SBU/Dept
Leaching
Date and time of Occurance:
15/6/16 9.30pm
Date and time of restorance:
15/6/15 11.30pm
Problem Statement: NL01V003 motor to gearbox coupling pinbush failure
Section/Equipment
Total Equipment downtime (Hrs)
Total Plant downtime(Hrs)
Team Involved in Investigation: ( Strictly cross functional team )
Praveen,naveen
Name of contract employee involved:
Leaching/NL01V003
2hr
Company:SS
Why-Why Analysis
Problem
Why-1
Why-2
Why-2
Reactor online flushing not done
Root Cause: 1) Schedule online flushing of reactor not done
Why-1
Why-2
Why-3
Root cause
Machine
Corrective action
Sl No
1
Preventive action
Due
Status
PSIC
SMP
Drg
Done
By
PSIC
Improper operation
Improper Adjustment
Shift Incharge
Sl No
Method
By
Sl No
1
Material
Due
Status
Done
PMI checklist
Pending
MOC
By
Due
Status
Varun
25/7/2016
pending
Sign HOD
SBU Head
Sign AO Head
Problem
Why-1
Why-2
Coupling gap was 4mm, instead of 2mm
Root Cause: 1) MOC of line
Corrective action
Sl No
1
Machine
Preventive action
Sl No
1
Sl No
SBU Head
SMP
Why-Why Analysis
ad of 2mm
Material
Corrective action
By
Shift Incharge
Preventive action
By
aintainance training
Varun.D
SMP
Drg
l Deployment Opportunities
PMI chec
By
Company:SS
Why-Why Analysis
Method
Improper operation
Improper Adjustment
By
Shift Incharge
Due
By
Due
Varun.D
1/7/2016
Drg
gn Engg/Oprn Head
PMI checklist
By
MOC
Due
Sign AO Head
Leaching/NL01V003
Why-1
Why-2
Root cause
Status
Done
Status
Pending
Status
Sign AO Head