CONTENIDO.
1.
2.
2.1
2.2
ANTECEDENTES........................................................................................................3
OBJETIVO.................................................................................................................... 3
INFORMACIN BSICA DEL SISTEMA......................................................................3
PROYECCIN DE DEMANDA DEL SEIN....................................................................4
FUENTE: COES-SINAC...............................................................................................4
2.3
PROYECCIN DE OBRAS DE TRANSMISIN Y GENERACIN..............................5
FUENTE: COES-SINAC...............................................................................................6
FUENTE: COES-SINAC...............................................................................................7
2.4
HORIZONTE DE ANLISIS Y DESPACHOS DE GENERACIN.................................8
3.
METODOLOGA GENERAL DEL ESTUDIO.................................................................8
4.
ESTUDIOS DE ESTADO ESTACIONARIO..................................................................9
4.1
METODOLOGA PARA LOS ESTUDIOS DE ESTADO ESTACIONARIO.....................9
4.2
RESULTADOS EN ESTADO ESTACIONARIO............................................................9
4.2.1 Operacin normal ao 2012.........................................................................................9
4.2.2 Operacin normal ao 2013.......................................................................................11
4.2.3 Operacin normal ao 2015.......................................................................................15
5.
CONCLUSIONES Y RECOMENDACIONES..............................................................17
GERENCIA COMERCIAL
Informe DT/GC-06-2012
1.
ANTECEDENTES
Atreves del estudio para la aprobacin del plan de inversiones en transmisin 2013-2017 se
realiza anlisis del sistema elctrico del rea de demanda 10, las propuestas establecidas
por EGEMSA para incluir instalaciones nuevas segn el anlisis establecido en el periodo
con el ingreso de nuevas instalaciones de lneas de transmisin, demandas y generacin
elctrica.
Como parte del proceso de observaciones a la aprobacin de la resolucin 065-2012OS/CD, EGEMSA realiza un anlisis mas detallado del sistema elctrico del rea de
demanda 10, para su respectiva aprobacin por parte de Osinergmin.
2.
OBJETIVO.
Presentar la primera parte de los resultados del anlisis de la alternativa de compensacin
en el rea de demanda 10, evaluando el impacto de la nuevas obras de transmisin,
generacin y el ingreso de nuevas demandas en la operacin del Sistema Elctrico
Interconectado Nacional (SEIN), verificando que no se presenten restricciones del sistema
de transmisin, garantizando la confiabilidad y la calidad de las operaciones, a fin de que
