Detailed Estimate for Construction of Generator Room at MAHARAJA

DAV CENT. PUBLIC SCHOOL, Akhnoor


PARTICULARS OF ITEMS

S. No.
1

QTY.

UNIT

10.45

Cum

2.09

Cum

7.11

Cum

3.68

Sqm

Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not
exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan,
depth upto 1.5 mtr, including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is
to be leveled and neatly dressed in:

All kinds of soil as directed upto 25 mtr lead & upto 1.5 mtr lift.
a. Room = 1 No:i) Front & Back walls c/c = 2 x 21-3 x 2-6 x 2-6 = 265.625 cft.
ii) Both side walls c/c
2

= 2 x 8'-3 x 2-6 x 2-6 = 103.125 cft.


Total = 368.75 cft. Or 10.45 cum
Providing and laying in position cement concrete of specified grade excluding the cost of centring and
shuttering -All work upto plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm
nominal size) in crushed aggregate.

a. Room = 1 No:i) Front & Back walls c/c = 2 x 21-3 x 2-6 x 0-6 = 53.125 cft.
ii) Both side walls c/c
3

= 2 x 8'-3 x 2-6 x 0-6 = 20.625 cft.


Total = 73.75 cft. or 2.09 cum
Providing and laying in position cement concrete of specified grade excluding the cost of centring and
shuttering -All work upto plinth level. 1:3:6 1cement : 3 coarse sand : 6 graded stone aggregate 20mm
nominal size) in crushed aggregate.

a. Room = 1 No:i) Front & Back walls c/c 1st step = 2 x 20-9 x 2-0 x 1-0 = 83 cft.
2nd step = 2 x 20'-3" x 1-6 x 1-0 = 60.75 cft.
3rd step = 2 x 19'-6" x 0-9 x 1-0 = 29.25 cft.
ii) Both side walls c/c

1st step = 2 x 8-9 x 2-0 x 1-0 = 35 cft.


2nd step = 2 x 9-3 x 1-6 x 1-0 = 27.75 cft.
3rd step = 2 x 10-0 x 0-9 x 1-0 = 15 cft.

Total = 250.75 cft. or 7.105 cum


Providing & laying Damp-Proof Course 50 mm thick with cement concrete 1:2:4 (1 cement : 2 coarse
sand : 4 graded stone aggregate 20 mm nominal size) in crushed aggregate.
i) Front & Back walls c/c
ii) Side walls c/c

= 2 x 18-0 x 0'-9''= 27 sft.


= 2 x 10'-0 x 0-9 = 15 sft.
Total = 42 sft.

Deductions of openings:i) Door D (1 No.)


= 1 x 3-3 x 0-9 = 2.4375 sft.
Therefore, Net Qty. = 42 2.4375 = 39.5625 sft. or 3.68 sqm.
5

Brick work with common burnt clay F.P.S. (non-modular) bricks of class designation 75 in foundation
and plinth in: Cement mortar 1:6 (1cement : 6 coarse sand).
a. Room = 1 No.
i) Front & Back walls c/c = 2 x 18-0 x 0'-9'' x 10'-0" = 270 sft.
ii) Both side walls c/c = 2 x 10'-0 x 0-9 x 10'-0" = 150 sft.
Deductions of openings:
i) Door D1 (1 No.)
= 1 x 3-3 x 0-9 x 7-0 = 17.0625 cft.
ii) Window W1 (4 No.) = 4 x 4-0 x 0-9 x 4-6 = 54 cft.

Total = 71.0625 cft.


Lintels beam:
i) ALL WALLS

= 1 x 59-0 x 0-9 x 0-6 = 22.125 cft.

Therefore, Net Qty. = 270+150 (71.0625 + 22.125) = 326.8125 cft. or


6

9.26 cum

9.26

Cum

9.26

Cum

4.20

Cum

16.45

Sqm

20.35

Sqm

5.48

Sqm

21.34

Mtr

0.30

Cum

Extra for brick work in superstructure, above plinth level upto floor V level. (By manual means).
Quantity vide item No. 5 = 9.26 cum
Reinforcement cement concrete work in beams, suspended floors, roofs having slope upto 150 ,
landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases & spiral stair cases
upto floor five level excluding the cost of centering, shuttering, finishing & reinforcement with 1:1.5:3 (1
cement: 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size).

a. Lintels beam:
i) ALL WALLS

= 1 x 59-0 x 0-9 x 0-6 = 22.125 cft.

