September, 2012
Planning & Development Department, Lahore Pakistan
WWW.DGMEPUNJAB.GOV.PK
ii
iv
EXECUTIVE SUMMARY
Poultry industry is one of the largest growing agro-industries in the world. This can be
accredited to an increasing demand for poultry meat and egg products. In Pakistan, poultry
was kept as backyard business for household needs. In early sixties, the need of commercial
poultry was felt which resulted in 1963, in the form of a national campaign to enhance the
production of feed products in the country. However, Pakistans poultry industry is still
facing lots of problems and challenges to grow up constantly. One of the major causes of
low productivity is ineffective communication process among the stakeholders especially at
farmers level. For hi-tech intensive poultry production in the country, it is necessary to
stream line the poultry production activities. The poultry industry can be better and more
profitable if it is operated scientifically.
Keeping in view the necessity to promote the poultry production as a useful business;
Poultry Research Institute, Rawalpindi, L&DD Department, Government of the Punjab has
initiated the project titled Strengthening Regulatory Control and Capacities of Poultry
Research Institute to formulate regulations and their implementation for control of poultry
production activities at provincial level and provide technical trainings to the staff for their
capacity building. Strong linkages to the farmers community are also mandatory; trainings
on modern poultry housing and management are also arranged during the project
execution. The project was started on July 1st, 2009 with twenty four (24) months gestation
period at its planned cost of Rs. 57.000 million. The project has been revised for the readjustment of annual budget allocation at the same cost and time duration. 2nd revision of
the project has been made at the cost of Rs. 56.688 million with one year extension of
project time period (i.e. 2011-2012). Actual expenditure of Rs. 51.385 million has been
made till June 30th, 2012. The department has submitted the document PC-IV of the project
for evaluation on June 27th, 2012.
On the basis of data collection and analysis, the project is found to be Satisfactory with a
PERI Score of 70 which is based on the assessment results of project performance against its
planned objectives and physical targets. The overall performance of the project in context of
the procurement of machinery, equipments, transport and effective trainings for staff
members and farmers is satisfactory. It is observed that the work performance of PRI will be
v
vi
vii
viii
TABLE OF CONTENTS
1. INTRODUCTION ............................................................................................................ 1
Scope of poultry farming ................................................................................................... 1
Types of Poultry farms ....................................................................................................... 2
Types of Pakistani Poultry Chickens................................................................................... 2
1.1 THE EVALUATION REPORT: PURPOSE & STRUCTURE ..................................................... 3
2. THE PROJECT ................................................................................................................ 4
2.1 PROJECT BRIEF ................................................................................................................. 4
2.2 PROJECT BACKGROUND, DESCRIPTION AND JUSTIFICATION ......................................... 5
3) Government Poultry Disease Diagnostic Laboratories ................................................... 5
2.3 PROJECT OBJECTIVES ....................................................................................................... 6
2.5 PROJECT ACTIVITIES ........................................................................................................ 7
2.6 PLANNED PROJECT COST ................................................................................................. 7
3. METHODOLOGY .......................................................................................................... 10
3.1 TEAM FORMATION ........................................................................................................ 10
3.2 DOCUMENTS REVIEW .................................................................................................... 10
3.2.1 SPONSORS ASSESSMENT REPORT ....................................................................... 10
3.3 IDENTIFICATION OF KEY INDICATORS ........................................................................... 10
3.4 DEVISING EVALUATION PLAN ........................................................................................ 12
3.5 PHYSICAL ACTIVITIES & DATA COLLECTION .................................................................. 12
3.5.1 DATA COLLECTION................................................................................................ 12
3.5.2 PROJECT SITE VISITS ............................................................................................. 13
3.5.3 INTERVIEWS WITH PROJECT OFFICIALS ............................................................... 27
3.5.4 VISITS SNAPS/PICTORIAL SURVEY ........................................................................ 27
3.6 DATA ANALYSIS AND INTERPRETATION ........................................................................ 28
3.6.1 PROJECT COST ANALYSIS .................................................................................... 28
4. DGM&E ASSESSMENT ................................................................................................. 31
5. SWOT ANALYSIS ......................................................................................................... 32
6. OBSERVATIONS .......................................................................................................... 33
7. CONCLUSION .............................................................................................................. 37
8. LESSONS LEARNED ...................................................................................................... 38
9. RECOMMENDATIONS ................................................................................................. 39
ANNEXURE A: SPONSORS ASSESSMENT REPORT
ANNEXURE B: HEAD-WISE EXPENDITURES AGAINST MAJOR ACTIVITIES OF THE PROJECT
ANNEXURE C: LAB. ACTIVITIES PERFORMED DURING THE PROJECT PERIOD
ANNEXURE D: VARIETIES OF BIRDS INTRODUCED BY PRI
ANNEXURE E: PROJECT EVALUATION RATING INDEX (PERI)
ANNEXURE F: RECOMMENDED STAFF
ANNEXURE G: RECURRING COST
ANNEXURE H: PICTORIAL EVIDENCE OF PRI WEBSITE
1.
