WESTERN

RAILWAY

Stability Calculation
ABUTMENT - A - 1
Vasai Creek Bridge no. 73

May 5, 2000

RITES
( Railway Design Center )
Rail India Technical and Economics Services Limited

New Delhi

INPUT DATA SHEET FOR ABUTMENT A - 1


Geo -Technical Data
Number Of Soil Layers
Strata Being Predominantly Sandy & Clayey, so, it is c & Soil
Reduced Level of Bottom of 1st Layer
Ist Layer Height
Corrected S.P.T Value, N'
Corressponding

"c" Value

Density of Soil,
Reduced Level of Bottom of 2nd Layer
2nd Layer Height
Corrected S.P.T Value, N'
Corressponding

"c" Value

Density of Soil,
Reduced Level of Bottom of 3rd Layer
3rd Layer Height
Corrected S.P.T Value, N'
Corressponding

"c" Value

Density of Soil,
Reduced Level of Bottom of 4th Layer
4th Layer Height
Corrected S.P.T Value, N'
Corressponding

"c" Value

Density of Soil,
Reduced Level of Bottom of 5th Layer
5th Layer Height
Corrected S.P.T Value, N'
Corressponding

"c" Value

= -15.300 meter
= 2.925 meter
=
7.50
=
=

7.090
0.00

tonne/meter2
Degree

=
0.7
tonne/meter3
= -16.800 meter
= 1.500 meter
= 10.000
=
=

9.454
0.0

tonne/meter2
Degree

=
0.7
tonne/meter3
= -20.350 meter
= 3.550 meter
= 28.17
=
=

26.631 tonne/meter2
0.00 Degree

=
0.7
tonne/meter3
= -26.800 meter
= 6.450 meter
= 34.13
=
=

32.260 tonne/meter2
0.0
Degree

=
0.7
tonne/meter3
= -26.800 meter
= 0.000 meter
=
0.00
=
=

0.00
0.0

tonne/meter2
Degree

0.7

tonne/meter3

SPT (Field N value at Found.Level) for calculating Allow. Bearing Pressure

50

Reduced levels
Reduced level of Train Wagon Top
Reduced level of Rail Top
Reduced level at Bearing top
Reduced level at Pier cap top
Reduced level at PierCap bottom
Reduced level at Well Cap top
Reduced level at Well Cap bottom
Reduced level of Top of Intermediate Plug
Reduced level of Bottom of Intermediate Plug
Reduced level of Top of Sand filling
Reduced level of Bottom of Sand filling
Reduced level of Top of water filling
Reduced level of Bottom of water filling
Reduced level of Well Curb top
Reduced level of Well Foundation
Reduced level of Bed Level

=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=

13.952
9.227
5.057
4.697
3.417
3.350
2.150
-12.075
-12.375
-12.375
-24.100
2.150
-12.075
-24.100
-27.400
-0.300

Density of Soil,

meter
meter
meter
meter
meter
meter
meter
meter
meter
meter
meter
meter
meter
meter
meter
meter

Shape & Dimensions


Pier :Shape
(Rect., Double-D,Circular-Hollow,Circular-Solid,Twin-Circular )
Height / Thickness
Length
Breadth / Diameter
Pier Cap:Shape
(Rectan. Double-D,Circular-Hollow,Circular-Solid,Twin-Circular )
Height / Thickness
Length
Breadth / Diameter
Well Cap :Shape
(Double-D,Circular-Hollow,Circular-Solid,Twin-Circular )
Height / Thickness
diameter
Well :Shape
( Double - D, Circular - Hollow, )
Height
Outer Diameter
Inner Diameter

= Rectangular
= 0.067 meter
= 6.000 meter
= 4.700 meter

= Rectangular
= 1.280
= 14.800 meter
= 4.700 meter

= Circular - Solid
= 1.200 meter
= 8.000 meter

= Circular - Hollow
= 29.550 meter
= 8.000 meter
= 4.400 meter

EARTH PRESSURE
( As per clause 5.12.6 I.R.S substructure code , page no. 14 )

Geo - technical Data For 1st Layer:Angle of Internal Friction(

0.000

Degree

Angle of Wall Friction(

0.000

Degree

= (2/3) x , which is maximum of 22.5 Degree

0.000

Degree

Cohesion(C)

7.090

t/m3

Submerged Density(gSUB)

0.700

t/m3

Soil Density

1.700

t/m3

Slope of wall (w.r.t.vertical face)

0.000

Degree

Slope of earth fill

0.000

Degree

Value Of
F

F
i

=
=
=
=

DEGREE
0.00
0.00
0.00
0.00

0.00

meter

Height of Ist Layer

2.925

meter

Height From Bottom

5.600

meter

Height Of Above Layers

RADIAN
0.00
0.00
0.00
0.00

Coefficient of Active Earth Pressure :-

cos2()

Ka=

cos2 x cos( )x[1+{sin()xsin(i)/cos()xcos(i)}1/2]2


1
Ka=

1.000

Coefficient of Passive Earth Pressure :cos2()

Kp=

cos2 x cos ( )x[1-{sin()xsin(i)/cos()xcos(i)}1/2]2


1
Kp=

1.00

Active earth pressure (pa)


=
when H= 0.000
when H= 2.925

=
=

Kaxxh - 2xCxKa1/2
-14.180
-12.133

tonne/meter2
tonne/meter2

Passive earth pressure (pp)


Kpxxh+2xCxKp1/2

when H= 0

=
=

14.180

tonne/meter2

when H= 2.925

16.228

tonne/meter2

Active Earth Pressure

Force

Lever Arm

Moment @ Base

-14.18 x 2.925 x 8
0.5 ( -12.133 - -14.18 ) x 2.925 x 8

0.000
0.000

7.063
6.575

0.000
0.000

Passive Earth Pressure

Force

Lever Arm

Moment @ Base

14.18 x 2.925 x 8
0.5 ( 16.228 - 14.18 ) x 2.925 x 8

331.821
23.956

7.0625
6.575

2343.484
157.509

EARTH PRESSURE
( As per clause 5.12.6 I.R.S substructure code , page no. 14 )

Geo - technical Data For 2nd Layer:Angle of Internal Friction(

0.000

Degree

Angle of Wall Friction(

0.000

Degree

= (2/3) x , which is maximum of 22.5 Degree

0.000

Degree

Cohesion(C)

9.454

t/m3

Submerged Density(gSUB)

0.700

t/m3

Soil Density

1.700

t/m3

Slope of wall (w.r.t.vertical face)

0.000

Degree

Slope of earth fill

0.000

Degree

Value Of
F

F
i

=
=
=
=

DEGREE
0.00
0.00
0.00
0.00

RADIAN
0.00
0.00
0.00
0.00

Height of Ist Layer

2.925

meter

Height of 2 nd Layer

1.500

meter

Height From Bottom

4.100

meter

Coefficient of Active Earth Pressure :-

cos2()

Ka=

cos2 x cos( )x[1+{sin()xsin(i)/cos()xcos(i)}1/2]2


1
Ka=

1.000

Coefficient of Passive Earth Pressure :cos2()

Kp=

cos2 x cos ( )x[1-{sin()xsin(i)/cos()xcos(i)}1/2]2


1
Kp=

1.00

Active earth pressure (pa)


=
when H= 2.925
when H= 1.500

=
=

Kaxxh - 2xCxKa1/2
-16.860
-15.810

tonne/meter2
tonne/meter2

Passive earth pressure (pp)


Kpxxh+2xCxKp1/2

when H= 2.925

=
=

20.955

tonne/meter2

when H= 1.5

22.005

tonne/meter2

Active Earth Pressure

Force

Lever Arm

Moment @ Base

-16.86 x 1.5 x 8
0.5 ( -15.81 - -16.86 ) x 1.5 x 8

0.000
0.000

4.850
4.600

0.000
0.000

Passive Earth Pressure

Force

Lever Arm

Moment @ Base

20.955 x 1.5 x 8
0.5 ( 22.005 - 20.955 ) x 1.5 x 8

251.456
6.300

4.85
4.600

1219.562
28.980

EARTH PRESSURE
( As per clause 5.12.6 I.R.S substructure code , page no. 14 )

Geo - technical Data For 3rd Layer:Angle of Internal Friction(

0.000

Degree

Angle of Wall Friction(

0.000

Degree

= (2/3) x , which is maximum of 22.5 Degree

0.000

Degree

Cohesion(C)

26.631

t/m3

Submerged Density(FSUB)

0.700

t/m3

Soil Density

1.700

t/m3

Slope of wall (w.r.t.vertical face)

0.000

Degree

Slope of earth fill

0.000

Degree

Value Of
F

F
i

=
=
=
=

DEGREE
0.00
0.00
0.00
0.00

RADIAN
0.00
0.00
0.00
0.00

Height of 1st & 2nd Layer

4.425

meter

Height of 3 rd Layer

3.550

meter

Height From Bottom

0.550

meter

Coefficient of Active Earth Pressure :-

cos2()

Ka=

cos2 x cos( )x[1+{sin()xsin(i)/cos()xcos(i)}1/2]2


1
Ka=

1.000

Coefficient of Passive Earth Pressure :cos2()

Kp=

cos2 x cos ( )x[1-{sin()xsin(i)/cos()xcos(i)}1/2]2


1
Kp=

1.00

Active earth pressure (pa)


=
when H= 4.425
when H= 3.550

=
=

Kaxxh - 2xCxKa1/2
-50.164
-47.679

tonne/meter2
tonne/meter2

Passive earth pressure (pp)


Kpxxh+2xCxKp1/2

when H= 4.425

=
=

56.359

tonne/meter2

when H= 3.55

58.844

tonne/meter2

Active Earth Pressure

Force

Lever Arm

Moment @ Base

-50.164 x 3.55 x 8
0.5 ( -47.679 - -50.164 ) x 3.55 x 8

0.000
0.000

2.325
1.733

0.000
0.000

Passive Earth Pressure

Force

Lever Arm

Moment @ Base

56.359 x 3.55 x 8
0.5 ( 58.844 - 56.359 ) x 3.55 x 8

1600.595
35.287

2.325
1.733

3721.384
61.164

EARTH PRESSURE
( As per clause 5.12.6 I.R.S substructure code , page no. 14 )

Geo - technical Data For 4 th Layer:Angle of Internal Friction(

0.000

Degree

Angle of Wall Friction(

0.000

Degree

= (2/3) x , which is maximum of 22.5 Degree

0.000

Degree

Cohesion(C)

32.260

t/m3

Submerged Density(FSUB)

0.700

t/m3

Soil Density

1.700

t/m3

Slope of wall (w.r.t.vertical face)

0.000

Degree

Slope of earth fill

0.000

Degree

Value Of
F

F
i

=
=
=
=

DEGREE
0.00
0.00
0.00
0.00

RADIAN
0.00
0.00
0.00
0.00

Height of 1st + 2nd + 3 rd Layer

7.975

meter

Height of 4 th Layer

6.450

meter

Height From Bottom

5.900

meter

Coefficient of Active Earth Pressure :-

cos2()

Ka=

cos2 x cos( )x[1+{sin()xsin(i)/cos()xcos(i)}1/2]2


1
Ka=

1.000

Coefficient of Passive Earth Pressure :cos2()

Kp=

cos2 x cos ( )x[1-{sin()xsin(i)/cos()xcos(i)}1/2]2


1
Kp=

1.00

Active earth pressure (pa)


=
when H= 7.975
when H= 6.450

=
=

Kaxxh - 2xCxKa1/2
-58.938
-54.423

tonne/meter2
tonne/meter2

Passive earth pressure (pp)