B. R.C.C. Slab:
i) Slab
8
a)

= 19'-6 x15-6 x 0-5 = 125.9375 cft.

Total = 22.125 + 125.9375 = 148.0625 cft. Or 4.196 cum


Centring & shuttering including strutting, propping etc. & removal of form for:
Foundations, footings, bases of columns etc. for mass concrete.
For Wall Foundation/Footing (1:3:6)
a. Room = 2 Nos.
i) Front & Back walls c/c 1st step = 2 x 20-9 x 1-0 = 41.5 sft.
2nd step = 2 x 20'-3" x 1-0 = 40.5 sft.
3rd step = 2 x 19'-6" x 1-0 = 39 sft.
ii) Both side walls c/c

1st step = 2 x 8-9 x 1-0 = 17.5 sft.


2nd step = 2 x 9-3 x 1-0 = 18.5 sft
3rd step = 2 x 10-0 x 1-0 = 20 sft
177 sft. or 16.45 sqm

b)

Suspended floors, roofs, landings, balconies & access platform.


i) Roof of Room (1 No.) = 1 x 18-0 x 10-0 = 180.00 sft.
ii) Projection (2 No.) = 1 x 19-6 x 2-0 = 39.00 sft.

c)

Total =219 sft. or 20.35 sqm


Lintels, beams, plinth beams, girders, bressumers and cantilevers.
a. Lintels beam:
i) ALL WALLS

e)

= 2 x 59-0 x 0-6 = 59 sft

Total = 59 sft. Or 5.483 sqm


Edges of slabs and breaks in floors and walls. Under 20 cms wide.
i) Front And Back = 2 x 1 x 19-6 = 39 rft.
ii) Both sides = 2 x 1 x 15'-6" = 31 rft

70 rft. or 21.34 mtr


Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought
framed and fixed in position:
a) First class deodar wood.
i) Door D1 (01 No.)
Vertical Member = 1 x 2 x 0-3 x 0-5 x 7-0 = 1.458 cft.
Horiz. Member = 1 x 3 x 0-3 x 0-5 x 2-7 = .807 cft.
ii) Window W1 (04 No.)
Vertical Member = 4 x 4 x 0-3 x 0-5 x 4-6 = 7.5 cft.
Horiz. Member = 4 x 2 x 0-3 x 0-5 x 3-8 = 3.056 cft.
Total = 10.56 cft. or
0.299 cum

10

Providing 40x5 mm flat iron hold fast 40 cm long including fixing to frame with 10mm diameter bolts,
nuts & wooden plugs & embeddings in cement concrete block 30x10x15 cm 1:3:6 mix (1 cement : 3
coarse sand : 6 graded stone aggregate 20 mm nominal size).

i) Door D1 (01 No.) = 1 x 2 x 3 = 06 Nos.


ii) Window W1 (04 No.)
11

= 4 x 2 x 2 =16 Nos.
Total = 22 Nos.
Providing & fixing panelled or panelled & glazed shutters for doors, windows & clerestory windows
including ISI marked M.S. pressed Butt hinges bright finished of required size with necessary screws
excluding panelling which will be paid for separately, all complete as per direction of engineer-in charge.

22.00

Each

1.38

Sqm

5.44

Sqm

49.21

Sqm

Total = 729.17 sft. or 67.77 sqm

67.77

Sqm

Total =219 sft. or 20.35 sqm


Filling available excavated earth (exculding rock) in trenches, plinth, side of foundation etc. layers not
exceeding 20cm in depth, consolidating each deposited layer by ramming & watering lead upto 50m and
lift upto 1.5m.

20.35

Sqm

6.34

Cum

First Class deodar wood, 35mm thick shutter.