INTRODUCTION
Poultry farming has become one of the most dynamic associated parts of agriculture
throughout the world. Poultry culture in South Asian countries is expanding rapidly and the
rate of growth of commercial layer and broiler (meat producing) farms is phenomenal to
meet the ever increasing demand for proteins through poultry meat and eggs. In Pakistan,
poultry industry had made considerable contribution to food production and plays a vital
role in the economy of the country. Raising of poultry in Pakistan has virtually proven a
profitable enterprise as it is the best source of cheap, palatable and nutritious food protein.
The poultry production was commenced in Pakistan in 1963. Poultry as on a commercial
scale in the private sector started due to pioneering effect made by PIA (Pakistan
International Airline) in 1965, when the first modern hatchery unit in Karachi was
established. Later on, the investments have taken keen interest in this sector, as was result
of which substantial development has taken place towards expansion of this industry. The
commercial poultry farming sector is a classic example of private sector enterprise with a
phenomenal growth of 20 to 25%per annum. The achievement of this rapid growth was
made to the incentives granted by the government from time to time e.g. liberal financing
and credit, income tax exemption, duty free imports etc. during last thirty five years, poultry
farming in Pakistan has developed as an important sub-sector of livestock. During the last
thirty five years, poultry farming in Pakistan has developed as an important sub-sector of
livestock. This expansion continues to fill the genuine gaps of the animal protein and should
be fully encouraged in order to promote the welfare and prosperity of the people by
providing them with a nutritious balanced diet.
Scope of poultry farming
Poultry industry which provides cheap source of animal protein has taken a quantum leap in
the last three decades evolving from a near backyard practice to a venture of industrial
promotion. Poultry is one of the fastest growing segments of the agricultural sector in
Pakistan today. While the production of agricultural crops, it has been rising at a rate of 1.5
to 2 percent per annum that of eggs has been rising at a rate of 8 percent per annum.
Page | 1
Page | 2
regimens which requires great emphasis on the aspect of regulatory control and
institutional capacity building in poultry production sector.
Page | 3
2.
THE PROJECT
2.1
PROJECT BRIEF
-do-
01-07-2009
30-06-2012
27-07-2010
27-08-2011
01-07-2009
30-06-2012
Beneficiaries
Page | 4
2.2
The Punjab Government led the poultry development activities with the start of a scheme
Increased Poultry Production in Punjab in 1970, and later on established the Poultry
Development Centre (PRI) at Rawalpindi in 1978 aimed to Support poultry development in a
policy environment through public investment and inducing private capital/ initiatives in the
sector for poverty alleviation, food security and generation of exportable surpluses. The
research challenges of PRI are;
Emerging poultry diseases
Enhance genetics for improved efficiency, quality, and disease resistance
Employment of techniques and information of genomics proteomics and
metabolomics
Changing needs of todays poultry
Factors effecting cost of production
Understanding the biology of todays poultry
Alternative production systems
Product quality including flavor and other gustatory characteristics
This institute possesses research and training facilities in different disciplines of poultry
production such as poultry disease diagnostics, breeding & incubation, poultry nutrition,
feed testing, marketing & processing, poultry management and rural poultry farming.
Table 2: Field offices of Poultry Research Institute
Sr no.