Kpxxh+2xCxKp1/2

when H= 7.975

=
=

70.103

tonne/meter2

when H= 6.45

74.618

tonne/meter2

Active Earth Pressure

Force

Lever Arm

Moment @ Base

-58.938 x 6.45 x 8
0.5 ( -54.423 - -58.938 ) x 6.45 x 8

0.000
0.000

9.125
8.050

0.000
0.000

Passive Earth Pressure

Force

Lever Arm

Moment @ Base

70.103 x 6.45 x 8
0.5 ( 74.618 - 70.103 ) x 6.45 x 8

3617.325
116.487

9.125
8.050

33008.093
937.720

EARTH PRESSURE
( As per clause 5.12.6 I.R.S substructure code , page no. 14 )

Geo - technical Data For 5 th Layer:Angle of Internal Friction(

0.000

Degree

Angle of Wall Friction(

0.000

Degree

= (2/3) x , which is maximum of 22.5 Degree

0.000

Degree

Cohesion(C)

0.000

t/m3

Submerged Density(FSUB)

0.700

t/m3

Soil Density

1.700

t/m3

Slope of wall (w.r.t.vertical face)

0.000

Degree

Slope of earth fill

0.000

Degree

Value Of
F

F
i

=
=
=
=

DEGREE
0.00
0.00
0.00
0.00

RADIAN
0.00
0.00
0.00
0.00

Height of 1st+2nd+3 rd+4 th Layer

14.425

meter

Height of 5 th Layer

0.000

meter

Height From Bottom

5.900

meter

Coefficient of Active Earth Pressure :-

cos2()

Ka=

cos2 x cos( )x[1+{sin()xsin(i)/cos()xcos(i)}1/2]2


1
Ka=

1.000

Coefficient of Passive Earth Pressure :cos2()

Kp=

cos2 x cos ( )x[1-{sin()xsin(i)/cos()xcos(i)}1/2]2


1
Kp=

1.00

Active earth pressure (pa)


=
when H= 14.425
when H= 0.000

=
=

Kaxxh - 2xCxKa1/2
10.098
10.098

tonne/meter2
tonne/meter2

Passive earth pressure (pp)


Kpxxh+2xCxKp1/2

when H= 14.425

=
=

10.098

tonne/meter2

when H= 0

10.098

tonne/meter2

Active Earth Pressure

Force

Lever Arm

Moment @ Base

10.098 x 0 x 8
0.5 ( 10.098 - 10.098 ) x 0 x 8

0.000
0.000

5.900
5.900

0.000
0.000

Passive Earth Pressure

Force

Lever Arm

Moment @ Base

10.098 x 0 x
0.5 ( 10.098 - 10.098 ) x 0 x

0.000
0.000

5.900
5.900

0.000
0.000

Active Earth Pressure :-

Active Earth Pressure

Force

Moment @ Base

For 1 st Layer

0.000

0.000

For 1

st

Layer

0.000

0.000

For 2

nd

Layer

0.000

0.000

For 2 nd Layer

0.000

0.000

For 3

rd

Layer

0.000

0.000

For 3

rd

Layer

0.000

0.000

For 4

th

Layer

0.000

0.000

For 4 th Layer

0.000

0.000

For 5 Layer
For 5 th Layer

0.000
0.000

0.000
0.000

TOTAL FORCES & MOMENT


ABOUT BASE

0.000

0.000

Passive Earth Pressure

Force

Moment @ Base

For 1 st Layer

331.821

2343.484

For 1 st Layer

23.956

157.509

251.456

1219.562

th

Passive Earth Pressure :-

For 2

nd

Layer

For 2

nd

Layer

6.300

28.980

For 3 rd Layer

1600.595

3721.384

For 3 rd Layer

35.287

61.164

For 4 th Layer

3617.325

33008.093

For 4 th Layer

116.487

937.720

For 5 th Layer

0.000

0.000

For 5 th Layer

0.000

0.000

TOTAL FORCES & MOMENT


ABOUT BASE

5983.227

41477.896

NET RESISTANCE :IT IS DUE TO NET PASSIVE - ACTIVE RESISTANCE AT BASE OF FOUNDATION

= 41477.896 - 0
=

41477.90

50 % OF PASSIVE RESISTANCE IS MOBILISED , SO


= 41477.896
2
= 20738.9482 tonne.meter

PROJECT : VASAI CREEK BRIDGE


CIRCULAR WELL FOUNDATION DESIGN
Bearing Top Level
5.057

R.Ls(m)
Pier Cap Top Level
4.697

Pier cap
1

1 3.417

Pier
High Tide Level
2.350

well cap

Well Cap Top Level


3.350
2.150

3
Water Filling

Steining

Mean Tide Level


-0.100
Low Tide Level
-2.550

-0.300

Bed Level

Intermediate plug
-12.375
Maximum Scour Level
4

Sand Filling

Well Curb Top Level


-24.100
well curb
Bottom plug
Well Foundation Level
-27.400

Well Cap Plan

Dia

8.000

meter

section at 3 - 3 ( Well Cap )

Well Curb Plan


Thickness at Top of Well Curb
=

1.85 meter

Inner Diameter
of Well
4.400 meter

Outer Diameter of Well

Thickness at Bottom of Well Curb


=
0.050 meter
8.100 meter

Section at 4 - 4

Pier - Cap Plan

14.800

4.700

meter

4.700

meter

meter

Section at 1-1 ( Pier - Cap )

Pier Plan

6.000

section at 2-2 ( Pier )

Pier - Cap Elevation & Section


0.600 meter
14.800
C/L
Bridge

4.700
I
II

6.000
Pier

6.000
4.400

0.680 meter

6.000

4.400

Pier - Cap Plan

Area Calculation of Pier Cap :Pier Cap Top , I =

69.560

Pier Top , II =

28.200

meter2
meter2

Height =

0.600 meter

Height =

0.680 meter

Total Volume of Pier Cap =


Pier Cap Top , I =

41.736

Pier Top , II =

32.198

meter3
meter3

Total Volume of Pier Cap =


Total Area of Pier Cap =

73.934

meter3

48.88 meter2

SINKING EFFORT
For Pier, P-3 of Bridge no. 73
Diameter of Well =
Top Reduced Level Of Well =
Bottom /Foundation Reduced Level of Well =
Natural Ground Reduced Level of Well =
Mean Tide Reduced Level =
Depth of Embedment of Well =
Depth of Well =
Height of Well From M.T.L to Found Level =
Thickness of Steining =
Inner Diameter of Well =

8.000
2.150
-27.400
-0.300
-0.100
27.100
29.550
27.300
1.800
4.400

meter
meter
meter
meter
meter
meter
meter
meter
meter
meter

Area of Well Steining = 35.06 meter2


Weight / meter @ 2.2 t/m3 = 77.132 Tonnes
Weight of Well (Non-Buoyant) :77.132 x 29.55
= 2279 Tonnes
Weight of Well ( Full Buoyancy, @ 1.2 t/m3 ) :35.06 x 29.55 x ( 2.2 - 1.0 ) =
1243 Tonnes

35.06 x

Weight of Well ( 50 % Buoyancy ) :29.55 x ( 2.2 - 0.5) =


1761 Tonnes

Surface area of the well in contact with bed :3.142 x 8 x

27.1

681 meter2

Buoyant Weight (Tonnes)


1
2
3
4

Steining Thickness
1.800
1.600
1.400
1.200

Area
35.060
32.170
29.028
25.635

Full Buoyant 50% Buoyant Non-Buoyant


1243.234
1761.248
2279.262
1140.745
1616.055
2091.366
1029.344
1458.237
1887.131
909.031
1287.794
1666.557

Sinking Effot (Tonnes/meter2)


1
2
3
4

Steining Thickness
1.800
1.600
1.400
1.200

Full Buoyant
1.825
1.675
1.511
1.335

50% Buoyant
2.586
2.373
2.141
1.891

Non-Buoyant
3.346
3.071
2.771
2.447

DEAD LOAD
DEAD LOAD OF SUB STRUCTURE :Shape
Units

Outer
Inner Sectional
Unit
Dia
/
Height Volume
Dia /
weight
Area
Breadth
Length
2
3
meter
meter
meter
meter meter
t/m3

Buoyant
Weight 100%
Weight
tonnes
tonnes

Pier Cap

Rectangular

4.70

14.80

48.88

1.280

73.934

2.500

184.835

Pier

Rectangular

4.70

6.00

28.20

0.067

1.889

2.500

4.723

8.00

50.265

1.200

60.319

2.500

150.796

150.796

8.00

4.40

35.06

14.525 509.249

2.500

1273.12

197.213

8.00

4.40

35.06

11.725 411.081

2.500

1027.70

616.621

14.80

4.40

15.21

0.300

4.56

2.400

10.948

6.386

8.10

4.40

18.16

3.300

59.936

2.500

149.839

89.904

8.10

4.40

33.37

3.300

110.113

2.400

264.272

154.159

4.40

15.21

14.23

216.296

1.000

216.296

0.000

4.40

15.21

11.73

178.28

1.700

303.080

124.798

Well Cap
Well Stenning
(Above Scour)
Well Stening
(Below Scour)

Circular Solid
Circular -

Hollow
Circular Hollow
Circular Intermediate Plug
Hollow
Circular Well Curb
Hollow
Circular Bottom Plug
Solid
Circular Water Inside Well
Hollow
Circular Sand Inside Well
Hollow

Dead Loads of Well Against 100% Buoyancy


1.0 Well Cap :Sectional Area
Height
Unit Weight

50.27
1.20
2.50

2.0 Well Steining, Upto Mean Tide Level :Sectional Area


35.060
Height
2.250
Unit Weight
2.500

meter2
meter
tonne/meter3
= 150.796 Tonnes

meter2
meter
tonne/meter3
= 197.213 Tonnes

3.0 Well Steining, Below Mean Tide Level :Sectional Area


35.060
meter2
Height
24.000
meter
Unit Weight
1.500
tonne/meter3
= 1262.17 Tonnes

4.0 Intermediate Plug :Sectional Area


Height
Unit Weight

15.205
0.300
1.400

meter2
meter
tonne/meter3
=
6.386 Tonnes

5.0 Sand - Fill Inside Well :Sectional Area


Height
Unit Weight

15.205
11.725
0.700

meter2
meter
tonne/meter3
= 124.798 Tonnes

6.0 Well Curb :Sectional Area


Height
Unit Weight

18.162
3.300
1.500

meter2
meter
tonne/meter3
=
89.904 Tonnes

7.0 Bottom Plug :Sectional Area


Height
Unit Weight

33.368
3.300
1.400

meter2
meter
tonne/meter3
= 154.159 Tonnes

Total Buoyant Weight of Well upto Foundation Level := Well Cap+Well Stening(below M.T.L)+Well Steining (Above M.T.L)+Intermediate Plug+
Well Curb +Bottom Plug +Sand Inside Well
=

150.796+197.213+616.621+6.386+89.904+154.159+124.798

Buoyant Weight = 1339.9

Tonnes

Buoyant Weight of Well From Scour Level to Foundation Level := Well Steining (Below Scour) + Sand Filling + Well Curb + Bottom Plug
= 616.6208105
=
=

368.86

985.480
985.480

Tonnes

Total Dead Loads (Weight) on Well upto Foundation Level := Super-Structure+Pier Cap+Pier+Well Cap+Well Stenning (Above Scour)+
Well Stening (Below Scour)+Intermediate Plug+Well Curb +Bottom Plug +
Water Inside Well+Sand Inside Well
= 2000+184.835+4.723+1339.877
=

3529.44

Total Dead Loads (Weight) on Well upto Foundation Level :-

3529.4

Tonnes

Dead Loads of Well Below Scour Level := Well Stening (Below Scour)+Well Curb +Bottom Plug +Sand Inside Well
= 1027.701+149.839+264.272+303.08
=

