0
LEED-NC 3.0 Registered Project Checklist
Information Technology Building, Brigham Young University
Provo, UT
Yes ? No

17 0 9 Sustainable Sites 26 Points

Y Prereq 1 Construction Activity Pollution Prevention Required


1 Credit 1 Site Selection 1
5 > Credit 2 Development Density & Community Connectivity 5
1 Credit 3 Brownfield Redevelopment 1
6 Credit 4.1 Alternative Transportation, Public Transportation Access 6
1 Credit 4.2 Alternative Transportation, Bicycle Storage & Changing Rooms 1
3 > Credit 4.3 Alternative Transportation, Low-Emitting and Fuel-Efficient Vehicles 3
2 > Credit 4.4 Alternative Transportation, Parking Capacity 2
1 Credit 5.1 Site Development, Protect of Restore Habitat 1
1 Credit 5.2 Site Development, Maximize Open Space 1
1 Credit 6.1 Stormwater Design, Quantity Control 1
1 Credit 6.2 Stormwater Design, Quality Control 1
1 > Credit 7.1 Heat Island Effect, Non-Roof 1
1 > Credit 7.2 Heat Island Effect, Roof 1
1 > Credit 8 Light Pollution Reduction 1

Yes ? No

2 0 8 Water Efficiency 10 Points

N * Prereq 1 Water Use Reduction, 20% Reduction Required


2 > Credit 1.1 Water Efficient Landscaping, Reduce by 50% 2
2 Credit 1.2 Water Efficient Landscaping, No Potable Use or No Irrigation 2
2 Credit 2 Innovative Wastewater Technologies 2
4 > Credit 3.1 Water Use Reduction, 30 - 40% Reduction (5% intervals) 2 to 4

Yes ? No

7 0 28 Energy & Atmosphere 35 Points

Y Prereq 1 Fundamental Commissioning of the Building Energy Systems Required


N > Prereq 2 Minimum Energy Performance, 10% New Bldgs, 5% Existing Bldgs Required
Y Prereq 3 Fundamental Refrigerant Management Required
19 > Credit 1 Optimize Energy Performance, 12 - 48% (2% intervals) 1 to 19
7 > Credit 2 On-Site Renewable Energy, 1 - 13% (1% intervals) 1 to 7
2 Credit 3 Enhanced Commissioning 2
2 Credit 4 Enhanced Refrigerant Management 2
3 > Credit 5 Measurement & Verification 3
2 Credit 6 Green Power 2

Key: e - errata > - changes from NC 2.2 * - new credit continued…


Yes ? No

3 0 0 Materials & Resources 14 Points

Y Prereq 1 Storage & Collection of Recyclables Required


3 > Credit 1.1 Building Reuse, Maintain 55 - 95% (20% intervals) Walls, Floors, & Roof 1 to 3
1 Credit 1.2 Building Reuse, Maintain 50% of Interior Non-Structural Elements 1
1 Credit 2.1 Construction Waste Management, Divert 50% from Disposal 1
1 Credit 2.2 Construction Waste Management, Divert 75% from Disposal 1
1 Credit 3.1 Materials Reuse, 5% 1
1 Credit 3.2 Materials Reuse,10% 1
1 Credit 4.1 Recycled Content, 10% (post-consumer + ½ pre-consumer) 1
1 Credit 4.2 Recycled Content, 20% (post-consumer + ½ pre-consumer) 1
1 Credit 5.1 Regional Materials, 10% Extracted, Processed & Manufactured Regionally 1
1 Credit 5.2 Regional Materials, 20% Extracted, Processed & Manufactured Regionally 1
1 Credit 6 Rapidly Renewable Materials 1
1 Credit 7 Certified Wood 1

