hydraulic hoses.................................................................................................................. 10
Hydraulic fittings and support ............................................................................................ 10
Expansion............................................................................................................................ 10
Pipe welding........................................................................................................................ 10
Page 2 of 11
REV C1
NORURL
NORDIC ALUMINUM
3.2
1.
GENERAL
The purpose of this standard is to show the constructive arrangements for the
studies and developments of hydraulic installations within Norurl Aluminium
Plant.
The specific conditions for the operating of an aluminium plant have led
Norurl to specify the constructive arrangements essential to the proper
functioning of hydraulic installations.
In this Document the following words and expressions shall have the meaning
hereby assigned to them except where the context otherwise requires:
Engineer:
The Owner or any person or organisation employed or engaged at
any time by the Owner and authorised by the Owner, in writing, from time to
time to act on behalf of the Owner in the execution of the items covered by this
Document, in whole or in any part, for any or all purposes provided in this
Technical Specification.
Owner:
Norurl hf (Nordic Aluminum Corporation Ltd.), an independent
legal entity owned by Century Aluminum.
1.1
NOMINAL PRESSURE
The nominal pressure is restricted to 210 bars maximum. Higher system
pressure shall be endorsed by The Engineer.
1.2
ELECTRICAL REQUIREMENT
As stated in Norurl Standard Technical Specifications for Electrical
Equipment
1.3
SYSTEM SIMPLICITY
Most of the hydraulic applications of an aluminium plant do not require
sophisticated systems. Norurl would like the suppliers of hydraulic circuits to
aim for simplicity in their design and reserves the right to refuse any system
considered to be more sophisticated than asked for.
1.4
Page 3 of 11
REV C1
NORURL
NORDIC ALUMINUM
1.5
NOISE LEVEL
Noise level from a hydraulic system shall not exceed Icelandic OSHA
requirements.
1.6
CE-CERTIFICATE
All equipment delivered to Norurl shall have CE-Certificate from the supplier.
2.
CONSTRUCTION DATA
2.1
2.2
REV C1
NORURL
NORDIC ALUMINUM
2.3
FILTRATION
Filtration systems that only have filters on the suction side of the pumps
are not acceptable.
Every hydraulic installation shall be equipped with a system of return
filters.
In hydraulic systems, with sensitive control valve systems, high pressure
filters are required on the pressure side of the pump.
The drain collector also has a filtration system.
All filters must be easily accessible and able to change filter elements
with a minimum loss of oil and time.
All filters shall be equipped with visual pressure drop indicator.
For continuously operating installations that cannot be stopped for filter
changes, filters shall be installed in duplicate, mounted in parallel. Filter
switching takes place using isolation valves, which may have proximity
safety devices confirming valve position and authorizing the start up of
the pumps.
On the return side of the system the filters shall be designed for at least
two times the peak return flow (including discharge of accumulators and
jacks) with a load loss of 10 to 35 kPa and having filtration ratio of 10-20
micron absolute value.
On the high-pressure side of the circuit the filters shall be designed for at
least twice the maximum-flow of the pump(s) with a load loss of 70 kPa
(complete filter, new filter element) and having filtration ratio of 10-20
micron absolute value.
REV C1
NORURL
NORDIC ALUMINUM
2.4
THE RESERVOIR
2.4.1 Construction
2.4.2 Capacity
Reservoir capacity for fluid VG46 shall be not less than:
The maximum system volume, or
Three (3) times the pump capacity in l/min.
Reservoir capacity for Fire resistant fluid shall be not less than:
Four (4) times the pump capacity in l/min.
2.4.3
2.4.4 Equipment
A reservoir shall be equipped with
A visual level display with electrical low-level indicator, activated when at
least 40% of the tank volume is remaining in the tank, and by that
shutting down the hydraulic pump.
Heat sensor activated when the oil temperature reaches 80C.
A drainage pipe with a ball valve
An open spillage pan placed under the reservoir and pump to
accumulate all spillage. This pan shall be able to be emptied by gravity.
