Sunteți pe pagina 1din 6
PP INSPECTION Ca =)=ints BS EN 13598-1:2003 BS EN 1253-4:2000 Unrivalled Quality In The Underground 1DYe-latcle( MUL cis CChezy Industries Sdn Bhd was incorporated on the 8th of November Dee eGR mec) at Bandar Pinggiran Subang, Shah Alam, Selangor. CO ee uu ec eae ay Chambers in January 2009 for the building and construction industry. CL Coie ee in the construction industry and complies with BS EN 13598-1:2003, SO Re Ce oe as ‘and modernization of our country, especially in terms of sewerage Den With many years of experience in both manufacturing and marketing in this industry, Chezy Industries has established their own network with distributors (hardware outlets), consultants, architects, developers and Pras ‘Our 315 mm PP inspection Chambers allow for easy access to the drainage system for maintenance inspection, oding and the removalat debris. Chezy Preformed Pls Inspection Chambers area simple push-fit ssembly and have been designed to oer loss labour intensive and more economical ataratives to radtonal construction methods, ‘Te connections tothe Crezy PP Inspection Chamber ae flexible and alw fora detection of poe of 2° in all rections. Our ‘chamber wil not leak even i hee is ground setlement of 50 mm 2 inches). Our PP Inspection Chambers aw for incoming pipes and one outet. Connections nat used canbe sealed by plugs provided CHAMBER BASE BODY RISER COVER AND COLLAR The chamber base is avaiable fr both This secon of the PP Inspection The chamber sser pices are designed The Chezy PP Inspection Chamber caver 110 mm and 160 mm drainage layouts, Chamber is joined to the base by a for dy Jointing and have strengthening and colar is made of high impact and UW with branch inlets designed to optimize simple dry jointing method (ubber rng), bs or adonlstuctualswength and stabilzed ABS. I has been tested to BS flow 0.7 kNim? Shall conform to EN ISO 9969 ENISO 9969 ‘Vacuum requirement for resistance No damage tothe structure Test EN 1277-1996 ‘of PP Inspection Chambers to that could be deemed to temperature Condition & ground and water pressure when impair its function Test period installed Internal negative pressure Resistance to vertical loading Deflection of horizontal dimensions Force forclassL_15KN. Clause 4 of EN 1253-2:1998 not to exceed 6% Deflection of cover shall conform to clause 4 ‘of EN 1258-1:2008, <0.4% No cracking We

S-ar putea să vă placă și