Yes ? No

5 0 10 > Indoor Environmental Quality 15 Points

Y Prereq 1 Minimum IAQ Performance Required


Y Prereq 2 Environmental Tobacco Smoke (ETS) Control Required
1 Credit 1 Outdoor Air Delivery Monitoring 1
1 Credit 2 Increased Ventilation 1
1 Credit 3.1 Construction IAQ Management Plan, During Construction 1
1 > Credit 3.2 Construction IAQ Management Plan, Before Occupancy 1
1 Credit 4.1 Low-Emitting Materials, Adhesives & Sealants 1
1 Credit 4.2 Low-Emitting Materials, Paints & Coatings 1
1 > Credit 4.3 Low-Emitting Materials, Flooring Systems 1
1 Credit 4.4 Low-Emitting Materials, Composite Wood & Agrifiber Products 1
1 > Credit 5 Indoor Chemical & Pollutant Source Control 1
1 Credit 6.1 Controllability of Systems, Lighting 1
1 Credit 6.2 Controllability of Systems, Thermal Comfort 1
1 Credit 7.1 Thermal Comfort, Design 1
1 > Credit 7.2 Thermal Comfort, Verification 1
1 > Credit 8.1 Daylight & Views, Daylight 75% of Spaces 1
1 Credit 8.2 Daylight & Views, Views for 90% of Spaces 1
Yes ? No

2 0 0 > Innovation & Design Process 6 Points

1 Credit 1.1 Innovation in Design: Composted Soil 1


Credit 1.2 Innovation in Design: Provide Specific Title 1
Credit 1.3 Innovation in Design: Provide Specific Title 1
Credit 1.4 Innovation in Design: Provide Specific Title 1
* Credit 1.5 Innovation in Design: Provide Specific Title 1
1 Credit 2 LEED® Accredited Professional 1

Yes ? No

2 0 2 Regional Priority Credits 4 Points

1 * Credit 1.1 Regional Priority Credt: SS 2 - Community Connectivity 1


1 * Credit 1.2 Regional Priority Credt: SS 4.1 - Public Transportation 1
1 * Credit 1.3 Regional Priority Credt: WE 1 - Efficient Landscaping, Option 2 1
1 * Credit 1.4 Regional Priority Credt: IEQ 8.1 - Daylight 1

Yes ? No
38 0 57 Project Totals (pre-certification estimates) 110 Points
Certified 40-49 points Silver 50-59 points Gold 60-79 points Platinum 80+ points
None Project Certification Level (pre-certification estimates)
Date Company Contact Contact Info
Description
Contact Position Phone Email
Wayn Martin apostry shop 25525

Allen Ewell electgrical shop

Rob Davey ? 25262


Notes
spoke to Lee and he gave me the msds

in charge of lighting, call him for light timing


he will give us utility cost of building for the
last 12 months
office FTE estimate
250 sf/person

gross sf 79984
320

bikes 16
Status Notes
Action 0%
Submittals 0%
Credit 0%
Requirement

Plan of Action

Notes
Status Notes
Action 0%
Submittals 0%
Credit 0%
Requirement

Plan of Action

Notes
Status Notes
Action 0%
Submittals 0%
Credit 0%
Requirement

Plan of Action

Notes
Question Answer Source Responsibility
Commissioning? Matt
M&V Plan? Matt
Do we have a digital copy? Clyne is on it. Matt
Who is in charge of building performance? How can we find
out energy efficiency of the building? Gene Matt
Is ASHRAE 62.1, & 55.2 code? Or just BMP? Matt
Parking requirements? City compliance? Pablo
Landscape guidelines? Water saving? Is the grass normal?
Etc. Pablo

Call custodial and find out the system they use for recycling Pablo
Find out who contractor was and if they sorted construction
waste Pablo
Check how many bike racks there are. 18
Are there any changing rooms? 2

FTE of the building. 250


Divide up schedule of values and find up materials
Talk to alan atwell about night timing
Recycled
Description Base Bid Material Cost % of Total Reuse Preconsumer
Glass, Glazing, & Metal Panels 1,404,500 912,925 21%
Structural Steel 1,375,498 894,074 20% 7.0%
Gypsum Drywall 1,074,180 698,217 16%
Concrete 657,873 427,617 10% 5.0%
Masonry 326,255 212,066 5% 2.8%
Asphalt Paving 321,043 208,678 5%
Site Concrete 235,299 152,944 3% 5.0%
Membrane Roofing 224,405 145,863 3%
Metal Doors & Frames 167,341 108,772 2%
Building Insulation 123,700 80,405 2%
Millwork 113,450 73,743 2%
Acoustical Treatment 112,687 73,247 2%
Painting 109,100 70,915 2%
Tile 100,800 65,520 1%
SUBTOTAL 6,346,131 94%
OTHER DIV 2-10 379,349 6%
TOTAL HARD COST 2-10 6,725,480
DIV 1,11-16 6,400,756
TOTAL HARD COST 13,126,236