estn en conformidad con todas las instalaciones del SEIN.
En el presente informe se realiza el anlisis elctrico del Estudios de estado estacionario en
operacin normal, contingencia.
Todos los anlisis elctricos se realizan empleando el programa DIgSILENT Power Factory
(DIgital SImuLator and Electric NeTwork Calculation).
GERENCIA COMERCIAL
Informe DT/GC-06-2012
2012
2013
2014
2015
2016
MW
GWH
MW
GWH
MW
GWH
MW
GWH
MW
GWH
Antapacay
90
278
90
724
90
725
90
725
90
725
18
111
18
126
18
126
18
126
18
126
44
44
70
377
70
613
70
613
10
83
10
83
10
83
10
83
10
83
20
173
20
219
30
263
40
620
40
620
Pachapaqui
35
69
12
104
12
104
Toromocho
Amp.Concentradora Toquepala y
Cuajone
Ampliacin Cementos Lima
10
33
120
339
160
1175
160
1266
160
1266
60
60
44
360
44
360
44
360
28
169
28
169
28
169
28
169
28
169
Ampliacin Antamina
21
175
21
175
55
466
56
466
56
466
25
61
211
147
1120
147
1120
El Brocal (Colquijirca)
10
82
10
82
10
82
10
82
Bayovar
10
82
10
82
10
82
10
82
10
84
10
84
10
84
152
1544
26
156
26
226
25
207
26
207
Constancia
23
164
90
657
90
657
28
169
28
169
28
169
Minas Conga
25
210
130
900
144
1100
100
338
440
3497
440
3497
125
351
118
868
118
868
Mina Chapi
55
26
221
Chucapaca - Caahuire
72
35
287
Pukaqaqa (Milpo)
10
87
40
348
Quellaveco
10
89
114
808
Hilarin
52
Quechua
19
140
Galeno
Total zona NORTE
Total zona CENTRO
30
237
82
82
63
461
168
1151
212
1588
116
791
1428
1428
542
3388
558
4691
594
5003
98
338
893
893
TOTAL PROYECTOS
214
1129
2403
2403
328
933
1883
5732
847
6660
1157
9360
1573
12502
1963
15951
FUENTE: COES-SINAC
GERENCIA COMERCIAL
2.3
Informe DT/GC-06-2012
GERENCIA COMERCIAL
Informe DT/GC-06-2012
PROYECTO
MW
Mar-2012
29.0
Mar-2012
5.0
Abr-2012
10.0
May-2012
4.0
May-2012
60.0
Jun-2012
80.0
Jul-2012
37 3
Jul-2012
20.0
Jul-2012
20.0
Set-2012
292.8
Nov-2012
20.0
Dic-2012
32.0
Dic-2012
4.1
Dic-2012
9.3
Ene-2013
20.0
Ene-2013
18.0
Mar-2013
90.0
May-2013
19.3
Jun-2013
80.0
Jun-2013
30.0
Jul-2013
99.9
Jul-2013
8.8
Jul-2013
11.9
Set-2013
268.7
Set-2013
Reserva Fra de Generacin -TURBO GAS DUAL D2/GasNatural - NORTE Talara) - EEPS.A
200.0
Set-2013
Reserva Fra de Generacin - TURBO GAS DUAL D2/GasNatural - SUR (No)- ENERSUR
564.0
Ene-2014
Ene-2014
197.6
Ene-2014
520.0
Ene-2014
12.8
FUENTE: COES-SINAC
GERENCIA COMERCIAL
Informe DT/GC-06-2012
FECHA
PROYECTO
MW
Feb-2014
Feb-2014
19.7
Feb-2014
17.6
Abr-2014
Reserva Fra de Generacin - TURBO GAS DUAL D2/GasNatural - NORTE (Planta de Eten)
200.0
May-2014
C.H. Chancay-SINERSA
20.0
Jun-2014
168.0
Jul-2014
5.0
Ago-2014
2.0
Oct-2014
20.0
Oct-2014
20.0
Oct-2014
20.0
Oct-2014
112.0
Dic-2014
19.0
Dic-2014
8.4
Dic-2014
8.0
Ene-2015
90.0
Ene-2015
16.0
Ene-2015
3.7
Ene-2015
11.1
Ene-2015
20.0
Abr-2015
98.1
May-2015
90.6
Jul-2015
200.0
Jul-2015
456.0
Jul-2015
10.4
Jul-2015
14.6
Dic-2015
525.0
Ene-2016
149.8
Feb-2016
640
Jun-2016
C.H. Olmos-SINERSA
60.0
18
FUENTE: COES-SINAC
GERENCIA COMERCIAL
Informe DT/GC-06-2012
3.
GERENCIA COMERCIAL
4.