Description of Field Offices
1) Government Poultry Breeding Farms
1
Bahawalpur
2
Dina
3
Dera Ghazi Khan
4
Multan
5
Sargodha
2) Government Poultry Rearing Farms
1
Attock
2
Bahawal Nagar
3
Gujrat
4
Mianwali
3) Government Poultry Disease Diagnostic Laboratories
1
Gujjar Khan
2
Ghakkar
3
Summandri
Page | 5
4
Kamalia
5
Arif Wala
6
Bahawal Nagar
7
Jhang
8
Jhelum
4) Details of District Setup of Poultry Research Institute
Total No. of Districts in Punjab
DDLO
Sanctioned Strength
29
In Position
29
Vacant
5
36
VO (H)
36
45
17
During the year 2003-2008, 185 number of research studies on different aspects of poultry
production were conducted. Out of these, 30 number of research studies were published in
renowned scientific journal. Under training program of the institute, short training courses
of different durations are offered.
However, the changing role of public sector in Punjab necessitates redefining the objectives,
plans and activities of Poultry Research Institute (PRI) for improved service delivery,
development and desired output. Unfortunately, the aspect of regulatory control and
human resource development in public sector remained out of focus and poultry sector
occasionally suffers colossal losses due to absence of such driving forces.
Therefore, the project has been designed to bring the poultry production activities of the
province under a regulatory control. Formulation of regulations and methodology of their
enforcement will be worked out through the stakeholders consultation.
The infrastructure of PRI needs to be improved for modern research, disease diagnosis,
surveillance, reporting, quality control, training and gender participation for effective
service delivery to the poultry sector. Similarly, the potential of existing staff could not be
effectively utilized. The HRD of PRI will help to introduce the modern and scientific
techniques in the poultry production.
2.3
PROJECT OBJECTIVES
The project has been planned with the following specific objectives.
1) Formulation of regulations and their implementation for control of poultry
production activities in Punjab.
2) Institutional capacity building in terms of infrastructure and human resource
development.
Page | 6
2.5
PROJECT ACTIVITIES
Targets of Physical Activities as given in the project document PC-I is given as under;
Table 3: Detail of Project Activities
Sr No.
2.6
Activity
Description
Regulatory Control
Table 4: Year-wise phasing as per PC-I along with ADP Allocation (2nd Revised)
(Rs. in millions)
% AGE OF ALLOCATION
YEAR
PHASING AS PER PC-I
ALLOCATION
ON PHASING
2009-10
08.904
08.904
100%
2010-11
28.188
28.188
100%
2011-12
19.596
19.596
100%
TOTAL
56.688
56.688
100%
2009-10
16%
2010-11
50%
PC-I ESTIMATES
Percentage of Total
Cost
Establishment Charges
3.144
5.54%
Operating Expenses
12.034
21.22%
Physical Assets
29.686
52.36%
11.824
20.85%
TOTAL
56.688
100%
Page | 8
Estimated Cost
R&M
21%
Estb Charges
6%
Operating Exps
21%
Phys Assets
52%
Page | 9
3. METHODOLOGY
Following criteria has been used to carry out evaluation of the project as elaborated in flow
chart as given in Figure 3;
Page | 10
TEAM FORMATION
PC-I REVIEW
PC-IV REVIEW
PROJECT DOCUMENTS
REVIEW
OTHERS
SPONSORs
ASSESSMENT REPORT
(SAR) REVIEW
COST
OBJECTIVES
IDENTIFYING PROJECT
KEY INDICATORS
DURATION
PHYSICAL
ACHIEVEMENTS
FINANCIAL
ACHIEVEMENTS
COMPONENTS
SURVEY PLAN
DEVISING EVALUATION
PLAN
INTERVEVIEWING
PLAN
QUESTIONAIRE
DESIGN
PERIODIC PHYSICAL
PROGRESS REPORTS
SITE VISITS
INTERVIEWS
PERIODIC FINANCIAL
PROGRESS REPORTS
PROCUREMENT
RECORDS
SITE SNAPS
Project Evaluation
Rating Index (PERI)
SWOT ANALYSIS
PROJECT COST
ANALYSIS
DGM&E ASSESSMENT
OBSERVATIONS
CONCLUSIONS
LESSON LEARNED
RECOMMENDATIONS
REPORT
SUBMISSION
Page | 11
feed. These Lab Services at Poultry Research Institute are directly provided to the
Government Poultry Farms, Commercial Poultry Farms and Feed Millers.
