(NJHEP)
Location: The Project envisages the diversion of Neelum waters through tunnels at Nauseri about 41
upstream of Muzaffarabad and out falling in Jhelum River Chatter Kalas in AJ&K, where the powerhouse will
located.
Salient Features
Dam Type
Height of Dam
60 meters
Tunnel Length
Gross Head
420 m
Design Discharge
280 cumecs
No. of Units
10.0 MAF
2.8 million m
CCA
----
Installed Capacity
969 MW
Power Generation
Execution by
WAPDA / NJHPC
Supervision Consultants
Contractor
Donor Agency
Commencement Date
January 2008
Completion Date
Financial Status
117,291.84
126,772.60
244,064.45
72,756.44
89,272.56
162,029.00
116,515.400
158,367.180
274,882.590
117,291.84
126,772.60
244,064.45
227,577.49
186,457.02
414,034.51
st
nd
nd
rd
st
5,500.00
5,500.00
11,000.00
Status
Physical Progress
75.00%
Financial Progress
73.85 %
SALIENT FEATURES