Informe DT/GC-06-2012
GERENCIA COMERCIAL
Informe DT/GC-06-2012
BARRAS
LNEAS DE TRANSMISIN REA
OPERATIVA SUR ESTE
Lne Machupicchu-YuraCachimayo_L1001
Lne MachupicchuDrv.Cachimayo_L1002/1
MACH138
Lne Cachimayo-DoloresPata_L1003
INCA138
Lne Quencoro-DoloresPata_L1004
MACH138
POTENCIAS EN BARRAS
j
INCA138
CAELP13
8
DOLOR13
8
DOLOR138
QUEN138
Lne Quencoro-T.Combapata_1005/1
T-COMBAPATA
QUEN138
Lne Tintaya-T.Combapata_L1005/2
T-COMBAPATA
TINTA138
Lne Cachimayo-Abancay_L1007
ABAN138
INCA138
Lne Tintaya-Callalli_L1008
TINTA138
Lne Machupicchu-YuraCachimayo_L1001
Lne MachupicchuDrv.Cachimayo_L1002/1
MACH138
Lne Cachimayo-DoloresPata_L1003
INCA138
DOLOR138
CALLA13
8
INCA138
CAELP13
8
DOLOR13
8
QUEN138
Lne Quencoro-T.Combapata_1005/1
T-COMBAPATA
QUEN138
Lne Tintaya-T.Combapata_L1005/2
T-COMBAPATA
TINTA138
Lne Quencoro-DoloresPata_L1004
Lne Cachimayo-Abancay_L1007
MACH138
ABAN138
Lne Tintaya-Callalli_L1008
TINTA138
Lne Machupicchu-YuraCachimayo_L1001
Lne MachupicchuDrv.Cachimayo_L1002/1
MACH138
Lne Cachimayo-DoloresPata_L1003
INCA138
Lne Quencoro-DoloresPata_L1004
MACH138
INCA138
CALLA13
8
INCA138
CAELP13
8
DOLOR13
8
DOLOR138
QUEN138
Lne Quencoro-T.Combapata_1005/1
T-COMBAPATA
QUEN138
Lne Tintaya-T.Combapata_L1005/2
T-COMBAPATA
TINTA138
Lne Cachimayo-Abancay_L1007
ABAN138
INCA138
DOLOR138
CALLA13
8
INCA138
CAELP13
8
DOLOR13
8
QUEN138
Lne Quencoro-T.Combapata_1005/1
T-COMBAPATA
QUEN138
Lne Tintaya-T.Combapata_L1005/2
Lne Cachimayo-Abancay_L1007
T-COMBAPATA
ABAN138
TINTA138
INCA138
Lne Tintaya-Callalli_L1008
TINTA138
Lne Machupicchu-YuraCachimayo_L1001
Lne MachupicchuDrv.Cachimayo_L1002/1
MACH138
Lne Cachimayo-DoloresPata_L1003
Lne Quencoro-DoloresPata_L1004
MACH138
INCA138
Pi
(MW)
Qi
(MVAr)
Pj
(MW)
Qj
(MVAR)
LOAD (%)
CASOS
Estiaje.
46.63
0.67
-45.23
-1.03
49.9
34.72
0.13
-34.03
-2.17
28.3
8.01
-0.42
-8.00
-0.36
8.8
-3.34
25.79
3.03
28.6
25.74
5.97
10.72
17.88
13.56
47.68
1.11
-5.93
-6.38
9.94
-3.96
10.82
-1.99
12.87
-5.36
18.12
0.65
26.2
0.72
13.67
-6.08
13.6
-1.84
-46.27
1.37
50.2
37.69
-3.12
-36.90
1.27
30.3
8.18
-8.81
-8.17
8.02
13.0
-3.71
27.44
25.86
11.05
-7.69
3.71
7.20
9.2
5.96
28.05
-9.54
33.1
-6.18
-25.29
1.79
29.7
-2.94
11.14
-2.65
15.5
23.82
-12.22
-23.46
8.13
24.7
46.98
1.17
-45.56
-1.46
50.3
34.37
0.09
-33.69
-2.18
28.1
5.07
-4.09
-5.07
3.30
7.2
-1.69
28.73
1.41
31.7
-1.42
-9.21
-3.74
11.3
-2.66
18.47
-2.67
20.8
-7.14
21.59
2.92
31.7
0.56
19.57
-5.48
18.4
28.68
9.27
18.19
21.23
19.36
47.76
-4.20
-46.32
3.86
50.8
37.62
-4.02
-36.82
2.27
30.6
7.67
-5.07
-7.66
4.27
10.0
-3.81
23.32
20.37
-
-3.07
3.81
2.58
5.3
3.94
23.76
-8.01
28.1
-4.71
-2.78
-20.02
11.42
-0.27
-2.76
23.6
15.9
10
GERENCIA COMERCIAL
Informe DT/GC-06-2012
11.32
Lne Tintaya-Callalli_L1008
CALLA13
8
TINTA138
10.23
-11.92
-10.13
6.72
14.6
Estiaje.
