Documente Academic
Documente Profesional
Documente Cultură
RAILWAY
Stability Calculation
ABUTMENT - A - 1
Vasai Creek Bridge no. 73
May 5, 2000
RITES
( Railway Design Center )
Rail India Technical and Economics Services Limited
New Delhi
"c" Value
Density of Soil,
Reduced Level of Bottom of 2nd Layer
2nd Layer Height
Corrected S.P.T Value, N'
Corressponding
"c" Value
Density of Soil,
Reduced Level of Bottom of 3rd Layer
3rd Layer Height
Corrected S.P.T Value, N'
Corressponding
"c" Value
Density of Soil,
Reduced Level of Bottom of 4th Layer
4th Layer Height
Corrected S.P.T Value, N'
Corressponding
"c" Value
Density of Soil,
Reduced Level of Bottom of 5th Layer
5th Layer Height
Corrected S.P.T Value, N'
Corressponding
"c" Value
= -15.300 meter
= 2.925 meter
=
7.50
=
=
7.090
0.00
tonne/meter2
Degree
=
0.7
tonne/meter3
= -16.800 meter
= 1.500 meter
= 10.000
=
=
9.454
0.0
tonne/meter2
Degree
=
0.7
tonne/meter3
= -20.350 meter
= 3.550 meter
= 28.17
=
=
26.631 tonne/meter2
0.00 Degree
=
0.7
tonne/meter3
= -26.800 meter
= 6.450 meter
= 34.13
=
=
32.260 tonne/meter2
0.0
Degree
=
0.7
tonne/meter3
= -26.800 meter
= 0.000 meter
=
0.00
=
=
0.00
0.0
tonne/meter2
Degree
0.7
tonne/meter3
50
Reduced levels
Reduced level of Train Wagon Top
Reduced level of Rail Top
Reduced level at Bearing top
Reduced level at Pier cap top
Reduced level at PierCap bottom
Reduced level at Well Cap top
Reduced level at Well Cap bottom
Reduced level of Top of Intermediate Plug
Reduced level of Bottom of Intermediate Plug
Reduced level of Top of Sand filling
Reduced level of Bottom of Sand filling
Reduced level of Top of water filling
Reduced level of Bottom of water filling
Reduced level of Well Curb top
Reduced level of Well Foundation
Reduced level of Bed Level
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
13.952
9.227
5.057
4.697
3.417
3.350
2.150
-12.075
-12.375
-12.375
-24.100
2.150
-12.075
-24.100
-27.400
-0.300
Density of Soil,
meter
meter
meter
meter
meter
meter
meter
meter
meter
meter
meter
meter
meter
meter
meter
meter
= Rectangular
= 0.067 meter
= 6.000 meter
= 4.700 meter
= Rectangular
= 1.280
= 14.800 meter
= 4.700 meter
= Circular - Solid
= 1.200 meter
= 8.000 meter
= Circular - Hollow
= 29.550 meter
= 8.000 meter
= 4.400 meter
EARTH PRESSURE
( As per clause 5.12.6 I.R.S substructure code , page no. 14 )
0.000
Degree
0.000
Degree
0.000
Degree
Cohesion(C)
7.090
t/m3
Submerged Density(gSUB)
0.700
t/m3
Soil Density
1.700
t/m3
0.000
Degree
0.000
Degree
Value Of
F
F
i
=
=
=
=
DEGREE
0.00
0.00
0.00
0.00
0.00
meter
2.925
meter
5.600
meter
RADIAN
0.00
0.00
0.00
0.00
cos2()
Ka=
1.000
Kp=
1.00
=
=
Kaxxh - 2xCxKa1/2
-14.180
-12.133
tonne/meter2
tonne/meter2
when H= 0
=
=
14.180
tonne/meter2
when H= 2.925
16.228
tonne/meter2
Force
Lever Arm
Moment @ Base
-14.18 x 2.925 x 8
0.5 ( -12.133 - -14.18 ) x 2.925 x 8
0.000
0.000
7.063
6.575
0.000
0.000
Force
Lever Arm
Moment @ Base
14.18 x 2.925 x 8
0.5 ( 16.228 - 14.18 ) x 2.925 x 8
331.821
23.956
7.0625
6.575
2343.484
157.509
EARTH PRESSURE
( As per clause 5.12.6 I.R.S substructure code , page no. 14 )
0.000
Degree
0.000
Degree
0.000
Degree
Cohesion(C)
9.454
t/m3
Submerged Density(gSUB)
0.700
t/m3
Soil Density
1.700
t/m3
0.000
Degree
0.000
Degree
Value Of
F
F
i
=
=
=
=
DEGREE
0.00
0.00
0.00
0.00
RADIAN
0.00
0.00
0.00
0.00
2.925
meter
Height of 2 nd Layer
1.500
meter
4.100
meter
cos2()
Ka=
1.000
Kp=
1.00
=
=
Kaxxh - 2xCxKa1/2
-16.860
-15.810
tonne/meter2
tonne/meter2
when H= 2.925
=
=
20.955
tonne/meter2
when H= 1.5
22.005
tonne/meter2
Force
Lever Arm
Moment @ Base
-16.86 x 1.5 x 8
0.5 ( -15.81 - -16.86 ) x 1.5 x 8
0.000
0.000
4.850
4.600
0.000
0.000
Force
Lever Arm
Moment @ Base
20.955 x 1.5 x 8
0.5 ( 22.005 - 20.955 ) x 1.5 x 8
251.456
6.300
4.85
4.600
1219.562
28.980
EARTH PRESSURE
( As per clause 5.12.6 I.R.S substructure code , page no. 14 )
0.000
Degree
0.000
Degree
0.000
Degree
Cohesion(C)
26.631
t/m3
Submerged Density(FSUB)
0.700
t/m3
Soil Density
1.700
t/m3
0.000
Degree
0.000
Degree
Value Of
F
F
i
=
=
=
=
DEGREE
0.00
0.00
0.00
0.00
RADIAN
0.00
0.00
0.00
0.00
4.425
meter
Height of 3 rd Layer
3.550
meter
0.550
meter
cos2()
Ka=
1.000
Kp=
1.00
=
=
Kaxxh - 2xCxKa1/2
-50.164
-47.679
tonne/meter2
tonne/meter2
when H= 4.425
=
=
56.359
tonne/meter2
when H= 3.55
58.844
tonne/meter2
Force
Lever Arm
Moment @ Base
-50.164 x 3.55 x 8
0.5 ( -47.679 - -50.164 ) x 3.55 x 8
0.000
0.000
2.325
1.733
0.000
0.000
Force
Lever Arm
Moment @ Base
56.359 x 3.55 x 8
0.5 ( 58.844 - 56.359 ) x 3.55 x 8
1600.595
35.287
2.325
1.733
3721.384
61.164
EARTH PRESSURE
( As per clause 5.12.6 I.R.S substructure code , page no. 14 )
0.000
Degree
0.000
Degree
0.000
Degree
Cohesion(C)
32.260
t/m3
Submerged Density(FSUB)
0.700
t/m3
Soil Density
1.700
t/m3
0.000
Degree
0.000
Degree
Value Of
F
F
i
=
=
=
=
DEGREE
0.00
0.00
0.00
0.00
RADIAN
0.00
0.00
0.00
0.00
7.975
meter
Height of 4 th Layer
6.450
meter
5.900
meter
cos2()
Ka=
1.000
Kp=
1.00
=
=
Kaxxh - 2xCxKa1/2
-58.938
-54.423
tonne/meter2
tonne/meter2
when H= 7.975
=
=
70.103
tonne/meter2
when H= 6.45
74.618
tonne/meter2
Force
Lever Arm
Moment @ Base
-58.938 x 6.45 x 8
0.5 ( -54.423 - -58.938 ) x 6.45 x 8
0.000
0.000
9.125
8.050
0.000
0.000
Force
Lever Arm
Moment @ Base
70.103 x 6.45 x 8
0.5 ( 74.618 - 70.103 ) x 6.45 x 8
3617.325
116.487
9.125
8.050
33008.093
937.720
EARTH PRESSURE
( As per clause 5.12.6 I.R.S substructure code , page no. 14 )
0.000
Degree
0.000
Degree
0.000
Degree
Cohesion(C)
0.000
t/m3
Submerged Density(FSUB)
0.700
t/m3
Soil Density
1.700
t/m3
0.000
Degree
0.000
Degree
Value Of
F
F
i
=
=
=
=
DEGREE
