BOQ
Page
Unit
Difference
m3
43,065
#REF!
#REF!
m3
190
#REF!
#REF!
m3
42,875
#REF!
#REF!
Backfilled
2/1
2/1
BOQ
Page
Unit
Difference
3/1
3/1
m3
905
958
53
10097.01
162
248.22
16
Reinforced Concrete
Reinforced cement concrete Grade 45 (C 45/20) minimum
cement content 380 kg/m3 with Sulphate Resisting / Ordinary
Portland cement. Including reinforcement, concrete,
formwork,..... Etc. Complete
3/1
m3
9,935
3/1
Columns
m3
232
3/1
Shear walls
m3
71
75.52
3/1
m3
463
508.62
46
3/1
m3
70
70
3/1
m3
20
20
m3
59
54
-5
Unit
Difference
m3
19
19
3/3
Columns
m3
689
743.6
54.6
3/3
Shear walls
m3
233
#REF!
#REF!
3/3
m3
13
13
3/3
m3
52
52
3/3
Parapet walls
m3
126.5
117.50
3/3
m3
100
89.4
-10.56
BOQ
Page
Unit
Difference
3/4
m2
1,317
1,317.0
3/4
m2
6,840
7,029.0
189
3/4
m2
419
419.0
3/4
m2
6,456
6,530.0
74
3/4
m2
1,067
1,076.0
3/4
m2
6,443
6,443.0
3/4
m2
1,067
1,541.0
474
3/4
m2
6,709
6,900.0
191
3/4
m2
1,067
1,120.0
m3
802
802
m3
99
99
m3
76
76
m3
53
53
L.S
53
BOQ
Page
Unit
Difference
Rate
Total
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Rate
Total
#REF!
#REF!
749
121345.690825624
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Rate
Total
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Rate
Total
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
574.3225
56954.844421875
1288.2
97604.3376
1166.16
61678.2024
39550
39550
#REF!
Rate
Total
#REF!
#REF!
#REF!
#REF!
#REF!
SUMMARY
Contract Value
Variations
Claims
Others
Revised Contract Value (Dhs)
Performance security Bond No:
10%
Period Ending :
31-Dec-14
Duration
12 months
Commencement date :
15-Dec-14
Additions:
A
Advance Payment
Deductions:
G
Liquidated damages
Amount due in words UAE Dirams : Four Hundred One Thousand Six Hundred Twenty and
The Contractor : MESC
..
ai - UAE
Issue Date :
7/Jan/2015
SUMMARY
10,000,000.00
10,000,000.00
Valid Until :
30-Jan-15
15-Dec-15
AED
AED
4,956,469.12
4,956,469.12
1,000,000.00
495,646.91
504,353.09
5,460,822.21
495,646.91
-
(495,646.91)
4,965,175.30
3,988,389.11
976,786.19
Dhs.
Add/Less
Add/Less
:
:
Dhs.
Dhs.
Add/Less
Dhs.
:
:
:
Dhs.
Dhs.
Dhs.
10,000,000.00
-
10,000,000.00
Advance Payment
Dhs.
10%
Bankers:
1,000,000.00 Bankers:
Deduct
Deduct
Deduct
(Appendix F)
Total Deduction
Add Materials on site 75 % (Appendix E)
Percentage of work done :
53.64%
NET AMOUNT D
(Dirhams Three hundred and twoThousand Four Hundred Sixty Nine and Fils 34 / 100 Only)
Signature:
Date:
NET AMOUNT
ATION NO. 10
Commencement Date
Duration (Days)
Completion Date
15/Dec/14
365
15/Dec/15
Expiry Date:
Not Available
Expiry Date:
DHS.
(Appendix A)
DHS.
5,363,573.06
(Appendix B)
(Appendix C)
(Appendix D)
5,363,573.06
5,363,573.06
536,357.31
536,357.31
pecified)
(Appendix F)
ly)
3,988,389.112
5,061,103.72
5,061,103.72
-
TOTAL
302,469.34
DHS.
302,469.34
USE
Dhs.
Bill Description
Contract Amount
Amount (Dhs)
Previous
Current
To date
Previous
Current
To date
5,145,734.93
89.74%
6.58%
96.32%
4,617,740.19
338,728.93
4,956,469.12
3,600,000.00
10.22%
1.09%
11.31%
367,746.20
39,357.73
407,103.93
49.85%
3.78%
53.64%
4,985,486.39
378,086.67
5,363,573.06
Total - Carried to PA
10,000,000.00
8,745,734.93
Page 25 of 1621
Appendix F
Certificate No.
Period Ending
PC # 01
December-14
401,620.80
PC # 02
January-15
100,978.23
PC # 03
February-15
527,968.01
PC # 04
March-15
50,000.00
Amount ( AED )
Remarks
PC # 05
April-15
600,836.17
PC # 06
May-15
338,053.96
PC # 07
June-15
456,501.61
PC # 08
July-15
464,011.35
PC # 09
August-15
717,486.02
3,988,389.11
Page 26 of 1621
Bill Description
Contract Amount
Amount (Dhs)
Previous
Current
To date
Previous
Current
To date
1.1
Preliminaries
500,000.00
73.00%
4.13%
77.13%
365,000.00
1.2
Site Works
690,428.53
98.45%
0.00%
98.45%
679,704.10
1.3
Concrete Works
3,707,730.02
91.03%
7.33%
98.36%
3,375,188.22
1.4
73,004.50
100.00%
0.00%
100.00%
73,004.50
1.5
Masonry Works
107,863.25
95.94%
4.06%
100.00%
103,478.85
4,384.40
107,863.25
1.6
Finishing Works
66,708.63
95.09%
21,364.52
42,067.72
63,432.25
4,617,740.19
338,728.93
4,956,469.12
10,000,000.00
5,145,734.93
95.09%
46.18%
3.39%
49.56%
20,625.00
271,651.81
385,625.00
679,704.10
3,646,840.03
73,004.50
Page 27 of 1621
Description
Preliminaries ( 5% of Contract Value)
Quantity
Unit
Unit Rate
LS
500,000.00
Valuation Qty. or %
(Amount Dhs)
Previous
Valuation Amount
Current
To date
Previous
This month
Remarks
To-Date
500,000.00
Break down
A
Mobilization
40%
LS
200,000.00
100%
0%
100%
200,000.00
55%
LS
275,000.00
60.00%
7.50%
67.50%
165,000.00
Demobilisation
5%
LS
25,000.00
0%
0%
0%
73.00%
4.13%
77.13%
20,625.00
-
200,000.00
185,625.00
-
100%
500,000.00
365,000.00
20,625.00
385,625.00
Page 28 of 1621
Item Description
Quantity
Unit
Rate
Site work
A
3,973.31
m3
20.00
71.00
m3
60.00
Anti-termite Treatment (Qty. for All Blocks) (Work done for Manara block/Accomodation
block/UG Tank)
2,940.47
m2
5.00
Stone Columns works to Improve Soil Bearing Capacity (For All Blocks, except Manara
Block)
LS
550,000.00
Back filling with excavated earth upto grade slab level (for all Blocks)
4,200.00
m3
10.00
Page 29 of 1621
Item Description
Quantity
Unit
Rate
Page 30 of 1621
Amount
(Dhs)
79,466.20
4,260.00
14,702.33
550,000.00
42,000.00
Progress (%)
Previous
Current
To date
98.00%
0.00%
98.00%
100.00%
0.00%
100.00%
95.00%
0.00%
95.00%
100.00%
0.00%
100.00%
80.00%
0.00%
80.00%
Payment Application - 10
Work Done Upto:
30/Sep/15
Amount (Dhs)
Previous
Current
To date
Remarks
77,876.88
77,876.88
4,260.00
4,260.00
13,967.22
13,967.22
550,000.00
550,000.00
33,600.00
33,600.00
Page 31 of 1621
Amount
(Dhs)
690,428.53
Progress (%)
Previous
Current
To date
Payment Application - 10
Work Done Upto:
30/Sep/15
Amount (Dhs)
Previous
679,704.10
Current
To date
Remarks
679,704.10
Page 32 of 1621
Item Description
Quantity
Unit
Rate
14.00
m3
400.00
160.00
m3
1,400.00
Reinforced cement concrete of grade 40/20 substructure with recommended cement type
and weight as per soil report
B
42.14
m3
1,500.00
35.24
m3
1,500.00
5.00
m3
1,500.00
Page 33 of 1621
Item Description
Quantity
Unit
Rate
3.00
m3
1,550.00
3.00
m3
1,500.00
19.75
m3
1,500.00
22.14
m3
1,500.00
12.30
m3
1,500.00
11.07
m3
1,500.00
7.68
m3
400.00
21.89
m3
1,200.00
2.83
m3
1,550.00
2.37
m3
400.00
18.29
m3
1,200.00
20.00
m3
700.00
Page 34 of 1621
Item Description
RCC Columns - Ground Floor
Quantity
6.07
Unit
m3
Rate
1,550.00
Page 35 of 1621
Item Description
Quantity
Unit
Rate
39.48
m3
1,500.00
9.27
m3
1,500.00
23.51
m3
1,550.00
1.80
m3
1,575.00
6.23
m3
400.00
19.70
m3
1,100.00
9.25
m3
1,500.00
10.28
m3
1,500.00
10.39
m3
400.00
5.54
m3
400.00
Page 36 of 1621
Item Description
RCC Footings
Quantity
Unit
Rate
47.38
m3
1,200.00
1.05
m3
1,550.00
20.59
m3
1,200.00
20.00
m3
700.00
6.60
m3
1,550.00
52.24
m3
1,500.00
9.84
m3
1,500.00
23.10
m3
1,550.00
2.30
m3
400.00
2.10
m3
400.00
RCC Footings
6.40
m3
1,200.00
1.46
m3
1,550.00
6.52
m3
1,200.00
3.84
m3
700.00
Page 37 of 1621
Item Description
RCC Columns GF
Quantity
8.00
Unit
m3
Rate
1,550.00
Page 38 of 1621
Item Description
Quantity
Unit
Rate
33.32
m3
400.00
16.94
m3
400.00
130.90
m3
1,200.00
8.47
m3
1,550.00
57.34
m3
1,200.00
18.10
m3
700.00
80.92
m3
400.00
427.62
m3
1,200.00
44.32
m3
1,550.00
96.00
m3
1,750.00
28.31
m3
400.00
144.73
m3
1,200.00
RCC Lift & Staircase Wall upto GF(Prayer Area & Class Room)
7.20
m3
1,500.00
Page 39 of 1621
Item Description
Quantity
Unit
Rate
93.18
m3
700.00
114.61
m3
1,550.00
75.21
m3
1,500.00
75.83
m3
1,500.00
30.02
m3
1,500.00
49.08
m3
1,500.00
17.71
m3
1,500.00
14.96
m3
1,550.00
48.75
m3
1,500.00
19.35
m3
1,500.00
AA
457.88
m2
60.00
AB
193.18
m3
1,500.00
Page 40 of 1621
Item Description
RCC Beams - Roof (Main Mosque)
Quantity
Unit
112.50
m3
Rate
1,500.00
Page 41 of 1621
Item Description
Quantity
Unit
Rate
76.59
m3
1,500.00
21.12
m3
1,500.00
RCC Parapet Wall 20cm thick (Main Mosque & Class Room)
65.79
m3
1,550.00
D
E
F
G
H
J
K
L
M
P
Page 42 of 1621
Item Description
Quantity
Unit
Rate
Q
R
S
T
U
V
W
X
Y
Z
AA
AB
Page 43 of 1621
Item Description
Quantity
Unit
Rate
AC
Page 44 of 1621
Item Description
Quantity
Unit
Rate
Page 45 of 1621
Amount
(Dhs)
Payment Application - 10
Work Done Upto :
30/Sep/15
Amount (Dhs)
Progress (%)
Previous
Current
To date
Previous
Current
To date
5,600.00
100.00%
0.00%
100.00%
5,600.00
5,600.00
224,000.00
100.00%
0.00%
100.00%
224,000.00
224,000.00
63,210.00
100.00%
0.00%
100.00%
63,210.00
63,210.00
52,860.00
100.00%
0.00%
100.00%
52,860.00
52,860.00
7,500.00
100.00%
0.00%
100.00%
7,500.00
7,500.00
Page 46 of 1621
Amount
(Dhs)
Payment Application - 10
Work Done Upto :
30/Sep/15
Amount (Dhs)
Progress (%)
Previous
Current
To date
Previous
Current
To date
4,650.00
100.00%
0.00%
100.00%
4,650.00
4,650.00
4,500.00
100.00%
0.00%
100.00%
4,500.00
4,500.00
29,625.00
100.00%
0.00%
100.00%
29,625.00
29,625.00
33,210.00
100.00%
0.00%
100.00%
33,210.00
33,210.00
18,450.00
100.00%
0.00%
100.00%
18,450.00
18,450.00
16,605.00
100.00%
0.00%
100.00%
16,605.00
16,605.00
3,072.00
100.00%
0.00%
100.00%
3,072.00
3,072.00
26,268.00
100.00%
0.00%
100.00%
26,268.00
26,268.00
4,386.50
100.00%
0.00%
100.00%
4,386.50
4,386.50
948.00
100.00%
0.00%
100.00%
948.00
948.00
21,948.00
100.00%
0.00%
100.00%
21,948.00
21,948.00
14,000.00
100.00%
0.00%
100.00%
14,000.00
14,000.00
Page 47 of 1621
Amount
(Dhs)
9,408.50
540,241.00
Payment Application - 10
Work Done Upto :
30/Sep/15
Amount (Dhs)
Progress (%)
Previous
Current
To date
100.00%
0.00%
100.00%
100.0%
0.0%
100.0%