1744.892

Tonnes

Dead Loads of Well Below Scour Level :-

1744.9

Tonnes

LIVE LOAD & MOMENTS


1 Dead Load from Super-Structure, Per Span :Dead Load of Super-Structure , 48.50 m (One Box Girder)

1000

Dead Load of Super-Structure, 22.0 m (One Box Girder)

380

Reaction on Pier :2 x ( 1000 + 380 )

1380.00

Live Load from Super-Structure :One Span Loaded

Both Span Loaded

One Track

Both Track

One Track

Loaded Length

48.5

48.5

71.75

Total Load, EUDL (B.M)

459.65

919.30

652.19

Reaction on Pier

229.825

459.65

326.095

Vertical Loads :One Span Loaded

L.L Reaction in excess of


15% of D.L
DeadLoad of Well (Scour)
Vertical Loads

Both Span Loaded

One Track

Both Track

One Track

0.000

0.000

0.000

2568.706

2568.706

2568.706

2568.706

2568.706

2568.706

4 Longitudinal Loads & Moments, For Non Seismic Case :(Tractive Effort & Braking Forces)
1.0

One Span Loaded Condition, 48.50m :Tractive Effort =

100.00

Braking Force =

97.23

(a) When One Track Loaded , Force on Pier


(40% is taken into account)
100x0.4

40.00

78.89

Tractive Effort =

100.00

Braking Force =

135.57

(b) When Both Track Loaded , Force on Pier


(40% is taken into account)
100x0.4+97.23x0.4
2.0

Both Span Loaded Condition, 71.75 m :-

(a) When One Track Loaded , Force on Pier


(50% is taken into account)
135.57x0.5

67.79

117.79

5.147

17.522

(b) When Both Track Loaded , Force on Pier


(50% is taken into account)
100x0.5+135.57x0.5
The above Forces are assumed to act at top of bearing , R.L.
Lever Arm, From Top of Bearing to Scour Level
5.147+12.375
Moments :One Span Loaded Condition(48.50m),One Track Loaded :40x17.522

700.88

One Span Loaded Condition(48.50m),Two Tracks loaded :78.892x17.522

1382.35

Both Span Loaded Condition(97.0m), One Track Loaded :67.785x17.522

1187.72877

Both Span Loaded Condition(97.0m),Two Tracks Loaded :117.785x17.522 = 2063.82877

5 Longitudinal Loads & Moments, For Seismic Case :( In Longitudinal Direction )


(Tractive Effort & Braking Forces)
(For Seismic Case, Longitudinal Loads will be Half.as per the new Amendments.)
1.0

One Span Loaded Condition, 48.50m :Tractive Effort =

100.00

Braking Force =

97.23

(a) When One Track Loaded , Force on Pier


(40% is taken into account)
100x0.4

20.00

39.45

Tractive Effort =

100.00

Braking Force =

135.57

2
(b) When Both Track Loaded , Force on Pier
(40% is taken into account)
100x0.4+97.23x0.4
2
2.0

Both Span Loaded Condition, 71.75 m :-

(a) When One Track Loaded , Force on Pier


(50% is taken into account)
135.57x0.5

33.89

58.89

5.147

17.522

2
(b) When Both Track Loaded , Force on Pier
(50% is taken into account)
100x0.5+135.57x0.5
2
The above Forces are assumed to act at top of bearing , R.L.
Lever Arm, From Top of Bearing to Scour Level
5.147+12.375
Moments :One Span Loaded Condition(48.50m),One Track Loaded :-

20x17.522

350.44

One Span Loaded Condition(48.50m),Two Tracks loaded :39.446x17.522

691.17

Both Span Loaded Condition(97.0m), One Track Loaded :33.8925x17.522 = 593.864385


Both Span Loaded Condition(97.0m),Two Tracks Loaded :58.8925x17.522 = 1031.91439

6 Live Load Eccentricity


Pier - Cap Plan

14.800 meter

1.250

2.650
5.300
14.800 meter

Section at Pier - Cap


Center Line of Bearing

1.25

Meters on Eitherside of Center line of Pier

Center Line of Bearing

2.65

Meters on Eitherside of Center line of Bridge

( I ) One Span Loaded Condition


(a) One Track Loaded
Moment in Longitudinal Direction , ML

= 229.825 x 1.25

= 287.281

Moment in Transverse Direction , MT


= 229.825 x 2.65

= 609.03625

(b) Both Tracks Loaded


Moment in Longitudinal Direction , ML
= 459.65 x 1.25

= 574.5625

Moment in Transverse Direction , MT


= 459.65 x 0

( II ) Both Span Loaded Condition


(a) One Track Loaded
Moment in Longitudinal Direction , ML
= ( 326.095 - 229.825 )

x 1.25
=

120.3375

Moment in Transverse Direction , MT


= 326.095 x 2.65

= 864.15

(b) Both Tracks Loaded


(1) Moment Due to Live Load in Longitudinal Direction , M L
= ( 652.19 - 459.65 )
=

x 1.25

240.675

Tonne.meter

(2) Moment Due to Dead Load in Longitudinal Direction (See Calculation Below
=

775.00

Tonne.meter

Net Moment Due to Live Load + Dead Load in Longitudinal Direction , M L


=

1015.675

Moment in Transverse Direction , MT


= 652.19 x 0

7 Dead Load Eccentricity


Pier - Cap Plan

14.800 meter

1.250

2.650
5.300
14.800 meter

Section at Pier - Cap


Center Line of Bearing

1.25

Meters on Eitherside of Center line of Pier

Center Line of Bearing

2.65

Meters on Eitherside of Center line of Bridge

( I ) One Span Loaded Condition


(a) One Track Loaded
Moment in Longitudinal Direction , ML
=

0.00

0.00

Moment in Transverse Direction , MT

(b) Both Tracks Loaded


Moment in Longitudinal Direction , ML
=

0.00

0.00

0.00

Moment in Transverse Direction , MT

( II ) Both Span Loaded Condition


(a) One Track Loaded
Moment in Longitudinal Direction , ML

Moment in Transverse Direction , MT


0.00
(b) Both Tracks Loaded
Moment in Longitudinal Direction , ML
= ( 1000 - 380 )

x 1.25
=

775.00

0.00

Moment in Transverse Direction , MT

Tonnes
Tonnes

Tonnes

Both Span Loaded


Both Track
71.75
1304.38
652.19

Both Span Loaded


Both Track
169.201
2568.706
2737.907

ic Case :-

Tonnes
Tonnes

Tonnes

Tonnes
Tonnes
Tonnes

Tonnes

Tonnes
meter
meter

Tonne.meter
Tonne.meter
Tonne.meter
Tonne.meter

udinal Direction )

mendments.)
Tonnes
Tonnes

Tonnes

Tonnes

Tonnes
Tonnes

Tonnes

Tonnes

meter
meter

Tonne.meter
Tonne.meter
Tonne.meter
Tonne.meter

4.700

f Center line of Pier


Center line of Bridge

Tonne.meter

Tonne.meter

Tonne.meter

Tonne.meter

Tonne.meter

Tonne.meter

ection (See Calculation Below) , M L

gitudinal Direction , M L
Tonne.meter
Tonne.meter

4.700

f Center line of Pier


Center line of Bridge

Tonne.meter

Tonne.meter

Tonne.meter

Tonne.meter

Tonne.meter

Tonne.meter

Tonne.meter
Tonne.meter

MOMENT DUE TO TILT & SHIFT


( A tilt of 1 in 100 and Shift of D/40, or 0.15 whichever is more is considered )

In Longitudinal & Transverse Direction


Dead Loads :W1, Dead Load
Super-Structure + Pier + Pier Cap
2000+184.83+4.72
=
2189.558
Tonnes
W2, Buoyant Weight of Well := Well Cap + Well Steining (Below & Above M.T.L) +
Intermediate Plug + Sand Fill + Bottom Plug + Well Curb
150.8+197.21+1262.17+ 6.39+124.8+89.9+154.16
=

1985.422

Tonnes

Live Loads :Live Loads Contributions :- 15% of Dead Load


15 % of (2189.56+1985.422)
=
626.247
Tonnes
1 (a) One Span Loaded Condition(48.50m),One Track Loaded :48.5 - 626.247 = nil + 2189.558
=

2189.558

Tonnes

1 (b) One Span Loaded Condition(48.50m),Two Tracks loaded :48.5 - 626.247 = nil + 2189.558
=

2189.558

Tonnes

2 (a) Both Span Loaded Condition(97.0m), One Track Loaded :71.75 - 626.247 = nil + 2189.558
=

2189.558

Tonnes

2 (b) Both Span Loaded Condition(97.0m),Two Tracks Loaded :71.75 - 626.247 = -554.497
= -554.497 + 2189.558
=

1635.061

Tonnes

Diameter Of Well
H, Ht from Well Cap Top to well Found.Level

=
=

8.000
30.750

Moment Due TO Tilt and Shift

meter
meter

( In Longitudinal & Transverse Direction )

1.0 One Span Loaded Condition, (48.50m),


(a) One Track Loaded
=' { ( W1 x (D/40+H/100) ) + ( W2/2 x H/100 ) }
=

2189.56 x (8/40+30.75/100)+

1985.42 / 2 x 30.75 / 100


1416.460 Tonnes

(b) Both Tracks Loaded


=' { ( W1 x (D/40+H/100) ) + ( W2/2 x H/100 ) }
=

2189.56 x (8/40+30.75/100)+

1985.42 / 2 x 30.75 / 100


1416.460 Tonnes

2.0 Both Span Loaded Condition, (97.0m),


(a) One Track Loaded
=' { ( W1 x (D/40+H/100) ) + ( W2/2 x H/100 ) }
=

2189.56 x (8/40+30.75/100)+

1985.42 / 2 x 30.75 / 100


1416.460 Tonnes

(b) Both Tracks Loaded


=' { ( W1 x (D/40+H/100) ) + ( W2/2 x H/100 ) }
=

1635.06 x (8/40+30.75/100)+

1985.42 / 2 x 30.75 / 100


1440.311 Tonnes

LOAD COMBINATIONS
1 Combination - I
Dead-Load + Live-Load + Longitudinal Force + Water Current Forces

2 Combination - II
Combination - I + Wind Forces

3 Combination - III (Longitudinal Direction)


Combination - I + Seismic Forces in Longitudinal Direction

4 Combination - III (Transverse Direction)


Combination - I + Seismic Forces in Transverse Direction

5 Combination - IV
Construction Stage

In above Combinations I to III , Live Load will be Considered as :1.0

One Span Loaded Condition, 48.50m :(a) When One Track Loaded
(b) When Both Track Loaded

2.0

Both Span Loaded Condition, 97.0m :(a) When One Track Loaded
(b) When Both Track Loaded

Combination - I
Dead-Load + Live-Load + Longitudinal Force + Water Current Forces

CONDITIONS

Longitudinal Direction
Force ( t )

Moment ( t.m )

Transverse Direction
Force ( t )

One Span Loaded Condition - One Track Loaded


(a) Longitudinal Forces

40.000

700.880

(b) Live Load Eccentricity

287.281

(c) Water Current Forces

6.395

52.329

31.973

@ Scour Level

46.395

1040.490

31.973

One Span Loaded Condition - Both Track Loaded


(a) Longitudinal Forces

78.892

1382.346

(b) Live Load Eccentricity

574.5625

(c) Water Current Forces

6.395

52.329

31.973

@ Scour Level

85.287

2009.237

31.973

Both Span Loaded Condition - One Track Loaded


(a) Longitudinal Forces

67.785

1187.729

(b) Live Load Eccentricity

120.3375

(c) Water Current Forces

6.395

52.329

31.973

@ Scour Level

74.180

1360.395

31.973

Both Span Loaded Condition - Both Track Loaded


(a) Longitudinal Forces

117.785

2063.829

(b) Live Load Eccentricity

1015.675

(c) Water Current Forces

6.395

52.329

31.973

124.180

3131.832

31.973

@ Scour Level

Cases

V.Loads (t)