0.00
0.00
0.00
0.00
RADIAN
0.00
0.00
0.00
0.00
14.425
meter
Height of 5 th Layer
0.000
meter
5.900
meter
cos2()
Ka=
1.000
Kp=
1.00
=
=
Kaxxh - 2xCxKa1/2
10.098
10.098
tonne/meter2
tonne/meter2
when H= 14.425
=
=
10.098
tonne/meter2
when H= 0
10.098
tonne/meter2
Force
Lever Arm
Moment @ Base
10.098 x 0 x 8
0.5 ( 10.098 - 10.098 ) x 0 x 8
0.000
0.000
5.900
5.900
0.000
0.000
Force
Lever Arm
Moment @ Base
10.098 x 0 x
0.5 ( 10.098 - 10.098 ) x 0 x
0.000
0.000
5.900
5.900
0.000
0.000
Force
Moment @ Base
For 1 st Layer
0.000
0.000
For 1
st
Layer
0.000
0.000
For 2
nd
Layer
0.000
0.000
For 2 nd Layer
0.000
0.000
For 3
rd
Layer
0.000
0.000
For 3
rd
Layer
0.000
0.000
For 4
th
Layer
0.000
0.000
For 4 th Layer
0.000
0.000
For 5 Layer
For 5 th Layer
0.000
0.000
0.000
0.000
0.000
0.000
Force
Moment @ Base
For 1 st Layer
331.821
2343.484
For 1 st Layer
23.956
157.509
251.456
1219.562
th
For 2
nd
Layer
For 2
nd
Layer
6.300
28.980
For 3 rd Layer
1600.595
3721.384
For 3 rd Layer
35.287
61.164
For 4 th Layer
3617.325
33008.093
For 4 th Layer
116.487
937.720
For 5 th Layer
0.000
0.000
For 5 th Layer
0.000
0.000
5983.227
41477.896
NET RESISTANCE :IT IS DUE TO NET PASSIVE - ACTIVE RESISTANCE AT BASE OF FOUNDATION
= 41477.896 - 0
=
41477.90
R.Ls(m)
Pier Cap Top Level
4.697
Pier cap
1
1 3.417
Pier
High Tide Level
2.350
well cap
3
Water Filling
Steining
-0.300
Bed Level
Intermediate plug
-12.375
Maximum Scour Level
4
Sand Filling
Dia
8.000
meter
1.85 meter
Inner Diameter
of Well
4.400 meter
Section at 4 - 4
14.800
4.700
meter
4.700
meter
meter
Pier Plan
6.000
4.700
I
II
6.000
Pier
6.000
4.400
0.680 meter
6.000
4.400
69.560
Pier Top , II =
28.200
meter2
meter2
Height =
0.600 meter
Height =
0.680 meter
41.736
Pier Top , II =
32.198
meter3
meter3
73.934
meter3
48.88 meter2
SINKING EFFORT
For Pier, P-3 of Bridge no. 73
Diameter of Well =
Top Reduced Level Of Well =
Bottom /Foundation Reduced Level of Well =
Natural Ground Reduced Level of Well =
Mean Tide Reduced Level =
Depth of Embedment of Well =
Depth of Well =
Height of Well From M.T.L to Found Level =
Thickness of Steining =
Inner Diameter of Well =
8.000
2.150
-27.400
-0.300
-0.100
27.100
29.550
27.300
1.800
4.400
meter
meter
meter
meter
meter
meter
meter
meter
meter
meter
35.06 x
27.1
681 meter2
Steining Thickness
1.800
1.600
1.400
1.200
Area
35.060
32.170
29.028
25.635
Steining Thickness
1.800
1.600
1.400
1.200
Full Buoyant
1.825
1.675
1.511
1.335
50% Buoyant
2.586
2.373
2.141
1.891
Non-Buoyant
3.346
3.071
2.771
2.447
DEAD LOAD
DEAD LOAD OF SUB STRUCTURE :Shape
Units
Outer
Inner Sectional
Unit
Dia
/
Height Volume
Dia /
weight
Area
Breadth
Length
2
3
meter
meter
meter
meter meter
t/m3
Buoyant
Weight 100%
Weight
tonnes
tonnes
Pier Cap
Rectangular
4.70
14.80
48.88
1.280
73.934
2.500
184.835
Pier
Rectangular
4.70
6.00
28.20
0.067
1.889
2.500
4.723
8.00
50.265
1.200
60.319
2.500
150.796
150.796
8.00
4.40
35.06
14.525 509.249
2.500
1273.12
197.213
8.00
4.40
35.06
11.725 411.081
2.500
1027.70
616.621
14.80
4.40
15.21
0.300
4.56
2.400
10.948
6.386
8.10
4.40
18.16
3.300
59.936
2.500
149.839
89.904
8.10
4.40
33.37
3.300
110.113
2.400
264.272
154.159
4.40
15.21
14.23
216.296
1.000
216.296
0.000
4.40
15.21
11.73
178.28
1.700
303.080
124.798
Well Cap
Well Stenning
(Above Scour)
Well Stening
(Below Scour)
Circular Solid
Circular -
Hollow
Circular Hollow
Circular Intermediate Plug
Hollow
Circular Well Curb
Hollow
Circular Bottom Plug
Solid
Circular Water Inside Well
Hollow
Circular Sand Inside Well
Hollow
50.27
1.20
2.50
meter2
meter
tonne/meter3
= 150.796 Tonnes
meter2
meter
tonne/meter3
= 197.213 Tonnes
15.205
0.300
1.400
meter2
meter
tonne/meter3
=
6.386 Tonnes
15.205
11.725
0.700
meter2
meter
tonne/meter3
= 124.798 Tonnes
18.162
3.300
1.500
meter2
meter
tonne/meter3
=
89.904 Tonnes
33.368
3.300
1.400
meter2
meter
tonne/meter3
= 154.159 Tonnes
Total Buoyant Weight of Well upto Foundation Level := Well Cap+Well Stening(below M.T.L)+Well Steining (Above M.T.L)+Intermediate Plug+
Well Curb +Bottom Plug +Sand Inside Well
=
150.796+197.213+616.621+6.386+89.904+154.159+124.798
Tonnes
Buoyant Weight of Well From Scour Level to Foundation Level := Well Steining (Below Scour) + Sand Filling + Well Curb + Bottom Plug
= 616.6208105
=
=
368.86
985.480
985.480
Tonnes
Total Dead Loads (Weight) on Well upto Foundation Level := Super-Structure+Pier Cap+Pier+Well Cap+Well Stenning (Above Scour)+
Well Stening (Below Scour)+Intermediate Plug+Well Curb +Bottom Plug +
Water Inside Well+Sand Inside Well
= 2000+184.835+4.723+1339.877
=
3529.44
3529.4
Tonnes
Dead Loads of Well Below Scour Level := Well Stening (Below Scour)+Well Curb +Bottom Plug +Sand Inside Well
= 1027.701+149.839+264.272+303.08
=
1744.892
Tonnes
1744.9
Tonnes
1000
380
1380.00
One Track
Both Track
One Track
Loaded Length
48.5
48.5
71.75
459.65
919.30
652.19
Reaction on Pier
229.825
459.65
326.095
One Track
Both Track
One Track
0.000
0.000
0.000
2568.706
2568.706
2568.706
2568.706
2568.706
2568.706
4 Longitudinal Loads & Moments, For Non Seismic Case :(Tractive Effort & Braking Forces)
1.0
100.00
Braking Force =
97.23
40.00
78.89
Tractive Effort =
100.00
Braking Force =
135.57
67.79
117.79
5.147
17.522
700.88
1382.35
1187.72877
100.00
Braking Force =
97.23
20.00
39.45
Tractive Effort =
100.00
Braking Force =
135.57
2
(b) When Both Track Loaded , Force on Pier
(40% is taken into account)
100x0.4+97.23x0.4
2
2.0
33.89
58.89
5.147
17.522
2
(b) When Both Track Loaded , Force on Pier
(50% is taken into account)
100x0.5+135.57x0.5
2
The above Forces are assumed to act at top of bearing , R.L.