Previous
Current
To date
9,408.50
9,408.50
540,241.00
540,241.00
Page 48 of 1621
Amount
(Dhs)
Payment Application - 10
Work Done Upto :
30/Sep/15
Amount (Dhs)
Progress (%)
Previous
Previous
Current
To date
Current
To date
59,220.00 100.00%
0.00%
100.00%
59,220.00
59,220.00
13,905.00 100.00%
0.00%
100.00%
13,905.00
13,905.00
36,440.50 100.00%
0.00%
100.00%
36,440.50
36,440.50
2,835.00 100.00%
0.00%
100.00%
2,835.00
2,835.00
2,492.00
100.00%
0.00%
100.00%
2,492.00
2,492.00
21,670.00
100.00%
0.00%
100.00%
21,670.00
21,670.00
13,875.00
100.00%
0.00%
100.00%
13,875.00
13,875.00
15,417.83
100.00%
0.00%
100.00%
15,417.83
15,417.83
4,156.00 100.00%
0.00%
100.00%
4,156.00
4,156.00
2,216.00 100.00%
0.00%
100.00%
2,216.00
2,216.00
Page 49 of 1621
Amount
(Dhs)
Payment Application - 10
Work Done Upto :
30/Sep/15
Amount (Dhs)
Progress (%)
Previous
Previous
Current
To date
Current
To date
56,856.00 100.00%
0.00%
100.00%
56,856.00
56,856.00
1,627.50 100.00%
0.00%
100.00%
1,627.50
1,627.50
24,708.00 100.00%
0.00%
100.00%
24,708.00
24,708.00
14,000.00 100.00%
0.00%
100.00%
14,000.00
14,000.00
10,230.00 100.00%
0.00%
100.00%
10,230.00
10,230.00
78,360.00 100.00%
0.00%
100.00%
78,360.00
78,360.00
14,760.00 100.00%
0.00%
100.00%
14,760.00
14,760.00
35,805.00 100.00%
0.00%
100.00%
35,805.00
35,805.00
920.00 100.00%
0.00%
100.00%
920.00
920.00
840.00 100.00%
0.00%
100.00%
840.00
840.00
7,680.00 100.00%
0.00%
100.00%
7,680.00
7,680.00
2,263.00 100.00%
0.00%
100.00%
2,263.00
2,263.00
7,824.00 100.00%
0.00%
100.00%
7,824.00
7,824.00
2,688.00 100.00%
0.00%
100.00%
2,688.00
2,688.00
Page 50 of 1621
Amount
(Dhs)
Progress (%)
Previous
12,400.00 100.00%
443,188.83
Payment Application - 10
Work Done Upto :
30/Sep/15
Amount (Dhs)
100.0%
Current
To date
0.00%
100.00%
0.0%
100.0%
Previous
Current
To date
12,400.00
12,400.00
443,188.83
443,188.83
Page 51 of 1621
Amount
(Dhs)
Payment Application - 10
Work Done Upto :
30/Sep/15
Amount (Dhs)
Progress (%)
Previous
Current
To date
Previous
Current
To date
13,328.00
100.00%
0.00%
100.00%
13,328.00
13,328.00
6,776.00
100.00%
0.00%
100.00%
6,776.00
6,776.00
157,080.00
100.00%
0.00%
100.00%
157,080.00
157,080.00
13,128.50
100.00%
0.00%
100.00%
13,128.50
13,128.50
68,808.00 100.00%
0.00%
100.00%
68,808.00
68,808.00
12,670.00 100.00%
0.00%
100.00%
12,670.00
12,670.00
32,368.00 100.00%
0.00%
100.00%
32,368.00
32,368.00
513,144.00 100.00%
0.00%
100.00%
513,144.00
513,144.00
68,696.00 100.00%
0.00%
100.00%
68,696.00
68,696.00
35.00%
85.00%
84,000.00
11,324.00 100.00%
0.00%
100.00%
11,324.00
11,324.00
173,676.00 100.00%
0.00%
100.00%
173,676.00
173,676.00
10,800.00 100.00%
0.00%
100.00%
10,800.00
10,800.00
168,000.00
50.00%
58,800.00
142,800.00
Page 52 of 1621
Amount
(Dhs)
Payment Application - 10
Work Done Upto :
30/Sep/15
Amount (Dhs)
Progress (%)
Previous
Previous
Current
To date
Current
To date
65,226.00 100.00%
0.00%
100.00%
65,226.00
65,226.00
177,651.70 100.00%
0.00%
100.00%
177,651.70
177,651.70
112,816.13 100.00%
0.00%
100.00%
112,816.13
112,816.13
113,739.17 100.00%
0.00%
100.00%
113,739.17
113,739.17
45,027.60 100.00%
0.00%
100.00%
45,027.60
45,027.60
73,612.50 100.00%
0.00%
100.00%
73,612.50
73,612.50
26,557.50 100.00%
0.00%
100.00%
26,557.50
26,557.50
23,188.00
100.00%
0.00%
100.00%
23,188.00
23,188.00
73,125.00
100.00%
0.00%
100.00%
73,125.00
73,125.00
29,025.00
100.00%
0.00%
100.00%
29,025.00
29,025.00
27,472.80
100.00%
0.00%
100.00%
27,472.80
27,472.80
289,762.50
100.00%
0.00%
100.00%
289,762.50
289,762.50
Page 53 of 1621
Amount
(Dhs)
168,756.00
2,475,758.39
Payment Application - 10
Work Done Upto :
30/Sep/15
Amount (Dhs)
Progress (%)
Previous
100.00%
96.6%
Current
To date
0.00%
100.00%
2.4%
99.0%
Previous
168,756.00
2,391,758.39
Current
To date
-
58,800.00
168,756.00
2,450,558.39
Page 54 of 1621
Amount
(Dhs)
Payment Application - 10
Work Done Upto :
30/Sep/15
Amount (Dhs)
Progress (%)
Previous
Current
To date
Current
To date
114,890.40
100.00%
100.00%
114,890.40
114,890.40
31,680.00
100.00%
100.00%
31,680.00
31,680.00
65.00%
65.00%
66,281.41
66,281.41
101,971.40
Previous
Page 55 of 1621
Amount
(Dhs)
Payment Application - 10
Work Done Upto :
30/Sep/15
Amount (Dhs)
Progress (%)
Previous
Current
To date
Previous
Current
To date
Page 56 of 1621
Amount
(Dhs)
248,541.80
Payment Application - 10
Work Done Upto :
30/Sep/15
Amount (Dhs)
Progress (%)
Previous
0.0%
Current
To date
85.6%
85.6%
Previous
Current
To date
212,851.81
212,851.81
540,241.00
540,241.00
540,241.00
443,188.83
443,188.83
443,188.83
2,475,758.39
2,391,758.39
248,541.80
58,800.00
2,450,558.39
212,851.81
212,851.81
Page 57 of 1621
Amount
(Dhs)
3,707,730.02
Payment Application - 10
Work Done Upto :
30/Sep/15
Amount (Dhs)
Progress (%)
Previous
91.0%
Current
To date
7.3%
98.4%
Previous
Current
3,375,188.22
271,651.81
To date
3,646,840.03
Page 58 of 1621
Remarks
Page 59 of 1621
Remarks
Page 60 of 1621
Remarks
Refer annex-B for measurement ,Item K
Page 61 of 1621
Remarks
Page 62 of 1621
Remarks
Refer annex-D for measurement,Item C
Refer annex-D for measurement,Item D
Refer annex-D for measurement,Item G
Refer annex-D for measurement,Item M
Refer annex-D for measurement,Item N
Refer annex-D for measurement,Item P
Refer annex-D for measurement,Item Q
Refer annex-B for measurement ,Item R
Page 63 of 1621
Remarks
Refer annex-F for measurement, Item N
Page 64 of 1621
Remarks
Page 65 of 1621
Remarks
Refer annex-E for measurement ,Item L1
Refer annex-E for measurement ,Item M1
Refer annex-E for measurement ,Item N1
Refer annex-E for measurement ,Item P1
Refer annex-E for measurement ,Item Q1
Refer annex-E for measurement ,Item R1
Refer annex-E for measurement ,Item S1
Refer annex-E for measurement ,Item T1
Refer annex-E for measurement ,Item U1
Refer annex-E for measurement ,Item V1
Refer annex-E for measurement ,Item Y1
Refer annex-E for measurement ,Item Z1
Page 66 of 1621
Remarks
Refer annex-E for measurement ,Item AA1
Page 67 of 1621
Remarks
Page 68 of 1621
Remarks
Page 69 of 1621
Remarks
Page 70 of 1621
Remarks
Page 71 of 1621
Item Description
Quantity
Unit
Rate
142.00
m2
5.00
140.00
m2
10.00
Application of Bitumen Coat to foundations to RCC Foundations sides & top / Wall sides
upto required level.
207.59
m2
10.00
11.06
m2
5.00
130.85
m2
10.00
33.67
m2
10.00
Page 72 of 1621
Item Description
Quantity
Unit
Rate
146.30
m2
10.00
1000 gauge Polythene sheet. Below Tie Beam PCC & Grade slab
223.70
m2
5.00
5.00
69.00
m2
30.00
Bitumen Application
134.60
m2
10.00
118.75
m2
45.00
59.38
m2
50.00
250.00
Total - Page 01
Page 73 of 1621
Item Description
Quantity
Unit
Rate
44.58
m2
5.00
250.18
m2
10.00
55.37
m2
5.00
81.28
m2
10.00
200.00
m2
5.00
23.04
m2
5.00
63.48
m2
10.00
19.60
m2
5.00
22.40
m2
10.00
38.44
m2
5.00
Page 74 of 1621
Item Description
Quantity
Unit
Rate
1000 gauge Polythene sheet for below Footing/Tie Beams PCC (Fountain Area)
502.68
m2
5.00
Bitumen Application for PCC / RCC for Footings & Neck Columns(Fountain Area)
885.51
m2
10.00
1000 gauge Polythene sheet for below Grade Slab (Fountain Area)
181.04
m2
5.00
395.36
m2
10.00
1000 gauge Polythene sheet for below Footing PCC (Prayer Area)
822.07
m2
5.00
854.33
m2
10.00
1000 gauge Polythene sheet for below Tie Beams PCC (Prayer Area & Class Room)
283.13
m2
5.00
Bitumen Application for below Tie Beams PCC (Prayer Area & Class Room)
599.86
m2
10.00
1000 gauge Polythene sheet for below RCC Grade slab (Prayer Area & Class Room)
931.82
m2
5.00
Page 75 of 1621
Item Description
Quantity
Unit
Rate
Page 76 of 1621
Item Description
Quantity
Unit
Rate
Collection
From Page 01
From Page 02
Page 77 of 1621
Item Description
Quantity
Unit
Rate
Page 78 of 1621
Payment Application - 10
Work Done Upto:
30/Sep/15
Progress (%)
Amount (Dhs)
Previous
Current
To date
Amount (Dhs)
Previous
Current
Remarks
To date
710.00
100.00%
0.00%
100.00%
710.00
710.00 ,Item F
1,400.00
100.00%
0.00%
100.00%
1,400.00
1,400.00 ,Item G
2,075.90
100.00%
0.00%
100.00%
2,075.90
2,075.90 ,Item H
55.30
100.00%
0.00%
100.00%
55.30
1,308.50
100.00%
0.00%
100.00%
1,308.50
336.70
100.00%
0.00%
100.00%
336.70
Page 79 of 1621
Payment Application - 10
Work Done Upto:
30/Sep/15
Progress (%)
Amount (Dhs)
Previous
Amount (Dhs)
Current
To date
Previous
Current
Remarks
To date
1,463.00
100.00%
0.00%
100.00%
1,463.00
1,463.00 ,item P
1,118.50
100.00%
0.00%
100.00%
1,118.50
345.00
100.00%
0.00%
100.00%
345.00
7,500.00
100.00%
0.00%
100.00%
7,500.00
1,346.00
100.00%
0.00%
100.00%
1,346.00
5,343.75
100.00%
0.00%
100.00%
5,343.75
2,969.00
100.00%
0.00%
100.00%
2,969.00
25,971.65
25,971.65
100.00%
0.00%
100.00%
25,971.65
Page 80 of 1621
Payment Application - 10
Work Done Upto:
30/Sep/15
Progress (%)
Amount (Dhs)
Previous
Current
To date
Amount (Dhs)
Previous
Current
Remarks
To date
222.90
100.00%
0.00%
100.00%
222.90
222.90 measurement ,E
2,501.80
100.00%
0.00%
100.00%
2,501.80
276.85
100.00%
0.00%
100.00%
276.85
812.80
100.00%
0.00%
100.00%
812.80
1,000.00
100.00%
0.00%
100.00%
1,000.00
115.20
100.00%
0.00%
100.00%
115.20
115.20 Item F
634.80
100.00%
0.00%
100.00%
634.80
634.80 Item G
98.00
100.00%
0.00%
100.00%
98.00
98.00 Item J
224.00
100.00%
0.00%
100.00%
224.00
224.00 Item K
192.20
100.00%
0.00%
100.00%
192.20
192.20 Item L
Page 81 of 1621
Payment Application - 10
Work Done Upto:
30/Sep/15
Progress (%)
Amount (Dhs)
Previous
Amount (Dhs)
Current
To date
Previous
Current
Remarks
To date
2,513.40
100.00%
