Republic of the Philippines

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES


Sto. Tomas Branch
DAILY ACCOMPLISHMENT REPORT
Date: 23 May 2016
Total Hrs: 9

Time In: 7:30


Time Out: 5:30

Tasks Performed this day:


Conducted Electrical Test (Pre-Test) on both high and low boards (without crystals)
Tabulated and documented the data gathered from the Electrical Test
Assured that all processes had been done before Crystal Attach
Crystal Attach on both high and low boards
RTV Fill on both high and low boards

Student Name & Signature: Lumban, Christine Ylane P.


Supervisors Signature: _______________________

Date: 24 May 2016


Total Hrs: 9

Time In: 7:30


Time Out: 5:30

Tasks Performed this day:

Performed an MSA on boards that failed on the Pre-Test


Compared and documented the results collected from the MSA
Final Visual Inspection on the boards before Final Electrical Test
Material check on 93AT295 and 93AT291 chips
Endorsed the visually inspected boards for buy off and packing

Student Name & Signature: Lumban, Christine Ylane P.


Supervisors Signature: _______________________

Poblacion 2, Sto. Tomas Batangas Phone: 043-7783508

THE COUNTRYS 1ST POLYTECHNIC U

Republic of the Philippines

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES


Sto. Tomas Branch
DAILY ACCOMPLISHMENT REPORT
Date: 25 May 2016
Total Hrs: 9

Time In: 7:30


Time Out: 5:30

Tasks Performed this day:


Performed Final Electrical Test on both high and low boards (with crystals)
Tabulated and documented the data from the Final Electrical Test
Compared the data grouped from the Final and Pre-Test (considering there has been rejects
after the pre-test, crystal attach and rtv fill)
Visual inspection on the boards that failed in the Final Electrical Test
Endorsed the visually inspected boards for buy off and packing
TMS on Electrical Test

Student Name & Signature: Lumban, Christine Ylane P.


Supervisors Signature: _______________________
Date: 26 May 2016
Total Hrs: 9

Time In: 7:30


Time Out: 5:30

Tasks Performed this day:


Packed, checked and inspected the boards that are ready for shipment
Conducted Electrical Test on sample boards for Quality Assurance
Endorsement and shipment of FISCAN CT-SCAN
Grouped pictures of the boards that are necessary for traceability
Discussed the progress on the Job Training Program

Student Name & Signature: Lumban, Christine Ylane


Supervisors Signature: _______________________

Poblacion 2, Sto. Tomas Batangas Phone: 043-7783508

THE COUNTRYS 1ST POLYTECHNIC U

Republic of the Philippines

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES


Sto. Tomas Branch

DAILY ACCOMPLISHMENT REPORT


Date: 27 May 2016
Total Hrs: 9

Time In: 7:30


Time Out: 5:30

Tasks Performed this day:


Material check on the Side and Center parts that are needed for the next production
Listed the boards defects and mild faults that are essential for traceability and reports
Performed Electrical Test (Dark current) on rejected Photodiodes
CDA Bombing demonstration
Studied Basic Costing (Material cost, labor, overhead and yield that are critical for Billing of
Materials)
Performed Gross Leak Test on a rejected metal can that failed in the Fine Leak Test

Student Name & Signature: Lumban, Christine Ylane P.


Supervisors Signature: _______________________
Date: 30 May 2016
Total Hrs: 9

Time In: 7:30


Time Out: 5:30

Tasks Performed this day:


Completed the final LabView Project to be checked for evaluation
Material check on the unsawn 93AT295 that is needed for the next production
Overview on OrCad Capture
Reported some topics about Casting and OrCad

Student Name & Signature: Lumban, Christine Ylane


Supervisors Signature: _______________________

Poblacion 2, Sto. Tomas Batangas Phone: 043-7783508

THE COUNTRYS 1ST POLYTECHNIC U

Republic of the Philippines

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES


Sto. Tomas Branch

WEEKLY ACCOMPLISHMENTS REPORT


Christine Ylane P. Lumban
Student Name
Excelitas Technologies Philippines Inc.
Company Name

Week No:

10

23 May 30 May 2016


Inclusive Dates

Tasks Done this week:

Conducted Electrical Test (Pre-Test) on both high and low boards (without crystals)
Crystal Attach on both high and low boards
RTV Fill on both high and low boards
Performed an MSA on boards that failed on the Pre-Test
Final Visual Inspection on the boards before Final Electrical Test
Performed Final Electrical Test on both high and low boards (with crystals)
Compared the data grouped from the Final and Pre-Test (considering there has been

rejects after the pre-test, crystal attach and rtv fill)


Visual inspection on the boards that failed in the Final Electrical Test
TMS on Electrical Test
Packed, checked and inspected the boards that are ready for shipment
Endorsement and shipment of FISCAN CT-SCAN
Material check on the Side and Center parts that are needed for the next production
Listed the boards defects and mild faults that are essential for traceability and reports
Performed Electrical Test (Dark current) on rejected Photodiodes
CDA Bombing demonstration
Studied Basic Costing (Material cost, labor, overhead and yield that are critical for Billing

of Materials)
Completed the final LabView Project to be checked for evaluation
Overview on OrCad Capture
Reported some topics about Casting and OrCad
New Skill/s Acquired This Week:

Packed, checked and inspected the boards that are ready for shipment (Quality

Assurance)
Performed Electrical Test (Dark current) on rejected Photodiodes
CDA Bombing demonstration (how to use chemicals such as oxygen, argon and helium

in CDA bombing)
Studied Basic Costing (Material cost, labor, overhead and yield that are critical for Billing

of Materials)
Usage of different LabView functions and experimenting on how they can make the
slightest and biggest difference in a LabView program
Poblacion 2, Sto. Tomas Batangas Phone: 043-7783508

THE COUNTRYS 1ST POLYTECHNIC U

Republic of the Philippines

POLYTECHNIC UNIVERSITY OF THE PHILIPPINES


Sto. Tomas Branch
Knowledge and Overview of the fundamentals of OrCad Capture
Your major accomplishments this week: (Provide a detailed description of the tasks involved in each accomplishment)
Shipment of FISCAN CT-SCAN boards (23 low energy boards and 26 high energy boards). This
project had really undergone numerous courses and had gone through various operators,
technicians and QAs. To be able to finish this project within the desired target date has given me
a tremendous feeling and finally, I could let out a sigh of relief.
TASK/S
ACCOMPLISHMENTS
Conducted Electrical Test (Pre-Test) on both high and low boards (without crystals)
Crystal Attach on both high and low boards
RTV Fill on both high and low boards
Performed an MSA on boards that failed on the Pre-Test
Final Visual Inspection on the boards before Final Electrical Test
Performed Final Electrical Test on both high and low boards (with crystals)
Shipment of FISCAN CT-SCAN
Performed Electrical Test (Dark current) on rejected Photodiodes
Studied Basic Costing (Material cost, labor, overhead and yield that are critical for Billing

of Materials)
Completed the final LabView Project to be checked for evaluation

*All these tasks have been accomplished


Problem Encountered this week:
Hectic schedule of the operators
Had a hard time in getting the desired result in Final Electrical Test
Confusion in the initial process of buy off and electrical test to be performed by the QA
Ways done to overcome or solve those problems:

Constant follow up on the operators so that we could minimize the possible downtime
that could happen from their hectic schedule
Provided the desired light that the chips needed
Cleared and explained the details and process well to the QA
Noted by:
______________________
Engr. Jireh Rodriguez
OJT Supervisor