Lever Arm, From Top of Bearing to Scour Level
5.147+12.375
Moments :One Span Loaded Condition(48.50m),One Track Loaded :-
20x17.522
350.44
691.17
14.800 meter
1.250
2.650
5.300
14.800 meter
1.25
2.65
= 229.825 x 1.25
= 287.281
= 609.03625
= 574.5625
x 1.25
=
120.3375
= 864.15
x 1.25
240.675
Tonne.meter
(2) Moment Due to Dead Load in Longitudinal Direction (See Calculation Below
=
775.00
Tonne.meter
1015.675
14.800 meter
1.250
2.650
5.300
14.800 meter
1.25
2.65
0.00
0.00
0.00
0.00
0.00
x 1.25
=
775.00
0.00
Tonnes
Tonnes
Tonnes
ic Case :-
Tonnes
Tonnes
Tonnes
Tonnes
Tonnes
Tonnes
Tonnes
Tonnes
meter
meter
Tonne.meter
Tonne.meter
Tonne.meter
Tonne.meter
udinal Direction )
mendments.)
Tonnes
Tonnes
Tonnes
Tonnes
Tonnes
Tonnes
Tonnes
Tonnes
meter
meter
Tonne.meter
Tonne.meter
Tonne.meter
Tonne.meter
4.700
Tonne.meter
Tonne.meter
Tonne.meter
Tonne.meter
Tonne.meter
Tonne.meter
gitudinal Direction , M L
Tonne.meter
Tonne.meter
4.700
Tonne.meter
Tonne.meter
Tonne.meter
Tonne.meter
Tonne.meter
Tonne.meter
Tonne.meter
Tonne.meter
1985.422
Tonnes
2189.558
Tonnes
1 (b) One Span Loaded Condition(48.50m),Two Tracks loaded :48.5 - 626.247 = nil + 2189.558
=
2189.558
Tonnes
2 (a) Both Span Loaded Condition(97.0m), One Track Loaded :71.75 - 626.247 = nil + 2189.558
=
2189.558
Tonnes
2 (b) Both Span Loaded Condition(97.0m),Two Tracks Loaded :71.75 - 626.247 = -554.497
= -554.497 + 2189.558
=
1635.061
Tonnes
Diameter Of Well
H, Ht from Well Cap Top to well Found.Level
=
=
8.000
30.750
meter
meter
2189.56 x (8/40+30.75/100)+
2189.56 x (8/40+30.75/100)+
2189.56 x (8/40+30.75/100)+
1635.06 x (8/40+30.75/100)+
LOAD COMBINATIONS
1 Combination - I
Dead-Load + Live-Load + Longitudinal Force + Water Current Forces
2 Combination - II
Combination - I + Wind Forces
5 Combination - IV
Construction Stage
One Span Loaded Condition, 48.50m :(a) When One Track Loaded
(b) When Both Track Loaded
2.0
Both Span Loaded Condition, 97.0m :(a) When One Track Loaded
(b) When Both Track Loaded
Combination - I
Dead-Load + Live-Load + Longitudinal Force + Water Current Forces
CONDITIONS
Longitudinal Direction
Force ( t )
Moment ( t.m )
Transverse Direction
Force ( t )
40.000
700.880
287.281
6.395
52.329
31.973
@ Scour Level
46.395
1040.490
31.973
78.892
1382.346
574.5625
6.395
52.329
31.973
@ Scour Level
85.287
2009.237
31.973
67.785
1187.729
120.3375
6.395
52.329
31.973
@ Scour Level
74.180
1360.395
31.973
117.785
2063.829
1015.675
6.395
52.329
31.973
124.180
3131.832
31.973
@ Scour Level
Cases
V.Loads (t)
Resultant Forces ( t )
2568.706
56.345
1356.725
2568.71
91.083
2026.201
2568.71
80.777
1765.811
2737.91
128.230
3142.743
Combination - I (a)
Dead-Load + Live-Load + Longitudinal Force (Seismic) + Water Current Forces
CONDITIONS
Longitudinal Direction
Force ( t )
Moment ( t.m )
Transverse Direction
Force ( t )
20.000
350.440
287.281
6.395
52.329
31.973
@ Scour Level
26.395
690.050
31.973
39.446
691.173
574.563
6.395
52.329
31.973
@ Scour Level
45.841
1318.064
31.973
33.893
593.864
120.3375
6.395
52.329
31.973
@ Scour Level
40.287
766.531
31.973
58.893
1031.914
1015.675
6.395
52.329
31.973
@ Scour Level
65.287
2099.918
31.973
Cases
V.Loads
Resultant Forces ( t )
2568.706
41.460
1110.969
2568.706
55.889
1343.782
2568.706
51.432
1361.978
2737.907
72.696
2116.155
Combination - II
Dead-Load + Live-Load + Longitudinal Force + Water Current Forces + Wind
CONDITIONS
Longitudinal Direction
Force ( t )
Moment ( t.m )
Transverse Direction
Force ( t )
46.395
1040.490
31.973
35.618
18.006
46.395
1040.490
85.597
@ Scour Level
85.287
2009.237
31.973
35.618
18.006
85.287
2009.237
85.597
@ Scour Level
74.180
1360.395
31.973
35.618
36.011
74.180
1360.395
103.602
@ Scour Level
124.180
3131.832
31.973
35.618
36.011
124.180
3131.832
103.602
@ Scour Level
Cases
V.Loads
Resultant Forces ( t )
2568.706
97.361
2258.321
2568.706
120.833
2446.204
2568.706
127.421
2863.162
2737.907
161.722
3628.409
Combination - III
( Longitudinal Direction )
Dead-Load + Live-Load + Longitudinal Force + Water Current Forces + Seismic (Long. Direction )
CONDITIONS
Longitudinal Direction
Force ( t )
Moment ( t.m )
Transverse Direction
Force ( t )
26.395
690.050
31.973
193.196
2589.695
25.642
140.398
245.232
3420.143
31.973
@ Scour Level
45.841
1318.064
31.973
193.196
2589.695
25.642
140.398