The available laboratory equipment was insufficient to fulfill the requirements of modern
research and quality control of poultry feed. Therefore, to meet the requirements of
modern research work along with up-gradation of the services of poultry feed testing; major
activity under the development project was to analyze feed samples and to purchase the
modern scientific equipment (e.g. egg analyzer, flask shaker, water bath digital. Water
distillation apparatus, ultrasonic cleaning bath, flame photometer etc). The detail of
purchased items is given as under;
Page | 14
Page | 15
testing were post mortem, bacterial examination, samples processed for Mycoplasmal,
for H.I. Titre against ND, Histopathology, flocks tested for H.I. against AI, Swab samples
processed for AI and Tissue samples processed for ND, AI. Purchasing of lab equipment
was also checked by the evaluation team. A pictorial evidence of the equipment
purchased (e.g. Binocular Compound Microscope, Bench Top Centrifuge, Thermocycle,
Microtitration/Cell Culture Plate etc) is given as here under:-
Page | 17
iii) POULTRY SHEDS:PRI from its establishment used the former system of Open Farming to preserve the
poultry production. By initiating the development project, Environment Control Farming
system was introduced for advance Hi-tech poultry farming and automatic control panel
was installed to control the temperature and humidity of the poultry farms. Pictorial
evidence has been given as under;
Page | 18
Page | 19
Fig 30: Generator Placed Near Breeding Farm-1 (30KVA for Breeding Farm 01), In front of PRI Main
Office Building (40KVA for Hatchery and Labs) along with Generator Placed Near Breeding Farm-2
(30KVA for Breeding Farm 02 & Feed mill)
Page | 20
Page | 21
Fig 41: Living Room for Male Trainees along with Refrigrator, Geasers, Blankets etc
Fig 42: Living Room along with Kitchen with required Utensils for Female Trainees
vi) FURNITURE & FIXTURE PURCHASED FOR VISITORS HOUSE, PRI: Visitors house
consisting of two attached rooms/bed rooms and adjoining with small kitchen was fully
furnished. Rooms furniture (i.e. beds, chairs, sofas, center tables, dressing table, dining
table and iron stand) as well as kitchen utensils were purchased under the project.
Page | 22
Flooring of walkways and patios at PRI were also repaired during execution of the
project. It was observed that some of the patch work was in progress during visiting the
project site. However, it has been over and done after the project evaluation. Replacement
of old tube well with new one has also been done.
Page | 24
Renovation of the boys hostel was completed in terms of flooring of the entrance,
hostel rooms, corridors, and kitchen as well as restructuring of attached washrooms. All
missing facilities prior to the project have been provided during the execution. It was also
observed that already existed old laboratory building has been restructured as women
hostel and renovated accordingly. A boundary wall has also been constructed around the
hostel building to provide safe and protected environment to the female trainees.
Renovation of visitors house was also completed with all of its required arrangements.
Page | 25
Fig 53: Renovation of the corridores of Boys Hostel and Visitors House, PRI
Page | 26
DEPARTMENT
L&DD Department
CONTACT #
0321-5561750
Dr. Muhammad
Ashraf Anjum
L&DD Department
51-9290163
Ext (116)
Assistant Research
Officer
L&DD Department
51-9290163
Senior Research
Officer
L&DD Department
51-9290163
Assistant Research
Officer
L&DD Department
51-9290167
Veterinary Officer
L&DD Department
51-9290163
Malik Ghulam
Fareed
Chemist
L&DD Department
51-9290163
Ext (117)
Naeem Mehmood
Ashraf
Chemist
L&DD Department
51-9290163
Ext (117)
Page | 27
Year
PC-I Phasing
ADP
Allocation
2009-10
2010-11
08.904
28.188
08.904
28.188
2011-12
19.596
19.596
TOTAL
56.688
56.688
Releases
Expenditure
as per PC-IV
08.904
28.188
19.596
(04.688
surrendered)
56.688
08.904
27.707
14.774
(0.124
lapsed)
51.385
(Rs. in Millions)
% age
Utilization on
Releases
100%
98.29%
75.39%
91.22%
Page | 28
27.707
19.596
14.774
8.904
8.904
2009-10
2010-11
2011-12
PC-I
ESTIMATES
3.144
12.034
29.686
11.824
56.688
ITEMS
Establishment Charges
Operating Expenses
Physical Assets
Repair & Maintenance
TOTAL
ACTUAL
UTILIZATION
3.123
7.257
29.198
11.807
51.385
Item-wise Expenditures
R&M
23%
(Rs. in millions)
% AGE OF
UTILIZATION
99.33%
60.30%
98.35%
99.85%
89.46%
Est. Charges
6%
Operating Exp
14%
Physical Assets
57%
SR #
ITEMS
Operating Expenses
1
Inland Training/Ex. Tour
PC-I
ESTIMATES
ACTUAL
UTILIZATION
1.126
1.126
(Rs. in Millions)
% AGE OF
UTILIZATION
100%
Page | 29
2
Conferences/Seminars
0.200
3
Medicines/Chemicals
3.200
4
P.O.L.
