COMMISSIONING
PROTOCOL FOR STACKER
CUM RECLAIMER - A
Rev No: 00
REPORT NO: 2
Date : 06/ 05/2014
Page 1 of 2
Sl.No.
1
2
3
4
5
6
7
Left side
of
machine
4
5
6
Function
Alarm
Trip
Alarm
Trip
Trip
Trip
Interlock for clamp
released
Observation
Checked
Checked
Checked
Checked
Checked
Checked
Checked
Field Interlocks:
Sl.No.
1
2
Signal
NC
NC
NC
NC
NC
NC
-
Right
side of
machine
Description
70% Rail Clamp released
Proximity
80% Rail Clamp released
Proximity
100% Rail Clamp released
Proximity
70% Rail Clamp released
Proximity
80% Rail Clamp released
Proximity
100% Rail Clamp released
Proximity
CHECKED BY ABB
Signal
NO
Function
Trip Interlock
NO
Operation Interlock
Checked
NO
Operation Interlock
Checked
NO
Trip Interlock
Checked
NO
Operation Interlock
Checked
NO
Operation Interlock
Checked
WITNESSED BY THYSEN
Observation
Checked
WITNESSED BY COASTAL
Format No : SCR/CM
COMMISSIONING
PROTOCOL FOR STACKER
CUM RECLAIMER - A
Rev No: 00
REPORT NO: 2
Date : 06/ 05/2014
Page 2 of 2
4. HMI: All the operational feedbacks / indications / command were shown in which Process Panel given in the
control desk.
5. Remarks / Observations: Logic developed / checked and found satisfactory.
CHECKED BY ABB
WITNESSED BY THYSEN
WITNESSED BY COASTAL