Glass, Glazing, & Metal Panels


Structural Steel
Gypsum Drywall
Concrete
Earthwork
Masonry
Asphalt Paving
Site Utilities
Site Concrete
Membrane Roofing
Metal Doors & Frames
Aggregate Pier Soil Reinforcement
Building Insulation
Millwork
Acoustical Treatment
Painting
Tile
Recycled IEQ
Postconsumer $ of recycled Regional $$ Regional RR FSC Adhesives/Sealants
- -
85.0% 791,255 -
5.0% 34,911 95.0% 663,306
10,690 100.0% 427,617
20.2% 45,806 100.0% 212,066
- 60.0% 125,207
3,824 100.0% 152,944
- 50.0% 72,932
- -
- 60.0% 48,243
- 80.0% 58,994
- -
- -
- 50.0% 32,760
886,486 1,794,069
13% 27%
*As high as 16%, but probably 14%
*As high as 30%, but most likely 27%

emailed viracon, kawneer (aluminum curtain wall)


Contacted Bayou and Nucor, and both are all from scrap. I lowered the percentage a little to allow for other metals.
IEQ
Paints/Sealants Floor Coverings Wood Products Notes

Georgia Pacific - These are estimates using joint compound, drywa

allow for other metals.


using joint compound, drywall, and densglass statistics.
10720
1320 0.12
8.12

1320 0.56 0.5 10 36.96


ITB UPC
Mean Temp ITB (KWH) ITB (DTH) kwh/sf UPC (KWH) UPC (DTH)kwh/sf
Jan 28 74,400.0 0.056 503.9 0.9 119,575 2,038.1 2.458
Feb 34 85,800.0 0.069 495.9 1.1 124,559 1,780.7 2.561
Mar 41 85,000 507.0 1.043 132,213 1,419.7 2.718
Apr 48 90,000 567.0 1.104 126,941 1,745.1 2.610
May 58 105,000 180.0 1.288 138,127 829.5 2.840
Jun 67 120,000 65.0 1.472 162,301 756.7 3.337
Jul 75 132,000 65.0 1.619 178,778 645.9 3.675
Aug 72 136,000 65.0 1.669 193,060 713.8 3.969
Sep 64 118,200 0.461 138.7 1.450 159,600 716.8 3.281
Oct 52 84,000 0.092 567.4 1.031 137,616 910.7 2.829
Nov 40 79,800 0.079 507.1 0.979 132,462 1,454.9 2.723
Dec 30 66,600 0.039 767.2 0.817 125,282 1,843.9 2.576

0.741
4.5
0.610
0.602 4.0
0.532
0.4361 3.5

3.0

2.5

2.0

1.5

1.0

0.5

-
Jan Feb Mar Apr May Jun

30% 20%
ITB (KWH)
Jan 66,600 46,620.0 53,280.0
Feb 66,600 46,620.0 53,280.0
Mar 82,000 57,400.0 65,600.0
Apr 85,000 59,500.0 68,000.0
May 105,000 73,500.0 84,000.0
Jun 120,000 84,000.0 96,000.0
Jul 132,000 92,400.0 105,600.0
Aug 136,000 95,200.0 108,800.0
Sep 118,200 82,740.0 94,560.0
Oct 84,000 58,800.0 67,200.0
Nov 79,800 55,860.0 63,840.0
Dec 66,600 46,620.0 53,280.0
250,000.0
Electricity Usage Comparison

200,000.0

150,000.0

100,000.0

50,000.0

-
Jan Feb Mar Apr May Jun Jul Aug Sep O

2,500.0

Column F
Column I
2,000.0

1,500.0

1,000.0
Mar Apr May Jun Jul Aug Sep Oct Nov Dec

500.0

-
Jan Feb Mar Apr May Jun Jul Aug Sep O
Usage Comparison

Column C
Column G

un Jul Aug Sep Oct Nov Dec

Column E
Column H

n Jul Aug Sep Oct Nov Dec