Avenida
Estiaje
Barra
Tensin
kV
Unidad
Mxima
Demanda
Mnima
Demanda
Mxima
Demanda
Mnima
Demanda
MACH138
138
kV
138.75
140.74
138.71
139.63
INCA138
138
kV
134.34
137.00
134.14
136.57
ABAN138
138
kV
131.46
135.88
130.17
135.46
DOLOR138
138
kV
134.21
137.29
134.24
136.68
QUEN138
138
kV
134.55
137.56
134.55
136.80
TINTA138
138
kV
138.00
135.80
138.00
134.84
COMBA138
138
kV
136.40
137.27
135.89
136.36
CALLA138
138
kV
137.86
137.50
138.42
137.26
Fig. N 1
11
GERENCIA COMERCIAL
Informe DT/GC-06-2012
Quencoro-DoloresPata_L1004
Quencoro-T.Combapata_1005/1
Tintaya-T.Combapata_L1005/2
Cachimayo-Abancay_L1007
Tintaya-Callalli_L1008
Machupicchu-YuraCachimayo_L1001
Machupicchu-Drv.Cachimayo_L1002/1
Lne Cachimayo-DoloresPata_L1003
Lne
Lne
Lne
Lne
Lne
Lne
Lne
Quencoro-DoloresPata_L1004
Quencoro-T.Combapata_1005/1
Tintaya-T.Combapata_L1005/2
Cachimayo-Abancay_L1007
Tintaya-Callalli_L1008
Machupicchu-YuraCachimayo_L1001
Machupicchu-Drv.Cachimayo_L1002/1
Lne Cachimayo-DoloresPata_L1003
Lne
Lne
Lne
Lne
Quencoro-DoloresPata_L1004
Quencoro-T.Combapata_1005/1
Tintaya-T.Combapata_L1005/2
Cachimayo-Abancay_L1007
BARRAS
i
MACH138
MACH138
INCA138
DOLOR138
T-COMBAPATA
T-COMBAPATA
ABAN138
TINTA138
MACH138
MACH138
INCA138
DOLOR138
T-COMBAPATA
T-COMBAPATA
ABAN138
TINTA138
MACH138
MACH138
INCA138
DOLOR138
T-COMBAPATA
T-COMBAPATA
ABAN138
POTENCIAS EN BARRAS
j
INCA138
CAELP138
DOLOR13
8
QUEN138
QUEN138
TINTA138
INCA138
CALLA138
INCA138
CAELP138
DOLOR13
8
QUEN138
QUEN138
TINTA138
INCA138
CALLA138
INCA138
CAELP138
DOLOR13
8
QUEN138
QUEN138
TINTA138
INCA138
Pi
(MW)
41.94
26.75
Qi
(MVAr)
11.84
8.98
Pj
(MW)
-40.66
-26.25
Qj
(MVAR)
-12.40
-11.60
LOAD
(%)
48.4
24.5
-8.07
1.92
8.08
-2.64
9.7
-45.64
41.87
-49.07
-27.02
-18.18
48.22
37.11
1.08
-5.77
2.65
-10.85
-3.50
-3.41
-3.93
45.79
-40.49
51.23
27.71
18.36
-46.78
-36.35
-0.99
5.11
-1.81
8.25
-1.61
2.98
1.97
52.0
48.81
57.05
43.5
16.8
50.8
29.9
4.18
-5.58
-4.17
4.76
7.5
-8.70
-19.51
16.53
-15.26
3.52
47.29
31.37
-7.02
5.97
-6.68
-5.66
-5.76
14.04
10.26
8.71
19.83
-16.30
15.43
-3.51
-45.67
-30.71
6.55
-10.54
1.04
0.38
-0.09
-13.52
-12.29
12.0
25.0
19.7
22.2
6.1
54.4
28.2
-5.70
-0.08
5.70
-0.65
6.5
-43.35
34.73
-42.75
-29.46
-1.76
-3.52
-0.15
-13.39
43.49
-33.78
44.37
30.34
1.80
1.46
-0.74
11.56
49.5
40.3
49.4
49.0
12
GERENCIA COMERCIAL
Informe DT/GC-06-2012