0.600
Physical Assets
4
Transport
6.208
5
Plant & Machinery
20.028
6
Furniture & Fixture
1.900
Repair & Maintenance
7
Building & Structure
11.824
TOTAL
45.086
Head-wise expenditures are annexed at B
Building &
Structure
27%
Training POL
3%
1%
0.100
3.200
0.600
50%
100%
100%
6.207
20.010
1.489
99.98%
99.91%
78.36%
11.807
44.539
99.85%
91%
Conference
0%
Medi/Chemical
7%
Transport
14%
Page | 30
4. DGM&E ASSESSMENT
The DGM&E assessment has been carried out regarding the planned objectives as well as
planned targets of the project as following:Table 9: DGM&E Assessment of Planned Objective/Targets
ACTIVITIES/TARGETS
DGM&E ASSESSMENT
QUALITATIVE
Formulation of
regulations and their
implementation for
control of poultry
production activities in
Punjab
Institutional capacity
building in terms of
infrastructure and
human resource
development
Establishment of strong
linkages among
stakeholders of poultry
sector
Page | 31
5. SWOT ANALYSIS
After mapping the detailed observations regarding overall physical & financial performance
of the project, SWOT analysis has been carried out to analyze the detailed strengths,
weaknesses, opportunities and threats involved during and after the project
execution/implementation phase which may also be adapted even for the other public
sector interventions of the same department in future.
Table 10: Strengths, Weaknesses, Opportunities & Threats
STRENGTHS
WEAKNESSES
1. Existence of functional organizational 1. Slow process of approval of Punjab Poultry
structure
Act, 2012
2. Development of project
2. Hindrance in foreign trainings of staff
infrastructure
members
3. Poultry research and development,
3. No PC-I cost estimation of lab
Crossbreeding between chickens
chemicals/reagents and furniture
4. Environment control poultry farming
purchased.
5. Training programmes for professional
skills
6. Autonomous in feed testing of
poultry and disease diagnosis
7. Training & research assistance for
university students
8. Improved training and
testing/diagnostic services for
farmers community
THREATS
OPPORTUNITIES
1. Potential for improved effectiveness 1. Lack of implementing the public policies
and efficiency of Poultry Sector
2. An outbreak of bird flu and other
2. Better & adequate testing, diagnostic
epidemics
and extension services and more
3. Lack of an effective publicity campaign
tangible benefits of poultry
4. Local breeds have low productivity in
production
terms of egg production and weight gain
3. Dissemination of the common results
due to genetic limitations
of research studies carried out by PRI 5. Lack of policy initiative to focus attention
to the farmers/growers community
on developing local poultry into a
4. Maximizing of production to take
productive/income generating activity
advantage of economies of scale
6. Low literacy level of the farmers
5. Poultry can be used as a tool to
community
alleviate poverty while also ensuring 7. Inaccessibility of far-off farmers
food security
community
Page | 32
6. OBSERVATIONS
The evaluation team visited the office of the Director, PRI L&DD Department Rawalpindi to
assess various project activities. Evaluation of the project has revealed many facts and
figures about the project. The observations regarding overall project activities are given in
ensuing paragraphs:1) The project was initiated at its original cost of Rs. 57.000 million with its planned
gestation period of twenty four months (as July 1st, 2009 to June 30th, 2011). The
scheme was revised at the same cost of Rs. 57.000 million, due to the overall
adjustment in budget provision/allocation for the year 2009-10 and 2010-11. Second
revision of project PC-I was made at the revised cost of Rs. 56.688 million with one
year extension of time period as 2011-2012. The actual utilization (up to July, 2012)
was Rs. 51.385 million as per PC-IV document.