12

i) Door D (01 No.): 1 x 1 x 2-7x 5'-9 = 14.854 sft.


or 1.38 sqm
Providing & fixing Glass Panes of 4mm thickness. (Weight not less tha 10 kg/sqm) for fixed glass
windows. (LMR)
i) Window W1 (4 No.): 4 x 1 x 4-1x 3-7 = 58.53 sft. Or 5.44 Sqm

13

Finishing: Cement Plaster:12 mm Cement Plaster of mix. 1:6 (1 cement : 6 coarse sand). Inner Side:
i) Room (1 No.): 1 x 2 x (18-0+ 10-0) x 10-0 = 560 sft
D/d for Openings:
i) Door D1 (1 No.):
ii) Window W1 (1 No.):

14

1 x 3-3x 7-0x 0'-9" = 17.0625 sft.


1 x 4-0x 4-6x 0'-9" = 13.5 sft.
Total = 30.5625 sft.

Therefore, Net Qty. = 560 30.5625 = 529.4375 sft. or 49.21 sqm


Finishing: Cement Plaster:18 mm Cement Plaster in two coats underlayer 12mm thick cement plaster 1:5 (1 cement : 5 coarse sand)
finished with a top layer 6mm thick cement plaster 1:6 (1 cement : 6 fine sand). Outer Side:
i) Front & Back Side: 2 x 19-6 x 10-5 = 406.25 sft
ii) Left & Right Side: 2 x 15'-6" x 10'-5 = 322.92 sft.

15

Finishing: Cement Plaster:6 mm cement plaster to ceiling of mix 1:3 (1 cement : 3 fine sand).
i) Roof of Room (1 No.) = 1 x 18-0 x 10-0 = 180.00 sft.
ii) Projection (2 No.) = 1 x 19-6 x 2-0 = 39.00 sft.

16

Available Qty. Vide Item No.1 = 10.45 cum


D/d Qty. of cement conc. upto G.L:
i) Qty. Vide Item No.2 = 2.09 cum
ii) Qty. Vide Item No.3 = 7.11 cum
= 9.2 cum
Net Qty. = 10.45 9.20 = 1.25 cum
B. Filling under Floors:
i) Room (1 No.): 1 x 18-0x 10-0 x 1-0 = 180 cft.
Total = 180 cft. or 5.09 cum
Total = 1.25 + 5.09 = 6.34 cum
17

Supply & filling sand under floors including watering, ramming, consolidating & dressing complete.

i) Room (1 No.): 1 x 18-0x 10-0 x 0-4 = 60 cft.


18

Total = 60 cft. Or 1.70 cum


Providing & laying in position cement concrete of specified grade excluding the cost of centring &
shuttering -All works upto plinth level 1:5:10 (1cement : 5 fine sand : 10 graded brick aggregate 40mm
nominal size) in Crushed aggregate:

1.70

Cum

1.27

Cum

16.73

Sqm

1.73

Sqm

69.56

Sqm

69.56

Sqm

69.56

Sqm

67.77

Sqm

28.18

Sqm

Under G. Floors:

19

i) Room (1 No.): 1 x 18-0x 10-0 x 0-3 = 45 cft.


Total = 45 cft. or 1.27 cum
Providing & laying Polished Homogenous Vitrified Floor Tiles in 600mm x 600mm, Rak, Kajaria, Nitco
(thickness 10mm with water absorptions less than 0.5% & flexural strength not less than 40N/mm2 in all
colours & shades, laid on 20mm thick cement mortar 1 : 4 (cement & same colour grouting make Bal
Endura, Dr. Fixit).

Ground Floor:
i) Room (1 No.): 1 x 18-0x 10-0 = 180.00 sft.
20

Total = 180 sft. or 16.73 sqm


Providing & laying fixing Ceramic Mat Finished Tiles conforming to IS:13753 of NITCO, ORIENT,
SOMANY, KAJARIA make in all colours, shades except Burgundy, Bottle Green, Black of 300mm x
450mm or approved by the architect in Skirting & Dados of over 12mm thick bed of cement mortar 1:3 (1
cement : 3 coarse sand) & jointing with grey cement slurry at the rate of 3.3 kg/sqm including painting in
white cement mixed with pigment of matching shade complete.