Resultant Forces ( t )

Resultant Moment (t.m)

Case - I (a) One Span Loaded Condition


Single Track Loaded

2568.706

56.345

1356.725

Case - I (b) One Span Loaded Condition


Double Track Loaded

2568.71

91.083

2026.201

Case - I (c) Both Span Loaded Condition


Single Track Loaded

2568.71

80.777

1765.811

Case - I (d) Both Span Loaded Condition


Double Track Loaded

2737.91

128.230

3142.743

Combination - I (a)
Dead-Load + Live-Load + Longitudinal Force (Seismic) + Water Current Forces

CONDITIONS

Longitudinal Direction
Force ( t )

Moment ( t.m )

Transverse Direction
Force ( t )

One Span Loaded Condition - One Track Loaded


(a) Longitudinal Forces

20.000

350.440

(b) Live Load Eccentricity

287.281

(c) Water Current Forces

6.395

52.329

31.973

@ Scour Level

26.395

690.050

31.973

One Span Loaded Condition - Both Track Loaded


(a) Longitudinal Forces

39.446

691.173

(b) Live Load Eccentricity

574.563

(c) Water Current Forces

6.395

52.329

31.973

@ Scour Level

45.841

1318.064

31.973

Both Span Loaded Condition - One Track Loaded


(a) Longitudinal Forces

33.893

593.864

(b) Live Load Eccentricity

120.3375

(c) Water Current Forces

6.395

52.329

31.973

@ Scour Level

40.287

766.531

31.973

Both Span Loaded Condition - Both Track Loaded


(a) Longitudinal Forces

58.893

1031.914

(b) Live Load Eccentricity

1015.675

(c) Water Current Forces

6.395

52.329

31.973

@ Scour Level

65.287

2099.918

31.973

Cases

V.Loads

Resultant Forces ( t )

Resultant Moment (t.m)

Case - I (a) One Span Loaded Condition


Single Track Loaded

2568.706

41.460

1110.969

Case - I (b) One Span Loaded Condition


Double Track Loaded

2568.706

55.889

1343.782

Case - I (c) Both Span Loaded Condition


Single Track Loaded

2568.706

51.432

1361.978

Case - I (d) Both Span Loaded Condition


Double Track Loaded

2737.907

72.696

2116.155

Combination - II
Dead-Load + Live-Load + Longitudinal Force + Water Current Forces + Wind

CONDITIONS

Longitudinal Direction
Force ( t )

Moment ( t.m )

Transverse Direction
Force ( t )

One Span Loaded Condition - One Track Loaded


(a) Combination I (a)

46.395

1040.490

31.973

(b) Wind Due to Dead Load

35.618

(c) Wind Due to Live Load

18.006

46.395

1040.490

85.597

@ Scour Level

One Span Loaded Condition - Both Track Loaded


(a) Combination I (b)

85.287

2009.237

31.973

(b) Wind Due to Dead Load

35.618

(c) Wind Due to Live Load

18.006

85.287

2009.237

85.597

@ Scour Level

Both Span Loaded Condition - One Track Loaded


(a) Combination I (c)

74.180

1360.395

31.973

(b) Wind Due to Dead Load

35.618

(c) Wind Due to Live Load

36.011

74.180

1360.395

103.602

@ Scour Level

Both Span Loaded Condition - Both Track Loaded


(a) Combination I (d)

124.180

3131.832

31.973

(b) Wind Due to Dead Load

35.618

(c) Wind Due to Live Load

36.011

124.180

3131.832

103.602

@ Scour Level

Cases

V.Loads

Resultant Forces ( t )

Resultant Moment (t.m)

Case - II (a) One Span Loaded Condition


Single Track Loaded

2568.706

97.361

2258.321

Case - II (b) One Span Loaded Condition


Double Track Loaded

2568.706

120.833

2446.204

Case - II (c) Both Span Loaded Condition


Single Track Loaded

2568.706

127.421

2863.162

Case - II (d) Both Span Loaded Condition


Double Track Loaded

2737.907

161.722

3628.409

Combination - III
( Longitudinal Direction )
Dead-Load + Live-Load + Longitudinal Force + Water Current Forces + Seismic (Long. Direction )

CONDITIONS

Longitudinal Direction
Force ( t )

Moment ( t.m )

Transverse Direction
Force ( t )

One Span Loaded Condition - One Track Loaded


(a) Combination I (a)

26.395

690.050

31.973

(b) Seismic, Dead Load

193.196

2589.695

(c) Hydro-Dynamic Forces

25.642

140.398

245.232

3420.143

31.973

@ Scour Level

One Span Loaded Condition - Both Track Loaded


(a) Combination I (b)

45.841

1318.064

31.973

(b) Seismic, Dead Load

193.196

2589.695

(c) Hydro-Dynamic Forces

25.642

140.398

264.678

4048.157

31.973

@ Scour Level

Both Span Loaded Condition - One Track Loaded


(a) Combination I (c)

40.287

766.531

31.973

(b) Seismic, Dead Load

193.196

2589.695

(c) Hydro-Dynamic Forces

25.642

140.398

259.124

3496.623

31.973

@ Scour Level

Both Span Loaded Condition - Both Track Loaded


(a) Combination I (d)

65.287

2099.918

31.973

(b) Seismic, Dead Load

193.196

2589.695

(c) Hydro-Dynamic Forces

25.642

140.398

284.124

4830.011

31.973

@ Scour Level

Cases

V.Loads

Resultant Forces ( t )

Resultant Moment (t.m)

Case-3-L(a) One Span Loaded Condition


Single Track Loaded

2568.706

247.307

3529.229

Case-3-L(b) One Span Loaded Condition


Double Track Loaded

2568.706

266.602

4056.603

Case-3-L(c) Both Span Loaded Condition


Single Track Loaded

2568.706

261.089

3673.389

Case-3-L(d) Both Span Loaded Condition


Double Track Loaded

2737.907

285.918

4837.092

Combination - III
( Transverse Direction )
Dead-Load + Live-Load + Longitudinal Force + Water Current Forces + Seismic (Trans. Direction )

CONDITIONS

Longitudinal Direction
Force ( t )

Moment ( t.m )

Transverse Direction
Force ( t )

One Span Loaded Condition - One Track Loaded


(a) Combination I (a)

26.395

690.050

31.973

(b) Seismic, Dead Load

193.196

(c) Seismic, Live Load

6.895

(d) Hydro-Dynamic Forces

25.642

26.395

690.050

257.705

@ Scour Level

One Span Loaded Condition - Both Track Loaded


(a) Combination I (b)

45.841

1318.064

31.973

(b) Seismic, Dead Load

193.196

(c) Seismic, Live Load

13.790

(d) Hydro-Dynamic Forces

25.642

45.841

1318.064

264.600

@ Scour Level

Both Span Loaded Condition - One Track Loaded


(a) Combination I (c)

40.287

766.531

31.973

(b) Seismic, Dead Load

193.196

(c) Seismic, Live Load

9.783

(d) Hydro-Dynamic Forces

25.642

40.287

766.531

260.593

@ Scour Level

Both Span Loaded Condition - Both Track Loaded


(a) Combination I (d)

65.287

2099.918

31.973

(b) Seismic, Dead Load

193.196

(c) Seismic, Live Load

19.566

(d) Hydro-Dynamic Forces

25.642

65.287

2099.918

270.376

@ Scour Level

Cases

V.Loads

Resultant Forces ( t )

Resultant Moment (t.m)

Case-3-T(a) One Span Loaded Condition


Single Track Loaded

2568.706

259.053

3830.734

Case-3-T(b) One Span Loaded Condition


Double Track Loaded

2568.706

268.541

3577.957

Case-3-T(c) Both Span Loaded Condition


Single Track Loaded

2568.706

263.689

4164.418

Case-3-T(d) Both Span Loaded Condition


Double Track Loaded

2737.907

278.146

4052.924

Combination - IV
( Construction Stage )
CONDITIONS

Longitudinal Direction
Force ( t )

Transverse Direction

Moment ( t.m )

Force ( t )

One Box Loaded Condition


(a) Ecc. Moment ( Const.)

375.000

(b) Water Current Forces

6.395

52.329

31.973

6.395

427.329

31.973

@ Scour Level

Two Boxes Loaded Condition - On Same Span


(a) Ecc. Moment ( Const.)

750.000

(b) Water Current Forces

6.395

52.329

31.973

6.395

802.329

31.973

@ Scour Level

Two Boxes Loaded Condition - One On Each Span


(a) Ecc. Moment ( Const.)

(b) Water Current Forces

6.395

52.329

31.973

6.395

52.329

31.973

@ Scour Level

Three Boxes Loaded Condition


(a) Ecc. Moment ( Const.)

375.000

(b) Water Current Forces

6.395

52.329

31.973

6.395

427.329

31.973

@ Scour Level

Cases

V.Loads

Resultant Forces ( t )

Resultant Moment (t.m)

Case - 4 (a) One Box Loaded Condition


Any Span

2589.456

32.606

1929.557

Case - 4 (b) Two Boxes Loaded Condition


On Same Span

2610.206

32.606

843.913

Case - 4 (c) Two Box Loaded Condition


One On Each Span

2610.206

32.606

3502.034

Case - 4 (d) Three Box Loaded Condition


2630.956

32.606

1929.557

SUMMARY OF LOAD COMBINATION


@ Scour Level
Cases

V.Loads (t)

Resultant Forces ( t )

Resultant Moment (t.m)

COMBINATION - I
Combination - I - (a)

2568.706

56.345

1356.725

Combination - I - (b)

2568.706

91.083

2026.201

Combination - I - (c)

2568.706

80.777

1765.811

Combination - I - (d)

2737.907

128.230

3142.743

COMBINATION - II
Combination - II - (a)

2568.706

97.361

2258.321

Combination - II - (b)

2568.706

120.833

2446.204

Combination - II - (c)

2568.706

127.421

2863.162

Combination - II - (d)

2737.907

161.722

3628.409

COMBINATION - III - Longitudinal


Combination - III - L - (a)

2568.706

247.307

3529.229

Combination - III - L - (b)

2568.706

266.602

4056.603

Combination - III - L - (c)

2568.706

261.089

3673.389

Combination - III - L- (d)

2737.907

285.918

4837.092

COMBINATION - III - Transverse


Combination - III - T - (a)

2568.706

259.053

3830.734

Combination - III - T - (b)

2568.706

268.541

3577.957

Combination - III - T - (c)

2568.706

263.689

4164.418

Combination - III - T - (d)

2737.907

278.146

4052.924

COMBINATION - IV - Construction Stage


Combination - IV - (a)

2589.456

32.606

1929.557

Combination - IV - (b)

2610.206

32.606

843.913

Combination - IV- (c)

2610.206

32.606

3502.034

Combination - IV - (d)

2630.956

32.606

1929.557

SUMMARY OF LOAD COMBINATION


@ Scour Level
CONDITIONS

Longitudinal Direction
Force ( t )

Moment ( t.m )

Transverse Direction
Force ( t )

COMBINATION - I (Dead-Load + Live-Load + Longitudinal Force + Water Current Forces)


Combination - I - (a)

46.395

1040.490

31.973

Combination - I - (b)

85.287

2009.237

31.973

Combination - I - (c)