0.00%
100.00%
2,513.40
2,513.40 Item E
8,855.10
100.00%
0.00%
100.00%
8,855.10
8,855.10 Item F
905.20
100.00%
0.00%
100.00%
905.20
905.20
3,953.60
100.00%
0.00%
100.00%
3,953.60
3,953.60
4,110.35
100.00%
0.00%
100.00%
4,110.35
4,110.35
8,543.30
100.00%
0.00%
100.00%
8,543.30
8,543.30
1,415.65
100.00%
0.00%
100.00%
1,415.65
1,415.65
5,998.60
100.00%
0.00%
100.00%
5,998.60
5,998.60
0.00%
100.00%
4,659.10
4,659.10
4,659.10
100.00%
Page 82 of 1621
Payment Application - 10
Work Done Upto:
30/Sep/15
Progress (%)
Amount (Dhs)
47,032.85
Previous
100.00%
Amount (Dhs)
Current
To date
0.00%
100.00%
Previous
47,032.85
Current
To date
-
Remarks
47,032.85
Page 83 of 1621
Payment Application - 10
Work Done Upto:
30/Sep/15
Progress (%)
Amount (Dhs)
Previous
Current
To date
Amount (Dhs)
Previous
Current
To date
25,971.65
25,971.65
25,971.65
47,032.85
47,032.85
47,032.85
Remarks
Page 84 of 1621
Payment Application - 10
Work Done Upto:
30/Sep/15
Progress (%)
Amount (Dhs)
73,004.50
Previous
100.00%
Current
To date
0.00% 100.00%
Amount (Dhs)
Previous
73,004.50
Current
To date
73,004.50
Remarks
100.00%
Page 85 of 1621
Item Description
Quantity
Unit
Rate
Masonry Works
For Accommodation Block
Substructure & Superstructure Block Work
A
81.60
m2
85.00
164.98
m2
95.00
276.63
m2
60.00
50.84
m2
55.00
130.90
m2
95.00
77.87
m2
90.00
261.16
m2
60.00
Page 86 of 1621
Item Description
100mm Thick Hollow block work
Quantity
Unit
Rate
160.45
m2
55.00
189.20
m2
95.00
65.80
m2
60.00
Total - Page 01
Page 87 of 1621
Item Description
Quantity
Unit
Rate
Collection
From Page 01
Page 88 of 1621
Item Description
Quantity
Unit
Rate
Page 89 of 1621
Amount
(Dhs)
Progress (%)
Previous
Payment Application - 10
Work Done Upto : 30/Sep/15
Amount (Dhs)
Previous
Current
To date
Current
To date
6,936.00 100.00%
0.00%
100.00%
6,936.00
15,673.10 100.00%
0.00%
100.00%
15,673.10
16,597.80 100.00%
0.00%
100.00%
16,597.80
2,796.20 100.00%
0.00%
100.00%
2,796.20
12,435.50 100.00%
0.00%
100.00%
12,435.50
7,008.30 100.00%
0.00%
100.00%
7,008.30
15,669.60 100.00%
0.00%
100.00%
15,669.60
Remarks
6,936.00
12,435.50
Page 90 of 1621
Amount
(Dhs)
Progress (%)
Previous
8,824.75 100.00%
Payment Application - 10
Work Done Upto : 30/Sep/15
Amount (Dhs)
Previous
Current
To date
0.00%
100.00%
8,824.75
Current
To date
-
17,974.00
80.00% 20.00%
100.00%
14,379.20
3,594.80
3,948.00
80.00% 20.00%
100.00%
3,158.40
789.60
100.0%
103,478.85
4,384.40
107,863.25
95.94%
4.06%
8,824.75
Remarks
Refer Annex-D for
measurement,Item V
17,974.00
107,863.25
Page 91 of 1621
Amount
(Dhs)
107,863.25
Progress (%)
Previous
Current
To date
Payment Application - 10
Work Done Upto : 30/Sep/15
Amount (Dhs)
Previous
103,478.85
Current
4,384.40
To date
Remarks
107,863.25
Page 92 of 1621
Amount
(Dhs)
Progress (%)
Previous
107,863.25 95.94%
Current
To date
4.06% 100.00%
Payment Application - 10
Work Done Upto : 30/Sep/15
Amount (Dhs)
Previous
103,478.85
Current
4,384.40
To date
Remarks
107,863.25
Page 93 of 1621
Project : Residential Building (B+G+12+Gym) on plot # 241-584 at Al Nahda 2nd, Dubai - UAE
Employer : Mr. Abdulla Abdul Rahman Mohd Al Mohammad
Consultant : Access Engineering Consultancy
Contractor : Modern Executive System Contracting L.L.C
Appendix E - Materials on Site
Item
Description
DN
Material Status
Ref
Date
Delivered
Reinforcement
A.1
A.2
A.3
16mm HT Bars
20mm HT Bars
25mm HT Bars
34893
34893
34893
20-Apr-14
20-Apr-14
20-Apr-14
20.39
24.73
6.29
A.4
A.5
12mm HT Bars
16mm HT Bars
35028
35028
3-May-14
3-May-14
30.65
20.39
A.6
A.7
A.8
35108
35108
35108
11-May-14
11-May-14
11-May-14
4.00
4.08
43.27
A.9
A.10
A.11
A.12
12mm
16mm
20mm
25mm
35261
35261
35261
35261
26-May-14
26-May-14
26-May-14
26-May-14
35.26
9.21
2.00
5.71
A.13
A.14
1202508970
1202508970
27-May-14
27-May-14
10.00
10.00
A.15
A.16
A.17
A.18
10mm
16mm
20mm
25mm
1382658
1382658
1382658
1382658
29-May-14
29-May-14
29-May-14
29-May-14
2.00
20.00
24.00
4.00
26.04
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Steel
Bars
Bars
Bars
Bars
Bars
Bars
Bars
Bars
94 of 1621
Project : Residential Building (B+G+12+Gym) on plot # 241-584 at Al Nahda 2nd, Dubai - UAE
Employer : Mr. Abdulla Abdul Rahman Mohd Al Mohammad
Consultant : Access Engineering Consultancy
Contractor : Modern Executive System Contracting L.L.C
Appendix E - Materials on Site
Item
Description
A.19
A.20
A.21
A.22
A.23
A.24
20mm
25mm
12mm
16mm
10mm
12mm
A.25
A.26
A.27
B
B.1
Steel
Steel
Steel
Steel
Steel
Steel
Bars
Bars
Bars
Bars
Bars
Bars
DN
Material Status
Ref
Date
1200039368
1200039368
1200041259
1200041259
1200041258
1200041258
7-Jun-14
7-Jun-14
18-Aug-14
18-Aug-14
18-Aug-14
18-Aug-14
1200041460
1200041843
1202510025
25-Aug-14
4-Sep-14
13-Sep-14
46.00
30.00
30.00
106.00
502.00
101401419
1-May-14
1,400.00
1,400.00
525988
500213
132557
132558
527988
527994
528373
528379
20-Apr-14
12-May-14
14-May-14
15-Jun-14
21-Jun-14
21-Jun-14
10-Aug-14
10-Aug-14
Plywood
C.1
C.2
C.3
C.4
C.5
C.6
C.7
C.8
Plywood
Plywood
Plywood
Plywood
Plywood
Plywood
Plywood
Plywood
4'
4'
4'
4'
4'
4'
4'
4'
x
x
x
x
x
x
x
x
8'
8'
8'
8'
8'
8'
8'
8'
x
x
x
x
x
x
x
x
18mm
18mm
18mm
18mm
18mm
18mm
18mm
18mm
,
,
,
,
,
,
,
,
9
9
9
9
9
9
9
9
ply
ply
ply
ply
ply
ply
ply
ply
Delivered
302.00
16.00
10.00
12.00
22.00
20.00
14.00
94.00
35.00
70.00
140.00
35.00
175.00
35.00
105.00
35.00
95 of 1621
Project : Residential Building (B+G+12+Gym) on plot # 241-584 at Al Nahda 2nd, Dubai - UAE
Employer : Mr. Abdulla Abdul Rahman Mohd Al Mohammad
Consultant : Access Engineering Consultancy
Contractor : Modern Executive System Contracting L.L.C
Appendix E - Materials on Site
Item
C.9
C.10
C.11
C.12
C.13
C.14
D
D1
D2
D3
D4
Description
Plywood 4' x 8' x 18mm , 9 ply
Plywood 4' x 8' x 18mm , 9 ply
Plywood 4' x 8' x 18mm , 9 ply
Plywood 4' x 8' x 18mm , 9 ply
Plywood 4' x 8' x 18mm , 9 ply
Plywood 4' x 8' x 18mm , 9 ply
Total of Plywood on Site
DN
Ref
528369
528376
528392
528392
503643
529242
Material Status
Date
10-Aug-14
10-Aug-14
11-Aug-14
19-Aug-14
1-Sep-14
11-Sep-14
Delivered
35.00
280.00
70.00
100.00
140.00
175.00
1,430.00
Block
250mm thermal block
200 mm thick Block
200 mm thick hollow Block
100 mm thick hollow Block
Total of Blocks on Site
10,000.00
9,800.00
8,826.39
18,000.00
46,626.39
Total Value of Material on Site
96 of 1621
Material Status
Used
Balance
20.39
24.73
6.29
ton
ton
ton
2,320.00
2,320.00
2,320.00
30.65
20.39
ton
ton
2,320.00
2,320.00
4.00
4.08
43.27
ton
ton
ton
2,320.00
2,320.00
2,320.00
35.26
9.21
2.00
5.71
ton
ton
ton
ton
2,320.00
2,320.00
2,320.00
2,320.00
10.00
10.00
ton
ton
2,320.00
2,320.00
2.00
20.00
24.00
4.00
26.04
ton
ton
ton
ton
2,320.00
2,320.00
2,320.00
2,320.00
97 of 1621
Work
Material Status
Used
302.00
16.00
10.00
12.00
22.00
20.00
14.00
94.00
46.00
30.00
30.00
106.00
396.00
Balance
106.00
Unit
ton
ton
ton
ton
ton
ton
ton
ton
ton
ton
ton
ton
2,270.00
2,270.00
2,270.00
2,270.00
1,400.00
1,400.00
bag
13.25
13.25
35.00
70.00
140.00
35.00
175.00
35.00
105.00
35.00
sheet
sheet
sheet
sheet
sheet
sheet
sheet
sheet
149.50
149.50
149.50
149.50
149.50
149.50
149.50
149.50
240,620.00
18,550.00
98 of 1621
Material Status
Used
35.00
280.00
70.00
100.00
140.00
175.00
1,430.00
Balance
10,000.00
9,800.00
8,826.39
18,000.00
46,626.39
ummay (Appendix A)
No
No
No
No
4.60
2.70
1.80
1.40
46,000.00
26,460.00
15,887.50
25,200.00
113,547.50
240,620.00
674,952.50
180,465.00
506,214.38
99 of 1621
Project : Residential Building (B+G+12+Gym) on plot # 241-584 at Al Nahda 2nd, Dubai - UAE
Employer : Mr. Abdulla Abdul Rahman Mohd Al Mohammad
Consultant : Access Engineering Consultancy
Contractor : Modern Executive System Contracting L.L.C
Bill No.: 04.1 - Mechanical and Electrical Installation - Drainage Installation
No.
Item Description
Quantity
Unit
Rate
Drainage Installation
Supply and fixing of rainwater, soil, waste and vent pipework installations etc with all
necessary fittings complete in accordance with specification and drawings
Pipe works
Supplying and fixing of pipes with all necessary fittings.
A
1,200
45.00
200
32.00
300
32.00
560
32.00
560
32.00
100
32.00
400
25.00
Page 100 of 1621
Project : Residential Building (B+G+12+Gym) on plot # 241-584 at Al Nahda 2nd, Dubai - UAE
Employer : Mr. Abdulla Abdul Rahman Mohd Al Mohammad
Consultant : Access Engineering Consultancy
Contractor : Modern Executive System Contracting L.L.C
Bill No.: 04.1 - Mechanical and Electrical Installation - Drainage Installation
No.
Item Description
Quantity
Unit
Rate
450
25.00
600
25.00
500
25.00
300
25.00
111
20.00
sum
22,490.00
Total - Page 01
Drainage Installation (Cont'd)
A
B
C
FT - Floor trap.
B.D - Floor drain.
F.D - Floor drain.
274
24
No
No
No
120.00
100.00
Page 101 of 1621
Project : Residential Building (B+G+12+Gym) on plot # 241-584 at Al Nahda 2nd, Dubai - UAE
Employer : Mr. Abdulla Abdul Rahman Mohd Al Mohammad
Consultant : Access Engineering Consultancy
Contractor : Modern Executive System Contracting L.L.C
Bill No.: 04.1 - Mechanical and Electrical Installation - Drainage Installation
No.
D
E
F
F.1
Item Description
G.T - Gully trap.
R.E - Rodding eye at all necessary locations.
Rain water sump with grill in terrace.
Supplying and fixing sump pump for pump room of capacity and rating as mentioned in
the drawing.
Quantity
Unit
No
No
No
sum
Rate
400.00
100.00
15,000.00
Providing manholes at various locations including GRP covers as indicated in the drawing
G
H
J
K
L
M
MH-2-FIC.
MH-01.
