COSTOS ANUALES DE OPERACIN Y MANTENIMIENTO DE INSTITUCIN EDUCATIVA A PRECIO

TENIMIENTO DE INSTITUCIN EDUCATIVA A PRECIOS PRIVADOS Y SOCIALES

FORMATO 1 -A
FLUJO DE COSTOS TOTALES A PRECIOS PRIVADOS
ALTERNATIVA 01

Construccin de 01 aula, comedor o sum, SS.HH en un solo nivel de material noble con techo cobertura liviana, p
NOMBRE RESUMIDO
DEL PROYECTO

Acciones
COSTO PRIVADO CON PROYECTO (A)
Costos de Inversin
Estudios definitivos
Ejecucin de la infraestructura (Costo Directo)
Gastos Generales
Utilidad
Valor Referencial
IGV
Gastos por Supervisin y Liquidacin
Presupuesto total de infraestructura
Operacin y Mantenimiento
Mantenimiento con proyecto

MEJORAMIENTO DEL SERVICIO EDUCATIVO


Ao

Ao

Ao

Ao

0
1,791,409.39

1
85,866.56

2
85,866.56

3
85,866.56

1,791,409.39

0.00

0.00

0.00

85,866.56
1,265.00

85,866.56
1,265.00

85,866.56
1,265.00

84,601.56

84,601.56

84,601.56

24,638.21
1,231,910.25
98,552.82
123,191.03
1,453,654.10
261,657.74
51,459.35
1,766,771.19
0.00

Operacin con proyecto


COSTO PRIVADO SIN PROYECTO (B)

0.00

85,061.56

85,061.56

85,061.56

Operacin y Mantenimiento

0.00

85,061.56

85,061.56

85,061.56

Mantenimiento sin proyecto


Operacin sin proyecto
COSTOS INCREMENTALES (A-B)

550.00

550.00

550.00

84,511.56

84,511.56

84,511.56

1,791,409.39

805.00

805.00

805.00

FAS 9%

1.0000

0.9174

0.8417

0.7722

VAC PP

1,791,409.39

738.53

677.55

621.61

VACT

1,796,575.61

FORMATO 1 -A
TOTALES A PRECIOS PRIVADOS
LTERNATIVA 01

l noble con techo cobertura liviana, pozo septico,cerco perimetrico, mitigacion ambiental.

Construccin
NOMBRE RESUMIDO
DEL PROYECTO

AMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. DEL CASERIO SHIGUA


Ao

Ao

Ao

Ao

Ao

Ao

Ao

4
85,866.56

5
85,866.56

6
85,866.56

7
85,866.56

8
85,866.56

9
85,866.56

10
85,866.56

0.00

0.00

0.00

0.00

0.00

0.00

0.00

85,866.56
1,265.00

85,866.56
1,265.00

85,866.56
1,265.00

85,866.56
1,265.00

85,866.56
1,265.00

85,866.56
1,265.00

85,866.56
1,265.00

84,601.56

84,601.56

84,601.56

84,601.56

84,601.56

84,601.56

84,601.56

85,061.56

85,061.56

85,061.56

85,061.56

85,061.56

85,061.56

85,061.56

85,061.56

85,061.56

85,061.56

85,061.56

85,061.56

85,061.56

85,061.56

550.00

550.00

550.00

550.00

550.00

550.00

550.00

84,511.56

84,511.56

84,511.56

84,511.56

84,511.56

84,511.56

84,511.56

805.00

805.00

805.00

805.00

805.00

805.00

805.00

0.7084

0.6499

0.5963

0.5470

0.5019

0.4604

0.4224

570.28

523.19

480.00

440.36

404.00

370.64

340.04

FORMATO 1 - B
FLUJO DE COSTOS TOTALES A PRECIOS PRIVADOS
ALTERNATIVA 02

Construccin de 01 aula, comedor o sum, SS.HH en un solo nivel de material noble con techo aligerado, pozo se
NOMBRE RESUMIDO
DEL PROYECTO

MEJORAMIENTO DEL SERVICIO EDUCATIVO

Acciones
COSTO PRIVADO CON PROYECTO (A)
Costos de Inversin
Estudios definitivos
Ejecucin de la infraestructura (Costo Directo)
Gastos Generales
Utilidad
Valor Referencial
IGV
Gastos por Supervisin y Liquidacin
Presupuesto total de infraestructura
Operacin y Mantenimiento
Mantenimiento con proyecto