74.180

1360.395

31.973

Combination - I - (d)

124.180

3131.832

31.973

COMBINATION - II
Combination - II - (a)

46.395

1040.490

85.597

Combination - II - (b)

85.287

2009.237

85.597

Combination - II - (c)

74.180

1360.395

103.602

Combination - II - (d)

124.180

3131.832

103.602

COMBINATION - III - Longitudinal


Combination - III - (a) - L

245.232

3420.143

31.973

Combination - III - (b) - L

264.678

4048.157

31.973

Combination - III - (c) - L

259.124

3496.623

31.973

Combination - III - (d) - L

284.124

4830.011

31.973

COMBINATION - III - Transverse


Combination - III - (a) - T

26.395

690.050

257.705

Combination - III - (b) - T

45.841

1318.064

264.600

Combination - III - (c) - T

40.287

766.531

260.593

Combination - III - (d) - T

65.287

2099.918

270.376

COMBINATION - IV - Construction Stage


Combination - IV - (a)

6.395

427.329

31.973

Combination - IV - (b)

6.395

1318.064

31.973

Combination - IV - (c)

6.395

52.329

31.973

Combination - IV - (d)

6.395

427.329

31.973

Current Forces

be Considered as :-

Current Forces
Transverse Direction
Moment ( t.m )
609.036
261.643
870.679
0
261.643
261.643
864.15
261.643
1125.795
0
261.643
261.643

Resultant Moment (t.m)

1356.725

2026.201

1765.811

3142.743

c) + Water Current Forces


Transverse Direction
Moment ( t.m )
609.036
261.643
870.679
0
261.643
261.643
864.15
261.643
1125.795
0
261.643
261.643

Resultant Moment (t.m)

1110.969

1343.782

1361.978

2116.155

Current Forces + Wind


Transverse Direction
Moment ( t.m )
870.679
696.767
436.897
2004.344
261.643
696.767
436.897
1395.308
1125.795
696.767
696.767
2519.329
261.643
696.767
873.795
1832.205
Resultant Moment (t.m)

2258.321

2446.204

2863.162

3628.409

al Direction )

es + Seismic (Long. Direction )


Transverse Direction
Moment ( t.m )
870.679
870.679
261.643
261.643
1125.795
1125.795
261.643
261.643
Resultant Moment (t.m)

3529.229

4056.603

3673.389

4837.092

es + Seismic (Trans. Direction )


Transverse Direction
Moment ( t.m )
870.679
2589.695
167.298
140.398
3768.070
261.643
2589.695
334.595
140.398
3326.331
1125.795
2589.695
237.376
140.398
4093.264
261.643
2589.695
474.752
140.398
3466.488
Resultant Moment (t.m)

3830.734

3577.957

4164.418

4052.924

Transverse Direction
Moment ( t.m )
1620.000
261.643
1881.643
261.643
261.643
3240.000
261.643
3501.643
1620.000
261.643
1881.643

Resultant Moment (t.m)

1929.557

843.913

3502.034

1929.557

@ Scour Level
Resultant Moment (t.m)

1356.725
2026.201
1765.811
3142.743
2258.321
2446.204
2863.162
3628.409

udinal
3529.229
4056.603
3673.389
4837.092

erse
3830.734
3577.957
4164.418
4052.924

on Stage
1929.557
843.913
3502.034
1929.557

@ Scour Level
Transverse Direction
Moment ( t.m )

al Force + Water Current Forces)


870.679
261.643
1125.795
261.643
2004.344
1395.308
2519.329
1832.205

udinal
870.679
261.643
1125.795
261.643
3768.070
3326.331
4093.264
3466.488
1881.643
261.643
3501.643
1881.643

ACTIVE EARTH PRESSURE


Strata Being Predominantly Clayey

SCOUR, REDUCED LEVEL

Ka

1.0

p =

. h . Ka - 2 .c . ( Ka )1/2

p =

. h - 2 .c

=
h=

-12.375 meter
0.0 meter

c=
=

At Scour Level =

For 1st Layer :-

7.1 Tonne/meter2
0.7 Tonne/meter3

p =

. h - 2 .c

p =

0.7x0

p =

h=
c=
=
p =
p =

At Bottom of 1st Layer

p=

For 1st & 2nd Layer :-

h=

2 x 7.

-14.18 Tonne/meter2

2.925 meter
7.1 Tonne/meter2
0.7 Tonne/meter3
. h - 2 .c
0.7x2.925 -

2 x 7.09018718094158

-12.133 Tonne/meter2

2.925 meter

c=

9.45 Tonne/meter2

0.7 Tonne/meter3

p =
p =
At Top of 2nd Layer

p=

For 2nd Layer :-

h=
c=
=
p =
p =

At Bottom of 2nd Layer

Degree

p=

. h - 2 .c
0.7x2.925 -

2 x 9.4535829079221

-16.860 Tonne/meter2

1.5 meter
9.45 Tonne/meter2
0.70 Tonne/meter3
. h - 2 .c
0.7x1.5 - 2 x 9.4535829079221
-15.810 Tonne/meter2

For 2nd & 3rd Layer :-

h=
c=
=
p =
p =

At Top of 3rd Layer

p=

For 3rd Layer :-

h=

1.5 meter
26.63 Tonne/meter2
0.70 Tonne/meter3
. h - 2 .c
0.7x1.5 - 2 x 26.6307430516166
-50.164 Tonne/meter2

3.55 meter

c=

26.63 Tonne/meter2

0.70 Tonne/meter3

p =
p =
At Bottom of 3rd Layer

p=

For 3rd & 4th Layer :-

h=
c=
=
p =
p =

. h - 2 .c
0.7x3.55 -

2 x 26.63

-47.679 Tonne/meter2

3.55 meter
32.2604 Tonne/meter2
0.7 Tonne/meter3
. h - 2 .c
0.7x3.55 -

2 x 32.26

At Top of 4th Layer

p=

For 4th Layer :-

h=

6.450 meter

c=
=

32.26 Tonne/meter2

p =
p =
At Bottom of 4th Layer
At Top of 5th layer

p=
p

At Foundation Level, R.L

=
h=
c=
=
=
p =
p =

-57.503 Tonne/meter2

0.7 Tonne/meter3
. h - 2 .c
0.7x6.45 -

2 x 32.26

-52.988 Tonne/meter2
#REF!

-27.400 meter
0.600 meter
0 Tonne/meter2
0.7 Tonne/meter3
#REF!
. h .ka - 2 .c.ka1/2
#REF!

From above it can be noted that active pressure diagram would be negative
and hence active pressure would be zero.

PASSIVE EARTH PRESSURE


Strata Being Predominantly Clayey

Kp

1.0

p =

. h . Kp + 2 .c . ( Kp )1/2

p =

. h + 2 .c

SCOUR, REDUCED LEVEL

RL =
h=
c=
=

At Scour Level =

For 1st Layer :-

p =

0.7x0 +

p =

h=

At Bottom of 1st Layer

p=

For 1st & 2nd Layer :-

h=

2 x 7.09

14.18 Tonne/meter2

2.925 meter
7.1 Tonne/meter2
0.7 Tonne/meter3
.h + 2.c
0.7x2.925 +

2 x 7.09

16.228 Tonne/meter2

2.925 meter

c=

9.45 Tonne/meter2

0.7 Tonne/meter3

p =
p =
p=

h=
c=
=
p =
p =

At Bottom of 2nd Layer

0.7 Tonne/meter3
.h + 2.c

p =
p =

For 2nd Layer :-

7.1 Tonne/meter2

p =

c=
=

At Top of 2nd Layer

-12.375 meter
0.0 meter

p=

.h + 2.c
0.7x2.925 +

2 x 9.45

20.955 Tonne/meter2

1.5 meter
9.45 Tonne/meter2
0.70 Tonne/meter3
.h + 2.c
0.7x1.5 + 2 x 9.454
22.005 Tonne/meter2

For 2nd & 3rd Layer :-

h=
c=
=
p =
p =

At Top of 3rd Layer

p=

For 3rd Layer :-

h=

1.5 meter
26.63 Tonne/meter2
0.70 Tonne/meter3
.h + 2.c
0.7x1.5 + 2 x 26.63
56.359 Tonne/meter2

3.55 meter

c=

26.63 Tonne/meter2

0.70 Tonne/meter3

p =
p =

.h + 2.c
0.7x3.55 + 2 x 26.63

At Bottom of 3rd Layer

p=

58.844 Tonne/meter2

For 3rd & 4th Layer :-

h=

At Top of 4th Layer


For 4th Layer :-

At Bottom of 4th Layer


At top of 5th layer

At Foundation Level, R.L

3.55 meter

c=
=

32.26035 Tonne/meter2

p =
p =

.h + 2.c
0.7x3.55 + 2 x 32.26

p=

70.103 Tonne/meter2

0.7 Tonne/meter3

h=

6.450 meter

c=
=

32.26 Tonne/meter2

p =
p =

.h + 2.c
0.7x6.45 + 2 x 32.26

p=

74.618 Tonne/meter2

0.7 Tonne/meter3

#REF! t/m2

-26.800 Meter

h=

0.600 meter

c=

0 Tonne/meter2

=
=
p =
p =

0.7 Tonne/meter3
#REF!
.h + 2.c
0.7x0.599999999999998 +

p=

#REF! Tonne/meter

PASSIVE EARTH PRESSURE DIAGRAM


Reduced Level =
ht.= 2.925 m
Reduced Level =
ht.= 1.5

-12.375 m

t/m2

14.2

1st Layer

c =

-15.300 m

16.228
20.955

c =

Reduced Level =

2nd Layer
-16.800 m

ht.= 3.55

3rd Layer

Reduced Level =

7.1 t/m2

9.45 t/m2

22.005
56.359

-20.350 m

c =

26.63 t/m2

c =

32.26 t/m2

58.844
70.103

ht.= 6.5
Reduced Level

4th Layer
-26.800 m

74.618
#REF!

ht.= 0.000

c=

0.0 t/m2

5th Layer

Reduced Level =

-26.800 m

#REF!

Force

Lever Arm

Moment @ Base

Tonnes
331.821
23.956
251.456
6.300
676.308
35.287
3617.325
116.487

meter
13.563
13.075
11.350
11.100
8.825
8.233
3.225
2.150

Tonne.meter
4500.319
313.221
2854.025
69.930
5968.417
290.530
11665.874
250.447

#REF!
#REF!

0.000
0.000

#REF!
#REF!