2) After reviewing the Sponsors Assessment Report of the project, actual expenditures
of Rs. 51.372 million during the project execution was found slightly varied from the
actually stated financial utilization of Rs. 51.385 million as per PC-IV. Difference in
the total amount expended in the third year of the project (See annexure-A) should
be made clear.
3) All the machinery and equipment procured for Feed Testing Laboratory and Disease
Diagnostic Laboratory of PRI were found installed and functional. It is also revealed
that by capacity building in terms of labs infrastructure, the work performance of
both laboratories in context of poultry feed analysis; adoption of modern research
techniques for growing poultry production and poultry disease diagnosis was
improved and will contribute a large share in expansion of the poultry industry of the
province.
4) It is also observed that the activities of PRI sections especially disease diagnostic and
feed testing/analyzing activities directly linked to the project have also been
compared with the labs. activities prior to the development project. The
performance of both laboratories was found satisfactory. Lab activities performed
under the project is annexed at C
5) Formulation of policy with regard to control of poultry production activities in Punjab
has been done in consultation with the poultry stakeholders. However, it is yet to be
approved by the concerned authority for efficient implementation throughout the
Page | 33
province. It is also practical that by implementing these regulations, not only the
poultry market will grow up; it will also be favorable in good trade of poultry
stakeholders.
6) As far as project staff is concerned, total of 11 project posts were initially approved
and finally cleared by finance department. Initial recruitment of 4 project posts was
made during project execution and the remaining 5 posts were posted through
transfer adjustment. Whereas, two posts of Senior Research Officers were
conditional and subjected to the final approval of the Punjab Poultry Act, 2012.
7) In view of modern research & development activities, PRI has introduced seven
varieties of birds and distributed in the domestic market of countryside districts of
the Punjab. List of these birds is annexed at D
8) It is observed that PRI has improved the poultry production activities by shifting the
conventional open poultry farming to the environment control poultry farming. This
advance hi-tech farming controls the temperature & humidity and provides tunnel
ventilation for improving the broiler production.
9) One of the key project objectives of PRI was capacity building of human resource vis-vis poultry disease diagnostics and control, community mobilization & extension
services, participatory approaches, modern business approaches, IT & E-governance
concepts and modern technologies in poultry production etc. The complete training
facilities against scientific areas of poultry production and administration were given
to the staff of PRI in perception of their managerial precision. No foreign training as
per PC-I was provided during the project execution.
10) It is observed that trainings to the farmers community are also mandatory. At PRI,
six months to one day training programmes are being offered in different fields of
poultry farming, gender-based knowledge of poultry farming is also being delivered.
It will contribute in generation of income as well as improved business opportunities
and self reliance. It is, further, observed during visit internship and research
assistance is also offered to the university students.
11) Hostel facilities for males & females are provided to the trainees/internees. Under
the project, Jinnah Hostel for male trainees has been renovated; flooring of the
building is complete. Recently, 30-35 boarders have been accommodated there. At
Page | 34
the same time, women hostel is also renovated, the old building of laboratory is
renewed as hostel building. Currently, no female trainee is receiving training at PRI.
12) Transportation facility under the project is also complete. The vehicle Toyota Hiace
Van (3000 CC) has been purchased to provide the pick & drop services of trainees,
and another vehicle Toyota Hilux single cabin (2500 CC) is purchased for
organizational/ administrative activities of the institute. However, for organizational
and administrative activities of the institute, some economical vehicle of 1000 CC
e.g. Suzuki Cultus could be procured, as O&M of Toyota Hilux single cabin (2500 CC)
are very high.
13) It was also observed that the POL charges of Rs. 0.600 million under development
project was fully consumed. Not only project vehicle but regular vehicles of PRI also
used POL from the project. Whereas, the POL expenditures of two procured project
vehicles was met out of Non-development budget of Rs. 0.161 million, See annexure
B (d). It was, further, observed that total non-development budget of PRI for POL
was Rs. 4.556 million for the year 2009-2012, annexed at B(d-1). Detail of POL
consumption against PRIs vehicles (development/non-development) along with
justification of POL consumption of development side for regular vehicles should be
rationalized by the department.