Ground Floor:
i) Room (1 No.) Skirting: 1 x 2 x (18-0+ 10-0) x 0-4 = 18.66 sft.
Total = 18.66 sft. or 1.73 sqm
21

Providing & applying white cement based Wall Putty of avg. thickness 1 mm of approved brand &
manufacture over plastered wall surface to prepare the surface even and smooth complete.
i) Qty. Vide Item No. 13 = 49.21 sqm
ii) Qty. Vide Item No. 15 = 20.35 sqm

22

Total = 69.56 sqm


Applying Cement Primer priming coat to walls & ceiling with primer of approved quality & manufacture
to give an even shade.
i) Qty. Vide Item No. 13 = 49.21 sqm
ii) Qty. Vide Item No. 15 = 20.35 sqm

23

Total = 69.56 sqm


Painting walls with Plastic Emulsion Paint of approved brand & manufacture to give an even shade (2 or
more coats).
i) Qty. Vide Item No. 13 = 49.21 sqm
ii) Qty. Vide Item No. 15 = 20.35 sqm
Total = 69.56 sqm

24
25

Spectrum Texture Paint (External).


i) Qty. Vide Item No. 14 = 67.77 sqm
Painting with Synthetic Enamel Paint of approved brand & manufacture to give an even shade including
priming coat. 2 or more coats on new works over an under coat of suitable shade with ordinary paint of
approved & manufacture.

i) Door D1 (1 No.)
= 1 x 2 x (3-3 x 7-0) x 1.60 = 72.80 sft.
ii) Window W1 (4 No.) = 4 x 2 x (4-0 x 4-6) x 1.60 = 230.40 sft.
26

Total =303.20 sft. or 28.18 sqm


Reinforcement for RCC works including straghening, cutting, bending, placing in position and binding
all complete.
a) Thermo-mechanical treated bars.

a)
27

i) Qty. Vide Item No. 7 = 4.2 cum @ 110 Kg /cum = 462 Kg


Providing & fixing ISI marked Aluminium (Anodised) Tower Bolt anodic coating not less than Grade AC10 as per IS:1868 transparent or dyed to required colour or shade with necessary screws etc. complete.

462.00

Kg

4.00

Nos.

16.00

Nos.

4.00

Nos.

16.00

Nos.

2.00

Nos.

i) 150x10mm
For Door D (1 No.) = 1 x 2 x 2 = 4 Nos.
Total = 4 Nos.
ii) 100x10mm
For Window W1 (4 No.) = 4 x 2 x 2 = 16 Nos.
28

Total = 16 Nos.
Providing & fixing Aluminium Handles ISI marked anodised (anodic coating not less than grade AC 10 as
per IS:1868) transparent or dyed to required colour and shade with necessary screws etc. complete.
i) 125mm
For Door D (1 No.) = 1 x 2 x 2 = 4 Nos.
Total = 4 Nos.
ii) 100mm

29

For Window W1 (4 No.) = 4 x 2 x 2 = 16 Nos.


Total = 16 Nos.
Providing & fixing Aluminium Hanging Floor Door Stopper ISI marked anodised (anodic coating not less
than grade AC 10 as per IS:1868) transparent or dyed to required colour and shade with necessary
screws etc complete.

a) Twin Rubber Stopper.

30

For Door D (1 No.) = 1 x 2 x 1 = 2 Nos.


Total = 2 Nos.
Providing & fixing bright finished brass 100mm Mortice Latch & Lock ISI marked with 6 Levers & a pair
of anodised (anodic coating not less than grade AC 10 as per IS:1868) transparent or dyed to required
colour & shade with necessary screws etc complete, best make of approved quality.

For Door D (1 No.) = 1 x 2 x 1 = 2 Nos.


Providing & fixing Aluminium IS:3564 Marked Aluminium Die Cast Body Tubular Type Universal
Hydraulic Door Closer, Hardwyn Make (Class Queen) or equivalent with necessary accessories & screws
etc. complete.

2.00

Nos.

31

2.00

Nos.

32

For Door D (1 No.) = 1 x 2 x 1 = 2 Nos.


Providing & fixing Aluminium Casement Stays ISI marked anodised (anodic coating not less than grade
AC 10 as per IS:1868) transparent or dyed to required colour and shade with necessary screws etc.
complete.