264.678
4048.157
31.973
@ Scour Level
40.287
766.531
31.973
193.196
2589.695
25.642
140.398
259.124
3496.623
31.973
@ Scour Level
65.287
2099.918
31.973
193.196
2589.695
25.642
140.398
284.124
4830.011
31.973
@ Scour Level
Cases
V.Loads
Resultant Forces ( t )
2568.706
247.307
3529.229
2568.706
266.602
4056.603
2568.706
261.089
3673.389
2737.907
285.918
4837.092
Combination - III
( Transverse Direction )
Dead-Load + Live-Load + Longitudinal Force + Water Current Forces + Seismic (Trans. Direction )
CONDITIONS
Longitudinal Direction
Force ( t )
Moment ( t.m )
Transverse Direction
Force ( t )
26.395
690.050
31.973
193.196
6.895
25.642
26.395
690.050
257.705
@ Scour Level
45.841
1318.064
31.973
193.196
13.790
25.642
45.841
1318.064
264.600
@ Scour Level
40.287
766.531
31.973
193.196
9.783
25.642
40.287
766.531
260.593
@ Scour Level
65.287
2099.918
31.973
193.196
19.566
25.642
65.287
2099.918
270.376
@ Scour Level
Cases
V.Loads
Resultant Forces ( t )
2568.706
259.053
3830.734
2568.706
268.541
3577.957
2568.706
263.689
4164.418
2737.907
278.146
4052.924
Combination - IV
( Construction Stage )
CONDITIONS
Longitudinal Direction
Force ( t )
Transverse Direction
Moment ( t.m )
Force ( t )
375.000
6.395
52.329
31.973
6.395
427.329
31.973
@ Scour Level
750.000
6.395
52.329
31.973
6.395
802.329
31.973
@ Scour Level
6.395
52.329
31.973
6.395
52.329
31.973
@ Scour Level
375.000
6.395
52.329
31.973
6.395
427.329
31.973
@ Scour Level
Cases
V.Loads
Resultant Forces ( t )
2589.456
32.606
1929.557
2610.206
32.606
843.913
2610.206
32.606
3502.034
32.606
1929.557
V.Loads (t)
Resultant Forces ( t )
COMBINATION - I
Combination - I - (a)
2568.706
56.345
1356.725
Combination - I - (b)
2568.706
91.083
2026.201
Combination - I - (c)
2568.706
80.777
1765.811
Combination - I - (d)
2737.907
128.230
3142.743
COMBINATION - II
Combination - II - (a)
2568.706
97.361
2258.321
Combination - II - (b)
2568.706
120.833
2446.204
Combination - II - (c)
2568.706
127.421
2863.162
Combination - II - (d)
2737.907
161.722
3628.409
2568.706
247.307
3529.229
2568.706
266.602
4056.603
2568.706
261.089
3673.389
2737.907
285.918
4837.092
2568.706
259.053
3830.734
2568.706
268.541
3577.957
2568.706
263.689
4164.418
2737.907
278.146
4052.924
2589.456
32.606
1929.557
Combination - IV - (b)
2610.206
32.606
843.913
2610.206
32.606
3502.034
Combination - IV - (d)
2630.956
32.606
1929.557
Longitudinal Direction
Force ( t )
Moment ( t.m )
Transverse Direction
Force ( t )
46.395
1040.490
31.973
Combination - I - (b)
85.287
2009.237
31.973
Combination - I - (c)
74.180
1360.395
31.973
Combination - I - (d)
124.180
3131.832
31.973
COMBINATION - II
Combination - II - (a)
46.395
1040.490
85.597
Combination - II - (b)
85.287
2009.237
85.597
Combination - II - (c)
74.180
1360.395
103.602
Combination - II - (d)
124.180
3131.832
103.602
245.232
3420.143
31.973
264.678
4048.157
31.973
259.124
3496.623
31.973
284.124
4830.011
31.973
26.395
690.050
257.705
45.841
1318.064
264.600
40.287
766.531
260.593
65.287
2099.918
270.376
6.395
427.329
31.973
Combination - IV - (b)
6.395
1318.064
31.973
Combination - IV - (c)
6.395
52.329
31.973
Combination - IV - (d)
6.395
427.329
31.973
Current Forces
be Considered as :-
Current Forces
Transverse Direction
Moment ( t.m )
609.036
261.643
870.679
0
261.643
261.643
864.15
261.643
1125.795
0
261.643
261.643
1356.725
2026.201
1765.811
3142.743
1110.969
1343.782
1361.978
2116.155
2258.321
2446.204
2863.162
3628.409
al Direction )
3529.229
4056.603
3673.389
4837.092
3830.734
3577.957
4164.418
4052.924
Transverse Direction
Moment ( t.m )
1620.000
261.643
1881.643
261.643
261.643
3240.000
261.643
3501.643
1620.000
261.643
1881.643
1929.557
843.913
3502.034
1929.557
@ Scour Level
Resultant Moment (t.m)
1356.725
2026.201
1765.811
3142.743
2258.321
2446.204
2863.162
3628.409
udinal
3529.229
4056.603
3673.389
4837.092
erse
3830.734
3577.957
4164.418
4052.924
on Stage
1929.557
843.913
3502.034
1929.557
@ Scour Level
Transverse Direction
Moment ( t.m )
udinal
870.679
261.643
1125.795
261.643
3768.070
3326.331
4093.264
3466.488
1881.643
261.643
3501.643
1881.643
Ka
1.0
p =
. h . Ka - 2 .c . ( Ka )1/2
p =
. h - 2 .c
=
h=
-12.375 meter
0.0 meter
c=
=
At Scour Level =
7.1 Tonne/meter2
0.7 Tonne/meter3
p =
. h - 2 .c
p =
0.7x0
p =
h=
c=
=
p =
p =
p=
h=
2 x 7.