Lne Tintaya-Callalli_L1008
Lne Machupicchu-YuraCachimayo_L1001
Lne Machupicchu-Drv.Cachimayo_L1002/1
TINTA138
MACH138
MACH138
Lne Cachimayo-DoloresPata_L1003
Lne
Lne
Lne
Lne
Lne
CALLA138
INCA138
CAELP138
DOLOR13
8
QUEN138
QUEN138
TINTA138
INCA138
CALLA138
INCA138
Quencoro-DoloresPata_L1004
Quencoro-T.Combapata_1005/1
Tintaya-T.Combapata_L1005/2
Cachimayo-Abancay_L1007
Tintaya-Callalli_L1008
DOLOR138
T-COMBAPATA
T-COMBAPATA
ABAN138
TINTA138
-12.32
48.84
36.50
-2.39
-0.12
-1.62
12.40
-47.34
-35.76
-3.11
-0.08
-0.37
-0.45
-13.33
-12.47
4.30
-18.14
2.95
11.6
51.5
29.3
-6.74
0.45
5.92
7.3
-6.47
3.20
-5.98
-8.98
-6.10
13.34
12.61
-4.28
18.42
-2.94
6.03
-8.27
-0.26
4.27
0.27
16.1
16.9
8.2
28.3
6.2
Tensin
kV
Unidad
MACH138
INCA138
ABAN138
DOLOR138
QUEN138
TINTA138
COMBA138
CALLA138
138
138
138
138
138
138
138
138
kV
kV
kV
kV
kV
kV
kV
kV
Avenida
Mxima
Mnima
Demanda Demanda
137.49
140.96
130.09
137.65
123.61
135.10
130.10
137.84
130.49
138.13
138.00
138.36
132.99
138.82
139.66
139.05
Estiaje
Mxima
Mnima
Demanda Demanda
138.08
140.49
129.72
136.20
121.80
132.02
129.79
136.52
130.26
136.84
138.00
138.00
133.03
137.44
138.79
138.85
BARRAS
i
Lne Machupicchu-YuraCachimayo_L1001
Lne Machupicchu-Drv.Cachimayo_L1002/1
MACH138
MACH138
Lne Cachimayo-DoloresPata_L1003
INCA138
j
INCA138
CAELP138
DOLOR138
Lne Quencoro-DoloresPata_L1004
DOLOR138
QUEN138
Lne Quencoro-T.Combapata_1005/1
T-COMBAPATA
QUEN138
Pi
(MW)
41.60
27.11
-8.00
45.58
41.29
POTENCIAS EN BARRAS
Qi
Pj
Qj
(MVAr)
(MW)
(MVAR)
-1.44
-40.50 0.01
-2.47
-26.69 -0.65
LOAD
(%)
44.1
22.0
-7.86
8.01
7.08
12.2
2.80
45.72
-2.81
49.5
-13.58
-39.94
12.41
48.80
13
GERENCIA COMERCIAL
Informe DT/GC-06-2012
Lne Tintaya-T.Combapata_L1005/2
T-COMBAPATA
TINTA138
Lne Cachimayo-Abancay_L1007
ABAN138
INCA138
Lne Tintaya-Callalli_L1008
TINTA138
Lne Machupicchu-YuraCachimayo_L1001
Lne Machupicchu-Drv.Cachimayo_L1002/1
MACH138
MACH138
Lne Cachimayo-DoloresPata_L1003
INCA138
Lne Quencoro-DoloresPata_L1004
DOLOR138
Lne Quencoro-T.Combapata_1005/1
T-COMBAPATA
QUEN138
Lne Tintaya-T.Combapata_L1005/2
T-COMBAPATA
TINTA138
Lne Cachimayo-Abancay_L1007
ABAN138
INCA138
Lne Tintaya-Callalli_L1008
TINTA138
Lne Machupicchu-YuraCachimayo_L1001
Lne Machupicchu-Drv.Cachimayo_L1002/1
MACH138
MACH138
Lne Cachimayo-DoloresPata_L1003
INCA138
48.50
26.89
17.99
48.22
37.11
CALLA138
INCA138
CAELP138