14) Feedback from the trainees of on-going and completed training sessions has been
collected, detail is given as under;
i) Ongoing Training Programmes: 9 out of 32 trainees/internees of different
ongoing training courses & internship programmes are interviewed. Almost all of
them are responded positively; as the trainings are useful. However, 5 trainees
are jobless and 3 have no access of feed testing as well as disease diagnosis
facilities available at PRI.
ii) Completed Training Programmes: 11 out of 21 trainees of six months training
programmes have been interviewed. 4 trainees are jobless, 3 are not satisfied
with these trainings and 8 trainees have no access to the testing/diagnostic
facilities at PRI.
It is observed that a number of jobless persons are getting trainings who are not
directly involved even in their domestic poultry business/activities which shows
Page | 35
lacking of training aptitude in motivating the trainees to own their personal trade in
poultry market.
15) Web development and networking is complete and found satisfactory. Research
work, detail of PRI different sections; Disease, Extension & Education, Feed Testing
Laboratory, Breeding and Incubation, Marketing & Processing, Nutrition is available.
Furthermore, updates relating to poultry market and guidance map of poultry
activities for the farmers community is available at PRIs website.
16) Repair & maintenance of different sections has been completed. Renovation of
laboratories, roads/passages, main office building, and renovation of visitors house
along with replacement of tube well is complete according to the scope of work and
is found satisfactory.
17) It is observed that the purchasing of Lab chemicals/Reagents and procurement of
furniture & fixture are one of the major physical targets; however, no cost
estimation of these items have been done earlier.
Page | 36
7. CONCLUSION
The evaluation results and the reasons for success or failure of the project have been
documented as conclusion. After a detailed study and analysis of project documents,
interviews and visits to the project locations to determine project findings and provide
feedback on the execution and implementation of the project, it is concluded by applying
the Project Evaluation Rating Index (PERI) technique that the project is Satisfactory. See
Annexure-E
Table 11: Conclusion
STATUS
RATING
RATING OF PROJECT
Highly Satisfactory
Satisfactory
Moderately Satisfactory
Moderately Unsatisfactory
Unsatisfactory
Highly Unsatisfactory
Page | 37
8. LESSONS LEARNED
1. The projects purpose, scope and objective were well defined in the PC-1 document
and executed and achieved accordingly.
2. Procedural competency in developing the project infrastructure may apprehend the
purpose of such interventions.
3. Sponsors Assessment Report usually provides variation in total budget utilized
under the development phase against its component-wise actual utilization on the
planned project cost.
4. There is need of further R&D in the field. Practical/adaptive research needs to be
enhanced for better poultry production opportunities.
5. The advance poultry production services may strengthen the poultry sector.
Page | 38
9. RECOMMENDATIONS
1. Project may be transferred to the non-development side with the annual cost of Rs.
4.500 million along with 8 project posts. All the recruitments should be made as per
PC-I. Detail of recommended recurring cost of project and project posts has been
annexed at F and G respectively.
2. Post of Deputy Director (P&D) may not be recommended as the planning &
development has been done during implementation phase of the project. It is,
further, recommended that the Director, PRI may implement the P&D policies with
the assistance of PRIs regular staff.
3. The transfer of remaining two project posts of Senior Research Officers (BS-18) is
subject to the approval of the Punjab Poultry Act, 2012. The department may clear
these posts by Finance Department after the final approval/implementation of the
legislation.
4. Institutional development should be the final outcome of all activities. In view of
significant institutional development and better interest of poultry production in the
province, endorsement of the Punjab Poultry Act, 2012 should be made at once.
5. Trainings in proper poultry management should be at the core of poultry
development programs. It is, therefore, recommended that the usefulness of
training courses at PRI should be observed in the good interest of trainees for their
personal expertise of ownership.
6. It should also be obligatory to render the trainings on disease control and genetic
improvement of birds at the door step of farmers from the remote areas to grow up
the productivity of domestic chickens.
7. Proper maintenance of PRI networking may improve the institutional extension
services for the poultry stakeholders and it will be more advantageous to spread out
poultry production activities in the country.
8. Poultry production accompaniment the role of women in the household. Therefore,
women groups should be involved in commercialization of poultry production
activities and should be encouraged to have a stake in the ownership.
Page | 39
Page | 40
Page | 41
c) MEDICINES/CHEMICALS
d) POL CHARGES
d-1) DETAIL LIST POL ESTIMATES UNDER NON DEVELOPMENT BUDGET PRI, RAWALPINDI
Sr No
Year
Allocation (Rs.Mill)
Expenditure(Rs.Mill)
2009-10
1.295
1.270
2010-11
1.261
1.260
2011-12
2.000
1.999
e) TRANSPORT
Sr No.