-14.18 Tonne/meter2
2.925 meter
7.1 Tonne/meter2
0.7 Tonne/meter3
. h - 2 .c
0.7x2.925 -
2 x 7.09018718094158
-12.133 Tonne/meter2
2.925 meter
c=
9.45 Tonne/meter2
0.7 Tonne/meter3
p =
p =
At Top of 2nd Layer
p=
h=
c=
=
p =
p =
Degree
p=
. h - 2 .c
0.7x2.925 -
2 x 9.4535829079221
-16.860 Tonne/meter2
1.5 meter
9.45 Tonne/meter2
0.70 Tonne/meter3
. h - 2 .c
0.7x1.5 - 2 x 9.4535829079221
-15.810 Tonne/meter2
h=
c=
=
p =
p =
p=
h=
1.5 meter
26.63 Tonne/meter2
0.70 Tonne/meter3
. h - 2 .c
0.7x1.5 - 2 x 26.6307430516166
-50.164 Tonne/meter2
3.55 meter
c=
26.63 Tonne/meter2
0.70 Tonne/meter3
p =
p =
At Bottom of 3rd Layer
p=
h=
c=
=
p =
p =
. h - 2 .c
0.7x3.55 -
2 x 26.63
-47.679 Tonne/meter2
3.55 meter
32.2604 Tonne/meter2
0.7 Tonne/meter3
. h - 2 .c
0.7x3.55 -
2 x 32.26
p=
h=
6.450 meter
c=
=
32.26 Tonne/meter2
p =
p =
At Bottom of 4th Layer
At Top of 5th layer
p=
p
=
h=
c=
=
=
p =
p =
-57.503 Tonne/meter2
0.7 Tonne/meter3
. h - 2 .c
0.7x6.45 -
2 x 32.26
-52.988 Tonne/meter2
#REF!
-27.400 meter
0.600 meter
0 Tonne/meter2
0.7 Tonne/meter3
#REF!
. h .ka - 2 .c.ka1/2
#REF!
From above it can be noted that active pressure diagram would be negative
and hence active pressure would be zero.
Kp
1.0
p =
. h . Kp + 2 .c . ( Kp )1/2
p =
. h + 2 .c
RL =
h=
c=
=
At Scour Level =
p =
0.7x0 +
p =
h=
p=
h=
2 x 7.09
14.18 Tonne/meter2
2.925 meter
7.1 Tonne/meter2
0.7 Tonne/meter3
.h + 2.c
0.7x2.925 +
2 x 7.09
16.228 Tonne/meter2
2.925 meter
c=
9.45 Tonne/meter2
0.7 Tonne/meter3
p =
p =
p=
h=
c=
=
p =
p =
0.7 Tonne/meter3
.h + 2.c
p =
p =
7.1 Tonne/meter2
p =
c=
=
-12.375 meter
0.0 meter
p=
.h + 2.c
0.7x2.925 +
2 x 9.45
20.955 Tonne/meter2
1.5 meter
9.45 Tonne/meter2
0.70 Tonne/meter3
.h + 2.c
0.7x1.5 + 2 x 9.454
22.005 Tonne/meter2
h=
c=
=
p =
p =
p=
h=
1.5 meter
26.63 Tonne/meter2
0.70 Tonne/meter3
.h + 2.c
0.7x1.5 + 2 x 26.63
56.359 Tonne/meter2
3.55 meter
c=
26.63 Tonne/meter2
0.70 Tonne/meter3
p =
p =
.h + 2.c
0.7x3.55 + 2 x 26.63
p=
58.844 Tonne/meter2
h=
3.55 meter
c=
=
32.26035 Tonne/meter2
p =
p =
.h + 2.c
0.7x3.55 + 2 x 32.26
p=
70.103 Tonne/meter2
0.7 Tonne/meter3
h=
6.450 meter
c=
=
32.26 Tonne/meter2
p =
p =
.h + 2.c
0.7x6.45 + 2 x 32.26
p=
74.618 Tonne/meter2
0.7 Tonne/meter3
#REF! t/m2
-26.800 Meter
h=
0.600 meter
c=
0 Tonne/meter2
=
=
p =
p =
0.7 Tonne/meter3
#REF!
.h + 2.c
0.7x0.599999999999998 +
p=
#REF! Tonne/meter
-12.375 m
t/m2
14.2
1st Layer
c =
-15.300 m
16.228
20.955
c =
Reduced Level =
2nd Layer
-16.800 m
ht.= 3.55
3rd Layer
Reduced Level =
7.1 t/m2
9.45 t/m2
22.005
56.359
-20.350 m
c =
26.63 t/m2
c =
32.26 t/m2
58.844
70.103
ht.= 6.5
Reduced Level
4th Layer
-26.800 m
74.618
#REF!
ht.= 0.000
c=
0.0 t/m2
5th Layer
Reduced Level =
-26.800 m
#REF!
Force
Lever Arm
Moment @ Base
Tonnes
331.821
23.956
251.456
6.300
676.308
35.287
3617.325
116.487
meter
13.563
13.075
11.350
11.100
8.825
8.233
3.225
2.150
Tonne.meter
4500.319
313.221
2854.025
69.930
5968.417
290.530
11665.874
250.447
#REF!
#REF!
0.000
0.000
#REF!
#REF!
#REF! Tonnes
50 % Mobilisation
#REF! Tonnes
#REF! Tonne.meter
#REF! Tonne.meter
Coefficients of Active & Passive Earth Pressure, I.e. K a & Kp :Angle of Internal Friction(
0.000
1 - Sin
Degree
Ka
1 + Sin
Ka
1 - Sin 0
1 + Sin 0
Ka
1.00
Kp
1 + Sin
Kp
1 + Sin 0
1 - Sin 0
Kp
1.00
-27.400
meter )
V.Loads
(t)
15.025
Longitudinal Direction
Moment (t.m)
Force ( t )
Moment (t.m)
46.395
1040.490
31.973
870.679
697.078
480.390
1416.460
1416.460
46.395
3154.027
31.973
2767.529
z @ Scour Level
Transfer to Base
Tilt & Shift
Buy. Wt. Of Well Below Scour 985.480
3554.186
z @ Base Level
`
=
=
56.345
4196.08
Tonnes
Tonne.meter
=
=
2568.706+985.48
3554.19 Tonnes
= 20738.95 Tonnes
0.00
Tonne.meter
Eccentricity, e = M / P
Diameter of Well at Base
=
=
0.00
8.10
meter
meter
=
=
Transverse Direction
Force ( t )
2568.706
Resultant Forces
Resultant Moments
meter
211.305
51.530
m4
m2
= P/A + MNRxY/I
= 68.97
tonne/meter2
= P/A - MNRxY/I
= 68.97
tonne/meter2
-27.400
meter )
V.Loads
(t)
15.025
Longitudinal Direction
meter
Transverse Direction
Force ( t )
Moment (t.m)
Force ( t )
Moment (t.m)
2568.706
F @ Scour Level
Transfer to Base
Tilt & Shift
Buy. Wt. Of Well Below Scour 985.480
3554.186
F @ Base Level
85.287
2009.237
31.973
261.643
1281.430
480.390
1416.460
1416.460
85.287
4707.127
31.973
2158.492
Resultant Forces
Resultant Moments
=
=
91.083
5178.43
=
=
2568.706+985.48
3554.19 Tonnes
Tonnes
Tonne.meter
= 20738.95 Tonnes
0.00
Tonne.meter
Eccentricity, e = M / P
Diameter of Well at Base
=
=
0.00
8.100
meter
meter
=
=
211.305
51.530
m4
m2
= P/A + MNRxY/I
tonne/meter2
= 68.97
= P/A - MNRxY/I
tonne/meter2
= 68.97
-27.400
meter )
V.Loads
(t)
15.025
Longitudinal Direction
meter
Transverse Direction
Force ( t )
Moment (t.m)
Force ( t )
Moment (t.m)
2568.706
F @ Scour Level
Transfer to Base
Tilt & Shift
Buy. Wt. Of Well Below Scour 985.480
3554.186
F @ Base Level