MH - Pressure Breaking Manhole.
Sump pump pit at basement, size 0.8 x 0.8 x 1.2m.
C.B - Catch basin.
Valve chamber
1
1
1
1
18
1
No
No
No
No
No
No
L.S
1,500.00
1,200.00
1,200.00
1,000.00
500.00
620.00
Providing manholes at various locations including GRP covers as indicated in the drawing
Rain water collection pipe from roof upto sand trap as shown in drawing.
4,000.00
Page 102 of 1621
Project : Residential Building (B+G+12+Gym) on plot # 241-584 at Al Nahda 2nd, Dubai - UAE
Employer : Mr. Abdulla Abdul Rahman Mohd Al Mohammad
Consultant : Access Engineering Consultancy
Contractor : Modern Executive System Contracting L.L.C
Bill No.: 04.1 - Mechanical and Electrical Installation - Drainage Installation
No.
Item Description
Quantity
Unit
No
Rate
1,000.00
Total - Page 02
Collection
From Page 01
From Page 02
Project : Residential Building (B+G+12+Gym) on plot # 241-584 at Al Nahda 2nd, Dubai - UAE
Employer : Mr. Abdulla Abdul Rahman Mohd Al Mohammad
Consultant : Access Engineering Consultancy
Contractor : Modern Executive System Contracting L.L.C
Bill No.: 04.1 - Mechanical and Electrical Installation - Drainage Installation
No.
Item Description
Quantity
Unit
Rate
#REF!
Amount as
per BOQ (Dhs)
Progress (%)
Previous
Current
To date
Amount (Dhs)
Previous
Current
To date
54,000.00
6,400.00
9,600.00
17,920.00
17,920.00
3,200.00
10,000.00
Page 105 of 1621
#REF!
Amount as
per BOQ (Dhs)
Progress (%)
Previous
Current
To date
Amount (Dhs)
Previous
Current
To date
11,250.00
15,000.00
12,500.00
7,500.00
2,220.00
22,490.00
190,000.00
32,880.00
2,400.00
N.A
Page 106 of 1621
#REF!
Amount as
per BOQ (Dhs)
Progress (%)
Previous
Current
To date
Amount (Dhs)
Previous
Current
To date
400.00
N.A
800.00
15,000.00
1,500.00
1,200.00
1,200.00
1,000.00
9,000.00
620.00
4,000.00
Page 107 of 1621
#REF!
Amount as
per BOQ (Dhs)
Progress (%)
Previous
Current
To date
Amount (Dhs)
Previous
Current
To date
1,000.00
71,000.00
190,000.00
71,000.00
#REF!
Amount as
per BOQ (Dhs)
261,000.00
Progress (%)
Previous
Current
To date
Amount (Dhs)
Previous
Current
To date
Project : Residential Building (B+G+12+Gym) on plot # 241-584 at Al Nahda 2nd, Dubai - UAE
Employer : Mr. Abdulla Abdul Rahman Mohd Al Mohammad
Consultant : Access Engineering Consultancy
Contractor : Modern Executive System Contracting L.L.C
Bill No.: 04 - Mechanical and Electrical Installation - Domestic water and plumbing installation
No.
Item Description
Quantity
Unit
Rate
Main incoming line from DEWA with 50mm diameter pipe, class "E" buried including in
uPVC sleeve including recessed type water meter
L.S
2,500.00
Cold water pipe work with all necessary connections, bends, support hangers, excavation
if any, embedded in wall or floor all etc complete.
B
Project : Residential Building (B+G+12+Gym) on plot # 241-584 at Al Nahda 2nd, Dubai - UAE
Employer : Mr. Abdulla Abdul Rahman Mohd Al Mohammad
Consultant : Access Engineering Consultancy
Contractor : Modern Executive System Contracting L.L.C
Bill No.: 04 - Mechanical and Electrical Installation - Domestic water and plumbing installation
No.
Item Description
Quantity
Unit
Rate
Total - Page 01
Project : Residential Building (B+G+12+Gym) on plot # 241-584 at Al Nahda 2nd, Dubai - UAE
Employer : Mr. Abdulla Abdul Rahman Mohd Al Mohammad
Consultant : Access Engineering Consultancy
Contractor : Modern Executive System Contracting L.L.C
Bill No.: 04 - Mechanical and Electrical Installation - Domestic water and plumbing installation
No.
Item Description
Quantity
Unit
Rate
FT - Floor trap.
B.D - Floor drain.
F.D - Floor drain.
G.T - Gully trap.
R.E - Rodding eye at all necessary locations.
Rain water sump with grill in terrace.
Supplying and fixing sump pump for pump room of capacity and rating as mentioned in
the drawing.
274
24
No
No
No
No
No
No
sum
1
1
1
1
No
No
No
No
120.00
100.00
400.00
100.00
15,000.00
Providing manholes at various locations including GRP covers as indicated in the drawing
G
H
J
K
MH-2-FIC.
MH-01.
MH - Pressure Breaking Manhole.
Sump pump pit at basement, size 0.8 x 0.8 x 1.2m.
1,500.00
1,200.00
1,200.00
1,000.00
Page 112 of 1621
Project : Residential Building (B+G+12+Gym) on plot # 241-584 at Al Nahda 2nd, Dubai - UAE
Employer : Mr. Abdulla Abdul Rahman Mohd Al Mohammad
Consultant : Access Engineering Consultancy
Contractor : Modern Executive System Contracting L.L.C
Bill No.: 04 - Mechanical and Electrical Installation - Domestic water and plumbing installation
No.
L
M
Item Description
C.B - Catch basin.
Valve chamber
Quantity
Unit
Rate
18
1
No
No
500.00
620.00
Providing manholes at various locations including GRP covers as indicated in the drawing
Rain water collection pipe from roof upto sand trap as shown in drawing.
L.S
4,000.00
No
1,000.00
Total - Page 02
Collection
From Page 01
From Page 02
Page 113 of 1621
Project : Residential Building (B+G+12+Gym) on plot # 241-584 at Al Nahda 2nd, Dubai - UAE
Employer : Mr. Abdulla Abdul Rahman Mohd Al Mohammad
Consultant : Access Engineering Consultancy
Contractor : Modern Executive System Contracting L.L.C
Bill No.: 04 - Mechanical and Electrical Installation - Domestic water and plumbing installation
No.
Item Description
Quantity
Unit
Rate
Project : Residential Building (B+G+12+Gym) on plot # 241-584 at Al Nahda 2nd, Dubai - UAE
Employer : Mr. Abdulla Abdul Rahman Mohd Al Mohammad
Consultant : Access Engineering Consultancy
Contractor : Modern Executive System Contracting L.L.C
Bill No.: 04 - Mechanical and Electrical Installation - Domestic water and plumbing installation
No.
Item Description
Quantity
Unit
Rate
#REF!
Amount as
per BOQ (Dhs)
Progress (%)
Previous
Current
To date
Amount (Dhs)
Previous
Current
To date
2,500.00
#REF!
Amount as
per BOQ (Dhs)
Progress (%)
Previous
Current
2,500.00
To date
Amount (Dhs)
Previous
Current
To date
Quantity Surveyor:
Page 117 of 1621
#REF!
Amount as
per BOQ (Dhs)
Progress (%)
Previous
Current
To date
Amount (Dhs)
Previous
Current
To date
Date:
32,880.00
2,400.00
N.A
400.00
N.A
800.00
15,000.00
1,500.00
1,200.00
1,200.00
1,000.00
Page 118 of 1621
#REF!
Amount as
per BOQ (Dhs)
Progress (%)
Previous
Current
To date
Amount (Dhs)
Previous
Current
To date
9,000.00
620.00
4,000.00
1,000.00
71,000.00
Quantity Surveyor:
Date:
2,500.00
71,000.00
Page 119 of 1621
#REF!
Amount as
per BOQ (Dhs)
Progress (%)
Previous
Current
To date
Amount (Dhs)
Previous
Current
To date
#REF!
Amount as
per BOQ (Dhs)
Progress (%)
Previous
Current
73,500.00
To date
Amount (Dhs)
Previous
Current
-
To date
-
Quantity Surveyor:
Date:
Project : Residential Building (B+G+12+Gym) on plot # 241-584 at Al Nahda 2nd, Dubai - UAE
Employer : Mr. Abdulla Abdul Rahman Mohd Al Mohammad
Consultant : Access Engineering Consultancy
Contractor : Modern Executive System Contracting L.L.C
Variation Order No.: 01 - Additional Excavation and Backfilling along Grid 1-1 and Grid A-A
Item
Item Description
Quantity
Unit
Rate
Additional Excavation and Backfilling along Grid 1-1 and Grid A-A
A
Open excavation.
818
m3
8.50
818
m3
21.00
Project : Residential Building (B+G+12+Gym) on plot # 241-584 at Al Nahda 2nd, Dubai - UAE
Employer : Mr. Abdulla Abdul Rahman Mohd Al Mohammad
Consultant : Access Engineering Consultancy
Contractor : Modern Executive System Contracting L.L.C
Variation Order No.: 01 - Additional Excavation and Backfilling along Grid 1-1 and Grid A-A
Item
Item Description
Quantity
Unit
Rate
#REF!
Amount as
per BOQ
(Dhs)
#REF!
Amount (Dhs)
Progress (%)
Previous
Current
To date
Previous
Current
#REF!
To date
6,953.00
80%
20%
100%
5,562.40
1,390.60
6,953.00
17,178.00
80%
20%
100%
13,742.40
3,435.60
17,178.00
Remarks
#REF!
Amount as
per BOQ
(Dhs)
24,131.00
#REF!
Amount (Dhs)
Progress (%)
Previous
80.00%
Current
To date
20.00% 100.00%
Previous
19,304.80
Current
4,826.20
#REF!
To date
Remarks
24,131.00
Project : Residential Building (B+G+12+Gym) on plot # 241-584 at Al Nahda 2nd, Dubai - UAE
Employer : Mr. Abdulla Abdul Rahman Mohd Al Mohammad
Consultant : Access Engineering Consultancy
Contractor : Modern Executive System Contracting L.L.C
Variation Order No.: 03 - Application of Crystalline Water Proofing instead of S.B.S Membrane System
Progress (%)
Item
Item Description
ADDITION
Supply and applying of Joint Treatment KWS as per the Consultant approval & Vertical Construction joints
Unit
Quantity
Rate
Amount(AED)
Previous
Current
To date
Current
Remarks
To date
7,806.20
Kg
25.00
195,155.00
1.00
LS
40,950.00
40,950.00
Supply & Fixing of 2-sides Polystyerene Sheets (10cm Thick) as per Consultant approval
145.00
Kg
50.00
7,250.00
400.00
m2
20.00
8,000.00
LS
37,703.25
37,703.25
OMISSION
4mm thick membrane waterproofing for Basement Exterior Area (horizontal & vertical)
(2,325.000)
m2
35.00
(81,375.00)
50mm thick screed concrete for protecting waterproofing membrane on the horizontal surfaces for raft slab
and raft sloped area
(1,450.000)
m2
22.00
(31,900.00)
(900.000)
m2
22.00
(19,800.00)
(231.000)
m2
75.00
(17,325.00)
(585.000)
m2
65.00
(38,025.00)
100,633.25
Item Description
Quantity
Unit
607.81
m2
Rate
Finishing Works
Plastering Works
For Manar Block
A
External Plaster
For Accomodation Block
External Plaster
37.00
Item Description
External Plaster
Quantity
Unit
Rate
885.51
m2
37.00
309.62
m2
37.00
External Plaster
For Mosque
External Plaster
Item Description
Quantity
Unit
Rate
Total - Page 01
Item Description
Quantity
Unit
Rate
Collection
From Page 01
Item Description
Quantity
Unit
Rate
Amount
(Dhs)
22,488.97
Progress (%)
Previous
95.00%
Current
To date
Payment Application - 10
Work Done Upto : 30/Sep/15
Amount (Dhs)
Previous
Current
Remarks
To date
0.00%
0.00%
0.00%
0.00%
5.00%
100.00%
21,364.52
1,124.45
22,488.97
0.00%
0.00%
0.00%
Amount
(Dhs)
32,763.87
11,455.79
Progress (%)
Previous
Current
To date
90.00%
90.00%
Payment Application - 10
Work Done Upto : 30/Sep/15
Amount (Dhs)
Previous
Current
-
Remarks
To date
29,487.48
29,487.48
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
100.00%
11,455.79
11,455.79
0.00%
0.00%
Amount
(Dhs)
66,708.63
Progress (%)
Previous
Current
To date
Payment Application - 10
Work Done Upto : 30/Sep/15
Amount (Dhs)
Previous
21,364.52
Current
42,067.72
To date
Remarks
63,432.25
Amount
(Dhs)
66,708.63
Progress (%)
Previous
Current
To date
Payment Application - 10
Work Done Upto : 30/Sep/15
Amount (Dhs)
Previous
21,364.52
Current
42,067.72
To date
Remarks
63,432.25
Amount
(Dhs)
Progress (%)
Previous
Current
To date
95.1%
Payment Application - 10
Work Done Upto : 30/Sep/15
Amount (Dhs)
Previous
21,364.52
Current
42,067.72
To date
Remarks
63,432.25
Item Description
SUMMARY - MEP WORKS
MECHANICAL ENGINEERING INSTALLATIONS
DRAINAGE WORKS
WATER SUPPLY WORKS
FIRE FIGHTING SYSTEM WORKS
AIR CONDITIONING SYSTEMS
2.3
CONTRACT
AMOUNT (AED)
BREAKDOWN
AMOUNT (AED)
705,000.00
169,949.00
478,051.00
57,000.00
1,428,000.00
1,428,000.00
1,467,000.00
1,467,000.00
3,600,000.00
3,600,000.00
Payment Application - 10
30/Sep/15
Valuation Qty. or %
This Month
To date
38.20%
13.15%
0.00%
3.55%
2.00%
0.00%
41.75%
15.15%
0.00%
64,920.52
62,863.71
-
6,033.19
9,561.02
-
70,953.71
72,424.73
-
6.03%
0.00%
6.03%
86,037.00
6,783.00
92,820.00
10.49%
1.16%
11.65%
153,924.98
16,980.53
170,905.50
10.22%
1.09%
11.31%
367,746.20
39,357.73
407,103.93
Previous
Previous
Amount (Dhs)
This Month
To date
19005.94
25496.06
1000
1500
7140
78606.79
258,074.08
(87,168.58)
146,529.85
7500.1498
130,248.79
146,529.85
(6,512.44)
(6,512.44)
117,223.91
29,305.98
(14,652.99)
(14,652.99)
146,529.85
117,223.88
12.5000%
260,574.08
0.640067713
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
0.00
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
#REF!