Air breather with filtration-threshold of 3 micron. The air that enters shall
be dried using a cartridge of a drying product.
Page 6 of 11
REV C1
NORURL
NORDIC ALUMINUM
Fill connections shall be placed so that the fluid passes through the
return filter. Filling takes place using a hydraulic quick coupling 1/2"
connection.
2.5
THERMAL EXCHANGERS
The normal working temperature of the hydraulic circuit must be between 40
and 70C. Working fluid heating and cooling systems shall be used to ensure
this temperature.
To avoid all local oil carbonisation, electrical heating tubes that can
produce about 0.7 W/cm2 shall be used.
The tubes must be carefully installed on the walls of the reservoir and
must be able to be dismantled without having to empty the reservoir
(well or sheath). They shall be located halfway between the bottom of
the reservoir and the minimum- oil level.
Low speed oil circulation (using an auxiliary pump) is recommended
(stirring of the oil to prevent having hot and cold areas).
Heating tubes that produce more than 0.7 W/cm2, but less than 2
W/cm2 can only be used with the Engineer approval. This size of heating
tubes requires low speed oil circulation and suitable baffles in the
reservoir so as to be properly submerged in oil. An electrical safety
device allows the tubes to be turned on only if the auxiliary circulation
pump is on.
Fluid cooling
If the natural cooling of the designed hydraulic system is insufficient an external
cooling shall be added.
The cooling method preferred is by air cooled heat exchanger.
For installations under 30 kW of power, the cooler shall be mounted on
the return line to the reservoir. Depending on requirements it may let
either all or a part of the oil in circulation to pass through.
Page 7 of 11
REV C1
NORURL
NORDIC ALUMINUM
2.6
In any event, all returns from the pressure limiters shall pass through the
cooler.
A thermostat valve shall regulate the cooling of the hydraulic fluid. This
valve shall starts up cooling if the temperature rises higher than 55C
and maintains cooling until a temperature of 40C is reached.
Major installations over 30 kW of power shall be equipped with a special
cooling circuit that is similar in principle to the heating system.
HYDRAULIC PUMPS
The choice of the type of pump depends on the specified pressure limits
Vane pumps:
up to 10 MPa (used only with special permission)
Gear pumps:
up to 15 MPa
Piston pumps: all pressures
Rotation speed is limited to 1500 rpm, including in the case of thermal motor
drive.
Maximum underpressure on pump suctions -10 kPa.
Pumps shall be mounted sideward or under the reservoir with an
acceptable access to the pump.
A shut-off valve shall be placed on the suction pipe between pump and
reservoir.
In case of specific space problems a pump can be mounted on top of the
reservoir, with special permission from the Engineer.
Only small gear pumps can be immersed in the reservoir.
A pump is mounted on the electric motor using a lantern and coupling.
When using double identical pumps, each pump is mounted on its own
electric motor
2.7
HYDRAULIC CYLINDERS
2.8
HYDRAULIC VALVES
REV C1
NORURL
NORDIC ALUMINUM
The type of assembly must enable each receiver (cylinder, motor etc) to
be isolated from the control circuit.
No element (speed control valve etc) must be located inside the block.
The diameter of the drilling holes must be equal at least to the nominal
diameter of the connected piping in order to guarantee a minimum of
toad loss.
The connections must not display any widening (accumulation of
impurities) or narrowing (local load losses).
Page 9 of 11
REV C1
NORURL
NORDIC ALUMINUM
2.9
2.9.2
Hydraulic hoses
In particular, flexible tubing shall be used only
Between mobile pieces of equipment
To facilitate the replacement of interchangeable components
To reduce the transmission of mechanical vibrations and/or noise.
2.9.4 Expansion
The connections shall be spread out to create a line that is better for expansion.
2.9.5 Pipe welding
All pipe welding on hydraulic tubes is forbidden.
Page 10 of 11
REV C1
NORURL
NORDIC ALUMINUM
3.
3.1
3.2
Page 11 of 11
REV C1