Particulars
Qty
Amount
(Million)
6.207
Amount
(Millions)
100
00.294
20
00.059
10
00.039
08
00.102
20
00.129
20
00.133
40
00.512
50
00.130
Easy Chairs
02
00.013
01
00.053
Side Tables
02
00.010
Centre Table
01
00.009
Rostrum
01
00.003
275
01.489
Sr No.
Particulars
2
3
4
5
6
7
8
9
10
11
12
13
Computer Chairs
Office
1600*800*760mm
Office
1200*600*760mm
Computer Tables
Total
Table
Table
Sr. No.
Birds Names
PRI Black
PRI Silky
Criteria
PC-IV Submission
1.1
Before Project Completion
1.2
Within One Month of Project Closure
1.3
Within Two Months of Project Closure
1.4
After Three Month of Project Closure
1.5
After Six Month of Project Closure
1.6
After Nine Month of Project Closure
Sub-Total-1
Data Availability & Response of Concerned
Agency
2.1
Excellent
2.2
Very Good
2.3
Good
2.4
Satisfactory
2.5
Average
2.6
Poor
Sub-Total-2
Financial Progress
3.1
Excellent
3.2
Very Good
3.3
Good
3.4
Satisfactory
3.5
Average
3.6
Poor
Sub-Total-3
Total Physical Progress
4.1
Excellent (100%)
4.2
Very Good (>90 %)
4.3
Good (80-90 %)
4.4
Satisfactory (70-80 %)
4.5
Average (60-70%)
4.6
Poor (<60 %)
Sub-Total-4
Objectives Achievement
5.1
All Achieved
Maximum
Points
Points
Obtained
5
4
3
2
1
0
5
5
4
3
2
1
0
5
10
8
6
4
2
0
10
10
8
6
5
4
0
10
10
5.2
5.3
5.4
5.5
5.6
90% Achieved
80% Achieved
70% Achieved
60% Achieved
< 50% Achieved
Sub-Total-5
10
Project Justification
6.1
Excellent
6.2
Very Good
6.3
Good
6.4
Satisfactory
6.5
Average
6.6
Poor
Sub-Total-6
Statistical Analysis Findings (find year-wise
average)
7.1
Excellent
7.2
Very Good
7.3
Good
7.4
Satisfactory
7.5
Average
7.6
Poor
Sub-Total-7
Sponsor's Assessment
8.1
Excellent
8.2
Very Good
8.3
Good
8.4
Satisfactory
8.5
Average
8.6
Poor
Sub-Total-8
Formulation of Project Team and Organization
9.1
Excellent
9.2
Very Good
9.3
Good
9.4
Satisfactory
9.5
Average
9.6
Unsatisfactory
Sub-Total-9
Revisions
9
6
4
2
0
10
5
4
3
2
1
0
5
5
4
3
2
1
0
5
5
4
3
2
1
0
5
5
4
3
2
1
0
5
1
1
10.1
10.2
10.3
10.4
No Revision
One Revision
Two Revisions
Three or more Revisions
Sub-Total-10
11
12
13
14
15
5
3
2
1
5
10
7
5
2
2
10
3
0
10
10
8
6
5
4
0
10
5
4
3
2
1
0
5
5
4
3
2
1
0
5
5
10
10
10
15.2
15.3
15.4
15.5
15.6
Very Good
Good
Satisfactory
Average
Poor
Sub-Total-15
4
3
2
1
0
5
100
PERI
68
PROJECT
EVALUATION
RESULT
Satisfactory
-
3
68
SR #
POST
AS PER
PC-I
BPS
CLEARED BY
FD
RECOMMENDED
POSTS
01
18
01
NIL
01
18
01
Conditional
01
18
01
-do-
Database Administrator
01
17
01
01
Data Manager
01
16
01
01
Laboratory Technician
02
11
02
02
Laboratory Attendant
02
02
02
Naib Qasid
01
01
01
Sanitary Worker
01
01
01
11
08
Total
11
Directorate General of Monitoring and Evaluation, Planning and Development Department, Govt. of Punjab
(September, 2012)