#REF!
#REF!
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
2,684,500
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
4,006,600
Dry Amount
#REF!
#REF!
#REF!
#REF!
0
#REF!
#REF!
#REF!
0
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0
4,006,600
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Dry Amount
Dry Amount
Dry Amount
Dry Amount
#REF!
#REF!
-
Dry Amount
No.
Payment Application - 10
30/Sep/15
Item Description
Valuation Qty. or %
This Month
To date
90.00%
5.00%
95.00%
100.00%
95.00%
50.00%
35.00%
0.00%
5.00%
10.00%
0.00%
0.00%
100.00%
100.00%
60.00%
35.00%
Previous
Amount (Dhs)
This Month
Previous
To date
169,949.00
5.00%
Carried To Collection
8,497.45
7,647.71
424.87
8,072.58
10,196.94
6,458.06
26,342.10
14,275.72
-
339.90
5,268.42
-
10,196.94
6,797.96
31,610.51
14,275.72
-
6.00%
4.00%
31.00%
24.00%
19.00%
10,196.94
6,797.96
52,684.19
40,787.76
32,290.31
8.00%
13,595.92
0.00%
3.00%
5,098.47
0.00%
100.00%
169,949.00
38.20%
3.55%
41.75%
64,920.52
6,033.19
70,953.71
5.00%
95.00%
21,512.30
1,195.13
22,707.42
0
2.2
A
B
478,051.00
5.00%
23,902.55
90.00%
B1
FIRST FIX
Sleeves for pipes inside Slab
3.00%
14,341.53
95.00%
5.00%
100.00%
13,624.45
717.08
14,341.53
B2
Pex Piping Works,PPR Piping works indoor with fittings & accessories
16.00%
76,488.16
30.00%
10.00%
40.00%
22,946.45
7,648.82
30,595.26
B3
B4
10.00%
3.00%
47,805.10
14,341.53
10.00%
0.00%
0.00%
10.00%
4,780.51
-
B5
25.00%
119,512.75
0.00%
B6
21.00%
100,390.71
0.00%
B7
14.00%
66,927.14
0.00%
C
C1
FINAL FIX
Fixing of Sanitary fixtures for the Bathrooms, toilets & Kitchen
3.00%
14,341.53
0.00%
Carried To Collection
100.00%
478,051.00
13.15%
2.00%
15.15%
62,863.71
9,561.02
4,780.51
-
72,424.73
No.
2.3
Item Description
% Contract
Amount
B
B1
FIRST FIX
Supply & Installation of Fire Extinguishers
Carried To Collection
COLLECTION
From Page 1 - DRAINAGE WORKS
From Page 2 - WATER SUPPLY WORKS
From Page 3 - FIRE FIGHTING WORKS
Contract Amount
(Dhs)
Previous
Valuation Qty. or %
This Month
To date
Amount (Dhs)
This Month
Previous
To date
57,000.00
5.00%
95.00%
100.00%
2,850.00
0.00%
54,150.00
0.00%
57,000.00
0.00%
0.00%
0.00%
169,949.00
478,051.00
57,000.00
705,000.00
18.13%
2.21%
20.34%
64,920.52
62,863.71
-
6,033.19
9,561.02
-
70,953.71
72,424.73
-
127,784.22
15,594.21
143,378.43
Item Description
% Contract
Amount
1,428,000.00
B4
B5
C
C1
FINAL FIX
Supply & Installation of Grills and Diffusers
A
B
B1
B2
B3
Carried To Collection
5.00%
71,400.00
1.50%
21,420.00
29.00%
414,120.00
54.00%
771,120.00
2.00%
3.50%
28,560.00
49,980.00
5.00%
71,400.00
100.00%
1,428,000.00
COLLECTION
From Page 1
1,428,000.00
1,428,000.00
Payment Application - 10
30/Sep/15
Valuation Qty. or %
Previous
Amount (Dhs)
This Month
To date
Previous
This Month
To date
95.00%
5.00%
100.00%
67,830.00
3,570.00
71,400.00
85.00%
15.00%
100.00%
18,207.00
3,213.00
21,420.00
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
6.03%
0.48%
6.50%
86,037.00
6,783.00
92,820.00
86,037.00
6,783.00
92,820.00
6.03%
0.48%
6.50%
86,037.00
6,783.00
92,820.00
1,190,000.00
7,140.00
1,428,000.00
1200%
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
0.00
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
#REF!
#REF!
#REF!
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
2,684,500
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
4,006,600
Dry Amount
#REF!
#REF!
#REF!
#REF!
0
#REF!
#REF!
#REF!
0
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0
4,006,600
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
Dry Amount
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Dry Amount
Dry Amount
Dry Amount
Dry Amount
#REF!
#REF!
-
Dry Amount
No.
Item Description
Work done up
1,467,000.00
5.00%
73,350.00
85.00%
0.95%
13,936.50
0.50%
2.00%
7,335.00
29,340.00
100.00%
90.00%
0.70%
10,269.00
90.00%
3.50%
2.00%
3.00%
1.50%
8.00%
24.00%
18.00%
51,345.00
29,340.00
44,010.00
22,005.00
117,360.00
352,080.00
264,060.00
40.00%
85.00%
0.25%
3,667.50
85.00%
0.25%
3,667.50
Valuation Q
C14
C15
C16
C17
C18
C19
Containment works inside floor for low current system, fire alarm, central
montoring
Supply & Installation of Cables for Light Points
Supply & Installation of Cables for Power Points
Supply & Installation of cabling works for data & telephone systems
Suuply & Installation of 12U, 42U cabinet
Supply & Installation of Fire alarm with necessary cabling
Supply & Installation of emergency & exit light with necessary cabling
D
D1
D2
D3
D4
D5
D6
FINAL FIX
Supply & installation of Switches, Sockets
Supply & Installation of Isolators for Mechanical Equipments
DB's Dressing
Installation of Light Fittings
Supply & Installation of Active Components for data and telephone systems
Programming, inrterfacing works
1.00%
1.00%
0.50%
1.00%
2.00%
1.00%
Carried To Collection
100.00%
1,467,000.00
10.49%
100.00%
1,467,000.00
10.49%
C13
COLLECTION
From Page 1 - ELECTRICAL WORKS
0.25%
3,667.50
5.00%
4.00%
4.60%
2.00%
3.00%
5.00%
73,350.00
58,680.00
67,482.00
29,340.00
44,010.00
73,350.00
14,670.00
14,670.00
7,335.00
14,670.00
29,340.00
14,670.00
1,467,000.00
10.49%
Payment Application - 10
30/Sep/15
KS
Valuation Qty. or %
This Month
10.00%
To date
95.00%
0.00%
Amount (Dhs)
This Month
Previous
62,347.50
-
To date
7,335.00
-
69,682.50
-
0.00%
10.00%
100.00%
100.00%
7,335.00
26,406.00
2,934.00
7,335.00
29,340.00
10.00%
100.00%
9,242.10
1,026.90
10,269.00
10.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
50.00%
85.00%
20,538.00
24,939.00
-
5,134.50
-
25,672.50
24,939.00
-
15.00%
100.00%
3,117.38
550.13
3,667.50
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
1.16%
11.65%
153,924.98
16,980.53
170,905.50
1.16%
11.65%
153,924.98
16,980.53
170,905.50
1.16%
11.65%
153,924.98
16,980.53
170,905.50
Description
Unit
Nos
Excavation
Manara block
Accomodation block
Ablulation block
UG Water Tank
m3
m3
m3
m3
Mosque block
Exterior Ablution
m3
m3
1
1
1
1
1
1
1
m2
m2
m2
m2
m2
m2
m2
m2
m3
m3
Annex -A
Length
(m)
13.50
23.10
18.67
12.44
7.17
39.30
8.40
Width
###
12.45
12.45
4.70
4.13
53.40
8.40
Height
(m)
2.80
1.50
1.20
1.70
1.70
1.20
1.20
Qty.
Remarks
510.30
431.39
278.93
99.40
50.28
2,518.34
84.67
3,973.31
1
1
1
1
1
1
1
13.50
23.10
18.67
12.00
6.00
39.30
8.40
###
12.45
12.45
3.50
4.50
53.40
8.40
182.25
287.60
232.44
42.00
27.00
2,098.62
70.56
2,940.47
11.90
###
0.50
70.81
70.81
Concrete Works
Blinding Concrete
Manara Block
m3
m3
11.90
11.90
0.10
14.16
14.16
RCC Works
E
m3
m3
11.54
###
1.20
159.81
159.81
Waterproofing Works
F
m3
m3
m2
offset
offset
deduct for opening
Total Qty. - for RCC Wall from -1.20 to +6.35lvl
RCC for Wall from above Raft +6.35 to +10.70lvl.
from +6.35lvl to +9.70lvl
from +9.70 to +10.70 level
Total Qty. - for RCC Wall from +6.35 to +10.70lvl
RCC for Wall from above Raft +10.70 to +14.50lvl.
from +10.7lvl to +14.50lvl
offset
Total Qty. - for RCC Wall from +10.70 to +14.50lvl
RCC for Wall from above Raft +14.80 to +19.00lvl.
from +14.50 to +19.00lvl
Total Qty. - for RCC Wall from +14.40 to +19.00lvl
RCC for Wall from above Raft +19.00 to +21.50lvl.
from +19.00 to +21.50lvl
Total Qty. - for RCC Wall from +19.00 to +21.50lvl
RCC for Wall from above Raft +21.50 to +23.00lvl.
from +21.50 to 23.00 lvl
P-109 (Mosque)
m2
m2
11.90
###
141.61
141.61
1
1
11.90
47.60
###
0.10
141.61
141.61
m2
m2
m2
m2
m2
m3
4
4
24
1
1
3.80
0.64
0.10
11.50
46.00
1.00
1.00
1.00
m3
m3
m3
m3
m3
m3
m3
m3
m3
4
4
4
4
4
4
6
6
(4)
3.80
0.35
3.80
0.35
3.80
0.35
0.50
0.20
1.10
0.40
0.40
0.40
0.40
0.40
0.40
0.10
0.10
0.40
1.55
1.55
3.00
3.00
3.00
3.00
6.00
6.00
6.00
9.42
0.880
18.24
1.7000
18.24
1.70
1.80
0.72
(10.56)
42.14
m3
m3
m3
4
4
4
4.60
4.60
4.60
0.40
0.60
0.50
3.35
0.75
0.25
24.66
8.28
2.30
###
1.20
15.20
2.54
2.40
132.25
55.20
207.59
35.24
m3
m3
4
4
4.10
1.20
0.30
0.10
3.80
2.20
18.70
1.06
19.75
m3
16.40
0.30
4.50
22.14
22.14
m3
16.40
0.30
2.50
12.30
12.30
m3
Manara Block
16.40
0.45
1.50
11.07
Page 1545 of 1621
Description
Unit
Nos
P-109 (Mosque)
Annex -A
Length
(m)
Width
Height
(m)
Qty.
