PROPOSED CONSTRUCTION OF NEW M&E BUILDING FOR REPLACEMENT PURPOSE AT

CB4 INCLUDING 1 UNIT (11KV) SUB-STATION WITH GENSET ROOM, 1 UNIT PUMP
HOUSE, 1 UNIT INTEGRATED WATER THAK (PORTABLE WATER & FIRE FIGHTING),
SYSTEM INSTALLATION & ANCILLARY WORKS AT KUANTAN PORT, PAHANG.

BILL NO. 4 - EXTERNAL WORKS WITHIN WATER STORAGE TANK


ITEM NO DESCRIPTION
4.1

UNIT

RATE (RM)

QUANTITY

6%
TOTAL AMOUNT
BEFORE GST (RM)

AMOUNT GST
6% (RM)

TOTAL AMOUNT
INCLUSIVE GST (RM)

ROAD WORKS

4.1.1

Excavate down to prepare road for receiving road pavement in all material other than solid
rocks and stockpiled for used or disposed off the excavated meterials to contractor's own
dumping ground.

m3

600

50

29,716.98

1,783.02

31,500.00

4.1.2

Supply, deliver,lay and compact sand as sub-base to a compacted thickness of 50mm.

m2

900

4,433.96

266.04

4,700.00

4.1.3

Supply, deliver,lay and compact sand as sub-base to a compacted thickness of 225mm.

m2

900

30

26,561.32

1,593.68

28,155.00

4.1.4

Supply,deliver and apply bituminous prime coat to surface of the road base including
cleaning of the surface of bituminous prime coat.

m2

900

2.5

2,169.81

130.19

2,300.00

4.1.5

Supply,deliver lay and compact the asphaltic concrete binder course to 50mm compacted
thickness. 9include the application of tack coat).

m2

900

35

31,226.42

1,873.58

33,100.00

4.1.6

Supply, deliver, lay and compact the asphaltic concrete wearing course to 40mm
compacted thickness before handling over to Majlis perbandaran Kuantan at the direction
of S.O.

m2

900

25

22,264.15

1,335.85

23,600.00

116,372.64

6,982.36

123,355.00

116,372.64

6,982.36

123,355.00

CARRIED TO PAGE 4.2


B/F
4.2

DRAINAGE WORKS
E.- Exceeding
N.E. - Not exceeding

Depth will be calculated from ground surface to drain invert for each drain length from a
point to adjacent point for the various depth ranges. Depth will be measured as average
depth between two point and average depth between two side of wall.

4.2.1

4.2.2

Supply, deliver and construct 230mm half round drain to the lines and grades as shown in
the drawing. Rate should include excavation, backfilling, compaction, disposal of surplus
or unsuitable materials, half round section, rubble wall, concrete base cemet mortar joints,
a maximum of 25mm thick cement mortar tapering, cement rendering, forming of
weepholes with filter media and aggregate for

a) Depth N.E 0.75m


b) Depth E. 0.75m but N.E. 1.50m

m
m

135
25

160
260

21,320.75
6,415.09

1,279.25
384.91

22,600.00
6,800.00

Extra over item 4.2.1 for drain with heavy duty G.I. Grating cover and 1 layer of BRC A8
at building entrance.

10

350

3,396.23

203.77

3,600.00

147,504.72

8,850.28

156,355.00

147,504.72

8,850.28

156,355.00

CARRIED TO PAGE 4.3


B/F

4.2.3

Supply, deliver all material and construct drainage sumps at the ends of single pipe culvert
and drain including excavation, brickwall with plastering, G.I grating c/w hinges, screed,
formwork, concrete C20/20, reinforcement, connection with adjacement drain, backfilling
and disposal of surplus material, etc as shown in the Drawing.

no

1,800.00

10,660.38

639.62

11,300.00

4.2.4

Supply,deliver,construct and omplete the 300mm dia. Class 'Y'R.C. pipe culvert with concre

20

450

8,867.92

532.08

9,400.00

4.2.5

Allow for coordibation works and al necessary connection to external drain.

L.S.

4,905.66

294.34

5,200.00

4.2.6

Supply, deliver all material and construct 7m wide reinforced concrete entrance slab for
main entrance gate. Rate to include formwork, reinforcement, concrete, heavy duty G.I.
grating to all details as shown in the Drawing.

L.S.

4,905.66

294.34

5,200.00

4.2.7

Supply, deliver all material and construct scour pit at the end of single pipe culvert
including excavation, brickwall with plastering, G.I. grating c/w hinges, screed, formwork,
concrete C20/20, lean concrete C15/20, reinforcement, connection with adjacement drain,
backfilling and disposal of surplus materials, etc as shown in the Drawing.

3,962.26

237.74

4,200.00

180,806.60

10,848.40

191,655.00

180,806.60

10,848.40

CARRIED TO PAGE 4.4


B/F

no

2,000.00

191,655.00