Republic of the Philippines


DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS

0/-

<tJ f74J#

/<3 ~ J.:i) /1-

OFFICE OF THE SECRETARY


Manila

DEPARTMENTORDER -)
)

79)

NO.
Seriesof 201~by'./J./"
~

)
)

SUBJECT: Minimum Horizontal and Vertical


Clearances
for
Welcome
Arches/Overhead
Boundary
Markers, Overhead Utilities and
Power Lines Crossing and Along
National Highways

To ensure that construction of welcome arch/overhead boundary marker structures and


installation of overhead utility and power lines across and along national highways will
provide sufficient horizontal and vertical clearances, the following guidelines with typical
sections are hereby prescribed:
A. Welcome Arch/Overhead Boundary Marker:
1. To give allowance for future road improvement and widening, welcome
arch's/overhead boundary marker's posts shall be located at 2.0m setback from the
road right-of-way (RROW) limit to give allowance for the space allotted for
underground utilities per D.O. No. 26, s. 2011, re: Policy on Diggings/Excavationsby
Private and Public Utilities on National Roads, as shown in Typical Sections 1 and 2,
Annex "A").
2. Welcome arch/overhead boundary marker shall be provided with minimum vertical
clearance of 5.33m from the roadway surface as shown in Annexes "A" and "B".
3. On critical fill slope (where vehicles have high propensity to overturn) and on nontraversable cut slope, welcome arch's/overhead boundary marker's posts may be
allowed along the edge of the shoulder provided the posts shall be shielded with
appropriate barrier, (Typical Sections 3 and 4, Annex "B").
4. On road sections where there are RROWconstraints, like in urban areas, posts shall
be located along the edge of the sidewalk, (Typical Section 5, Annex "C").
B. Overhead Utilities and Power Lines:
1. For overhead utility and power lines crossing the roadway where traffic comprise of
trucks, vertical clearance shall not be less than S.SOmmeters from the roadway
surface to the calculated lowest point of cable sag, (Typical Section 6 , Annex "0").
2. Along the roadway and on areas designated for and frequented by pedestrians,
minimum vertical clearance of 4.88m from the surface of the sidewalk is prescribed,
(Typical Section 7, Annex "0").
For strict compliance of all concerned.

Department

of Public Works and Highways


Office of the Secretary

1111111111111111111111111111111111111

WIN6R01282

D.O. No. 79 5.2016

AN N EX "A"
RRO.w,

2.00

2.00

WELCOME

ARCH I BOUNDARY

W LCOME ARCH

ER POST

CARRI

EWAY

-----------

I')

-.J

--

POST

lti::E

l~~~[~~J-----------

l--T-- J

UTILITIES

MARKER

1').10

Dralnago

---------------T-----t--I------------------~
UNDERGROUND

BOUNDARY

Typical Section 1

UNDERGROUND

UTILITIES

With Allowance For Future Widening


RRO.w.

2.00

2.00

WELCOME

ARCH I BOUNDARY

LCOME ARCH

R POST

BOUNDARY

MARKER

POST

1').
1'),6

t
----------

lti::E

----- ---UNDERGROUND

----------- -----------UTILITIES

---[

~--

UNDERGROUND

Note:
1. All dimensions are in meter (m), unless otherwise specified.

Typical Section 2
With Allowance For Future Widening

14--------------- ..--------- ..-----.-...


--...
-.~-~~~~--

UTILITIES

_._----~-_._~------_.~----_.---------_
.._._~------~~---------------.----------

....

D.O. No. 79 5.2016

-----------------------------------------------------------

ANNEX "8"
/

I
I

I
I
I
I
I

1.00

WELCOME

ARCH I BOUNDARY

FLEXBEAM
BARRIER

I
I

MARKER

POST

GUARDRAIL

I
WELCOME

ARCH I BOUNDARY

MARKER

ST

CARRI

I
I
I

GEWA Y
I

I
I

1
1

I
I
/~

EXISTING

GROUND

/1

EXISTING
GROUND

JI

L.. __

Section

..J

/
/

I
I
I
I
L

/
/

POST

I
I
I

1.00

/1

GUARDRAIL

Typical Section 3

I
I
/
I

,
/

/
I

I
I
I
I
I

FLEXBEAM

GUARDRAIL
BARRIER

GUARDRAIL

POST

I
I
I
I
WELCOME

ARCH I BOUNDARY

MARKER

ST

SHOULDER

CARRI
1.00

GEWA Y

I
I
I

1.00
I
I
I

/L
I
GROUND

/
/

/1

BARRIER
(SEE DETAILS)

ARCH I BOUNDARY
MARKER POST

II

EXISTING

WELCOME

EXISTING
GROUND

BARRIER
(SEE DETAILS)

L. __

..J

I
I
I
I
I
I
I

Typical Section 4

PLAN

Note:
1. All dimensions

DETAILS
are in meter (m), unless otherwise specified.

\------~-.------------------------------------------.----~----------~---------~

.. - ..------.-----.--

..-----------.----.-~---~~-~-

.. ---------------

.. -.m--- ..------------

.. -----~-

..~----

....

No. 79 5.2016
-ANNEXD.O.
~~~--

RROW.

WELCOME

ARCH

----------

BOUNDARY

MA

---------

ER POST

WELCOME

---------

--

Sidewalk

ARCH

OUNOARY

MARKER

POST

Sidewalk

---------- -------

I
I

Typical Section 5
Urban Area with RROW Constraint

Note:

_'All d;m'_n_S_io_ns_._re_in_m_~_(_m_),

_un_le_s_s_ot_h_e_rw_is_e_s_pec_-

..__.

.__ .

.__._ .._. __

~-

..

D.O. No. 79 5.2016

ANNEX "0"
RROW

ELECTRICAL POST
OUTSIDE RROW

2.00

o
It')

Traffic

Traffic

Flow

Flow

I
I
I
I I
I I
L....I

I
I
I
I
I

I
L....I

2.00
SIDEWAlK

SlOEWAlK

ll'i

ELECTRICAL POST
OUTSIDE RROW

Typical Section 5
Utility I Power Lines Crossing the Roadway

ELECTRIC
OUTSID
IlO
IlO

ELECTRICAL POST
OUTSIDE RROW

L POST
RROW

,--.
.~

~~

r-

SIDEWALK

....

...

I
I
I
I
I I
L....I

I
I

Roadway pavement

L....I

Typical Section 6
Utility I Power Lines Along the Roadway
Note:
1. All dimensions are in meter (m), unless otherwise specified.