Total Force @ Base

#REF! Tonnes

50 % Mobilisation

#REF! Tonnes

#REF! Tonne.meter
#REF! Tonne.meter

Coefficients of Active & Passive Earth Pressure, I.e. K a & Kp :Angle of Internal Friction(

0.000

1 - Sin

Degree

Coefficient of Active Earth Pressure :-

Ka

1 + Sin

Ka

1 - Sin 0
1 + Sin 0

Ka

1.00

Kp

1 + Sin

Coefficient of Passive Earth Pressure :1 - Sin

Kp

1 + Sin 0
1 - Sin 0

Kp

1.00

Total Loads, Forces & Moment @ Base


( Reduced Level =

-27.400

meter )

Combination 1.0 (a)


Height From Scour Level to Base of Foundation =

Forces & Moments

V.Loads
(t)

15.025
Longitudinal Direction
Moment (t.m)

Force ( t )

Moment (t.m)

46.395

1040.490

31.973

870.679

697.078

480.390

1416.460

1416.460

46.395

3154.027

31.973

2767.529

z @ Scour Level
Transfer to Base
Tilt & Shift
Buy. Wt. Of Well Below Scour 985.480
3554.186
z @ Base Level
`

=
=

56.345
4196.08

Tonnes
Tonne.meter

=
=

2568.706+985.48
3554.19 Tonnes

Loads :Total Load, P

50% Passive Mobilisation

= 20738.95 Tonnes

Therefore, Resultant Moment

0.00

Tonne.meter

Eccentricity, e = M / P
Diameter of Well at Base

=
=

0.00
8.10

meter
meter

Check for Maximum Stress :Moment of Inertia = xD4/64


Area of the base = xD2/4

=
=

Transverse Direction

Force ( t )

2568.706

Resultant Forces
Resultant Moments

meter

211.305
51.530

m4
m2

Maximum & Minimum Base Pressure Calculation


Maximum base pressure

= P/A + MNRxY/I
= 68.97
tonne/meter2

Minimum base pressure

= P/A - MNRxY/I
= 68.97
tonne/meter2

Total Loads, Forces & Moment @ Base


( Reduced Level =

-27.400

meter )

Combination 1.0 (b)


Height From Scour Level to Base of Foundation =

Forces & Moments

V.Loads
(t)

15.025
Longitudinal Direction

meter
Transverse Direction

Force ( t )

Moment (t.m)

Force ( t )

Moment (t.m)

2568.706
F @ Scour Level
Transfer to Base
Tilt & Shift
Buy. Wt. Of Well Below Scour 985.480
3554.186
F @ Base Level

85.287

2009.237

31.973

261.643

1281.430

480.390

1416.460

1416.460

85.287

4707.127

31.973

2158.492

Resultant Forces
Resultant Moments

=
=

91.083
5178.43

=
=

2568.706+985.48
3554.19 Tonnes

Tonnes
Tonne.meter

Loads :Total Load, P

50% Passive Mobilisation

= 20738.95 Tonnes

Therefore, Resultant Moment

0.00

Tonne.meter

Eccentricity, e = M / P
Diameter of Well at Base

=
=

0.00
8.100

meter
meter

Check for Maximum Stress :Moment of Inertia = xD4/64


Area of the base = xD2/4

=
=

211.305
51.530

m4
m2

Maximum & Minimum Base Pressure Calculation


Maximum base pressure

= P/A + MNRxY/I
tonne/meter2
= 68.97

Minimum base pressure

= P/A - MNRxY/I
tonne/meter2
= 68.97

Total Loads, Forces & Moment @ Base


( Reduced Level =

-27.400

meter )

Combination 1.0 (c)


Height From Scour Level to Base of Foundation =

Forces & Moments

V.Loads
(t)

15.025
Longitudinal Direction

meter
Transverse Direction

Force ( t )

Moment (t.m)

Force ( t )

Moment (t.m)

2568.706
F @ Scour Level
Transfer to Base
Tilt & Shift
Buy. Wt. Of Well Below Scour 985.480
3554.186
F @ Base Level

74.180

1360.395

31.973

1125.795

1114.548

480.390

1416.460

1416.460

74.180

3891.402

31.973

3022.644

Resultant Forces
Resultant Moments

=
=

80.777
4927.41

=
=

2568.706+985.48
4174.98 Tonnes

Tonnes
Tonne.meter

Loads :Total Load, P

50% Passive Mobilisation

= 20738.95 Tonnes

Therefore, Resultant Moment

0.00

Tonne.meter

Eccentricity, e = M / P
Diameter of Well at Base

=
=

0.00
8.10

meter
meter

Check for Maximum Stress :Moment of Inertia = xD4/64


Area of the base = xD2/4

=
=

211.305
51.530

m4
m2

Maximum & Minimum Base Pressure Calculation


Maximum base pressure

= P/A + MNRxY/I
tonne/meter2
= 81.02

Minimum base pressure

= P/A - MNRxY/I
tonne/meter2
= 81.02

Total Loads, Forces & Moment @ Base


( Reduced Level =

-27.400

meter )

Combination 1.0 (d)


Height From Scour Level to Base of Foundation =

Forces & Moments

V.Loads
(t)

15.025
Longitudinal Direction

meter
Transverse Direction

Force ( t )

Moment (t.m)

Force ( t )

Moment (t.m)

2737.907
F @ Scour Level
Transfer to Base
Tilt & Shift
Buy. Wt. Of Well Below Scour 985.480
3723.387
F @ Base Level

124.180

3131.832

31.973

261.643

1865.798

480.390

1440.311

1440.311

124.180

6437.941

31.973

2182.344

Resultant Forces
Resultant Moments

=
=

128.230
6797.77

=
=

2737.907+985.48
3620.48 Tonnes

Tonnes
Tonne.meter

Loads :Total Load, P

50% Passive Mobilisation

= 20738.95 Tonnes

Therefore, Resultant Moment

0.00

Tonne.meter

Eccentricity, e = M / P
Diameter of Well at Base

=
=

0.00
8.100

meter
meter

Check for Maximum Stress :Moment of Inertia = xD4/64


Area of the base = xD2/4

=
=

211.305
51.530

m4
m2

Maximum & Minimum Base Pressure Calculation


Maximum base pressure

= P/A + MNRxY/I
tonne/meter2
= 81.02

Minimum base pressure

= P/A - MNRxY/I
tonne/meter2
= 81.02

Total Loads, Forces & Moment @ Base


( Reduced Level =

-27.400

meter )

Combination 2.0 (a)


Height From Scour Level to Base of Foundation =

15.025
Longitudinal Direction

meter
Transverse Direction

Forces & Moments

V.Loads
(t)

Force ( t )

Moment (t.m)

Force ( t )

Moment (t.m)

F @ Scour Level
Transfer to Base
Tilt & Shift
Buy. Wt. Of Well Below Scour
F @ Base Level

2568.706

46.395

1040.490

85.597

2004.344

697.078

1286.091

1416.460

3554.186

46.395

3154.027

85.597

4706.894

=
=

97.361
5665.93

Total Load, P

=
=

2568.706+985.48
3554.19 Tonnes

50% Passive Mobilisation

20738.95 Tonnes

Resultant Forces
Resultant Moments

Tonnes
Tonne.meter

Loads :-

Therefore, Resultant Moment


Eccentricity, e = M / P
Diameter of Well at Base

0.00

Tonne.meter

=
=

0.00
8.100

meter
meter

Check for Maximum Stress :Moment of Inertia = xD4/64


Area of the base = xD2/4

1416.460

985.480

=
=

211.305
51.530

m4
m2

Maximum & Minimum Base Pressure Calculation


Maximum base pressure

=
=

P/A + MNRxY/I
68.97
tonne/meter2

Minimum base pressure

=
=

P/A - MNRxY/I
68.97
tonne/meter2

Total Loads, Forces & Moment @ Base


( Reduced Level =

-27.400

meter )

Combination 2.0 (b)


Height From Scour Level to Base of Foundation =

15.025
Longitudinal Direction

meter
Transverse Direction

Forces & Moments

V.Loads
(t)

Force ( t )

Moment (t.m)

Force ( t )

Moment (t.m)

F @ Scour Level
Transfer to Base
Tilt & Shift
Buy. Wt. Of Well Below Scour
F @ Base Level

2568.706

85.287

2009.237

85.597

1395.308

1281.430

1286.091

1416.460

3554.186

85.287

4707.127

85.597

4097.858

=
=

120.833
6240.95

Total Load, P

=
=

2568.706+985.48
3554.19 Tonnes

50% Passive Mobilisation

20738.95 Tonnes

Resultant Forces
Resultant Moments

Tonnes
Tonne.meter

Loads :-

Therefore, Resultant Moment


Eccentricity, e = M / P
Diameter of Well at Base

0.00

Tonne.meter

=
=

0.00
8.100

meter
meter

Check for Maximum Stress :Moment of Inertia = xD4/64


Area of the base = xD2/4

1416.460

985.480

=
=

211.305
51.530

m4
m2

Maximum & Minimum Base Pressure Calculation


Maximum base pressure

=
=

P/A + MNRxY/I
tonne/meter2
68.97

Minimum base pressure

=
=

P/A - MNRxY/I
tonne/meter2
68.97

Total Loads, Forces & Moment @ Base


( Reduced Level =

-27.400

meter )

Combination 2.0 (c)


Height From Scour Level to Base of Foundation =

15.025
Longitudinal Direction

meter
Transverse Direction

Forces & Moments

V.Loads
(t)

Force ( t )

Moment (t.m)

Force ( t )

Moment (t.m)

F @ Scour Level
Transfer to Base
Tilt & Shift
Buy. Wt. Of Well Below Scour
F @ Base Level

2568.706

74.180

1360.395

103.602

2519.329

1114.548

1556.625

1416.460

3554.186

74.180

3891.402

103.602

5492.414

=
=

127.421
6731.24

Total Load, P

=
=

2568.706+985.48
3554.19 Tonnes

50% Passive Mobilisation

20738.95 Tonnes

Resultant Forces
Resultant Moments

Tonnes
Tonne.meter

Loads :-

Therefore, Resultant Moment


Eccentricity, e = M / P
Diameter of Well at Base

0.00

Tonne.meter

=
=

0.00
8.100

meter
meter

Check for Maximum Stress :Moment of Inertia = xD4/64


Area of the base = xD2/4

1416.460

985.480

=
=

211.305
51.530

m4
m2

Maximum & Minimum Base Pressure Calculation


Maximum base pressure

=
=

P/A + MNRxY/I
tonne/meter2
68.97

Minimum base pressure

=
=

P/A - MNRxY/I
tonne/meter2
68.97

Total Loads, Forces & Moment @ Base


( Reduced Level =

-27.400

meter )

Combination 2.0 (d)


Height From Scour Level to Base of Foundation =

15.025
Longitudinal Direction

meter
Transverse Direction

Forces & Moments

V.Loads
(t)

Force ( t )

Moment (t.m)

Force ( t )

Moment (t.m)

F @ Scour Level
Transfer to Base
Tilt & Shift
Buy. Wt. Of Well Below Scour
F @ Base Level

2737.91

124.180

3131.832

103.602

1832.205

1865.798

1556.625

1440.311

3723.39

124.180

6437.941

103.602

4829.141

=
=

161.722
8047.84

Total Load, P

=
=

2737.907+985.48
3620.48 Tonnes

50% Passive Mobilisation

20738.95 Tonnes

Resultant Forces
Resultant Moments

Tonnes
Tonne.meter

Loads :-

Therefore, Resultant Moment


Eccentricity, e = M / P
Diameter of Well at Base

0.00

Tonne.meter

=
=

0.00
8.100

meter
meter

Check for Maximum Stress :Moment of Inertia = xD4/64


Area of the base = xD2/4

1440.311

985.48

=
=

211.305
51.530

m4
m2

Maximum & Minimum Base Pressure Calculation


Maximum base pressure

=
=

P/A + MNRxY/I
tonne/meter2
70.26

Minimum base pressure

=
=

P/A - MNRxY/I
tonne/meter2
70.26

Total Loads, Forces & Moment @ Base


( Reduced Level =

-27.400

meter )

Combination 3.0 (a) - L


Height From Scour Level to Base of Foundation =

15.025
Longitudinal Direction

meter
Transverse Direction

Forces & Moments

V.Loads
(t)

Force ( t )

Moment (t.m)

Force ( t )

Moment (t.m)

F @ Scour Level
Transfer to Base
Tilt & Shift
Buy. Wt. Of Well Below Scour
F @ Base Level

