CB4 INCLUDING 1 UNIT (11KV) SUB-STATION WITH GENSET ROOM, 1 UNIT PUMP
HOUSE, 1 UNIT INTEGRATED WATER THAK (PORTABLE WATER & FIRE FIGHTING),
SYSTEM INSTALLATION & ANCILLARY WORKS AT KUANTAN PORT, PAHANG.
UNIT
RATE (RM)
QUANTITY
6%
TOTAL AMOUNT
BEFORE GST (RM)
AMOUNT GST
6% (RM)
TOTAL AMOUNT
INCLUSIVE GST (RM)
ROAD WORKS
4.1.1
Excavate down to prepare road for receiving road pavement in all material other than solid
rocks and stockpiled for used or disposed off the excavated meterials to contractor's own
dumping ground.
m3
600
50
29,716.98
1,783.02
31,500.00
4.1.2
m2
900
4,433.96
266.04
4,700.00
4.1.3
m2
900
30
26,561.32
1,593.68
28,155.00
4.1.4
Supply,deliver and apply bituminous prime coat to surface of the road base including
cleaning of the surface of bituminous prime coat.
m2
900
2.5
2,169.81
130.19
2,300.00
4.1.5
Supply,deliver lay and compact the asphaltic concrete binder course to 50mm compacted
thickness. 9include the application of tack coat).
m2
900
35
31,226.42
1,873.58
33,100.00
4.1.6
Supply, deliver, lay and compact the asphaltic concrete wearing course to 40mm
compacted thickness before handling over to Majlis perbandaran Kuantan at the direction
of S.O.
m2
900
25
22,264.15
1,335.85
23,600.00
116,372.64
6,982.36
123,355.00
116,372.64
6,982.36
123,355.00
DRAINAGE WORKS
E.- Exceeding
N.E. - Not exceeding
Depth will be calculated from ground surface to drain invert for each drain length from a
point to adjacent point for the various depth ranges. Depth will be measured as average
depth between two point and average depth between two side of wall.
4.2.1
4.2.2
Supply, deliver and construct 230mm half round drain to the lines and grades as shown in
the drawing. Rate should include excavation, backfilling, compaction, disposal of surplus
or unsuitable materials, half round section, rubble wall, concrete base cemet mortar joints,
a maximum of 25mm thick cement mortar tapering, cement rendering, forming of
weepholes with filter media and aggregate for
m
m
135
25
160
260
21,320.75
6,415.09
1,279.25
384.91
22,600.00
6,800.00
Extra over item 4.2.1 for drain with heavy duty G.I. Grating cover and 1 layer of BRC A8
at building entrance.
10
350
3,396.23
203.77
3,600.00
147,504.72
8,850.28
156,355.00
147,504.72
8,850.28
156,355.00
4.2.3
Supply, deliver all material and construct drainage sumps at the ends of single pipe culvert
and drain including excavation, brickwall with plastering, G.I grating c/w hinges, screed,
formwork, concrete C20/20, reinforcement, connection with adjacement drain, backfilling
and disposal of surplus material, etc as shown in the Drawing.
no
1,800.00
10,660.38
639.62
11,300.00
4.2.4
Supply,deliver,construct and omplete the 300mm dia. Class 'Y'R.C. pipe culvert with concre
20
450
8,867.92
532.08
9,400.00
4.2.5
L.S.
4,905.66
294.34
5,200.00
4.2.6
Supply, deliver all material and construct 7m wide reinforced concrete entrance slab for
main entrance gate. Rate to include formwork, reinforcement, concrete, heavy duty G.I.
grating to all details as shown in the Drawing.
L.S.
4,905.66
294.34
5,200.00
4.2.7
Supply, deliver all material and construct scour pit at the end of single pipe culvert
including excavation, brickwall with plastering, G.I. grating c/w hinges, screed, formwork,
concrete C20/20, lean concrete C15/20, reinforcement, connection with adjacement drain,
backfilling and disposal of surplus materials, etc as shown in the Drawing.
3,962.26
237.74
4,200.00
180,806.60
10,848.40
191,655.00
180,806.60
10,848.40
no
2,000.00
191,655.00