4.00

Nos.

33

For Window W1 (4 No.) = 4 x 1 x 1 = 4 Nos.


Total = 4 Nos.
Making Plinth protection 50 mm thick of cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded
stone aggregate 20 mm nominal size) over 75 mm bed of dry brick ballast 40 mm nominal size well
rammed & consolidated & grouted with fine sand including finishing the top smooth in crushed
aggregate.

8.67

Sqm

i) Front & Back Sides: 2 x 19-6 x 1-4 = 52 sft.


i) Left & Right Sides: 2 x 15-6 x 1-4 = 41.33 sft.
Total = 93.33 sft. or 8.67 sqm
34

Total: Rs.
Carriage of material from source to site of work by mechanical transport including loading and
unloading complete.

LUMPSUM @ 4% INCLUDING COST OF CARRIAGES,UNSEEN ITEMS & WATCH AND WARD OF


MATERIAL AT SITE
35

ADD FOR ELECTRIFICATION WORKS


Add 20% above on all items
Grand Total: Rs.

RUPEES THREE LAKHS NINETY SEVEN THOUSAND

f Generator Room at MAHARAJA HARISINGH


LIC SCHOOL, Akhnoor
RATE

AMOUNT

(Rs.)

(Rs.)

240.45

2,513

3112.80

6,506

3707.40

26,341

275.45

1,014

4551.45

42,146

706.50

6,542

6161.00

25,852

179.25

2,949

372.40

7,578

305.70

1,676

176.55

3,768

127931.10

38,251

113.80

2,504

3263.15

4,503

687.50

3,740

141.65

6,971

225.00

15,248

130.25

2,651

102.20

648

326.75

555

2750.40

3,493

1421.20

23,777

834.20

1,443

81.75

5,687

32.85

2,285

78.20

5,440

138.10

9,359

103.35

2,912

71.00

32,802

63.90

256

47.60

762

64.55

258

58.75

940

81.65

163

804.10

1,608

1256.40

2,513

84.30

337

328.30

2,846
298,836

11,953

20,000
66,158
396,947
397,000

Detailed Estimate for Construction of Water Tank at MAHARAJA HAR


CENT. PUBLIC SCHOOL, Akhnoor
PARTICULARS OF ITEMS

S. No.
1

QTY.

UNIT

1.13

Cum

0.23

Cum

0.64

Cum

0.84

Sqm

3.16

Cum

2.12

Cum

1.39

Sqm

Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not
exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan,
depth upto 1.5 mtr, including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is
to be leveled and neatly dressed in:

All kinds of soil as directed upto 25 mtr lead & upto 1.5 mtr lift.

i) Pillar (4Nos.) = 4 x 2'-0" x 2-0 x 2-6 = 40 cft.


Total = 40 cft. Or 1.13 cum
Providing and laying in position cement concrete of specified grade excluding the cost of centring and
shuttering -All work upto plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm
nominal size) in crushed aggregate.

i) Pillar (4Nos.) = 4 x 2'-0" x 2-0 x 0-6 = 8 cft.


Total = 8 cft. Or 0.23 cum
Providing and laying in position cement concrete of specified grade excluding the cost of centring and
shuttering -All work upto plinth level. 1:3:6 1cement : 3 coarse sand : 6 graded stone aggregate 20mm
nominal size) in crushed aggregate.

i) Pillar (4Nos.) = 4 x 1'-6" x 1-6 x 2-6 = 22.5 cft.


Total = 22.5 cft. or 0.64 cum
Providing & laying Damp-Proof Course 50 mm thick with cement concrete 1:2:4 (1 cement : 2 coarse
sand : 4 graded stone aggregate 20 mm nominal size) in crushed aggregate.
i) Pillar (4Nos.) = 4 x 1'-6" x 1-6 = 9 sft.
Total = 9 sft. Or 0.84 sqm

Brick work with common burnt clay F.P.S. (non-modular) bricks of class designation 75 in foundation
and plinth in: Cement mortar 1:6 (1cement : 6 coarse sand).
i) Pillar (4Nos.) = 4 x 1'-1-1/2" x 1-1-1/2 x 2'-6" =12.66 cft.
ii) Long Walls = 2 x 11'-6" x 4'-0" x 0'-9" = 69 cft
iii) Short Walls = 2 x 5'-0" x 4'-0" x 0'-9" = 30 cft

