Main Characteristics
Developed in 2004 as Nauticus Construction, focused on shipbuilders.
Renamed in 2011 to Nauticus Project, reflecting broad coverage to shipowners,
designers, etc.
Fully Internet based (software, database and document files stored in DNV/Norway
servers). No need for IT homologation, no deployement.
Special version for shipyards (software and database in DNV/Norway, document
files stored in the shipyard server). No need for renaming document files,
renumbering of documents, etc.
Indepency from shipbuilder, classification society, shipdesigner, etc.
Can be fully downloaded for read-only at end of project.
The stroke of genius behind NP is not just its simplicity and flexibility but also its
shift of focus towards deliverables. The project breakdown structure atomizes the
project into manageable deliverables. A project based on such tangible
deliverables is far easier to manage than one based on activities alone. It allows
one to be precise about what has to be delivered and helps track progress in a
concrete way.
Det Norske Veritas Ltda. Todos os direitos reservados.
Slide 2
Charterers
Finance
Classification
Newbuilding
Dept.
Owners
Shipyards
Site teams
Vendors
Charterers Requirements
Describe how you will:
-
Shipbuilding is a Process !
Slide 5
Standards
Rules
Corrective action
taken by the Yard
No
Request for
inspection
Check status
Ready
for
inspectio
n?
INspection report +
comments
Computer
database
No
Yes
owners
inspection
Application form
from QC Dept.
Inspectio
n
result
Yes
Technical
Documentation
Manufacturers
manuals
Contract
specification
Previous surveys
comments
Inspection report
Computer
database
The vessel
Top level folder
Not started
In Progress
Accepted
Not Accepted
Activity
Block
Fabrication
File attachments
Comments
File attachments
Activity statistics
Activity list
Project model
breakdown
Coment list
Attached
documents
11
Standards
Rules
Corrective action
taken by the Yard
No
Request for
inspection
Check status
Ready
for
inspectio
n?
INspection report +
comments
Computer
database
No
Yes
owners
inspection
Application form
from QC Dept.
Inspectio
n
result
Yes
Technical
Documentation
Manufacturers
manuals
Contract
specification
Previous surveys
comments
Inspection report
Computer
database
END
12
13
Weekly
Statistics
14
Progress Chart
15
Activity Overview
16
Vendor
Prequalificatio
n
Design
Approval
Building
Delivery
Operation
17
18
19
20
21
22
23
24
25
26
27
Slide 28
Dvidas
www.dnv.com.br
Salvaguardando a vida, a propriedade e o meio ambiente
Slide 29
Slide 29