Ao

Ao

Ao

Ao

0
2,187,063.61

1
86,351.56

2
86,351.56

3
86,351.56

2,187,063.61

0.00

0.00

0.00

86,351.56
1,750.00

86,351.56
1,750.00

86,351.56
1,750.00

84,601.56

84,601.56

84,601.56

30,079.85
1,503,992.38
120,319.39
150,399.24
1,774,711.01
319,447.98
62,824.77
2,156,983.76
0.00

Operacin con proyecto


COSTO PRIVADO SIN PROYECTO (B)

0.00

85,061.56

85,061.56

85,061.56

Operacin y Mantenimiento

0.00

85,061.56

85,061.56

85,061.56

Mantenimiento sin proyecto

550.00

550.00

550.00

84,511.56

84,511.56

84,511.56

2,187,063.61

1,290.00

1,290.00

1,290.00

1.0000

0.9174

0.8417

0.7722

2,187,063.61

1,183.49

1,085.77

996.12

Operacin sin proyecto


COSTOS INCREMENTALES (A-B)
FAS 9%
VAC PP

2,195,342.39

RMATO 1 - B
OTALES A PRECIOS PRIVADOS
ERNATIVA 02

al noble con techo aligerado, pozo septico,cerco perimetrico, mitigacion ambiental

AMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. DEL CASERIO SHIGUA


Ao

Ao

Ao

Ao

Ao

Ao

Ao

4
86,351.56

5
86,351.56

6
86,351.56

7
86,351.56

8
86,351.56

9
86,351.56

10
86,351.56

0.00

0.00

0.00

0.00

0.00

0.00

0.00

86,351.56
1,750.00

86,351.56
1,750.00

86,351.56
1,750.00

86,351.56
1,750.00

86,351.56
1,750.00

86,351.56
1,750.00

86,351.56
1,750.00

84,601.56

84,601.56

84,601.56

84,601.56

84,601.56

84,601.56

84,601.56

85,061.56

85,061.56

85,061.56

85,061.56

85,061.56

85,061.56

85,061.56

85,061.56

85,061.56

85,061.56

85,061.56

85,061.56

85,061.56

85,061.56

550.00

550.00

550.00

550.00

550.00

550.00

550.00

84,511.56

84,511.56

84,511.56

84,511.56

84,511.56

84,511.56

84,511.56

1,290.00

1,290.00

1,290.00

1,290.00

1,290.00

1,290.00

1,290.00

0.7084

0.6499

0.5963

0.5470

0.5019

0.4604

0.4224

913.87

838.41

769.18

705.67

647.41

593.95

544.91

FORMATO 2 -A
FLUJO DE COSTOS TOTALES A PRECIOS SOCIALES
ALTERNATIVA 01

Construccin de 01 aula, comedor o sum, SS.HH en un solo nivel de material noble con techo cobertura livian
NOMBRE RESUMIDO
DEL PROYECTO

Acciones
COSTO SOCIAL CON PROYECTO (A)
Costos de Inversin
Estudios definitivos
Ejecucin de la infraestructura (Costo Directo)
Gastos Generales
Utilidad
Valor Referencial
Gastos por Supervisin y Liquidacin
Presupuesto total de infraestructura
Operacin y Mantenimiento
Mantenimiento con proyecto

MEJORAMIENTO DEL SERVICIO EDUCA


Ao
0
1,425,623.34
1,425,623.34

Ao
1
85,866.56

Ao
2
85,866.56

Ao
3
85,866.56

0.00

0.00

0.00

85,866.56
1,265.00

85,866.56
1,265.00

85,866.56
1,265.00

84,601.56

84,601.56

84,601.56

22,396.13
1,250,740.93
105,709.73
0.00
1,356,450.65
46,776.55
1,403,227.21
0.00

Operacin con proyecto


COSTO SOCIAL SIN PROYECTO (B)

0.00

84,916.67

84,916.67

84,916.67

Operacin y Mantenimiento

0.00

84,916.67

84,916.67

84,916.67

462.00

462.00

462.00

Mantenimiento sin proyecto


Operacin sin proyecto

84,454.67

84,454.67

84,454.67

1,425,623.34

949.89

949.89

949.89

FAS 9%

1.0000

0.9174

0.8417

0.7722

VAC PS

1,425,623.34

871.46

799.50

733.49

COSTOS INCREMENTALES (A-B)

1,431,719.40

ORMATO 2 -A
TOTALES A PRECIOS SOCIALES
LTERNATIVA 01
noble con techo cobertura liviana, pozo septico,cerco perimetrico, mitigacion ambiental.