74.180
1360.395
31.973
1125.795
1114.548
480.390
1416.460
1416.460
74.180
3891.402
31.973
3022.644
Resultant Forces
Resultant Moments
=
=
80.777
4927.41
=
=
2568.706+985.48
4174.98 Tonnes
Tonnes
Tonne.meter
= 20738.95 Tonnes
0.00
Tonne.meter
Eccentricity, e = M / P
Diameter of Well at Base
=
=
0.00
8.10
meter
meter
=
=
211.305
51.530
m4
m2
= P/A + MNRxY/I
tonne/meter2
= 81.02
= P/A - MNRxY/I
tonne/meter2
= 81.02
-27.400
meter )
V.Loads
(t)
15.025
Longitudinal Direction
meter
Transverse Direction
Force ( t )
Moment (t.m)
Force ( t )
Moment (t.m)
2737.907
F @ Scour Level
Transfer to Base
Tilt & Shift
Buy. Wt. Of Well Below Scour 985.480
3723.387
F @ Base Level
124.180
3131.832
31.973
261.643
1865.798
480.390
1440.311
1440.311
124.180
6437.941
31.973
2182.344
Resultant Forces
Resultant Moments
=
=
128.230
6797.77
=
=
2737.907+985.48
3620.48 Tonnes
Tonnes
Tonne.meter
= 20738.95 Tonnes
0.00
Tonne.meter
Eccentricity, e = M / P
Diameter of Well at Base
=
=
0.00
8.100
meter
meter
=
=
211.305
51.530
m4
m2
= P/A + MNRxY/I
tonne/meter2
= 81.02
= P/A - MNRxY/I
tonne/meter2
= 81.02
-27.400
meter )
15.025
Longitudinal Direction
meter
Transverse Direction
V.Loads
(t)
Force ( t )
Moment (t.m)
Force ( t )
Moment (t.m)
F @ Scour Level
Transfer to Base
Tilt & Shift
Buy. Wt. Of Well Below Scour
F @ Base Level
2568.706
46.395
1040.490
85.597
2004.344
697.078
1286.091
1416.460
3554.186
46.395
3154.027
85.597
4706.894
=
=
97.361
5665.93
Total Load, P
=
=
2568.706+985.48
3554.19 Tonnes
20738.95 Tonnes
Resultant Forces
Resultant Moments
Tonnes
Tonne.meter
Loads :-
0.00
Tonne.meter
=
=
0.00
8.100
meter
meter
1416.460
985.480
=
=
211.305
51.530
m4
m2
=
=
P/A + MNRxY/I
68.97
tonne/meter2
=
=
P/A - MNRxY/I
68.97
tonne/meter2
-27.400
meter )
15.025
Longitudinal Direction
meter
Transverse Direction
V.Loads
(t)
Force ( t )
Moment (t.m)
Force ( t )
Moment (t.m)
F @ Scour Level
Transfer to Base
Tilt & Shift
Buy. Wt. Of Well Below Scour
F @ Base Level
2568.706
85.287
2009.237
85.597
1395.308
1281.430
1286.091
1416.460
3554.186
85.287
4707.127
85.597
4097.858
=
=
120.833
6240.95
Total Load, P
=
=
2568.706+985.48
3554.19 Tonnes
20738.95 Tonnes
Resultant Forces
Resultant Moments
Tonnes
Tonne.meter
Loads :-
0.00
Tonne.meter
=
=
0.00
8.100
meter
meter
1416.460
985.480
=
=
211.305
51.530
m4
m2
=
=
P/A + MNRxY/I
tonne/meter2
68.97
=
=
P/A - MNRxY/I
tonne/meter2
68.97
-27.400
meter )
15.025
Longitudinal Direction
meter
Transverse Direction
V.Loads
(t)
Force ( t )
Moment (t.m)
Force ( t )
Moment (t.m)
F @ Scour Level
Transfer to Base
Tilt & Shift
Buy. Wt. Of Well Below Scour
F @ Base Level
2568.706
74.180
1360.395
103.602
2519.329
1114.548
1556.625
1416.460
3554.186
74.180
3891.402
103.602
5492.414
=
=
127.421
6731.24
Total Load, P
=
=
2568.706+985.48
3554.19 Tonnes
20738.95 Tonnes
Resultant Forces
Resultant Moments
Tonnes
Tonne.meter
Loads :-
0.00
Tonne.meter
=
=
0.00
8.100
meter
meter
1416.460
985.480
=
=
211.305
51.530
m4
m2
=
=
P/A + MNRxY/I
tonne/meter2
68.97
=
=
P/A - MNRxY/I
tonne/meter2
68.97
-27.400
meter )
15.025
Longitudinal Direction
meter
Transverse Direction
V.Loads
(t)
Force ( t )
Moment (t.m)
Force ( t )
Moment (t.m)
F @ Scour Level
Transfer to Base
Tilt & Shift
Buy. Wt. Of Well Below Scour
F @ Base Level
2737.91
124.180
3131.832
103.602
1832.205
1865.798
1556.625
1440.311
3723.39
124.180
6437.941
103.602
4829.141
=
=
161.722
8047.84
Total Load, P
=
=
2737.907+985.48
3620.48 Tonnes
20738.95 Tonnes
Resultant Forces
Resultant Moments
Tonnes
Tonne.meter
Loads :-
0.00
Tonne.meter
=
=
0.00
8.100
meter
meter
1440.311
985.48
=
=
211.305
51.530
m4
m2
=
=
P/A + MNRxY/I
tonne/meter2
70.26
=
=
P/A - MNRxY/I
tonne/meter2
70.26
-27.400
meter )
15.025
Longitudinal Direction
meter
Transverse Direction
V.Loads
(t)
Force ( t )
Moment (t.m)
Force ( t )
Moment (t.m)
F @ Scour Level
Transfer to Base
Tilt & Shift
Buy. Wt. Of Well Below Scour
F @ Base Level
2568.706
245.232
3420.143
31.973
870.679
3684.609
480.390
1416.460
1416.460
3554.186
245.232
8521.211
31.973
2767.529
=
=
247.307
8959.37
Total Load, P
=
=
2568.706+985.48
3554.19 Tonnes
20738.95 Tonnes
Resultant Forces
Resultant Moments
985.480
Tonnes
Tonne.meter
Loads :-
0.00
Tonne.meter
=
=
0.00
8.100
meter
meter
=
=
211.305
51.530
m4
m2
=
=
P/A + MNRxY/I
68.97
tonne/meter2
=
=
P/A - MNRxY/I
68.97
tonne/meter2
-27.400
meter )
15.025
Longitudinal Direction
meter
Transverse Direction
V.Loads
(t)
Force ( t )
Moment (t.m)
Force ( t )
Moment (t.m)
F @ Scour Level
Transfer to Base
Tilt & Shift
Buy. Wt. Of Well Below Scour
F @ Base Level
2568.706
264.678
4048.157
31.973
261.643
3976.785
480.390
1416.460
1416.460
3554.186
264.678
9441.401
31.973
2158.492
=
=
266.602
9685.00
Total Load, P
=
=
2568.706+985.48
3554.186 Tonnes
20738.95 Tonnes
Resultant Forces
Resultant Moments
985.480
Tonnes
Tonne.meter
Loads :-
0.00
Tonne.meter
=
=
0.00