Remarks
11.07
Manara Block
Description
Unit
Nos
m3
m3
m3
m3
m3
m3
3
7
5
1
1
2
Concrete Works
A
P-109 (Mosque)
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
3
3
3
1
2
2
1
3
7
5
1
1
2
m3
m3
m2
m2
Accomodation Block
m2
m2
m2
m2
m2
m2
15
2
2
2
3
7
5
1
P-109 (Mosque)
Description
Unit
Nos
m2
m2
m2
1
2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
3
7
5
1
1
2
C1
C2
m3
m3
15
2
m2
F5
STB1
Total Qty. - for Polythene Sheet
Bitumen Application
To Blinding Concrete Top
F1
F2
F3
F4
F5
STB1
To RCC Footings
F1
F2
F3
f4
F5
STB1
Total Qty. - for Bitumen application
3
7
5
1
1
2
Accomodation Block
P-109 (Mosque)
Description
Unit
Nos
m3
m3
m3
m3
m3
3
3
4
1
1
m3
m3
m3
m3
m3
m2
Accomodation Block
m3
m3
m3
m3
14
3
1
1
2
2
1
2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
6
6
8
2
2
3
3
3
1
2
Description
W
P-109 (Mosque)
Nos
m2
m2
m2
m2
2
1
1
Unit
m3
m2
m2
m2
m2
m2
m2
m2
m2
1
-8
2
-4
2
2
1
-2
m2
m2
m2
m2
m2
m2
m2
m2
m2
1
-5
5
-2
1
-4
1
-2
m2
m2
m2
m2
m2
1
-1
5
1
m2
Nos
10
Nos
Description
15mm thk. Plaster
Bed Room & Watch Man Room
ddt for opening W11
add for Jamb
ddt for opening D12
ddt for opening D15
Bath Room 1
ddt for opening D14
Pantry
ddt for opening D14
ddt for Arch opening
add for Jamb
Bath Room 2
ddt for opening D14
Lobby 1
ddt for opening D12
ddt for opening D14
ddt for Arch opening
add for Jamb
Lobby 2
ddt for opening D13
ddt for Arch opening
add for Jamb
Lobby 3
ddt for opening D14
ddt for opening D12
ddt for opening
add for Jamb
Kitchen 1 &2
ddt for opening D13
ddt for opening W12
add for Jamb
Living Room 1 & 2
ddt for opening W11
add for Jamb
ddt for opening D12
Main Entrance 1
ddt for opening D11
ddt for opening D12
ddt for opening D13
ddt for opening
add for Jamb
P-109 (Mosque)
Accomodation Block
Unit
Nos
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
4
-4
4
-3
-1
1
-1
1
-1
-1
1
1
-1
1
-2
-1
-1
1
1
-1
-2
2
1
-1
-1
-1
1
2
-2
-2
1
2
-4
1
-2
1
-1
-1
-1
-1
1
P-109 (Mosque)
Description
Unit
Nos
Main Entrance 2
ddt for opening D11
ddt for opening D12
ddt for opening D14
ddt for opening
add for Jamb
Bath Room 3
ddt for opening D14
Washing Room
ddt for opening D14
WC
ddt for opening D14
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
1
-1
-1
-1
-1
1
1
-1
1
-2
1
-1
m2
Accomodation Block
Annex -B
Length
(m)
2.30
2.00
2.30
2.30
2.50
2.40
Width
###
###
1.90
1.90
2.10
0.30
Depth/Ht.
(m)
Qty.
0.10
0.10
0.10
0.10
0.10
0.10
Remarks
1.59
2.80
2.19
0.44
0.53
0.14
7.68
4.20
2.00
6.00
4.50
2.40
5.60
10.60
0.35
0.35
0.35
0.35
0.35
0.35
0.35
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.44
0.21
0.63
0.16
0.17
0.39
0.37
2.37
2.10
1.80
1.40
2.00
2.20
2.00
###
###
###
1.60
1.80
0.30
0.40
0.40
0.40
0.40
0.40
0.60
5.29
9.07
3.92
1.28
1.58
0.72
21.87
0.50
0.60
0.25
0.25
1.30
1.30
2.44
0.39
2.83
17.00
7.00
1.70
1.70
57.80
23.80
81.60
2.30
2.00
2.30
2.30
P-109 (Mosque)
###
###
1.90
1.90
15.87
28.00
21.85
4.37
Accomodation Block
Annex -B
Length
(m)
2.50
2.40
Width
Depth/Ht.
(m)
Qty.
Remarks
2.10
0.30
5.25
1.44
11.06
2.30
2.00
2.30
2.30
2.50
2.40
###
###
1.90
1.90
2.10
0.30
15.87
28.00
21.85
4.37
5.25
1.44
2.10
1.80
1.40
2.00
2.20
2.00
###
###
###
1.60
1.80
0.30
13.23
22.68
9.80
3.20
3.96
1.20
130.85
1.50
1.70
1.30
1.30
29.25
4.42
33.67
P-109 (Mosque)
Accomodation Block
Annex -B
Length
(m)
Width
21.10
10.20
8.90
15.00
1.80
0.25
0.25
0.25
0.25
0.25
Depth/Ht.
(m)
Qty.
0.50
0.50
0.50
0.50
0.50
Remarks
7.91
3.83
4.45
1.88
0.23
18.29
0.20
0.20
0.50
0.50
3.50
3.90
4.90
1.17
6.07
200.00 m2
0.10
20.00
20.00
20.70
14.30
8.50
1.50
0.20
0.20
35.19
4.29
39.48
21.00
8.80
14.65
1.50
0.20
0.20
0.20
0.20
0.60
0.60
0.60
0.60
5.04
2.11
1.76
0.36
9.27
21.10
10.20
8.90
15.00
1.80
0.50
0.50
0.50
0.50
0.50
63.30
30.60
35.60
15.00
1.80
146.30
4.20
2.00
6.00
4.50
2.40
P-109 (Mosque)
0.35
0.35
0.35
0.35
0.35
4.41
2.10
6.30
1.58
1.68
Accomodation Block
Annex -B
Length
Width
(m)
5.60
0.35
10.60
0.35
200.00 m2
62.70
0.25
Depth/Ht.
(m)
Qty.
Remarks
3.92
3.71
200.00
223.70
1.50
23.51
23.51
21.10
2.80 m2
8.90
2.10 m2
3.20
1.50
9.90
1.80
3.50
73.85
(22.40)
62.30
(8.40)
22.40
10.50
34.65
(7.92)
3.50
3.50
3.50
3.50
2.20
164.98
20.60
1.00
9.95
0.90
5.40
0.90
2.40
1.20
3.90
2.20
3.90
2.20
3.90
2.20
3.90
2.20
80.34
(11.00)
194.03
(3.96)
21.06
(7.92)
9.36
(5.28)
276.63
3.00
1.00
1.80
1.60
3.90
2.20
3.90
3.90
11.70
(2.20)
35.10
6.24
50.84
2.40
0.30
0.25
1.80
1.80
P-109 (Mosque)
Accomodation Block
Annex -B
Length
(m)
16.00
1.50
7.40
1.00
0.90
7.60
0.90
7.40
0.90
1.00
5.40
8.40
0.90
6.40
1.00
0.90
1.20
5.60
9.20
0.90
1.20
5.60
8.80
0.90
1.00
1.10
5.50
10.80
0.90
1.20
6.60
20.70
1.50
7.40
1.00
9.60
1.80
1.00
0.90
1.10
5.50
P-109 (Mosque)
Width
Depth/Ht.
(m)
3.50
2.20
0.13
2.20
2.20
3.00
2.20
3.00
2.20
2.20
0.23
3.00
2.20
3.00
2.20
2.20
2.20
0.23
3.00
2.20
2.20
0.23
3.00
2.20
2.20
2.20
0.23
3.00
2.20
2.10
0.12
3.50
2.20
0.23
2.20
3.50
2.20
2.20
2.20
2.20
0.23
Qty.
Remarks
224.00
(13.20)
3.85
(6.60)
(1.98)
22.80
(1.98)
22.20
(1.98)
(2.20)
1.24
25.20
(1.98)
19.20
(4.40)
(1.98)
(2.64)
1.29
27.60
(1.98)
(5.28)
2.58
26.40
(1.98)
(2.20)
(2.42)
1.27
64.80
(3.96)
(5.04)
0.79
144.90
(13.20)
1.70
(4.40)
33.60
(3.96)
(2.20)
(1.98)
(2.42)
1.27
Accomodation Block
Annex -B
Length
(m)
8.20
1.80
1.00
0.90
1.20
5.60
8.40
0.90
5.80
0.90
6.40
0.90
Width
Depth/Ht.
(m)
3.50
2.20
2.20
2.20
2.20
Qty.
0.23
3.00
2.20
3.00
2.20
3.00
2.20
Remarks
28.70
(3.96)
(2.20)
(1.98)
(2.64)
1.29
25.20
(1.98)
17.40
(3.96)
19.20
(1.98)
607.81
P-109 (Mosque)
Accomodation Block
Description
Annex -C
Unit
Nos
m3
m3
1
1
Length
(m)
Width
Depth/Ht.
(m)
Qty.
Remarks
Concrete Works
A
m3
m3
m2
m2
m3
m3
m3
m2
m2
11.50
5.50
3.50
4.00
0.10
0.10
4.03
2.20
6.23
1
1
1
10.69
2.95
2.20
2.95
1.87
1.07
0.50
0.50
0.50
15.77
2.76
1.18
19.70
37.00
1.80
0.25
9.25
9.25
1
1
12.00
6.00
3.50
4.50
42.00
27.00
69.00
WaterStopper
Water Stopper
m2
m2
m2
m2
m2
m3
P-109(Mosque)
m2
m2
m2
m2
m2
m3
m3
m3
30.00
30.00
30.00
2
2
11.50
5.50
3.25
4.00
74.75
44.00
118.75
1
1
1
11.50
5.50
29.50
3.25
4.00
2.55
37.38
22.00
75.23
134.60
1
1
11.50
5.50
3.25
4.00
37.38
22.00
59.38
1
1
1
10.70
2.95
1.96
2.95
2.36
1.32
0.25
0.25
0.25
7.89
1.74
0.65
10.28
Description
Annex -D
Unit
Nos
m3
m3
m3
m3
m3
6
4
2
2
2
Length
(m)
Width
Depth/Ht.
(m)
Qty.
Remarks
Concrete Works
A
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
###
###
###
2.90
3.50
0.10
0.10
0.10
0.10
0.10
3.75
1.60
0.58
1.80
2.66
10.39
2
1
1
2
1
2
1
1
1
1
1
16.67
16.67
15.22
3.65
9.60
4.50
8.85
5.05
5.20
5.40
5.40
0.45
0.45
0.45
0.45
0.60
0.45
0.45
0.45
0.40
0.40
0.45
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
1.50
0.75
0.68
0.33
0.58
0.41
0.40
0.23
0.21
0.22
0.24
5.54
6
4
2
2
2
2
2
2.20
1.70
1.40
2.80
3.50
2.80
3.50
###
###
###
2.60
3.20
2.60
3.20
0.40
0.40
0.40
0.40
0.40
0.40
0.40
11.62
4.62
1.57
5.82
8.96
5.82
8.96
47.38
m3
m3
m3
m3
m2
m3
2.50
2.00
1.70
3.10
3.80
P-109(Mosque)
m2
m2
m2
m2
m2
8
4
4
0.55
0.55
0.65
0.25
0.25
0.25
0.55
0.40
0.35
1.05
6
4
2
2
2
2.50
2.00
1.70
3.10
3.80
###
###
###
2.90
3.50
37.50
16.00
5.78
17.98
26.60
44.58
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
6
6
4
4
2
2
2
2
2
2
2.50
10.00
2.00
8.00
1.70
6.80
2.90
12.00
3.80
14.60
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
6
6
4
4
2
2
2
2
2
2
4
4
8
2.20
8.80
1.70
6.80
1.40
5.60
2.80
10.80
3.50
13.40
5.30
5.50
1.35
###
0.10
0.60
0.10
###
0.10
0.60
0.10
3.50
0.10
###
0.40
###
0.40
###
0.40
2.60
0.40
3.20
0.40
0.40
0.20
0.55
m2
m3
0.61
0.22
0.23
37.50
6.00
4.80
3.20
5.78
1.36
3.48
2.40
26.60
2.92
29.04
21.12
11.56
10.88
3.92
4.48
14.56
8.64
22.40
10.72
8.48
4.40
5.94
250.18
2
1
1
2
1
2
1
1
Ablution Block
16.67
16.67
15.22
3.65
9.60
4.50
8.85
5.05
0.25
0.25
0.25
0.25
0.40
0.25
0.25
0.25
0.60
0.60
0.60
0.60
0.50
1.10
0.60
1.10
5.00
2.50
2.28
1.10
1.92
2.48
1.33
1.39
Page 1560 of 1621
Description
Annex -D
Unit
Nos
1
1
1
m3
m3
m2
m3
P-109(Mosque)
m3
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m3
m2
Length
(m)
5.20
5.40
5.40
Width
0.20
0.20
0.25
Depth/Ht.
(m)
1.10
0.60
0.60
2
1
1
2
1
2
1
1
1
1
1
16.67
16.67
15.22
3.65
9.60
4.50
8.85
5.05
5.20
5.40
5.40
0.45
0.45
0.45
0.45
0.60
0.45
0.45
0.45
0.40
0.40
0.45
55.37
2
1
1
2
1
2
1
1
1
1
1
16.67
16.67
15.22
3.65
9.60
4.50
8.85
5.05
5.20
5.40
5.40
0.60
0.60
0.60
0.60
0.50
1.10
0.60
1.10
1.10
0.60
0.60
20.00
10.00
9.13
4.38
4.80
9.90
5.31
5.56
5.72
3.24
3.24
81.28
2
1
1
2
1
2
1
1
1
1
1
16.67
16.67
15.22
3.65
9.60
4.50
8.85
5.05
5.20
5.40
5.40
0.45
0.45
0.45
0.45
0.60
0.45
0.45
0.45
0.40
0.40
0.45
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
1.50
0.75
0.68
0.33
0.58
0.41
0.40
0.23
0.21
0.22
0.24
5.54
200.00 m2
200.00
200.00
200.00 m2
0.10
20.00
20.00
m3
m3
m3
12
4
m3
m3
1
1
0.50
0.50
0.20
0.20
4.00
4.50
4.80
1.80
6.60
16.67
3.00
15.22
2.50
0.20
0.20
50.74
1.50
m3
52.24
2
2
2
1
17.00
15.40
5.50
5.80
0.20
0.20
1.00
1.00
0.50
0.50
0.20
0.20
m3
m3
1.14
0.65
0.81
15.00
7.50
6.85
3.29
5.76
4.05
3.98
2.27
2.08
2.16
2.43
m3
m3
m3
m3
m3
Remarks
20.59
m2
m3
Qty.