Construc
NOMBRE RESUMIDO
DEL PROYECTO

AMIENTO DEL SERVICIO EDUCATIVO DE LA I.E. DEL CASERIO SHIGUA


Ao
4
85,866.56

Ao
5
85,866.56

Ao
6
85,866.56

Ao
7
85,866.56

Ao
8
85,866.56

Ao
9
85,866.56

Ao
10
85,866.56

0.00

0.00

0.00

0.00

0.00

0.00

0.00

85,866.56
1,265.00

85,866.56
1,265.00

85,866.56
1,265.00

85,866.56
1,265.00

85,866.56
1,265.00

85,866.56
1,265.00

85,866.56
1,265.00

84,601.56

84,601.56

84,601.56

84,601.56

84,601.56

84,601.56

84,601.56

84,916.67

84,916.67

84,916.67

84,916.67

84,916.67

84,916.67

84,916.67

84,916.67

84,916.67

84,916.67

84,916.67

84,916.67

84,916.67

84,916.67

462.00

462.00

462.00

462.00

462.00

462.00

462.00

84,454.67

84,454.67

84,454.67

84,454.67

84,454.67

84,454.67

84,454.67

949.89

949.89

949.89

949.89

949.89

949.89

949.89

0.7084

0.6499

0.5963

0.5470

0.5019

0.4604

0.4224

672.93

617.36

566.39

519.62

476.72

437.36

401.24

FORMATO 2 - B
FLUJO DE COSTOS TOTALES A PRECIOS SOCIALES
ALTERNATIVA 01

Construccin de 01 aula, comedor o sum, SS.HH en un solo nivel de material noble con techo aligerado, poz
NOMBRE RESUMIDO
DEL PROYECTO

MEJORAMIENTO DEL SERVICIO EDUCAT

Acciones
COSTO SOCIAL CON PROYECTO (A)
Costos de Inversin
Estudios definitivos
Ejecucin de la infraestructura (Costo Directo)
Gastos Generales
Utilidad
Valor Referencial
Gastos por Supervisin y Liquidacin
Presupuesto total de infraestructura
Operacin y Mantenimiento
Mantenimiento con proyecto

Ao
0
1,772,080.34
1,772,080.34

Ao
1
86,000.93

Ao
2
86,000.93

Ao
3
86,000.93

0.00

0.00

0.00

86,000.93
1,470.53

86,000.93
1,470.53

86,000.93
1,470.53

84,530.40

84,530.40

84,530.40

27,342.58
1,558,573.06
129,056.98
0.00
1,687,630.05
57,107.72
1,744,737.76
0.00

Operacin con proyecto


COSTO SOCIAL SIN PROYECTO (B)

0.00

84,916.67

84,916.67

84,916.67

Operacin y Mantenimiento

0.00

84,916.67

84,916.67

84,916.67

462.00

462.00

462.00

Mantenimiento sin proyecto


Operacin sin proyecto

84,454.67

84,454.67

84,454.67

1,772,080.34

1,084.26

1,084.26

1,084.26

FAS 9%

1.0000

0.9174

0.8417

0.7722

VAC PS

1,772,080.34

994.73

912.60

837.25

COSTOS INCREMENTALES (A-B)

1,779,038.74

MATO 2 - B
TALES A PRECIOS SOCIALES
RNATIVA 01

al noble con techo aligerado, pozo septico,cerco perimetrico, mitigacion ambiental