2568.706

245.232

3420.143

31.973

870.679

3684.609

480.390

1416.460

1416.460

3554.186

245.232

8521.211

31.973

2767.529

=
=

247.307
8959.37

Total Load, P

=
=

2568.706+985.48
3554.19 Tonnes

50% Passive Mobilisation

20738.95 Tonnes

Resultant Forces
Resultant Moments

985.480

Tonnes
Tonne.meter

Loads :-

Therefore, Resultant Moment


Eccentricity, e = M / P
Diameter of Well at Base

0.00

Tonne.meter

=
=

0.00
8.100

meter
meter

Check for Maximum Stress :Moment of Inertia = xD4/64


Area of the base = xD2/4

=
=

211.305
51.530

m4
m2

Maximum & Minimum Base Pressure Calculation


Maximum base pressure

=
=

P/A + MNRxY/I
68.97
tonne/meter2

Minimum base pressure

=
=

P/A - MNRxY/I
68.97
tonne/meter2

Total Loads, Forces & Moment @ Base


( Reduced Level =

-27.400

meter )

Combination 3.0 (b) - L


Height From Scour Level to Base of Foundation =

15.025
Longitudinal Direction

meter
Transverse Direction

Forces & Moments

V.Loads
(t)

Force ( t )

Moment (t.m)

Force ( t )

Moment (t.m)

F @ Scour Level
Transfer to Base
Tilt & Shift
Buy. Wt. Of Well Below Scour
F @ Base Level

2568.706

264.678

4048.157

31.973

261.643

3976.785

480.390

1416.460

1416.460

3554.186

264.678

9441.401

31.973

2158.492

=
=

266.602
9685.00

Total Load, P

=
=

2568.706+985.48
3554.186 Tonnes

50% Passive Mobilisation

20738.95 Tonnes

Resultant Forces
Resultant Moments

985.480

Tonnes
Tonne.meter

Loads :-

Therefore, Resultant Moment


Eccentricity, e = M / P
Diameter of Well at Base

0.00

Tonne.meter

=
=

0.00
8.100

meter
meter

Check for Maximum Stress :Moment of Inertia = xD4/64


Area of the base = xD2/4

=
=

211.305
51.530

m4
m2

Maximum & Minimum Base Pressure Calculation


Maximum base pressure

=
=

P/A + MNRxY/I
tonne/meter2
68.97

Minimum base pressure

=
=

P/A - MNRxY/I
tonne/meter2
68.97

Total Loads, Forces & Moment @ Base


( Reduced Level =

-27.400

meter )

Combination 3.0 (c) - L


Height From Scour Level to Base of Foundation =

15.025
Longitudinal Direction

meter
Transverse Direction

Forces & Moments

V.Loads
(t)

Force ( t )

Moment (t.m)

Force ( t )

Moment (t.m)

F @ Scour Level
Transfer to Base
Tilt & Shift
Buy. Wt. Of Well Below Scour
F @ Base Level

2568.706

259.124

3496.623

31.973

1125.795

3893.344

480.390

1416.460

1416.460

3554.186

259.124

8806.427

31.973

3022.644

=
=

261.089
9310.72

Total Load, P

=
=

2568.706+985.48
3554.186 Tonnes

50% Passive Mobilisation

20738.95 Tonnes

Resultant Forces
Resultant Moments

985.480

Tonnes
Tonne.meter

Loads :-

Therefore, Resultant Moment


Eccentricity, e = M / P
Diameter of Well at Base

0.00

Tonne.meter

=
=

5.84
8.100

meter
meter

Check for Maximum Stress :Moment of Inertia = xD4/64


Area of the base = xD2/4

=
=

211.305
51.530

m4
m2

Maximum & Minimum Base Pressure Calculation


Maximum base pressure

=
=

P/A + MNRxY/I
tonne/meter2
68.97

Minimum base pressure

=
=

P/A - MNRxY/I
tonne/meter2
68.97

Total Loads, Forces & Moment @ Base


( Reduced Level =

-27.400

meter )

Combination 3.0 (d) - L


Height From Scour Level to Base of Foundation =

15.025
Longitudinal Direction

meter
Transverse Direction

Forces & Moments

V.Loads
(t)

Force ( t )

Moment (t.m)

Force ( t )

Moment (t.m)

F @ Scour Level
Transfer to Base
Tilt & Shift
Buy. Wt. Of Well Below Scour
F @ Base Level

2737.907

284.124

4830.011

31.973

261.643

4268.969

480.390

1440.311

1440.311

284.124

10539.291

31.973

2182.344

Resultant Forces
Resultant Moments

985.480
3723.387

=
=

285.918 Tonnes
10762.87 Tonne.meter

Total Load, P

=
=

2737.907+985.48
3723.387 Tonnes

50% Passive Mobilisation

20738.95 Tonnes

Loads :-

Therefore, Resultant Moment


Eccentricity, e = M / P
Diameter of Well at Base

0.00

Tonne.meter

=
=

0.00
8.100

meter
meter

Check for Maximum Stress :Moment of Inertia = xD4/64


Area of the base = xD2/4

=
=

211.305
51.530

m4
m2

Maximum & Minimum Base Pressure Calculation


Maximum base pressure

=
=

P/A + MNRxY/I
tonne/meter2
72.26

Minimum base pressure

=
=

P/A - MNRxY/I
tonne/meter2
72.26

Total Loads, Forces & Moment @ Base


( Reduced Level =

-27.400

meter )

Combination 3.0 (a) - T


Height From Scour Level to Base of Foundation =

Forces & Moments

V.Loads
(t)

15.025
Longitudinal Direction

meter
Transverse Direction

Force ( t )

Moment (t.m)

Force ( t )

Moment (t.m)

F @ Scour Level
Transfer to Base
Tilt & Shift
Buy. Wt. Of Well Below Scour 985.480
3554.186
F @ Base Level

26.395

690.050

257.705

3768.070

396.578

3872.014

1416.460

26.395

2503.087

257.705

9056.544

Resultant Forces
Resultant Moments

=
=

259.053
9396.09

Total Load, P

=
=

2568.706+985.48
3554.186 Tonnes

50% Passive Mobilisation

20738.95 Tonnes

Therefore, Resultant Moment

0.00

Tonne.meter

Eccentricity, e = M / P
Diameter of Well at Base

=
=

0.00
8.100

meter
meter

2568.706

Tonnes
Tonne.meter

Loads :-

Check for Maximum Stress :Moment of Inertia = xD4/64


Area of the base = xD2/4

=
=

211.305
51.530

m4
m2

Maximum & Minimum Base Pressure Calculation


Maximum base pressure

=
=

P/A + MNRxY/I
68.97
tonne/meter2

Minimum base pressure

=
=

P/A - MNRxY/I
68.97
tonne/meter2

1416.460

Total Loads, Forces & Moment @ Base


( Reduced Level =

-27.400

meter )

Combination 3.0 (b) - T


Height From Scour Level to Base of Foundation =

Forces & Moments

V.Loads
(t)

15.025
Longitudinal Direction

meter
Transverse Direction

Force ( t )

Moment (t.m)

Force ( t )

Moment (t.m)

2568.706
F @ Scour Level
Transfer to Base
Tilt & Shift
Buy. Wt. Of Well Below Scour 985.480
3554.186
F @ Base Level

45.841

1318.064

264.600

3326.331

688.754

3975.608

1416.460

45.841

3423.278

264.600

8718.399

Resultant Forces
Resultant Moments

=
=

268.541
9366.39

Total Load, P

=
=

2568.706+985.48
3554.19 Tonnes

50% Passive Mobilisation

20738.95 Tonnes

Therefore, Resultant Moment

0.00

Tonne.meter

Eccentricity, e = M / P
Diameter of Well at Base

=
=

0.00
8.100

meter
meter

Tonnes
Tonne.meter

Loads :-

Check for Maximum Stress :Moment of Inertia = xD4/64


Area of the base = xD2/4

=
=

211.305
51.530

m4
m2

Maximum & Minimum Base Pressure Calculation


Maximum base pressure

=
=

P/A + MNRxY/I
tonne/meter2
68.97

Minimum base pressure

=
=

P/A - MNRxY/I
tonne/meter2
68.97

1416.460

Total Loads, Forces & Moment @ Base


( Reduced Level =

-27.400

meter )

Combination 3.0 (c) - T


Height From Scour Level to Base of Foundation =

Forces & Moments

V.Loads
(t)

15.025
Longitudinal Direction

meter
Transverse Direction

Force ( t )

Moment (t.m)

Force ( t )

Moment (t.m)

2568.706
F @ Scour Level
Transfer to Base
Tilt & Shift
Buy. Wt. Of Well Below Scour 985.480
3554.186
F @ Base Level

40.287

766.531

260.593

4093.264

605.313

3915.408

1416.460

40.287

2788.303

260.593

9425.131

Resultant Forces
Resultant Moments

=
=

263.689
9828.92

Total Load, P

=
=

2568.706+985.48
3554.186 Tonnes

50% Passive Mobilisation

20738.95 Tonnes

Therefore, Resultant Moment

0.00

Tonne.meter

Eccentricity, e = M / P
Diameter of Well at Base

=
=

0.00
8.100

meter
meter

Tonnes
Tonne.meter

Loads :-

Check for Maximum Stress :Moment of Inertia = xD4/64


Area of the base = xD2/4

=
=

211.305
51.530

m4
m2

Maximum & Minimum Base Pressure Calculation


Maximum base pressure

=
=

P/A + MNRxY/I
68.973 tonne/meter2

Minimum base pressure

=
=

P/A - MNRxY/I
68.973 tonne/meter2

1416.460

Total Loads, Forces & Moment @ Base


( Reduced Level =

-27.400

meter )

Combination 3.0 (d) - T


Height From Scour Level to Base of Foundation =

15.025
Longitudinal Direction

meter
Transverse Direction

Forces & Moments

V.Loads
(t)

Force ( t )

Moment (t.m)

Force ( t )

Moment (t.m)

F @ Scour Level
Transfer to Base
Tilt & Shift
Buy. Wt. Of Well Below Scour
F @ Base Level

2737.91

65.287

65.287

65.287

65.287

980.938

980.938

1440.311

1440.311

3723.39

65.287

2486.536

65.287

2486.536

=
=

92.330
3516.49

Total Load, P

=
=

2737.907+985.48
3620.48 Tonnes

50% Passive Mobilisation

20738.95 Tonnes

Therefore, Resultant Moment

0.00

Tonne.meter

Eccentricity, e = M / P
Diameter of Well at Base

=
=

0.00
8.100

meter
meter

Resultant Forces
Resultant Moments

985.480

Tonnes
Tonne.meter

Loads :-

Check for Maximum Stress :Moment of Inertia = xD4/64


Area of the base = xD2/4

=
=

211.305
51.530

m4
m2

Maximum & Minimum Base Pressure Calculation


Maximum base pressure

=
=

P/A + MNRxY/I
tonne/meter2
70.26

Minimum base pressure

=
=

P/A - MNRxY/I
tonne/meter2
70.26

Total Loads, Forces & Moment @ Base


( Reduced Level =

-27.400

meter )

Combination 4.0 (a)


Height From Scour Level to Base of Foundation =

15.025
Longitudinal Direction

meter
Transverse Direction

Forces & Moments

V.Loads
(t)

Force ( t )

Moment (t.m)

Force ( t )

Moment (t.m)

F @ Scour Level
Transfer to Base
Tilt & Shift
Buy. Wt. Of Well Below Scour
F @ Base Level