3.40
3.08
2.20
1.16
9.84
77.00
0.20
1.50
m3
23.10
23.10
m2
m2
m2
m2
m2
m2
m2
1
-1
-1
-1
34.00
3.85
130.90
130.90
Ablution Block
24.00
3.05
2.00
1.00
3.85
2.60
2.20
2.20
92.40
(7.93)
(4.40)
(2.20)
Description
Total Qty. - for 200mm thk Thermal BW
200mm thk Hollow Block work
200mm thk Hollow BW
ddt LD 4
ddt D16
ddt for Arches
ddt for Arches
ddt for Arches
Total Qty. - for 200mm thk Hollow BW
100mm thk Hollow Block work
100mm thk Hollow BW
ddt for Door D18
Total Qty. - for 100mm thk Hollow BW
Wall Palster - Internal
Toilet 1
Handicap toilet
Annex -D
Unit
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
Washing
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
ddt
LV room
ddt
Substation
OTS
ddt
Pump Room
P-109(Mosque)
Depth/Ht.
(m)
Qty.
Remarks
77.87
1
-1
-1
-1
-1
-1
66.00
1.40
2.10
1.80
2.20
1.00
4.25
2.00
2.40
2.30
2.30
2.30
280.50
(2.80)
(5.04)
(4.14)
(5.06)
(2.30)
261.16
1
-14
45.00
1.00
4.25
2.20
m2
m2
Width
m2
ddt D16
ddt for arch opening
Lobby
Length
(m)
m2
Toilet lobby
Nos
191.25
(30.80)
160.45
26
26
2
2
2
2
-14
-18
2
2
-2
2
2
-1
-1
2
2
-2
-1
-1
2
2
-1
2
2
-1
2.00
1.00
2.00
-1
-1
2
2
-1
m2
Ablution Block
1.20
1.80
1.80
1.72
9.52
1.80
0.80
0.80
5.50
5.00
2.00
5.20
2.11
2.10
4.30
5.20
3.30
2.00
2.00
2.10
5.20
9.50
2.20
3.30
4.80
1.00
4.80
4.80
6.60
3.05
4.80
4.80
3.60
2.00
3.85
3.85
3.85
3.85
3.85
3.85
2.20
2.20
3.85
3.85
2.20
4.35
4.35
2.20
3.00
3.85
3.85
2.20
2.20
2.20
3.85
3.85
2.20
4.45
4.45
2.20
4.45
5.25
4.45
2.70
2.20
4.75
4.75
2.20
120.12
180.18
13.86
13.24
73.30
13.86
(24.64)
(31.68)
42.35
38.50
(8.80)
45.24
18.36
(4.62)
(12.90)
40.04
25.41
(8.80)
(4.40)
(4.62)
40.04
73.15
(4.84)
29.37
42.72
(2.20)
42.72
25.20
58.74
(8.24)
(10.56)
45.60
34.20
(4.40)
885.51
Description
Unit
Nos
m3
m3
m3
m3
m3
1
4
16
4
2
Concrete Works
A
P-109 (Mosque)
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
4
4
16
1
4
16
4
2
m3
m3
m3
m3
m3
m2
m2
m2
m2
m2
m2
m2
m2
m2
46
2
2
2
1
4
16
4
2
4
4
16
Description
RF5
CF6
F2
CF8
CF7
For Footing Top sides
RF5
CF6
F2
CF8
CF7
For Neck columns sides
C6
C8
C5
C13
P-109 (Mosque)
Unit
Nos
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
1
1
4
4
16
16
4
4
2
2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
1
1
4
4
16
16
4
4
2
2
m2
m2
m2
m2
92
2
2
2
m2
m3
m3
m2
12
m2
m2
4
8
m3
m3
m3
m3
8
16
12
4
8
Description
Total Qty. - for Polythene Sheet below Grade slab
P-109 (Mosque)
Nos
m2
Unit
m2
m2
m2
m2
8
8
32
m3
m3
m3
m3
46
2
2
2
m3
m3
m3
48
A1
Description
MOSQUE - PRAYER AREA
Blinding Concrete at Prayer Area
RF1
RF2
RF3
CF1
CF2
CF3
CF4
CF5
F1
F2
F3
F4
F5
F9
F13
B1
P-109 (Mosque)
Unit
Nos
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
1
1
1
1
1
1
1
2
2
2
1
2
13
6
2
2
2
1
2
m3
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
13
6
2
2
C1
Description
Unit
Nos
F13
m2
m2
1
2
1
1
1
1
1
1
1
1
1
1
1
1
2
1
2
1
2
1
1
1
2
1
13
1
6
1
2
1
2
1
2
1
1
1
2
1
RF2
RF3
CF1
CF2
CF3
CF4
CF5
|F1
F2
F3
F4
F5
F9
F13
Total Qty. - for Bitumen application at Prayer Area
P-109 (Mosque)
m2
Page 1567 of 1621
Description
RCC For Footings at Prayer area
RF1
RF2
RF3
CF1
CF2
CF3
CF4
CF5
F1
F2
F3
F4
F5
F9
F13
FB
E1
P-109 (Mosque)
Unit
Nos
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
1
1
1
1
1
1
1
2
2
2
1
2
13
6
2
2
2
1
2
2
2
2
1
1
1
1
1
4
14
12
2
4
2
2
3
1
8
Description
Unit
Total Qty. - for Polythene Sheet below Tie Beam (Prayer Area & class Room)
PCC Below Tie Beam (Prayer Area & Class Room)
TB5
TB5, TB6
TB8
TB5,TB6
TB7
TB5
TB7
TB3,TB4
TB4
TB4
TB1
TB4
m2
2TB2
2TB4
TB4
TB4
G1
P-109 (Mosque)
Total Qty. - for PCC below Tie Beam (Prayer Area & class Room)
RCC Tie Beams (Prayer Area & Class Room)
TB5
TB5, TB6
TB8
TB5,TB6
TB7
TB5
TB7
TB3,TB4
TB4
TB4
TB1
TB4
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
2
2
1
1
1
1
1
4
14
12
2
4
2
2
3
1
8
m2
2TB2
2TB4
TB4
TB4
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
Total Qty. - for RCC Tie Beam (Prayer Area & class Room)
m3
Nos
2
2
1
1
1
1
1
4
14
12
2
4
2
2
3
1
8
Description
Bitumen to Tie Beams (Prayer Area & Class Room)
TB5
TB5, TB6
TB8
TB5,TB6
TB7
TB5
TB7
TB3,TB4
TB4
TB4
TB1
TB4
2TB2
2TB4
TB4
TB4
J1
K1
L1
M1
P-109 (Mosque)
Unit
Nos
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
4
4
2
2
2
2
2
8
28
24
4
8
4
4
6
2
16
m3
Total Qty. - for Bitumen to Tie Beam (Prayer Area & class Room)
RCC for Lift / Staircase Wall (Prayer Area & Class Room)
RCC Lift & S/case Wall upto GF
m3
Total Qty. - for RCC Lift/Staircase Wall (Prayer Area & class Room)
Polythene Sheet Below Grade Slab (Prayer & Class Room)
1000G Polyhtene Sheet Below Grade slab
m3
Total Qty. - for Polytheene sheet for Grade slab(Prayer Area & class Room)
RCC Grade slab (Prayer & Class Room)
RCC Gade Slab
m2
Total Qty. - for RCC Grade Slab(Prayer Area & class Room)
Secondary Hall - GF Columns (Prayer & Class Room Area)
m3
m2
m2
m2
m2
m2
m3
m3
m3
m3
m3
1
2
1
1
1
1
2
1
1
1
Description
RCC for Columns
C1
C4
C2
C3
C5
C8
C12
C11
C14
Main mosque prayer area
C1
C4
C9
C10
C6
Frame
C1
C4
N1
P1
Q1
P-109 (Mosque)
Unit
Nos
m3
m3
m3
m3
m3
m3
m3
m3
m3
4
2
2
2
2
2
6
2
1
m3
m3
m3
m3
m3
m3
m3
m3
2
2
2
2
2
2
2
2
Total Qty. - for RCC Column GF (Secondary Hall)(Prayer Area & class Room)
Secondary Hall - GF Shear / Core Wall (Prayer & Class Room Area)
RCC for Shear Wall / Core Wall
W1
W1 (ht. 3.6 to 8.0m)
W1
Lift Wall
S/case wall
W2 (GF to RF)
m3
Total Qty. - for RCC Shear/Core Wall GF (Secondary Hall)(Prayer Area & clas
RCC Slab - Ladies Prayer Area & Classroom at FirstFloor
Slab
m3
m3
m3
m3
m3
m3
m3
m3
m3
1
1
1
1
1
1
R1
S1
T1
U1
V1
W1
X1
P-109 (Mosque)
Description
Unit
Nos
B1
m3
m3
m3
1
1
2
Total Qty. - for RCC Beams (Ladies Prayer Area) at 1st flr
RCC Slab -( Ladies Class Room) at First floor
Slab
m3
Total Qty. - for RCC slab (Ladies Class Room) at 1st flr
RCC Beams - Ladies Class Room at First floor
B4
B5
B6, B7, & B7
m3
m3
m3
m3
m3
m2
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m2
1
1
3
1
1
2
2
4
2
1
1
Y1
Z1
AB1
Description
Unit
Nos
m2
m2
m2
m2
m3
RC beams
AC1
AD1
P-109 (Mosque)
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
RC beams
AE1
m2
m2
m2
m3
m3
m3
m3
2
2
2
2
1
1
2
2
2
2
1
1
1
1
2
m3
m3
m3
m3
m3
1
10
2
2
AF1
Description
Nos
m3
m3
m3
m3
m3
m3
m3
2
2
4
2
2
2
2
m3
Room 1
ddt for D6
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m3
P-109 (Mosque)
Unit
1
1
2
-1
-1
2
2
-1
-1
1
1
1
-1
Annex -E
Length
(m)
26.60
4.60
2.20
3.90
4.40
Width
3.40
3.90
###
3.80
3.90
Depth/Ht.
(m)
Qty.
0.10
0.10
0.10
0.10
0.10
Remarks
9.04
7.18
7.74
5.93
3.43
33.32
19.60
19.00
8.00
0.60
0.60
0.60
0.10
0.10
0.10
4.70
4.56
7.68
16.94
26.25
4.20
1.80
3.50
4.00
3.00
3.50
###
3.35
3.50
0.55
0.50
0.40
0.50
0.50
43.31
29.40
20.74
23.45
14.00
130.90
0.50
0.80
0.65
0.75
###
0.40
0.40
0.25
0.65
0.65
0.65
0.65
7.48
0.42
0.34
0.24
8.47
26.60
4.60
2.20
3.90
4.40
19.60
19.00
8.00
3.40
3.90
###
3.80
3.90
0.60
0.60
0.60
90.44
71.76
77.44
59.28
34.32
47.04
45.60
76.80
502.68
P-109 (Mosque)
Annex -E
Length
(m)
26.60
60.00
4.60
17.00
2.20
8.80
3.90
15.40
4.40
12.20
26.25
58.50
4.20
15.40
1.80
7.20
3.50
13.70
4.00
15.00
Width
Depth/Ht.
(m)
Qty.
3.40
0.10
3.90
0.10
###
0.10
3.80
0.10
3.90
0.10
3.00
0.55
3.50
0.50
###
0.40
3.35
Remarks
90.44
6.00
71.76
6.80
77.44
14.08
59.28
6.16
34.32
2.44
78.75
32.18
58.80
30.80
51.84
46.08
46.90
0.50
3.50
2.00
2.40
2.10
2.30
0.50
28.00
15.00
0.65
0.65
0.65
0.65
119.60
3.12
2.73
2.99
885.51
19.60
3.00
0.40
0.40
0.70
0.70
43.90
13.44
57.34
2.80
2.90
2.90
3.80
###
0.85
0.10
0.10
0.10
12.77
3.36
1.97
18.10
P-109 (Mosque)
2.80
3.80
127.68
2.90
2.90
###
0.85
33.64
19.72
Annex -E
Length
(m)
Width
Depth/Ht.
(m)
Qty.
Remarks
181.04
19.60
19.00
8.00
0.50
0.80
0.65
0.75
###
0.40
0.40
0.25
0.70
0.70
0.70
109.76
106.40
179.20
395.36
3.40
3.40
3.40
3.40
39.10
2.18
1.77
1.28
44.32
2.00 m3
96.00
96.00
P-109 (Mosque)
Annex -E
Length
(m)
6.85
10.80
14.25
12.30
11.00
5.60
7.20
6.25
6.25
5.10
5.50
4.30
1.65
2.10
3.80
2.50
2.80
2.30
1.30
Width
15.90
3.80
5.80
5.40
10.50
3.80
4.30
5.30
4.00
5.30
3.10
3.50
###
###
3.30
###
3.10
2.10
###
Depth/Ht.
(m)
Qty.