8.100
meter
meter
=
=
211.305
51.530
m4
m2
=
=
P/A + MNRxY/I
tonne/meter2
68.97
=
=
P/A - MNRxY/I
tonne/meter2
68.97
-27.400
meter )
15.025
Longitudinal Direction
meter
Transverse Direction
V.Loads
(t)
Force ( t )
Moment (t.m)
Force ( t )
Moment (t.m)
F @ Scour Level
Transfer to Base
Tilt & Shift
Buy. Wt. Of Well Below Scour
F @ Base Level
2568.706
259.124
3496.623
31.973
1125.795
3893.344
480.390
1416.460
1416.460
3554.186
259.124
8806.427
31.973
3022.644
=
=
261.089
9310.72
Total Load, P
=
=
2568.706+985.48
3554.186 Tonnes
20738.95 Tonnes
Resultant Forces
Resultant Moments
985.480
Tonnes
Tonne.meter
Loads :-
0.00
Tonne.meter
=
=
5.84
8.100
meter
meter
=
=
211.305
51.530
m4
m2
=
=
P/A + MNRxY/I
tonne/meter2
68.97
=
=
P/A - MNRxY/I
tonne/meter2
68.97
-27.400
meter )
15.025
Longitudinal Direction
meter
Transverse Direction
V.Loads
(t)
Force ( t )
Moment (t.m)
Force ( t )
Moment (t.m)
F @ Scour Level
Transfer to Base
Tilt & Shift
Buy. Wt. Of Well Below Scour
F @ Base Level
2737.907
284.124
4830.011
31.973
261.643
4268.969
480.390
1440.311
1440.311
284.124
10539.291
31.973
2182.344
Resultant Forces
Resultant Moments
985.480
3723.387
=
=
285.918 Tonnes
10762.87 Tonne.meter
Total Load, P
=
=
2737.907+985.48
3723.387 Tonnes
20738.95 Tonnes
Loads :-
0.00
Tonne.meter
=
=
0.00
8.100
meter
meter
=
=
211.305
51.530
m4
m2
=
=
P/A + MNRxY/I
tonne/meter2
72.26
=
=
P/A - MNRxY/I
tonne/meter2
72.26
-27.400
meter )
V.Loads
(t)
15.025
Longitudinal Direction
meter
Transverse Direction
Force ( t )
Moment (t.m)
Force ( t )
Moment (t.m)
F @ Scour Level
Transfer to Base
Tilt & Shift
Buy. Wt. Of Well Below Scour 985.480
3554.186
F @ Base Level
26.395
690.050
257.705
3768.070
396.578
3872.014
1416.460
26.395
2503.087
257.705
9056.544
Resultant Forces
Resultant Moments
=
=
259.053
9396.09
Total Load, P
=
=
2568.706+985.48
3554.186 Tonnes
20738.95 Tonnes
0.00
Tonne.meter
Eccentricity, e = M / P
Diameter of Well at Base
=
=
0.00
8.100
meter
meter
2568.706
Tonnes
Tonne.meter
Loads :-
=
=
211.305
51.530
m4
m2
=
=
P/A + MNRxY/I
68.97
tonne/meter2
=
=
P/A - MNRxY/I
68.97
tonne/meter2
1416.460
-27.400
meter )
V.Loads
(t)
15.025
Longitudinal Direction
meter
Transverse Direction
Force ( t )
Moment (t.m)
Force ( t )
Moment (t.m)
2568.706
F @ Scour Level
Transfer to Base
Tilt & Shift
Buy. Wt. Of Well Below Scour 985.480
3554.186
F @ Base Level
45.841
1318.064
264.600
3326.331
688.754
3975.608
1416.460
45.841
3423.278
264.600
8718.399
Resultant Forces
Resultant Moments
=
=
268.541
9366.39
Total Load, P
=
=
2568.706+985.48
3554.19 Tonnes
20738.95 Tonnes
0.00
Tonne.meter
Eccentricity, e = M / P
Diameter of Well at Base
=
=
0.00
8.100
meter
meter
Tonnes
Tonne.meter
Loads :-
=
=
211.305
51.530
m4
m2
=
=
P/A + MNRxY/I
tonne/meter2
68.97
=
=
P/A - MNRxY/I
tonne/meter2
68.97
1416.460
-27.400
meter )
V.Loads
(t)
15.025
Longitudinal Direction
meter
Transverse Direction
Force ( t )
Moment (t.m)
Force ( t )
Moment (t.m)
2568.706
F @ Scour Level
Transfer to Base
Tilt & Shift
Buy. Wt. Of Well Below Scour 985.480
3554.186
F @ Base Level
40.287
766.531
260.593
4093.264
605.313
3915.408
1416.460
40.287
2788.303
260.593
9425.131
Resultant Forces
Resultant Moments
=
=
263.689
9828.92
Total Load, P
=
=
2568.706+985.48
3554.186 Tonnes
20738.95 Tonnes
0.00
Tonne.meter
Eccentricity, e = M / P
Diameter of Well at Base
=
=
0.00
8.100
meter
meter
Tonnes
Tonne.meter
Loads :-
=
=
211.305
51.530
m4
m2
=
=
P/A + MNRxY/I
68.973 tonne/meter2
=
=
P/A - MNRxY/I
68.973 tonne/meter2
1416.460
-27.400
meter )
15.025
Longitudinal Direction
meter
Transverse Direction
V.Loads
(t)
Force ( t )
Moment (t.m)
Force ( t )
Moment (t.m)
F @ Scour Level
Transfer to Base
Tilt & Shift
Buy. Wt. Of Well Below Scour
F @ Base Level
2737.91
65.287
65.287
65.287
65.287
980.938
980.938
1440.311
1440.311
3723.39
65.287
2486.536
65.287
2486.536
=
=
92.330
3516.49
Total Load, P
=
=
2737.907+985.48
3620.48 Tonnes
20738.95 Tonnes
0.00
Tonne.meter
Eccentricity, e = M / P
Diameter of Well at Base
=
=
0.00
8.100
meter
meter
Resultant Forces
Resultant Moments
985.480
Tonnes
Tonne.meter
Loads :-
=
=
211.305
51.530
m4
m2
=
=
P/A + MNRxY/I
tonne/meter2
70.26
=
=
P/A - MNRxY/I
tonne/meter2
70.26
-27.400
meter )
15.025
Longitudinal Direction
meter
Transverse Direction
V.Loads
(t)
Force ( t )
Moment (t.m)
Force ( t )
Moment (t.m)
F @ Scour Level
Transfer to Base
Tilt & Shift
Buy. Wt. Of Well Below Scour
F @ Base Level
2589.456
6.395
427.329
31.973
1881.643
96.078
480.390
1416.460
1416.460
6.395
1939.866
31.973
3778.492
Resultant Forces
Resultant Moments
985.480
3574.936
=
=
32.606 Tonnes
4247.362 Tonne.meter
Total Load, P
=
=
2589.456+985.48
3574.94 Tonnes
Loads :-
20738.948 Tonnes
0.00
Tonne.meter
=
=
0.00
8.100
meter
meter
=
=
211.305
51.530
m4
m2
=
=
P/A + MNRxY/I
69.376
tonne/meter2
=
=
P/A - MNRxY/I
69.376
tonne/meter2
-27.400
meter )
15.025