DOLOR138
QUEN138
CALLA138
INCA138
CAELP138
DOLOR138
Lne Quencoro-DoloresPata_L1004
DOLOR138
QUEN138
Lne Quencoro-T.Combapata_1005/1
T-COMBAPATA
QUEN138
Lne Tintaya-T.Combapata_L1005/2
T-COMBAPATA
TINTA138
Lne Cachimayo-Abancay_L1007
ABAN138
INCA138
Lne Tintaya-Callalli_L1008
TINTA138
Lne Machupicchu-YuraCachimayo_L1001
Lne Machupicchu-Drv.Cachimayo_L1002/1
MACH138
MACH138
Lne Cachimayo-DoloresPata_L1003
INCA138
Lne Quencoro-DoloresPata_L1004
DOLOR138
Lne Quencoro-T.Combapata_1005/1
T-COMBAPATA
QUEN138
Lne Tintaya-T.Combapata_L1005/2
T-COMBAPATA
TINTA138
Lne Cachimayo-Abancay_L1007
ABAN138
INCA138
Lne Tintaya-Callalli_L1008
TINTA138
10.53
50.62
-10.02
57.14
-9.78
27.48
6.31
40.4
-2.61
18.16
-2.57
16.5
-3.41
-3.93
-46.78
-36.35
2.98
1.97
50.8
29.9
4.18
-5.58
-4.17
4.76
7.5
-8.70
19.51
16.53
15.26
-7.02
8.71
6.55
12.0
5.97
19.83
-10.54
25.0
-6.68
-16.30
1.04
19.7
-5.66
15.43
0.38
22.2
3.52
-5.76
-3.51
-0.09
6.1
46.95
31.73
1.21
-0.62
-45.56
-31.16
-1.69
-1.97
49.8
25.6
-5.48
-8.94
5.50
8.15
11.5
0.93
43.27
-0.98
47.0
-11.84
-33.07
9.35
40.6
8.25
43.61
-9.38
49.6
-12.08
30.02
9.27
45.4
-2.43
12.27
-3.08
11.4
-4.20
-4.02
-46.32
-36.82
3.86
2.27
50.8
30.6
7.67
-5.07
-7.66
4.27
10.0
-3.81
23.32
20.37
11.32
-3.07
3.81
2.58
5.3
3.94
23.76
-8.01
28.1
-4.71
-20.02
-0.27
23.6
-2.78
11.42
-2.76
15.9
10.23
-11.92
-10.13
6.72
14.6
43.14
33.99
42.02
29.27
12.19
47.76
37.62
CALLA138
INCA138
CAELP138
DOLOR138
QUEN138
CALLA138
Estiaje
Barra
Tensin
kV
Unidad
Mxima
Demanda
Mnima
Demanda
Mxima
Demanda
Mnima
Demanda
MACH138
138
kV
139.59
140.96
140.09
140.49
INCA138
138
kV
136.11
137.65
135.52
136.20
ABAN138
138
kV
130.52
135.10
128.67
132.02
DOLOR138
138
kV
136.61
137.84
136.04
136.52
QUEN138
138
kV
136.93
138.13
136.39
136.84
TINTA138
138
kV
138.70
138.36
138.00
138.00
COMBA138
138
kV
136.80
138.82
136.33
137.44
CALLA138
138
kV
140.03
139.05
138.79
138.85
14
GERENCIA COMERCIAL
Informe DT/GC-06-2012
sin
15
Estia
Informe DT/GC-06-2012
BARRAS
i
Lne MachupicchuYuraCachimayo_L1001
INCA138
Lne MachupicchuDrv.Cachimayo_L1002/1
MACH138
Lne Cachimayo-DoloresPata_L1003
INCA138
Lne Quencoro-DoloresPata_L1004
DOLOR138
Lne Quencoro-T.Combapata_1005/1
TCOMBAPATA
Lne Tintaya-T.Combapata_L1005/2
TCOMBAPATA
Lne Cachimayo-Abancay_L1007
ABAN138
Lne Tintaya-Callalli_L1008
TINTA138
Lne MachupicchuYuraCachimayo_L1001