Total = 111.66 cft. Or 3.16 cum


Reinforcement cement concrete work in beams, suspended floors, roofs having slope upto 150 ,
landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases & spiral stair cases
upto floor five level excluding the cost of centering, shuttering, finishing & reinforcement with 1:1.5:3 (1
cement: 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size).

i) Bottom Slab

= 1 x 11-6 x 6-6 x 0-6 = 37.38 cft.

ii) Top Slab


= 1 x 11-6 x 6-6 x 0-6 = 37.38 cft.
Total = 37.38 + 37.38 = 74.76 cft. Or 2.12 cum
7
a)

Centring & shuttering including strutting, propping etc. & removal of form for:
Foundations, footings, bases of columns etc. for mass concrete.
i) Pillar (4Nos.) = 4 x 1'-6 x 2'-6" =15 sft.
15 sft. or 1.39 sqm

b)

Suspended floors, roofs, landings, balconies & access platform.


i) Bottom Slab
= 1 x 10-0 x 5-0 = 50 sft.
ii) Top Slab

= 1 x 10-0 x 5-0 = 50 sft.

9.29

Sqm

21.95

Mtr

Total = 371 sft. or 34.48 sqm

34.48

Sqm

Total =50 sft. or 4.64 sqm


Reinforcement for RCC works including straghening, cutting, bending, placing in position and binding
all complete.

4.64

Sqm

233.00

Kg

13.92

Sqm

8.00

Each

Total =100 sft. or 9.29 sqm


c)

Edges of slabs and breaks in floors and walls. Under 20 cms wide.
i) Bottom Slab
= 2 x (11-6 + 6-6) = 36 rft.
ii) Top Slab

= 2 x (11-6 + 6-6) = 36 rft.


72 rft. or 21.95 mtr

Finishing: Cement Plaster:18 mm Cement Plaster in two coats underlayer 12mm thick cement plaster 1:5 (1 cement : 5 coarse sand)
finished with a top layer 6mm thick cement plaster 1:6 (1 cement : 6 fine sand). Outer Side:
a) Outer Side:i) Pillar (4Nos.) = 4 x 4 x 1'-1-1/2 x 3'-2" = 57 sft
ii) Long Walls = 2 x 11'-6" x 4'-0" = 92 sft
iii) Short Walls = 2 x 6'-6" x 4'-0" = 52 sft
b) Inner Side:i) Long Walls = 2 x 10'-0" x 4'-0" = 80 sft
ii) Short Walls = 2 x 5'-0" x 4'-0" = 40 sft
iii) Bottom Slab = 10'-0" x 5'-0" = 50 sft

Finishing: Cement Plaster:6 mm cement plaster to ceiling of mix 1:3 (1 cement : 3 fine sand).
i) Top Slab = 10'-0" x 5'-0" = 50 sft

10

a) Thermo-mechanical treated bars.


i) Qty. Vide Item No. 6 = 2.12 cum @ 110 Kg /cum = 233 Kg
Providing & fixing 18mm thick mirror polished, machine cut for kitchen platform, vanity counters facies
14
& similar locations of required size of approved shade colour & texture laid over 20mm thick base
cement mortar 1:4 (1cement : 4 coarse sand) & joints treated with white cement mixed with matching
pigment, epoxy touch ups, including rubbing, curing etc.complete at all levels.

a)

Granite Ruby Red


i) Outer Side: 2 x (11-6 + 6-6) x 4-0 = 144 sft.

b)

Tap Shelf = 1 x 11'6" x 0'-6" = 5.75 sft


Total = 149.75 sft or 13.92 sqm

11

Add for Taps 8 Nos. @ Rs. 250 Each (LMR)


Total: Rs

12

Carriage of material from source to site of work by mechanical transport including loading and
unloading complete.
LUMPSUM @ 4% INCLUDING COST OF CARRIAGES,UNSEEN ITEMS & WATCH AND WARD OF
MATERIAL AT SITE
Add 20% above on all items except item no. 11
Grand Total: Rs.