MIENTO DEL SERVICIO EDUCATIVO DE LA I.E. DEL CASERIO SHIGUA


Ao
4
86,000.93

Ao
5
86,000.93

Ao
6
86,000.93

Ao
7
86,000.93

Ao
8
86,000.93

Ao
9
86,000.93

Ao
10
86,000.93

0.00

0.00

0.00

0.00

0.00

0.00

0.00

86,000.93
1,470.53

86,000.93
1,470.53

86,000.93
1,470.53

86,000.93
1,470.53

86,000.93
1,470.53

86,000.93
1,470.53

86,000.93
1,470.53

84,530.40

84,530.40

84,530.40

84,530.40

84,530.40

84,530.40

84,530.40

84,916.67

84,916.67

84,916.67

84,916.67

84,916.67

84,916.67

84,916.67

84,916.67

84,916.67

84,916.67

84,916.67

84,916.67

84,916.67

84,916.67

462.00

462.00

462.00

462.00

462.00

462.00

462.00

84,454.67

84,454.67

84,454.67

84,454.67

84,454.67

84,454.67

84,454.67

1,084.26

1,084.26

1,084.26

1,084.26

1,084.26

1,084.26

1,084.26

0.7084

0.6499

0.5963

0.5470

0.5019

0.4604

0.4224

768.12

704.69

646.51

593.13

544.15

499.22

458.00

SISTEMA NACIONAL DE INVERSION PUBLICA

Cdigo
Correlativo
Elaborado
Actualizado

FORMATO 10
CAMBIOS EN EL VACT - PP
NOMBRE RESUMIDO
DEL PROYECTO

MEJORAMIENTO DEL SERVICIO EDUCATIVO


DE LA I.E. DEL CASERIO SHIGUA
Alternativa 1

Nmero de beneficiarios
VACT - PP
VAE 1/
1/

1,015
1,796,575.61
344,403.54

Alternativa2
1,015
2,195,342.39
420,847.14

Sobre la base del VACT - PP, considerando 10 aos de vida til del proyecto

SISTEMA NACIONAL DE INVERSION PUBLICA

Cdigo
Correlativo
Elaborado
Actualizado

FORMATO 10
CAMBIOS EN EL VACT - PS
NOMBRE RESUMIDO
DEL PROYECTO

MEJORAMIENTO DEL SERVICIO EDUCATIVO


DE LA I.E. DEL CASERIO SHIGUA
Alternativa 1

Nmero de beneficiarios
VACT - PS
VAE 1/
1/

1,015
1,431,719.40
274,460.61

Alternativa 2
1,015
1,779,038.74
341,041.73

Sobre la base del VACT - PS, considerando 10 aos de vida til del proyecto

325,985.84

271,478.70

Cdigo

SISTEMA NACIONAL DE INVERSION PUBLICA Correlativo


Elaborado
Actualizado

FORMATO 11
MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E.15048 DEL CASERIO HIERBA BUENA
NOMBRE RESUMIDO
DEL PROYECTO

MEJORAMIENTO DEL SERVICIO EDUCATIVO DE


LA I.E. DEL CASERIO SHIGUA

Alternativa 1
Nmero de alumnos
VACT PS
VAE 1/
Ratio C/E 2/

Alternativa 2

1,015
1,431,719.40
274,460.61
1,409.99

1/

Sobre la base del VACT PS, considerando 10 aos de vida til del proyecto

2/

Ratio C/E = VACT PS / Numero de alumnos

1,015
1,779,038.74
341,041.73
1,752.04

Cdigo

SISTEMA NACIONAL DE INVERSION PUBLICA

Correlativo

Elaborado
Actualizado

FORMATO 20
ANALISIS DE SENSIBILIDAD
NOMBRE RESUMIDO
DEL PROYECTO

MEJORAMIENTO DEL SERVICIO EDUCATIVO DE


LA I.E. DEL CASERIO SHIGUA

% Variacin en Costos
Totales (Inversin)
20
15
10
5
0
-5
-10
-15
-20
1/

Ratio C/E = VACT/numero de alumnos

Ratio C/E1/
Alternativa 2

1,691.99
1,621.49
1,550.99
1,480.49
1,409.99
1,339.49
1,268.99
1,198.49
1,127.99

Ratio C/E1/
Alternativa 1

2,102.45
2,014.84
1,927.24
1,839.64
1,752.04
1,664.44
1,576.83
1,489.23
1,401.63

Alternativas
Alternativa 01: construccin de infraestructura con
cobertura liviana ( 01 aula para el nivel inicial, 02

Inversin a precios
privados
1,791,409.39

para primaria, comedor o sum , SS.HH, pozo


septico, direccion, patio de usos multiples, cerco
perimetrico, mitigacin ambiental )
Alternativa 02: construccin de infraestructura con
losa aligerada ( 01 aula para el nivel inicial, 02 para
primaria, comedor o sum , SS.HH, pozo septico,
direccion, patio de usos multiples, cerco perimetrico,
mitigacin ambiental)

2,187,063.61

Inversin a precios
sociales

VACT a Precios
Sociales

Coeficiente
C/E

1,425,623.34

1,431,719.40

1,409.99

1,772,080.34

1,779,038.74

1,752.04