Documente Academic
Documente Profesional
Documente Cultură
By using call reestablishment feature in the WCDMA we can reduce the call
drop in CS and PS domain. This feature enables us to successful reestablish
the call after the abnormal release indication has been sent by the RNC.
The re-establishment procedure allows MS to resume a connection in
progress after a radio link failure, possibly in a new cell or in a new location
area (re-establishment in a new location area initiates no location updating).
Below trend provides the details of CSV Drop (NBH) , HS+PS Drop (DBH) and
Erlang Minutes per drop (NBH) : Improvement observed in the CSV Drop and
Erlang Minutes per drop.
800
1.6
700
1.4
600
1.2
D
r
o
p
r
a
t
e
500
1
400
0.8
300
0.6
0.4
0.2
0
200
Low Traffic due
to Diwali
Holidays
Parameter changes
implemented in Jaipur
RNC
Parameter changes
implemented in Ajmer
and Jodhpur RNC
100
0
E
r
l
a
n
g
m
i
n
d
r
o
p
The below trend provide the details of improvement observed in the cell BBH
for the KPI CSV call drop rate and HS+PS Drop Rate.
CSV Drop Rate 2%
%
o
f
c
e
l
l
m
e
e
t
i
n
g
c
r
i
t
e
r
i
a
100
95
90
85
80
Parameter changes
done in Jaipur RNC
Parameter changes
done in Ajmer and
Jodhpur RNC
75
Axis Title
This drop rate improvement has been observed n the cell BBH level and
indicates that the cell KPI has improved overall as far as the CSV and PS drop
rate is considered. Beside no major impact seen on other KPIs due to this
parameter changes.
On the trial basis the parameter changes were firstly performed in the Jaipur
RNC on 22nd Nov 2012 and in Ajmer and Jodhpur RNC the changes were
implemented on 27th Nov 2012.
2.1 Detailed parameter description and impact analysis of call reestablishment
The CS call drop analysis is as shown below the basic counter responsible for
the call drops are as mentioned :
1. VS.RAB.AbnormRel.CS.IuAAL2
2.
3.
4.
5.
6.
7.
8.
9.
VS.RAB.AbnormRel.CS.OLC
VS.RAB.AbnormRel.CS.OM
VS.RAB.AbnormRel.CS.Preempt
VS.RAB.AbnormRel.CS.RF
VS.RAB.AbnormRel.CS.RF.SRBReset
VS.RAB.AbnormRel.CS.RF.ULSync
VS.RAB.AbnormRel.CS.RF.UuNoReply
VS.RAB.AbnormRel.CS.UTRANgen
From the above counter list the major pegged counters are the point no. 5 , 6
and 7.
VS.RAB.NormRel.AMR
0.8
0.7
0.6
D
r
o
p
R
a
t
e
0.5
0.4
0.3
0.2
0.1
0
The below graph indicates the RAB abnormal release analysis for the major
pegged counters in the CS domain , it can clearly be seen that the CS Call
drop rate due to SRB reset and UL sync has dipped a large volume thus
impacting the overall CS call drop rate :
50000
45000
40000
35000
30000
25000
20000
15000
10000
5000
0
R
A
B
N
o
r
m
a
l
r
e
l
e
a
s
e
VS.RAB.AbnormRel.CS.RF
VS.RAB.AbnormRel.CS.RF.SRBReset
VS.RAB.AbnormRel.CS.RF.ULSync
350
300
250
200
150
100
50
0
41215 41217 41219 41221 41223 41225 41227 41229 41231 41233 41235 41237 41239 41241 41243
41214 41216 41218 41220 41222 41224 41226 41228 41230 41232 41234 41236 41238 41240 41242
The below graph indicates the RAB abnormal release analysis for the major
pegged counters in the PS domain , it can clearly be seen that the PS Call
drop rate due to SRB reset , TRB Reset and UL sync has dipped a large
volume thus impacting the overall CS call drop rate :
VS.RAB.AbnormRel.PS.RF.SRBReset
VS.RAB.AbnormRel.PS.RF.ULSync
VS.RAB.AbnormRel.PS.RF.TRBReset
VS.Call.Drop.PS.Other
1600
1400
P
S
c
a
l
l
d
r
o
p
6000
5000
1200
1000
800
600
4000
3000
2000
400
200
0
P
S
1000
0
c
a
l
l
d
r
o
p
O
t
h
e
r
3.2.1
The below signaling details indicate the 20 pre and post signaling at call drop
, The PS Timer setted to 30000 ms for Enhanced Call Reestablishment, start
after RNC send the RL Active CMD, stop after RNC receives cell update
message.
PS Domain call signaling :
3.2.3
Below is the signaling flow for the call setup details in the WCDMA mode :
The call re-establishment details are transmitted in the SIB 4 and SIB 12 after
the release indication has been received a counter N313 starts which repeats
it self for the times T313 value is assigned.
We need to increases these timers in order to provide UE the time for relaching and making a call re attempt for the RAB new connection.
4.1 Further scope of improvement.
In this section we will discuss the relevant further analysis and modification
needed for the CS and PS call drop rate improvement
1. Further modification of counters and timers to improve the call drop
rate.
2. These changes were made on the RNC level and cell level further
changes need to be performed on the cell level for the in synsc and out
sync parameters.
3. RSVDBIT1_BIT27 testing to be done at RNC level , in this part we need
to check the pre and post changes after the RSVDBIT1_BIT27 enable
and disable
5.1 Suggestions required.
Request readers for further suggestions and proposals for making
further improvement in the KPIs.