RUPEES ONE LAKH FORTY SEVEN THOUSAND AND FIVE HUNDRED ONLY

f Water Tank at MAHARAJA HARISINGH DAV


C SCHOOL, Akhnoor
RATE

AMOUNT

(Rs.)

(Rs.)

240.45

272

3112.80

716

3707.40

2,373

275.45

231

4551.45

14,383

6161.00

13,061

179.25

249

372.40

3,460

176.55

3,875

225.00

7,758

130.25

604

71.00

16,543

3859.90

53,730

250.00

2,000
119,255

4,770
23,451
147,476
=

147,500

DETAILS FOR CONSUMPTION OF MATERIALS FOR CONSTRUCTION OF CHOWKIDAR Q


AT THE JKSPDC RESIDENTIAL COMPLEX, BATHINDI, JAMMU.
ITEM
NO.

2
3
4
5
6

7
8
12
15

21
22
23
26
27
28

29

PARTICULARS OF ITEMS

STONE
STONE
AGGRE. 20 AGGRE. 40
MM
MM

CEMENT in STEEL in
Qtl.
Qtl.

QTY.

UNIT

SAND

4.79
26.62
0.13
0.90

Cum
Cum
Cum
Cum

2.156
11.979
0.059
0.405

23.958
0.117
0.81

4.311
-

8.143
56.564
0.368
2.88

0.63
17.88

Cum
Cum

0.284
4.470

0.567
-

2.008
11.175

0.50
4.68

Cum
Cum

0.125
2.106

4.212

0.460
18.72

0.135

Cum

0.061

0.122

0.297

12mm Cement Plaster in 1:6 mix = 85.29


sqm

85.29

Sqm

1.023

3.070

18mm Cement Plaster (12 mm + 6 mm)


in 1:5 & 1:6 mix = 60.83 sqm

60.83

Sqm

1.095

3.808

33.25
1.71

Sqm
Cum

0.200
0.770

1.220
2.223

18.02

Sqm

0.360

2.238

23.71

Sqm

0.285

2.475

6.52
515.00

Sqm
Kg

0.130
-

0.810
-

515.00

8.38

Sqm

0.189

0.377

8.38
Total =

Sqm

0.629
26.33
Cum

30.16
Cum

4.31
Cum

116.46
Qtls.

515.00
Kg

P.C.C. 1:4:8 mix = 4.79 cum


P.C.C. 1:3:6 mix = 26.62 cum
P.C.C. 1:3:6 mix = 0.13 cum
P.C.C. 1:2:4 mix = 0.90 cum
D.P.C. 1:2:4 mix (50 mm thick) = 20.18
sqm = 12.55 x 0.05 = 0.63 cum
Brick Work in 1:6 mix = 17.88 cum
Half Brick Work in 1:4 mix = 4.32 x 0.115
sqm = 0.50 cum
R.C.C. 1:1.5:3 mix = 4.68 cum
P.C.C. Blocks of size 30x10x15cm- 1:3:6
mix = 30 Nos. Therefore, 30 x 0.30 x 0.10
x 0.15 = 0.135 cum.

6 mm Cement Plaster in 1:3 mix = 33.25


sqm
P.C.C. 1:5:10 mix = 1.71 cum
Tile Flooring 20 mm thick base of mortar
in 1:4 mix = 18.02 sqm.
Tile Skirting & Dados 12 mm thick base
of mortar in 1:3 mix = 23.71 sqm.
Tile Flooring 20 mm thick base of mortar
in 1:4 mix = 6.52 sqm.

38

Steel TMT bars = 515.00 Kg

46

i) Plinth Protection 50 mm thick in 1:3:6


mix = 8.38 sqm.
ii) Plinth Protection 75 mm thick bed of
dry brick blast + fine sand.

ALS FOR CONSTRUCTION OF CHOWKIDAR QUARTER


TIAL COMPLEX, BATHINDI, JAMMU.
BRICKS in
Nos.

BRICK
AGGRE. 40
MM

8529

239
-

1.539

8768.00
Nos.

0.5657
2.10
Cum