SAIC NUMBER
SAIC-A-1001
WBS / BI / JO NUMBER
EQUIPMENT ID NUMBER(S)
EQUIPMENT DESCRIPTION
REV. NO.
REFERENCE
A2
Fill Material' shall be used for all fills except where 'Select Fill Material' is
specified. As a minimum, 'Select Fill Material' shall be used within 0.6 m
(2 ft) of the bottom elevation of foundations, spread footings, or slabson-grade when fill is required to achieve final grade. 'Select Fill Material'
shall also be specified for backfill which will be in contact with concrete
or steel structures.
SAES-A-114
Sec. 6.2.1
SAES-A-114
Sec. 6.2
B1
SAES-A-114
Sec. 6.2.2
B2
SAES-A-114
Sec. 6.2.2
Portion passing the #40 sieve -Liquid Limit (LL) shall be between 0 - 35.
B3
SAES-A-114
Sec. 6.2.2
Portion passing the #40 sieve- Plasticity Index (PI) shall be 0 - 12%.
B4
SAES-A-114
Sec. 6.2.2
C1
Note 1:If of lift thickness is less than 75mm, maximum size shall not
exceed of lift thickness.
Page 1 of 3
PLANT NO.
TRAVEL TIME
Fill Materials
SYSTEM ID.
QUANTITY INSP.
CIVIL-
CONTRACTOR / SUBCONTRACTOR
ACCEPTANCE CRITERIA
QR NUMBER
18-May-05
EQPT CODE
ITEM
No.
DATE APPROVED
SAES-A-114
Sec. 6.3.2.10
PASS
FAIL
N/A
RE-INSP DATE
C2
Page 2 of 3
SAES-A-114
Sec. 6.3.2.10
SAIC NUMBER
DATE APPROVED
SAIC-A-1001
WBS / BI / JO NUMBER
ITEM
No.
ACCEPTANCE CRITERIA
REFERENCE
QR NUMBER
18-May-05
CIVIL-
CONTRACTOR / SUBCONTRACTOR
PASS
FAIL
N/A
RE-INSP DATE
SAES-A-114
Sec. 6.3.2.10
REMARKS:
REFERENCE DOCUMENTS:
1- SAES-A-114 -- Excavation and Backfill, 28 April 2004
Contractor / Third-Party
Saudi Aramco
Construction Representative*
PMT Representative
T&I Witnessed
QC Record Reviewed
Work Verified
T&I Witnessed
QC Record Reviewed
Work Verified
T&I Witnessed
QC Record Reviewed
Work Verified
QC Inspector
PID Representative
Performed Inspection
QC Supervisor
Name, Organization,
Initials and Date:
Y = YES
Page 3 of 3
N = NO F = FAILED