2589.456

6.395

427.329

31.973

1881.643

96.078

480.390

1416.460

1416.460

6.395

1939.866

31.973

3778.492

Resultant Forces
Resultant Moments

985.480
3574.936

=
=

32.606 Tonnes
4247.362 Tonne.meter

Total Load, P

=
=

2589.456+985.48
3574.94 Tonnes

50% Passive Mobilisation

Loads :-

Therefore, Resultant Moment


Eccentricity, e = M / P
Diameter of Well at Base

20738.948 Tonnes

0.00

Tonne.meter

=
=

0.00
8.100

meter
meter

Check for Maximum Stress :Moment of Inertia = xD4/64


Area of the base = xD2/4

=
=

211.305
51.530

m4
m2

Maximum & Minimum Base Pressure Calculation


Maximum base pressure

=
=

P/A + MNRxY/I
69.376
tonne/meter2

Minimum base pressure

=
=

P/A - MNRxY/I
69.376
tonne/meter2

Total Loads, Forces & Moment @ Base


( Reduced Level =

-27.400

meter )

Combination 4.0 (b)


Height From Scour Level to Base of Foundation =

15.025
Longitudinal Direction

meter
Transverse Direction

Forces & Moments

V.Loads
(t)

Force ( t )

Moment (t.m)

Force ( t )

Moment (t.m)

F @ Scour Level
Transfer to Base
Tilt & Shift
Buy. Wt. Of Well Below Scour
F @ Base Level

2610.206

6.395

802.329

31.973

261.643

96.078

480.390

1416.460

1416.460

3595.686

6.395

2314.866

31.973

2158.492

=
=

32.606
3165.07

Total Load, P

=
=

2610.206+985.48
3595.69 Tonnes

50% Passive Mobilisation

20738.95 Tonnes

Resultant Forces
Resultant Moments

985.480

Tonnes
Tonne.meter

Loads :-

Therefore, Resultant Moment


Eccentricity, e = M / P
Diameter of Well at Base

0.00

Tonne.meter

=
=

0.00
8.100

meter
meter

Check for Maximum Stress :Moment of Inertia = xD4/64


Area of the base = xD2/4

=
=

211.305
51.530

m4
m2

Maximum & Minimum Base Pressure Calculation


Maximum base pressure

=
=

P/A + MNRxY/I
69.779 tonne/meter2

Minimum base pressure

=
=

P/A - MNRxY/I
69.779 tonne/meter2

Total Loads, Forces & Moment @ Base


( Reduced Level =

-27.400

meter )

Combination 4.0 (c)


Height From Scour Level to Base of Foundation =

15.025
Longitudinal Direction

meter
Transverse Direction

Forces & Moments

V.Loads
(t)

Force ( t )

Moment (t.m)

Force ( t )

Moment (t.m)

F @ Scour Level
Transfer to Base
Tilt & Shift
Buy. Wt. Of Well Below Scour
F @ Base Level

2610.206

6.395

52.329

31.973

3501.643

96.078

480.390

1416.460

1416.460

3595.686

6.395

1564.866

31.973

5398.492

=
=

32.606
5620.72

Total Load, P

=
=

2610.206+985.48
3595.69 Tonnes

50% Passive Mobilisation

20738.95 Tonnes

Resultant Forces
Resultant Moments

985.480

Tonnes
Tonne.meter

Loads :-

Therefore, Resultant Moment


Eccentricity, e = M / P
Diameter of Well at Base

0.00

Tonne.meter

=
=

0.00
8.100

meter
meter

Check for Maximum Stress :Moment of Inertia = xD4/64


Area of the base = xD2/4

=
=

211.305
51.530

m4
m2

Maximum & Minimum Base Pressure Calculation


Maximum base pressure

=
=

P/A + MNRxY/I
69.779 tonne/meter2

Minimum base pressure

=
=

P/A - MNRxY/I
69.779 tonne/meter2

Total Loads, Forces & Moment @ Base


( Reduced Level =

-27.400

meter )

Combination 4.0 (d)


Height From Scour Level to Base of Foundation =

15.025
Longitudinal Direction

meter
Transverse Direction

Forces & Moments

V.Loads
(t)

Force ( t )

Moment (t.m)

Force ( t )

Moment (t.m)

F @ Scour Level
Transfer to Base
Tilt & Shift
Buy. Wt. Of Well Below Scour
F @ Base Level

2630.956

6.395

427.329

31.973

1881.643

96.078

480.390

1440.311

1440.311

6.395

1963.717

31.973

3802.344

Resultant Forces
Resultant Moments

985.480
3616.436

=
=

32.606 Tonnes
4279.487 Tonne.meter

Total Load, P

=
=

2630.956+985.48
3616.436 Tonnes

50% Passive Mobilisation

20738.948 Tonnes

Loads :-

Therefore, Resultant Moment


Eccentricity, e = M / P
Diameter of Well at Base

0.00

Tonne.meter

=
=

0.00
8.100

meter
meter

Check for Maximum Stress :Moment of Inertia = xD4/64


Area of the base = xD2/4

=
=

211.305
51.530

m4
m2

Maximum & Minimum Base Pressure Calculation


Maximum base pressure

=
=

P/A + MNRxY/I
tonne/meter2
70.181

Minimum base pressure

=
=

P/A - MNRxY/I
tonne/meter2
70.181

SUMMARY OF BASE PRESSURE

@ Foundation Level

Cases

Maximum Base Pressure (t/m2)

Minimum Base Pressure (t/m2)

Combination - I - (a)

68.973

68.973

Combination - I - (b)

68.973

68.973

Combination - I - (c)

81.020

81.020

Combination - I - (d)

81.020

81.020

Combination - II - (a)

68.973

68.973

Combination - II - (b)

68.973

68.973

Combination - II - (c)

68.973

68.973

Combination - II - (d)

70.260

70.260

Combination - III - (a) - L

68.973

68.973

Combination - III - (b) - L

68.973

68.973

Combination - III - (c) - L

68.973

68.973

Combination - III - (d) - L

72.257

72.257

Combination - III - (a) - T

68.973

68.973

Combination - III - (b) - T

68.973

68.973

Combination - III - (c) - T

68.973

68.973

Combination - III - (d) - T

70.260

70.260

Combination - IV - (a)

69.376

69.376

Combination - IV - (b)

69.779

69.779

Combination - IV - (c)

69.779

69.779

COMBINATION - I

COMBINATION - II

COMBINATION - III - Longitudinal

COMBINATION - III - Transverse

COMBINATION - IV - Construction Stage

Combination - IV - (d)

70.181

70.181

STABILITY AGAINST OVER-TURNING & SLIDING


Well Stability against Over-Turning
For Critical Loading Condition I.e. Combination - III - (d) - L

Combination - III (Longitudinal Direction)


Dead-Load + Live-Load + Longitudinal Force + Water Current Forces +
Seismic Force (Longitudinal Direction)
Factor Of Safety Against Over-Turning :-

meter
8.100
3723.387 Tonnes
0.000 Tonne.meter

Diameter of Well at Base


Total Load @ Base
Net Moment @ Base

Factor Of Safety :Total Load @ Base x Diameter of Well at Base /2


Net Moment @ Base

= 3723.387 x 8.1 / 2
0.00
=

#DIV/0!

#DIV/0!

Well Stability against Sliding


For Critical Loading Condition I.e. Combination - III - (d) - L

Combination - III (Longitudinal Direction)


Dead-Load + Live-Load + Longitudinal Force + Water Current Forces +
Seismic Force (Longitudinal Direction)
Factor Of Safety Against Sliding :-

Sliding Force, (Active Pressure)


285.918 Tonnes
Resisting Force, (50%,Passive Pressure)
20738.948 Tonne.meter
Factor Of Safety :Resisting Force, (50%,Passive Pressure)
Sliding Force, (Active Pressure)
=

20738.948 / 285.918

= 72.53
SAFE

PERMISSIBLE BEARING CAPACITY


( FOUNDATION STRATA )
Reference Clause 1.3.1 on Page 3 of " MANNUAL ON THE DESIGN
AND CONSTRUCTION OF WELLS & PILE FOUNDATIONS " By R.D.S.O
Allowable Bearing Capacity , Q ( Kg / m2 )
2
Q = 5.4 x N x B

+ 16 ( 100 + N2 ) x Df

For End Resistance :N = Field SPT Value at Foundation / resting Level


N=
50
N' = Corrected SPT Value ,
N' = 15 + 0.5 ( N - 15 )
N' = 15 + 0.5 ( 50 - 15 )
N' = 32.5
B = Diameter of Well at Foundation Leval
8.100
meter
D = Depth of Well Below Scour Level
15.025
meter
Df =

x D

Df =

0.7

Df =

10.5175

15.025

So
2
2
Q = 5.4 x N x B + 16 ( 100 + N ) x Df
Q = (5.4x32.5x32.5x8.1) + 16(100+32.5x32.5)x10.5175

Q = 240774.125 Kg / m2
Q=

240.774

tonnes / m3

For Seismic Case :Q = 1.33 x Q


Q=

320.230

tonnes / m3

REDISTRIBUTION -2
For Critical Loading Condition I.e. Combination - III - (c) - T
Combination - III (Longitudinal Direction)
Dead-Load + Live-Load + Longitudinal Force + Water Current Forces +
Seismic Force (Transverse Direction)
Diameter of Well at Base =
Ecentericity(e) =
e/df
=

8.100
0.000

e/df
0.000
0.025
0.050
0.075
0.100
0.125
0.15
0.175
0.2
0.225
0.25
0.275
0.294
0.3
0.325
0.35
0.375
0.4

C1
1.00
1.00
1.00
1.00
1.00
1.00
0.91
0.83
0.755
0.685
0.615
0.55
0.5
0.485
0.42
0.36
0.295
0.235

C2
1
1.2
1.4
1.6
1.8
2
2.23
2.48
2.76
3.11
3.55
4.15
4.69
4.96
6
7.48
9.93
13.87

0.425
0.45
0.475
0.5

0.175
0.12
0.06
0

21.08
38.25
96.1

0.000
0.000
0.025

1.00
1.00
1.00

1.00
1.00
1.20

C1=
C2=
Q=P/A

meter
meter

0.000

C1xDF

1.00
1.00

modified pressure(QP)=C2xQ
C1xDf
Df-C1xDf
Length above the centre line
angle
Redistrebuted area
Redistributed area as % of total area
Remaining % area

72.26

=
=
=
=
=
=
=
=

72.26
8.10
0.00
4.05
0.000
51.53
100.00
0.00

t/m2
t/m2 (OK)
meter
meter
metre
meter2
(OK)

REDISTRIBUTION -1
For Critical Loading Condition I.e. Combination - III - (d) - L
Combination - III (Longitudinal Direction)
Dead-Load + Live-Load + Longitudinal Force + Water Current Forces +
Seismic Force (Longitudinal Direction)
Diameter of Well at Base =
Ecentericity(e =
e/df
=

8.100
0.000

e/df
0.000
0.025
0.050
0.075
0.100
0.125
0.15
0.175
0.2
0.225
0.25
0.275
0.294
0.3
0.325
0.35
0.375
0.4

C1
1.00
1.00
1.00
1.00
1.00
1.00
0.91
0.83
0.755
0.685
0.615
0.55
0.5
0.485
0.42
0.36
0.295
0.235

C2
1
1.2
1.4
1.6
1.8
2
2.23
2.48
2.76
3.11
3.55
4.15
4.69
4.96
6
7.48
9.93
13.87

0.425
0.45
0.475
0.5

0.175
0.12
0.06
0

21.08
38.25
96.1

0.000
0.000
0.025

1.00
1.00
1.00

1.00
1.00
1.20

C1=
C2=
Q=P/A

meter
meter

0.000

C1xDF

1.00
1.00

modified pressure(QP)=C2xQ
C1xDf
Df-C1xDf
Length above the centre line
angle
Redistrebuted area
Redistributed area as % of total area

72.26

t/m2

=
=
=
=
=
=
=

72.26
8.10
0.00
4.05
0.000
51.53
100.00

t/m2
meter
meter
metre
meter2

(OK)

Remaining % area

0.00

(OK)

S-ar putea să vă placă și