Longitudinal Direction
meter
Transverse Direction
V.Loads
(t)
Force ( t )
Moment (t.m)
Force ( t )
Moment (t.m)
F @ Scour Level
Transfer to Base
Tilt & Shift
Buy. Wt. Of Well Below Scour
F @ Base Level
2610.206
6.395
802.329
31.973
261.643
96.078
480.390
1416.460
1416.460
3595.686
6.395
2314.866
31.973
2158.492
=
=
32.606
3165.07
Total Load, P
=
=
2610.206+985.48
3595.69 Tonnes
20738.95 Tonnes
Resultant Forces
Resultant Moments
985.480
Tonnes
Tonne.meter
Loads :-
0.00
Tonne.meter
=
=
0.00
8.100
meter
meter
=
=
211.305
51.530
m4
m2
=
=
P/A + MNRxY/I
69.779 tonne/meter2
=
=
P/A - MNRxY/I
69.779 tonne/meter2
-27.400
meter )
15.025
Longitudinal Direction
meter
Transverse Direction
V.Loads
(t)
Force ( t )
Moment (t.m)
Force ( t )
Moment (t.m)
F @ Scour Level
Transfer to Base
Tilt & Shift
Buy. Wt. Of Well Below Scour
F @ Base Level
2610.206
6.395
52.329
31.973
3501.643
96.078
480.390
1416.460
1416.460
3595.686
6.395
1564.866
31.973
5398.492
=
=
32.606
5620.72
Total Load, P
=
=
2610.206+985.48
3595.69 Tonnes
20738.95 Tonnes
Resultant Forces
Resultant Moments
985.480
Tonnes
Tonne.meter
Loads :-
0.00
Tonne.meter
=
=
0.00
8.100
meter
meter
=
=
211.305
51.530
m4
m2
=
=
P/A + MNRxY/I
69.779 tonne/meter2
=
=
P/A - MNRxY/I
69.779 tonne/meter2
-27.400
meter )
15.025
Longitudinal Direction
meter
Transverse Direction
V.Loads
(t)
Force ( t )
Moment (t.m)
Force ( t )
Moment (t.m)
F @ Scour Level
Transfer to Base
Tilt & Shift
Buy. Wt. Of Well Below Scour
F @ Base Level
2630.956
6.395
427.329
31.973
1881.643
96.078
480.390
1440.311
1440.311
6.395
1963.717
31.973
3802.344
Resultant Forces
Resultant Moments
985.480
3616.436
=
=
32.606 Tonnes
4279.487 Tonne.meter
Total Load, P
=
=
2630.956+985.48
3616.436 Tonnes
20738.948 Tonnes
Loads :-
0.00
Tonne.meter
=
=
0.00
8.100
meter
meter
=
=
211.305
51.530
m4
m2
=
=
P/A + MNRxY/I
tonne/meter2
70.181
=
=
P/A - MNRxY/I
tonne/meter2
70.181
@ Foundation Level
Cases
Combination - I - (a)
68.973
68.973
Combination - I - (b)
68.973
68.973
Combination - I - (c)
81.020
81.020
Combination - I - (d)
81.020
81.020
Combination - II - (a)
68.973
68.973
Combination - II - (b)
68.973
68.973
Combination - II - (c)
68.973
68.973
Combination - II - (d)
70.260
70.260
68.973
68.973
68.973
68.973
68.973
68.973
72.257
72.257
68.973
68.973
68.973
68.973
68.973
68.973
70.260
70.260
Combination - IV - (a)
69.376
69.376
Combination - IV - (b)
69.779
69.779
Combination - IV - (c)
69.779
69.779
COMBINATION - I
COMBINATION - II
Combination - IV - (d)
70.181
70.181
meter
8.100
3723.387 Tonnes
0.000 Tonne.meter
= 3723.387 x 8.1 / 2
0.00
=
#DIV/0!
#DIV/0!
20738.948 / 285.918
= 72.53
SAFE
+ 16 ( 100 + N2 ) x Df
x D
Df =
0.7
Df =
10.5175
15.025
So
2
2
Q = 5.4 x N x B + 16 ( 100 + N ) x Df
Q = (5.4x32.5x32.5x8.1) + 16(100+32.5x32.5)x10.5175
Q = 240774.125 Kg / m2
Q=
240.774
tonnes / m3
320.230
tonnes / m3
REDISTRIBUTION -2
For Critical Loading Condition I.e. Combination - III - (c) - T
Combination - III (Longitudinal Direction)
Dead-Load + Live-Load + Longitudinal Force + Water Current Forces +
Seismic Force (Transverse Direction)
Diameter of Well at Base =
Ecentericity(e) =
e/df
=
8.100
0.000
e/df
0.000
0.025
0.050
0.075
0.100
0.125
0.15
0.175
0.2
0.225
0.25
0.275
0.294
0.3
0.325
0.35
0.375
0.4
C1
1.00
1.00
1.00
1.00
1.00
1.00
0.91
0.83
0.755
0.685
0.615
0.55
0.5
0.485
0.42
0.36
0.295
0.235
C2
1
1.2
1.4
1.6
1.8
2
2.23
2.48
2.76
3.11
3.55
4.15
4.69
4.96
6
7.48
9.93
13.87
0.425
0.45
0.475
0.5
0.175
0.12
0.06
0
21.08
38.25
96.1
0.000
0.000
0.025
1.00
1.00
1.00
1.00
1.00
1.20
C1=
C2=
Q=P/A
meter
meter
0.000
C1xDF
1.00
1.00
modified pressure(QP)=C2xQ
C1xDf
Df-C1xDf
Length above the centre line
angle
Redistrebuted area
Redistributed area as % of total area
Remaining % area
72.26
=
=
=
=
=
=
=
=
72.26
8.10
0.00
4.05
0.000
51.53
100.00
0.00
t/m2
t/m2 (OK)
meter
meter
metre
meter2
(OK)
REDISTRIBUTION -1
For Critical Loading Condition I.e. Combination - III - (d) - L
Combination - III (Longitudinal Direction)
Dead-Load + Live-Load + Longitudinal Force + Water Current Forces +
Seismic Force (Longitudinal Direction)
Diameter of Well at Base =
Ecentericity(e =
e/df
=
8.100
0.000
e/df
0.000
0.025
0.050
0.075
0.100
0.125
0.15
0.175
0.2
0.225
0.25
0.275
0.294
0.3
0.325
0.35
0.375
0.4
C1
1.00
1.00
1.00
1.00
1.00
1.00
0.91
0.83
0.755
0.685
0.615
0.55
0.5
0.485
0.42
0.36
0.295
0.235
C2
1
1.2
1.4
1.6
1.8
2
2.23
2.48
2.76
3.11
3.55
4.15
4.69
4.96
6
7.48
9.93
13.87
0.425
0.45
0.475
0.5
0.175
0.12
0.06
0
21.08
38.25
96.1
0.000
0.000
0.025
1.00
1.00
1.00
1.00
1.00
1.20
C1=
C2=
Q=P/A
meter
meter
0.000
C1xDF
1.00
1.00
modified pressure(QP)=C2xQ
C1xDf
Df-C1xDf
Length above the centre line
angle
Redistrebuted area
Redistributed area as % of total area
72.26
t/m2
=
=
=
=
=
=
=
72.26
8.10
0.00
4.05
0.000
51.53
100.00
t/m2
meter
meter
metre
meter2
(OK)
Remaining % area
0.00
(OK)