INCA138
Lne MachupicchuDrv.Cachimayo_L1002/1
MACH138
Lne Cachimayo-DoloresPata_L1003
INCA138
Lne Quencoro-DoloresPata_L1004
DOLOR138
Lne Quencoro-T.Combapata_1005/1
TCOMBAPATA
Lne Tintaya-T.Combapata_L1005/2
TCOMBAPATA
Lne Cachimayo-Abancay_L1007
ABAN138
Lne Tintaya-Callalli_L1008
TINTA138
Lne MachupicchuYuraCachimayo_L1001
INCA138
Lne MachupicchuDrv.Cachimayo_L1002/1
MACH138
Lne Cachimayo-DoloresPata_L1003
INCA138
Lne Quencoro-DoloresPata_L1004
DOLOR138
Lne Quencoro-T.Combapata_1005/1
TCOMBAPATA
Lne Tintaya-T.Combapata_L1005/2
TCOMBAPATA
Lne Cachimayo-Abancay_L1007
ABAN138
Lne Tintaya-Callalli_L1008
TINTA138
Lne MachupicchuYuraCachimayo_L1001
INCA138
Qi
(MVAr)
Pj
(MW)
Qj
(MVAR)
LOAD (%)
CASOS
GERENCIA COMERCIAL
26.44
92.74
-13.98
99.1
16.49
61.0
6.83
35.9
POTENCIAS EN BARRAS
Pi
(MW)
MACH1
87.2
38
7
CAELP1 75.2
38
3
DOLOR 32.6
138
1
QUEN13
10.7
8
0
QUEN13
35.1
8
7
TINTA13 24.0
8
4
INCA13
30.3
8
7
CALLA1
-8.64
38
MACH1
84.0
38
2
CAELP1 76.3
38
5
DOLOR 38.0
138
6
QUEN13 24.7
8
2
QUEN13
78.6
8
2
TINTA13 74.6
8
4
INCA13
17.8
8
1
CALLA1
-0.09
38
MACH1
87.8
38
0
CAELP1 74.7
38
1
DOLOR 28.5
138
3
QUEN13
14.7
8
5
QUEN13
30.9
8
4
TINTA13 19.0
8
0
INCA13
34.8
8
2
CALLA1
11.8
38
6
MACH1
38
84.5
j
-9.71
-7.28
72.03
32.49
1.41
10.71
-1.89
11.7
8.42
36.16
-10.76
42.06
-13.91
23.46
9.42
31.06
-12.84
31.15
9.97
46.5
0.17
8.69
-5.86
9.5
32.05
89.21
-20.53
96.8
21.82
62.6
12.20
42.4
-4.51
26.6
-14.54
-12.52
4.14
73.00
37.88
24.68
18.51
83.60
-8.03
92.5
-19.73
69.66
29.59
87.4
-5.86
18.03
0.60
25.2
-8.34
0.11
2.63
7.7
27.92
93.29
-15.44
99.3
17.06
60.4
4.89
30.9
-10.59
-5.46
71.58
28.44
3.75
14.76
-4.21
16.4
4.51
31.68
-7.76
36.1
-9.24
18.67
3.98
23.6
-10.57
35.77
8.20
50.7
0.15
11.94
-5.62
12.0
22.10
89.48
-11.50
94.0
16
GERENCIA COMERCIAL
Informe DT/GC-06-2012
je Minima Demanda
5
Lne MachupicchuDrv.Cachimayo_L1002/1
MACH138
Lne Cachimayo-DoloresPata_L1003
INCA138
Lne Quencoro-DoloresPata_L1004
DOLOR138
CAELP1
38
DOLOR
138
QUEN13
8
Lne Quencoro-T.Combapata_1005/1
TCOMBAPATA
QUEN13
8
Lne Tintaya-T.Combapata_L1005/2
TCOMBAPATA
TINTA13
8
Lne Cachimayo-Abancay_L1007
ABAN138
INCA13
8
Lne Tintaya-Callalli_L1008
TINTA138
CALLA1
38
76.0
9
36.3
2
23.0
1
77.0
5
70.0
8
19.9
8
3.10
-7.65
-10.16
1.46
72.92
36.16
22.97
14.20
60.7
9.79
40.1
-1.86
24.6
18.48
81.88
-8.47
91.0
-19.66
65.64
27.81
82.7
-8.90
20.30