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
Remarks
10.89
4.10
8.27
6.64
11.55
2.13
3.10
6.63
5.00
5.41
1.71
3.01
3.54
2.65
2.51
1.25
1.74
0.48
0.34
80.92
6.85
10.80
14.25
12.30
11.00
5.60
7.20
6.25
6.25
5.10
5.50
4.30
1.65
2.10
3.80
2.50
2.80
2.30
P-109 (Mosque)
15.90
3.80
5.80
5.40
10.50
3.80
4.30
5.30
4.00
5.30
3.10
3.50
###
###
3.30
###
3.10
2.10
108.92
41.04
82.65
66.42
115.50
21.28
30.96
33.13
25.00
27.03
17.05
15.05
2.72
4.41
163.02
37.50
17.36
9.66
Main Mosque Block
Annex -E
Length
(m)
1.30
Width
Depth/Ht.
(m)
Qty.
###
Remarks
3.38
822.07
6.85
45.50
10.80
29.20
14.25
40.10
12.30
35.40
11.00
43.00
5.60
18.80
7.20
23.00
6.25
23.10
6.25
20.50
5.10
20.80
5.50
17.20
4.30
15.60
1.65
5.45
2.10
8.82
3.80
25.08
2.50
10.00
2.80
11.80
2.30
8.80
1.30
3.38
15.90
0.10
3.80
0.10
5.80
0.10
5.40
0.10
10.50
0.10
3.80
0.10
4.30
0.10
5.30
0.10
4.00
0.10
5.30
0.10
3.10
0.10
3.50
0.10
###
0.10
###
0.10
3.30
0.10
###
0.10
3.10
0.10
2.10
0.10
###
0.10
108.92
9.10
41.04
2.92
82.65
4.01
66.42
3.54
115.50
4.30
21.28
1.88
30.96
2.30
66.25
2.31
50.00
2.05
54.06
2.08
17.05
1.72
30.10
1.56
35.39
0.54
26.46
0.88
25.08
2.51
12.50
1.00
17.36
1.18
4.83
0.88
3.38
0.34
854.33
P-109 (Mosque)
Annex -E
Length
(m)
15.60
10.50
14.10
5.10
9.70
3.50
5.20
3.70
5.00
5.00
2.80
4.00
1.20
1.80
1.00
2.20
2.50
2.00
1.00
12.80
Width
6.50
3.50
5.50
11.40
10.50
5.30
4.00
5.00
6.00
4.80
5.20
3.00
###
###
###
###
2.80
1.80
###
1.20
Depth/Ht.
(m)
Qty.
0.70
0.70
0.70
0.65
0.65
0.55
0.55
0.55
0.55
0.55
0.45
0.45
0.40
0.40
0.40
0.45
0.45
0.50
0.40
0.80
Remarks
70.98
25.73
54.29
37.79
66.20
10.20
11.44
20.35
33.00
26.40
6.55
10.80
7.49
7.78
0.80
4.36
6.30
1.80
0.80
24.58
427.62
10.50
6.80
6.80
9.27
5.90
4.65
26.42
19.60
6.10
4.01
20.50
9.80
4.90
11.30
11.30
14.50
2.00
P-109 (Mosque)
0.45
0.45
0.40
0.45
0.40
0.45
0.40
0.60
0.60
0.60
0.90
0.60
0.60
0.60
0.60
0.60
0.60
9.45
6.12
2.72
4.17
2.36
2.09
10.57
47.04
51.24
28.87
36.90
23.52
5.88
13.56
20.34
8.70
9.60
Annex -E
Length
(m)
Width
Depth/Ht.
(m)
Qty.
Remarks
283.13
10.50
6.80
6.80
9.27
5.90
4.65
26.42
19.60
6.10
4.01
20.50
9.80
4.90
11.30
11.30
14.50
2.00
0.45
0.45
0.40
0.45
0.40
0.45
0.40
0.60
0.60
0.60
0.90
0.60
0.60
0.60
0.60
0.60
0.60
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.95
0.61
0.27
0.42
0.24
0.21
1.06
4.70
5.12
2.89
3.69
2.35
0.59
1.36
2.03
0.87
0.96
28.31
10.50
6.80
6.80
9.27
5.90
4.65
26.42
19.60
6.10
4.01
20.50
9.80
4.90
11.30
11.30
14.50
2.00
0.25
0.25
0.20
0.25
0.20
0.25
0.20
0.40
0.40
0.40
0.70
0.40
0.40
0.40
0.40
0.40
0.40
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.70
0.70
0.70
1.20
0.70
0.70
0.80
0.70
0.70
0.70
3.15
2.04
0.82
1.39
0.71
0.70
3.17
21.95
23.91
13.47
34.44
10.98
2.74
7.23
9.49
4.06
4.48
144.73
P-109 (Mosque)
Annex -E
Length
(m)
Width
10.50
6.80
6.80
9.27
5.90
4.65
26.42
19.60
6.10
4.01
20.50
9.80
4.90
11.30
11.30
14.50
2.00
Depth/Ht.
(m)
Qty.
0.50
0.50
0.50
0.50
0.50
0.50
0.50
0.60
0.60
0.60
1.10
0.60
0.60
0.70
0.60
0.60
0.60
Remarks
21.00
13.60
6.80
9.27
5.90
4.65
26.42
94.08
102.48
57.74
90.20
47.04
11.76
31.64
40.68
17.40
19.20
599.86
24.00
0.25
1.20
7.20
7.20
27.40
17.45
9.90
9.60
6.40
23.30
4.70
6.70
4.30
3.40
27.40
17.45
9.90
9.60
6.40
23.30
4.70
6.70
4.30
3.40
638.42
164.03
66.33
41.28
21.76
931.82
0.10
0.10
0.10
0.10
0.10
63.84
16.40
6.63
4.13
2.18
93.18
P-109 (Mosque)
Annex -E
Length
(m)
Width
Depth/Ht.
(m)
Qty.
Remarks
2.00
2.00
2.00
2.00
2.00
2.00
6.00
2.00
1.00
0.40
0.27
0.50
0.32
0.26
0.23
0.15
0.22
0.15
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
3.60
11.52
3.89
7.20
4.61
3.74
3.31
19.44
3.17
0.54
2.00
2.00
1.15
0.85
0.50
1.20
2.00
2.00
0.40
0.27
0.25
0.40
###
0.70
0.40
0.27
4.00
4.00
7.60
7.60
7.60
7.60
7.60
7.60
6.40
4.32
4.37
5.17
3.80
12.77
12.16
8.21
114.61
2.60
2.60
2.60
7.30
14.00
1.80
m2
m2
m2
0.35
0.25
m2
3.60
4.00
7.60
3.65
3.65
7.55
9.36
10.40
19.76
9.33
12.78
13.59
75.21
24.13
9.82
0.32
75.83
75.83
P-109 (Mosque)
Annex -E
Length
(m)
24.92
24.92
9.85
Width
0.40
0.40
0.40
Depth/Ht.
(m)
1.30
1.00
0.90
Qty.
Remarks
12.96
9.97
7.09
30.02
8.50
130.00 m2
7.80
0.25
0.25
16.58
32.50
49.08
8.10
8.50
59.00
0.25
0.25
0.25
0.90
0.90
0.70
5.47
1.91
10.33
17.71
0.50
0.50
0.32
0.23
m2
m2
m2
m2
4.00
4.00
4.00
4.00
4.00
4.00
5.12
1.84
14.96
195.00 m2
0.25
48.75
48.75
90.00
16.00
0.25
0.25
0.70
0.90
15.75
3.60
19.35
44.00
4.30
189.20
189.20
P-109 (Mosque)
Annex -E
Length
(m)
14.00
Width
Depth/Ht.
(m)
4.70
Qty.
Remarks
65.80
65.80
208.00 m2
21.00
10.40
416.00
29.40
12.48
0.70
0.60
457.88
208.00 m2
40.50 m2
74.70 m2
0.40
0.20
0.25
166.40
8.10
18.68
193.18
21.00
10.40
16.40
11.00
15.00
32.00
0.70
0.60
0.40
0.40
0.40
0.40
1.80
1.30
1.00
1.30
1.00
1.00
52.92
16.22
13.12
11.44
6.00
12.80
112.50
24.30
9.85
0.32
76.59
76.59
25.00
25.00
11.00
0.40
0.40
0.40
0.32
1.00
0.90
3.20
10.00
7.92
21.12
70.00
3.20
4.00
13.70
P-109 (Mosque)
0.20
0.20
0.20
0.20
1.10
1.80
1.80
1.20
Main Mosque Block
15.40
11.52
2.88
6.58
100%
Annex -E
Length
(m)
7.50
5.20
4.00
6.65
4.80
5.80
5.40
Width
0.20
0.20
0.20
0.20
0.20
0.20
0.20
Depth/Ht.
(m)
1.20
1.80
1.80
1.80
1.80
1.80
1.80
Qty.
Remarks
3.60
3.74
5.76
4.79
3.46
4.18
3.89
65.79
4.90
6.20
6.75
1.20
1.20
6.78
4.90
1.20
1.20
6.10
9.10
7.40
2.00
4.60
4.60
4.60
2.20
2.20
4.60
4.60
2.20
2.20
4.60
4.60
4.60
2.20
22.54
28.52
62.10
(2.64)
(2.64)
62.38
45.08
(2.64)
(2.64)
28.06
41.86
34.04
(4.40)
309.62
P-109 (Mosque)
Description
Unit
Nos
m3
Concrete Works
A
m3
m3
m3
m3
m3
m3
m2
for footings
Neck columns
m3
m2
m2
m2
m2
m2
m2
m2
4
4
4
4
4
m2
4
2
2
m3
m2
m2
m2
2
2
m2
m2
m2
m2
m2
m2
m2
m3
m3
RCC Columns GF
RCC Columns GF
m3
m3
Annex -F
Length
(m)
2.40
Width
###
Depth/Ht.
(m)
0.10
Qty.
Remarks
2.30
2.30
5.00
0.60
0.10
2.10
2.10
2.00
###
0.40
6.40
6.40
0.80
0.70
0.65
1.46
1.46
2.40
###
23.04
23.04
2.40
9.60
2.00
8.00
3.00
###
0.10
###
0.40
0.65
23.04
3.84
16.00
12.80
7.80
63.48
6.00
6.00
2.00
0.30
0.30
0.20
0.60
0.50
0.50
4.32
1.80
0.40
6.52
6.00
0.50
12.00
6.00
2.00
0.50
0.40
6.00
1.60
6.00
0.60
19.60
14.40
6.00
0.50
6.00
2.00
0.50
2.00
22.40
6.20
###
38.44
38.44
6.20
###
0.10
3.84
3.84
4.00 m2
2.00
8.00
8.00
Appendix B - Variations
Item
Description
To provide Stone columns by Vibro-Replacement Technique for improvement of Soil
Bearing Capacity
Amount (Dhs)
550,000.00
550,000.00
Progress (%)
Previous
Current
To date
0.00%
0.00%
Previous
-
No.
2.1
1.10
1.01
B
B1
B2
B3
B4
B5
D1
D2
2.2
B1
B2
B3
B4
B5
B6
B7
C1
2.3
B
B1
Item Description
FIRST FIX
Drainage works inside Raft
FINAL FIX
Supply & Installation of Floor Trap, Clean out, manhole covers, grating channel
Carried To Collection
0
WATER SUPPLY WORKS
Mobilisation of materials, labour, preparation of shop drawings, manuals, submittals, samples inspection
FIRST FIX
Pex Piping Works,PPR Piping works indoor with fittings & accessories
FINAL FIX
Carried To Collection
Mobilisation of materials, labour, preparation of shop drawings, manuals, submittals, samples inspection
FIRST FIX
Supply & Installation of Fire Extinguishers
Carried To Collection
COLLECTION
From Page 1 - DRAINAGE WORKS
From Page 2 - WATER SUPPLY WORKS
From Page 3 - FIRE FIGHTING WORKS
###
5.00%
8,497.45
6.00%
###
4.00%
6,797.96
31.00%
###
24.00%
###
19.00%
###
8.00%
###
3.00%
5,098.47
100.00%
###
###
5.00%
###
3.00%
###
16.00%
###
10.00%
###
3.00%
###
25.00%
###
21.00%
###
14.00%
###
3.00%
###
###
###
###
5.00%
2,850.00
95.00%
###
###
###
###
###
###
###
Payment Certificate
No. 07
Up to Date: 07/03/2010
MEP Works
NSTALLATIONS
Valuatio
UpdatedDry Rate
Amount
Previous
90.00%
100.00%
95.00%
50.00%
35.00%
38.20%
90.00%
95.00%
30.00%
10.00%
13.15%
0.00%
18.13%
Payment Application - 10
30/Sep/15
Valuation Qty. or %
Amount (D
This Month
To date
Previous
5.00%
95.00%
0.00%
100.00%
10,196.94
5.00%
100.00%
6,458.06
10.00%
60.00%
7,647.71
26,342.10
0.00%
35.00%
14,275.72
0.00%
0.00%
0.00%
3.55%
41.75%
64,920.52
5.00%
95.00%
21,512.30
5.00%
100.00%
13,624.45
10.00%
40.00%
22,946.45
0.00%
10.00%
4,780.51
0.00%
0.00%
0.00%
0.00%
0.00%
2.00%
15.15%
62,863.71
0.00%
0.00%
0.00%
0.00%
64,920.52
62,863.71
-
2.21%
20.34%
127,784.22
Amount (Dhs)
This Month
To date
424.87
8,072.58
10,196.94
339.90
6,797.96
5,268.42
31,610.51
14,275.72
6,033.19
70,953.71
1,195.13
22,707.42
717.08
14,341.53
7,648.82
30,595.26
4,780.51
9,561.02
72,424.73
6,033.19
9,561.02
-
70,953.71
72,424.73
-
15,594.21
143,378.43