ATTACHMENT 3
NEGLIGIBLE
(1)
MINOR
(2)
SERIOU
S
(3)
FATAL
(4)
CATASTROP
HIC
(5)
10
15
20
25
12
16
20
12
15
10
PROBABILITY
MOST LIKELY
(5)
POSSIBLE
(4)
CONCEIVABLE
(3)
REMOTE
(2)
INCONCEIVABLE
(1)
Likelihood:
Severity:
Category of
Hazards:
Inconceivable
Negligible
Injuries
Mechanical
Remote
Minor Injuries
Conceivable
Moderate Injuries
Possible
Major Injuries
failure of services
Chemical
Most likely
Fatality
Ergonomic
Psycho-social
Electrical
Biological
Engineer
HSEC Chairman
Mgmt.
Representative
Date:
Date:
Date:
Date:
Page 1 of 3
Form No : CSCEC-HSE-F-10
Ver : 0.0
HIRARC FORM
Company
Process / Location:
Signature Tower
Approved by:
(Name, designation)
Date:
31.05.2015
Conducted by:
(Name, designation)
Date: 31.05.2016
1.Nethiyaa Rajendran
Review Date:
1.
HAZARD IDENTIFICATION
No
Work Activity
2
Operator climbing up
to tower crane cabin
Hazard
Routine inspection by
tower crane operator
at cabin area
2. P.Parthiban
2.
RISK ASSESSMENT
Which can cause/
effect
Existing risk
control
(is any)
Likelihood
Severity
RISK CONTROL
Risk
Recommended
control measures
Fall from
height
Fatality
Tripping
Sharp object
Tripping
hazards
Slip and fall
from height
Major injury
Finger cut
Serious
injury
Major injury
To provide lifeline
and safety harness
To provide
guardrail on the
climbing ladder
To provide leather
gloves
To provide anti slip
mat at cabin area
To provide
guardrail at cabin
PIC
(Due date/
status)
Ver : 1
Operation
thunderstorm
Check
device
during
Chain sling
snap
Fatality
Lighting
Serious injury
supporting
Loss of load
Fatality / moderate
injury
Loss of load
Fatality/ moderate
injury
Check
signal
man/communication
set
Fatality
Loss of load
Major injury
Serious injury
Crash in between
8
Ensure
load
are
fastened properly
Routine inspection
by operator
Stop operating
during
thunderstorm
Install the lighting
indicator
Check wire rope,
limit switches hook
latch and checklist
Ensure proper
lifting appliance
and used for right
job
Ensure trained
signalman
Inspection of the
signals and crane
Ensure loads are
properly tied and
secured
Page 3 of 3