4.07
29.9
-8.65
-3.07
3.00
8.5
Barra
Tensin
kV
Unidad
MACH138
INCA138
ABAN138
DOLOR138
QUEN138
TINTA138
COMBA138
CALLA138
138
138
138
138
138
138
138
138
kV
kV
kV
kV
kV
kV
kV
kV
Avenida
Mxima
Mnima
Demanda
Demanda
140.16
140.07
137.90
139.84
130.79
137.01
137.75
139.86
137.79
139.51
138.88
136.46
137.30
135.63
138.51
138.32
Estiaje
Mxima
Mnima
Demanda
Demanda
140.94
142.14
139.06
139.21
132.30
134.99
138.88
139.15
138.89
138.89
138.00
136.21
137.72
135.23
137.91
137.96
Fig. N 4
17
GERENCIA COMERCIAL
5.
Informe DT/GC-06-2012
CONCLUSIONES Y RECOMENDACIONES.
Los resultados obtenidos en las simulaciones ao 2012 caso actual, muestra que las
tensiones obtenidas en estiaje para mxima demanda caso mas critico alcanzan valores
de 134.14 KV, 134.24 KV, 134.55 y 130.17 kV en las SEs de Cachimayo, Dolorespata,
Quencoro y Abancay respectivamente. estos valores indican que es muy necesario y
urgente inyectar potencia reactiva con bancos capacitivos en las barras afectadas por
cada
La comparacin que se realiza el ao 2013 con y sin compensacin reactiva nos muestra
que tan importante y necesario es incorporar bancos capacitivos en las SEs donde se
tendr problemas con 15 MVAr en la SE de Quencoro y 10 MVAr adicionales en la SE de
Dolorespata, el cuadro N 7 nuestra resultados por debajo del (-5%) de los valores
establecidos para la operacin en las barras de Cachimayo, Abancay, Dolorespata y
Quencoro con tensiones de 129.72, 121.80, 129.79 y 130.25 kV respectivamente
comparado con los resultados obtenidos con compensacin reactiva capacitiva se
mostrados en el cuadro N 9 con tensiones de operacin de 135.52, 128.67, 136.04 y
136.39 kV
respectivamente.
GERENCIA COMERCIAL
Informe DT/GC-06-2012
El anlisis del estudio en estado estacionario nos permite analizar las condiciones de
tensin del rea de demanda 10 seleccionando una buena compensacin reactiva para
evitar el colapso de voltaje y mejorar la estabilidad del sistema elctrico de potencia.
ELABORADO POR:
REVISADO POR:
APROBADO POR:
19
GERENCIA COMERCIAL
Informe DT/GC-05-2012
ANEXOS A
FLUJOS DE CARGA AO 2012
20
GERENCIA COMERCIAL
Informe DT/GC-05-2012
ANEXOS B
FLUJOS DE CARGA AO 2013
21
GERENCIA COMERCIAL
Informe DT/GC-05-2012
22
GERENCIA COMERCIAL
Informe DT/GC-05-2012
23
GERENCIA COMERCIAL
Informe DT/GC-05-2012
ANEXOS C
FLUJOS DE CARGA AO 2015
24